ROLE OF VOLUNTARY TEAMS OF PROFESSIONAL ENGINEERS IN
DISSATER MANAGEMENT – EXPERIENCES FROM GUJARAT
EARTHQUAKE
Sreenivas Sarma Paraitham1
, Narayan Rao Devarashetty2
1
Professor and Head, Civil Engineering Department, CBIT, Hyderabad, India – 500 075
2
Practicing Engineer and Chartered Valuer, Kodad, Khammam district, Telangana, India
Abstract
Post disaster works are of great significance and need, in any part of the globe. While these works are attempted with lot of
strategic planning in the developed countries, emotion, excitement coupled with lack of a professional approach to the problem ,
are often seen in the developing countries , resulting in furthering the ill effects of the disaster . Earthquake hit areas are known to
witness this kind of situation, attracting unprecedented rush of unrelated persons, only to add to the chaos . Professional
engineers have a role to play in this context and must volunteer themselves in order to contribute for the disaster management and
execute appropriate post-disaster work.
This paper presents the experiences of the authors as members of a voluntary professional team that visited Gujarat after the
devastating earthquake of 26th
January, 2001.The various challenges faced by the professional engineers, both technical and non-
technical , are highlighted and the efforts made to overcome them are narrated . The technical challenges include the seismic
retrofitting measures to be adopted for non-engineered constructions and reversal and replacement of inadequate and
inappropriate retrofitting measures by adequate and appropriate ones. The non-technical challenges include accessing the
authorities, convincing them about the need for suitable retrofitting strategies and making them evolve policies for emergency re-
construction and rehabilitation .An overview of the various reasons for the very occurrence of the disaster , is also presented . In
all, it is emphasized that the professional engineers have a key role to play in the disaster management and must volunteer to act
to meet the need of the hour .
Keywords: Post disaster works, Earthquake hit areas, Role of professional engineers, Disaster management
--------------------------------------------------------------------***------------------------------------------------------------------
1. INTRODUCTION
A devastating earthquake has hit Gujarat, India , at about
08.46 AM on the 52nd
Republic day of the country ,killing at
least 20,000 people, injuring about 1,67,000 and destroying
about 400,000 homes . The epicenter was about 9 kM SW of
the village of Chobari in Bachau taluka of Kutch district.
The earthquake lasted for over two minutes , reached 7.7 M
on the moment magnitude scale and had a maximum felt
intensity of X on the Mercalli scale .
Bhuj, situated only 20 kilometres (12 mi) from the epicenter,
was devastated. Considerable damage also occurred in
Bachau and Anjar with hundreds of villages flattened in
Taluka of Anjar, Bhuj & Bhachau. Over a million structures
were damaged or destroyed, including many historic
buildings and tourist attractions. The quake destroyed
around 40% of homes, eight schools, two hospitals and 4 km
of road in Bhuj and partly destroyed the city's historic
Swaminarayan Temple and historic fort as well Prag Mahal
and Aina Mahal. In Ahmedabad, Gujarat's commercial
capital with a population of 56 lakhs, as many as 50 multi-
storied buildings collapsed and several hundred people were
killed. Total property damage was estimated at $5.5 billion.
In Kutch, the quake destroyed about 60% of food and water
supplies and around 2,58,000 houses - 90% of the district's
housing stock. The biggest setback was the total demolition
of the Bhuj Civil hospital. The Indian military provided
emergency support which was later augmented by the
International Federation of Red Cross and Red Crescent
Society. A temporary Red Cross hospital remained in Bhuj
to provide care while a replacement hospital was built.
2. GRIHA SEVA TEAM
An appeal was made through news papers and other sources
of information dissemination , nationally and internationally
, by a leading geo-technical consultant from Chennai
inviting to join him for a voluntary participation in the ‘
professional post-disaster activity ‘ in the areas of Bhuj and
Ahmedabad . A team of Seventeen members (photo-1) was
formed and named ‘Griha Seva’, which consisted of
professionals from various disciplines including two
material scientists from outside the country . The authors
were the only two picked up from the then combined state of
Andhra Pradesh.
It was interesting to note that a retired military major was
appointed as the ‘Team Manager’ to activate the team
members and to maintain discipline among the team
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 111
members and in the activities of the team. A leading local
architect of Ahmedabad city was picked up to help the team
in accessing the authorities and the quake-hit sites . This
really worked well and the architect besides taking care of
these aspects , has done a commendable job in providing
hospitality and accommodation .
3. SITE VISITS AND ACTIVITY OF THE TEAM
The team which consisted of varied professionals such as
Structural engineers , Geotechnical engineers , Architects ,
surveyors , material scientists , Geologists , Testing experts
and field assistants , was led by a geotechnical expert from
Chennai and was ably supported by one local architect , in
accessing the authorities and the sites . In a total of about
two weeks program during the last part of February , 2001 ,
the first few days were spent in Bhuj and then the activity
was shifted to Ahmedabad .
In both the places , the activity consisted of visiting the
already identified critical sites/structures , making visual
inspections , gathering the details by enquiry, by
measurements , by observation etc., conducting suitable in-
situ tests (photo-2) wherever necessary ,making a
preliminary assessment of the damage to the building/
structure and suggesting emergency measures wherever
needed . consolidation of the data , detailed analysis,
discussion and finalization of retrofitting/ rehabilitation
strategy was usually happening in the evenings , back home.
Photo-1: Griha seva team
Photo-2: In-situ tests
The proposed action plans were submitted to the team
leader who in turn used to meet the authorities (mainly the
Collector of the district ) with the help of the local architect
, take the guidance , approval and then reaching those
identified sites again in the morning next day to get the
proposed rehabilitation measures executed . At least
twenty sites in Bhuj and Fifty sites in Ahmedabad were
visited . However , due to various reasons , it was possible
to conduct a detailed inspection , make a comprehensive
analysis , provide recommendations for emergency
rehabilitation measures , get the approval and implement the
same on the field – only for twenty buildings , in
Ahmedabad city .
4. DAMAGE PATTERNS OBSERVED
Bhuj was more severely effected than the city of
Ahmedabad . Many villages in the proximity of Bhuj such
as Bachau, Anjar , Rapar were totally brought down and
remained as rumbles , when the team visited . The buildings
in all these villages were of mud or stone masonry. The city
of Bhuj was having both - masonry structures ( mostly in the
old city ) and framed RC structures ( mostly in the new city
) as well . Severe cracking was seen in almost all parts of all
the buildings in Bhuj. Scenes of any building surviving the
quake without cracks were very rare! The crack patterns
ranged from characteristic ‘X’ cracking in walls (photo-3) to
intensive wide spread cracking (photo-4) in the entire
building structure. The damage ranged from distress in
