โขWhat is Contract?
โขWhat is Construction Contract?
โขPurpose of Construction Contract
โขContract for Bid and Procurement
โขContract for Pricing Arrangement
โขConstruction Contract Component
โขContract Document List
โขStandard Form of Contract in Malaysia
โขWhat is Contract?
โขWhat is Construction Contract?
โขPurpose of Construction Contract
โขContract for Bid and Procurement
โขContract for Pricing Arrangement
โขConstruction Contract Component
โขContract Document List
โขStandard Form of Contract in Malaysia
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
ย
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
ย
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Putting the SPARK into Virtual Training.pptxCynthia Clay
ย
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
"๐ฉ๐ฌ๐ฎ๐ผ๐ต ๐พ๐ฐ๐ป๐ฏ ๐ป๐ฑ ๐ฐ๐บ ๐ฏ๐จ๐ณ๐ญ ๐ซ๐ถ๐ต๐ฌ"
๐๐ ๐๐จ๐ฆ๐ฌ (๐๐ ๐๐จ๐ฆ๐ฆ๐ฎ๐ง๐ข๐๐๐ญ๐ข๐จ๐ง๐ฌ) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
๐๐ ๐๐จ๐ฆ๐ฌ provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
โญ ๐ ๐๐๐ญ๐ฎ๐ซ๐๐ ๐ฉ๐ซ๐จ๐ฃ๐๐๐ญ๐ฌ:
โข 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
โข SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
โขFreenBecky 1st Fan Meeting in Vietnam
โขCHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
โข WOW K-Music Festival 2023
โข Winner [CROSS] Tour in HCM
โข Super Show 9 in HCM with Super Junior
โข HCMC - Gyeongsangbuk-do Culture and Tourism Festival
โข Korean Vietnam Partnership - Fair with LG
โข Korean President visits Samsung Electronics R&D Center
โข Vietnam Food Expo with Lotte Wellfood
"๐๐ฏ๐๐ซ๐ฒ ๐๐ฏ๐๐ง๐ญ ๐ข๐ฌ ๐ ๐ฌ๐ญ๐จ๐ซ๐ฒ, ๐ ๐ฌ๐ฉ๐๐๐ข๐๐ฅ ๐ฃ๐จ๐ฎ๐ซ๐ง๐๐ฒ. ๐๐ ๐๐ฅ๐ฐ๐๐ฒ๐ฌ ๐๐๐ฅ๐ข๐๐ฏ๐ ๐ญ๐ก๐๐ญ ๐ฌ๐ก๐จ๐ซ๐ญ๐ฅ๐ฒ ๐ฒ๐จ๐ฎ ๐ฐ๐ข๐ฅ๐ฅ ๐๐ ๐ ๐ฉ๐๐ซ๐ญ ๐จ๐ ๐จ๐ฎ๐ซ ๐ฌ๐ญ๐จ๐ซ๐ข๐๐ฌ."
