Sedimentation is a water treatment process where suspended solids settle under gravity in tanks called sedimentation basins or clarifiers. It is used to remove coarse particles, coagulated particles, precipitated particles, and biomass. The key principles are that particles with a specific gravity greater than water will settle, and the detention time in the basin must be sufficient for settling. Sedimentation can be plain or assisted by chemicals. The performance is influenced by factors like particle size and density, water viscosity and temperature, detention time, basin depth and area, and flow rate. Rectangular and circular basins are commonly used.
Sedimentation is the tendency for particles in suspension to settle out of the fluid in which they are entrained and come to rest against a barrier. This is due to their motion through the fluid in response to the forces acting on them: these forces can be due to gravity, centrifugal acceleration, or electromagnetism.
Sedimentation is the tendency for particles in suspension to settle out of the fluid in which they are entrained and come to rest against a barrier. This is due to their motion through the fluid in response to the forces acting on them: these forces can be due to gravity, centrifugal acceleration, or electromagnetism.
Deals with what is activated sludge, mechanisms and kinetics of treatment, design of activated sludge process, secondary clarifiers and their design and bulking sludge, raising sludge and foaming of ASP.
Lecture notes of Environmental Engineering-II as per Solapur university syllabus of TE CIVIL.
Prepared by
Prof S S Jahagirdar,
Associate Professor,
N K Orchid college of Engg and Technology,
Solapur
Primary waste water treatment powerpointb presntationkanchan jadon
This ppt basically depends on primary waste water treatment. It gives brief description about what is water treatment,sources of waste water,types of waste water basically mostly focus on primary treatment like screening,types of screening,description on every type of screens, grit removal,communator,primary sedimentation.
This presentation envisages on theory Of Filtration, Types of Filters, Slow Sand, Rapid Sand and Pressure Filters Including Construction, Operation, Cleaning, Operational Problems In Filters, Design criteria of Slow & Rapid Sand Filter Without Under Drainage System.
WHAT IS SEDIMENTATION?
TYPES OF SEDIMENTATION
TYPES OF SETTLING
BATCH SEDIMENTATION
RATE OF SEDIMENTATION
APPLICATIONS OF SEDIMENTATION
EQUIPMENTS USED FOR BATCH SEDIMENTATION
THICKENERS
CLARIFIERS
Deals with what is activated sludge, mechanisms and kinetics of treatment, design of activated sludge process, secondary clarifiers and their design and bulking sludge, raising sludge and foaming of ASP.
Lecture notes of Environmental Engineering-II as per Solapur university syllabus of TE CIVIL.
Prepared by
Prof S S Jahagirdar,
Associate Professor,
N K Orchid college of Engg and Technology,
Solapur
Primary waste water treatment powerpointb presntationkanchan jadon
This ppt basically depends on primary waste water treatment. It gives brief description about what is water treatment,sources of waste water,types of waste water basically mostly focus on primary treatment like screening,types of screening,description on every type of screens, grit removal,communator,primary sedimentation.
This presentation envisages on theory Of Filtration, Types of Filters, Slow Sand, Rapid Sand and Pressure Filters Including Construction, Operation, Cleaning, Operational Problems In Filters, Design criteria of Slow & Rapid Sand Filter Without Under Drainage System.
WHAT IS SEDIMENTATION?
TYPES OF SEDIMENTATION
TYPES OF SETTLING
BATCH SEDIMENTATION
RATE OF SEDIMENTATION
APPLICATIONS OF SEDIMENTATION
EQUIPMENTS USED FOR BATCH SEDIMENTATION
THICKENERS
CLARIFIERS
Transition curve and Super-elevation
Transition Curve
Objectives of Transition Curve
Properties Of Transition Curve
Types Of Transition Curve
Length Of Transition Curve
Superelevation
Objective of providing superelevation
Advantages of providing superelevation
Superelevation Formula
Numerical
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
2. SEDIMENTATION
Sedimentation is water treatment process, during which water has
little or no movement, and suspended solids sink to the bottom under
the force of gravity and form a sediment, this process is called
sedimentation.
3. PURPOSE OF SEDIMENTATION
To remove coarse dispersed phase.
To remove coagulated and flocculated impurities.
To remove precipitated impurities after chemical treatment.
To settle the sludge (biomass) after activated sludge process / tricking
filters.
4. SEDIMENTATION PRINCIPLE
Suspended solids present in water having specific gravity greater than that of water
tend to settle down by gravity as soon as the turbulence is retarded by offering
storage. Inorganic suspended solids having specific gravity of about 2.65;
and Organic suspended solids having specific gravity of about 1.04
The particles having specific gravity of about 1.20 or so readily settle down at the
bottom of tank. But it is difficult to cause the settlement of lighter particles.
