1.0 Introduction
The primary controller response to a
load/generation imbalance results in generation
adjustment so as to maintain load/generation
balance. However, due to droop, it also results
in a non-zero steady-state frequency deviation.
This frequency deviation must be corrected.
Also, the net scheduled export must be
maintained according to the purchase
agreements.
Primary control does nothing to correct the
steady-state frequency error or the net scheduled
export. These two problems are handled by
providing a supplementary signal from the
control center to each generation unit on
automatic generation control (AGC).
2
The signal is derived from the Area Control
Error (ACE) and, when received at a generation
plant, activates the “speed changer motor” to
adjust the energy supply set point to the
generator.
In these notes, we will learn how the ACE is
computed, and we will see how it is used in
correcting steady-state frequency error.
2.0 Review
From our notes AGC1, we defined the following
terms:
 Net Actual Interchange: APij
 Net Scheduled Interchange: SPij
 Interchange Deviation (defined pg 396 of text):
ΔPij=APij-SPij (1)
Note that the above terms are each defined with
respect to two distinct areas.
3
We also defined, in AGC1, the following terms:
 Actual Export: 

n
j
iji APAP
1
(2)
 Scheduled Export: 

n
j
iji SPSP
1
(3)
 Net Deviation: 

n
j
iji PP
1
(4)
Note that the above three terms are each defined
with respect to a single area.
We also saw that the net deviation is related to
the net actual and scheduled interchanges, and
to the actual and scheduled exports, by:
ii
n
j
ij
n
j
ij
ij
n
j
ij
n
j
iji
SPAPSPAP
SPAPPP






11
11
)(
(5)
Although your text does not define net
deviation, it does use it as the first term in the
ACE expression of eq. (11.30).
4
Finally, we saw in our notes AGC2, when
discussing the multi-machine case, that












Kpu
RK
pu
R
R
S
R
S
Pf
...
60
1
1 (6)













Kpu
RK
pu
Rpui
Ri
pui
Ri
Mi
R
S
R
S
P
R
Sf
R
S
P
...
60
1
1 (7)
If all units have the same per-unit droop
constant, i.e., if R1pu=R2pu=…=RKpu, then eqs.
(6) and (7) become
 RKR
pu
SS
PRf




...60 1
(8)
 RKR
Ri
pu
Ri
Mi
SS
PSf
R
S
P





...60 1
(9)
In eqs. (8) and (9), ΔP represents the change in
total load so that it is
 positive if load increases and negative if load
decrease;
 positive if generation decreases and negative if
generation increases.
5
3.0 Area Control Error
The Area Control Error (ACE) is composed of
 Net Deviation ΔPi, from eq. (5), written more
compactly below:
iii SPAPP  (5)
When ΔPi>0, it means that the actual export
exceeds the scheduled export, and so the
generation in area i should be reduced.
 Steady-state frequency deviation
60 ff (10)
When Δf>0, it means the generation in the
system exceeds the load and therefore we
should reduce generation in the area.
From the above, our first impulse may be to
immediately write down the ACE for area i as:
fPACE ii  (11a)
Alternatively (and consistent with the text)
 ii PACE (11b)
6
But we note 2 problems with eq. (11). First, we
are adding 2 quantities that have different units.
Anytime you come across a relation that adds 2
or more units having different units, beware.
The second problem is that the magnitudes of
the two terms in eq. (11) may differ
dramatically. If we are working in MW and Hz
(or rad/sec), then we may see ΔPi in the 100’s of
MW whereas we will see Δf (or Δω) in the
hundredths or at most tenths of a Hz. The
implication is that the control signal, per eq.
(11), will greatly favor the export deviations
over the frequency deviations.
Therefore we need to scale one of them. To do
so, we define area i frequency bias as βi. It has
units of MW/Hz. Your text shows (pg. 393) that
fi
Lfififi
R
DD
1

(12a)
i
iLii
R
DD


1

(12b)
7
where
 Di is the damping coefficient from the swing
equation (and represents the effect of
synchronous generator windage and friction);
 DLi is the load damping coefficient and
represents the tendency of the load to decrease
as frequency decreases (an effect mainly
attributed to induction motors).
 The f or ω subscripts indicate whether we will
compute ACE using f or ω (text uses ω).
The damping terms of eq. (12) are usually
significantly smaller than the regulation term, so
that a reasonable approximation is that
fi
fi
R
1

