PRESENTATION OF QUANTITY SURVEYING
CE-208

Compiled by –
Group-01, 2nd Year, 2nd Semester, Section-C, Department of Civil Engineering,

Ahsanullah University of Science & Technology
CONTRIBUTED BY Arafat Chowdhury (GL) (12-01-03-116)
 Sagar Ahmed (12-01-03-102)
 Farah Tabassum Nova (12-01-03-103)
 Abdul Aahad (12-01-03-104)
 S.M. Rafsan (12-01-03-105)

 Saffat Rabby Munayem (12-01-03-106)
 Abdullah Al Hasan (12-01-03-107)
 Shams Mashrur Khan (12-01-03-109)
 Monisha Podder Puja (12-01-03-110)
 Md. Mamun Or Rashid (12-01-03-111)











Mohibul Hasan Abir (12-01-03-112)
Md. Amzad Hossain Patowary (12-01-03-114)
Khurrom Jah Murad (12-01-03-115)
Asif Mahmud Tanveer (12-01-03-117)
Bishwojith Deb (12-01-03-120)
Shuvo Ghosh (12-01-03-121)
Fatema Rahman Jisha (12-01-03-122)
Sabrina Zissan Rafa (12-01-03-124)
Md.Asif Faisal Chowdhury (12-01-03-125)
Topic:
Estimation of a Residential Building
CONTENTS:
 Site Details
 Typical Plan
 Earthwork Excavation
 Footing

 Short Column
 Grade Beam
 Water Reservoir
 Floor Slab

 Beam & Column









Stairs
Masonry Wall
Others
Plastering & Paint
Ground Floor
Over Head Tank
Costing Estimation
Site Details
Client: Mr. & Mrs. X Chowdhury.
Contractor: Building Technology & Ideas (bti).
Architecture: Mr. Tofayel Muhammad Sarwar.
Engineer: MD. Shakhawat Hossain.
Location: Plot No: 44, Firmgate, Dhaka.
Description of Building:
•
(G+5) Storied.
•
units at each floor.
•
sft
Building Name: bti Garden.
Starting Time: January 2012
Ending Time: December 2014
Typical Plan
EARTHWORK EXCAVATION

Excavation for Footing: 872.25cft
Excavation for Underground
Water Reservoir: 701cft
Total Volume: 1574cft
ESTIMATION OF FOOTING
Total Cement Concrete (CC) for
(F1,F2,F3,F4) : 280+262+113+81=
cft
Total BFS for (F1,F2,F3,F4) :

+196+84.5+72=545sft
SHORT COLUMN
Total Cement Concrete (CC)

for C ,C2,C3,C4
+35+34+39=131cft
REINFORCEMENT
IN COLUMN
Total Reinforcement for columns

(C1,C2,C3,C4):
Φ

: 588 KG

Φ

: 74 KG

Φ

: 234 KG

Grade Beam (GB) to PL:
Φ

: 75 KG

Φ

: 16 KG

Φ

: 22 KG
CC OF GRADE BEAM
Length: 202ft
Outflush:
.5+0.5+0.75+1+1+0.75+0.5+0.
+0.625+0.625+0.625+0.625+0.
+0.5= 9ft

Total Length: 202+9=211ft
Cross Sectional Area:
.25*1=1.25sft
Volume of CC: 211*1.25=264cft
REINFORCEMENT
OF GB
(2-Top+1 Bottom)=633ft

-Φ
-Φ

(2 Bottom)= 420ft

-Φ

(Extra Top)=291ft

Total Length & Weight :
Φ

=420+291=711ft= 535KG
Φ

=633ft=305 KG

Stirrup (For Mid Section): 1080ft
Stirrup (For Support Section): 864ft
Total Length & Weight : Φ
ft= 370 KG

=
UNDERGROUND
WATER RESERVOIR
CC Layer under UGWR (3 inches thick) : 53cft

Bottom Slab (9 inches thick) : 158cft
Wall (7 inches thick) : 226cft
Top Slab (6 inches thick) : 78cft
Total Volume: 515cft
For Economical Purpose:
BFS Around UGWR Wall (5 inches thick):186 cft
Reinforcement Φ
Bottom Slab+Wall+Top Slab:
+4113+1420=6475ft=1220 KG
FLOOR SLAB CC &
REINFORCEMENT
BFS: 1454sft
CC (3 inches Thickness) :
.5cft