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
ย
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
Memorandum Of Association Constitution of Company.pptseri bangash
ย
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
ย
Discover the innovative and creative projects that highlight my journey throughย Full Sail University. Below, youโll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
Remote sensing and monitoring are changing the mining industry for the better. These are providing innovative solutions to long-standing challenges. Those related to exploration, extraction, and overall environmental management by mining technology companies Odisha. These technologies make use of satellite imaging, aerial photography and sensors to collect data that might be inaccessible or from hazardous locations. With the use of this technology, mining operations are becoming increasingly efficient. Let us gain more insight into the key aspects associated with remote sensing and monitoring when it comes to mining.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
ย
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
1. MEASUREMENT OF QUANTITIES
โ Mat Naim bin Abdullah @ Mohd Asmoni
โ Diploma QS (UTM), BSc. QS (Glasgow
Caledonian University), M.Eng. Construction
(UTM), PhD Facilities Management (UTM)
โ matnaim@utm.my
โ amn871969@yahoo.com
โ C04-308
โ 019-7573760
www.utm.my innovative โ entrepreneurial โ global 1
2. MEASUREMENT OF QUANTITIES
Assumption No. 1: Total land area = 10m x 10m
Project Title: Construction and completion of
guard house
Owner: Panicsonic Sdn Bhd
Architect: A to Z Sdn Bhd
Drawing Title: Ground beam and foundation plan
-------------------------------------------------------------------------
Drawn by: Sheila
Checked by: Aaron
www.utm.my innovative โ entrepreneurial โ global 2
4. MEASUREMENT OF QUANTITIES
Construction Method
1. Preliminaries (Initial site works) - % of total cost
2. Site clearance and earthwork
3. Foundation construction (E.g. Piling and footing)
4. Work below lowest floor finish
5. Frame
6. Staircase
7. Upper Floor
8. Roof
9. Wall and partition
10. Door and window
11. Finishes
12. Sundries (Built-in furniture)
13. Building services (M&E, ICT etc)
14. External works (Water reticulation, landscape etc)
www.utm.my innovative โ entrepreneurial โ global 4
5. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
1) Site clearance
1.1) Clear the site including grubbing of Area of the site:
trees, shrubs and demolish any 10 x 10 = 100m2
existing structure and cart away
and dump to the specified
location.
10.00
10.00
----------
100.00 100 m2
----------
www.utm.my innovative โ entrepreneurial โ global 5
7. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.1) Piling including all related works Area of the building:
Length = 3048 + 3048 = 6096
6.10 Width = 3048 + 3048 = 6096
6.10
----------
37.21 37 m2
----------
www.utm.my innovative โ entrepreneurial โ global 7
8. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.2) Excavation for pile cap Size of pile cap = 1219 x 1219
Depth of excavation:
9/1.22 1524 + 50 (lean concrete) = 1574
1.22
1.57
----------
21.03 21 m3
----------
Excavation and Lean concrete as base
for pile cap
www.utm.my innovative โ entrepreneurial โ global 8
10. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.3) Reinforced concrete Grade 30 for Size of pile cap:
pile cap Length = 1219
Width = 1219
9/1.22 Thickness = 305
1.22
0.31
----------
4.15 4 m3
----------
Concrete for pile cap
www.utm.my innovative โ entrepreneurial โ global 10
11. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.4) 50mm thick lean concrete Grade Size of pile cap:
15 for pile cap Length = 1219
Width = 1219
9 / 1.22
1.22
----------
13.40 13 m2
----------
Excavation and Lean concrete as base
for pile cap
www.utm.my innovative โ entrepreneurial โ global 11
13. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.5) Formwork for pile cap Size of pile cap:
Length = 1219
9 / 4 /1.22 Width = 1219
0.31 Thickness = 305
----------
13.62 14 m2 9/2/1.22
---------- 0.31 6.81
9/2/1.50
0.31 8.37
15.18 15m2
Formwork for pile cap
www.utm.my innovative โ entrepreneurial โ global 13
14. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.6) Reinforcement bar Y12 for pile cap Length:
a c
9/2/ 12/ 1.53
---------- b
330.48m x 0.89 kg/m = 294.13kg = a + b + c โ cover
---------- = 305 + 1219 + 305 โ 6(50)
= 294 kg = 1829 โ 300
= 1529
No. of bars:
= (b/100) + 1
= ((1219 โ 2(50)cover )/100 )+1
= 12 nos.