structural elements of the buildings to total collapse of the
structures. Several buildings were seen sunken in to the
ground ; some of them which were multi-storied were
brought down by one to two stories .Buildings hitting the
adjacent buildings by pounding action , crushed beam
column junctions , buckled columns with crushed concrete
and bent reinforcing bars (in to 2nd
and even 3rd
modes )were
commonly seen.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 112
Photo-3: ‘X’ cracking in walls
Photo-4: Wide spread cracking in building
In Ahmedabad city, relatively less percentage of buildings
suffered damage when compared to Bhuj. However, some of
the buildings suffered very severe damage and even
collapsed. A few multi-storied buildings with floating
columns (photo-5) were also seen to be damaged .Wide
spread cracking in walls and structural elements ,buckled
and distorted columns (photo-6) , cracked and excessively
deflected beams , poorly concreted beam column junctions
(photo-7) and critically damaged lift cores and staircases
marked the scenes in the damaged building sites . Photos
(8) and (9) present the typical failure patterns of structural
elements in the buildings of Ahmedabad city .
Photo-5: Floating columns
Photo-6: Buckled Columns
Photo-7: Poor concreting
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 113
Photo-8: Fractured Columns
Photo-9: Spiral cracking in beams
5. FACTORS OBSERVED TO HAVE
ENHANCED THE IMPACT OF DISASTER
In Bhuj town : Even when the ‘Griha Seva’ team arrived in
Bhuj , after about three weeks of the very occurrence of the
event also , no major clearing operation or restoration
operation could be taken up either by the Government or
private organizations .That was because the number of
buildings collapsed was large and the debris was so huge
that the disposal was a problem . Added to this, the narrow
lanes of Bhuj town (photo-10) , which were further
narrowed down by the very presence of debris on either side
and the unprecedented rush of unrelated persons in the form
of visitors to the town . There was no control, whatsoever,
on this issue due to many reasons . It was really difficult to
segregate the crowd in to professionals, visitors and the
relatives of the affected who came in search of them. It was
in fact the disciplined attitude of the visitors that was
required at that juncture, which would make their
appropriate help reach the effected area rather than
themselves. Rescuing the bodies, clearing the debris and
taking up emergency rehabilitation activity was almost
impossible at that stage. Disposal of the debris was another
serious problem that needed attention. Important structures
like hospitals were severely hit and the number of casualties
and injured were too high to be attended .The team of ‘Griha
Seva’ under these conditions felt appropriate to stay in
Ahmedabad and continue it’s operations.
From among the technical observations made which
contributed for the enhancement of the impact of disaster ,
the following were note worthy .
 Improper planning and injudicious approval and
construction of buildings, without leaving the
required space and even set backs on the road side as
well as al round the buildings. The closer
proximities of the buildings with one another not
only caused debris clearing difficult but also caused
pounding (photo-11) and collapse of adjacent
buildings in quite a number of cases.
 Non-engineered way of constructing structures with
defective materials and faulty execution procedures
.Serious violations of design and detailing rules that
should have otherwise been followed strictly in such
very severe seismic zones (zone-v).
Photo-10: Narrow lanes
Photo-11: Pounding of buildings
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 114
In Ahmedabad City : This city , the capital of Gujarat ,a
state which was just recovering from drought that occurred
in the previous year , was relatively safe though
experiencing the problems of accommodating refugees,
visitors etc., and increased prices of commodities . Despite
these issues, the city became the focal point of all disaster
management activities, with several government nominated
organizations, NGOs and Voluntary organizations coming
forward for the cause. The primary challenge for the
administrative authorities was to categorize and prioritize
the various quake hit sites in terms of the extent of damage
and in order of the urgency required to rehabilitate the
structures. Partially damaged structures were raising greater
concern as the inhabitants were growing panicky with the
after shocks still continuing and the status of structural
safety not known. The issues being so technical, there was a
great demand for teams of professional engineers to
volunteer and act . It was due to this reason that the collector
of Ahmedabad appreciated the members of the ‘Griha Seva’
team , saying that they did a commendable job in the hour of
the need .
From among the technical observations made which
worsened the effects of disaster , the following were
noteworthy .
 Inappropriate retrofitting measures adopted that
were lacking any engineering judgment ( refer to
photo-12).
 Failure to adhere to the important detailing rules of
reinforcement(photo-13), which otherwise are ‘must
to follow’ in such severe seismic zones .
 Injudicious use of floating columns in multi-storied
structures .
 Defective materials and faulty workmanship (photo-
14).
Photo-12: Improper retrofitting
Photo-13: Poor detailing
Photo-14: defective wrokmanship
6. ROLE OF VOLUNTARY TEAMS OF
PROFESSIONALS
In the event of any disaster such as the Bhuj earthquake , it
is very common for normal public to be emotional , excited
and enthusiastic to visit the place and / or donate money
,clothes , food etc. However , such disasters require a
professional approach in mitigating and managing them.
Civil engineering professionals have a very crucial role to
play in this context and must therefore volunteer to serve the
structures and the people . A disaster could turn out to be a
catastrophe , if unrelated people rush to the effected site and
try to act without the knowledge of the subject .Site visits ,
compilation of data , Analysis , Reanalysis , Designs ,
Decisions on debris clearance/retrofitting are all technical
issues that require professional expertise . Hence , this
aspect should be borne in mind and true professionals must
come forward to volunteer and serve , during the disasters .
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 115
7. CONCLUSION
 Post disaster works must be attempted with lot of
strategic planning in the developing countries like
India.
 Civil engineering professionals must team up and
volunteer to come forward and serve during the
disasters such as earthquakes.
 Unnecessary rushing of unrelated persons to the
disaster affected places and their injudicious
intervention will only enhance the impact of the
disaster and may even turn it in to a catastrophe ;
hence should be avoided.
ACKNOWLEDGEMNTS
The authors would like to profusely thank Mr.Mohan
G.Ramanathan , for leading the ‘Griha Seva’ team from the
front and Mr.Viral Jassubhai for extending local support at
Bhuj and Ahmedabad besides giving hospitality and
accommodation . Further , they wholeheartedly thank
Mr.Srinivas , the then collector of Ahmedabad , for his
encouragement and appreciation given to the ‘Griha Seva’
team . Author-1 thanks the management of his institution for
permitting him to participate in this service oriented activity.
REFERENCES
[1] Sreenivas Sarma . P, Expert lecture on “ Lessons
learnt from Gujarat Earthquake of 26th
January,2001” , A state level meet conducted on
22nd
April , 2001at Kodad, Andhra Pradesh , India.

