This slide is a presentation during 15th International Surveyors' Congress on 28 Jun 2013 @ Hotel Istana, KL. Its demonstrates the role of BS in GBI. It doesn't mean exclusively done by BS, but just highlighting the relevant competency.
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
Design and Application of passive fire protection stated in Uniform Building By-Laws of Malaysia. It contains graphical guidance to make the law items easier to comprehend and apply.
Credit to: UTM alumni
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAFakhrul Afifi
Conservation works is the most complex method in restoring the element and facade of the old building. Without conservation, the heritage building cannot long last until the expected age.
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
Design and Application of passive fire protection stated in Uniform Building By-Laws of Malaysia. It contains graphical guidance to make the law items easier to comprehend and apply.
Credit to: UTM alumni
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAFakhrul Afifi
Conservation works is the most complex method in restoring the element and facade of the old building. Without conservation, the heritage building cannot long last until the expected age.
Project 1: Industrialised Building System [ IBS ]JerotichMaswan
Project 1 of Advanced Architectural Construction.
Requirement: Design a 3 storey apartment building using Precast Concrete System. Other IBS systems are allowed. Create a report on IBS and the building detailing.
Project 1: Industrialised Building System [ IBS ]JerotichMaswan
Project 1 of Advanced Architectural Construction.
Requirement: Design a 3 storey apartment building using Precast Concrete System. Other IBS systems are allowed. Create a report on IBS and the building detailing.
Adoption and Compliance with Energy Codes - ASHRAE 90.1 and NECBRDH Building Science
Energy efficiency Requirements for Part 3 Buildings in BC. The measures of enforcement and compliance, with an overview and lessons learned regarding ASHRAE 90.1 as well as, the similarities and difference in the NECB 2011.
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfPaige Cruz
Monitoring and observability aren’t traditionally found in software curriculums and many of us cobble this knowledge together from whatever vendor or ecosystem we were first introduced to and whatever is a part of your current company’s observability stack.
While the dev and ops silo continues to crumble….many organizations still relegate monitoring & observability as the purview of ops, infra and SRE teams. This is a mistake - achieving a highly observable system requires collaboration up and down the stack.
I, a former op, would like to extend an invitation to all application developers to join the observability party will share these foundational concepts to build on:
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionAggregage
Join Maher Hanafi, VP of Engineering at Betterworks, in this new session where he'll share a practical framework to transform Gen AI prototypes into impactful products! He'll delve into the complexities of data collection and management, model selection and optimization, and ensuring security, scalability, and responsible use.
Securing your Kubernetes cluster_ a step-by-step guide to success !KatiaHIMEUR1
Today, after several years of existence, an extremely active community and an ultra-dynamic ecosystem, Kubernetes has established itself as the de facto standard in container orchestration. Thanks to a wide range of managed services, it has never been so easy to set up a ready-to-use Kubernetes cluster.
However, this ease of use means that the subject of security in Kubernetes is often left for later, or even neglected. This exposes companies to significant risks.
In this talk, I'll show you step-by-step how to secure your Kubernetes cluster for greater peace of mind and reliability.
In his public lecture, Christian Timmerer provides insights into the fascinating history of video streaming, starting from its humble beginnings before YouTube to the groundbreaking technologies that now dominate platforms like Netflix and ORF ON. Timmerer also presents provocative contributions of his own that have significantly influenced the industry. He concludes by looking at future challenges and invites the audience to join in a discussion.
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...James Anderson
Effective Application Security in Software Delivery lifecycle using Deployment Firewall and DBOM
The modern software delivery process (or the CI/CD process) includes many tools, distributed teams, open-source code, and cloud platforms. Constant focus on speed to release software to market, along with the traditional slow and manual security checks has caused gaps in continuous security as an important piece in the software supply chain. Today organizations feel more susceptible to external and internal cyber threats due to the vast attack surface in their applications supply chain and the lack of end-to-end governance and risk management.
The software team must secure its software delivery process to avoid vulnerability and security breaches. This needs to be achieved with existing tool chains and without extensive rework of the delivery processes. This talk will present strategies and techniques for providing visibility into the true risk of the existing vulnerabilities, preventing the introduction of security issues in the software, resolving vulnerabilities in production environments quickly, and capturing the deployment bill of materials (DBOM).
Speakers:
Bob Boule
Robert Boule is a technology enthusiast with PASSION for technology and making things work along with a knack for helping others understand how things work. He comes with around 20 years of solution engineering experience in application security, software continuous delivery, and SaaS platforms. He is known for his dynamic presentations in CI/CD and application security integrated in software delivery lifecycle.
Gopinath Rebala
Gopinath Rebala is the CTO of OpsMx, where he has overall responsibility for the machine learning and data processing architectures for Secure Software Delivery. Gopi also has a strong connection with our customers, leading design and architecture for strategic implementations. Gopi is a frequent speaker and well-known leader in continuous delivery and integrating security into software delivery.