Φ
Φ

= 9754ft=1936 KG
= 375ft=102 KG
BEAMS
Long Sec-B-1:
Φ

=28 KG

Φ

=113 KG

Φ

=37 KG

Long Sec-B-2:
Φ

KG

Φ

KG

Φ

=21 KG

Long Sec-B-3:
Φ

KG

Φ

KG

Φ

KG
Long Sec-B-4:
Φ =84 KG
Φ =124 KG
Φ =37 KG

Long Sec-B-7:
Φ
KG
Φ
KG
Φ =73 KG

Long Sec-B-5:
Φ =88 KG
Φ =146 KG
Φ =37 KG

Long Sec-B-8:
Φ
KG
Φ =13 KG

Long Sec-B-6:
Φ =57 KG
Φ =131 KG
Φ =39 KG

Long Sec-B-9:
Φ
KG
Φ
KG
Φ
KG

Long Sec-B-10:
Φ
KG
Φ
KG
Φ =31 KG
Total Weight :
Φ
KG
Φ
KG
Φ
KG
Columns:
CC:

Volume: 171.875*5=860cft
Reinforcement:

Total Weight:
Φ20=52*3=156KG
Φ16=33.2*3= 100 KG
For C4 :

For C1+C2+C3:

1st Floor+ Ground :
Volume: 1.5*1*10=15cft

1st Floor+ Ground :
Volume: 1.25*1*10*3=37.5cft

2nd to 5th Floor:
Volume: 1.5*1*9.5=14.25cft

2nd to 5th Floor:
Volume: 1.25*1*9.5*3=35.625cft

Total Weight:
Φ20=52KG
Φ16=33.2KG
STAIRS
Flight:
Steps: 9*12= 108 Steps
(Each Floor: 2*9=18 Steps)
Area: 0.5(1+0.5)*0.563=0.437 sft
Volume of Flight
cft

Landing:
Landings=13
Volume of Landings:
*0.5*7.583*13= 200 cft
REINFORCEMENT OF
STAIRS
Landing:
Φ

: 1882ft

Φ

: 3250ft
Flight:

Φ

ft

Φ

ft

Total Length & Weight:
Φ
Φ

: 2542ft=480 KG
: 4460ft= 1210 KG
Railing:

Area: 130*3=390sft
Masonry Wall:
Brick Required for 1st Floor:
Length of Wall: 288.5ft
Area of Wall: 2885sft
Deduction for Windows & Door: 263+464.5=727.5sft
Total Brick: 2157.5sft
Brick Required for 2nd Floor:
Length of Wall: 288.5ft
Area of Wall: 2740.75sft
Deduction for Windows & Door: 263+464.5=727.5sft
Total Brick: 2013.5sft
Brick Required for 3rd, 4th & 5th Floor:
Length of Wall: 278ft
Area of Wall: 2641sft
Deduction for Windows & Door: 263+464.5=727.5sft
Total Area of Brick: 1914sft
Others
Tiles

Window Grill:

1st & 2nd Floor:
Left Side: 436.033sft
Right Side: 410.649sft

1st & 2nd Floor:
Area: 225sft

3rd & 5th Floor:
Left Side: 405sft
Right Side: 410.649sft
th Floor:
Left Side: 417.351sft
Right Side: 410.649sft

3rd, 4th & 5th Floor:
Area: 240sft
Reinforcement in Verandah Railing:

Reinforcement in Cantilever:

For 1st Floor & 2nd Floor (Φ10) :
V1+V2+V6+V4= 43+42+36+19= 140sft

1st Floor (Φ20): 24+27=51 KG
2nd Floor (Φ20): 26+34=60 KG
3rd Floor (Φ20): 54+40=94 KG
4th Floor (Φ20): 53+31= 84 KG

For 3rd Floor & 5th Floor (Φ10) :
V1+V2+V5+V3= 43+42+27+36= 150sft

GB Lap:
For 4th Floor (Φ10) :
V1+V2+V7+V3= 43+42+37+36= 160sft

Φ16= 70ft= 34 KG
Φ20= 67ft= 50 KG

Reinforcement in Lintel:
Length for 1st, 2nd ,3rd ,4th, 5th Floor (Φ20): 511ft
Stirrup (Φ20) : 427.5ft
Total Length (Φ20): 511+427.5= 940ft= 177 KG
Door Frame & Shutter:

Window:

1st & 2nd Floor:

Thai-Aluminium:
Length: 22*0.25=5.5sft
Glass: 30sft

D1 (2 Pieces)= 3.333ft
D2 (4 Pieces) = 3ft
D3 (6 Pieces) = 2.5ft
3rd, 4th & 5th Floor:
D1 (2 Pieces)= 3.333ft
D2 (4 Pieces) = 3ft
D3 (5 Pieces) = 2.5ft
Sanitary Pit:
Height= 2.5 ft
Length= 2ft
Width= 2ft
Brick Wall Perimeter: 2*(2.416+2.417)=9.667
Area: 9.667*2.5=25sft*10=250sft

