SlideShare a Scribd company logo
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
A B C D E F G H I J K L
CADANGAN PEMBANGUNAN 2 BLOK 31 TINGKAT PANSAPURI SERVICE (404) UNIT DI ATAS 7 TINGKAT PODIUM
BERSERTA 2 TINGKAT BASEMEN DI ATAS LOT 160, JALAN ROBSON OFF JALAN SYED PUTRA, MUKIM KUALA
LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR.
CFA (M2) = 88,935.58 CFA (M2) = 7,992.96 CFA (M2) = 29,713.97 CFA (M2) = 25,745.95 CFA (M2) = 25,482.70
Estimated Cost Estimated Cost Estimated Cost Estimated Cost Estimated Cost
Construction per m2 Construction per m2 Construction per m2 Construction per m2 Construction per m2
Cost (RM) of CFA (RM) Cost (RM) of CFA (RM) Cost (RM) of CFA (RM) Cost (RM) of CFA (RM) Cost (RM) of CFA (RM)
1.00 SUBSTRUCTURE
1.01 SITE PREPARATION 1,795,000.00 20.18 161,000.00 20.14 600,000.00 20.19 520,000.00 20.20 514,000.00 20.17
1.02 PILING 17,465,000.00 196.38 1,570,000.00 196.42 5,835,000.00 196.37 5,056,000.00 196.38 5,004,000.00 196.37
1.03 FOUNDATIONS 5,496,000.00 61.80 494,000.00 61.80 1,836,000.00 61.79 1,591,000.00 61.80 1,575,000.00 61.81
1.04 BASEMENT CARCASS 404,000.00 4.54 404,000.00 50.54 - - - - - -
Group Element Total 25,160,000.00 282.90 2,629,000.00 328.91 8,271,000.00 278.35 7,167,000.00 278.37 7,093,000.00 278.35
2.00 STRUCTURAL FRAME
2.01 FRAME 40,067,000.00 450.52 3,247,000.00 406.23 11,178,000.00 376.19 12,887,000.00 500.54 12,755,000.00 500.54
2.02 TRANSFER STUCTURES - - - - - - - - - -
2.03 ROOF TRUSSES - - - - - - - - - -
2.04 ROOF STRUCTURE 386,000.00 4.34 - - - - 194,000.00 7.54 192,000.00 7.53
2.05 STAIRCASE & RAMP 1,832,000.00 20.60 111,000.00 13.89 455,000.00 15.31 636,000.00 24.70 630,000.00 24.72
Group Element Total 42,285,000.00 475.46 3,358,000.00 420.12 11,633,000.00 391.50 13,717,000.00 532.78 13,577,000.00 532.79
3.00 EXTERNAL WALLING AND FINISHES
3.01 WALLS 2,290,000.00 25.75 - - 674,000.00 22.68 812,000.00 31.54 804,000.00 31.55
3.02 EXTERNAL FINISHES 4,298,000.00 48.33 - - 2,243,000.00 75.49 1,033,000.00 40.12 1,022,000.00 40.11
3.03 CURTAIN WALLING - - - - - - - - - -
3.04 DOORS - - - - - - - - - -
3.05 ALUMINIUM SCREENING 6,626,000.00 74.50 - - 6,626,000.00 222.99 - - - -
3.06 WINDOWS 5,386,000.00 60.56 - - - - 2,707,000.00 105.14 2,679,000.00 105.13
Group Element Total 18,600,000.00 209.14 - - 9,543,000.00 321.16 4,552,000.00 176.80 4,505,000.00 176.79
4.00 ROOF COVERING ,ETC
4.01 ROOFING 782,000.00 8.79 - - - - 393,000.00 15.26 389,000.00 15.27
4.02 RAINWATER GOODS 1,544,000.00 17.36 - - - - 776,000.00 30.14 768,000.00 30.14
Group Element Total 2,326,000.00 26.15 - - - - 1,169,000.00 45.41 1,157,000.00 45.40
5.00 INTERNAL WALLING
5.01 WALLS 1,603,900.00 18.03 92,900.00 11.62 216,000.00 7.27 651,000.00 25.29 644,000.00 25.27
5.02 DOORS 9,509,000.00 106.92 - - 201,000.00 6.76 4,678,000.00 181.70 4,630,000.00 181.69
Group Element Total 11,112,900.00 124.95 92,900.00 11.62 417,000.00 14.03 5,329,000.00 206.98 5,274,000.00 206.96
6.00 INTERNAL FINISHES
6.01 FLOORS 8,745,600.00 98.34 92,600.00 11.59 1,032,000.00 34.73 3,830,000.00 148.76 3,791,000.00 148.77
6.02 WALLS 8,590,000.00 96.59 214,000.00 26.77 829,000.00 27.90 3,793,000.00 147.32 3,754,000.00 147.32
6.03 CEILINGS 2,473,000.00 27.81 103,000.00 12.89 378,000.00 12.72 1,001,000.00 38.88 991,000.00 38.89
