IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 114 
DESIGN AND DEVELOPMENT OF PICO MICRO HYDRO SYSTEM BY USING HOUSE HOLD WATER SUPPLY Gunjan Yadav1, A.K Chauhan2 1M.Tech, Department of Mechanical Engineering, KNIT, Sultanpur, UP, India 2Assistant Professor, Department of Mechanical Engineering, KNIT, Sultanpur, UP, India Abstract The energy demand in the World is increasing day by day due to rapidly increasing population and advancement in science and technology. But in present era there are too many obstacles which decrease the consumption of electricity for common peoples, high cost of fuel, high demand and low supply of fuel. Fuels like coal, petroleum, CNG, LPG, nuclear energy are depleting day by day and also degrades our eco-system. Installation cost of large hydro power project are very high and cannot be installed anywhere. Due to these reasons; there is a high time to follow such a system which sort out all these problems. One such a system is proposed in this paper. The aim of this research paper is to build such a system which gives electricity at low cost, which must be eco-friendly, easy to use and to store the generated power by means of battery charging for future use particularly during electricity blackouts. The work of this paper is performed by designing a Pico Micro Hydro system by using house hold water supply. In the domestic pipeline the flow of water has enough kinetic energy to rotate the blade of a small hydro turbine which in turn rotates the rotor of a generator to generate electricity in addition to the other routine activities such as laundry, cook and bathe. Keywords: Pico hydro system, energy storage, renewable energy and small turbine. 
--------------------------------------------------------------------***--------------------------------------------------------------------- 1. INTRODUCTION The hydro power which has a maximum electrical output of five kilowatts (5kw) is come under the category of Pico Micro Hydro [1]. This system is beneficial than other large hydro system as it have low cost, can be installed anywhere, eco-friendly and easily available to people. New Pico micro hydro technology have made it more economical power source in the developing country. AC can be produced which can be used to drive standard electrical appliances. Examples of devices which can be run by this system are light bulbs, radios, television, refrigerator and many more. Generally, Pico micro hydro system is installed at rural and hilly areas [3]-[5]. Figure 1 shows an example of Pico micro hydro system used in hilly area [2]. 
Fig 1: Pico Micro Hydro system 
In this system water (from lake and Small River) firstly stored in a reservoir (forebay tank). This stored water is flows downhill through a pipe (penstock). The running water in the penstock has a enough kinetic energy to rotates the blade of a turbine which in turn rotates the rotor of a generator which produce electricity. However in this research paper it is shown that house hold water supply also have enough kinetic energy to rotate a small hydro turbine for energy production. Hence this research is done to show that house hold water supply has additional capability for electrical energy production instead of other routine activities like bath, laundry, cook and cloth washing. Production of the electricity can be done without pay extra charges on the water bill. The main function of this system is to store the generated power by means of battery charging for future use particularly during electricity blackouts. The proposed system produces 8.408W power which is very less as compare to other Pico micro hydro system but it is cost effective, easy to use, eco-friendly and easy to installed anywhere. 2. DEVELOPMENT OF THE PROPOSED PICO MICRO HYDRO SYSTEM 
The proposed Pico Micro Hydro System (PMHS) was fabricated at K.N.I.T Sultanpur. It consists of a pelton turbine and an alternator. The experiments were performed
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 115 
on the above mentioned test rig in Raman Hostel by utilizing the normal water supply. Pelton turbine test-rig coupled to an AC generator through shaft which has an electrical output 5.65 V as shown in figure 2. The generated power is 8.408 W corresponding to a turbine generator efficiency of 50 % [1]. 
Fig 2: Proposed PMHS 2.1 Water Supply System 1000 L of water storage tank at a height of 6.4 m from the ground and the net head available to the turbine is 6 m. Tap (as a nozzle) of varying diameter from 0.5 cm to 1.2 cm is used in the proposed system. The (pipe) penstock consists of 9 m in length and of 1.5 cm diameter and the flow rate into the turbine is 0.285 L/s. In this system friction losses in the pipe and pipe fitting is consider negligible. This means that the net hydro power available at the consumer’s end is more or less similar to hydro power to turbine. The net hydro power available to the turbine at inlet is 16.817 W. 2.2 Design of Pelton Turbine Test-Rig The turbine blades are made up spoons of stainless steel which are 7 cm length of tail and 7 cm length of curve and are fabricated (welded) on the 21 cm OD cycle rim. Total 12 number of stainless steel spoons are used to construct the turbine figure 3 shows the proposed pelton turbine test rig. 
Fig 3: Proposed Pelton Turbine test-rig 
C. Pulley System 
The torque and power from the main shaft is being transmitted to the shaft of the alternator through belt pulley system figure 4 shows the pulley system. 
Fig 4: Pulley system The circumference of the large pulley is ten times that of the small pulley; the small pulley will rotate ten times for every one time rotation of the large pulley. 2.4 Alternator Two pole alternators is used in this system. Winding on the stator is done by using 38 gauge wires and has 800 turns. The winding is done on a soft iron rod. The shaft of the magnet is connected to the small pulley. Rotation of the small pulley rotates the magnet of the alternator. When magnet rotates between the winding produces AC in the winding by induction. AC produced is transmitted to the full wave rectifier to convert AC into DC, which is used for charging battery figure 5 shows the alternator. 
Fig 5: Alternator 2.5 Full Wave Bridge Rectifier Since AC is produced in the proposed PMHS and we need DC to charge battery. So we need rectifier to convert AC into DC. Full wave bridge rectifier is used in this proposed system. 4 Pine diode and 1000 mfd capacitor are used to make full wave bridge rectifier.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 116 
2.6 Battery In the proposed PMHS 6 V rechargeable lead-acid battery is used. This is charged by the alternator of the proposed PMHS. Through this battery a 5 W CFL is lighted up. 
Fig 6: 6V Rechargeable Battery 2.7 Inverting Kit Inverting kit which is used in the proposed system converts DC to AC and also amplifies the voltage from 6 V to 175 V. 3. MATHEMATICAL ANALSIS 3.1 Head Measurement When determining head (falling water), gross or “static” head and net or “dynamic” head must be considered. Gross head is the vertical distance between the top of the penstock and the point where the water hits the blades of the turbine. Net head is gross head minus the pressure or head losses due to friction and turbulence in the penstock. These head losses depend on the type, diameter, and length of the penstock piping and the number of bends or elbows. Gross head can be used to estimate power availability and determine general feasibility, but net head is used to calculate the actual power available. There are many methods of head measurement. However the proposed PMHS uses domestic water supply and in this system Raman Hostel water supply is used which has 1000L of water storage tank at a height of 21 feet from the ground and the net head available to the turbine is 20 feet. Measurement of head is simply done by measuring height from the top of the floor where 1000L tank is installed and the point where the water hits the pelton turbine test- rig. 3.2 Water Flow Rate Measurement 