Cover:
Volume of CC=20cft
Weight of Φ 0 Reinforcement=

KG
False Slab:
Volume of CC: 9*24=216cft
Length of Reinforcement (Φ

): 72+32=104*24=2496ft

Lintel:
Volume of CC: .458*80=117cft
Length of Reinforcement (Φ

*80=2240ft

Kitchen Worktop:
Volume of CC: .625*10=26.25cft
Length of Reinforcement (Φ
*10=420ft
Plastering:
For 1st Floor:
Length of Wall: 288.5ft
Area of Wall: 2885sft
Deduction for Windows & Door: 263+464.5=727.5sft
Total Area of Inside: 2157.5sft
Volume: 1078.5cft (0.5 inch Thickness)
Total Area of Outside: 2157.5sft
Volume: 1618.125cft
inch Thickness)
For 2nd Floor:
Total Area of Outside: 2
.5sft
Length of Wall: 288.5ft
Volume: 1510.1255cft (0.75 inch Thickness)
Area of Wall: 2740.75sft
Deduction for Windows & Door: 263+464.5=727.5sft
Total Area of Inside:
.5sft
Volume:
.75cft (0.5 inch Thickness)
For 3rd, 4th & 5th Floor:
Length of Wall: 278ft
Area of Wall: 2641sft
Deduction for Windows & Door: 263+464.5=727.5sft
Total Area of Inside: 1914sft
Volume: 957cft
Total Area of Outside: 1914sft
Volume:
.5cft
Paint:
(Same as Plastering)
Total Volume of Paint for inside: 1078.5+2013.5+957= 4050cft
Total Volume of Paint for Outside: 1618.125+1510.1255+1435.5= 4564cft
Ground Floor:
Boundary:
Masonry Wall: 119.3*5*.4167=
cft
No. Of Bricks= 3443 Nos.
Volume of Brick with Mortar: 300cft
Volume of Brick without Mortar: 235cft
Volume of Mortar: 65cft
Volume of wetted Mortar: 65*1.5=
.5cft
Volume of Sand: 78cft
Volume of Cement: 19.5cft=16 Bags

Garage:
Masonry Wall:
.3*7*.4167=348cft
No. Of Bricks=
Nos.
Volume of Brick with Mortar:
cft
Volume of Brick without Mortar:
cft
Volume of Mortar: cft
Volume of wetted Mortar:
cft
Volume of Sand:
cft
Volume of Cement: cft=22 Bags
Grill:
No of Long Bar: 12
No of Short Bar: 480
Total Length of Φ Bar: 2868ft
Over Head Tank :
Section B-1:
Volume of CC: 87.5cft
Reinforcement:
2-16 Length : 19ft+16ft=35ft
mm= 25.25*2=50.5ft
mm=42*2=84ft

Section B-2:
Volume of CC: 87.5cft
Reinforcement:
-16 Length
+12=49ft
mm= .25*2=54.5ft
-16mm=27.25*2=54.5ft
ESTIMATION OF COST
Labor Cost: (6 Labors, 1800 BDT/Day)
,42,000 BDT
# Cement (2856 Bags*500 BDT) =14,28,000 BDT
# Sand:
cft (10,000BDT/1000cft)= 1,24,560 BDT
# Brick: ,000 Nos ( 10 BDT/ Each)= 2,00,000 BDT
Reinforcement:
KG= 13,57,432 BDT
Tiles: (2490sft*60 BDT/sft)= 1,49,420 BDT
Thai- Aluminium & Glass: (5000*80)=4,00,000 BDT
# Door : *10,000 =4,00,000 BDT
Total Cost of Materials & Man Power:
,01,412 BDT
Other Cost:
# Plumbing System Cost:
of Total Cost= 5,39,155 BDT
# Electrical Cost:
of Total Cost= 5,39,155 BDT
# Elevator:
Lac
#Generator
Lac
Total Cost: ,79,722.00 BDT
FINALLY !
COPYRIGHT
 This presentation is copyright protected by Arafat Chowdhury,
Department of Civil Engineering, Ahsanullah University of Science
& Technology (AUST) Dhaka, Bangladesh

 If you want to present or use these slides for any purposes kindly
contact to Arafat Chowdhury
Thank you for watching & your precious time !