6.04 STAIRCASES AND RAILINGS 826,000.00 9.29 53,000.00 6.63 359,000.00 12.08 208,000.00 8.08 206,000.00 8.08
Group Element Total 20,634,600.00 232.02 462,600.00 57.88 2,598,000.00 87.43 8,832,000.00 343.04 8,742,000.00 343.06
7.00 FITTINGS,ETC.
7.01 SANITARY WARES & FITTINGS 6,825,000.00 76.74 - - 265,000.00 8.92 3,280,000.00 127.40 3,280,000.00 128.71
7.02 SIGNAGES 557,000.00 6.26 50,000.00 6.26 186,000.00 6.26 161,000.00 6.25 160,000.00 6.28
7.03 MAIL BOX 60,400.00 0.68 - - - - 30,200.00 1.17 30,200.00 1.19
7.04 LIF CAR FINISHES - - - - - - - - - -
Group Element Total 7,442,400.00 83.68 50,000.00 6.26 451,000.00 15.18 3,471,200.00 134.83 3,470,200.00 136.18
8.00 SERVICES
8.01 CHILLER PLANT - - - - - - - - - -
8.02 HVAC 5,996,000.00 67.42 499,000.00 62.43 959,000.00 32.27 2,269,000.00 88.13 2,269,000.00 89.04
8.03 Fire Protection 1,704,000.00 19.16 315,000.00 39.41 665,000.00 22.38 364,000.00 14.14 360,000.00 14.13
8.04 Hot, Cold Water & Sanitary Plumbing 6,023,000.00 67.72 157,000.00 19.64 597,000.00 20.09 2,648,000.00 102.85 2,621,000.00 102.85
8.05 Natural Gas - - - - - - - - - -
8.06 BMS - - - - - - - - - -
8.07 Pool Filtration System 740,000.00 8.32 - - 740,000.00 24.90 - - - -
8.08 Electrical HV & Genset - - - - - - - - - -
8.09 Electrical LV 1,808,000.00 20.33 143,000.00 17.89 496,000.00 16.69 585,000.00 22.72 584,000.00 22.92
8.10 Telecom, Telephone services 11,750,000.00 132.12 1,059,000.00 132.49 3,936,000.00 132.46 3,410,000.00 132.45 3,345,000.00 131.27
8.11 Metering Utilities - - - - - - - - - -
8.12 Vertical Transportation 5,064,000.00 56.94 236,000.00 29.53 942,000.00 31.70 1,943,000.00 75.47 1,943,000.00 76.25
8.13 Security - - - - - - - - - -
8.14 Building Maintenance Units - - - - - - - - - -
8.15 Waste Collection System - - - - - - - - - -
8.16 Waste Bin System 153,000.00 1.72 14,000.00 1.75 51,000.00 1.72 44,000.00 1.71 44,000.00 1.73
8.17 Rain Water Harvesting System 168,000.00 1.89 - - 43,000.00 1.45 63,000.00 2.45 62,000.00 2.43
8.18 Profits and Attendance 1,002,180.00 11.27 72,690.00 9.09 252,870.00 8.51 339,780.00 13.20 336,840.00 13.22
8.19 BWICS 668,120.00 7.51 48,460.00 6.06 168,580.00 5.67 226,520.00 8.80 224,560.00 8.81
Group Element Total 35,076,300.00 394.40 2,544,150.00 318.30 8,850,450.00 297.85 11,892,300.00 461.91 11,789,400.00 462.64
9.00 External Works and Ancillary Works 6,545,000.00 73.59
SUB TOTAL ESTIMATED
CONSTRUCTION COST
169,182,200.00 9,136,650.00 41,763,450.00 56,129,500.00 55,607,600.00
Preliminary (8%) 13,534,576.00
Construction Contingency (5%) 8,459,110.00
Cost Escalation (Assuming tender to be
called in one year's time) (2%)
3,823,517.72
GRAND TOTAL ESTIMATED
CONSTRUCTION COST
194,999,403.72
Amount (RM) RM/m2 Amount (RM) RM/m2 Amount (RM) RM/m2 Amount (RM) RM/m2 Amount (RM) RM/m2
a. Structure 67,445,000.00 758.36 5,987,000.00 749.03 19,904,000.00 669.85 20,884,000.00 811.16 20,670,000.00 811.14
b. Architectural 66,660,900.00 749.54 605,500.00 75.75 13,009,000.00 437.81 23,353,200.00 907.06 23,148,200.00 908.39
c. M&E 35,076,300.00 394.40 2,544,150.00 318.30 8,850,450.00 297.85 11,892,300.00 461.91 11,789,400.00 462.64
BASEMENT CARPARK PODIUM CARPARK TOWER A TOWER B
Element
OVERALL PROJECT