More Related Content

Viewers also liked

Characteristic orthogonal polynimial application to galerkin indirect variati...
Characteristic orthogonal polynimial application to galerkin indirect variati...Characteristic orthogonal polynimial application to galerkin indirect variati...
Characteristic orthogonal polynimial application to galerkin indirect variati...
eSAT Publishing House
 
Study of the effects of carbon and glass fibre reinforcement and other filler...
Study of the effects of carbon and glass fibre reinforcement and other filler...Study of the effects of carbon and glass fibre reinforcement and other filler...
Study of the effects of carbon and glass fibre reinforcement and other filler...
eSAT Publishing House
 
Spatial correlation based clustering algorithm for random and uniform topolog...
Spatial correlation based clustering algorithm for random and uniform topolog...Spatial correlation based clustering algorithm for random and uniform topolog...
Spatial correlation based clustering algorithm for random and uniform topolog...
eSAT Publishing House
 
Recent developments in paper currency recognition
Recent developments in paper currency recognitionRecent developments in paper currency recognition
Recent developments in paper currency recognition
eSAT Publishing House
 
Investigation of the mechanical, corrosion properties and wear behaviour of e...
Investigation of the mechanical, corrosion properties and wear behaviour of e...Investigation of the mechanical, corrosion properties and wear behaviour of e...
Investigation of the mechanical, corrosion properties and wear behaviour of e...
eSAT Publishing House
 
Low power fpga solution for dab audio decoder
Low power fpga solution for dab audio decoderLow power fpga solution for dab audio decoder
Low power fpga solution for dab audio decoder
eSAT Publishing House
 
Thermal analysis and dc conductivity of
Thermal analysis and dc conductivity ofThermal analysis and dc conductivity of
Thermal analysis and dc conductivity of
eSAT Publishing House
 
Influence of land use land cover in simulating the thunderstorm event using ...
Influence of land use  land cover in simulating the thunderstorm event using ...Influence of land use  land cover in simulating the thunderstorm event using ...
Influence of land use land cover in simulating the thunderstorm event using ...
eSAT Publishing House
 
Ensuring secure transfer, access and storage over the cloud storage
Ensuring secure transfer, access and storage over the cloud storageEnsuring secure transfer, access and storage over the cloud storage
Ensuring secure transfer, access and storage over the cloud storage
eSAT Publishing House
 
An overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring systemAn overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring system
eSAT Publishing House
 
Evaluation of mechanical properties of retrogression and reaged al 7075 alloy...
Evaluation of mechanical properties of retrogression and reaged al 7075 alloy...Evaluation of mechanical properties of retrogression and reaged al 7075 alloy...
Evaluation of mechanical properties of retrogression and reaged al 7075 alloy...
eSAT Publishing House
 
Experimental investigation of thermal performance of petrol engine using fuel...
Experimental investigation of thermal performance of petrol engine using fuel...Experimental investigation of thermal performance of petrol engine using fuel...
Experimental investigation of thermal performance of petrol engine using fuel...
eSAT Publishing House
 
Implementation of sql server based on sqlite engine on
Implementation of sql server based on sqlite engine onImplementation of sql server based on sqlite engine on
Implementation of sql server based on sqlite engine on
eSAT Publishing House
 
Analysis of denial of service (dos) attacks in wireless sensor networks
Analysis of denial of service (dos) attacks in wireless sensor networksAnalysis of denial of service (dos) attacks in wireless sensor networks
Analysis of denial of service (dos) attacks in wireless sensor networks
eSAT Publishing House
 