More Related Content

Viewers also liked

PROCEEDINGS OF TIQS CONFERENCE & AAQS MEETINGS IN DAR ES SALAAM AUG 2016
PROCEEDINGS OF TIQS CONFERENCE & AAQS MEETINGS IN DAR ES SALAAM AUG 2016PROCEEDINGS OF TIQS CONFERENCE & AAQS MEETINGS IN DAR ES SALAAM AUG 2016
PROCEEDINGS OF TIQS CONFERENCE & AAQS MEETINGS IN DAR ES SALAAM AUG 2016Tom Joseph Mukasa
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1Tee Joanne
 
Nancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CVNancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CVnancy nader
 
Integrated Assignment : Measurement & CT & BM
Integrated Assignment : Measurement & CT & BMIntegrated Assignment : Measurement & CT & BM
Integrated Assignment : Measurement & CT & BMJaey Chai
 
QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838Bryan Chong Liang Chua
 
Software Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportSoftware Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportPang Khai Shuen
 
Software Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - SlidesSoftware Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - SlidesPang Khai Shuen
 
Siwes report original
Siwes report originalSiwes report original
Siwes report originalBrightnyt Pun
 
ECA Presentation
ECA PresentationECA Presentation
ECA PresentationLee Pei Gie
 
Top 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answersTop 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answersmitchellparker911
 
The Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction ContractThe Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction ContractTom Joseph Mukasa
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentationelliotfus
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentationcynfang Fong
 
Final interview report
Final interview reportFinal interview report
Final interview report마 이환
 
Top 8 civil engineer resume samples
Top 8 civil engineer resume samplesTop 8 civil engineer resume samples
Top 8 civil engineer resume samplesRottenTomatoes345
 
Quantity surveying practise
Quantity surveying practiseQuantity surveying practise
Quantity surveying practiseSasi Cool
 

Viewers also liked (19)

PROCEEDINGS OF TIQS CONFERENCE & AAQS MEETINGS IN DAR ES SALAAM AUG 2016
PROCEEDINGS OF TIQS CONFERENCE & AAQS MEETINGS IN DAR ES SALAAM AUG 2016PROCEEDINGS OF TIQS CONFERENCE & AAQS MEETINGS IN DAR ES SALAAM AUG 2016
PROCEEDINGS OF TIQS CONFERENCE & AAQS MEETINGS IN DAR ES SALAAM AUG 2016
 
QS Chapter December 2016
QS Chapter December 2016QS Chapter December 2016
QS Chapter December 2016
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Nancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CVNancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CV
 
Integrated Assignment : Measurement & CT & BM
Integrated Assignment : Measurement & CT & BMIntegrated Assignment : Measurement & CT & BM
Integrated Assignment : Measurement & CT & BM
 
QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838
 
Software Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportSoftware Application in Quantity Surveying - Report
Software Application in Quantity Surveying - Report
 
Software Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - SlidesSoftware Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - Slides
 
Siwes report original
Siwes report originalSiwes report original
Siwes report original
 
Construction law
Construction lawConstruction law
Construction law
 
ECA Presentation
ECA PresentationECA Presentation
ECA Presentation
 
Top 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answersTop 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answers
 
The Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction ContractThe Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction Contract
 
Siwes it report
Siwes it reportSiwes it report
Siwes it report
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 
Final interview report
Final interview reportFinal interview report
Final interview report
 
Top 8 civil engineer resume samples
Top 8 civil engineer resume samplesTop 8 civil engineer resume samples
Top 8 civil engineer resume samples
 
Quantity surveying practise
Quantity surveying practiseQuantity surveying practise
Quantity surveying practise
 

Similar to Quantity Surveying Presentation by Abhijatrik-28C

Planing,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALLPlaning,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALLArshana Anu
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete PresentationJosue Campos
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2ing_eliali4748
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfAvin Kharel
 
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
EQS -  EARTHWORK FOR ROADS AND CANALS.pdfEQS -  EARTHWORK FOR ROADS AND CANALS.pdf
EQS - EARTHWORK FOR ROADS AND CANALS.pdfGovindarajuluBadana
 
Design calculations of raft foundation
Design calculations of raft foundationDesign calculations of raft foundation
Design calculations of raft foundationShahzad Ali
 
Analysis and design of 15 storey office and
Analysis and design of 15 storey office andAnalysis and design of 15 storey office and
Analysis and design of 15 storey office andMasroor Alam
 
Analysis and design of 15 storey office and
Analysis and design of 15 storey office andAnalysis and design of 15 storey office and
Analysis and design of 15 storey office andMasroor Alam
 
HLS Sustainable Living
HLS Sustainable LivingHLS Sustainable Living
HLS Sustainable LivingHelen Lee
 