More Related Content

What's hot

Petrotrim Pipe Schedules
Petrotrim Pipe SchedulesPetrotrim Pipe Schedules
Petrotrim Pipe Schedules
Petrotrim Services
 
Part ii
Part iiPart ii
Part ii
AlmirMustafi
 
Ws sinamics-sm150-gm150-igbt-ru c
Ws sinamics-sm150-gm150-igbt-ru cWs sinamics-sm150-gm150-igbt-ru c
Ws sinamics-sm150-gm150-igbt-ru c
Группа компаний СИС
 
DSI Inches to Decimal - Millimeter Conversion Chart
DSI Inches to Decimal - Millimeter Conversion ChartDSI Inches to Decimal - Millimeter Conversion Chart
DSI Inches to Decimal - Millimeter Conversion Chart
Distributor Service Incorporated
 
Decimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size DrillsDecimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size Drills
AmericanMillwright
 
RP Consumer Discretionary ex Autos performance 2013
RP Consumer Discretionary ex Autos performance 2013RP Consumer Discretionary ex Autos performance 2013
RP Consumer Discretionary ex Autos performance 2013
Marco Motta
 
Millimeter To Inch Conversion Table
Millimeter To Inch Conversion TableMillimeter To Inch Conversion Table
Millimeter To Inch Conversion Table
AmericanMillwright
 
08. icv sastanak (microsoft) miroslav nps3
08. icv sastanak (microsoft) miroslav nps308. icv sastanak (microsoft) miroslav nps3
08. icv sastanak (microsoft) miroslav nps3
Menadžment Centar Beograd
 
Lintech trs aseries_specsheet
Lintech trs aseries_specsheetLintech trs aseries_specsheet
Lintech trs aseries_specsheet
Electromate
 
Unite steel drill pipe and tool joints
Unite steel drill pipe and tool jointsUnite steel drill pipe and tool joints
Unite steel drill pipe and tool joints
Shanghai Unite Steel
 
Lintech s aseries_specsheet
Lintech s aseries_specsheetLintech s aseries_specsheet
Lintech s aseries_specsheet
Electromate
 
Inch To Millimeter Conversion Table
Inch To Millimeter Conversion TableInch To Millimeter Conversion Table
Inch To Millimeter Conversion Table
AmericanMillwright
 
005 apitubing
005 apitubing005 apitubing
005 apitubing
Limberg Tola Mayta
 
Drill pipe specifications
Drill pipe specificationsDrill pipe specifications
Drill pipe specifications
Shanghai Unite Steel
 
Kollmorgen gold line_bh_with_servostar_600_tb_catalog
Kollmorgen gold line_bh_with_servostar_600_tb_catalogKollmorgen gold line_bh_with_servostar_600_tb_catalog
Kollmorgen gold line_bh_with_servostar_600_tb_catalog
Electromate
 
Scan-to-CAD Comparison / PSH sample in Geomagic Qualify 2013
Scan-to-CAD Comparison / PSH sample in Geomagic Qualify 2013Scan-to-CAD Comparison / PSH sample in Geomagic Qualify 2013
Scan-to-CAD Comparison / PSH sample in Geomagic Qualify 2013
PSH Mechanical Design
 
