COSMOTE’s Business Continuity Mgmt - History
                 Risk Mitigation Strategy, Test plans for the Test Events, Crisis Operation Centre for
2002-4           the Olympic Games



                 BCM KICK OFF - Olympic Games expertise : the trigger to start a holistic BCM
2004-6
                 approach in COSMOTE


                 Approach based on PAS56
                                                                                 27 Departmental business recovery plans
                 Risk Assessment/BIA questionnaire based
2006-7
                  Emergency planning, based on 16
                                                                                  Emergency Management/CMP/Training
                  specific scenarios


                   BCM Plans & Strategies redeveloped
                                                                                 BCM Policy designed aligned to BS 25999
                   aligned to BS 25999
  2008
 to date          New operational Chart for Incident &                            BCM Training & Awareness for all BCM
                  Crisis Response established                                     Teams




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos                    2
Some Interesting BCM Figures




                       4
                 Companies in
                  SE Europe
                  implement
                BCM under our
                 coordination




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   3
BCM Does not Do Magic !!!




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   4
Business Continuity Management



                       A holistic management process that identifies potential threats to an
                     organization and the impacts to business operations that those threats, if
                        realized, might cause, and which provides a framework for building
                     organizational resilience with the capability for an effective response that
                      safeguards the interests of its key stakeholders, reputation, brand and
                                               value-creating activities




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   5
Business Continuity Management System

                                                A relatively newcomer to the arena
                                                       of business disciplines


                                                     Creates operational structures




                               Creates & develops the processes and procedures to be
                              implemented in the event of a very serious incident which
                                       threatens the organization’s continuity



Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   6
British Standard BS25999



                                                                     Understanding
                                                                     the Organisation




                                                  Exercising,               BCM              Determining
                                                  Maintaining            Programme           BCM
                                                  & Reviewing            Management          Strategy




                                                                     Developing and
                                                                     Implementing
                                                                     a BCM Response




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos    7
Understanding the Organization




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   8
Deciding what to protect…

              Key People

              Key Network Systems

              Key IT Systems                                                    Human Resources


              Customer Care
                                                                                                                 Buildings &
                                                                                                           Technology Infrastructure
                  Data Centres

              Main Network Equipment locations

                                                                                     Business Processes,
                                                                                      Technology & IT



               .



Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos                                9
Deciding what to protect…

            Key Product & Services

               Voice calling;

               SMS Text messaging;

               Data services – mobile broadband;

               MMS messaging;

               Roaming services;




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   10
The reason………..

              Identify Mission-critical Net, Business and IT processes and resources identified

                                                                   Determine RTOs

                       Highlight the interdependencies between Business and IT processes

                                  Establish the priority of the recovery of these processes

                         Enhance senior management's understanding of the business risks

                    Identify Business process and application/technology interdependencies

                 Determine the most critical Business processes and identify how the Business is
                              affected from one day to one week, during the outage




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   11
Determining BCM Strategies




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   12
The Art of Continuity….


               IT & Cellular Network
                • Technical Recovery Coordinators appointed and trained
                • Critical Applications, Systems & Services as Technical Recovery targets
                • Technical Recovery Strategies ( per critical element )
                • Technical Recovery Plans ( per critical element )
                • Rehearsal Plans
                • Live Testing Programme




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   13
The Art of Continuity….

               Technology & Customer Care Recovery Sites
                 •     Technology (Net & IT), Customer Care sites, scattered across Greece
                       with embedded resilience

               Recovery Workplaces
                • Recovery Workplaces fully equipped and tested with Workstations and
                  Laptops to accommodate employees & critical business processes




        Alternative Workplace 1                                                      Alternative Workplace 2
Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos        14
Developing & Implementing a BCM
                                          Response




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   15
Incident Management

                             Incidents may occur any time without notice.
           Early detection, prompt notification and reporting of an incident, ensures that the
            necessary safety and control procedures are immediately activated so that the
                                   correct priorities can be followed:




                                                                   Buildings, Technology                  Business Processes,
                Human Resources
                                                                       Infrastructure                      Technology & IT




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos                         16
Why should an incident be reported?
    Incidents are never welcome, still there are some serious gains when
    reported and filed accordingly :

     Not always obvious what has gone wrong and what the consequences are

     To manage any incident it is necessary to get the :

                                                  Right Information …
                                                  To the right people…
                                                  At the right time...
                                                  So they can make the right decisions !!!