Voltage sag mitigation using supercapacitor based dynamic voltage restorer
Voltage sag mitigation using supercapacitor based dynamic voltage restorerVoltage sag mitigation using supercapacitor based dynamic voltage restorer
Voltage sag mitigation using supercapacitor based dynamic voltage restorer
eSAT Publishing House
 
Optimum capacity allocation of distributed generation
Optimum capacity allocation of distributed generationOptimum capacity allocation of distributed generation
Optimum capacity allocation of distributed generation
eSAT Publishing House
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
eSAT Publishing House
 
Study of shear walls in multistoried buildings with different thickness and r...
Study of shear walls in multistoried buildings with different thickness and r...Study of shear walls in multistoried buildings with different thickness and r...
Study of shear walls in multistoried buildings with different thickness and r...
eSAT Publishing House
 
Using transfer learning for video popularity prediction
Using transfer learning for video popularity predictionUsing transfer learning for video popularity prediction
Using transfer learning for video popularity prediction
eSAT Publishing House
 
A novel tool for stereo matching of images
A novel tool for stereo matching of imagesA novel tool for stereo matching of images
A novel tool for stereo matching of images
eSAT Publishing House
 

Viewers also liked (20)

Characteristic orthogonal polynimial application to galerkin indirect variati...
Characteristic orthogonal polynimial application to galerkin indirect variati...Characteristic orthogonal polynimial application to galerkin indirect variati...
Characteristic orthogonal polynimial application to galerkin indirect variati...
 
Study of the effects of carbon and glass fibre reinforcement and other filler...
Study of the effects of carbon and glass fibre reinforcement and other filler...Study of the effects of carbon and glass fibre reinforcement and other filler...
Study of the effects of carbon and glass fibre reinforcement and other filler...
 
Spatial correlation based clustering algorithm for random and uniform topolog...
Spatial correlation based clustering algorithm for random and uniform topolog...Spatial correlation based clustering algorithm for random and uniform topolog...
Spatial correlation based clustering algorithm for random and uniform topolog...
 
Recent developments in paper currency recognition
Recent developments in paper currency recognitionRecent developments in paper currency recognition
Recent developments in paper currency recognition
 
Investigation of the mechanical, corrosion properties and wear behaviour of e...
Investigation of the mechanical, corrosion properties and wear behaviour of e...Investigation of the mechanical, corrosion properties and wear behaviour of e...
Investigation of the mechanical, corrosion properties and wear behaviour of e...
 
Low power fpga solution for dab audio decoder
Low power fpga solution for dab audio decoderLow power fpga solution for dab audio decoder
Low power fpga solution for dab audio decoder
 
Thermal analysis and dc conductivity of
Thermal analysis and dc conductivity ofThermal analysis and dc conductivity of
Thermal analysis and dc conductivity of
 
Influence of land use land cover in simulating the thunderstorm event using ...
Influence of land use  land cover in simulating the thunderstorm event using ...Influence of land use  land cover in simulating the thunderstorm event using ...
Influence of land use land cover in simulating the thunderstorm event using ...
 
Ensuring secure transfer, access and storage over the cloud storage
Ensuring secure transfer, access and storage over the cloud storageEnsuring secure transfer, access and storage over the cloud storage
Ensuring secure transfer, access and storage over the cloud storage
 
An overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring systemAn overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring system
 
Evaluation of mechanical properties of retrogression and reaged al 7075 alloy...
Evaluation of mechanical properties of retrogression and reaged al 7075 alloy...Evaluation of mechanical properties of retrogression and reaged al 7075 alloy...
Evaluation of mechanical properties of retrogression and reaged al 7075 alloy...
 
Experimental investigation of thermal performance of petrol engine using fuel...
Experimental investigation of thermal performance of petrol engine using fuel...Experimental investigation of thermal performance of petrol engine using fuel...
Experimental investigation of thermal performance of petrol engine using fuel...
 
Implementation of sql server based on sqlite engine on
Implementation of sql server based on sqlite engine onImplementation of sql server based on sqlite engine on
Implementation of sql server based on sqlite engine on
 
Analysis of denial of service (dos) attacks in wireless sensor networks
Analysis of denial of service (dos) attacks in wireless sensor networksAnalysis of denial of service (dos) attacks in wireless sensor networks
Analysis of denial of service (dos) attacks in wireless sensor networks
 
Voltage sag mitigation using supercapacitor based dynamic voltage restorer
Voltage sag mitigation using supercapacitor based dynamic voltage restorerVoltage sag mitigation using supercapacitor based dynamic voltage restorer
Voltage sag mitigation using supercapacitor based dynamic voltage restorer
 
Optimum capacity allocation of distributed generation
Optimum capacity allocation of distributed generationOptimum capacity allocation of distributed generation
Optimum capacity allocation of distributed generation
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
 
Study of shear walls in multistoried buildings with different thickness and r...
Study of shear walls in multistoried buildings with different thickness and r...Study of shear walls in multistoried buildings with different thickness and r...
Study of shear walls in multistoried buildings with different thickness and r...
 
