Building Information Management
Omar Selim
Building Information Management
Omar Selim
● Founder of BIMarabia
● BIM manager with 14 years of experience.
● Research Assistant at Qatar University
Sir Christopher Wren’s Great Model. 1672
Lack of integration of
design and construction,
and often poor
collaboration among
team members.
Problems in Construction Industry Lot of
Challenges
⬗ Poorly Coordinated Design Documents
⬗ Change Orders & Rework
⬗ Delays & Cost Overruns
⬗ Claims & Litigation
⬗ Greater Risk
⬗ Poor Turnover Documents
⬗ Frustrated Owners
⬗ Tight Profit Margins
⬗ 25% of world solid waste.
⬗ Buildings consume 30% of raw materials.
⬗ Buildings consume 42% world’s energy 5
Source: Organization for Economics Cooperation & Development
(OECD)
Why change the way we practice?
Our current business models contain
57% non-value added waste
The construction industry is fraught with
infighting and adversarial relationships
The construction industry is the only
industry with a reduction in productivity
since the advent of computerization
Typical Problems in Construction
Industry
⬗ Lack ofProper Planning
⬗ Lack of Coordination
⬗ Lack of Professional Specialized Education
⬗ Poor Decision Making
⬗ Inefficient dispute resolution mechanism
⬗ Lack of Mediation
⬗ Difficulty in responsibility fixation
⬗ Lack of Project Monitoring/ Program Monitoring
⬗ Reluctance in adoption of new technology
⬗ Lack in Value Engineering adoption
⬗ Lack of Integrated Project Delivery
Typical Problems in Construction
Industry
⬗ 30% of projects do not meet original program or budget
⬗ 92% of clients said that designers drawings are typically not sufficient
for construction
⬗ 37% of materials used in construction become waste
⬗ 10% of the cost of a project is typically due to change orders
⬗ 38% of carbon emissions are from buildings not cars
CMAA Owners survey, CMAA Industry Report, Economist Magazine
Owner Engineer Contractor
Architect
Estimated $5 Trillion Wasted
in the AEC industry Per Year!
Miscommunication
can result in severe
economic impact.
Problem
Subcontractor
BIM is not CAD
“CAD helps people to draw. BIM helps people to construct.”
(Richard Saxon, Ecobuild, February 2009)
“BIM is not CAD. BIM was never meant to be CAD. CAD is a
replacement for pen and paper, a documentation tool. By
comparison, BIM programs are design applications in which the
documentation flows from and is a derivative of the process, from
schematic design to construction to facility management.” (Pete
Zyskowski, Cadalyst)
- AUTOCAD Starts in 1982
25 Years of AutoCAD
CAD vs. BIM
Task CAD
(hours)
BIM
(hours)
Hours saved Time savings
Schematic 190 90 100 53%
Design development 436 220 216 50%
Construction
documents
1023 815 208 20%
Checking and
coordination
175 16 159 91%
Totals: 1824 1141 683
(Rick Rundel (7),2007)
CAD versus BIM
• Primarily 2D
Computer Aided Design Building Information Modeling
• Dumb graphics
• Lines, arcs, circles
• 2D 3D 4D 5D 6D & beyond
• Intelligent objects
• Walls, windows, floors, roofs
A Brief History of Drawing
- First Start in 1963
- Ivan Sutherland’s Sketchpad program
What is BIM ,, Building Information Modeling,,
BUILDING INFORMATION MODELING
(BIM)
What is BIM ,, Building Information Modeling,,
B
The “Building” is unhelpful as
people start to think of a
“building”. For people working in
infrastructure they may wonder
whether “BIM” is relevant
BIM is as relevant to “Infrastructure” and Oil & Gas” as “ Buildings”.
What is BIM ,, Building Information Modeling,,
WHAT IS BIM?
I
“Information” is a fundamental to BIM. In fact it is the flow and
sharing of structured information that is the central philosophy
of BIM.
M
There is even a debate as to whether “M” should
be for “Modeling” or for “Management”
The danger with using “Modeling” is that people
start to think purely in terms of a (CAD) model.
BIMarabia
What is BIM ,, Building Information Modeling,,
Why BIM?
● Better, faster, more cost effective built assets
● …across whole life - Build, Operate & Maintain
● Earlier visual understanding - clients, operators, users
● Early Employer's Information Requirements
● Greater outcome & cost certainty, fewer changes
● Lower risk premium, higher utilisation
● Lower carbon, waste & H&S incidents
● Target 20% CAPEX, 33% WHOLE LIFE savings
What is BIM?
Understanding with BIM
5
Site meetings with
BIM
Understanding
construction…
Setting out with
BIM
Operations & maintenance with
BIM
What is BIM?
What is BIM?
What is BIM ,, Building Information Modeling,,
BIM is
a Methodology
of gathering and maintaining information
about a building for
quick decision making throughout
The life cycle of the building.
3D: PARAMETRIC AND GEOMETRY INFORMATION
4D: ADDING TIME/SCHEDULE INFORMATION
5D: ADDING COST/BUDGET INFORMATION
6D: ADDING SUSTAINABILITY INFORMATION
7D: ADDING FACILITIES MANAGEMENT INFORMATION
WHAT IS BIM? 4D, 5D, 6D, 7D
6D
4D
3D 5D 7D
What is BIM ,, Building Information Modeling,,
BIM: A PARADIGM SHIFT
HAND DRAFTING
(Before 1982)
CAD
(1982 to Present)
Board, Triangle, Paper and Ink CAD Software (Computer Screen)
What is BIM ,, Building Information Modeling,,
BIM
(Practically from 2000)
BIM is not 3D CAD…it is a database driven representation
2D, 3D, 4D & 5D digital renderings Database
- driven representation
• Lines, arcs, circles • Intelligent objects
Object representation in BIM
Technology
EcoBuild America
AEC-ST Science and Technology
May 21, 2008
2D (CAD) Steel Detailing
EcoBuild America
AEC-ST Science and Technology
May 21, 2008
BIM Shop Drawing Model
EcoBuild America
AEC-ST Science and Technology
May 21, 2008
3D (BIM) Steel Detailing
Tekla Structures X-Steel Model by Dowco Consultants in collaboration
with LPR, Zimmerman, Structural Consultants Inc.
EcoBuild America
AEC-ST Science and Technology
May 21, 2008
Steel as Actually Erected
3D Sections
● Quantities
● Dimensions
● Loading
● Calculations
● Specification
• Owners
• Planners
• Realtors
• Appraisers
• Mortgage Bankers
• Designers
• Engineers
• Cost & Quantity Estimators
• Specifiers
• Contracts & Lawyers
• Construction Contractors
• Sub-Contractors
• Fabricators
Who uses the information from BIM Model? ,, BIM Users,,
• Code Officials
• Facility Managers
• Maintenance &
Sustainment
• Renovation &
Restoration
• Disposal & Recycling
Scoping, Testing,
Simulation
• Safety & Occupational
Health
• Environmental & NEPA
• Plant Operations
• Energy, LEED
• Space & Security
• Network Managers
• CIO’s
• Risk Management
• Occupant Support
• First Responders
Why BIM ,,Benefits of BIM,,
Why
you should be interested about
BIM during design stage?