Thermal Measurement of SiC SBD(SCS110AG)
Thermal Measurement of SiC SBD(SCS110AG)Thermal Measurement of SiC SBD(SCS110AG)
Thermal Measurement of SiC SBD(SCS110AG)
Tsuyoshi Horigome
 

What's hot (17)

Petrotrim Pipe Schedules
Petrotrim Pipe SchedulesPetrotrim Pipe Schedules
Petrotrim Pipe Schedules
 
Part ii
Part iiPart ii
Part ii
 
Ws sinamics-sm150-gm150-igbt-ru c
Ws sinamics-sm150-gm150-igbt-ru cWs sinamics-sm150-gm150-igbt-ru c
Ws sinamics-sm150-gm150-igbt-ru c
 
DSI Inches to Decimal - Millimeter Conversion Chart
DSI Inches to Decimal - Millimeter Conversion ChartDSI Inches to Decimal - Millimeter Conversion Chart
DSI Inches to Decimal - Millimeter Conversion Chart
 
Decimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size DrillsDecimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size Drills
 
RP Consumer Discretionary ex Autos performance 2013
RP Consumer Discretionary ex Autos performance 2013RP Consumer Discretionary ex Autos performance 2013
RP Consumer Discretionary ex Autos performance 2013
 
Millimeter To Inch Conversion Table
Millimeter To Inch Conversion TableMillimeter To Inch Conversion Table
Millimeter To Inch Conversion Table
 
08. icv sastanak (microsoft) miroslav nps3
08. icv sastanak (microsoft) miroslav nps308. icv sastanak (microsoft) miroslav nps3
08. icv sastanak (microsoft) miroslav nps3
 
Lintech trs aseries_specsheet
Lintech trs aseries_specsheetLintech trs aseries_specsheet
Lintech trs aseries_specsheet
 
Unite steel drill pipe and tool joints
Unite steel drill pipe and tool jointsUnite steel drill pipe and tool joints
Unite steel drill pipe and tool joints
 
Lintech s aseries_specsheet
Lintech s aseries_specsheetLintech s aseries_specsheet
Lintech s aseries_specsheet
 
Inch To Millimeter Conversion Table
Inch To Millimeter Conversion TableInch To Millimeter Conversion Table
Inch To Millimeter Conversion Table
 
005 apitubing
005 apitubing005 apitubing
005 apitubing
 
Drill pipe specifications
Drill pipe specificationsDrill pipe specifications
Drill pipe specifications
 
Kollmorgen gold line_bh_with_servostar_600_tb_catalog
Kollmorgen gold line_bh_with_servostar_600_tb_catalogKollmorgen gold line_bh_with_servostar_600_tb_catalog
Kollmorgen gold line_bh_with_servostar_600_tb_catalog
 
Scan-to-CAD Comparison / PSH sample in Geomagic Qualify 2013
Scan-to-CAD Comparison / PSH sample in Geomagic Qualify 2013Scan-to-CAD Comparison / PSH sample in Geomagic Qualify 2013
Scan-to-CAD Comparison / PSH sample in Geomagic Qualify 2013
 
Thermal Measurement of SiC SBD(SCS110AG)
Thermal Measurement of SiC SBD(SCS110AG)Thermal Measurement of SiC SBD(SCS110AG)
Thermal Measurement of SiC SBD(SCS110AG)
 

Similar to Cp 24062018 2241

cost appraisal
cost appraisalcost appraisal
cost appraisal
ahmong4
 
BREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONSBREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONS
ahmong4
 
Review W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxReview W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptx
ssuserb71d4d
 
Tabel uap
Tabel uapTabel uap
Tabel uap
Muhammad Luthfan
 
Bang gia topaz elite dragon 2
Bang gia topaz elite dragon 2Bang gia topaz elite dragon 2
Bang gia topaz elite dragon 2
LouisTrn3
 
Mojtaba Hasanlu's Portfolios in Rotor
Mojtaba Hasanlu's Portfolios in RotorMojtaba Hasanlu's Portfolios in Rotor
Mojtaba Hasanlu's Portfolios in Rotor
Shanghai Jiao Tong University
 
J J FOAM MODERANISATION
J J FOAM MODERANISATIONJ J FOAM MODERANISATION
J J FOAM MODERANISATION
Pawan Gupta
 
Fixed Network service frequent fault Analysis(October) v2.pptx
Fixed Network service frequent fault Analysis(October) v2.pptxFixed Network service frequent fault Analysis(October) v2.pptx
Fixed Network service frequent fault Analysis(October) v2.pptx
GirmaTeshome14
 