            Lessons Learnt

            Preventive / Proactive Measures for similar incidents in the future

            Evidence to prove to Auditors and Interested Parties that we have a
            credible BC Programme
Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   17
Incident Management Report Forms




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos
                                                                                                          18   18
BCMS Documentation




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   19
Golden Rule: The plan is nothing, Planning
                              is everything




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   20
Exercising, Maintaining, Reviewing




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   21
Why Learning is important

   The ability to be cool, confident in a major incident is not an inherited characteristic, but is
   the direct result of how well prepared one is, for the crises

   Exercises, are a powerful means not only of testing your plans, but also of educating BCM
   teams, employees and encouraging the right type of attitude and thinking


    Establish annual education programmes including but not limited to) :

            Classroom Trainings                                                         Total Number of           Total No of
                                                                                              Events               participants

            Desktop Exercises

            Wide Rehearsals

            Awareness Sessions
                                                                                             33                   1.998

                                                                                                      Statistics 2011
Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos                           22
Rehearse, rehearse, rehearse…




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   23
Rehearse, rehearse, rehearse…




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   24
Building Culture: The toolset




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   25
eLearning

                                                                                At a glance

                                                        Τhe e-learning tool hosted at             www.cosmote-
                                                        businesscontinuity.gr was created by COSMOTE
                                                        Group Business Continuity Section aiming the education
                                                        and awareness of all COSMOTE Group employees to the
                                                        principles of Business Continuity Management and its
                                                        role. It is constructed in Flash platform having a micro
                                                        site structure , that makes navigation of users friendly.
                                                        The tool is bilingual in both English and Greek.



                                                                                            Moreover, a 10 - questions
                                                                                            quiz was incorporated to
                                                                                            the tool.

                                                                                            Users that scored 50%+
                                                                                            could download and print
                                                                                            with their name the
                                                                                            Certificate of BCM
                                                                                            eLearning.




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos                  26
Awareness Assessment




                              Total running                             Total number                      Average daily
                                  time                                     of visits                          visits




                                    8
                                working
                                                                    1516    visits
                                                                                                          190
                                                                                                           visits per
                                 days                                                                     working day




                                                   Out of a total of 2350 employees




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos                   27
Business Continuity flash Teasers & Posters




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   28
Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   29
Important things to keep in mind for BCM
       Business Continuity Management is good Corporate Governance

       Incident Management, Crisis Management & Crisis Communications are
        all part of Business Continuity Management

       Disaster Recovery is yesterdays’ news. Resilience is todays’ requirement

       Habitual Business Continuity: Survival as a habit

       Create Efficiencies by capitalizing on Best Practice & make use of lessons
        learnt




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   30
Some Words of Wisdom…
      Always plan for where you are, not for where you aspire to be

      Prepare for Impact, not for Scenarios. Scenarios can be countless, Impact
       is countable.

      Have a well rehearsed method for exchanging information

      Synthesize the information before feeding it to the Top Team




Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   31
Contact: Glikeria Zigouri
  gzigouri@cosmote.gr
  +30 697 6883886
Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos   32

More Related Content

What's hot

Awareness iso 22301 danang suryo
Awareness iso 22301 danang suryoAwareness iso 22301 danang suryo
Awareness iso 22301 danang suryo
Danang suryo Wardhono
 
Assessing the impact of a disruption: Building an effective business impact a...
Assessing the impact of a disruption: Building an effective business impact a...Assessing the impact of a disruption: Building an effective business impact a...
Assessing the impact of a disruption: Building an effective business impact a...
Bryghtpath LLC
 
PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)
PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)
PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)
PECB
 
Business Continuity Detailed Plan
Business Continuity Detailed PlanBusiness Continuity Detailed Plan
Business Continuity Detailed Plan
Wissam Abdel Baki
 
Business Continuity Workshop Final
Business Continuity Workshop   FinalBusiness Continuity Workshop   Final
Business Continuity Workshop Final
Bill Lisse
 
ITSM Foundation Course Material
ITSM Foundation Course MaterialITSM Foundation Course Material
ITSM Foundation Course Material
stefanhenry
 
Business Continuity Management PowerPoint Presentation Slides
Business Continuity Management PowerPoint Presentation SlidesBusiness Continuity Management PowerPoint Presentation Slides
Business Continuity Management PowerPoint Presentation Slides
SlideTeam
 
Five Key Considerations when Setting your MBCO
Five Key Considerations when Setting your MBCOFive Key Considerations when Setting your MBCO
Five Key Considerations when Setting your MBCO
BCP Asia
 
Business continuity management per ISO 22301 - a certification training cour...
 Business continuity management per ISO 22301 - a certification training cour... Business continuity management per ISO 22301 - a certification training cour...
Business continuity management per ISO 22301 - a certification training cour...
Mart Rovers
 
Business impact.analysis based on ISO 22301
Business impact.analysis based on ISO 22301Business impact.analysis based on ISO 22301
Business impact.analysis based on ISO 22301
mascot4u
 
business-continuity-management-awareness-presentation-for-mampu2929
business-continuity-management-awareness-presentation-for-mampu2929business-continuity-management-awareness-presentation-for-mampu2929
business-continuity-management-awareness-presentation-for-mampu2929
Andy Willams
 
Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)
Goutama Bachtiar
 
Societal Security – the new standard ISO 22301 for Business Continuity Manage...
Societal Security – the new standard ISO 22301 for Business Continuity Manage...Societal Security – the new standard ISO 22301 for Business Continuity Manage...
Societal Security – the new standard ISO 22301 for Business Continuity Manage...
Global Risk Forum GRFDavos
 
Business Impact Analysis - The Most Important Step during BCMS Implementation
Business Impact Analysis - The Most Important Step during BCMS ImplementationBusiness Impact Analysis - The Most Important Step during BCMS Implementation
Business Impact Analysis - The Most Important Step during BCMS Implementation
PECB
 
BUSINESS CONTINUITY MANAGEMENT system
BUSINESS CONTINUITY MANAGEMENT systemBUSINESS CONTINUITY MANAGEMENT system
BUSINESS CONTINUITY MANAGEMENT system
Kuroba Kaitou
 
Business impact assessment (bia)
Business impact assessment (bia)Business impact assessment (bia)
Business impact assessment (bia)
Shashwat Shankar
 
ISO 27001
ISO 27001ISO 27001
Bcp drp
Bcp drpBcp drp
Bcp drp
aqel aqel
 
Business continuity planning
Business continuity planningBusiness continuity planning
Business continuity planningSandeep Kashyap
 

What's hot (20)

Awareness iso 22301 danang suryo
Awareness iso 22301 danang suryoAwareness iso 22301 danang suryo
Awareness iso 22301 danang suryo
 
Assessing the impact of a disruption: Building an effective business impact a...
Assessing the impact of a disruption: Building an effective business impact a...Assessing the impact of a disruption: Building an effective business impact a...
Assessing the impact of a disruption: Building an effective business impact a...
 
PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)
PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)
PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)
 
Business Continuity Detailed Plan
Business Continuity Detailed PlanBusiness Continuity Detailed Plan
Business Continuity Detailed Plan
 
Business Continuity Workshop Final
Business Continuity Workshop   FinalBusiness Continuity Workshop   Final
Business Continuity Workshop Final
 
ITSM Foundation Course Material
ITSM Foundation Course MaterialITSM Foundation Course Material
ITSM Foundation Course Material
 
Business Continuity Management PowerPoint Presentation Slides
Business Continuity Management PowerPoint Presentation SlidesBusiness Continuity Management PowerPoint Presentation Slides
Business Continuity Management PowerPoint Presentation Slides
 
Five Key Considerations when Setting your MBCO
Five Key Considerations when Setting your MBCOFive Key Considerations when Setting your MBCO
Five Key Considerations when Setting your MBCO
 
Business continuity management per ISO 22301 - a certification training cour...
 Business continuity management per ISO 22301 - a certification training cour... Business continuity management per ISO 22301 - a certification training cour...
Business continuity management per ISO 22301 - a certification training cour...
 
Business impact.analysis based on ISO 22301
Business impact.analysis based on ISO 22301Business impact.analysis based on ISO 22301
Business impact.analysis based on ISO 22301
 
business-continuity-management-awareness-presentation-for-mampu2929
business-continuity-management-awareness-presentation-for-mampu2929business-continuity-management-awareness-presentation-for-mampu2929
business-continuity-management-awareness-presentation-for-mampu2929
 
Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)
 
Societal Security – the new standard ISO 22301 for Business Continuity Manage...
Societal Security – the new standard ISO 22301 for Business Continuity Manage...Societal Security – the new standard ISO 22301 for Business Continuity Manage...
Societal Security – the new standard ISO 22301 for Business Continuity Manage...
 
Business Impact Analysis - The Most Important Step during BCMS Implementation
Business Impact Analysis - The Most Important Step during BCMS ImplementationBusiness Impact Analysis - The Most Important Step during BCMS Implementation
Business Impact Analysis - The Most Important Step during BCMS Implementation
 
Business Continuity Management
Business Continuity ManagementBusiness Continuity Management
Business Continuity Management
 
BUSINESS CONTINUITY MANAGEMENT system
BUSINESS CONTINUITY MANAGEMENT systemBUSINESS CONTINUITY MANAGEMENT system
BUSINESS CONTINUITY MANAGEMENT system
 
Business impact assessment (bia)
Business impact assessment (bia)Business impact assessment (bia)
Business impact assessment (bia)
 
ISO 27001
ISO 27001ISO 27001
ISO 27001
 
Bcp drp
Bcp drpBcp drp
Bcp drp
 
Business continuity planning
Business continuity planningBusiness continuity planning
Business continuity planning
 