(12c)
i
i
R

1

(12d)
Then the ACE equation becomes:
fPACE fiii   (12e)
  iii PACE (12f)
8
4.0 Example
Consider the two-area interconnection shown in
Fig. 1 with data given as below.
A1 A2
1000 MW
Fig. 1
Area 1 Area 2
Load=20,000 MW Load=40,000 MW
Capacity=20,000 MW Capacity=42,000 MW
Gen=19,000 MW Gen=41,000 MW
R1pu=0.05 R1pu=0.05
The scheduled interchange is 1000 MW flowing
from A2 to A1, so that scheduled exports are:
 SP1=-1000 MW
 SP2=1000 MW
There are two parts to this problem:
1.Determine frequency and generation of each
area and the tie line flow after a 1000 MW
loss of load in A1, but before supplementary
control has taken effect (this means we will
determine only the effect of primary control).
9
2.Repeat (1) after supplementary control action
has taken effect.
Solution:
We assume that area capacities are the ratings:
SR1=20000
SR2=42000
We also note that the load decreases, therefore
ΔP=-1000 MW.
1.From eq. (8),
 
pu
SS
PRf
RKR
pu
000806.0
]4200020000[
)1000(05.0
...60 1








Therefore
Hzf 0484.060*000806.0 
so that f=60.0484 Hz.
Then we can compute the increase in generation
in each area per eq. (9). For Area 1:
 
MW
SS
PS
P
RR
R
M 6.322
4200020000
)1000)(20000(
11
1
1 






Therefore
MWPM 4.677,186.322190001 
10
For Area 2:
 
MW
SS
PS
P
RR
R
M 4.677
4200020000
)1000)(42000(
11
2
2 






Therefore
MWPM 6.322,404.677410002 
It is of interest now to obtain the actual exports,
and we can do this for each area by taking the
difference between load and generation. The
loads in areas 1 and 2 were 20000 and 40000,
but remember that we lost 1000 MW of load in
area 1, so that its value is now 19000.
Generation levels were computed above.
Therefore
AP1=18,677-19,000=-322.6 MW
AP2=40,322.6-40,000=322.6 MW
So clearly the new tie-line flow is 322.6 MW
from A2 to A1.
Note: For multiple areas, calculating tie-line
flows requires a power flow solution (DC power
flow is suitable to use here).
11
From eq. (5), net deviation is:
4.677)1000(6.322111  SPAPP
4.677)1000(6.322222  SPAPP
2.To find the effect of supplementary control,
we first need to compute the frequency bias
parameters. We neglect effects of damping
terms, so that we use eq. (12c) or (12d):
fi
fi
R
1

(12c)
i
i
R

1

(12d)
But note that the droop constant in (12c) or
(12d) is not in per-unit. To convert to per-unit,
recall eqs. (13) and (14) from AGC2 notes:
M
f
P
f
R



(13a)
MP
R




 (13b)
Mpu
pu
Mpu
pu
rMrM
pu
PP
f
SPSP
ff
R













/
/
/
/ 00
(14)
12
Substituting eq. (13a) or (13b) into (14) gives:
00
0
/
/
f
S
R
f
S
P
f
SP
ff
R r
f
r
MrM
pu 






(15a)
00
0
/
/



rr
MrM
pu
S
R
S
PSP
R 






(15b)
Therefore
r
puf
S
f
RR 0

(16a)
r
pu
S
RR 0
 
(16b)
We can use (16a) to calculate the frequency bias
term of (12c), which is used in the ACE
equation of (12d):
fPACE fiii   (12d)
Alternatively, we can use (16b) to calculate the
frequency bias terms of (12d), which is used in
the ACE equation of (12e):
  iii PACE (12e)
In the rest of this example, we will use (16a),
(12c), and (12d).
13
Applying eq. (16a) to obtain Rf1 and Rf2, we get
MWHz
S
f
RR
r
puf /00015.0
20000
60
05.0
1
0
1 
MWHz
S
f
RR
r
puf /000071429.0
42000
60
05.0
2
0
2 
Then the frequency bias terms are obtained as
HzMW
Rf
f /7.6666
00015.0
11
1
1 
HzMW
Rf
f /14000
000071429.0
11
2
2 
Now we can compute the ACE in each area:
MW
fSPAPfPACE ff
100068.3224.677
484)6666.7(0.0-1000)--322.6(
)( 111111