www.utm.my innovative โ entrepreneurial โ global 14
16. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF Taker off : Checked by:
3.1) Column stump Size of column stump:
3.1.1) Reinforced concrete Grade 30 Length = 229
for column stump Width = 229
Height = 1524 โ 305 thickness of pile
9/0.23 cap โ (351/2) Half of beamโs
0.23 thickness
1.04 = 1043.50
----------
0.50 1 m3
----------
www.utm.my innovative โ entrepreneurial โ global 16
17. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.1) Column stump Size of column stump:
3.1.2) Formwork for column stump Length = 229
Width = 229
9/4/0.23 Height = 1524 โ 305 thickness of pile
1.04 cap โ (351/2) Half of beamโs
---------- thickness
8.61 9 m2 = 1043.50
----------
www.utm.my innovative โ entrepreneurial โ global 17
18. MEASUREMENT OF QUANTITIES
Height of column stump
@100 c/c
www.utm.my innovative โ entrepreneurial โ global 18
19. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.1) Column stump Length = a + half beamโs thickness โ
3.1.3) Reinforcement bar Y12 for cover + 2 laps
column stump lap
9/4/2.97
---------- a
106.92m x 0.89kg/m = 95.16kg
---------- lap
95kg
= 1524 + (351/2) โ 50 + (660x2)
= 2969.50
www.utm.my innovative โ entrepreneurial โ global 19
21. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.1) Column stump Length of link: (length of CSโ 2cover) x
3.1.4) R6 link in for column stump 4 +hook Hook
9/6/0.62
----------
33.48m x 0.22kg/m = 7.36kg =(229-100)+(229-100)+(229-100)+(229-
---------- 100)+100=616
7kg
No. of link:
Height of column stump = 1043.50
=(1043.50/229)+1
= 6 nos.
www.utm.my innovative โ entrepreneurial โ global 21
22. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.1) Excavation for ground beam Length=3048+3048=6096
Width = 229
2/3/6.10 Thickness = 351
0.23
0.35
----------
2.95m3
----------
3m3
Excavation for ground beam
www.utm.my innovative โ entrepreneurial โ global 22
23. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.2) Reinforced concrete Grade 30 for Length=3048+3048=6096
ground beam Width = 229
Thickness = 351
2/3/6.10
0.23
0.35
----------
2.95m3
----------
3m3
RC for ground beam
www.utm.my innovative โ entrepreneurial โ global 23
24. MEASUREMENT OF QUANTITIES
Assumption No. 1: Total land area = 10m x 10m
Project Title: Construction and completion of
guard house
Owner: Panicsonic Sdn Bhd
Architect: A to Z Sdn Bhd
Drawing Title: Ground beam and foundation plan
-------------------------------------------------------------------------
Drawn by: Sheila
Checked by: Aaron
www.utm.my innovative โ entrepreneurial โ global 24
25. MEASUREMENT OF QUANTITIES
Height of column stump
@100 c/c
www.utm.my innovative โ entrepreneurial โ global 25
26. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.3) Formwork for ground beam Length=3048+3048=6096
Width = 229
Thickness = 351
2/3/2/6.10
0.35
----------
25.62 26m2
----------
Installation of reinforcement bar and
formwork for ground beam
www.utm.my innovative โ entrepreneurial โ global 26
27. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Length = (lengthโ2cover)+(2bend-
3.2.4) Reinforcement bar Y10 for 2cover)
ground beam =(6096-(2x50))+(2x351)-(4x50)
= 6498
2/3/4/6.50
----------
156.00m x 0.62kg/m = 96.72kg
----------
97kg
www.utm.my innovative โ entrepreneurial โ global 27
28. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Length of stirrup:
3.2.5) R6 stirrup for ground beam Hook
2/3/28/0.86
---------- =(229-100)+(351-100)+(229-100)+(351-
144.48m x 0.22kg/m = 31.79kg 100)+100
---------- =860
32kg
No. of stirrup:
Length of grd beam= 6096
=(6096/229)+1
= 28 nos.