Principle #7 – “Use visual controls so no problems are hidden.”
Principle #7 – “Use visual controls so no problems are hidden.”
Why BIM ,,Benefits of BIM,,
Takes design to the next level.
Why BIM ,,Benefits of BIM,,
Why BIM ,,Benefits of BIM,,
Why BIM ,,Benefits of BIM,,
Why BIM ,,Benefits of BIM,,
Is this Design can be done without BIM???
BIM Collaboration
Design team
Rest of your project
team
Document
Control
RFIs &
change
orders
Bidding &
Tenders
Workflows &
approvals
Commissioning Submittals Field
Inspections
Handover
Authoring tools Coordination tools
“Traditional BIM”
leaves project
teams, information
& processes
disconnected
How do I…
• View models without special software?
• Link RFIs with objects for resolution of clashes
and issues
How do I…
• Link information into my model for a
complete BIM handover?
• Get an audit trail of decisions made?
How do I…
• Distribute huge BIM files?
• Reduce cycle times on clash
resolution?
• Version control to avoid errors on
out-of-date models?
How do I…
• Access models on my mobile
device?
Rest of your project
team
Coordination tools
Document
Control
RFIs &
change
orders
Bidding &
Tenders
Workflows &
approvals
Commissioning
Packages &
Deliverables
Field
Inspections
Handover
Document
Control
RFIs &
change
orders
Bidding &
Tenders
Workflows &
approvals
Commissioning Submittals Field
Inspections
Handover
Native model data
Open BIM, IFC, COBie
Driving everyone project-wide to participate in BIM
Open
BIM
Handover
Design
team
BIM Collaboration
Updates
model, submits
to Aconex
Retrieves
models, runs
clash detection
Submits clash
report, assigns
to disciplines
Retrieves
assigned
clashes
Smarter and faster processes and decisions
▶ Project-wide clash detection / design coordination
Designer /
Engineer
BIM Coordinator
BIM Collaboration
Finds issue
on site, checks
BIM model
Resolves issue
on site
Responds with instruction
Receives RFI,
clicks through
to BIM model
Reviews linked
information for
full context
Raises RFI
Informed and connected review cycle
▶ Project-wide access to the model
Contractor Designer /
Engineer
BIM Collaboration
IPD
✓ All project partners – uses
a single, shared 3D model,
cultivating collaborative
working relationships.
✓ This ensures everyone is
focused on achieving best
value, from project
inception to eventual
decommissioning.
Better outcomes through collaboration
From …
… to
BIM
is used for:
Marketing
Facilities
Analysis
Quantities
Clash
Simulation
VR/AR/MR
Design
(Building Information Modeling)
Integrated Process
5D
Benefits of 5D BIM :-
• Understand the scope of the projects in a superior manner with visual and data modeling capabilities. The costs are driven by
formulas on every building system on the basis of the certain design, materials, site conditions, phasing and other parameters with
reference to the owner’s timeline.
• The project team members will be able to easily understand the projected design, assumptions and cost drivers. They can obtain a
transparent and perfect description of scope, cost and schedule upon which funding decisions are taken.
• Data is achieved in real time once the model is developed or modified. Substitute perceptions can also be easily searched, when owner
and project team can get the cost and other data disclosed instantly. It radically reduces design and estimation cycle time. With
authentic, perfect updates in real time, the efficiency is enhanced.
• Databases allow leveraging historical data as well as industry experience. Data can be utilized from particular sectors like healthcare or
distribution center construction.
• All the interested parties associated with the project can visualize the end product and properly understand what’s comprised in the
budget.
• The construction costs are modified automatically in real-time with the alteration in the model. “What-if’s” turns to be productive
and captivating solution missions for the project team members, specifically the owner.
5D
✓ Agreeing the design concept early in project development to
eliminate late stage design changes;
✓ Using standard design elements when practicable;
✓ Resolving complex construction details before the project
goes on site;
✓ Avoiding clashes;
✓ Taking advantage of intelligence and automation within the
model to check design integrity and estimate quantities;
✓ Producing fabrication and construction drawings from the
model; and Using data to control construction equipment.
TIME CONTROL
Cost estimating
Quality
▶   Information Exchange Specification
▶  Co-ordination
▶  Risk Management
▶  Issue Resolution
▶  Clash detection
✓ BIM makes possible swift and accurate
comparison of different design options.
➢ enabling development of more efficient,
cost-effective and sustainable solutions.
Enhanced & optimized performance
Fits first time ✓ Integrating multidisciplinary design inputs using a single 3D
model allows
➢ interface issues to be identified and resolved in advance
of construction
➢ eliminating the cost and time impacts of redesign.
✓ The model also enables new and existing assets to be
integrated seamlessly.
Clash detection
▶ Through deployment of new
generative modeling technologies,
solutions can be cost-effectively
optimized against agreed
parameters.
Optimized solutions
✓ Crowd behavior and fire modeling
capability enable designs to be optimized
for public safety.
➢ Asset managers can use the 3D
model to enhance operational
safety.
➢ Contractors can minimize
construction risks by reviewing
complex details or procedures before
going on site.
Reduced safety risk
Short-term
programming
and logistics
planning
Safety: BIM-based Safety Planning -
Site Layout Planning Optimise site layout plan by
examination of the location of material storage area,
machinery location, movement of machinery, access
way, impact to site surroundings, etc.
Greater predictability
✓ Projects can be visualized at an early stage - giving owners and operators a clear idea of design
intent and allowing them to modify the design to achieve the outcomes they want.
✓ In advance of construction, BIM also enables the project team to ‘build’ the project in a virtual
environment, rehearsing complex procedures, optimizing temporary works designs and planning
procurement of material, equipment and manpower.
BIM-based Safety Management Plan
Safety management could form a
part of BIM-based construction
procedures. BIM solutions can
include construction process data
such as activities and their logic –
also widely called 4D models –
additional dimension: time.
Safety: BIM-based Safety
Planning - Crane Reach and
Risk Zone
(i) BIM-based site planning to
check crane reach and
capability in construction
works.
(ii) Examine risks in case of
load fall.
(iii) Evaluate what the crane
jib could hit.
(iv) The significant of this kind
of examination increase if
there is limited space around
the construction site and
clashes become possible.
Visual Simulation and
understanding of
program changes.