 
MW
fSPAPfPACE ff
06.6774.677
84)14000(0.041000)-322.6(
)( 222222


 
14
So what does this mean?
 ACE1 indicates that the generators in A1
receive a signal to decrease generation by 1000
MW. Recall from page 9 that after primary
control action, PM1=18,677.4 MW. With a
1000 MW decrease, then PM1=17,677.4 MW.
 ACE2 indicates that the generators in A2 do not
change, so PM2=40,322.6 MW.
But now consider that previous to the secondary
control action, we were at a steady state (with
steady-state frequency deviation of 0.0484 so
that f=60.0484 Hz). Now the ACE signal has
cause a decrease in A1 generation by 1000 MW.
This action creates a load-generation imbalance
of ΔP=+1000 MW that will cause unit primary
controllers to act in both areas. From eq. (8):
 
pu
SS
PRf
RKR
pu
000806.0
]4200020000[
)1000(05.0
...60 1








Therefore
Hzf 0484.060*000806.0 
so that f=60.0484 - 0.0484 = 60Hz.
15
Then we compute the increase in generation in
each area per eq. (9). For Area 1:
 
MW
SS
PS
P
RR
R
M 6.322
4200020000
)1000)(20000(
11
1
1 






Therefore
MWPM 000,186.3224.176771 
For Area 2:
 
MW
SS
PS
P
RR
R
M 4.677
4200020000
)1000)(42000(
11
2
2 






Therefore
MWPM 000,414.6776.322,402 
The exports for the two areas will then be:
AP1=18,000-19,000=-1000 MW
AP2=41,000-40,000=+1000 MW
A summary of the situation is given below,
where we see that the final control action has
resulted in A1 generation entirely compensating
for the A1 load decrease of 1000 MW (with area
exports unchanged).
Area 1 Area 2
Load=19,000 MW Load=40,000 MW
Gen=18,000 MW Gen=41,000 MW

More Related Content

What's hot

Power Quality Audit.pptx
Power Quality Audit.pptxPower Quality Audit.pptx
Power Quality Audit.pptx
KarthikeyanK816516
 
Restructuring of power grid
Restructuring of power gridRestructuring of power grid
Restructuring of power grid
Saravanan Sivamani
 
Basics of AC transmission
Basics of AC transmissionBasics of AC transmission
Basics of AC transmission
SonuKumarBairwa
 
Chapter 5 corona
Chapter 5  coronaChapter 5  corona
Chapter 5 corona
firaoltemesgen1
 
Functions and performance requirements of excitation systems
Functions and performance requirements of excitation systemsFunctions and performance requirements of excitation systems
Functions and performance requirements of excitation systems
Rajshekar Naregal
 
Facts devices
Facts devicesFacts devices
Facts devices
Vinod Srivastava
 
Triggatron gap
Triggatron gapTriggatron gap
Triggatron gap
sarunkutti
 
Reactive power consumption in modern power system
Reactive power consumption in modern power systemReactive power consumption in modern power system
Reactive power consumption in modern power system
Rahuldey1991
 
Per unit representation
Per unit representationPer unit representation
Per unit representation
Md. Rimon Mia
 
Ac distribution
Ac distributionAc distribution
Ac distribution
Preet_patel
 
Power System Analysis and Design
Power System Analysis and DesignPower System Analysis and Design
Power System Analysis and Design
ZainUlAbdeen41
 
Phasor Measurement Unit (PMU)
 Phasor Measurement Unit (PMU) Phasor Measurement Unit (PMU)
Phasor Measurement Unit (PMU)
Siksha 'O' Anusandhan (Deemed to be University )
 