Sudheer Mechineni, Head of Application Frameworks, Standard Chartered Bank
Discover how Standard Chartered Bank harnessed the power of Neo4j to transform complex data access challenges into a dynamic, scalable graph database solution. This keynote will cover their journey from initial adoption to deploying a fully automated, enterprise-grade causal cluster, highlighting key strategies for modelling organisational changes and ensuring robust disaster recovery. Learn how these innovations have not only enhanced Standard Chartered Bank’s data infrastructure but also positioned them as pioneers in the banking sector’s adoption of graph technology.
Essentials of Automations: The Art of Triggers and Actions in FMESafe Software
In this second installment of our Essentials of Automations webinar series, we’ll explore the landscape of triggers and actions, guiding you through the nuances of authoring and adapting workspaces for seamless automations. Gain an understanding of the full spectrum of triggers and actions available in FME, empowering you to enhance your workspaces for efficient automation.
We’ll kick things off by showcasing the most commonly used event-based triggers, introducing you to various automation workflows like manual triggers, schedules, directory watchers, and more. Plus, see how these elements play out in real scenarios.
Whether you’re tweaking your current setup or building from the ground up, this session will arm you with the tools and insights needed to transform your FME usage into a powerhouse of productivity. Join us to discover effective strategies that simplify complex processes, enhancing your productivity and transforming your data management practices with FME. Let’s turn complexity into clarity and make your workspaces work wonders!
UiPath Test Automation using UiPath Test Suite series, part 5DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 5. In this session, we will cover CI/CD with devops.
Topics covered:
CI/CD with in UiPath
End-to-end overview of CI/CD pipeline with Azure devops
Speaker:
Lyndsey Byblow, Test Suite Sales Engineer @ UiPath, Inc.
GridMate - End to end testing is a critical piece to ensure quality and avoid...ThomasParaiso2
End to end testing is a critical piece to ensure quality and avoid regressions. In this session, we share our journey building an E2E testing pipeline for GridMate components (LWC and Aura) using Cypress, JSForce, FakerJS…
Communications Mining Series - Zero to Hero - Session 1DianaGray10
This session provides introduction to UiPath Communication Mining, importance and platform overview. You will acquire a good understand of the phases in Communication Mining as we go over the platform with you. Topics covered:
• Communication Mining Overview
• Why is it important?
• How can it help today’s business and the benefits
• Phases in Communication Mining
• Demo on Platform overview
• Q/A
PHP Frameworks: I want to break free (IPC Berlin 2024)Ralf Eggert
In this presentation, we examine the challenges and limitations of relying too heavily on PHP frameworks in web development. We discuss the history of PHP and its frameworks to understand how this dependence has evolved. The focus will be on providing concrete tips and strategies to reduce reliance on these frameworks, based on real-world examples and practical considerations. The goal is to equip developers with the skills and knowledge to create more flexible and future-proof web applications. We'll explore the importance of maintaining autonomy in a rapidly changing tech landscape and how to make informed decisions in PHP development.
This talk is aimed at encouraging a more independent approach to using PHP frameworks, moving towards a more flexible and future-proof approach to PHP development.
UiPath Test Automation using UiPath Test Suite series, part 4DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 4. In this session, we will cover Test Manager overview along with SAP heatmap.
The UiPath Test Manager overview with SAP heatmap webinar offers a concise yet comprehensive exploration of the role of a Test Manager within SAP environments, coupled with the utilization of heatmaps for effective testing strategies.
Participants will gain insights into the responsibilities, challenges, and best practices associated with test management in SAP projects. Additionally, the webinar delves into the significance of heatmaps as a visual aid for identifying testing priorities, areas of risk, and resource allocation within SAP landscapes. Through this session, attendees can expect to enhance their understanding of test management principles while learning practical approaches to optimize testing processes in SAP environments using heatmap visualization techniques
What will you get from this session?
1. Insights into SAP testing best practices
2. Heatmap utilization for testing
3. Optimization of testing processes
4. Demo
Topics covered:
Execution from the test manager
Orchestrator execution result
Defect reporting
SAP heatmap example with demo
Speaker:
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
The Art of the Pitch: WordPress Relationships and SalesLaura Byrne
Clients don’t know what they don’t know. What web solutions are right for them? How does WordPress come into the picture? How do you make sure you understand scope and timeline? What do you do if sometime changes?
All these questions and more will be explored as we talk about matching clients’ needs with what your agency offers without pulling teeth or pulling your hair out. Practical tips, and strategies for successful relationship building that leads to closing the deal.