WHAT YOU DESIGN IS WHAT YOU GET
Why BIM ,,Benefits of BIM,,
“A change
Any where
is
a change
Every where”
BIM Mandating
In January 2014, the European
Parliament approved a directive for
public sector procurement that
encourages public authorities to
consider using BIM in public works
In 2011, the UK Government has
mandated BIM delivery from 2016
onwards on all public sector projects.
BIM MANDATING
Since 2006, the General Services Administration (GSA) mandated the
use of BIM for federal buildings
Since 2008, the U.S. Army Corps of Engineers requires the use of BIM
for all military construction projects.
BIM MANDATING
UAE
UAE
Abu Dhabi
BIM MANDATING
INDUSTRY
TRENDS - BIM
Research
QATAR
QATAR
Doha
Qatar- BIM Project
The Qatar-BIM project is a research collaboration between
Teesside University, UK, Qatar University and Hochtieh-vicon.
The aim of this research is to develop whole lifecycle BIM
protocols to enable whole lifecycle information management
BIM
MANDATING
The Essential Eight technologies that
disrupting the construction industry
Robotics, AI, and the Internet of Things
• can reduce building costs by up to 20 percent.
• Engineers can do virtual reality goggles and
send mini-robots into buildings under
construction.
These robots use cameras to track the work as
it progresses.
• AI is being used to plan the routing of
electrical and plumbing systems in modern
buildings.
• Companies are using AI to develop safety
systems for worksites.
• AI is being used to track the real-time
• AI will alter business models in the
construction industry, reduce expensive
errors, reduce worksite injuries, and make
building operations more efficient.
• Leaders at construction companies should
prioritize investment based on areas where
AI can have the most impact on their
company’s unique needs.
Artificial intelligence
Software algorithms capable of performing tasks that normally require human
intelligence (thought processes and senses ) and automating complex
decision-making tasks .
for example (speech recognition, decision-making and language translation,
problem-solving, pattern recognition).
(AI) is not a monolithic technology.
AI is an umbrella concept that covers subfields such as machine learning, can teach
itself to learn, understand, reason, plan, and act when exposed to new data.
— for example, hospitals using a library of scanned images to quickly and accurately
detect and diagnose cancer;
insurance companies digitally and automatically recognizing and assessing car
damage;
or security companies trading clunky typed passwords for voice recognition.
10 Examples of AI in
Construction
1. Prevent cost overruns
2. AI for Better Design of Buildings
Through Generative Design ( BIM )
3. Risk Mitigation
4. Project Planning
5. AI Will Make Jobsites More Productive
6. AI for Construction Safety
7. AI Will Address Labor Shortages
8. Off-site Construction
9. AI and Big Data in Construction
10. AI for Post-Construction
Internet of things (IoT)
A term to describe a network of objects – devices, vehicles, etc.
– embedded with
sensors,
software,
network connectivity
and compute capability,
that can collect and exchange data over the Internet.
usually without human intervention
IoT augments people, places, processes, and products
with sensors to capture and analyze information across a value
chain, advancing the goals of the City.
According to McKinsey & Company, the Internet of Things could
add up to $11.1 trillion to the global economy by 2025.
Augmented reality
Augmented reality (AR): the addition of
information or visuals to the physical world,
via graphics and/or audio overlay,
to improve the user experience.
This real world “augmentation” is achieved
through devices that render and display
information.
Virtual reality
computer-generated simulation of a
three-dimensional image or a complete
environment within a defined space
that viewers can interact with
in realistic ways.
VR typically requires equipment, such as a
headset.
(VR) abolishes logistical limitations and makes anything possible.
The gaming and entertainment industries are obvious proving grounds for VR.
However, VR has the potential to transform many other industries as well,
especially in the realm of experiential training where workers can be put into
hazardous, difficult, or cost-prohibitive situations without the intense risks associated
with these activities in the real world.
Drones
Air or water-based devices and vehicles that
fly or move without an on-board human pilot.
Drones can operate autonomously on
a pre-defined flight plan or be controlled remotely.
1. Building surveys
2. Inspection of construction
worksite
3. Safety and health
4. Maintenance inspections
5. Reporting project progress
6. Promotional photography
7. Live feed
8. Site logistics
9. Laser scanning
10. Thermal imaging
Top 10 Uses Of Drones In The Construction
Industry
Source https://www.azimuthbuilders.com/blog/top-10-uses-of-drones-in-the-construction-industry
Robotics
Electro-mechanical machines or virtual agents
that
automate,
augment or assist human activities
autonomously or according to set instructions –
often a computer program.
These applications are transforming
manufacturing and non-manufacturing
operations
with new capabilities that address the challenges
of working in changing, uncertain, and
uncontrolled environments,
such as alongside humans without being a
danger to them.
Blockchain
A distributed electronic ledger that
uses algorithms to record transactions reliably
and anonymously.
Records are shared between parties,
and information, once entered, cannot be
altered as the downstream chain reinforces
upstream transactions.
3-D printing creates three-dimensional objects
based on digital models by layering or “printing”
successive layers of materials.
3-D printing relies on innovative “inks,” including
plastic, metal, and, more recently, glass and wood.
3-D printing has the potential to turn every large
enterprise, small business and living room into a
factory.
3-D printing
3D Printing
BIM FOR CONSTRUCTION – 3D PRINTING
3D printing is a process of
creating a three-dimensional
object from a digital file by
layering successive slices.
This could be achieved by
extruding small amounts of
molten plastic or using a
laser to fuse together tiny
particles of powdered
material. It is also on
ceramics and metals.
3D Printing. Hong Kong Housing Authority
Why BIM ,,Benefits of BIM,,
3D Printing
Source: Foster +Partners, UK – NBK Project
Different design options and alternatives
may be easily modeled and changed in
real-time during design based on end users
and/or owner feedback
OPTIONEERING (investigation of alternative designs)
Why BIM ,,Benefits of BIM,,
Source: Foster +Partners, UK – NBK Project
Why BIM ,,Benefits of BIM,,
The Mars City program layout.
The Mars City model includes Mission Control, dining and recreation spaces, workshops, and sleeping pods—as well as
a garage for the Mars Rovers.
Renderings of the Social Hub and Mission Control sectors within Mars City.
BIM
IMPLEMENTATION
1. STRATEGY
Defines the BIM goals and objectives;assesses change readiness; and
considers management and resource support.
2. BIM USES
Identifies the methods in which BIM will be implemented for
generating, processing, communicating, executing, and managing
information about the owner’s facilities.
3. PROCESS
Describes the means to accomplish the BIM Uses by documenting
the current methods, designing new processes leveraging BIM, and
developing transition plans
4. INFORMATION
Documents the information needs of the organization, including the
model element breakdown, level of development, and facility data.