Using transfer learning for video popularity prediction
Using transfer learning for video popularity predictionUsing transfer learning for video popularity prediction
Using transfer learning for video popularity prediction
 
A novel tool for stereo matching of images
A novel tool for stereo matching of imagesA novel tool for stereo matching of images
A novel tool for stereo matching of images
 

Similar to Role of voluntary teams of professional engineers in dissater management – experiences from gujarat earthquake

Investigation of practical life line rcc multistoried building structure & it...
Investigation of practical life line rcc multistoried building structure & it...Investigation of practical life line rcc multistoried building structure & it...
Investigation of practical life line rcc multistoried building structure & it...
eSAT Publishing House
 
Seismic performance assessment of the torsional effect in asymmetric structur...
Seismic performance assessment of the torsional effect in asymmetric structur...Seismic performance assessment of the torsional effect in asymmetric structur...
Seismic performance assessment of the torsional effect in asymmetric structur...
eSAT Journals
 
Pushover analysis of rc frame structure with floating column and soft story i...
Pushover analysis of rc frame structure with floating column and soft story i...Pushover analysis of rc frame structure with floating column and soft story i...
Pushover analysis of rc frame structure with floating column and soft story i...
eSAT Journals
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
eSAT Publishing House
 
IJSRED-V2I5P8
IJSRED-V2I5P8IJSRED-V2I5P8
IJSRED-V2I5P8
IJSRED
 
Occupational health and safety (ohs) management vis à-vis different phases of...
Occupational health and safety (ohs) management vis à-vis different phases of...Occupational health and safety (ohs) management vis à-vis different phases of...
Occupational health and safety (ohs) management vis à-vis different phases of...
eSAT Journals
 
Seismic behavior of intake tower of dam
Seismic behavior of intake tower of damSeismic behavior of intake tower of dam
Seismic behavior of intake tower of dam
eSAT Journals
 
Seismic behavior of intake tower of dam
Seismic behavior of intake tower of damSeismic behavior of intake tower of dam
Seismic behavior of intake tower of dam
eSAT Publishing House
 
Performance of an rcc frame building subjected to hydrodynamic force at each ...
Performance of an rcc frame building subjected to hydrodynamic force at each ...Performance of an rcc frame building subjected to hydrodynamic force at each ...
Performance of an rcc frame building subjected to hydrodynamic force at each ...
eSAT Journals
 
Parametric study on an industrial structure for various dynamic loads
Parametric study on an industrial structure for various dynamic loadsParametric study on an industrial structure for various dynamic loads
Parametric study on an industrial structure for various dynamic loads
eSAT Journals
 
Design and comparison of a residential building (g+10) for seismic forces usi...
Design and comparison of a residential building (g+10) for seismic forces usi...Design and comparison of a residential building (g+10) for seismic forces usi...
Design and comparison of a residential building (g+10) for seismic forces usi...
eSAT Journals
 
An overview of stress analysis of high energy pipeline systems used in therma...
An overview of stress analysis of high energy pipeline systems used in therma...An overview of stress analysis of high energy pipeline systems used in therma...
An overview of stress analysis of high energy pipeline systems used in therma...
eSAT Publishing House
 
Study on laminated rubber bearing base isolators for seismic protection of st...
Study on laminated rubber bearing base isolators for seismic protection of st...Study on laminated rubber bearing base isolators for seismic protection of st...
Study on laminated rubber bearing base isolators for seismic protection of st...
eSAT Journals
 
Selection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction ProjectSelection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction Project
IRJET Journal
 
Comparision of local retrofitting of r.c.frames by linear static method for m...
Comparision of local retrofitting of r.c.frames by linear static method for m...Comparision of local retrofitting of r.c.frames by linear static method for m...
Comparision of local retrofitting of r.c.frames by linear static method for m...
eSAT Journals
 
Probabilstic seismic risk evaluation of rc buildings (2)
Probabilstic seismic risk evaluation of rc buildings (2)Probabilstic seismic risk evaluation of rc buildings (2)
Probabilstic seismic risk evaluation of rc buildings (2)
eSAT Publishing House
 
Probabilstic seismic risk evaluation of rc buildings
Probabilstic seismic risk evaluation of rc buildings Probabilstic seismic risk evaluation of rc buildings
Probabilstic seismic risk evaluation of rc buildings
eSAT Journals
 
Handbook of retrofit of buildings
Handbook of retrofit of buildingsHandbook of retrofit of buildings
Handbook of retrofit of buildings
Juan Carlos Jiménez Pacheco
 
IRJET- Analysis of Flood Resistant Rehab Shelter
IRJET- Analysis of Flood Resistant Rehab ShelterIRJET- Analysis of Flood Resistant Rehab Shelter
IRJET- Analysis of Flood Resistant Rehab Shelter
IRJET Journal
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in india
eSAT Journals
 

Similar to Role of voluntary teams of professional engineers in dissater management – experiences from gujarat earthquake (20)

Investigation of practical life line rcc multistoried building structure & it...
Investigation of practical life line rcc multistoried building structure & it...Investigation of practical life line rcc multistoried building structure & it...
Investigation of practical life line rcc multistoried building structure & it...
 
Seismic performance assessment of the torsional effect in asymmetric structur...
Seismic performance assessment of the torsional effect in asymmetric structur...Seismic performance assessment of the torsional effect in asymmetric structur...
Seismic performance assessment of the torsional effect in asymmetric structur...
 
Pushover analysis of rc frame structure with floating column and soft story i...
Pushover analysis of rc frame structure with floating column and soft story i...Pushover analysis of rc frame structure with floating column and soft story i...
Pushover analysis of rc frame structure with floating column and soft story i...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
IJSRED-V2I5P8
IJSRED-V2I5P8IJSRED-V2I5P8
IJSRED-V2I5P8
 
Occupational health and safety (ohs) management vis à-vis different phases of...
Occupational health and safety (ohs) management vis à-vis different phases of...Occupational health and safety (ohs) management vis à-vis different phases of...
Occupational health and safety (ohs) management vis à-vis different phases of...
 