The simplest flow of measurement for small streams is the bucket method [4]. Therefore, this method is used because the capacity of the proposed hydro power system is significantly small. Moreover, this method is considerably more practical in the proposed PMHS which is very uncommon compared to other system in its category. Throughout this method, the flow rate of the distributed water is diverted into a bucket or barrel and the time it takes for the container to fill is recorded. The volume of the container is known and the flow rate is simply obtained by dividing this volume by the filling time. For example, the flow rate of water that filled 20 litres bucket within one minute is 20 litres per minute or 0.333 L/s. This is repeated several times to give more consistent and accurate measurement. 
퐹푙표푤 푅푎푡푒 푄 = 푉표푙푢푚푒 표푓 푡푕푒 푏푢푐푘푒푡 (푉) 퐹푖푙푙푖푛푔 푇푖푚푒 (푇) In this system 2 L of bucket is used and tap water takes 7 sec. to fill this volume. So, Volume in 7 seconds = 2 L So, the flow rate (Q) = 2 / 7 = 0.285 L/s In minute Q = 0.285 x 60 = 17.14 L/m 3.3 Power Estimation In general, the feasibility of the proposed PMHS is based on the following potential input/output power equation [2]: Pin = H × Q × g (1) Pout= H × Q × g × η (2) Where, Pin = Input power (Hydro power) Pout = Output power (Generator output) H = Head (meter) Q = Water flow rate (liter/second) g = gravity (9.81 m/s2) η = efficiency In the proposed system Head = 20 feet or 6 meters Q = 0.285 L/s g = 9.81 m/s2 Using eq. 1 Pin = 6 × 0.285 × 9.81 = 16.817 W Using eq. 2 Pout = 16.817 × 50/100 (here η is taken as 50 % [1]) = 8.408 W Hence from the proposed system we get 8.408 W corresponding to turbine power efficiency (50%). 3.4 Measurement of Speed, Current and Voltage In this proposed system RPM is measured by digital tacho meter by attaching a pin into the big pulley and readings are noted at different diameters of the tap (nozzle). Since the ratio between pulleys is 10:1, so the small pulley of the system rotates 10 times more than big pulley. Current and Voltage are measured by Digital Multi meter. For measuring their values 2 cases has been taken.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 117 
Case 1 Reading at 20 Feet Head At 20 feet current, voltage and rpm is measured at different values of diameter of tap (nozzle) as shown in table 1. Table 1 Values of RPM, Voltage and Current at 20 feet for different dia. of tap at 20 feet 
Diameter (tap) (mm) 
RPM (small pulley) 
Voltage (V) 
Current (mA) 
5 
150 × 10 
5.646 
6.87 
6 
140 × 10 
5.04 
6.14 
8 
133 × 10 
3.98 
4.85 
12 
122 ×10 
2.89 
3.52 
Graph between different parameters (current, voltage, diameter and RPM ×10) at 20 feet as shown below in figure 7 
Fig 7(a): Graph b/w Current and RPM 
Fig 7(b): Graph b/w Voltage and RPM 
Fig 7(c): Graph b/w Voltage and Diameter (tap) 
Fig 7(d): Graph b/w Current and Diameter (tap) 
Fig 7(e): Graph b/w RPM and Diameter (tap) Fig 7 Graph between different parameters (current, voltage, and diameter and RPM × 10) at 20feet From figure 7 and table 1 we get following results 
 From graph 7(a) and 7(d) we depicted that Current increases when RPM increases and decreases when diameter of the tap increases. 
 From graph 7(b) and 7(c) we depicted that Voltage increases when RPM increases and decreases when diameter of the tap increases. 
 From graph 7(e) RPM increases when diameter of tap decreases.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 118 
Case 2 Reading at 10 Feet Head At 10 feet current, voltage and rpm is also measured for same values of diameter of tap (nozzle) as we taken in 20 feet. These values are shown in table 2. Table 2 Values of RPM, Voltage and Current at 20 feet for different dia. of tap at 10 feet 
Diameter (mm) 
RPM (small pulley) 
Voltage (V) 
Current (mA) 
5 
100 x 10 
2.66 
2.76 
6 
92 x 10 
2.41 
2.50 
8 
80 x 10 
2.08 
2.16 
12 
66 x 10 
1.68 
1.744 
Graph between different parameters at 10 feet as shown in figure 8 
Fig 8(a): Graph b/t Voltage and Diameter (tap) 
Fig 8(b): Graph b/t Current and Diameter (tap) 
Fig 8(c): Graph b/t Voltage and RPM 
Fig 8(d): Graph b/t Current and RPM 
Fig 8(e): Graph b/t RPM and Diameter (tap) Fig 8 Graph between different parameters (current, voltage, and diameter and RPM × 10) at 10 feet From table 2 and figure 8 we concluded the following result 
 From graph 8(b) and 8(d) we see that current increases when RPM increases and decreases when diameter of the tap increases but values of current in 10 feet are less than 20 feet for the same value of the diameter of the tap. 
 From graph 8(a) and 8(c) we see that voltage increases when RPM increases and decreases when diameter of the tap increases but values of voltage is also in 10 feet is less than 20 feet for the same value of the diameter of the tap. 
 From graph 8(e) we see that RPM increases when diameter of tap decreases but values of RPM are also in 10 feet are less than 20 feet for the same value of the diameter of the tap. 
Hence from both the cases it is concluded that head and flow rate are the major parameter while designing a Pico micro hydro system. In this proposed system 20 feet head and 5 mm diameter of tap correspond to the maximum value of Power, Current, Voltage and RPM which is 8.408W, 6.87mA, 5.646V and 1500 respectively.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 119 
4. CONCLUSIONS This project is a simple, save and cost effective project which provides basic needs to the developing countries. By using this system one can charge batteries through which many electric applications can be run. This system can not only be a solution for India, where this study was performed, but could be an option for many regions worldwide. In this research paper we see that the current, voltage and RPM are inversely proportion to the dia. of tap and directly proportional to the head. Hence it is concluded that there are two main input parameters which are very important in ensuring the developed Pico micro hydro system to function as an alternative electrical power generator for residential use. The parameters are the pressure of the main pipeline water supply that representing the head (falling water) and the water supply flow rate. These parameters vary between residential areas. Hence, it is essential to determined both parameters at early stage for potential output power estimation. The power developed in the proposed system is 8.408 W. The maximum value current, voltage and RPM are 6.87 mA, 5.646 V and 1500. This system efficiently capable of charging a 6 V battery which is used for various purposes, in this system it is used to light up a 5 W CFL. In addition, since the turbine and generator are manufacture locally, so the selection of turbine and generator in terms of their type and size or capacity is also important in designing and developing the proposed Pico micro hydro system. Wrong type and improper sizing of these components would cause the system to operate at undesirable performance. REFERENCES [1]. H. Zainuddin, M.S. Yahaya, J.M.Lazi, M.F.M Basar and Z. Ibrahim and Development of Pico-hydro Generation System for Energy Storage Using Consuming Water Distributed to Houses” World Academy of Science, Engineering and Technology Issue in 2009. [2]. P. Maher and N. Smith “Pico hydro for village power: A practical manual for schemes up to 5 kW in hilly areas,” 2nd ed., Intermediate Technology Publications, May 2001 [3]. Birai Dhungana “Case Study of Developing Pico Hydropower Project to Improve Living Standard of Rural Nepal” Rentech Symposium Compendium, Volume I, March 2012 [4]. A. Harvey, A. Brown, P. Hettiarachi and A. Inversin, “Micro hydro design manual: A guide to small-scale water power schemes” Intermediate Technology Publications, 1993. World Academy of Science, Engineering and Technology 2009. [5]. N. Smith and G. Ranjitkhar, “Nepal Case study–Part One: Installation and performance of the Pico Power Pack,” Pico Hydro Newsletter, April 2000.