This phenomenon of settling down of particles at the bottom of sedimentation tank
is known as hydraulic subsidence and every particle has its own hydraulic settling
value which will cause its hydraulic subsidence.
Basin in which the flow is retarded is called sedimentation basin.Theoretical average
time for which the water is detained in the settling tank is called the detention period
5. TYPES OF SEDIMENTATION
Plain sedimentation: It is process of settling down of solids and
impurities in the raw water to the bottom of sedimentation basin by
natural gravity force alone, no chemical is added.
This method is very cheaper and mostly used in all filtration and
purification system of water.
Sedimentation by using clarifier and contact: In this method
chemicals are mixed in water and that water is rotated by help of
pumps for period of two hours per day, and suspended solids are settled
down in the bottom of reservoir or tank etc.
6. TYPES OF SEDIMENTATION
Chemically Assisted sedimentation or clarification: this is process in
which chemicals are added to water and through mixing the suspended
solids and other impurities are stick together and form floc, which
settles to the bottom of basin.
In general most used process is chemically assisted horizontal
sedimentation and following assumptions are based on.
water generally flows through a tank as an irregular flow thus the
intention of sedimentation is to create condition in which the flow is
uniform as for long enough period, to permit the maximum practical
amount of floc to be settled before the water reaches at the end of
tank.
7. PARAMETERS INFLUENCING
SEDIMENTATION
Size, shape and weight of particles.
Viscosity and temperature of water.
Detention period of tank.
Effective depth of tank.
Area of tank.
Surface over flow rate.
Velocity of flow and outlet design.
8. TYPE OF SEDIMENTATION BASIN
Sedimentation tank may function either intermittent or continuously.
The intermittent type tank are those which store water for a certain period
and keep it on completely rest.
In continuous type tank , the flow velocity is only reduced and water is not
brought to complete rest .
Sedimentation tank or basin may be either circular or rectangular in plan.
Long narrow rectangular tanks with horizontal flow are generally preferred to
the circular tank of radial or spiral flow.
9. RECTANGULAR SEDIMENTATION BASIN
Rectangular basins are the simplest design, allowing water to flow
horizontally through a long tank This type of basin is usually found in
large-scale water treatment plants.
Rectangular basins have a variety of advantages such as predictability,
cost-effectiveness, and low maintenance. They are the least likely to
short-circuit, especially if the length is at least twice the width.The
inlet and outlet arrangements of rectangular basis are shown below.
A disadvantage of rectangular basins is the large extent of land area
required.
10. CIRCULAR SEDIMENTATION BASIN
Square and circular
sedimentation basins with
horizontal flow are often
known as clarifiers.
This type of basin faces
short-circuiting problems.
below Figure shows the
inlet and outlet
arrangements.
11.
12. DESIGN DETAIL
Detention period for plain sedimentation 4-8 hours and for coagulated
sedimentation 3-4 hours.
Velocity of flow not greater than 30cm/ mint( horizontal flow).
Tank dimensions: L:B = 3 to 5:1. Generally L= 30 m (common) maximum 100 m.
Breadth= 6 m to 10 m. Circular: Diameter not greater than 60 m. generally 20
to 40 m.
Depth 2.5 to 5.0 m (3 m).
Surface Overflow Rate: For plain sedimentation 12000 to 18000 L/d/m2 tank
area; for thoroughly flocculated water 24000 to 30000 L/d/m2 tank area.
Slopes: Rectangular 1% towards inlet and circular 8%.
13. DETENTION PERIOD
The theoretical (calculated) time required for a given amount of water
or wastewater to pass through a tank at a given rate of flow. In other
words it is average time for which the water is detained in tank.
t=
𝒗𝒐𝒍𝒖𝒎𝒆
𝒇𝒍𝒐𝒘 𝒓𝒂𝒕𝒆
=
𝑽
𝑸
=
𝑳∗𝑩∗𝑫
𝑨𝑽
=
𝑫
𝑽
Where t is detention period, Q is flow rate.
14. DETENTION PERIOD
Detention time is inversely proportional to the incoming flow rate - as
flow rate increases, the detention time decreases.
Example
Calculate the detention time for a rectangular sedimentation tank
with the following dimensions, length is 20m, width is 10m, depth is
4m, and the flow rate is 0.5 𝒎 𝟑
per sec.
detention time = tank volume
incoming water flow rate
15. DETENTION PERIOD
Note units of measurement are all consistent. ie time is given in seconds
and length is given in meters.
detention time = (20 x 10 x 4)
0.5
detention time = 800
0.5
detention time = 1600 seconds
detention time = 26.7 minutes
The term detention is often used interchangeably
with retention and hydraulic retention time.