Contables
ContablesContables
Contables
nene fi
 
Contables
ContablesContables
Contables
nene fi
 
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 308. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
Menadžment Centar Beograd
 
Delta series 15
Delta series 15Delta series 15
Delta series 15
Julio Villagran
 
Calendario valorizado sistema de recreacion amotape
Calendario valorizado  sistema de recreacion amotapeCalendario valorizado  sistema de recreacion amotape
Calendario valorizado sistema de recreacion amotape
Edikson Soto
 
Sample Techno commercial proposal for rooftop solar plant using The Solar Labs
Sample Techno commercial proposal for rooftop solar plant using The Solar LabsSample Techno commercial proposal for rooftop solar plant using The Solar Labs
Sample Techno commercial proposal for rooftop solar plant using The Solar Labs
Rishi Singhal
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW software
Pratap Bikram Shahi
 
Catalogo codiacero
Catalogo codiaceroCatalogo codiacero
Catalogo codiacero
ricardo jimenez
 
Samsung Twin rotary compressor R-410A / R-22
Samsung Twin rotary compressor R-410A / R-22Samsung Twin rotary compressor R-410A / R-22
Samsung Twin rotary compressor R-410A / R-22
Haluk TOSUN
 
Regression project
Regression projectRegression project
Regression project
shrinivasvasala
 
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docxEENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
jack60216
 
88 Gibraltar Revised Pricelist Tower 1
88 Gibraltar Revised Pricelist Tower 188 Gibraltar Revised Pricelist Tower 1
88 Gibraltar Revised Pricelist Tower 1
88gibraltar
 

Similar to Cp 24062018 2241 (20)

cost appraisal
cost appraisalcost appraisal
cost appraisal
 
BREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONSBREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONS
 
Review W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxReview W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptx
 
Tabel uap
Tabel uapTabel uap
Tabel uap
 
Bang gia topaz elite dragon 2
Bang gia topaz elite dragon 2Bang gia topaz elite dragon 2
Bang gia topaz elite dragon 2
 
Mojtaba Hasanlu's Portfolios in Rotor
Mojtaba Hasanlu's Portfolios in RotorMojtaba Hasanlu's Portfolios in Rotor
Mojtaba Hasanlu's Portfolios in Rotor
 
J J FOAM MODERANISATION
J J FOAM MODERANISATIONJ J FOAM MODERANISATION
J J FOAM MODERANISATION
 
Fixed Network service frequent fault Analysis(October) v2.pptx
Fixed Network service frequent fault Analysis(October) v2.pptxFixed Network service frequent fault Analysis(October) v2.pptx
Fixed Network service frequent fault Analysis(October) v2.pptx
 
Contables
ContablesContables
Contables
 
Contables
ContablesContables
Contables
 
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 308. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
 
Delta series 15
Delta series 15Delta series 15
Delta series 15
 
Calendario valorizado sistema de recreacion amotape
Calendario valorizado  sistema de recreacion amotapeCalendario valorizado  sistema de recreacion amotape
Calendario valorizado sistema de recreacion amotape
 
Sample Techno commercial proposal for rooftop solar plant using The Solar Labs
Sample Techno commercial proposal for rooftop solar plant using The Solar LabsSample Techno commercial proposal for rooftop solar plant using The Solar Labs
Sample Techno commercial proposal for rooftop solar plant using The Solar Labs
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW software
 
Catalogo codiacero
Catalogo codiaceroCatalogo codiacero
Catalogo codiacero
 
Samsung Twin rotary compressor R-410A / R-22
Samsung Twin rotary compressor R-410A / R-22Samsung Twin rotary compressor R-410A / R-22
Samsung Twin rotary compressor R-410A / R-22
 
Regression project
Regression projectRegression project
Regression project
 
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docxEENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
 
88 Gibraltar Revised Pricelist Tower 1
88 Gibraltar Revised Pricelist Tower 188 Gibraltar Revised Pricelist Tower 1
88 Gibraltar Revised Pricelist Tower 1
 

More from Shze Hwa Lee

Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
Shze Hwa Lee
 
Pp2 p5
Pp2   p5Pp2   p5
Pp2 p5
Shze Hwa Lee
 
Be finalise a3
Be finalise a3Be finalise a3
Be finalise a3
Shze Hwa Lee
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slides
Shze Hwa Lee
 