More Related Content

What's hot

Performance Analysis of Photovoltaic Induction Motor Drive for Agriculture Pu...
Performance Analysis of Photovoltaic Induction Motor Drive for Agriculture Pu...Performance Analysis of Photovoltaic Induction Motor Drive for Agriculture Pu...
Performance Analysis of Photovoltaic Induction Motor Drive for Agriculture Pu...IAES-IJPEDS
 
Micro Hydel Powerplant
Micro Hydel PowerplantMicro Hydel Powerplant
Micro Hydel PowerplantBhavik A Shah
 
TYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSTYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSRAJ BAIRWA
 
Design of microhydro turbine for sewage treatment plant.
Design of microhydro turbine for sewage treatment plant.Design of microhydro turbine for sewage treatment plant.
Design of microhydro turbine for sewage treatment plant.Firdaus Julaihi
 
Hydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and KashmirHydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and KashmirAaquib Firdous
 
Micro and small hydro energy systems
Micro and small hydro energy systemsMicro and small hydro energy systems
Micro and small hydro energy systemsParamjit Singh
 
Modi Khola Hydropower Field Report
Modi Khola Hydropower Field ReportModi Khola Hydropower Field Report
Modi Khola Hydropower Field ReportSagunn Paudyal
 
Lecture 3.1 Turbines in Micro Hydro
Lecture 3.1 Turbines in Micro HydroLecture 3.1 Turbines in Micro Hydro
Lecture 3.1 Turbines in Micro Hydroshahabuddin khan
 
Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01Yashwadhan Sahi
 
Types of hydro power plant
Types of hydro power plantTypes of hydro power plant
Types of hydro power plantANKITBANJARE1
 
HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER
HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATERHYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER
HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATERaditya agrawal
 
Hydropower Development in India
Hydropower Development in IndiaHydropower Development in India
Hydropower Development in IndiaSatish Taji
 
Archimedes Screw as a Low Head Hydropower Generator
Archimedes Screw as a Low Head Hydropower GeneratorArchimedes Screw as a Low Head Hydropower Generator
Archimedes Screw as a Low Head Hydropower GeneratorChristos Charisiadis
 

What's hot (20)

Performance Analysis of Photovoltaic Induction Motor Drive for Agriculture Pu...
Performance Analysis of Photovoltaic Induction Motor Drive for Agriculture Pu...Performance Analysis of Photovoltaic Induction Motor Drive for Agriculture Pu...
Performance Analysis of Photovoltaic Induction Motor Drive for Agriculture Pu...
 
Micro Hydel Powerplant
Micro Hydel PowerplantMicro Hydel Powerplant
Micro Hydel Powerplant
 
TYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSTYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTS
 
Design of microhydro turbine for sewage treatment plant.
Design of microhydro turbine for sewage treatment plant.Design of microhydro turbine for sewage treatment plant.
Design of microhydro turbine for sewage treatment plant.
 