Viewers also liked

Establishing BCMS and Certifying Against ISO 22301
Establishing BCMS and Certifying Against ISO 22301Establishing BCMS and Certifying Against ISO 22301
Establishing BCMS and Certifying Against ISO 22301
Continuity and Resilience
 
Business continuity & disaster recovery planning (BCP & DRP)
Business continuity & disaster recovery planning (BCP & DRP)Business continuity & disaster recovery planning (BCP & DRP)
Business continuity & disaster recovery planning (BCP & DRP)
Narudom Roongsiriwong, CISSP
 
HKPC Seminar Why Business Continuity(20100611)
HKPC Seminar Why Business Continuity(20100611)HKPC Seminar Why Business Continuity(20100611)
HKPC Seminar Why Business Continuity(20100611)
elvinchan
 
ISO 22301 Lead Implementer - Four Page Brochure
ISO 22301 Lead Implementer - Four Page BrochureISO 22301 Lead Implementer - Four Page Brochure
ISO 22301 Lead Implementer - Four Page Brochure
PECB
 
Impact Analysis Template - Enterprise
Impact Analysis Template - EnterpriseImpact Analysis Template - Enterprise
Impact Analysis Template - Enterprise
Toby Elwin
 
AS ICT INFO 1 - AQA Examination Revision
AS ICT INFO 1 - AQA Examination RevisionAS ICT INFO 1 - AQA Examination Revision
AS ICT INFO 1 - AQA Examination Revision
inspireuk
 
Impact of Changing World Politics in Managing Risk
Impact of Changing World Politics in Managing RiskImpact of Changing World Politics in Managing Risk
Impact of Changing World Politics in Managing Risk
PECB
 
AQA AS ICT INFO2 Revision
AQA AS ICT INFO2 RevisionAQA AS ICT INFO2 Revision
AQA AS ICT INFO2 Revision
Snowfairy007
 
2.3 people and ict systems
2.3 people and ict systems2.3 people and ict systems
2.3 people and ict systemsmrmwood
 
AQA INFO 1 – Sample Work Requirements
AQA INFO 1 – Sample Work RequirementsAQA INFO 1 – Sample Work Requirements
AQA INFO 1 – Sample Work Requirements
mrmwood
 
Components of an ICT System
Components of an ICT SystemComponents of an ICT System
Components of an ICT Systemshiplakeict
 
What is an Energetic Mismatch?
What is an Energetic Mismatch? What is an Energetic Mismatch?
What is an Energetic Mismatch?
Liz Ryan
 
Building a business impact analysis (bia) process a hands on blueprint
Building a business impact analysis (bia) process a hands on blueprintBuilding a business impact analysis (bia) process a hands on blueprint
Building a business impact analysis (bia) process a hands on blueprint
luweinet
 
2.1 ict systems and components
2.1 ict systems and components2.1 ict systems and components
2.1 ict systems and componentsmrmwood
 
3.8 development methods
3.8 development methods3.8 development methods
3.8 development methodsmrmwood
 
3.7 developing ict solutions
3.7 developing ict solutions3.7 developing ict solutions
3.7 developing ict solutionsmrmwood
 
AQA AS ICT INFO1 Revision
AQA AS ICT INFO1 RevisionAQA AS ICT INFO1 Revision
AQA AS ICT INFO1 Revision
Snowfairy007
 
3.10 Introducing large ict systems into organisations
3.10 Introducing large ict systems into organisations3.10 Introducing large ict systems into organisations
3.10 Introducing large ict systems into organisationsmrmwood
 
Business Continuity And Disaster Recovery Notes
Business Continuity And Disaster Recovery NotesBusiness Continuity And Disaster Recovery Notes
Business Continuity And Disaster Recovery NotesAlan McSweeney
 
2.6 backup and recovery
2.6 backup and recovery2.6 backup and recovery
2.6 backup and recoverymrmwood
 

Viewers also liked (20)

Establishing BCMS and Certifying Against ISO 22301
Establishing BCMS and Certifying Against ISO 22301Establishing BCMS and Certifying Against ISO 22301
Establishing BCMS and Certifying Against ISO 22301
 
Business continuity & disaster recovery planning (BCP & DRP)
Business continuity & disaster recovery planning (BCP & DRP)Business continuity & disaster recovery planning (BCP & DRP)
Business continuity & disaster recovery planning (BCP & DRP)
 
HKPC Seminar Why Business Continuity(20100611)
HKPC Seminar Why Business Continuity(20100611)HKPC Seminar Why Business Continuity(20100611)
HKPC Seminar Why Business Continuity(20100611)
 