5. INFRASTRUCTURE
Determines the technology infrastructure to support BIM including
computer software, hardware, networks, and physical workspaces.
6. PERSONNEL
Establishes the roles, responsibilities, education, and training of the
active participants in the BIM processes established.
137
Dr. Bilal Sukkar
Current
Target
Transition
0
1
3
0
3
1
0
0
0
2
2
4
3
3
2
2
2
2
Extensive use of
BIM with limited
sharing between
parties
T
No external
project BIM
Processes
Documented
Integrated High
Level BIM
Process
Documented
Integrated High
level organizational
Process
documented
No internal
organizational
BIM Processes
Documented
T
T
Record
(As-Built) BIM
model received
by operations
Record BIM data
imported or
referenced for
operational uses
T
Established
Basic
Organizational
Goals
Established
Basic BIM
Objectives
Full Support for
BIM
Implementation
with Some
Resource
Commitment
Executive Level
BIM Support
Champion with
limit time
commitment
Multiple BIM
Champions with
Each Working
Group
BIM Committee is
formalized but not
inclusive of all
operating units
T
T
T
T
T
Limited Support
for feasibility
study
No BIM
Planning
Committee
established
No
Organizational
Mission or
Goals
No BIM Vision
or Objectives
Defined
Basic BIM
Vision is
Establish
No
Management
Support
No BIM
Champion
BIM Champion
identified but
limited time
committed to BIM
initiative
BIM Champion
with Adequate
Time
Commitment
Small Ad-hoc
Committee with
only those
interested in BIM
Multi-disciplinary BIM
Planning Committee
established with
members from all
operative units
BIM Vision address
mission, strategy,
and culture
No BIM Uses
for Projects
identified
No BIM Uses
for Projects
identified
Minimal Owner
Requirements
for BIM
Extensive use of
BIM with sharing
between parties
within project
phase
No BIM Uses
for Operations
identified
BIM data manually
maintained for
operational uses
BIM data is directly
integrated with
operational
systems
High-level BIM
Process
Documented
for Each Party
Detailed BIM
Process
Documented for
Primary BIM Uses
High-Level BIM
Process
Documented for
each operating unit
Detailed BIM
Process Document
for primary
organizational Uses
Organizational BIM Assessment Profile
Strategy
Level of Maturity Totals
Current Target Possible
Vision and Objectives
Management Support
BIM Champion
5
Uses
Project Uses
Operational Uses
Project Process
Operation Processes
Planning Team
5
5
5
3
1 2 5
4
0
Current Target Possible
5
5
5
5
BIM Objectives are
specific, measurable,
attainable, relevant,
and timely
Full support for BIM
Implementation with
Appropriate Resource
Commitment
Vision and Objectives
are regularly revisited,
maintained and
updated (as necessary)
Limited support for
continuing efforts
with a limited
budget
Full Support of
continuing
efforts
Executive-level BIM
Champion working
closely with Working
Group Champion
Planning Committee
includes members for
all level of the
organization including
executives
BIM Planning
Decisions are
integrated with
organizational
Strategic Planning
Open sharing of
BIM Data across all
parties and project
phases
BIM data maintained
with operational
systems in Real-time
Detailed BIM
Process
Documented
for all BIM Uses
Detailed BIM Process
Documented and
Regularly Maintained
and Updated
Detailed BIM
Process
Documented
for all BIM Uses
Detailed BIM Process
Documented and
Regularly Maintained
and Updated
Non-Existent Initial Defined
Managed Quantitatively Optimizing
3
1 2 5
4
0
Non-Existent Initial Defined
Managed Quantitatively Optimizing
Process Current Target Possible
3
1 2 5
4
0 Initial Quantitatively Optimizing
Non-Existent Defined
Managed
Basic
Organizational
Mission
Established
Organization
Mission address
purpose, services,
values at minimum
Mission and Goals 5
Goals are specific,
measurable,
attainable, relevant,
and timely
Mission and Goals are
regularly revisited,
maintained and
updated (as necessary)
C
C
C
C
C
C
C
C
C
C
Team Evaluation
Score 1 2 3 4
BIM Project
Execution Plan
Experience
Team Has No BIM
Experience
Team Has Completed Discrete
BIM Uses but has Not
Composed a Plan
Team Has Assisted in BIM
Planning
Team Has Led BIM
Execution Planning on
Projects
Electronic
Collaboration
Experience
Team Has Limited
Electronic Collaboration
Experience
Team Utilizes Electronic
Methods for Communication
such as (RFI’s, Submittals,
Change Orders, Etc.)
Team Utilizes Internet
Based Communication
Tools but Does not Share
Model
Team Shares BIM Model
and Utilizes Real Time
Communication Tools
BIM Uses Team Has No BIM
Experience
Team Has Used BIM for
Discrete Uses During One
Phase of the Project
Team Has Used BIM on
Multiple Stages of the
Project
Team Uses BIM Uses
Throughout All Stages of
the Project
Technical
Capabilities
Team Hires 3rd
Party to
Perform BIM Uses
Team Has Internal Staff to
Perform Some BIM Uses
Team Has Internal Staff to
Perform All BIM Uses
Team Has Internal Staff to
Develop New BIM Uses
CHANGE MANAGEMENT
Creating climate for change
⬗ Define urgency for change - e.g. to meet
BIM e-submissions or new project
procurement requirements
⬗ Define clear vision, goals and programme
⬗ Understand key risks and success factors
⬗ Formulate change strategies and levers
141
CHANGE MANAGEMENT
⬗ Engaging and enabling the change
⬗ Communication for buy-in o Communicate the
mandate for change clearly and frequently
⬗ Share success stories in practice workshops
⬗ Solicit and address implementation issues from
the ground
⬗ Enabling actions
⬗ Provide training and resources
⬗ Acquire equipments and software
⬗ Define BIM standards
142
CHANGE MANAGEMENT
⬗ Implementing and sustaining the change (12 – 24 months and
beyond)
⬗ Propagation (from project to project or team to team)
⬗ Setup quick start template for new teams or projects to follow
⬗ Set up a progression path for teams to develop in-depth
knowledge
⬗ Making it stick
⬗ Define clear ownership and accountability
⬗ Set up reward system
⬗ Incorporate BIM practices as part of the organisation’s ISO
processes
143
BIM ENVIRONMENT (HARDWARE AND SOFTWARE)
⬗ a. List of commonly used software for each task.
⬗ BIM authoring software
⬗ BIM reviewing software
⬗ BIM Coordination software
⬗ Analysis software
⬗ Others
⬗ b. Hardware that can run each software with a sizable model comfortably c. Document
management system or project coordination workspace and protocol to house, manage and
share the BIM models created within the organization and with external project partners.
144
BIM Planning and Management Tools?