Hydro electric power
Hydro electric powerHydro electric power
Hydro electric power
 
NHPC rambi
NHPC rambi NHPC rambi
NHPC rambi
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and KashmirHydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and Kashmir
 
Kotmale power station
Kotmale power stationKotmale power station
Kotmale power station
 
Micro and small hydro energy systems
Micro and small hydro energy systemsMicro and small hydro energy systems
Micro and small hydro energy systems
 
NTPC
NTPCNTPC
NTPC
 
Modi Khola Hydropower Field Report
Modi Khola Hydropower Field ReportModi Khola Hydropower Field Report
Modi Khola Hydropower Field Report
 
Lecture 3.1 Turbines in Micro Hydro
Lecture 3.1 Turbines in Micro HydroLecture 3.1 Turbines in Micro Hydro
Lecture 3.1 Turbines in Micro Hydro
 
Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01
 
Green mechatronics project pelton wheel
Green mechatronics project pelton wheelGreen mechatronics project pelton wheel
Green mechatronics project pelton wheel
 
Types of hydro power plant
Types of hydro power plantTypes of hydro power plant
Types of hydro power plant
 
HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER
HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATERHYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER
HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER
 
Hydropower Development in India
Hydropower Development in IndiaHydropower Development in India
Hydropower Development in India
 
Archimedes Screw as a Low Head Hydropower Generator
Archimedes Screw as a Low Head Hydropower GeneratorArchimedes Screw as a Low Head Hydropower Generator
Archimedes Screw as a Low Head Hydropower Generator
 
Micro hydropower plant
Micro hydropower plantMicro hydropower plant
Micro hydropower plant
 

Viewers also liked

Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote VillagesPico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villagesiosrjce
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plantSuresh Rathore
 
[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plantU.E.T Lahore Pakistan
 
A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...eSAT Publishing House
 
Hierarchal clustering and similarity measures along
Hierarchal clustering and similarity measures alongHierarchal clustering and similarity measures along
Hierarchal clustering and similarity measures alongeSAT Publishing House
 
Partial encryption of compresed video
Partial encryption of compresed videoPartial encryption of compresed video
Partial encryption of compresed videoeSAT Publishing House
 
An assessment of cloud computing evolution
An assessment of cloud computing evolutionAn assessment of cloud computing evolution
An assessment of cloud computing evolutioneSAT Publishing House
 
The effect of watercement ratio on the sulfate
The effect of watercement ratio on the sulfateThe effect of watercement ratio on the sulfate
The effect of watercement ratio on the sulfateeSAT Publishing House
 
An algorithm for solving integer linear programming
An algorithm for solving integer linear programmingAn algorithm for solving integer linear programming
An algorithm for solving integer linear programmingeSAT Publishing House
 
Redesign and thermal analysis of transfer mold tool
Redesign and thermal analysis of transfer mold toolRedesign and thermal analysis of transfer mold tool
Redesign and thermal analysis of transfer mold tooleSAT Publishing House
 
Matlab based comparative studies on selected mppt
Matlab based comparative studies on selected mpptMatlab based comparative studies on selected mppt
Matlab based comparative studies on selected mppteSAT Publishing House
 
A novel p q control algorithm for combined active
A novel p q control algorithm for combined activeA novel p q control algorithm for combined active
A novel p q control algorithm for combined activeeSAT Publishing House
 
A vm scheduling algorithm for reducing power consumption of a virtual machine...
A vm scheduling algorithm for reducing power consumption of a virtual machine...A vm scheduling algorithm for reducing power consumption of a virtual machine...
A vm scheduling algorithm for reducing power consumption of a virtual machine...eSAT Publishing House
 
Estimation of surface runoff in nallur amanikere
Estimation of surface runoff in nallur amanikereEstimation of surface runoff in nallur amanikere
Estimation of surface runoff in nallur amanikereeSAT Publishing House
 
Biosorption of hg (ii) from aqueous solutions
Biosorption of hg (ii) from aqueous solutionsBiosorption of hg (ii) from aqueous solutions
Biosorption of hg (ii) from aqueous solutionseSAT Publishing House
 
A novel hybrid communication technique involving power line communication and...
A novel hybrid communication technique involving power line communication and...A novel hybrid communication technique involving power line communication and...
A novel hybrid communication technique involving power line communication and...eSAT Publishing House
 
Geospatial information system for tourism management in aurangabad city a re...
Geospatial information system for tourism management in aurangabad city  a re...Geospatial information system for tourism management in aurangabad city  a re...
Geospatial information system for tourism management in aurangabad city a re...eSAT Publishing House
 
Effect of project cost and time monitoring on
Effect of project cost and time monitoring onEffect of project cost and time monitoring on
Effect of project cost and time monitoring oneSAT Publishing House
 

Viewers also liked (20)

Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote VillagesPico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
 
Picohydro systems
Picohydro systemsPicohydro systems
Picohydro systems
 
[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant
 
Report hydroelectric power plant
Report hydroelectric power plantReport hydroelectric power plant
Report hydroelectric power plant
 
A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...
 
Hierarchal clustering and similarity measures along
Hierarchal clustering and similarity measures alongHierarchal clustering and similarity measures along
Hierarchal clustering and similarity measures along
 
Partial encryption of compresed video
Partial encryption of compresed videoPartial encryption of compresed video
Partial encryption of compresed video
 
An assessment of cloud computing evolution
An assessment of cloud computing evolutionAn assessment of cloud computing evolution
An assessment of cloud computing evolution
 
The effect of watercement ratio on the sulfate
The effect of watercement ratio on the sulfateThe effect of watercement ratio on the sulfate
The effect of watercement ratio on the sulfate
 
An algorithm for solving integer linear programming
An algorithm for solving integer linear programmingAn algorithm for solving integer linear programming
An algorithm for solving integer linear programming
 
Redesign and thermal analysis of transfer mold tool
Redesign and thermal analysis of transfer mold toolRedesign and thermal analysis of transfer mold tool
Redesign and thermal analysis of transfer mold tool
 
Matlab based comparative studies on selected mppt
Matlab based comparative studies on selected mpptMatlab based comparative studies on selected mppt
Matlab based comparative studies on selected mppt
 
A novel p q control algorithm for combined active
A novel p q control algorithm for combined activeA novel p q control algorithm for combined active
A novel p q control algorithm for combined active
 
A vm scheduling algorithm for reducing power consumption of a virtual machine...
A vm scheduling algorithm for reducing power consumption of a virtual machine...A vm scheduling algorithm for reducing power consumption of a virtual machine...
A vm scheduling algorithm for reducing power consumption of a virtual machine...
 