The Art of the Pitch: WordPress Relationships and Sales
GBI: Role of BS
1. GREEN BUILDING
Role of Building Surveyors
INDEX (GBI)
Adi Irfan Che-Ani, UKM
Azzalilah Ramdani Musa, UKM
Norngainy MohdTawil, UKM
HafsahYahaya,TWINTECH
Ahmad Sairi, MPKj
15th International Surveyors’ Congress
Hotel Istana, Kuala Lumpur
28 June 2013
2. Part A
Part B
Part C
Building Surveyors involvement in GBI
GBI Assessment
• Energy Efficiency
• Indoor Environmental Quality
• Sustainable Site Planning + Management
• Materials and Resources
• Water Efficiency
• Innovation
Sample of GBI assessment on SOHO
Nucleus, Mutiara Damansara
Scope of Presentation
3. Building Surveyors involvement in
Green Building Index (GBI)
1. GBI facilitator
2. Coordination of GBI assignment among the
project team
3. Submitting person
• 1- 6 GBI assessment
4. Specific BS role in GBI scoring strategy
blog.equiprent.com
4. GBI Assessment
6 AssessmentCriteria
EE
• Energy Efficiency
EQ
• Indoor Environmental Quality
SM
• Sustainable Site Planning & Management
MR
• Material & Resources
WE
• Water Efficiency
IN
• Innovation
1
6
GBIAssessmentCriteria
www.constructionlawsignal.com
5. EE Energy Efficiency
GBI Assessment Criteria
EE 7
• Post
Occupancy
commissioning
EE 8
• EE verification
EE 9
• Sustainable
maintenance
www.ucl.ac.uk
6. EQ Indoor Environmental
Quality
GBI Assessment Criteria
www.tradiantcad.com
EQ 12
EQ 14
EQ 15
• External view
• IAQ before and
during occupancy
• Post occupancy
comfort survey
7. SM Sustainable Site Planning &
Management
GBI Assessment Criteria
www.constructionweekonline.in
SM1 - Site
selection
SM3 -
Development
density &
community
connectivity
SM4 -
Environment
Management
SM5 -
Earthwork-
construction
activity pollution
control
SM6 - Qlassic
SM7 - Workers'
site amenities
SM8 - Public
transportation
access
SM9 - Green
vehicle Priority
SM10 - Parking
capacity
SM12 - Greenery
& roof
SM13 - Building
user manual
10. IN Innovation
GBI Assessment Criteria
www.knowledge4innovation.eu
IN 1
Innovation In Design
& Environmental
Design Initiatives
IN2
Green Building Index
Accredited Facilitator
12. SAMPLE OF GBI ASSESSMENT
Open Plan Office Towers (8 & 20 storey)
SOHO, Nucleus, Mutiara Damansara
Credit to my GBI Facilitator group, G5: ChowYew Meng, David WangTeng
Peng, Hin FukYi, Hossam Eldien Elsawwaf, Kuan FookYee, Mohd Fuad Ahmad
13. Project Background
SOHO @ Nucleus, Mutiara Damansara
Property address
Lot area
Total land area
Gross floor area
Plot ratio
Development ratio
Parking bay
Parking bay (OKU)
Lot 67329 & 67330, Jalan PJU 7/7, Mutiara
Damansara, Petaling Jaya, Selangor
2.10 acre
8516 m2
25430.8
3.0
1:3.0
383 (authority requirement)
8
14. GBI Assessment
Part Item
Max
Points
Baseline
1 Energy Efficiency 35 2
2 Indoor Environmental Quality 21 9
3 Sustainable Site Planning &
Management
16 8
4 Material & Resources 11 2
5 Water Efficiency 10 0
6 Innovation 7 0
Total Score 100 21
AssessmentCriteria Score Summary
18. EE7 Post Occupancy Commissioning
All the tenancy fit-out works shall be submitted to the design
engineer for review and approve for construction before any
fit-out works can be carried to ensure the original design
intent of EE and IEQ is not compromised
Important checklists are:
• The choice of lightings proposed – must be energy efficient
lightings
• Materials used - to ensure that no materials that can pollute
the indoor air quality and the health of the occupants are
allowed. Examples are choice of paints & carpets selected
Baseline MS 1525 Gold Cost
0 0 2 40,000
19. EE7 Post Occupancy Commissioning
Upon completion of the fit-out works, he will verify and fine-tune
the installation to suit.
Within 12 months of practical completion or maybe earlier if
there is at least 50% of occupancy, the appointed CxS will carry
out a full post commissioning of the building’s energy related
system to verify their system performance is still sustained in
conjunction with the completed tenancy fit-outs.
The estimated additional cost of post commissioning by
appointing the same CxS is RM40,000.00
20. EE8 EEVerification
The building will use Energy Management System to monitor
and analyze energy consumption which includes reading of
sub-meters. The EMS’s Maximum Demand Limiting
program shall be fully commissioned within 12 months of
practical completion or an earlier date where there is at least
50% occupancy.
Functions of the Energy Management System
• Identify equipments that will be on the Maximum Demand
Limiting program. i.e. car park ventilation fans, building
exhaust fans ,water pumps, chillers etc
• Design a trend logging on the EMS to document down the
effectiveness of the demand limiting program and do the
necessary program changes if required
Baseline MS 1525 Gold Cost
0 2 2 -
21. EE8 EEVerification
•Design a trend logging on the EMS to document down the
effectiveness of the demand limiting program and do the
necessary program changes if required
•Design a trend logging to monitor all power consumption items
required for BEI computation
The actual building BEI can then be verified for the completed
building.