BIM Authoring BIM Analysis BIM Use
Great BIM tools (not an exhaustive list)
Standards & Guides
• AIA – (The American Institute of Architects)
• GSA (General Services Administration ) - 3D-4D Building
Information Modeling.
• AGC - The Contractors Guide to BIM
• NIBS- (National Institute of Building Sciences) -U.S. National
BIM Standard
• BSA –Building SMART Alliance.
• BSI - BIM Standards
oselim@bimarabia.com

Bim

  • 1.
  • 2.
    Building Information Management OmarSelim ● Founder of BIMarabia ● BIM manager with 14 years of experience. ● Research Assistant at Qatar University
  • 7.
    Sir Christopher Wren’sGreat Model. 1672
  • 8.
    Lack of integrationof design and construction, and often poor collaboration among team members.
  • 10.
    Problems in ConstructionIndustry Lot of Challenges ⬗ Poorly Coordinated Design Documents ⬗ Change Orders & Rework ⬗ Delays & Cost Overruns ⬗ Claims & Litigation ⬗ Greater Risk ⬗ Poor Turnover Documents ⬗ Frustrated Owners ⬗ Tight Profit Margins ⬗ 25% of world solid waste. ⬗ Buildings consume 30% of raw materials. ⬗ Buildings consume 42% world’s energy 5 Source: Organization for Economics Cooperation & Development (OECD)
  • 11.
    Why change theway we practice? Our current business models contain 57% non-value added waste The construction industry is fraught with infighting and adversarial relationships The construction industry is the only industry with a reduction in productivity since the advent of computerization
  • 12.
    Typical Problems inConstruction Industry ⬗ Lack ofProper Planning ⬗ Lack of Coordination ⬗ Lack of Professional Specialized Education ⬗ Poor Decision Making ⬗ Inefficient dispute resolution mechanism ⬗ Lack of Mediation ⬗ Difficulty in responsibility fixation ⬗ Lack of Project Monitoring/ Program Monitoring ⬗ Reluctance in adoption of new technology ⬗ Lack in Value Engineering adoption ⬗ Lack of Integrated Project Delivery
  • 13.
    Typical Problems inConstruction Industry ⬗ 30% of projects do not meet original program or budget ⬗ 92% of clients said that designers drawings are typically not sufficient for construction ⬗ 37% of materials used in construction become waste ⬗ 10% of the cost of a project is typically due to change orders ⬗ 38% of carbon emissions are from buildings not cars CMAA Owners survey, CMAA Industry Report, Economist Magazine
  • 14.
    Owner Engineer Contractor Architect Estimated$5 Trillion Wasted in the AEC industry Per Year! Miscommunication can result in severe economic impact. Problem Subcontractor
  • 15.
    BIM is notCAD “CAD helps people to draw. BIM helps people to construct.” (Richard Saxon, Ecobuild, February 2009) “BIM is not CAD. BIM was never meant to be CAD. CAD is a replacement for pen and paper, a documentation tool. By comparison, BIM programs are design applications in which the documentation flows from and is a derivative of the process, from schematic design to construction to facility management.” (Pete Zyskowski, Cadalyst)
  • 16.
  • 17.
    25 Years ofAutoCAD
  • 18.
    CAD vs. BIM TaskCAD (hours) BIM (hours) Hours saved Time savings Schematic 190 90 100 53% Design development 436 220 216 50% Construction documents 1023 815 208 20% Checking and coordination 175 16 159 91% Totals: 1824 1141 683 (Rick Rundel (7),2007)
  • 20.
    CAD versus BIM •Primarily 2D Computer Aided Design Building Information Modeling • Dumb graphics • Lines, arcs, circles • 2D 3D 4D 5D 6D & beyond • Intelligent objects • Walls, windows, floors, roofs
  • 22.
    A Brief Historyof Drawing - First Start in 1963 - Ivan Sutherland’s Sketchpad program
  • 23.
    What is BIM,, Building Information Modeling,,
  • 24.
    BUILDING INFORMATION MODELING (BIM) Whatis BIM ,, Building Information Modeling,,
  • 25.
    B The “Building” isunhelpful as people start to think of a “building”. For people working in infrastructure they may wonder whether “BIM” is relevant BIM is as relevant to “Infrastructure” and Oil & Gas” as “ Buildings”. What is BIM ,, Building Information Modeling,,
  • 27.
    WHAT IS BIM? I “Information”is a fundamental to BIM. In fact it is the flow and sharing of structured information that is the central philosophy of BIM.
  • 28.
    M There is evena debate as to whether “M” should be for “Modeling” or for “Management” The danger with using “Modeling” is that people start to think purely in terms of a (CAD) model. BIMarabia What is BIM ,, Building Information Modeling,,
  • 29.
    Why BIM? ● Better,faster, more cost effective built assets ● …across whole life - Build, Operate & Maintain ● Earlier visual understanding - clients, operators, users ● Early Employer's Information Requirements ● Greater outcome & cost certainty, fewer changes ● Lower risk premium, higher utilisation ● Lower carbon, waste & H&S incidents ● Target 20% CAPEX, 33% WHOLE LIFE savings
  • 30.
  • 31.
    Understanding with BIM 5 Sitemeetings with BIM Understanding construction… Setting out with BIM Operations & maintenance with BIM
  • 33.
  • 34.
  • 36.
    What is BIM,, Building Information Modeling,, BIM is a Methodology of gathering and maintaining information about a building for quick decision making throughout The life cycle of the building.
  • 37.
    3D: PARAMETRIC ANDGEOMETRY INFORMATION 4D: ADDING TIME/SCHEDULE INFORMATION 5D: ADDING COST/BUDGET INFORMATION 6D: ADDING SUSTAINABILITY INFORMATION 7D: ADDING FACILITIES MANAGEMENT INFORMATION WHAT IS BIM? 4D, 5D, 6D, 7D 6D 4D 3D 5D 7D What is BIM ,, Building Information Modeling,,
  • 38.
    BIM: A PARADIGMSHIFT HAND DRAFTING (Before 1982) CAD (1982 to Present) Board, Triangle, Paper and Ink CAD Software (Computer Screen) What is BIM ,, Building Information Modeling,, BIM (Practically from 2000) BIM is not 3D CAD…it is a database driven representation 2D, 3D, 4D & 5D digital renderings Database - driven representation • Lines, arcs, circles • Intelligent objects
  • 39.
  • 40.
    EcoBuild America AEC-ST Scienceand Technology May 21, 2008 2D (CAD) Steel Detailing
  • 41.
    EcoBuild America AEC-ST Scienceand Technology May 21, 2008 BIM Shop Drawing Model
  • 42.