Exp 4 (1)4. Gauss Siedal Load flow analysis using Matlab Software.
Exp 4 (1)4.	Gauss Siedal Load flow analysis using Matlab Software.Exp 4 (1)4.	Gauss Siedal Load flow analysis using Matlab Software.
Exp 4 (1)4. Gauss Siedal Load flow analysis using Matlab Software.
Shweta Yadav
 
voltage profile improvement in distribution system
voltage profile improvement in distribution systemvoltage profile improvement in distribution system
voltage profile improvement in distribution system
Dr Sunil Singh
 
Power Quality Improvement in Grid Connected PV System
Power Quality Improvement in Grid Connected PV SystemPower Quality Improvement in Grid Connected PV System
Power Quality Improvement in Grid Connected PV System
ijtsrd
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
इन्दुभूषण कुमार
 
PSOC.pptx
PSOC.pptxPSOC.pptx
PSOC.pptx
Srihari Datta
 
Facts lectures-2014
Facts lectures-2014Facts lectures-2014
Facts lectures-2014
IIIT Bhubaneswar
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
harshal567
 
Restructuring
RestructuringRestructuring
Restructuring
Revathi Subramaniam
 

What's hot (20)

Power Quality Audit.pptx
Power Quality Audit.pptxPower Quality Audit.pptx
Power Quality Audit.pptx
 
Restructuring of power grid
Restructuring of power gridRestructuring of power grid
Restructuring of power grid
 
Basics of AC transmission
Basics of AC transmissionBasics of AC transmission
Basics of AC transmission
 
Chapter 5 corona
Chapter 5  coronaChapter 5  corona
Chapter 5 corona
 
Functions and performance requirements of excitation systems
Functions and performance requirements of excitation systemsFunctions and performance requirements of excitation systems
Functions and performance requirements of excitation systems
 
Facts devices
Facts devicesFacts devices
Facts devices
 
Triggatron gap
Triggatron gapTriggatron gap
Triggatron gap
 
Reactive power consumption in modern power system
Reactive power consumption in modern power systemReactive power consumption in modern power system
Reactive power consumption in modern power system
 
Per unit representation
Per unit representationPer unit representation
Per unit representation
 
Ac distribution
Ac distributionAc distribution
Ac distribution
 
Power System Analysis and Design
Power System Analysis and DesignPower System Analysis and Design
Power System Analysis and Design
 
Phasor Measurement Unit (PMU)
 Phasor Measurement Unit (PMU) Phasor Measurement Unit (PMU)
Phasor Measurement Unit (PMU)
 
Exp 4 (1)4. Gauss Siedal Load flow analysis using Matlab Software.
Exp 4 (1)4.	Gauss Siedal Load flow analysis using Matlab Software.Exp 4 (1)4.	Gauss Siedal Load flow analysis using Matlab Software.
Exp 4 (1)4. Gauss Siedal Load flow analysis using Matlab Software.
 
voltage profile improvement in distribution system
voltage profile improvement in distribution systemvoltage profile improvement in distribution system
voltage profile improvement in distribution system
 
Power Quality Improvement in Grid Connected PV System
Power Quality Improvement in Grid Connected PV SystemPower Quality Improvement in Grid Connected PV System
Power Quality Improvement in Grid Connected PV System
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
PSOC.pptx
PSOC.pptxPSOC.pptx
PSOC.pptx
 
Facts lectures-2014
Facts lectures-2014Facts lectures-2014
Facts lectures-2014
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
Restructuring
RestructuringRestructuring
Restructuring
 

Similar to Automatic Generation Control-3

A novel voltage reference without the operational amplifier and resistors
A novel voltage reference without the operational amplifier and resistorsA novel voltage reference without the operational amplifier and resistors
A novel voltage reference without the operational amplifier and resistors
IJRES Journal
 
Operational Amplifier Design
Operational Amplifier DesignOperational Amplifier Design
Operational Amplifier Design
Bharat Biyani
 
「SPICEの活用方法」セミナー資料(28JAN2011) PPT
「SPICEの活用方法」セミナー資料(28JAN2011) PPT「SPICEの活用方法」セミナー資料(28JAN2011) PPT
「SPICEの活用方法」セミナー資料(28JAN2011) PPT
Tsuyoshi Horigome
 