Theatre building PPT.pptx
Theatre building PPT.pptxTheatre building PPT.pptx
Theatre building PPT.pptxDivyaprabaN
 
project ppt 2 pdf.pdf
project ppt 2 pdf.pdfproject ppt 2 pdf.pdf
project ppt 2 pdf.pdfKarthikMasky
 
3F TO 5F BEAM DESIGN SUMMARY.pdf
3F TO 5F BEAM DESIGN SUMMARY.pdf3F TO 5F BEAM DESIGN SUMMARY.pdf
3F TO 5F BEAM DESIGN SUMMARY.pdfNicolasGeotina
 
3F TO 5F BEAM DESIGN SUMMARY.pdf
3F TO 5F BEAM DESIGN SUMMARY.pdf3F TO 5F BEAM DESIGN SUMMARY.pdf
3F TO 5F BEAM DESIGN SUMMARY.pdfNicolasGeotina
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farmOmar Faruque
 
SD-II-ALL- column-20.pdf
SD-II-ALL- column-20.pdfSD-II-ALL- column-20.pdf
SD-II-ALL- column-20.pdfAbhijeet Pabale
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 

Similar to Quantity Surveying Presentation by Abhijatrik-28C (20)

Planing,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALLPlaning,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALL
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete Presentation
 
NAME 338 , Presentation 1
NAME 338 , Presentation 1NAME 338 , Presentation 1
NAME 338 , Presentation 1
 
2nd Presentation NAME 338
2nd Presentation NAME 3382nd Presentation NAME 338
2nd Presentation NAME 338
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
EQS -  EARTHWORK FOR ROADS AND CANALS.pdfEQS -  EARTHWORK FOR ROADS AND CANALS.pdf
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
 
Design calculations of raft foundation
Design calculations of raft foundationDesign calculations of raft foundation
Design calculations of raft foundation
 
Analysis and design of 15 storey office and
Analysis and design of 15 storey office andAnalysis and design of 15 storey office and
Analysis and design of 15 storey office and
 
Analysis and design of 15 storey office and
Analysis and design of 15 storey office andAnalysis and design of 15 storey office and
Analysis and design of 15 storey office and
 
HLS Sustainable Living
HLS Sustainable LivingHLS Sustainable Living
HLS Sustainable Living
 
Sony hospital
Sony hospitalSony hospital
Sony hospital
 
Theatre building PPT.pptx
Theatre building PPT.pptxTheatre building PPT.pptx
Theatre building PPT.pptx
 
Shi20396 ch17
Shi20396 ch17Shi20396 ch17
Shi20396 ch17
 
project ppt 2 pdf.pdf
project ppt 2 pdf.pdfproject ppt 2 pdf.pdf
project ppt 2 pdf.pdf
 
3F TO 5F BEAM DESIGN SUMMARY.pdf
3F TO 5F BEAM DESIGN SUMMARY.pdf3F TO 5F BEAM DESIGN SUMMARY.pdf
3F TO 5F BEAM DESIGN SUMMARY.pdf
 
3F TO 5F BEAM DESIGN SUMMARY.pdf
3F TO 5F BEAM DESIGN SUMMARY.pdf3F TO 5F BEAM DESIGN SUMMARY.pdf
3F TO 5F BEAM DESIGN SUMMARY.pdf
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
SD-II-ALL- column-20.pdf
SD-II-ALL- column-20.pdfSD-II-ALL- column-20.pdf
SD-II-ALL- column-20.pdf
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 

Recently uploaded

Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...asmaqueen5
 
call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..vikas rana
 
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...lizamodels9
 
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...gurkirankumar98700
 
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needs
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your NeedsKohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needs
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needsaidasheikh47
 
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDFMs Riya
 
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️soniya singh
 
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...delhimodel235
 
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...delhimodel235
 
Call Girls in Adarsh Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts S...
Call Girls in Adarsh Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts S...Call Girls in Adarsh Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts S...
Call Girls in Adarsh Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts S...delhimodel235
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | GurgaonFULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaonsoniya singh
 
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...delhimodel235
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|AkshayJoshi575980
 
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRGirls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRasmaqueen5
 
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaon
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | GurgaonFULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaon
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaonsoniya singh
 
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfThe Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfkratirudram
 
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...asmaqueen5
 
Omaxe Dwarka In Delhi E Brochure Pdf
Omaxe Dwarka In Delhi E Brochure     PdfOmaxe Dwarka In Delhi E Brochure     Pdf
Omaxe Dwarka In Delhi E Brochure Pdfashiyadav24
 
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...delhimodel235
 
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️soniya singh
 

Recently uploaded (20)

Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
 
call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..
 