    EcoBuild America AEC-ST Scienceand Technology May 21, 2008 3D (BIM) Steel Detailing Tekla Structures X-Steel Model by Dowco Consultants in collaboration with LPR, Zimmerman, Structural Consultants Inc.
  • 43.
    EcoBuild America AEC-ST Scienceand Technology May 21, 2008 Steel as Actually Erected
  • 44.
    3D Sections ● Quantities ●Dimensions ● Loading ● Calculations ● Specification
  • 52.
    • Owners • Planners •Realtors • Appraisers • Mortgage Bankers • Designers • Engineers • Cost & Quantity Estimators • Specifiers • Contracts & Lawyers • Construction Contractors • Sub-Contractors • Fabricators Who uses the information from BIM Model? ,, BIM Users,, • Code Officials • Facility Managers • Maintenance & Sustainment • Renovation & Restoration • Disposal & Recycling Scoping, Testing, Simulation • Safety & Occupational Health • Environmental & NEPA • Plant Operations • Energy, LEED • Space & Security • Network Managers • CIO’s • Risk Management • Occupant Support • First Responders
  • 53.
    Why BIM ,,Benefitsof BIM,, Why you should be interested about BIM during design stage?
  • 54.
    Principle #7 –“Use visual controls so no problems are hidden.”
  • 55.
    Principle #7 –“Use visual controls so no problems are hidden.”
  • 58.
    Why BIM ,,Benefitsof BIM,, Takes design to the next level.
  • 59.
  • 60.
  • 61.
  • 63.
    Why BIM ,,Benefitsof BIM,, Is this Design can be done without BIM???
  • 64.
  • 65.
    Design team Rest ofyour project team Document Control RFIs & change orders Bidding & Tenders Workflows & approvals Commissioning Submittals Field Inspections Handover Authoring tools Coordination tools “Traditional BIM” leaves project teams, information & processes disconnected How do I… • View models without special software? • Link RFIs with objects for resolution of clashes and issues How do I… • Link information into my model for a complete BIM handover? • Get an audit trail of decisions made? How do I… • Distribute huge BIM files? • Reduce cycle times on clash resolution? • Version control to avoid errors on out-of-date models? How do I… • Access models on my mobile device?
  • 66.
    Rest of yourproject team Coordination tools Document Control RFIs & change orders Bidding & Tenders Workflows & approvals Commissioning Packages & Deliverables Field Inspections Handover Document Control RFIs & change orders Bidding & Tenders Workflows & approvals Commissioning Submittals Field Inspections Handover Native model data Open BIM, IFC, COBie Driving everyone project-wide to participate in BIM Open BIM Handover Design team BIM Collaboration
  • 67.
    Updates model, submits to Aconex Retrieves models,runs clash detection Submits clash report, assigns to disciplines Retrieves assigned clashes Smarter and faster processes and decisions ▶ Project-wide clash detection / design coordination Designer / Engineer BIM Coordinator BIM Collaboration
  • 68.
    Finds issue on site,checks BIM model Resolves issue on site Responds with instruction Receives RFI, clicks through to BIM model Reviews linked information for full context Raises RFI Informed and connected review cycle ▶ Project-wide access to the model Contractor Designer / Engineer BIM Collaboration
  • 70.
  • 71.
    ✓ All projectpartners – uses a single, shared 3D model, cultivating collaborative working relationships. ✓ This ensures everyone is focused on achieving best value, from project inception to eventual decommissioning. Better outcomes through collaboration
  • 72.
  • 73.
  • 74.
  • 77.
  • 78.
    Benefits of 5DBIM :- • Understand the scope of the projects in a superior manner with visual and data modeling capabilities. The costs are driven by formulas on every building system on the basis of the certain design, materials, site conditions, phasing and other parameters with reference to the owner’s timeline. • The project team members will be able to easily understand the projected design, assumptions and cost drivers. They can obtain a transparent and perfect description of scope, cost and schedule upon which funding decisions are taken. • Data is achieved in real time once the model is developed or modified. Substitute perceptions can also be easily searched, when owner and project team can get the cost and other data disclosed instantly. It radically reduces design and estimation cycle time. With authentic, perfect updates in real time, the efficiency is enhanced. • Databases allow leveraging historical data as well as industry experience. Data can be utilized from particular sectors like healthcare or distribution center construction. • All the interested parties associated with the project can visualize the end product and properly understand what’s comprised in the budget. • The construction costs are modified automatically in real-time with the alteration in the model. “What-if’s” turns to be productive and captivating solution missions for the project team members, specifically the owner. 5D
  • 79.
    ✓ Agreeing thedesign concept early in project development to eliminate late stage design changes; ✓ Using standard design elements when practicable; ✓ Resolving complex construction details before the project goes on site; ✓ Avoiding clashes; ✓ Taking advantage of intelligence and automation within the model to check design integrity and estimate quantities; ✓ Producing fabrication and construction drawings from the model; and Using data to control construction equipment. TIME CONTROL
  • 80.
  • 81.
    Quality ▶   InformationExchange Specification ▶  Co-ordination ▶  Risk Management ▶  Issue Resolution ▶  Clash detection
  • 82.
    ✓ BIM makespossible swift and accurate comparison of different design options. ➢ enabling development of more efficient, cost-effective and sustainable solutions. Enhanced & optimized performance
  • 83.
    Fits first time✓ Integrating multidisciplinary design inputs using a single 3D model allows ➢ interface issues to be identified and resolved in advance of construction ➢ eliminating the cost and time impacts of redesign. ✓ The model also enables new and existing assets to be integrated seamlessly.
  • 84.
  • 85.
    ▶ Through deploymentof new generative modeling technologies, solutions can be cost-effectively optimized against agreed parameters. Optimized solutions
  • 86.
    ✓ Crowd behaviorand fire modeling capability enable designs to be optimized for public safety. ➢ Asset managers can use the 3D model to enhance operational safety. ➢ Contractors can minimize construction risks by reviewing complex details or procedures before going on site. Reduced safety risk
  • 87.
  • 88.
    Safety: BIM-based SafetyPlanning - Site Layout Planning Optimise site layout plan by examination of the location of material storage area, machinery location, movement of machinery, access way, impact to site surroundings, etc.
  • 91.
    Greater predictability ✓ Projectscan be visualized at an early stage - giving owners and operators a clear idea of design intent and allowing them to modify the design to achieve the outcomes they want. ✓ In advance of construction, BIM also enables the project team to ‘build’ the project in a virtual environment, rehearsing complex procedures, optimizing temporary works designs and planning procurement of material, equipment and manpower.
  • 92.
    BIM-based Safety ManagementPlan Safety management could form a part of BIM-based construction procedures. BIM solutions can include construction process data such as activities and their logic – also widely called 4D models – additional dimension: time.
  • 93.