Estimation of surface runoff in nallur amanikere
Estimation of surface runoff in nallur amanikereEstimation of surface runoff in nallur amanikere
Estimation of surface runoff in nallur amanikere
 
Biosorption of hg (ii) from aqueous solutions
Biosorption of hg (ii) from aqueous solutionsBiosorption of hg (ii) from aqueous solutions
Biosorption of hg (ii) from aqueous solutions
 
A novel hybrid communication technique involving power line communication and...
A novel hybrid communication technique involving power line communication and...A novel hybrid communication technique involving power line communication and...
A novel hybrid communication technique involving power line communication and...
 
Geospatial information system for tourism management in aurangabad city a re...
Geospatial information system for tourism management in aurangabad city  a re...Geospatial information system for tourism management in aurangabad city  a re...
Geospatial information system for tourism management in aurangabad city a re...
 
Effect of project cost and time monitoring on
Effect of project cost and time monitoring onEffect of project cost and time monitoring on
Effect of project cost and time monitoring on
 

Similar to Design and development of pico micro hydro system by using house hold water supply

IRJET- Residential Hydro Power Generation
IRJET- Residential Hydro Power GenerationIRJET- Residential Hydro Power Generation
IRJET- Residential Hydro Power GenerationIRJET Journal
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)inventionjournals
 
Generating a Lighting System by Using Pico Hydro System
Generating a Lighting System by Using Pico Hydro SystemGenerating a Lighting System by Using Pico Hydro System
Generating a Lighting System by Using Pico Hydro SystemTELKOMNIKA JOURNAL
 
Design Calculation of Penstock and Nozzle for 5kW Pelton Turbine Micro Hydrop...
Design Calculation of Penstock and Nozzle for 5kW Pelton Turbine Micro Hydrop...Design Calculation of Penstock and Nozzle for 5kW Pelton Turbine Micro Hydrop...
Design Calculation of Penstock and Nozzle for 5kW Pelton Turbine Micro Hydrop...ijtsrd
 
IRJET- Design of a Closed Channel Fluid Flow System for Piezoelectric Ene...
IRJET-  	  Design of a Closed Channel Fluid Flow System for Piezoelectric Ene...IRJET-  	  Design of a Closed Channel Fluid Flow System for Piezoelectric Ene...
IRJET- Design of a Closed Channel Fluid Flow System for Piezoelectric Ene...IRJET Journal
 
Hydro Energy Technology
Hydro Energy TechnologyHydro Energy Technology
Hydro Energy TechnologyAjay Bhatnagar
 
1 Computational and Experimental Investigation of Runner for Gravitational Wa...
1 Computational and Experimental Investigation of Runner for Gravitational Wa...1 Computational and Experimental Investigation of Runner for Gravitational Wa...
1 Computational and Experimental Investigation of Runner for Gravitational Wa...MaFeEvangelineSapon1
 
HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER
 HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER
HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATERaditya agrawal
 
IRJET - Hydro-Generation using Wave Energy
IRJET - Hydro-Generation using Wave EnergyIRJET - Hydro-Generation using Wave Energy
IRJET - Hydro-Generation using Wave EnergyIRJET Journal
 
Design and Fabrication of Solar Water Pump
Design and Fabrication of Solar Water PumpDesign and Fabrication of Solar Water Pump
Design and Fabrication of Solar Water PumpIRJET Journal
 
Design and fabrication of hydro electric power
Design and fabrication of hydro electric powerDesign and fabrication of hydro electric power
Design and fabrication of hydro electric powerkannan42
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plantMuddassar Awan
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plantMuddassar Awan
 
HYBRID OF ENERGY FROM WATER FLOW(PIPE) AND WIND SYSTEM WITH IMPROVED POWER QU...
HYBRID OF ENERGY FROM WATER FLOW(PIPE) AND WIND SYSTEM WITH IMPROVED POWER QU...HYBRID OF ENERGY FROM WATER FLOW(PIPE) AND WIND SYSTEM WITH IMPROVED POWER QU...
HYBRID OF ENERGY FROM WATER FLOW(PIPE) AND WIND SYSTEM WITH IMPROVED POWER QU...SRIDHAR R
 
Modelling Of Underground Cables for High Voltage Transmission
Modelling Of Underground Cables for High Voltage TransmissionModelling Of Underground Cables for High Voltage Transmission
Modelling Of Underground Cables for High Voltage Transmissiontheijes
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Design, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine BladeDesign, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine BladeIJSRD
 

Similar to Design and development of pico micro hydro system by using house hold water supply (20)

IRJET- Residential Hydro Power Generation
IRJET- Residential Hydro Power GenerationIRJET- Residential Hydro Power Generation
IRJET- Residential Hydro Power Generation
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
Generating a Lighting System by Using Pico Hydro System
Generating a Lighting System by Using Pico Hydro SystemGenerating a Lighting System by Using Pico Hydro System
Generating a Lighting System by Using Pico Hydro System
 
PICO HYDRO SYSTEM
PICO HYDRO SYSTEMPICO HYDRO SYSTEM
PICO HYDRO SYSTEM
 
Design Calculation of Penstock and Nozzle for 5kW Pelton Turbine Micro Hydrop...
Design Calculation of Penstock and Nozzle for 5kW Pelton Turbine Micro Hydrop...Design Calculation of Penstock and Nozzle for 5kW Pelton Turbine Micro Hydrop...
Design Calculation of Penstock and Nozzle for 5kW Pelton Turbine Micro Hydrop...
 