Seismic behavior of intake tower of dam
Seismic behavior of intake tower of damSeismic behavior of intake tower of dam
Seismic behavior of intake tower of dam
 
Seismic behavior of intake tower of dam
Seismic behavior of intake tower of damSeismic behavior of intake tower of dam
Seismic behavior of intake tower of dam
 
Performance of an rcc frame building subjected to hydrodynamic force at each ...
Performance of an rcc frame building subjected to hydrodynamic force at each ...Performance of an rcc frame building subjected to hydrodynamic force at each ...
Performance of an rcc frame building subjected to hydrodynamic force at each ...
 
Parametric study on an industrial structure for various dynamic loads
Parametric study on an industrial structure for various dynamic loadsParametric study on an industrial structure for various dynamic loads
Parametric study on an industrial structure for various dynamic loads
 
Design and comparison of a residential building (g+10) for seismic forces usi...
Design and comparison of a residential building (g+10) for seismic forces usi...Design and comparison of a residential building (g+10) for seismic forces usi...
Design and comparison of a residential building (g+10) for seismic forces usi...
 
An overview of stress analysis of high energy pipeline systems used in therma...
An overview of stress analysis of high energy pipeline systems used in therma...An overview of stress analysis of high energy pipeline systems used in therma...
An overview of stress analysis of high energy pipeline systems used in therma...
 
Study on laminated rubber bearing base isolators for seismic protection of st...
Study on laminated rubber bearing base isolators for seismic protection of st...Study on laminated rubber bearing base isolators for seismic protection of st...
Study on laminated rubber bearing base isolators for seismic protection of st...
 
Selection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction ProjectSelection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction Project
 
Comparision of local retrofitting of r.c.frames by linear static method for m...
Comparision of local retrofitting of r.c.frames by linear static method for m...Comparision of local retrofitting of r.c.frames by linear static method for m...
Comparision of local retrofitting of r.c.frames by linear static method for m...
 
Probabilstic seismic risk evaluation of rc buildings (2)
Probabilstic seismic risk evaluation of rc buildings (2)Probabilstic seismic risk evaluation of rc buildings (2)
Probabilstic seismic risk evaluation of rc buildings (2)
 
Probabilstic seismic risk evaluation of rc buildings
Probabilstic seismic risk evaluation of rc buildings Probabilstic seismic risk evaluation of rc buildings
Probabilstic seismic risk evaluation of rc buildings
 
Handbook of retrofit of buildings
Handbook of retrofit of buildingsHandbook of retrofit of buildings
Handbook of retrofit of buildings
 
IRJET- Analysis of Flood Resistant Rehab Shelter
IRJET- Analysis of Flood Resistant Rehab ShelterIRJET- Analysis of Flood Resistant Rehab Shelter
IRJET- Analysis of Flood Resistant Rehab Shelter
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in india
 

More from eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
eSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
eSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
eSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
eSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
eSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
eSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
eSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
eSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
eSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
eSAT Publishing House
 
Disaster recovery sustainable housing
Disaster recovery sustainable housingDisaster recovery sustainable housing
Disaster recovery sustainable housing
eSAT Publishing House
 
Detection of hazard prone areas in the upper himalayan region in gis environment
Detection of hazard prone areas in the upper himalayan region in gis environmentDetection of hazard prone areas in the upper himalayan region in gis environment
Detection of hazard prone areas in the upper himalayan region in gis environment
eSAT Publishing House
 

More from eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 
Disaster recovery sustainable housing
Disaster recovery sustainable housingDisaster recovery sustainable housing
Disaster recovery sustainable housing
 
Detection of hazard prone areas in the upper himalayan region in gis environment
Detection of hazard prone areas in the upper himalayan region in gis environmentDetection of hazard prone areas in the upper himalayan region in gis environment
Detection of hazard prone areas in the upper himalayan region in gis environment
 

Recently uploaded

Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 

Recently uploaded (20)

Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 

Role of voluntary teams of professional engineers in dissater management – experiences from gujarat earthquake