Be Report Finalize
Be Report FinalizeBe Report Finalize
Be Report Finalize
Shze Hwa Lee
 
Fm report template
Fm report templateFm report template
Fm report template
Shze Hwa Lee
 
Csi presentation
Csi   presentationCsi   presentation
Csi presentation
Shze Hwa Lee
 
Finased csi report
Finased csi reportFinased csi report
Finased csi report
Shze Hwa Lee
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
Shze Hwa Lee
 
Software Application Report
Software Application ReportSoftware Application Report
Software Application Report
Shze Hwa Lee
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
Shze Hwa Lee
 
Seminar 1 Questions
Seminar 1 QuestionsSeminar 1 Questions
Seminar 1 Questions
Shze Hwa Lee
 
Estimating presentation (question 1)
Estimating presentation (question 1)Estimating presentation (question 1)
Estimating presentation (question 1)
Shze Hwa Lee
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
Shze Hwa Lee
 
PP1 report group 7 (finalized)
PP1 report group 7 (finalized)PP1 report group 7 (finalized)
PP1 report group 7 (finalized)
Shze Hwa Lee
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
Shze Hwa Lee
 
ECA presentation
ECA presentationECA presentation
ECA presentation
Shze Hwa Lee
 
Bs 2 group assignment
Bs 2 group assignmentBs 2 group assignment
Bs 2 group assignment
Shze Hwa Lee
 
People dynamic (assingment 1)
People dynamic (assingment 1) People dynamic (assingment 1)
People dynamic (assingment 1)
Shze Hwa Lee
 
Safety and Health individual assignment
Safety and Health individual assignment Safety and Health individual assignment
Safety and Health individual assignment
Shze Hwa Lee
 

More from Shze Hwa Lee (20)

Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Pp2 p5
Pp2   p5Pp2   p5
Pp2 p5
 
Be finalise a3
Be finalise a3Be finalise a3
Be finalise a3
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slides
 
Be Report Finalize
Be Report FinalizeBe Report Finalize
Be Report Finalize
 
Fm report template
Fm report templateFm report template
Fm report template
 
Csi presentation
Csi   presentationCsi   presentation
Csi presentation
 
Finased csi report
Finased csi reportFinased csi report
Finased csi report
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Software Application Report
Software Application ReportSoftware Application Report
Software Application Report
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Seminar 1 Questions
Seminar 1 QuestionsSeminar 1 Questions
Seminar 1 Questions
 
Estimating presentation (question 1)
Estimating presentation (question 1)Estimating presentation (question 1)
Estimating presentation (question 1)
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
PP1 report group 7 (finalized)
PP1 report group 7 (finalized)PP1 report group 7 (finalized)
PP1 report group 7 (finalized)
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
ECA presentation
ECA presentationECA presentation
ECA presentation
 
Bs 2 group assignment
Bs 2 group assignmentBs 2 group assignment
Bs 2 group assignment
 
People dynamic (assingment 1)
People dynamic (assingment 1) People dynamic (assingment 1)
People dynamic (assingment 1)
 
Safety and Health individual assignment
Safety and Health individual assignment Safety and Health individual assignment
Safety and Health individual assignment
 

Recently uploaded

Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 

Recently uploaded (20)

Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 

Cp 24062018 2241

  • 1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 A B C D E F G H I J K L CADANGAN PEMBANGUNAN 2 BLOK 31 TINGKAT PANSAPURI SERVICE (404) UNIT DI ATAS 7 TINGKAT PODIUM BERSERTA 2 TINGKAT BASEMEN DI ATAS LOT 160, JALAN ROBSON OFF JALAN SYED PUTRA, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR. CFA (M2) = 88,935.58 CFA (M2) = 7,992.96 CFA (M2) = 29,713.97 CFA (M2) = 25,745.95 CFA (M2) = 25,482.70 Estimated Cost Estimated Cost Estimated Cost Estimated Cost Estimated Cost Construction per m2 Construction per m2 Construction per m2 Construction per m2 Construction per m2 Cost (RM) of CFA (RM) Cost (RM) of CFA (RM) Cost (RM) of CFA (RM) Cost (RM) of CFA (RM) Cost (RM) of CFA (RM) 1.00 SUBSTRUCTURE 1.01 SITE PREPARATION 1,795,000.00 20.18 161,000.00 20.14 600,000.00 20.19 520,000.00 20.20 514,000.00 20.17 1.02 PILING 17,465,000.00 196.38 1,570,000.00 196.42 5,835,000.00 196.37 5,056,000.00 196.38 5,004,000.00 196.37 1.03 FOUNDATIONS 5,496,000.00 61.80 494,000.00 61.80 1,836,000.00 61.79 1,591,000.00 61.80 1,575,000.00 61.81 1.04 BASEMENT CARCASS 404,000.00 4.54 404,000.00 50.54 - - - - - - Group Element Total 25,160,000.00 282.90 2,629,000.00 328.91 8,271,000.00 278.35 7,167,000.00 278.37 7,093,000.00 278.35 2.00 STRUCTURAL FRAME 2.01 FRAME 40,067,000.00 450.52 3,247,000.00 406.23 11,178,000.00 376.19 12,887,000.00 500.54 12,755,000.00 500.54 2.02 TRANSFER STUCTURES - - - - - - - - - - 2.03 ROOF TRUSSES - - - - - - - - - - 2.04 ROOF STRUCTURE 386,000.00 4.34 - - - - 194,000.00 7.54 192,000.00 7.53 2.05 STAIRCASE & RAMP 1,832,000.00 20.60 111,000.00 13.89 455,000.00 15.31 636,000.00 24.70 630,000.00 24.72 Group Element Total 42,285,000.00 475.46 3,358,000.00 420.12 11,633,000.00 391.50 13,717,000.00 532.78 13,577,000.00 532.79 3.00 EXTERNAL WALLING AND FINISHES 3.01 WALLS 2,290,000.00 25.75 - - 674,000.00 22.68 812,000.00 31.54 804,000.00 31.55 3.02 EXTERNAL FINISHES 4,298,000.00 48.33 - - 2,243,000.00 75.49 1,033,000.00 40.12 1,022,000.00 40.11 3.03 CURTAIN WALLING - - - - - - - - - - 3.04 DOORS - - - - - - - - - - 3.05 ALUMINIUM SCREENING 6,626,000.00 74.50 - - 6,626,000.00 222.99 - - - - 3.06 WINDOWS 5,386,000.00 60.56 - - - - 2,707,000.00 105.14 2,679,000.00 105.13 Group Element Total 18,600,000.00 209.14 - - 9,543,000.00 321.16 4,552,000.00 176.80 4,505,000.00 176.79 4.00 ROOF COVERING ,ETC 4.01 ROOFING 782,000.00 8.79 - - - - 393,000.00 15.26 389,000.00 15.27 4.02 RAINWATER GOODS 1,544,000.00 17.36 - - - - 776,000.00 30.14 768,000.00 30.14 Group Element Total 2,326,000.00 26.15 - - - - 1,169,000.00 45.41 1,157,000.00 45.40 5.00 INTERNAL WALLING 5.01 WALLS 1,603,900.00 18.03 92,900.00 11.62 216,000.00 7.27 651,000.00 25.29 644,000.00 25.27 5.02 DOORS 9,509,000.00 106.92 - - 201,000.00 6.76 4,678,000.00 181.70 4,630,000.00 181.69 Group Element Total 11,112,900.00 124.95 92,900.00 11.62 417,000.00 14.03 5,329,000.00 206.98 5,274,000.00 206.96 6.00 INTERNAL FINISHES 6.01 FLOORS 8,745,600.00 98.34 92,600.00 11.59 1,032,000.00 34.73 3,830,000.00 148.76 3,791,000.00 148.77 6.02 WALLS 8,590,000.00 96.59 214,000.00 26.77 829,000.00 27.90 3,793,000.00 147.32 3,754,000.00 147.32 6.03 CEILINGS 2,473,000.00 27.81 103,000.00 