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
 
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...
 
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needs
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your NeedsKohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needs
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needs
 
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
 
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
 
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
 
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
 
Call Girls in Adarsh Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts S...
Call Girls in Adarsh Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts S...Call Girls in Adarsh Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts S...
Call Girls in Adarsh Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts S...
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | GurgaonFULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
 
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
 
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRGirls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
 
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaon
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | GurgaonFULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaon
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaon
 
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfThe Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
 
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...
 
Omaxe Dwarka In Delhi E Brochure Pdf
Omaxe Dwarka In Delhi E Brochure     PdfOmaxe Dwarka In Delhi E Brochure     Pdf
Omaxe Dwarka In Delhi E Brochure Pdf
 
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...
 
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️
 

Quantity Surveying Presentation by Abhijatrik-28C

  • 1. PRESENTATION OF QUANTITY SURVEYING CE-208 Compiled by – Group-01, 2nd Year, 2nd Semester, Section-C, Department of Civil Engineering, Ahsanullah University of Science & Technology
  • 2. CONTRIBUTED BY Arafat Chowdhury (GL) (12-01-03-116)  Sagar Ahmed (12-01-03-102)  Farah Tabassum Nova (12-01-03-103)  Abdul Aahad (12-01-03-104)  S.M. Rafsan (12-01-03-105)  Saffat Rabby Munayem (12-01-03-106)  Abdullah Al Hasan (12-01-03-107)  Shams Mashrur Khan (12-01-03-109)  Monisha Podder Puja (12-01-03-110)  Md. Mamun Or Rashid (12-01-03-111)          Mohibul Hasan Abir (12-01-03-112) Md. Amzad Hossain Patowary (12-01-03-114) Khurrom Jah Murad (12-01-03-115) Asif Mahmud Tanveer (12-01-03-117) Bishwojith Deb (12-01-03-120) Shuvo Ghosh (12-01-03-121) Fatema Rahman Jisha (12-01-03-122) Sabrina Zissan Rafa (12-01-03-124) Md.Asif Faisal Chowdhury (12-01-03-125)
  • 3. Topic: Estimation of a Residential Building
  • 4. CONTENTS:  Site Details  Typical Plan  Earthwork Excavation  Footing  Short Column  Grade Beam  Water Reservoir  Floor Slab  Beam & Column        Stairs Masonry Wall Others Plastering & Paint Ground Floor Over Head Tank Costing Estimation
  • 5. Site Details Client: Mr. & Mrs. X Chowdhury. Contractor: Building Technology & Ideas (bti). Architecture: Mr. Tofayel Muhammad Sarwar. Engineer: MD. Shakhawat Hossain. Location: Plot No: 44, Firmgate, Dhaka. Description of Building: • (G+5) Storied. • units at each floor. • sft Building Name: bti Garden. Starting Time: January 2012 Ending Time: December 2014
  • 7.
  • 8.
  • 9.
  • 10. EARTHWORK EXCAVATION Excavation for Footing: 872.25cft Excavation for Underground Water Reservoir: 701cft Total Volume: 1574cft