IRJET- Design of a Closed Channel Fluid Flow System for Piezoelectric Ene...
IRJET-  	  Design of a Closed Channel Fluid Flow System for Piezoelectric Ene...IRJET-  	  Design of a Closed Channel Fluid Flow System for Piezoelectric Ene...
IRJET- Design of a Closed Channel Fluid Flow System for Piezoelectric Ene...
 
Hydro Energy Technology
Hydro Energy TechnologyHydro Energy Technology
Hydro Energy Technology
 
1 Computational and Experimental Investigation of Runner for Gravitational Wa...
1 Computational and Experimental Investigation of Runner for Gravitational Wa...1 Computational and Experimental Investigation of Runner for Gravitational Wa...
1 Computational and Experimental Investigation of Runner for Gravitational Wa...
 
HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER
 HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER
HYDROELECTRICITY GENERATION BY THE RECYCLING OF WATER
 
IRJET - Hydro-Generation using Wave Energy
IRJET - Hydro-Generation using Wave EnergyIRJET - Hydro-Generation using Wave Energy
IRJET - Hydro-Generation using Wave Energy
 
Design and Fabrication of Solar Water Pump
Design and Fabrication of Solar Water PumpDesign and Fabrication of Solar Water Pump
Design and Fabrication of Solar Water Pump
 
Domestic Power Pack
Domestic Power PackDomestic Power Pack
Domestic Power Pack
 
Design and fabrication of hydro electric power
Design and fabrication of hydro electric powerDesign and fabrication of hydro electric power
Design and fabrication of hydro electric power
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
 
HYBRID OF ENERGY FROM WATER FLOW(PIPE) AND WIND SYSTEM WITH IMPROVED POWER QU...
HYBRID OF ENERGY FROM WATER FLOW(PIPE) AND WIND SYSTEM WITH IMPROVED POWER QU...HYBRID OF ENERGY FROM WATER FLOW(PIPE) AND WIND SYSTEM WITH IMPROVED POWER QU...
HYBRID OF ENERGY FROM WATER FLOW(PIPE) AND WIND SYSTEM WITH IMPROVED POWER QU...
 
Ba4102382385
Ba4102382385Ba4102382385
Ba4102382385
 
Modelling Of Underground Cables for High Voltage Transmission
Modelling Of Underground Cables for High Voltage TransmissionModelling Of Underground Cables for High Voltage Transmission
Modelling Of Underground Cables for High Voltage Transmission
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Design, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine BladeDesign, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine Blade
 

More from eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 

More from eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Recently uploaded

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxViniHema
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...Amil baba
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Electivekarthi keyan
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 

Recently uploaded (20)

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 

Design and development of pico micro hydro system by using house hold water supply