ALFC.pdf
ALFC.pdfALFC.pdf
19212757
1921275719212757
19212757
Japan Patel
 
Chapter 2 automatic_load_frequency_contr
Chapter 2 automatic_load_frequency_contrChapter 2 automatic_load_frequency_contr
Chapter 2 automatic_load_frequency_contr
Srinivas Dalli
 
Design, Simulation and Implementation of Flyback based, True Single Stage, Is...
Design, Simulation and Implementation of Flyback based, True Single Stage, Is...Design, Simulation and Implementation of Flyback based, True Single Stage, Is...
Design, Simulation and Implementation of Flyback based, True Single Stage, Is...
IJMER
 
PWM Step-down Converter(NJM2309)
PWM Step-down Converter(NJM2309)PWM Step-down Converter(NJM2309)
PWM Step-down Converter(NJM2309)
Tsuyoshi Horigome
 
pwm inverter
pwm inverterpwm inverter
pwm inverter
Subzero Bill
 
PWM Buck Converter using Average Model
PWM Buck Converter using Average ModelPWM Buck Converter using Average Model
PWM Buck Converter using Average Model
Tsuyoshi Horigome
 
IEMCON-2015
IEMCON-2015IEMCON-2015
IEMCON-2015
Reetam Sen Biswas
 
Chapter two Part two.pptx
Chapter two Part two.pptxChapter two Part two.pptx
Chapter two Part two.pptx
AbdalleAidrous
 
ENEL301 report _Joseph Haystead_1132999
ENEL301 report _Joseph Haystead_1132999ENEL301 report _Joseph Haystead_1132999
ENEL301 report _Joseph Haystead_1132999
Joseph Haystead
 
Performance analysis of High Speed ADC using SR F/F
Performance analysis of High Speed ADC using SR F/FPerformance analysis of High Speed ADC using SR F/F
Performance analysis of High Speed ADC using SR F/F
IOSR Journals
 
ECE 626 project report Switched Capacitor
ECE 626 project report Switched CapacitorECE 626 project report Switched Capacitor
ECE 626 project report Switched Capacitor
Karthik Rathinavel
 
Ee6501 psa-eee-vst-au-units-v (1)
Ee6501 psa-eee-vst-au-units-v (1)Ee6501 psa-eee-vst-au-units-v (1)
Ee6501 psa-eee-vst-au-units-v (1)
Vara Prasad
 
Automatic Generation Control -1
Automatic Generation Control -1Automatic Generation Control -1
Automatic Generation Control -1
Power System Operation
 
DESIGNED A 350NM TWO STAGE OPERATIONAL AMPLIFIER
DESIGNED A 350NM TWO STAGE OPERATIONAL AMPLIFIERDESIGNED A 350NM TWO STAGE OPERATIONAL AMPLIFIER
DESIGNED A 350NM TWO STAGE OPERATIONAL AMPLIFIER
Ilango Jeyasubramanian
 
Final Project
Final ProjectFinal Project
Final Project
Mohnish Puri Goswami
 
CVT design
CVT designCVT design
CVT design
binodsahu8
 

Similar to Automatic Generation Control-3 (20)

A novel voltage reference without the operational amplifier and resistors
A novel voltage reference without the operational amplifier and resistorsA novel voltage reference without the operational amplifier and resistors
A novel voltage reference without the operational amplifier and resistors
 
Operational Amplifier Design
Operational Amplifier DesignOperational Amplifier Design
Operational Amplifier Design
 
「SPICEの活用方法」セミナー資料(28JAN2011) PPT
「SPICEの活用方法」セミナー資料(28JAN2011) PPT「SPICEの活用方法」セミナー資料(28JAN2011) PPT
「SPICEの活用方法」セミナー資料(28JAN2011) PPT
 
ALFC.pdf
ALFC.pdfALFC.pdf
ALFC.pdf
 
19212757
1921275719212757
19212757
 
Chapter 2 automatic_load_frequency_contr
Chapter 2 automatic_load_frequency_contrChapter 2 automatic_load_frequency_contr
Chapter 2 automatic_load_frequency_contr
 
Design, Simulation and Implementation of Flyback based, True Single Stage, Is...
Design, Simulation and Implementation of Flyback based, True Single Stage, Is...Design, Simulation and Implementation of Flyback based, True Single Stage, Is...
Design, Simulation and Implementation of Flyback based, True Single Stage, Is...
 