  • 11. ESTIMATION OF FOOTING Total Cement Concrete (CC) for (F1,F2,F3,F4) : 280+262+113+81= cft Total BFS for (F1,F2,F3,F4) : +196+84.5+72=545sft
  • 12. SHORT COLUMN Total Cement Concrete (CC) for C ,C2,C3,C4 +35+34+39=131cft
  • 13. REINFORCEMENT IN COLUMN Total Reinforcement for columns (C1,C2,C3,C4): Φ : 588 KG Φ : 74 KG Φ : 234 KG Grade Beam (GB) to PL: Φ : 75 KG Φ : 16 KG Φ : 22 KG
  • 14. CC OF GRADE BEAM Length: 202ft Outflush: .5+0.5+0.75+1+1+0.75+0.5+0. +0.625+0.625+0.625+0.625+0. +0.5= 9ft Total Length: 202+9=211ft Cross Sectional Area: .25*1=1.25sft Volume of CC: 211*1.25=264cft
  • 15. REINFORCEMENT OF GB (2-Top+1 Bottom)=633ft -Φ -Φ (2 Bottom)= 420ft -Φ (Extra Top)=291ft Total Length & Weight : Φ =420+291=711ft= 535KG Φ =633ft=305 KG Stirrup (For Mid Section): 1080ft Stirrup (For Support Section): 864ft Total Length & Weight : Φ ft= 370 KG =
  • 16. UNDERGROUND WATER RESERVOIR CC Layer under UGWR (3 inches thick) : 53cft Bottom Slab (9 inches thick) : 158cft Wall (7 inches thick) : 226cft Top Slab (6 inches thick) : 78cft Total Volume: 515cft For Economical Purpose: BFS Around UGWR Wall (5 inches thick):186 cft Reinforcement Φ Bottom Slab+Wall+Top Slab: +4113+1420=6475ft=1220 KG
  • 17. FLOOR SLAB CC & REINFORCEMENT BFS: 1454sft CC (3 inches Thickness) : .5cft Φ Φ = 9754ft=1936 KG = 375ft=102 KG
  • 18. BEAMS Long Sec-B-1: Φ =28 KG Φ =113 KG Φ =37 KG Long Sec-B-2: Φ KG Φ KG Φ =21 KG Long Sec-B-3: Φ KG Φ KG Φ KG
  • 19. Long Sec-B-4: Φ =84 KG Φ =124 KG Φ =37 KG Long Sec-B-7: Φ KG Φ KG Φ =73 KG Long Sec-B-5: Φ =88 KG Φ =146 KG Φ =37 KG Long Sec-B-8: Φ KG Φ =13 KG Long Sec-B-6: Φ =57 KG Φ =131 KG Φ =39 KG Long Sec-B-9: Φ KG Φ KG Φ KG Long Sec-B-10: Φ KG Φ KG Φ =31 KG Total Weight : Φ KG Φ KG Φ KG
  • 20. Columns: CC: Volume: 171.875*5=860cft Reinforcement: Total Weight: Φ20=52*3=156KG Φ16=33.2*3= 100 KG For C4 : For C1+C2+C3: 1st Floor+ Ground : Volume: 1.5*1*10=15cft 1st Floor+ Ground : Volume: 1.25*1*10*3=37.5cft 2nd to 5th Floor: Volume: 1.5*1*9.5=14.25cft 2nd to 5th Floor: Volume: 1.25*1*9.5*3=35.625cft Total Weight: Φ20=52KG Φ16=33.2KG
  • 21. STAIRS Flight: Steps: 9*12= 108 Steps (Each Floor: 2*9=18 Steps) Area: 0.5(1+0.5)*0.563=0.437 sft Volume of Flight cft Landing: Landings=13 Volume of Landings: *0.5*7.583*13= 200 cft
  • 22. REINFORCEMENT OF STAIRS Landing: Φ : 1882ft Φ : 3250ft Flight: Φ ft Φ ft Total Length & Weight: Φ Φ : 2542ft=480 KG : 4460ft= 1210 KG Railing: Area: 130*3=390sft
  • 23. Masonry Wall: Brick Required for 1st Floor: Length of Wall: 288.5ft Area of Wall: 2885sft Deduction for Windows & Door: 263+464.5=727.5sft Total Brick: 2157.5sft Brick Required for 2nd Floor: Length of Wall: 288.5ft Area of Wall: 2740.75sft Deduction for Windows & Door: 263+464.5=727.5sft Total Brick: 2013.5sft Brick Required for 3rd, 4th & 5th Floor: Length of Wall: 278ft Area of Wall: 2641sft Deduction for Windows & Door: 263+464.5=727.5sft Total Area of Brick: 1914sft
  • 24. Others Tiles Window Grill: 1st & 2nd Floor: Left Side: 436.033sft Right Side: 410.649sft 1st & 2nd Floor: Area: 225sft 3rd & 5th Floor: Left Side: 405sft Right Side: 410.649sft th Floor: Left Side: 417.351sft Right Side: 410.649sft 3rd, 4th & 5th Floor: Area: 240sft
  • 25. Reinforcement in Verandah Railing: Reinforcement in Cantilever: For 1st Floor & 2nd Floor (Φ10) : V1+V2+V6+V4= 43+42+36+19= 140sft 1st Floor (Φ20): 24+27=51 KG 2nd Floor (Φ20): 26+34=60 KG 3rd Floor (Φ20): 54+40=94 KG 4th Floor (Φ20): 53+31= 84 KG For 3rd Floor & 5th Floor (Φ10) : V1+V2+V5+V3= 43+42+27+36= 150sft GB Lap: For 4th Floor (Φ10) : V1+V2+V7+V3= 43+42+37+36= 160sft Φ16= 70ft= 34 KG Φ20= 67ft= 50 KG Reinforcement in Lintel: Length for 1st, 2nd ,3rd ,4th, 5th Floor (Φ20): 511ft Stirrup (Φ20) : 427.5ft Total Length (Φ20): 511+427.5= 940ft= 177 KG