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 114 DESIGN AND DEVELOPMENT OF PICO MICRO HYDRO SYSTEM BY USING HOUSE HOLD WATER SUPPLY Gunjan Yadav1, A.K Chauhan2 1M.Tech, Department of Mechanical Engineering, KNIT, Sultanpur, UP, India 2Assistant Professor, Department of Mechanical Engineering, KNIT, Sultanpur, UP, India Abstract The energy demand in the World is increasing day by day due to rapidly increasing population and advancement in science and technology. But in present era there are too many obstacles which decrease the consumption of electricity for common peoples, high cost of fuel, high demand and low supply of fuel. Fuels like coal, petroleum, CNG, LPG, nuclear energy are depleting day by day and also degrades our eco-system. Installation cost of large hydro power project are very high and cannot be installed anywhere. Due to these reasons; there is a high time to follow such a system which sort out all these problems. One such a system is proposed in this paper. The aim of this research paper is to build such a system which gives electricity at low cost, which must be eco-friendly, easy to use and to store the generated power by means of battery charging for future use particularly during electricity blackouts. The work of this paper is performed by designing a Pico Micro Hydro system by using house hold water supply. In the domestic pipeline the flow of water has enough kinetic energy to rotate the blade of a small hydro turbine which in turn rotates the rotor of a generator to generate electricity in addition to the other routine activities such as laundry, cook and bathe. Keywords: Pico hydro system, energy storage, renewable energy and small turbine. --------------------------------------------------------------------***--------------------------------------------------------------------- 1. INTRODUCTION The hydro power which has a maximum electrical output of five kilowatts (5kw) is come under the category of Pico Micro Hydro [1]. This system is beneficial than other large hydro system as it have low cost, can be installed anywhere, eco-friendly and easily available to people. New Pico micro hydro technology have made it more economical power source in the developing country. AC can be produced which can be used to drive standard electrical appliances. Examples of devices which can be run by this system are light bulbs, radios, television, refrigerator and many more. Generally, Pico micro hydro system is installed at rural and hilly areas [3]-[5]. Figure 1 shows an example of Pico micro hydro system used in hilly area [2]. Fig 1: Pico Micro Hydro system In this system water (from lake and Small River) firstly stored in a reservoir (forebay tank). This stored water is flows downhill through a pipe (penstock). The running water in the penstock has a enough kinetic energy to rotates the blade of a turbine which in turn rotates the rotor of a generator which produce electricity. However in this research paper it is shown that house hold water supply also have enough kinetic energy to rotate a small hydro turbine for energy production. Hence this research is done to show that house hold water supply has additional capability for electrical energy production instead of other routine activities like bath, laundry, cook and cloth washing. Production of the electricity can be done without pay extra charges on the water bill. The main function of this system is to store the generated power by means of battery charging for future use particularly during electricity blackouts. The proposed system produces 8.408W power which is very less as compare to other Pico micro hydro system but it is cost effective, easy to use, eco-friendly and easy to installed anywhere. 2. DEVELOPMENT OF THE PROPOSED PICO MICRO HYDRO SYSTEM The proposed Pico Micro Hydro System (PMHS) was fabricated at K.N.I.T Sultanpur. It consists of a pelton turbine and an alternator. The experiments were performed
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 115 on the above mentioned test rig in Raman Hostel by utilizing the normal water supply. Pelton turbine test-rig coupled to an AC generator through shaft which has an electrical output 5.65 V as shown in figure 2. The generated power is 8.408 W corresponding to a turbine generator efficiency of 50 % [1]. Fig 2: Proposed PMHS 2.1 Water Supply System 1000 L of water storage tank at a height of 6.4 m from the ground and the net head available to the turbine is 6 m. Tap (as a nozzle) of varying diameter from 0.5 cm to 1.2 cm is used in the proposed system. The (pipe) penstock consists of 9 m in length and of 1.5 cm diameter and the flow rate into the turbine is 0.285 L/s. In this system friction losses in the pipe and pipe fitting is consider negligible. This means that the net hydro power available at the consumer’s end is more or less similar to hydro power to turbine. The net hydro power available to the turbine at inlet is 16.817 W. 2.2 Design of Pelton Turbine Test-Rig The turbine blades are made up spoons of stainless steel which are 7 cm length of tail and 7 cm length of curve and are fabricated (welded) on the 21 cm OD cycle rim. Total 12 number of stainless steel spoons are used to construct the turbine figure 3 shows the proposed pelton turbine test rig. Fig 3: Proposed Pelton Turbine test-rig C. Pulley System The torque and power from the main shaft is being transmitted to the shaft of the alternator through belt pulley system figure 4 shows the pulley system. Fig 4: Pulley system The circumference of the large pulley is ten times that of the small pulley; the small pulley will rotate ten times for every one time rotation of the large pulley. 2.4 Alternator Two pole alternators is used in this system. Winding on the stator is done by using 38 gauge wires and has 800 turns. The winding is done on a soft iron rod. The shaft of the magnet is connected to the small pulley. Rotation of the small pulley rotates the magnet of the alternator. When magnet rotates between the winding produces AC in the winding by induction. AC produced is transmitted to the full wave rectifier to convert AC into DC, which is used for charging battery figure 5 shows the alternator. Fig 5: Alternator 2.5 Full Wave Bridge Rectifier Since AC is produced in the proposed PMHS and we need DC to charge battery. So we need rectifier to convert AC into DC. Full wave bridge rectifier is used in this proposed system. 4 Pine diode and 1000 mfd capacitor are used to make full wave bridge rectifier.
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 116 2.6 Battery In the proposed PMHS 6 V rechargeable lead-acid battery is used. This is charged by the alternator of the proposed PMHS. Through this battery a 5 W CFL is lighted up. Fig 6: 6V Rechargeable Battery 2.7 Inverting Kit Inverting kit which is used in the proposed system converts DC to AC and also amplifies the voltage from 6 V to 175 V. 3. MATHEMATICAL ANALSIS 3.1 Head Measurement When determining head (falling water), gross or “static” head and net or “dynamic” head must be considered. Gross head is the vertical distance between the top of the penstock and the point where the water hits the blades of the turbine. Net head is gross head minus the pressure or head losses due to friction and turbulence in the penstock. These head losses depend on the type, diameter, and length of the penstock piping and the number of bends or elbows. Gross head can be used to estimate power availability and determine general feasibility, but net head is used to calculate the actual power available. There are many methods of head measurement. However the proposed PMHS uses domestic water supply and in this system Raman Hostel water supply is used which has 1000L of water storage tank at a height of 21 feet from the ground and the net head available to the turbine is 20 feet. Measurement of head is simply done by measuring height from the top of the floor where 1000L tank is installed and the point where the water hits the pelton turbine test- rig. 3.2 Water Flow Rate Measurement The simplest flow of measurement for small streams is the bucket method [4]. Therefore, this method is used because the capacity of the proposed hydro power system is significantly small. Moreover, this method is considerably more practical in the proposed PMHS which is very uncommon compared to other system in its category. Throughout this method, the flow rate of the distributed water is diverted into a bucket or barrel and the time it takes for the container to fill is recorded. The volume of the container is known and the flow rate is simply obtained by dividing this volume by the filling time. For example, the flow rate of water that filled 20 litres bucket within one minute is 20 litres per minute or 0.333 L/s. This is repeated several times to give more consistent and accurate measurement. 