ISO 22301 Lead Implementer - Four Page Brochure
ISO 22301 Lead Implementer - Four Page BrochureISO 22301 Lead Implementer - Four Page Brochure
ISO 22301 Lead Implementer - Four Page Brochure
 
Impact Analysis Template - Enterprise
Impact Analysis Template - EnterpriseImpact Analysis Template - Enterprise
Impact Analysis Template - Enterprise
 
AS ICT INFO 1 - AQA Examination Revision
AS ICT INFO 1 - AQA Examination RevisionAS ICT INFO 1 - AQA Examination Revision
AS ICT INFO 1 - AQA Examination Revision
 
Impact of Changing World Politics in Managing Risk
Impact of Changing World Politics in Managing RiskImpact of Changing World Politics in Managing Risk
Impact of Changing World Politics in Managing Risk
 
AQA AS ICT INFO2 Revision
AQA AS ICT INFO2 RevisionAQA AS ICT INFO2 Revision
AQA AS ICT INFO2 Revision
 
2.3 people and ict systems
2.3 people and ict systems2.3 people and ict systems
2.3 people and ict systems
 
AQA INFO 1 – Sample Work Requirements
AQA INFO 1 – Sample Work RequirementsAQA INFO 1 – Sample Work Requirements
AQA INFO 1 – Sample Work Requirements
 
Components of an ICT System
Components of an ICT SystemComponents of an ICT System
Components of an ICT System
 
What is an Energetic Mismatch?
What is an Energetic Mismatch? What is an Energetic Mismatch?
What is an Energetic Mismatch?
 
Building a business impact analysis (bia) process a hands on blueprint
Building a business impact analysis (bia) process a hands on blueprintBuilding a business impact analysis (bia) process a hands on blueprint
Building a business impact analysis (bia) process a hands on blueprint
 
2.1 ict systems and components
2.1 ict systems and components2.1 ict systems and components
2.1 ict systems and components
 
3.8 development methods
3.8 development methods3.8 development methods
3.8 development methods
 
3.7 developing ict solutions
3.7 developing ict solutions3.7 developing ict solutions
3.7 developing ict solutions
 
AQA AS ICT INFO1 Revision
AQA AS ICT INFO1 RevisionAQA AS ICT INFO1 Revision
AQA AS ICT INFO1 Revision
 
3.10 Introducing large ict systems into organisations
3.10 Introducing large ict systems into organisations3.10 Introducing large ict systems into organisations
3.10 Introducing large ict systems into organisations
 
Business Continuity And Disaster Recovery Notes
Business Continuity And Disaster Recovery NotesBusiness Continuity And Disaster Recovery Notes
Business Continuity And Disaster Recovery Notes
 
2.6 backup and recovery
2.6 backup and recovery2.6 backup and recovery
2.6 backup and recovery
 

Similar to Implementing a Business Continuity Management System in Telecoms

Iaetsd design and implementation of secure cloud systems using
Iaetsd design and implementation of secure cloud systems usingIaetsd design and implementation of secure cloud systems using
Iaetsd design and implementation of secure cloud systems using
Iaetsd Iaetsd
 
HCL Technologies: The CIO Handbook (Edition 4)
HCL Technologies: The CIO Handbook (Edition 4)HCL Technologies: The CIO Handbook (Edition 4)
HCL Technologies: The CIO Handbook (Edition 4)
HCL Technologies
 
The CIO Handbook
The CIO HandbookThe CIO Handbook
The CIO Handbook
HCL Technologies
 
Cloud The Future Of The IT Department
Cloud   The Future Of The IT DepartmentCloud   The Future Of The IT Department
Cloud The Future Of The IT Department
IBM
 
EA Governance
EA GovernanceEA Governance
EA Governance
emergingpractices
 
Presentazione devoteam 2011
Presentazione devoteam 2011Presentazione devoteam 2011
Presentazione devoteam 2011Emmecicom
 
Cdi cio.com hcaf white paper- 082117
Cdi   cio.com hcaf white paper- 082117Cdi   cio.com hcaf white paper- 082117
Cdi cio.com hcaf white paper- 082117
John Baumgarten
 
2nd SIG Meeting Presentation
2nd SIG Meeting Presentation2nd SIG Meeting Presentation
2nd SIG Meeting Presentation
imaginefuturefactory
 
COBIT® Presentation Package.ppt
COBIT® Presentation Package.pptCOBIT® Presentation Package.ppt
COBIT® Presentation Package.ppt
Emmacuet
 
Capgemini ses - smart analytics accelerates the realization of value for ut...
Capgemini   ses - smart analytics accelerates the realization of value for ut...Capgemini   ses - smart analytics accelerates the realization of value for ut...
Capgemini ses - smart analytics accelerates the realization of value for ut...
Gord Reynolds
 