    Safety: BIM-based Safety Planning- Crane Reach and Risk Zone (i) BIM-based site planning to check crane reach and capability in construction works. (ii) Examine risks in case of load fall. (iii) Evaluate what the crane jib could hit. (iv) The significant of this kind of examination increase if there is limited space around the construction site and clashes become possible.
  • 94.
  • 95.
    WHAT YOU DESIGNIS WHAT YOU GET
  • 96.
    Why BIM ,,Benefitsof BIM,, “A change Any where is a change Every where”
  • 97.
  • 100.
    In January 2014,the European Parliament approved a directive for public sector procurement that encourages public authorities to consider using BIM in public works In 2011, the UK Government has mandated BIM delivery from 2016 onwards on all public sector projects. BIM MANDATING
  • 101.
    Since 2006, theGeneral Services Administration (GSA) mandated the use of BIM for federal buildings Since 2008, the U.S. Army Corps of Engineers requires the use of BIM for all military construction projects. BIM MANDATING
  • 102.
  • 103.
    INDUSTRY TRENDS - BIM Research QATAR QATAR Doha Qatar-BIM Project The Qatar-BIM project is a research collaboration between Teesside University, UK, Qatar University and Hochtieh-vicon. The aim of this research is to develop whole lifecycle BIM protocols to enable whole lifecycle information management BIM MANDATING
  • 104.
    The Essential Eighttechnologies that disrupting the construction industry
  • 105.
    Robotics, AI, andthe Internet of Things • can reduce building costs by up to 20 percent. • Engineers can do virtual reality goggles and send mini-robots into buildings under construction. These robots use cameras to track the work as it progresses. • AI is being used to plan the routing of electrical and plumbing systems in modern buildings. • Companies are using AI to develop safety systems for worksites. • AI is being used to track the real-time • AI will alter business models in the construction industry, reduce expensive errors, reduce worksite injuries, and make building operations more efficient. • Leaders at construction companies should prioritize investment based on areas where AI can have the most impact on their company’s unique needs.
  • 107.
    Artificial intelligence Software algorithmscapable of performing tasks that normally require human intelligence (thought processes and senses ) and automating complex decision-making tasks . for example (speech recognition, decision-making and language translation, problem-solving, pattern recognition). (AI) is not a monolithic technology. AI is an umbrella concept that covers subfields such as machine learning, can teach itself to learn, understand, reason, plan, and act when exposed to new data. — for example, hospitals using a library of scanned images to quickly and accurately detect and diagnose cancer; insurance companies digitally and automatically recognizing and assessing car damage; or security companies trading clunky typed passwords for voice recognition.
  • 108.
    10 Examples ofAI in Construction 1. Prevent cost overruns 2. AI for Better Design of Buildings Through Generative Design ( BIM ) 3. Risk Mitigation 4. Project Planning 5. AI Will Make Jobsites More Productive 6. AI for Construction Safety 7. AI Will Address Labor Shortages 8. Off-site Construction 9. AI and Big Data in Construction 10. AI for Post-Construction
  • 110.
    Internet of things(IoT) A term to describe a network of objects – devices, vehicles, etc. – embedded with sensors, software, network connectivity and compute capability, that can collect and exchange data over the Internet. usually without human intervention IoT augments people, places, processes, and products with sensors to capture and analyze information across a value chain, advancing the goals of the City. According to McKinsey & Company, the Internet of Things could add up to $11.1 trillion to the global economy by 2025.
  • 112.
    Augmented reality Augmented reality(AR): the addition of information or visuals to the physical world, via graphics and/or audio overlay, to improve the user experience. This real world “augmentation” is achieved through devices that render and display information.
  • 118.
    Virtual reality computer-generated simulationof a three-dimensional image or a complete environment within a defined space that viewers can interact with in realistic ways. VR typically requires equipment, such as a headset. (VR) abolishes logistical limitations and makes anything possible. The gaming and entertainment industries are obvious proving grounds for VR. However, VR has the potential to transform many other industries as well, especially in the realm of experiential training where workers can be put into hazardous, difficult, or cost-prohibitive situations without the intense risks associated with these activities in the real world.
  • 120.
    Drones Air or water-baseddevices and vehicles that fly or move without an on-board human pilot. Drones can operate autonomously on a pre-defined flight plan or be controlled remotely. 1. Building surveys 2. Inspection of construction worksite 3. Safety and health 4. Maintenance inspections 5. Reporting project progress 6. Promotional photography 7. Live feed 8. Site logistics 9. Laser scanning 10. Thermal imaging Top 10 Uses Of Drones In The Construction Industry Source https://www.azimuthbuilders.com/blog/top-10-uses-of-drones-in-the-construction-industry
  • 121.
    Robotics Electro-mechanical machines orvirtual agents that automate, augment or assist human activities autonomously or according to set instructions – often a computer program. These applications are transforming manufacturing and non-manufacturing operations with new capabilities that address the challenges of working in changing, uncertain, and uncontrolled environments, such as alongside humans without being a danger to them.
  • 123.
    Blockchain A distributed electronicledger that uses algorithms to record transactions reliably and anonymously. Records are shared between parties, and information, once entered, cannot be altered as the downstream chain reinforces upstream transactions.
  • 124.
    3-D printing createsthree-dimensional objects based on digital models by layering or “printing” successive layers of materials. 3-D printing relies on innovative “inks,” including plastic, metal, and, more recently, glass and wood. 3-D printing has the potential to turn every large enterprise, small business and living room into a factory. 3-D printing
  • 125.
  • 126.
    BIM FOR CONSTRUCTION– 3D PRINTING 3D printing is a process of creating a three-dimensional object from a digital file by layering successive slices. This could be achieved by extruding small amounts of molten plastic or using a laser to fuse together tiny particles of powdered material. It is also on ceramics and metals. 3D Printing. Hong Kong Housing Authority Why BIM ,,Benefits of BIM,,
  • 127.
    3D Printing Source: Foster+Partners, UK – NBK Project Different design options and alternatives may be easily modeled and changed in real-time during design based on end users and/or owner feedback OPTIONEERING (investigation of alternative designs) Why BIM ,,Benefits of BIM,,
  • 129.
    Source: Foster +Partners,UK – NBK Project Why BIM ,,Benefits of BIM,,
  • 130.
    The Mars Cityprogram layout.
  • 131.
    The Mars Citymodel includes Mission Control, dining and recreation spaces, workshops, and sleeping pods—as well as a garage for the Mars Rovers.
  • 132.
    Renderings of theSocial Hub and Mission Control sectors within Mars City.
  • 133.
  • 135.