www.utm.my innovative โ entrepreneurial โ global 28
29. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.1) Excavation for ground slab Depth of excavation = 500mm
6.10
6.10 BRC A8
150mm thick
concrete slab
0.50
----------
18.61m3 19 m3
---------- 50mm thick
sand
300mm thick
hardcore
DPM
Installation of formwork,Damp Proof Membrane
(DPM) and BRC wire mesh for ground slab
www.utm.my innovative โ entrepreneurial โ global 29
30. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.2) Reinforced concrete G30 in Depth of excavation = 500mm
ground slab
150mm thick
BRC A8
concrete slab
6.10
6.10
0.15 50mm thick
---------- sand
5.58m3 300mm thick
hardcore
---------- 6 m3
DPM
www.utm.my innovative โ entrepreneurial โ global 30
31. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.3) Formwork for ground slab Depth of excavation = 500mm
4/6.10 BRC A8
150mm thick
concrete slab
0.15
----------
3.66m2 50mm thick
---------- sand
4 m2 300mm thick
hardcore
DPM
www.utm.my innovative โ entrepreneurial โ global 31
32. MEASUREMENT OF QUANTITIES
Project: Construction and completion of
Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.4) BRC A8 for ground slab Depth of excavation = 500mm
150mm thick
BRC A8
6.10 concrete slab
6.10
----------
50mm thick
37.21m2 sand
---------- 300mm thick
hardcore
37 m2
DPM
www.utm.my innovative โ entrepreneurial โ global 32
33. MEASUREMENT OF QUANTITIES
Project: Construction and completion of
Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.5) DPM for ground slab Depth of excavation = 500mm
150mm thick
BRC A8
6.10 concrete slab
6.10
----------
50mm thick
37.21m2 sand
---------- 300mm thick
hardcore
37 m2
DPM
www.utm.my innovative โ entrepreneurial โ global 33
34. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.6) 50mm sand blinding for ground Depth of excavation = 500mm
slab
150mm thick
BRC A8
6.10 concrete slab
6.10
----------
50mm thick
37.21m2 sand
---------- 300mm thick
hardcore
37 m2
DPM
www.utm.my innovative โ entrepreneurial โ global 34
35. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.7) Hardcore for ground slab Depth of excavation = 500mm
6.10 BRC A8
150mm thick
concrete slab
6.10
0.30
---------- 50mm thick
11.16m3 sand
---------- 300mm thick
hardcore
11 m3
DPM
www.utm.my innovative โ entrepreneurial โ global 35
36. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME Taker off : Checked by:
4.1) Column Size of column:
4.1.1) Reinforced concrete Grade 30 Length = 229
for column Width = 229
Height = Height of the wall
9/0.23 = 3000mm
0.23
3.00
----------
1.43 1 m3
----------
Installation of reinforcement bar and
formwork for column
www.utm.my innovative โ entrepreneurial โ global 36
37. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.1) Column Size of column:
4.1.2) Formwork for column Length = 229
Width = 229
9/4/0.23 Height = 3000
3.00
----------
24.84 25 m2
----------
www.utm.my innovative โ entrepreneurial โ global 37
38. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.1) Column Length = height of column + half of roof
4.1.3) Reinforcement bar Y12 for beam + 1 lap + bend
column
bend
9/4/4.50
---------- Height of wall
162.00m x 0.89kg/m = 144.18kg
----------
144kg
lap
= 3000+ (0.5x351) + 660 + 660
= 4495.5
www.utm.my innovative โ entrepreneurial โ global 38
39. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.1) Column Length of link: (length of CSโ 2cover) x
4.1.4) R6 link in for column 4 +hook
Hook
9/14/0.82
----------
103.32m x 0.22kg/m = 22.73kg =(229-50)+(229-50)+(229-50)+(229-
---------- 50)+100=816
23kg
No. of link:
Height of column = 3000
=(3000/229)+1
= 14 nos.