PWM Step-down Converter(NJM2309)
PWM Step-down Converter(NJM2309)PWM Step-down Converter(NJM2309)
PWM Step-down Converter(NJM2309)
 
pwm inverter
pwm inverterpwm inverter
pwm inverter
 
PWM Buck Converter using Average Model
PWM Buck Converter using Average ModelPWM Buck Converter using Average Model
PWM Buck Converter using Average Model
 
IEMCON-2015
IEMCON-2015IEMCON-2015
IEMCON-2015
 
Chapter two Part two.pptx
Chapter two Part two.pptxChapter two Part two.pptx
Chapter two Part two.pptx
 
ENEL301 report _Joseph Haystead_1132999
ENEL301 report _Joseph Haystead_1132999ENEL301 report _Joseph Haystead_1132999
ENEL301 report _Joseph Haystead_1132999
 
Performance analysis of High Speed ADC using SR F/F
Performance analysis of High Speed ADC using SR F/FPerformance analysis of High Speed ADC using SR F/F
Performance analysis of High Speed ADC using SR F/F
 
ECE 626 project report Switched Capacitor
ECE 626 project report Switched CapacitorECE 626 project report Switched Capacitor
ECE 626 project report Switched Capacitor
 
Ee6501 psa-eee-vst-au-units-v (1)
Ee6501 psa-eee-vst-au-units-v (1)Ee6501 psa-eee-vst-au-units-v (1)
Ee6501 psa-eee-vst-au-units-v (1)
 
Automatic Generation Control -1
Automatic Generation Control -1Automatic Generation Control -1
Automatic Generation Control -1
 
DESIGNED A 350NM TWO STAGE OPERATIONAL AMPLIFIER
DESIGNED A 350NM TWO STAGE OPERATIONAL AMPLIFIERDESIGNED A 350NM TWO STAGE OPERATIONAL AMPLIFIER
DESIGNED A 350NM TWO STAGE OPERATIONAL AMPLIFIER
 
Final Project
Final ProjectFinal Project
Final Project
 
CVT design
CVT designCVT design
CVT design
 

More from Power System Operation

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
Power System Operation
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
Power System Operation
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
Power System Operation
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
Power System Operation
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
Power System Operation
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
Power System Operation
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
Power System Operation
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
Power System Operation
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
Power System Operation
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
Power System Operation
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Power System Operation
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
Power System Operation
 
What is load management
What is load managementWhat is load management
What is load management
Power System Operation
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
Power System Operation
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
Power System Operation
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
Power System Operation
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power System Operation
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
Power System Operation
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
Power System Operation
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
Power System Operation
 

More from Power System Operation (20)

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
What is load management
What is load managementWhat is load management
What is load management
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
 

Recently uploaded

原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 

Recently uploaded (20)