There shall be no additional cost incurred as the EMS system
shall be programmed and commissioned to monitor the building
energy consumption in MS1525.
22. EE9 Sustainable Maintenance
At least 50% of permanent building maintenance team will be
stationed at site 3 months in advance before practical
completion to ensure that the team fully participated in the
testing & commissioning of all building energy related system
and be familiarized with them.
Evidence of documented plan for at least 3 years facility
maintenance and maintenance budget (including staffing and
outsourced contracts) will be provided
Maintenance Budget items are:
• Staff cost including training cost
• General Housekeeping including façade cleaning–
outsourced contract
• Lift maintenance – outsourced contract
Baseline MS 1525 Gold Cost
0 2 3 40,000
23. EE9 Sustainable Maintenance
•Air conditioning maintenance – airside
•Air conditioning maintenance – chiller plant c/w water treatment
•Electrical Installation inspection by Competent Engineer
•Electrical Protection relays calibration
•EMS maintenance contract – to cover for program
modifications and general upkeep of system
•Ultrasonic and thermal scanning of electrical system to detect
for early signs of failure
•Cleaning of domestic & rainwater storage water tanks
•Lighting re-lamping
•Landscaping
•Fire fighting system maintenance contract
•Consumable items
•Yearly IAQ testing
•Quarterly Testing for legionella bacteria at cooling towers
24. EE9 Sustainable Maintenance
A designated maintenance office, fully equipped with all the
necessary facilities, tools, instrumentation and inventory storage
will be provided
Proposed Maintenance Office at Block B, Ground Floor Plan
26. Assessment Criteria Score
Summary & Estimated Cost
Criteria Item Points Baseline MS1525 Gold Cost
EQ
INDOOR ENVIRONMENT
QUALITY
EQ 1 Min IAQ performance 1 1 1 1 -
EQ 2 ETS control 1 1 1 1 -
EQ 3
Carbon dioxide monitoring and
control
1 0 0 1 70,000
EQ 4 Indoor air pollutants 2 0 0 2 -
EQ 5 Mould prevention 1 1 1 1 -
EQ 6
Thermal comfort: design and
control
2 0 1 2 325,000
EQ 7 Air change effectiveness 1 0 0 0 0
EQ 8 Daylighting 2 2 2 2 0
EQ 9 Daylight glare control 1 0 0 1 100,000
EQ 10 Electric lighting levels 1 1 1 1 Incl in EE5
EQ 11 High frequency ballasts 1 0 0 1 Incl in EE5
EQ 12 External view 2 2 2 2 -
EQ 13 Internalnoise level 1 1 1 1 42,000
EQ 14
IAQ before and during
occcupancy
2 0 0 2 -
EQ 15 Post occupancy comfort survey 2 0 0 2 30,000
TOTAL = 21 9 10 20 567,000
27. EQ12 External Views
Baseline MS 1525 Gold Cost
2 2 2 -
More than 75% of the NLA has external views through windows
To adopt ‘Open Plan Concept’
Meeting rooms and managerial rooms to be located away from
windows in order to maximize the external views
Low cubicle partition vision glass panels to be used
• More than 75
% of NLA has
a direct line
sight through
vision
glazing
28. EQ14 IAQ Before & During
Occupancy
Baseline MS 1525 Gold Cost
0 0 2 -
Air Flushing
Within 12 months of occupancy, conduct IAQ testing to
demonstrate maximum concentrations for pollutants are not
exceeded according to the Indoor Air Quality Code of Malaysia
Permanent air flushing system of at least 10 air changes/ hour
operation is installed for use during occupancy stage
Periodically check supply air and outdoor air flows
29. EQ15 Post Occupancy Comfort
Survey:Verification
Baseline MS 1525 Gold Cost
0 0 2 30,000
Survey to be conducted by
a third party within 12
months of occupancy:
• thermal & RH comfort
• visual comfort
• acoustic comfort
• co2,VOC, odour comfort
31. Assessment Criteria Score
Summary and Estimated Cost
CRITERIA ITEM Points Baseline MS1525 Gold Cost
SM
SUSTAINABLE SITE
PLANNING &
MANAGEMENT
SM 1 Site selection 1 1 1 1 -
SM 2 Brownfield Redevelopment 1 0 0 0 -
SM 3
Development density &
community connectivity
2 2 2 2 -
SM 4 Environment Management 2 0 0 2 42,995
SM 5
Earthwork-construction
activity pollution control
1 1 1 1 -
SM 6 Qlassic 1 0 0 1 -
SM 7 Workers' site amenities 1 1 1 1 -
SM 8 Public transportation access 1 1 1 1 -
SM 9 Green vehicle Priority 1 0 0 1 -
SM 10 Parking capacity 1 1 1 1 -
SM 11
Stormwater design-Quantity
& quality control
1 0 0 0 -
SM 12 Greenery & roof 2 1 1 2 80,120
SM 13 Building user manual 1 0 0 1 -
TOTAL = 16 8 8 14 123,115.00
32. SM1 Site Selection
Baseline MS 1525 Gold Cost
1 1 1 -
Proposed site does not meet any of the following criteria:
•Prime agricultural land
•Forest reserve or State Environmental Protection Zones
•Within 30m of any wetlands as defined by the Structure Plan OR within
setback distances from wetlands
•Previously undeveloped land that is within 30 m of Mean High Water
Spring (MHWS) sea level
•Previously undeveloped land that is within 20 m of lake, river, stream
and tributary
•Land which prior to acquisition for the project was public parkland
33. SM3 Development Density &
Community Connectivity
Baseline MS 1525 Gold Cost
2 2 2 -
Level sq m sq m NLA Remarks
10-17 7859.20 6680.32 @85%
1-9 8730.00 8841.60 10542.96 @60%
Total Fl
Area 8,730.00 16,700.80 17,223.28
Land Area 8,516.00 2.10 2.10
Density 88,098.41 sq.ft
(A) Development Density
REQUIREMENT: Minimum Density of 20,300 m2 per hectare net (87,000
sq.ft per acre net)
Floor Area Calculation, as below:
34. SM3 Development Density &
Community Connectivity
(B) Community Connectivity
REQUIREMENT: Proposed new building which meets the following
criteria:
•within 1km of residential zone or neighbourhood with an average density
of 25 units per hectare net (10 units per acre net)
•within 1 km of at least 10 Basic Services (refer below)
•with pedestrian access between the building and the services.