www.utm.my innovative โ entrepreneurial โ global 39
40. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.2) Roof beam Size of roof beam:
4.2.1) Reinforced concrete Grade 30 for Length=3048+3048=6096
roof beam Width = 229
Thickness = 351
2/3/6.10
0.23
0.35
----------
2.95m3
----------
3m3
www.utm.my innovative โ entrepreneurial โ global 40
41. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.2) Roof beam Size of roof beam:
4.2.2) Formwork for roof beam Length=3048+3048=6096
Width = 229 Side
Thickness = 351
2/3/6.10 Soffit
0.93
----------
34.04 34m2
----------
= 351 + 229 + 351
= 931
www.utm.my innovative โ entrepreneurial โ global 41
42. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.2) Roof beam Length = (lengthโ2cover)+(2bend-
4.2.3) Reinforcement bar Y10 for roof 2cover)
beam =(6096-(2x50))+(2x351)-(4x50)
= 6498
2/3/4/6.50
----------
156.00m x 0.62kg/m = 96.72kg
----------
97kg
www.utm.my innovative โ entrepreneurial โ global 42
43. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
3.2) Roof beam Length of stirrup:
3.2.5) R6 stirrup for roof beam Hook
2/3/28/1.06
---------- =(229-50)+(351-50)+(229-50)+(351-
178.08m x 0.22kg/m = 39.18kg 50)+100
---------- =1060
39kg
No. of stirrup:
Length of beam= 6096
=(6096/229)+1
= 28 nos.
www.utm.my innovative โ entrepreneurial โ global 43
44. MEASUREMENT OF QUANTITIES
Assumption No. 1: Total land area = 10m x 10m
Project Title: Construction and completion of
guard house
Owner: Panicsonic Sdn Bhd
Architect: A to Z Sdn Bhd
Drawing Title: Ground beam and foundation plan
-------------------------------------------------------------------------
Drawn by: Sheila
Checked by: Aaron
www.utm.my innovative โ entrepreneurial โ global 44
45. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
5) ROOF = area of roof
=axbx2 a 3m
5.1) Roof trusses and covering
2/8.50
5.20 a = 42482 + 30002
----------
88.40m2 88 m2 Front and rear elevation
---------- a = 5200
b = 6096 +
1200 + b
1200
b = 8496
Right and left elevation
www.utm.my innovative โ entrepreneurial โ global 45
46. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
6) DOOR and WINDOW Door can be
measured either a 3m
6.1) Single leaf panel door size 2100 x 900 in m2 or
including frame and painting number. If
enumerated then
need to state
type and size
2 2 nos. Front and rear elevation
----------
b
Right and left elevation
www.utm.my innovative โ entrepreneurial โ global 46
47. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
6) DOOR and WINDOW Window can be
measured either a 3m
6.2) Adjustable louvres window 1200 x 600 in m2 or
including frame , painting and glass number. If
enumerated then
need to state
type and size
6 6 nos. Front and rear elevation
----------
b
Right and left elevation
www.utm.my innovative โ entrepreneurial โ global 47
48. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
7) WALL AND PARTITION
a 3m
7.1) Half brickwall in comon brick
4/ 6.10
3.00 73.20
Less opening (e.g. door and window) Front and rear elevation
2/2.10
0.90 3.78 (door)
65 m2 b
6/1.20
0.60 4.32 (window)
Brickwall
65.10
Right and left elevation
www.utm.my innovative โ entrepreneurial โ global 48
49. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
8) FINISHES Area of plastering
and panting = a 3m
8.1) Plastering and painting Area of wall x 2
2/ 65m2 130m2 Area of ceiling =
area of slab
8.2) Floor Finishes โ cement render Front and rear elevation
37 m2
b
8.3) Ceiling 37m2
Brickwall
Right and left elevation
www.utm.my innovative โ entrepreneurial โ global 49
50. MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
9) SUNDRIES
a 3m
9.1) Built-in counter size 1800mm x 900mm
x 725mm(h).
1
1 no. Front and rear elevation
b
Brickwall
Right and left elevation
www.utm.my innovative โ entrepreneurial โ global 50