  • 26. Door Frame & Shutter: Window: 1st & 2nd Floor: Thai-Aluminium: Length: 22*0.25=5.5sft Glass: 30sft D1 (2 Pieces)= 3.333ft D2 (4 Pieces) = 3ft D3 (6 Pieces) = 2.5ft 3rd, 4th & 5th Floor: D1 (2 Pieces)= 3.333ft D2 (4 Pieces) = 3ft D3 (5 Pieces) = 2.5ft
  • 27. Sanitary Pit: Height= 2.5 ft Length= 2ft Width= 2ft Brick Wall Perimeter: 2*(2.416+2.417)=9.667 Area: 9.667*2.5=25sft*10=250sft Cover: Volume of CC=20cft Weight of Φ 0 Reinforcement= KG
  • 28. False Slab: Volume of CC: 9*24=216cft Length of Reinforcement (Φ ): 72+32=104*24=2496ft Lintel: Volume of CC: .458*80=117cft Length of Reinforcement (Φ *80=2240ft Kitchen Worktop: Volume of CC: .625*10=26.25cft Length of Reinforcement (Φ *10=420ft
  • 29. Plastering: For 1st Floor: Length of Wall: 288.5ft Area of Wall: 2885sft Deduction for Windows & Door: 263+464.5=727.5sft Total Area of Inside: 2157.5sft Volume: 1078.5cft (0.5 inch Thickness) Total Area of Outside: 2157.5sft Volume: 1618.125cft inch Thickness) For 2nd Floor: Total Area of Outside: 2 .5sft Length of Wall: 288.5ft Volume: 1510.1255cft (0.75 inch Thickness) Area of Wall: 2740.75sft Deduction for Windows & Door: 263+464.5=727.5sft Total Area of Inside: .5sft Volume: .75cft (0.5 inch Thickness)
  • 30. For 3rd, 4th & 5th Floor: Length of Wall: 278ft Area of Wall: 2641sft Deduction for Windows & Door: 263+464.5=727.5sft Total Area of Inside: 1914sft Volume: 957cft Total Area of Outside: 1914sft Volume: .5cft Paint: (Same as Plastering) Total Volume of Paint for inside: 1078.5+2013.5+957= 4050cft Total Volume of Paint for Outside: 1618.125+1510.1255+1435.5= 4564cft
  • 31. Ground Floor: Boundary: Masonry Wall: 119.3*5*.4167= cft No. Of Bricks= 3443 Nos. Volume of Brick with Mortar: 300cft Volume of Brick without Mortar: 235cft Volume of Mortar: 65cft Volume of wetted Mortar: 65*1.5= .5cft Volume of Sand: 78cft Volume of Cement: 19.5cft=16 Bags Garage: Masonry Wall: .3*7*.4167=348cft No. Of Bricks= Nos. Volume of Brick with Mortar: cft Volume of Brick without Mortar: cft Volume of Mortar: cft Volume of wetted Mortar: cft Volume of Sand: cft Volume of Cement: cft=22 Bags Grill: No of Long Bar: 12 No of Short Bar: 480 Total Length of Φ Bar: 2868ft
  • 32. Over Head Tank : Section B-1: Volume of CC: 87.5cft Reinforcement: 2-16 Length : 19ft+16ft=35ft mm= 25.25*2=50.5ft mm=42*2=84ft Section B-2: Volume of CC: 87.5cft Reinforcement: -16 Length +12=49ft mm= .25*2=54.5ft -16mm=27.25*2=54.5ft
  • 33. ESTIMATION OF COST Labor Cost: (6 Labors, 1800 BDT/Day) ,42,000 BDT # Cement (2856 Bags*500 BDT) =14,28,000 BDT # Sand: cft (10,000BDT/1000cft)= 1,24,560 BDT # Brick: ,000 Nos ( 10 BDT/ Each)= 2,00,000 BDT Reinforcement: KG= 13,57,432 BDT Tiles: (2490sft*60 BDT/sft)= 1,49,420 BDT Thai- Aluminium & Glass: (5000*80)=4,00,000 BDT # Door : *10,000 =4,00,000 BDT Total Cost of Materials & Man Power: ,01,412 BDT Other Cost: # Plumbing System Cost: of Total Cost= 5,39,155 BDT # Electrical Cost: of Total Cost= 5,39,155 BDT # Elevator: Lac #Generator Lac Total Cost: ,79,722.00 BDT
  • 35. COPYRIGHT  This presentation is copyright protected by Arafat Chowdhury, Department of Civil Engineering, Ahsanullah University of Science & Technology (AUST) Dhaka, Bangladesh  If you want to present or use these slides for any purposes kindly contact to Arafat Chowdhury Thank you for watching & your precious time !