Business Solutions Seminar Series
Business Solutions Seminar Series Business Solutions Seminar Series
Business Solutions Seminar Series
William Ho (何添福)
 
Implementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkImplementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance Framework
IJCSIS Research Publications
 
Cobit 5 Business Framework -Governance and Management of Enterprise IT
Cobit 5  Business Framework -Governance and Management of Enterprise ITCobit 5  Business Framework -Governance and Management of Enterprise IT
Cobit 5 Business Framework -Governance and Management of Enterprise IT
Balasubramanian.C PMP®,ITIL®,PRINCE2®,COBIT®5
 
Strengthening Employees Responsibility To Enhance Governance Of It Cobit Ra...
Strengthening Employees Responsibility To Enhance Governance Of It   Cobit Ra...Strengthening Employees Responsibility To Enhance Governance Of It   Cobit Ra...
Strengthening Employees Responsibility To Enhance Governance Of It Cobit Ra...
guest418d60a0
 
The CMDB/CMS in the Digital Age: A Bedrock for IT Transformation
The CMDB/CMS in the Digital Age: A Bedrock for IT TransformationThe CMDB/CMS in the Digital Age: A Bedrock for IT Transformation
The CMDB/CMS in the Digital Age: A Bedrock for IT Transformation
Enterprise Management Associates
 
UC2 International Deployment, Baltimore Society of Communications Technology ...
UC2 International Deployment, Baltimore Society of Communications Technology ...UC2 International Deployment, Baltimore Society of Communications Technology ...
UC2 International Deployment, Baltimore Society of Communications Technology ...
Agustin Argelich Casals
 
Integrated knowledge management model for global application management business
Integrated knowledge management model for global application management businessIntegrated knowledge management model for global application management business
Integrated knowledge management model for global application management businessApplication Management
 
Lean Information Technology Webinar
Lean Information Technology WebinarLean Information Technology Webinar
Lean Information Technology Webinar
Guidon Performance Solutions
 
Indian CST's GPMS Products Portfolio 2015
Indian CST's GPMS Products Portfolio 2015Indian CST's GPMS Products Portfolio 2015
Indian CST's GPMS Products Portfolio 2015Raja Seevan
 

Similar to Implementing a Business Continuity Management System in Telecoms (20)

Iaetsd design and implementation of secure cloud systems using
Iaetsd design and implementation of secure cloud systems usingIaetsd design and implementation of secure cloud systems using
Iaetsd design and implementation of secure cloud systems using
 
HCL Technologies: The CIO Handbook (Edition 4)
HCL Technologies: The CIO Handbook (Edition 4)HCL Technologies: The CIO Handbook (Edition 4)
HCL Technologies: The CIO Handbook (Edition 4)
 
The CIO Handbook
The CIO HandbookThe CIO Handbook
The CIO Handbook
 
Cloud The Future Of The IT Department
Cloud   The Future Of The IT DepartmentCloud   The Future Of The IT Department
Cloud The Future Of The IT Department
 
EA Governance
EA GovernanceEA Governance
EA Governance
 
Presentazione devoteam 2011
Presentazione devoteam 2011Presentazione devoteam 2011
Presentazione devoteam 2011
 
Cdi cio.com hcaf white paper- 082117
Cdi   cio.com hcaf white paper- 082117Cdi   cio.com hcaf white paper- 082117
Cdi cio.com hcaf white paper- 082117
 
2nd SIG Meeting Presentation
2nd SIG Meeting Presentation2nd SIG Meeting Presentation
2nd SIG Meeting Presentation
 
COBIT® Presentation Package.ppt
COBIT® Presentation Package.pptCOBIT® Presentation Package.ppt
COBIT® Presentation Package.ppt
 
Capgemini ses - smart analytics accelerates the realization of value for ut...
Capgemini   ses - smart analytics accelerates the realization of value for ut...Capgemini   ses - smart analytics accelerates the realization of value for ut...
Capgemini ses - smart analytics accelerates the realization of value for ut...
 
Business Solutions Seminar Series
Business Solutions Seminar Series Business Solutions Seminar Series
Business Solutions Seminar Series
 
Implementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkImplementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance Framework
 
Cobit 5 Business Framework -Governance and Management of Enterprise IT
Cobit 5  Business Framework -Governance and Management of Enterprise ITCobit 5  Business Framework -Governance and Management of Enterprise IT
Cobit 5 Business Framework -Governance and Management of Enterprise IT
 
Strengthening Employees Responsibility To Enhance Governance Of It Cobit Ra...
Strengthening Employees Responsibility To Enhance Governance Of It   Cobit Ra...Strengthening Employees Responsibility To Enhance Governance Of It   Cobit Ra...
Strengthening Employees Responsibility To Enhance Governance Of It Cobit Ra...
 