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 110 ROLE OF VOLUNTARY TEAMS OF PROFESSIONAL ENGINEERS IN DISSATER MANAGEMENT – EXPERIENCES FROM GUJARAT EARTHQUAKE Sreenivas Sarma Paraitham1 , Narayan Rao Devarashetty2 1 Professor and Head, Civil Engineering Department, CBIT, Hyderabad, India – 500 075 2 Practicing Engineer and Chartered Valuer, Kodad, Khammam district, Telangana, India Abstract Post disaster works are of great significance and need, in any part of the globe. While these works are attempted with lot of strategic planning in the developed countries, emotion, excitement coupled with lack of a professional approach to the problem , are often seen in the developing countries , resulting in furthering the ill effects of the disaster . Earthquake hit areas are known to witness this kind of situation, attracting unprecedented rush of unrelated persons, only to add to the chaos . Professional engineers have a role to play in this context and must volunteer themselves in order to contribute for the disaster management and execute appropriate post-disaster work. This paper presents the experiences of the authors as members of a voluntary professional team that visited Gujarat after the devastating earthquake of 26th January, 2001.The various challenges faced by the professional engineers, both technical and non- technical , are highlighted and the efforts made to overcome them are narrated . The technical challenges include the seismic retrofitting measures to be adopted for non-engineered constructions and reversal and replacement of inadequate and inappropriate retrofitting measures by adequate and appropriate ones. The non-technical challenges include accessing the authorities, convincing them about the need for suitable retrofitting strategies and making them evolve policies for emergency re- construction and rehabilitation .An overview of the various reasons for the very occurrence of the disaster , is also presented . In all, it is emphasized that the professional engineers have a key role to play in the disaster management and must volunteer to act to meet the need of the hour . Keywords: Post disaster works, Earthquake hit areas, Role of professional engineers, Disaster management --------------------------------------------------------------------***------------------------------------------------------------------ 1. INTRODUCTION A devastating earthquake has hit Gujarat, India , at about 08.46 AM on the 52nd Republic day of the country ,killing at least 20,000 people, injuring about 1,67,000 and destroying about 400,000 homes . The epicenter was about 9 kM SW of the village of Chobari in Bachau taluka of Kutch district. The earthquake lasted for over two minutes , reached 7.7 M on the moment magnitude scale and had a maximum felt intensity of X on the Mercalli scale . Bhuj, situated only 20 kilometres (12 mi) from the epicenter, was devastated. Considerable damage also occurred in Bachau and Anjar with hundreds of villages flattened in Taluka of Anjar, Bhuj & Bhachau. Over a million structures were damaged or destroyed, including many historic buildings and tourist attractions. The quake destroyed around 40% of homes, eight schools, two hospitals and 4 km of road in Bhuj and partly destroyed the city's historic Swaminarayan Temple and historic fort as well Prag Mahal and Aina Mahal. In Ahmedabad, Gujarat's commercial capital with a population of 56 lakhs, as many as 50 multi- storied buildings collapsed and several hundred people were killed. Total property damage was estimated at $5.5 billion. In Kutch, the quake destroyed about 60% of food and water supplies and around 2,58,000 houses - 90% of the district's housing stock. The biggest setback was the total demolition of the Bhuj Civil hospital. The Indian military provided emergency support which was later augmented by the International Federation of Red Cross and Red Crescent Society. A temporary Red Cross hospital remained in Bhuj to provide care while a replacement hospital was built. 2. GRIHA SEVA TEAM An appeal was made through news papers and other sources of information dissemination , nationally and internationally , by a leading geo-technical consultant from Chennai inviting to join him for a voluntary participation in the ‘ professional post-disaster activity ‘ in the areas of Bhuj and Ahmedabad . A team of Seventeen members (photo-1) was formed and named ‘Griha Seva’, which consisted of professionals from various disciplines including two material scientists from outside the country . The authors were the only two picked up from the then combined state of Andhra Pradesh. It was interesting to note that a retired military major was appointed as the ‘Team Manager’ to activate the team members and to maintain discipline among the team
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 111 members and in the activities of the team. A leading local architect of Ahmedabad city was picked up to help the team in accessing the authorities and the quake-hit sites . This really worked well and the architect besides taking care of these aspects , has done a commendable job in providing hospitality and accommodation . 3. SITE VISITS AND ACTIVITY OF THE TEAM The team which consisted of varied professionals such as Structural engineers , Geotechnical engineers , Architects , surveyors , material scientists , Geologists , Testing experts and field assistants , was led by a geotechnical expert from Chennai and was ably supported by one local architect , in accessing the authorities and the sites . In a total of about two weeks program during the last part of February , 2001 , the first few days were spent in Bhuj and then the activity was shifted to Ahmedabad . In both the places , the activity consisted of visiting the already identified critical sites/structures , making visual inspections , gathering the details by enquiry, by measurements , by observation etc., conducting suitable in- situ tests (photo-2) wherever necessary ,making a preliminary assessment of the damage to the building/ structure and suggesting emergency measures wherever needed . consolidation of the data , detailed analysis, discussion and finalization of retrofitting/ rehabilitation strategy was usually happening in the evenings , back home. Photo-1: Griha seva team Photo-2: In-situ tests The proposed action plans were submitted to the team leader who in turn used to meet the authorities (mainly the Collector of the district ) with the help of the local architect , take the guidance , approval and then reaching those identified sites again in the morning next day to get the proposed rehabilitation measures executed . At least twenty sites in Bhuj and Fifty sites in Ahmedabad were visited . However , due to various reasons , it was possible to conduct a detailed inspection , make a comprehensive analysis , provide recommendations for emergency rehabilitation measures , get the approval and implement the same on the field – only for twenty buildings , in Ahmedabad city . 4. DAMAGE PATTERNS OBSERVED Bhuj was more severely effected than the city of Ahmedabad . Many villages in the proximity of Bhuj such as Bachau, Anjar , Rapar were totally brought down and remained as rumbles , when the team visited . The buildings in all these villages were of mud or stone masonry. The city of Bhuj was having both - masonry structures ( mostly in the old city ) and framed RC structures ( mostly in the new city ) as well . Severe cracking was seen in almost all parts of all the buildings in Bhuj. Scenes of any building surviving the quake without cracks were very rare! The crack patterns ranged from characteristic ‘X’ cracking in walls (photo-3) to intensive wide spread cracking (photo-4) in the entire building structure. The damage ranged from distress in structural elements of the buildings to total collapse of the structures. Several buildings were seen sunken in to the ground ; some of them which were multi-storied were brought down by one to two stories .Buildings hitting the adjacent buildings by pounding action , crushed beam column junctions , buckled columns with crushed concrete and bent reinforcing bars (in to 2nd and even 3rd modes )were commonly seen.