1) Bank (Tesco, Curve) 6) Post Office (@ Ikano)
2)
Place of Worship (Surau
(Tesco,Curve, Mosque TTDI) 7) Restaurant (Tesco,Curve)
3) Convenience / Grocery (Tesco ) 8)
School (SMK Bandar
Utama)
4)
Park (Mutiara Damansara
Recreation Park) 9)
Supermarket (Tesco, Cold
Storage)
5) Pharmacy (Tesco Watson) 10)
Fitness Centre (Celebity
Fitness Centre)
36. SM4 Environment Management
(A) Conservation:
On previously developed or graded site, restore or protect a minimum of
50% of the site area (excluding the building footprint) with native or
adaptive vegetation.
Total Land Area 8516 m2
Building footprint 2300 m2
Remaining area 6216 m2
(Road, hardscape &
landscape)
50% remaining area 3108 m2
Proposed vegetation area
Ground level 3423 m2
(Softscape & trees with
shade)
So, 3423 > 3108 m2
Baseline MS 1525 Gold Cost
0 0 2 42,995
37. SM4 Environment Management
(A) Open Space:
Provide vegetated open space within the project boundary to exceed the
local zoning’s open space requirement for the site by 25%.
Proposed existing vegetation at Ground Floor to exceed the local zoning’s
open space requirement for the site by 25%.
Petaling Jaya’s (PJ) open space requirement is 20%.
•PJ Open space requirement= 20% x 8516 = 1703.2 m2
•Additional 25% = 25% x 1703.2 = 425.8 m2
•Total open space requirement = 1703.2 + 425.8 = 2129 m2
•Vegetation at Ground Floor= 3423 m2 is exceed 2129 m2
Additional landscape cost (area for vegetation at ground floor – PJ open
space)
= 3423 – 1703.2 = 1719.8 m2
= RM 25 x 1719.8 = RM 42,995
40. SM5 Earthworks: Construction
Activity Pollution Control
Baseline MS 1525 Gold Cost
1 1 1 -
In the Tender Stage, the requirement to establish an Erosion
Sedimentation Control (ESC) Plan is clearly documented. The
successfully contractor shall be supervised to ensure the ESC
specifications are strictly complied in order to accomplish the following
objectives:
•Prevent loss of soil during construction by storm water runoff and/or wind
erosion, including protecting topsoil by stockpiling for reuse.
•Prevent sedimentation of storm sewer or receiving stream.
Prevent polluting the air with dust or particulate matters.
Drive through bath
41. SM5 Earthworks: Construction
Activity Pollution Control
During Construction Stage, the ESC specifications/ measures undertaken
by the contractors are:
•Laying interlocking pavers at the entrance to construction site.
•Construct wash trough nearest to exit to wash and clean the vehicles
before leaving the site.
•To construct temporary earth drain, silt trap and sedimentation basin to
control soil erosion and the quality of water discharge.
•To protect the cut earth slope and disturbed earth surfaces with
temporary cover such as plastic sheets.
42. SM5 Earthworks: Construction
Activity Pollution Control
During Construction Stage, the ESC specifications/ measures undertaken
by the contractors are (cont’d)
•To compact the earth slope immediately after cutting and carry out turfing
or hydro-seeding as soon as possible to prevent soil erosion.
•To water the exposed earth surfaces at regular intervals during good
weather to prevent dust and particulate matters from polluting the air.
The tender document is deemed to have also stipulated this requirement
(Environmental Management Plan EMCP by main contractor which
submitted to the Owner). The sample is as below.