    1. STRATEGY Defines theBIM goals and objectives;assesses change readiness; and considers management and resource support. 2. BIM USES Identifies the methods in which BIM will be implemented for generating, processing, communicating, executing, and managing information about the owner’s facilities. 3. PROCESS Describes the means to accomplish the BIM Uses by documenting the current methods, designing new processes leveraging BIM, and developing transition plans 4. INFORMATION Documents the information needs of the organization, including the model element breakdown, level of development, and facility data. 5. INFRASTRUCTURE Determines the technology infrastructure to support BIM including computer software, hardware, networks, and physical workspaces. 6. PERSONNEL Establishes the roles, responsibilities, education, and training of the active participants in the BIM processes established.
  • 137.
  • 138.
    Current Target Transition 0 1 3 0 3 1 0 0 0 2 2 4 3 3 2 2 2 2 Extensive use of BIMwith limited sharing between parties T No external project BIM Processes Documented Integrated High Level BIM Process Documented Integrated High level organizational Process documented No internal organizational BIM Processes Documented T T Record (As-Built) BIM model received by operations Record BIM data imported or referenced for operational uses T Established Basic Organizational Goals Established Basic BIM Objectives Full Support for BIM Implementation with Some Resource Commitment Executive Level BIM Support Champion with limit time commitment Multiple BIM Champions with Each Working Group BIM Committee is formalized but not inclusive of all operating units T T T T T Limited Support for feasibility study No BIM Planning Committee established No Organizational Mission or Goals No BIM Vision or Objectives Defined Basic BIM Vision is Establish No Management Support No BIM Champion BIM Champion identified but limited time committed to BIM initiative BIM Champion with Adequate Time Commitment Small Ad-hoc Committee with only those interested in BIM Multi-disciplinary BIM Planning Committee established with members from all operative units BIM Vision address mission, strategy, and culture No BIM Uses for Projects identified No BIM Uses for Projects identified Minimal Owner Requirements for BIM Extensive use of BIM with sharing between parties within project phase No BIM Uses for Operations identified BIM data manually maintained for operational uses BIM data is directly integrated with operational systems High-level BIM Process Documented for Each Party Detailed BIM Process Documented for Primary BIM Uses High-Level BIM Process Documented for each operating unit Detailed BIM Process Document for primary organizational Uses Organizational BIM Assessment Profile Strategy Level of Maturity Totals Current Target Possible Vision and Objectives Management Support BIM Champion 5 Uses Project Uses Operational Uses Project Process Operation Processes Planning Team 5 5 5 3 1 2 5 4 0 Current Target Possible 5 5 5 5 BIM Objectives are specific, measurable, attainable, relevant, and timely Full support for BIM Implementation with Appropriate Resource Commitment Vision and Objectives are regularly revisited, maintained and updated (as necessary) Limited support for continuing efforts with a limited budget Full Support of continuing efforts Executive-level BIM Champion working closely with Working Group Champion Planning Committee includes members for all level of the organization including executives BIM Planning Decisions are integrated with organizational Strategic Planning Open sharing of BIM Data across all parties and project phases BIM data maintained with operational systems in Real-time Detailed BIM Process Documented for all BIM Uses Detailed BIM Process Documented and Regularly Maintained and Updated Detailed BIM Process Documented for all BIM Uses Detailed BIM Process Documented and Regularly Maintained and Updated Non-Existent Initial Defined Managed Quantitatively Optimizing 3 1 2 5 4 0 Non-Existent Initial Defined Managed Quantitatively Optimizing Process Current Target Possible 3 1 2 5 4 0 Initial Quantitatively Optimizing Non-Existent Defined Managed Basic Organizational Mission Established Organization Mission address purpose, services, values at minimum Mission and Goals 5 Goals are specific, measurable, attainable, relevant, and timely Mission and Goals are regularly revisited, maintained and updated (as necessary) C C C C C C C C C
  • 139.
  • 140.
    Team Evaluation Score 12 3 4 BIM Project Execution Plan Experience Team Has No BIM Experience Team Has Completed Discrete BIM Uses but has Not Composed a Plan Team Has Assisted in BIM Planning Team Has Led BIM Execution Planning on Projects Electronic Collaboration Experience Team Has Limited Electronic Collaboration Experience Team Utilizes Electronic Methods for Communication such as (RFI’s, Submittals, Change Orders, Etc.) Team Utilizes Internet Based Communication Tools but Does not Share Model Team Shares BIM Model and Utilizes Real Time Communication Tools BIM Uses Team Has No BIM Experience Team Has Used BIM for Discrete Uses During One Phase of the Project Team Has Used BIM on Multiple Stages of the Project Team Uses BIM Uses Throughout All Stages of the Project Technical Capabilities Team Hires 3rd Party to Perform BIM Uses Team Has Internal Staff to Perform Some BIM Uses Team Has Internal Staff to Perform All BIM Uses Team Has Internal Staff to Develop New BIM Uses
  • 141.
    CHANGE MANAGEMENT Creating climatefor change ⬗ Define urgency for change - e.g. to meet BIM e-submissions or new project procurement requirements ⬗ Define clear vision, goals and programme ⬗ Understand key risks and success factors ⬗ Formulate change strategies and levers 141
  • 142.
    CHANGE MANAGEMENT ⬗ Engagingand enabling the change ⬗ Communication for buy-in o Communicate the mandate for change clearly and frequently ⬗ Share success stories in practice workshops ⬗ Solicit and address implementation issues from the ground ⬗ Enabling actions ⬗ Provide training and resources ⬗ Acquire equipments and software ⬗ Define BIM standards 142
  • 143.
    CHANGE MANAGEMENT ⬗ Implementingand sustaining the change (12 – 24 months and beyond) ⬗ Propagation (from project to project or team to team) ⬗ Setup quick start template for new teams or projects to follow ⬗ Set up a progression path for teams to develop in-depth knowledge ⬗ Making it stick ⬗ Define clear ownership and accountability ⬗ Set up reward system ⬗ Incorporate BIM practices as part of the organisation’s ISO processes 143
  • 144.
    BIM ENVIRONMENT (HARDWAREAND SOFTWARE) ⬗ a. List of commonly used software for each task. ⬗ BIM authoring software ⬗ BIM reviewing software ⬗ BIM Coordination software ⬗ Analysis software ⬗ Others ⬗ b. Hardware that can run each software with a sizable model comfortably c. Document management system or project coordination workspace and protocol to house, manage and share the BIM models created within the organization and with external project partners. 144
  • 145.
    BIM Planning andManagement Tools? BIM Authoring BIM Analysis BIM Use Great BIM tools (not an exhaustive list)
  • 146.
    Standards & Guides •AIA – (The American Institute of Architects) • GSA (General Services Administration ) - 3D-4D Building Information Modeling. • AGC - The Contractors Guide to BIM • NIBS- (National Institute of Building Sciences) -U.S. National BIM Standard • BSA –Building SMART Alliance. • BSI - BIM Standards
  • 147.