퐹푙표푤 푅푎푡푒 푄 = 푉표푙푢푚푒 표푓 푡푕푒 푏푢푐푘푒푡 (푉) 퐹푖푙푙푖푛푔 푇푖푚푒 (푇) In this system 2 L of bucket is used and tap water takes 7 sec. to fill this volume. So, Volume in 7 seconds = 2 L So, the flow rate (Q) = 2 / 7 = 0.285 L/s In minute Q = 0.285 x 60 = 17.14 L/m 3.3 Power Estimation In general, the feasibility of the proposed PMHS is based on the following potential input/output power equation [2]: Pin = H × Q × g (1) Pout= H × Q × g × η (2) Where, Pin = Input power (Hydro power) Pout = Output power (Generator output) H = Head (meter) Q = Water flow rate (liter/second) g = gravity (9.81 m/s2) η = efficiency In the proposed system Head = 20 feet or 6 meters Q = 0.285 L/s g = 9.81 m/s2 Using eq. 1 Pin = 6 × 0.285 × 9.81 = 16.817 W Using eq. 2 Pout = 16.817 × 50/100 (here η is taken as 50 % [1]) = 8.408 W Hence from the proposed system we get 8.408 W corresponding to turbine power efficiency (50%). 3.4 Measurement of Speed, Current and Voltage In this proposed system RPM is measured by digital tacho meter by attaching a pin into the big pulley and readings are noted at different diameters of the tap (nozzle). Since the ratio between pulleys is 10:1, so the small pulley of the system rotates 10 times more than big pulley. Current and Voltage are measured by Digital Multi meter. For measuring their values 2 cases has been taken.
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 117 Case 1 Reading at 20 Feet Head At 20 feet current, voltage and rpm is measured at different values of diameter of tap (nozzle) as shown in table 1. Table 1 Values of RPM, Voltage and Current at 20 feet for different dia. of tap at 20 feet Diameter (tap) (mm) RPM (small pulley) Voltage (V) Current (mA) 5 150 × 10 5.646 6.87 6 140 × 10 5.04 6.14 8 133 × 10 3.98 4.85 12 122 ×10 2.89 3.52 Graph between different parameters (current, voltage, diameter and RPM ×10) at 20 feet as shown below in figure 7 Fig 7(a): Graph b/w Current and RPM Fig 7(b): Graph b/w Voltage and RPM Fig 7(c): Graph b/w Voltage and Diameter (tap) Fig 7(d): Graph b/w Current and Diameter (tap) Fig 7(e): Graph b/w RPM and Diameter (tap) Fig 7 Graph between different parameters (current, voltage, and diameter and RPM × 10) at 20feet From figure 7 and table 1 we get following results  From graph 7(a) and 7(d) we depicted that Current increases when RPM increases and decreases when diameter of the tap increases.  From graph 7(b) and 7(c) we depicted that Voltage increases when RPM increases and decreases when diameter of the tap increases.  From graph 7(e) RPM increases when diameter of tap decreases.
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 118 Case 2 Reading at 10 Feet Head At 10 feet current, voltage and rpm is also measured for same values of diameter of tap (nozzle) as we taken in 20 feet. These values are shown in table 2. Table 2 Values of RPM, Voltage and Current at 20 feet for different dia. of tap at 10 feet Diameter (mm) RPM (small pulley) Voltage (V) Current (mA) 5 100 x 10 2.66 2.76 6 92 x 10 2.41 2.50 8 80 x 10 2.08 2.16 12 66 x 10 1.68 1.744 Graph between different parameters at 10 feet as shown in figure 8 Fig 8(a): Graph b/t Voltage and Diameter (tap) Fig 8(b): Graph b/t Current and Diameter (tap) Fig 8(c): Graph b/t Voltage and RPM Fig 8(d): Graph b/t Current and RPM Fig 8(e): Graph b/t RPM and Diameter (tap) Fig 8 Graph between different parameters (current, voltage, and diameter and RPM × 10) at 10 feet From table 2 and figure 8 we concluded the following result  From graph 8(b) and 8(d) we see that current increases when RPM increases and decreases when diameter of the tap increases but values of current in 10 feet are less than 20 feet for the same value of the diameter of the tap.  From graph 8(a) and 8(c) we see that voltage increases when RPM increases and decreases when diameter of the tap increases but values of voltage is also in 10 feet is less than 20 feet for the same value of the diameter of the tap.  From graph 8(e) we see that RPM increases when diameter of tap decreases but values of RPM are also in 10 feet are less than 20 feet for the same value of the diameter of the tap. Hence from both the cases it is concluded that head and flow rate are the major parameter while designing a Pico micro hydro system. In this proposed system 20 feet head and 5 mm diameter of tap correspond to the maximum value of Power, Current, Voltage and RPM which is 8.408W, 6.87mA, 5.646V and 1500 respectively.
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 10 | NCCOTII 2014 | Jun-2014, Available @ http://www.ijret.org 119 4. CONCLUSIONS This project is a simple, save and cost effective project which provides basic needs to the developing countries. By using this system one can charge batteries through which many electric applications can be run. This system can not only be a solution for India, where this study was performed, but could be an option for many regions worldwide. In this research paper we see that the current, voltage and RPM are inversely proportion to the dia. of tap and directly proportional to the head. Hence it is concluded that there are two main input parameters which are very important in ensuring the developed Pico micro hydro system to function as an alternative electrical power generator for residential use. The parameters are the pressure of the main pipeline water supply that representing the head (falling water) and the water supply flow rate. These parameters vary between residential areas. Hence, it is essential to determined both parameters at early stage for potential output power estimation. The power developed in the proposed system is 8.408 W. The maximum value current, voltage and RPM are 6.87 mA, 5.646 V and 1500. This system efficiently capable of charging a 6 V battery which is used for various purposes, in this system it is used to light up a 5 W CFL. In addition, since the turbine and generator are manufacture locally, so the selection of turbine and generator in terms of their type and size or capacity is also important in designing and developing the proposed Pico micro hydro system. Wrong type and improper sizing of these components would cause the system to operate at undesirable performance. REFERENCES [1]. H. Zainuddin, M.S. Yahaya, J.M.Lazi, M.F.M Basar and Z. Ibrahim and Development of Pico-hydro Generation System for Energy Storage Using Consuming Water Distributed to Houses” World Academy of Science, Engineering and Technology Issue in 2009. [2]. P. Maher and N. Smith “Pico hydro for village power: A practical manual for schemes up to 5 kW in hilly areas,” 2nd ed., Intermediate Technology Publications, May 2001 [3]. Birai Dhungana “Case Study of Developing Pico Hydropower Project to Improve Living Standard of Rural Nepal” Rentech Symposium Compendium, Volume I, March 2012 [4]. A. Harvey, A. Brown, P. Hettiarachi and A. Inversin, “Micro hydro design manual: A guide to small-scale water power schemes” Intermediate Technology Publications, 1993. World Academy of Science, Engineering and Technology 2009. [5]. N. Smith and G. Ranjitkhar, “Nepal Case study–Part One: Installation and performance of the Pico Power Pack,” Pico Hydro Newsletter, April 2000.