Shall be specified in the tender specification. No additional cost incurred.
43. SM6 QLASSIC
Baseline MS 1525 Gold Cost
0 0 1 -
Quality Assessment System in construction (Qlassic) is a system or
method to measure and evaluate the quality of workmanship of a
construction work based on the relevant approved standard.
One (1) point will be gain simply by controlling the quality of workmanship
in construction work to achieve a minimum score of 70%.
44. SM6 QLASSIC
The requirement of minimum 70% score shall be specified in the tender
specification so that the contractor is aware of the expectation and hence
maintaining the quality of workmanship throughout the project.
There shall be no additional cost as CIDB is give this assessment free-of-
charge at the moment.
45. SM7 Workers Site Amenities
Baseline MS 1525 Gold Cost
1 1 1 -
•Temporary Accommodation for Workers
- site accommodation is not allowed
- Provide temporary rented accommodation nearby site
- Provide transport vehicles to and fro the site
•Portable Toilets
-provide adequate portable toilets based on number of workers (including
subcontractors)
•Health & Hygiene Facilities
-provide trained and qualified Health & Safety Officer on site as required
by DOSH.
-Provide facilities - First Aid room, first aid box, piped clean water for
drinking & washing
•Waste Disposal
-ensure that minimum waste is created; reduce, reuse & recycle.
No additional cost incurred.
46. SM7 Workers Site Amenities
Toilet at every
alternate floor
Portable toilet
on the ground
Rubbish
disposal
Emergency &
first aid room
47. SM8 PublicTransportation Access
Baseline MS 1525 Gold Cost
1 1 1 -
•Locate project within 1km of an existing, or planned and funded,
commuter rail, or light rail station OR
•Locate project within 500m of at least one bus stop.
500m radius
Bus stop
48. SM9 GreenVehicle Priority
Baseline MS 1525 Gold Cost
0 0 1 -
Car park requirements:
Site Area8516 m2
GFA proposed25430.8 m2
Occupant load =25430.8 m2 / 14 m2 = 1816.4
Preferred parking
=5% of Full Time Equivalent (FTE) occupants
=1816.4/ 4 (person per car)
=454 cars x 5%
=23 nos. reserved car park bays for green vehicles.
The bays is located at Aras Bawah 1.
49. SM10 Parking Capacity
Baseline MS 1525 Gold Cost
1 1 1 -
Car park requirements: 383 (as not to exceed minimum local zoning
requirement)
Car park provided:450
Omission:450-383 = 67
Car park allocation:Green vehicle + OKU + Preferred parking for
carpool/vanpool (5%)
*Preferred parking for carpool/vanpool (5% from 383)
= 23 + 8 + (5% from 383)
= 23 + 8 + 20 = 51
To provide 20 car park bays for carpools and vanpools.
So, 51 car park bays are located adjacent to lift lobby at Aras Bawah
Tanah 1.
No additional cost incurred.
50. SM10 Parking Capacity
51 car park bays are located adjacent to lift
lobby at Aras Bawah Tanah 1
Aras Bawah Tanah 1
51. SM12 Greenery & Roof
Baseline MS 1525 Gold Cost
1 1 2 80,120
(A) Hardscape and greenery application
The strategy is to:
•Provide pervious paving materials with SRI of at least 29 at driveway
area;
•Provide shades within the perimeter landscape area on ground level; and
•Provide open grid pavement system.
52. SM12 Greenery & Roof
Hardscape and greenery should > 50% of total hardscape
Total hardscape and greenery = 6410m2
50% of hardscape = 50% x 6410 = 3205 m2
Hardscape and greenery = open grid paving system + trees with shade
= 2299 + 920 = 3219 m2 So, 3219 > 3205 m2.
53. SM12 Greenery & Roof
(B) Roof application
Proposed development complied:
Roof Type – Low slope < 2: 12, has SRI of 78.
Part 3 : = (Area of SRI /0.75) + Area of vegetated roof / 0.5) >/ Total Roof
Area
= (Block A & B / 0.75 ) + ( 0 / 0.5 ) ≥ 1952.40 m2
= 2603.2 > 1952.4 m2 – Complied
Proposed to use PU white paint roof coating with SRI of 85
Additional cost:
= PU coating at RM 50 per sqm x roof area of coating (roof area – M&E
equipment area)
M&E equipment area (water tank and cooling tower) =
60+140+50+100=350m2
= RM 50 x (1952.40 – 350 m2)
= RM 50 x 1602.40 m2 = RM 80,120
54. SM13 Building User Manual
Shall be specified in the tender
specification.
No additional cost incurred since
this Building User Manual (BUM)
Documentation is part of fees
applicable to provision of basic
GBI Facilitator services.
The coordination of preparing
the BUM shall be carried out by
a competent person.
For this purpose, it is part of the
responsibility of appointed
Facility Manager and/or Building
Executive.