原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 

Automatic Generation Control-3

  • 1. 1 AGC 3 1.0 Introduction The primary controller response to a load/generation imbalance results in generation adjustment so as to maintain load/generation balance. However, due to droop, it also results in a non-zero steady-state frequency deviation. This frequency deviation must be corrected. Also, the net scheduled export must be maintained according to the purchase agreements. Primary control does nothing to correct the steady-state frequency error or the net scheduled export. These two problems are handled by providing a supplementary signal from the control center to each generation unit on automatic generation control (AGC).
  • 2. 2 The signal is derived from the Area Control Error (ACE) and, when received at a generation plant, activates the “speed changer motor” to adjust the energy supply set point to the generator. In these notes, we will learn how the ACE is computed, and we will see how it is used in correcting steady-state frequency error. 2.0 Review From our notes AGC1, we defined the following terms:  Net Actual Interchange: APij  Net Scheduled Interchange: SPij  Interchange Deviation (defined pg 396 of text): ΔPij=APij-SPij (1) Note that the above terms are each defined with respect to two distinct areas.
  • 3. 3 We also defined, in AGC1, the following terms:  Actual Export:   n j iji APAP 1 (2)  Scheduled Export:   n j iji SPSP 1 (3)  Net Deviation:   n j iji PP 1 (4) Note that the above three terms are each defined with respect to a single area. We also saw that the net deviation is related to the net actual and scheduled interchanges, and to the actual and scheduled exports, by: ii n j ij n j ij ij n j ij n j iji SPAPSPAP SPAPPP       11 11 )( (5) Although your text does not define net deviation, it does use it as the first term in the ACE expression of eq. (11.30).
  • 4. 4 Finally, we saw in our notes AGC2, when discussing the multi-machine case, that             Kpu RK pu R R S R S Pf ... 60 1 1 (6)              Kpu RK pu Rpui Ri pui Ri Mi R S R S P R Sf R S P ... 60 1 1 (7) If all units have the same per-unit droop constant, i.e., if R1pu=R2pu=…=RKpu, then eqs. (6) and (7) become  RKR pu SS PRf     ...60 1 (8)  RKR Ri pu Ri Mi SS PSf R S P      ...60 1 (9) In eqs. (8) and (9), ΔP represents the change in total load so that it is  positive if load increases and negative if load decrease;  positive if generation decreases and negative if generation increases.
  • 5. 5 3.0 Area Control Error The Area Control Error (ACE) is composed of  Net Deviation ΔPi, from eq. (5), written more compactly below: iii SPAPP  (5) When ΔPi>0, it means that the actual export exceeds the scheduled export, and so the generation in area i should be reduced.  Steady-state frequency deviation 60 ff (10) When Δf>0, it means the generation in the system exceeds the load and therefore we should reduce generation in the area. From the above, our first impulse may be to immediately write down the ACE for area i as: fPACE ii  (11a) Alternatively (and consistent with the text)  ii PACE (11b)
  • 6. 6 But we note 2 problems with eq. (11). First, we are adding 2 quantities that have different units. Anytime you come across a relation that adds 2 or more units having different units, beware. The second problem is that the magnitudes of the two terms in eq. (11) may differ dramatically. If we are working in MW and Hz (or rad/sec), then we may see ΔPi in the 100’s of MW whereas we will see Δf (or Δω) in the hundredths or at most tenths of a Hz. The implication is that the control signal, per eq. (11), will greatly favor the export deviations over the frequency deviations. Therefore we need to scale one of them. To do so, we define area i frequency bias as βi. It has units of MW/Hz. Your text shows (pg. 393) that fi Lfififi R DD 1  (12a) i iLii R DD   1  (12b)
  • 7. 7 where  Di is the damping coefficient from the swing equation (and represents the effect of synchronous generator windage and friction);  DLi is the load damping coefficient and represents the tendency of the load to decrease as frequency decreases (an effect mainly attributed to induction motors).  The f or ω subscripts indicate whether we will compute ACE using f or ω (text uses ω). The damping terms of eq. (12) are usually significantly smaller than the regulation term, so that a reasonable approximation is that fi fi R 1  (12c) i i R  1  (12d) Then the ACE equation becomes: fPACE fiii   (12e)   iii PACE (12f)