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 112 Photo-3: ‘X’ cracking in walls Photo-4: Wide spread cracking in building In Ahmedabad city, relatively less percentage of buildings suffered damage when compared to Bhuj. However, some of the buildings suffered very severe damage and even collapsed. A few multi-storied buildings with floating columns (photo-5) were also seen to be damaged .Wide spread cracking in walls and structural elements ,buckled and distorted columns (photo-6) , cracked and excessively deflected beams , poorly concreted beam column junctions (photo-7) and critically damaged lift cores and staircases marked the scenes in the damaged building sites . Photos (8) and (9) present the typical failure patterns of structural elements in the buildings of Ahmedabad city . Photo-5: Floating columns Photo-6: Buckled Columns Photo-7: Poor concreting
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 113 Photo-8: Fractured Columns Photo-9: Spiral cracking in beams 5. FACTORS OBSERVED TO HAVE ENHANCED THE IMPACT OF DISASTER In Bhuj town : Even when the ‘Griha Seva’ team arrived in Bhuj , after about three weeks of the very occurrence of the event also , no major clearing operation or restoration operation could be taken up either by the Government or private organizations .That was because the number of buildings collapsed was large and the debris was so huge that the disposal was a problem . Added to this, the narrow lanes of Bhuj town (photo-10) , which were further narrowed down by the very presence of debris on either side and the unprecedented rush of unrelated persons in the form of visitors to the town . There was no control, whatsoever, on this issue due to many reasons . It was really difficult to segregate the crowd in to professionals, visitors and the relatives of the affected who came in search of them. It was in fact the disciplined attitude of the visitors that was required at that juncture, which would make their appropriate help reach the effected area rather than themselves. Rescuing the bodies, clearing the debris and taking up emergency rehabilitation activity was almost impossible at that stage. Disposal of the debris was another serious problem that needed attention. Important structures like hospitals were severely hit and the number of casualties and injured were too high to be attended .The team of ‘Griha Seva’ under these conditions felt appropriate to stay in Ahmedabad and continue it’s operations. From among the technical observations made which contributed for the enhancement of the impact of disaster , the following were note worthy .  Improper planning and injudicious approval and construction of buildings, without leaving the required space and even set backs on the road side as well as al round the buildings. The closer proximities of the buildings with one another not only caused debris clearing difficult but also caused pounding (photo-11) and collapse of adjacent buildings in quite a number of cases.  Non-engineered way of constructing structures with defective materials and faulty execution procedures .Serious violations of design and detailing rules that should have otherwise been followed strictly in such very severe seismic zones (zone-v). Photo-10: Narrow lanes Photo-11: Pounding of buildings
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 114 In Ahmedabad City : This city , the capital of Gujarat ,a state which was just recovering from drought that occurred in the previous year , was relatively safe though experiencing the problems of accommodating refugees, visitors etc., and increased prices of commodities . Despite these issues, the city became the focal point of all disaster management activities, with several government nominated organizations, NGOs and Voluntary organizations coming forward for the cause. The primary challenge for the administrative authorities was to categorize and prioritize the various quake hit sites in terms of the extent of damage and in order of the urgency required to rehabilitate the structures. Partially damaged structures were raising greater concern as the inhabitants were growing panicky with the after shocks still continuing and the status of structural safety not known. The issues being so technical, there was a great demand for teams of professional engineers to volunteer and act . It was due to this reason that the collector of Ahmedabad appreciated the members of the ‘Griha Seva’ team , saying that they did a commendable job in the hour of the need . From among the technical observations made which worsened the effects of disaster , the following were noteworthy .  Inappropriate retrofitting measures adopted that were lacking any engineering judgment ( refer to photo-12).  Failure to adhere to the important detailing rules of reinforcement(photo-13), which otherwise are ‘must to follow’ in such severe seismic zones .  Injudicious use of floating columns in multi-storied structures .  Defective materials and faulty workmanship (photo- 14). Photo-12: Improper retrofitting Photo-13: Poor detailing Photo-14: defective wrokmanship 6. ROLE OF VOLUNTARY TEAMS OF PROFESSIONALS In the event of any disaster such as the Bhuj earthquake , it is very common for normal public to be emotional , excited and enthusiastic to visit the place and / or donate money ,clothes , food etc. However , such disasters require a professional approach in mitigating and managing them. Civil engineering professionals have a very crucial role to play in this context and must therefore volunteer to serve the structures and the people . A disaster could turn out to be a catastrophe , if unrelated people rush to the effected site and try to act without the knowledge of the subject .Site visits , compilation of data , Analysis , Reanalysis , Designs , Decisions on debris clearance/retrofitting are all technical issues that require professional expertise . Hence , this aspect should be borne in mind and true professionals must come forward to volunteer and serve , during the disasters .
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 115 7. CONCLUSION  Post disaster works must be attempted with lot of strategic planning in the developing countries like India.  Civil engineering professionals must team up and volunteer to come forward and serve during the disasters such as earthquakes.  Unnecessary rushing of unrelated persons to the disaster affected places and their injudicious intervention will only enhance the impact of the disaster and may even turn it in to a catastrophe ; hence should be avoided. ACKNOWLEDGEMNTS The authors would like to profusely thank Mr.Mohan G.Ramanathan , for leading the ‘Griha Seva’ team from the front and Mr.Viral Jassubhai for extending local support at Bhuj and Ahmedabad besides giving hospitality and accommodation . Further , they wholeheartedly thank Mr.Srinivas , the then collector of Ahmedabad , for his encouragement and appreciation given to the ‘Griha Seva’ team . Author-1 thanks the management of his institution for permitting him to participate in this service oriented activity. REFERENCES [1] Sreenivas Sarma . P, Expert lecture on “ Lessons learnt from Gujarat Earthquake of 26th January,2001” , A state level meet conducted on 22nd April , 2001at Kodad, Andhra Pradesh , India.