Baseline MS 1525 Gold Cost
0 0 1 Incl. IN2
Building
User Manual
55. SM13 Building User Manual
Acknowledgement
Preface
SECTION 1 (INTRODUCTION)
1.1 GENERAL
1.1.1 Purpose
1.1.2 Scope
1.1.3 Project Quality Objective
1.1.4 Handing Over Management
1.2 MALAYSIAN TOTAL ASSET MANAGEMENT
(PAM)
1.2.1 Dasar Pengurusan Aset Kerajaan (DPAK)
1.2.2 Manual Pengurusan Aset Menyeluruh (MPAM)
1.3 GOVERNMENT NEEDS STATEMENT
1.4 GOVERNMENT REQUIREMENTS
SECTION 2 (PROJECT INFORMATION)
2.1 INTRODUCTION OF THE PROJECT
2.1.1 Site Background
2.1.2 Site Characteristic
2.1.3 Environmental Studies
2.1.4 SWOT Analysis
2.1.5 Site Proposal
2.2 PROJECT INFORMATION / DESCRIPTION
2.3 MAINTENANCE ORGANIZATION/ CONSULTANT
2.3.1 Maintenance Department Organization
2.3.2 Scope of Work of Maintenance Personnel
2.4 GREEN BUILDING INDEX (GBI) SECTION
2.4.1 Overall Score Summary
2.4.2 Green Building features (passive and active)
2.5 RULES, REGULATIONS AND STANDARDS
2.6 LOCAL AUTHORITY DOCUMENTATION
2.6.1 Process of Plan Approval
2.6.2 Records of Plan Approval
Building
User Manual
56. SM13 Building User Manual
2.7 BUILDING BACKGROUND / INFORMATION
2.7.1 Fire Safety Manual / Health & Safety
2.7.2 Design Philosophy
- Special Design Features
2.7.3 Drawing and Drawing Record
-As Built Drawing- inclusive of soft copy
-Technical Specification-inclusive of softcopy
2.7.3 Construction Phase
- Knowing the construction process
2.7.4 Change Management
2.7.5 Asset Register
- Inclusive of Warranty and Guarantee Management –
M&E
SECTION 3 (MAINTENANCE BUSINESS PROCESS)-FM SERVICES
3.1 INTRODUCTION
Working Hours
Work Order-Complaint Process
Customer Care Centre
FACILITIES MANAGEMENT
Civil Maintenance
Mechanical, Electrical and Plumbing
House Keeping Services
Pest Control Services
Landscape Services
Security Guards
Building
User Manual
57. SM13 Building User Manual
SECTION 4 (BUILDING OPERATION & COMMISIONING)
INTRODUCTION OF BUILDING OPERATION AND MANUAL
4.2 OPERATION AND MANUAL
Description and Operation of Civil
List / Contact person of Supplier & Manufacturer
Structure of the building
List / Contact person of Supplier & Manufacturer
Operation of Mechanical System
List / Contact person of Supplier & Manufacturer
Operation of Electrical System
List / Contact person of Supplier & Manufacturer
SECTION 5 (BUILDING MAINTENANCE MANAGEMENT)
INTRODUCTION OF BUILDING MAINTENANCE AND
MANAGEMENT
Maintenance Schedule and Frequency
Planned Preventive Maintenance (PPM) – Building-
Daily, weekly, monthly, yearly
PPM for C&S - Daily, weekly, monthly, yearly
PPM for M&E- Daily, weekly, monthly, yearly
SECTION 6 (APPENDIX)
Building
User Manual
60. MR5 Storage & Collections of
Recyclables
Baseline MS 1525 Gold Cost
0 0 1 10,000
> Facilitate reduction of waste generated during
Construction and during building occupancy that is hauled
and disposed of in landfills.
Strategy:
During building occupancy stage
1) Provide dedicated area(s) and storage for collection of
non hazardous materials for recycling & provide
permanent recycle bin
During Construction for non hazardous & recycling
2) Always allocate a designated sum in every contract.
3) Set up Construction Waste Disposal Guidelines during
construction and in building manual.
4) Identify relevant debris/ waste storage area
5) Educate site workers on the storage and disposal method.
61. MR6 Construction Waste
Management
Baseline MS 1525 Gold Cost
0 0 1 -
Recycle and/or salvage ≥ 50% volume of non-hazardous
construction debris. The most effective way would be by
contractual obligations:
1. Quantify total tonnage of waste via truck loads of
waste disposal
2. To achieve 50% - 60% waste to be redirected to
identified manufacturer.
CONTRACT PROCUREMENT
1. Compulsory for contractors to provide recycle waste bins.
2. Contractor to provide method statement for segregation of
material during construction.
3. Contractors are to provide installation warranty from
suppliers and use suppliers panel of sub con to control
waste, quality and double handling.
4. Provide list of construction haulers and recyclers for
contractor to redirect waste.