The CMDB/CMS in the Digital Age: A Bedrock for IT Transformation
The CMDB/CMS in the Digital Age: A Bedrock for IT TransformationThe CMDB/CMS in the Digital Age: A Bedrock for IT Transformation
The CMDB/CMS in the Digital Age: A Bedrock for IT Transformation
 
Cobit5 and-grc
Cobit5 and-grcCobit5 and-grc
Cobit5 and-grc
 
UC2 International Deployment, Baltimore Society of Communications Technology ...
UC2 International Deployment, Baltimore Society of Communications Technology ...UC2 International Deployment, Baltimore Society of Communications Technology ...
UC2 International Deployment, Baltimore Society of Communications Technology ...
 
Integrated knowledge management model for global application management business
Integrated knowledge management model for global application management businessIntegrated knowledge management model for global application management business
Integrated knowledge management model for global application management business
 
Lean Information Technology Webinar
Lean Information Technology WebinarLean Information Technology Webinar
Lean Information Technology Webinar
 
Indian CST's GPMS Products Portfolio 2015
Indian CST's GPMS Products Portfolio 2015Indian CST's GPMS Products Portfolio 2015
Indian CST's GPMS Products Portfolio 2015
 

More from Global Risk Forum GRFDavos

Disaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian DohertyDisaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian Doherty
Global Risk Forum GRFDavos
 
Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...
Global Risk Forum GRFDavos
 
Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...
Global Risk Forum GRFDavos
 
Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...
Global Risk Forum GRFDavos
 
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Global Risk Forum GRFDavos
 
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
Global Risk Forum GRFDavos
 
C&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLAC&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLA
Global Risk Forum GRFDavos
 
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Global Risk Forum GRFDavos
 
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Global Risk Forum GRFDavos
 
Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...
Global Risk Forum GRFDavos
 
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
Global Risk Forum GRFDavos
 
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANOGlobal Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Risk Forum GRFDavos
 
Capacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDACapacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDA
Global Risk Forum GRFDavos
 
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Global Risk Forum GRFDavos
 
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Global Risk Forum GRFDavos
 
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Global Risk Forum GRFDavos
 
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Global Risk Forum GRFDavos
 
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Global Risk Forum GRFDavos
 
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Global Risk Forum GRFDavos
 
A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...
Global Risk Forum GRFDavos
 

More from Global Risk Forum GRFDavos (20)

Disaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian DohertyDisaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian Doherty
 
Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...
 
Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...
 
Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...
 
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
 
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
 
C&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLAC&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLA
 
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
 
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
 
Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...
 
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
 
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANOGlobal Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
 
Capacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDACapacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDA
 
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
 
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
 
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
 
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
 
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
 
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
 
A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...
 

Recently uploaded

CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 

Recently uploaded (20)

CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 

Implementing a Business Continuity Management System in Telecoms

  • 1. Implementing a Business Continuity Management System in Telecoms Glikeria Zigouri OTE Business Continuity Manager August 2012
  • 2. COSMOTE’s Business Continuity Mgmt - History Risk Mitigation Strategy, Test plans for the Test Events, Crisis Operation Centre for 2002-4 the Olympic Games BCM KICK OFF - Olympic Games expertise : the trigger to start a holistic BCM 2004-6 approach in COSMOTE Approach based on PAS56 27 Departmental business recovery plans Risk Assessment/BIA questionnaire based 2006-7 Emergency planning, based on 16 Emergency Management/CMP/Training specific scenarios BCM Plans & Strategies redeveloped BCM Policy designed aligned to BS 25999 aligned to BS 25999 2008 to date New operational Chart for Incident & BCM Training & Awareness for all BCM Crisis Response established Teams Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 2
  • 3. Some Interesting BCM Figures 4 Companies in SE Europe implement BCM under our coordination Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 3
  • 4. BCM Does not Do Magic !!! Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 4
  • 5. Business Continuity Management A holistic management process that identifies potential threats to an organization and the impacts to business operations that those threats, if realized, might cause, and which provides a framework for building organizational resilience with the capability for an effective response that safeguards the interests of its key stakeholders, reputation, brand and value-creating activities Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 5
  • 6. Business Continuity Management System A relatively newcomer to the arena of business disciplines Creates operational structures Creates & develops the processes and procedures to be implemented in the event of a very serious incident which threatens the organization’s continuity Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 6
  • 7. British Standard BS25999 Understanding the Organisation Exercising, BCM Determining Maintaining Programme BCM & Reviewing Management Strategy Developing and Implementing a BCM Response Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 7
  • 8. Understanding the Organization Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 8
  • 9. Deciding what to protect…  Key People  Key Network Systems  Key IT Systems Human Resources  Customer Care Buildings & Technology Infrastructure  Data Centres  Main Network Equipment locations Business Processes, Technology & IT . Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 9
  • 10. Deciding what to protect…  Key Product & Services  Voice calling;  SMS Text messaging;  Data services – mobile broadband;  MMS messaging;  Roaming services; Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 10
  • 11. The reason………..  Identify Mission-critical Net, Business and IT processes and resources identified  Determine RTOs  Highlight the interdependencies between Business and IT processes  Establish the priority of the recovery of these processes  Enhance senior management's understanding of the business risks  Identify Business process and application/technology interdependencies Determine the most critical Business processes and identify how the Business is affected from one day to one week, during the outage Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 11
  • 12. Determining BCM Strategies Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 12
  • 13. The Art of Continuity…. IT & Cellular Network • Technical Recovery Coordinators appointed and trained • Critical Applications, Systems & Services as Technical Recovery targets • Technical Recovery Strategies ( per critical element ) • Technical Recovery Plans ( per critical element ) • Rehearsal Plans • Live Testing Programme Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 13
  • 14. The Art of Continuity…. Technology & Customer Care Recovery Sites • Technology (Net & IT), Customer Care sites, scattered across Greece with embedded resilience Recovery Workplaces • Recovery Workplaces fully equipped and tested with Workstations and Laptops to accommodate employees & critical business processes Alternative Workplace 1 Alternative Workplace 2 Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 14
  • 15. Developing & Implementing a BCM Response Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 15
  • 16. Incident Management Incidents may occur any time without notice. Early detection, prompt notification and reporting of an incident, ensures that the necessary safety and control procedures are immediately activated so that the correct priorities can be followed: Buildings, Technology Business Processes, Human Resources Infrastructure Technology & IT Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 16
  • 17. Why should an incident be reported? Incidents are never welcome, still there are some serious gains when reported and filed accordingly :  Not always obvious what has gone wrong and what the consequences are  To manage any incident it is necessary to get the : Right Information … To the right people… At the right time... So they can make the right decisions !!!  Lessons Learnt  Preventive / Proactive Measures for similar incidents in the future  Evidence to prove to Auditors and Interested Parties that we have a credible BC Programme Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 17
  • 18. Incident Management Report Forms Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 18 18
  • 19. BCMS Documentation Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 19
  • 20. Golden Rule: The plan is nothing, Planning is everything Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 20
  • 21. Exercising, Maintaining, Reviewing Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 21
  • 22. Why Learning is important The ability to be cool, confident in a major incident is not an inherited characteristic, but is the direct result of how well prepared one is, for the crises Exercises, are a powerful means not only of testing your plans, but also of educating BCM teams, employees and encouraging the right type of attitude and thinking  Establish annual education programmes including but not limited to) :  Classroom Trainings Total Number of Total No of Events participants  Desktop Exercises  Wide Rehearsals  Awareness Sessions 33 1.998 Statistics 2011 Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 22
  • 23. Rehearse, rehearse, rehearse… Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 23
  • 24. Rehearse, rehearse, rehearse… Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 24
  • 25. Building Culture: The toolset Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 25
  • 26. eLearning At a glance Τhe e-learning tool hosted at www.cosmote- businesscontinuity.gr was created by COSMOTE Group Business Continuity Section aiming the education and awareness of all COSMOTE Group employees to the principles of Business Continuity Management and its role. It is constructed in Flash platform having a micro site structure , that makes navigation of users friendly. The tool is bilingual in both English and Greek. Moreover, a 10 - questions quiz was incorporated to the tool. Users that scored 50%+ could download and print with their name the Certificate of BCM eLearning. Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 26
  • 27. Awareness Assessment Total running Total number Average daily time of visits visits 8 working 1516 visits 190 visits per days working day Out of a total of 2350 employees Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 27
  • 28. Business Continuity flash Teasers & Posters Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 28
  • 29. Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 29
  • 30. Important things to keep in mind for BCM  Business Continuity Management is good Corporate Governance  Incident Management, Crisis Management & Crisis Communications are all part of Business Continuity Management  Disaster Recovery is yesterdays’ news. Resilience is todays’ requirement  Habitual Business Continuity: Survival as a habit  Create Efficiencies by capitalizing on Best Practice & make use of lessons learnt Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 30
  • 31. Some Words of Wisdom…  Always plan for where you are, not for where you aspire to be  Prepare for Impact, not for Scenarios. Scenarios can be countless, Impact is countable.  Have a well rehearsed method for exchanging information  Synthesize the information before feeding it to the Top Team Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 31
  • 32. Contact: Glikeria Zigouri gzigouri@cosmote.gr +30 697 6883886 Glikeria Zigouri /Implementing a Business Continuity Management System in Telecoms / 31.08.2012 @ Davos 32