12.89 378,000.00 12.72 1,001,000.00 38.88 991,000.00 38.89 6.04 STAIRCASES AND RAILINGS 826,000.00 9.29 53,000.00 6.63 359,000.00 12.08 208,000.00 8.08 206,000.00 8.08 Group Element Total 20,634,600.00 232.02 462,600.00 57.88 2,598,000.00 87.43 8,832,000.00 343.04 8,742,000.00 343.06 7.00 FITTINGS,ETC. 7.01 SANITARY WARES & FITTINGS 6,825,000.00 76.74 - - 265,000.00 8.92 3,280,000.00 127.40 3,280,000.00 128.71 7.02 SIGNAGES 557,000.00 6.26 50,000.00 6.26 186,000.00 6.26 161,000.00 6.25 160,000.00 6.28 7.03 MAIL BOX 60,400.00 0.68 - - - - 30,200.00 1.17 30,200.00 1.19 7.04 LIF CAR FINISHES - - - - - - - - - - Group Element Total 7,442,400.00 83.68 50,000.00 6.26 451,000.00 15.18 3,471,200.00 134.83 3,470,200.00 136.18 8.00 SERVICES 8.01 CHILLER PLANT - - - - - - - - - - 8.02 HVAC 5,996,000.00 67.42 499,000.00 62.43 959,000.00 32.27 2,269,000.00 88.13 2,269,000.00 89.04 8.03 Fire Protection 1,704,000.00 19.16 315,000.00 39.41 665,000.00 22.38 364,000.00 14.14 360,000.00 14.13 8.04 Hot, Cold Water & Sanitary Plumbing 6,023,000.00 67.72 157,000.00 19.64 597,000.00 20.09 2,648,000.00 102.85 2,621,000.00 102.85 8.05 Natural Gas - - - - - - - - - - 8.06 BMS - - - - - - - - - - 8.07 Pool Filtration System 740,000.00 8.32 - - 740,000.00 24.90 - - - - 8.08 Electrical HV & Genset - - - - - - - - - - 8.09 Electrical LV 1,808,000.00 20.33 143,000.00 17.89 496,000.00 16.69 585,000.00 22.72 584,000.00 22.92 8.10 Telecom, Telephone services 11,750,000.00 132.12 1,059,000.00 132.49 3,936,000.00 132.46 3,410,000.00 132.45 3,345,000.00 131.27 8.11 Metering Utilities - - - - - - - - - - 8.12 Vertical Transportation 5,064,000.00 56.94 236,000.00 29.53 942,000.00 31.70 1,943,000.00 75.47 1,943,000.00 76.25 8.13 Security - - - - - - - - - - 8.14 Building Maintenance Units - - - - - - - - - - 8.15 Waste Collection System - - - - - - - - - - 8.16 Waste Bin System 153,000.00 1.72 14,000.00 1.75 51,000.00 1.72 44,000.00 1.71 44,000.00 1.73 8.17 Rain Water Harvesting System 168,000.00 1.89 - - 43,000.00 1.45 63,000.00 2.45 62,000.00 2.43 8.18 Profits and Attendance 1,002,180.00 11.27 72,690.00 9.09 252,870.00 8.51 339,780.00 13.20 336,840.00 13.22 8.19 BWICS 668,120.00 7.51 48,460.00 6.06 168,580.00 5.67 226,520.00 8.80 224,560.00 8.81 Group Element Total 35,076,300.00 394.40 2,544,150.00 318.30 8,850,450.00 297.85 11,892,300.00 461.91 11,789,400.00 462.64 9.00 External Works and Ancillary Works 6,545,000.00 73.59 SUB TOTAL ESTIMATED CONSTRUCTION COST 169,182,200.00 9,136,650.00 41,763,450.00 56,129,500.00 55,607,600.00 Preliminary (8%) 13,534,576.00 Construction Contingency (5%) 8,459,110.00 Cost Escalation (Assuming tender to be called in one year's time) (2%) 3,823,517.72 GRAND TOTAL ESTIMATED CONSTRUCTION COST 194,999,403.72 Amount (RM) RM/m2 Amount (RM) RM/m2 Amount (RM) RM/m2 Amount (RM) RM/m2 Amount (RM) RM/m2 a. Structure 67,445,000.00 758.36 5,987,000.00 749.03 19,904,000.00 669.85 20,884,000.00 811.16 20,670,000.00 811.14 b. Architectural 66,660,900.00 749.54 605,500.00 75.75 13,009,000.00 437.81 23,353,200.00 907.06 23,148,200.00 908.39 c. M&E 35,076,300.00 394.40 2,544,150.00 318.30 8,850,450.00 297.85 11,892,300.00 461.91 11,789,400.00 462.64 BASEMENT CARPARK PODIUM CARPARK TOWER A TOWER B Element OVERALL PROJECT