62. MR6 Construction Waste
Management
ADDITIONAL COST
50 recycle bins x RM 150/u = RM 7,500.00
2 bins at Refuse Chamber = RM 2,500.00
Total = RM10,000.00
Item Material Waste Avoidance Strategy
Structure Element Concrete On Site: Use precast elements
Off Site: Use for road and pathway
construction, recyele for concrete
aggregate
Door, Window, Glass On Site: re-use Sell to registered recycle
vendorsOff Site: re-use or recycle
Fit Out Fixed Partition On Site: partly re-use
Sell to registered recycle
vendors
Off Site: separate and recycle
Carpet On Site: partly re-use Sell to registered recycle
vendorsOff Site: separate and recycle
Recycled Product Recycling centres
Glass Kuala Lumpur Glass Manufactures Co. Sdn. Bhd
Lot 5, Jln Kilang
46050 Petaling Jaya
Selangor
Contact Person: Pegawai Komersial: Mrs. Wendy Goh *
Contact: 7781 2277(T) 7781 5813(F)
Metal Seng Hiap Metal Sdn Bhd
Contact Person: Johnny Seah
Contact: 07 3863 739
Paper Heng Hiap Sdn Bhd
Contact Person: Johnny Seah
Contact: 07 3863 739
Tiles & Timber PROMAK INDUSTRY SDN BHD
No. 12D, 6 Miles, Jln Puchong,
58200 Kuala Lumpur
Kuala Lumpur
Contact: 03-791 6481(T) 03-792 3046(F)
66. Assessment Criteria Score
Summary & Estimated Cost
Criteria Item Points Baseline MS1525 Gold Cost
IN1
Innovation in Design &
Environmental Design
Initiatives
6 0 0 6 430,000
IN2
Green Building Index
Facilitator
1 0 0 1 270,000
Total 7 0 0 7 700,000
67. Baseline MS 1525 Gold Cost
0 0 1 30,000
IN1 Innovation In Design &
Environmental Design Initiatives
INNOVATION 1: CONDENSATE WATER RECOVERY FOR USED
COOLING TOWER MAKE-UP WATER OR OTHER SUITABLE
APPLICATION
FCU and its drain pan
AHU and its drain pan
68. Baseline MS 1525 Gold Cost
0 0 1 60,000
IN1 Innovation In Design &
Environmental Design Initiatives
INNOVATION 2: To provide heat recovery wheel to treat the
fresh air intake
69. Baseline MS 1525 Gold Cost
0 0 1 90,000
IN1 Innovation In Design &
Environmental Design Initiatives
INNOVATION 3 Non-Chemical Water Treatment System
The non-chemical water treatment system uses is a pipe that
wound with coils that impart pulsed, high frequency,
electromagnetic energy into the water
70. Baseline MS 1525 Gold Cost
0 0 1 150,000
IN1 Innovation In Design &
Environmental Design Initiatives
INNOVATION 4: Advance Air Filtration System (Electronic Air
Filter)
The EAC will be able to remove airborne particles at a dust
spot efficiency of 97% of 0.3 micron. It can also remove odor,
smoke, bacterial and spores
Electronic Air Filter Impingement, Polarization and Agglomeration
Process
71. Baseline MS 1525 Gold Cost
0 0 1 -
IN1 Innovation In Design &
Environmental Design Initiatives
INNOVATION 5: Recycling of All Fire System Water During
Regular Testing
72. IN1 Innovation In Design &
Environmental Design Initiatives
INNOVATION 6 : Refrigerant Leak Detection
Refrigeration leak detector system in a chiller plant room is
required to provide early detection of any leaking of refrigerant
from the chiller.
This system have a pump that provide 2-3 suction points from
the chiller and is capable to detect refrigerant of 10ppm in the
air.
Baseline MS 1525 Gold Cost
0 0 1 100,000
73. IN2 Green Building Index
Accredited Facilitator
Baseline MS 1525 Gold Cost
0 0 1 270,000
To engage a facilitator to support and encourage the design
and implementation required for Green Building Index rated
buildings
Strategy
To engage a facilitator from conception until the GBI certification
is obtained
Additional Cost
Project Registration fee = RM 20,000
GBI Facilitator fee = RM 250,000
76. Return of Investment
ITEM DESCRIPTION/CATEGORY MAXIMUM
POINTS
POINTS
ACHIEVED
EST. COST
IMPACT (RM)
EST.
SAVINGS
PER YEAR
(RM)
PAYBACK
(YEAR)
1 Energy Efficiency (EE) 35 32 1,105,809.00 1,017,205.20 1.09
2 Indoor Quality Environment
(IEQ)
21 20 547,000.00
3 Sustainable Site Planning and
Management (SM)
16 14 123,115.00
4 Material and Resources (MR) 11 8 10,000.00
5 Water Efficiency (WE) 10 7 59,500.00 19,460.00 30.3
6 Innovation (IN) 7 7 700,000.00
TOTAL 100 81 3,100,924.00 1,036,665.00 2.99
Estimated Total Building Construction Cost (Base) : RM78 mil.
Estimated Total Additional Cost Required to be : RM3,100,924.00
incorporated in the Green Building Design Features
for ‘GOLD’ Certification by GBISB
Percentage of Additional Cost Required over : 3.98%
Base Building