  • 8. 8 4.0 Example Consider the two-area interconnection shown in Fig. 1 with data given as below. A1 A2 1000 MW Fig. 1 Area 1 Area 2 Load=20,000 MW Load=40,000 MW Capacity=20,000 MW Capacity=42,000 MW Gen=19,000 MW Gen=41,000 MW R1pu=0.05 R1pu=0.05 The scheduled interchange is 1000 MW flowing from A2 to A1, so that scheduled exports are:  SP1=-1000 MW  SP2=1000 MW There are two parts to this problem: 1.Determine frequency and generation of each area and the tie line flow after a 1000 MW loss of load in A1, but before supplementary control has taken effect (this means we will determine only the effect of primary control).
  • 9. 9 2.Repeat (1) after supplementary control action has taken effect. Solution: We assume that area capacities are the ratings: SR1=20000 SR2=42000 We also note that the load decreases, therefore ΔP=-1000 MW. 1.From eq. (8),   pu SS PRf RKR pu 000806.0 ]4200020000[ )1000(05.0 ...60 1         Therefore Hzf 0484.060*000806.0  so that f=60.0484 Hz. Then we can compute the increase in generation in each area per eq. (9). For Area 1:   MW SS PS P RR R M 6.322 4200020000 )1000)(20000( 11 1 1        Therefore MWPM 4.677,186.322190001 
  • 10. 10 For Area 2:   MW SS PS P RR R M 4.677 4200020000 )1000)(42000( 11 2 2        Therefore MWPM 6.322,404.677410002  It is of interest now to obtain the actual exports, and we can do this for each area by taking the difference between load and generation. The loads in areas 1 and 2 were 20000 and 40000, but remember that we lost 1000 MW of load in area 1, so that its value is now 19000. Generation levels were computed above. Therefore AP1=18,677-19,000=-322.6 MW AP2=40,322.6-40,000=322.6 MW So clearly the new tie-line flow is 322.6 MW from A2 to A1. Note: For multiple areas, calculating tie-line flows requires a power flow solution (DC power flow is suitable to use here).
  • 11. 11 From eq. (5), net deviation is: 4.677)1000(6.322111  SPAPP 4.677)1000(6.322222  SPAPP 2.To find the effect of supplementary control, we first need to compute the frequency bias parameters. We neglect effects of damping terms, so that we use eq. (12c) or (12d): fi fi R 1  (12c) i i R  1  (12d) But note that the droop constant in (12c) or (12d) is not in per-unit. To convert to per-unit, recall eqs. (13) and (14) from AGC2 notes: M f P f R    (13a) MP R      (13b) Mpu pu Mpu pu rMrM pu PP f SPSP ff R              / / / / 00 (14)
  • 12. 12 Substituting eq. (13a) or (13b) into (14) gives: 00 0 / / f S R f S P f SP ff R r f r MrM pu        (15a) 00 0 / /    rr MrM pu S R S PSP R        (15b) Therefore r puf S f RR 0  (16a) r pu S RR 0   (16b) We can use (16a) to calculate the frequency bias term of (12c), which is used in the ACE equation of (12d): fPACE fiii   (12d) Alternatively, we can use (16b) to calculate the frequency bias terms of (12d), which is used in the ACE equation of (12e):   iii PACE (12e) In the rest of this example, we will use (16a), (12c), and (12d).
  • 13. 13 Applying eq. (16a) to obtain Rf1 and Rf2, we get MWHz S f RR r puf /00015.0 20000 60 05.0 1 0 1  MWHz S f RR r puf /000071429.0 42000 60 05.0 2 0 2  Then the frequency bias terms are obtained as HzMW Rf f /7.6666 00015.0 11 1 1  HzMW Rf f /14000 000071429.0 11 2 2  Now we can compute the ACE in each area: MW fSPAPfPACE ff 100068.3224.677 484)6666.7(0.0-1000)--322.6( )( 111111     MW fSPAPfPACE ff 06.6774.677 84)14000(0.041000)-322.6( )( 222222    
  • 14. 14 So what does this mean?  ACE1 indicates that the generators in A1 receive a signal to decrease generation by 1000 MW. Recall from page 9 that after primary control action, PM1=18,677.4 MW. With a 1000 MW decrease, then PM1=17,677.4 MW.  ACE2 indicates that the generators in A2 do not change, so PM2=40,322.6 MW. But now consider that previous to the secondary control action, we were at a steady state (with steady-state frequency deviation of 0.0484 so that f=60.0484 Hz). Now the ACE signal has cause a decrease in A1 generation by 1000 MW. This action creates a load-generation imbalance of ΔP=+1000 MW that will cause unit primary controllers to act in both areas. From eq. (8):   pu SS PRf RKR pu 000806.0 ]4200020000[ )1000(05.0 ...60 1         Therefore Hzf 0484.060*000806.0  so that f=60.0484 - 0.0484 = 60Hz.
  • 15. 15 Then we compute the increase in generation in each area per eq. (9). For Area 1:   MW SS PS P RR R M 6.322 4200020000 )1000)(20000( 11 1 1        Therefore MWPM 000,186.3224.176771  For Area 2:   MW SS PS P RR R M 4.677 4200020000 )1000)(42000( 11 2 2        Therefore MWPM 000,414.6776.322,402  The exports for the two areas will then be: AP1=18,000-19,000=-1000 MW AP2=41,000-40,000=+1000 MW A summary of the situation is given below, where we see that the final control action has resulted in A1 generation entirely compensating for the A1 load decrease of 1000 MW (with area exports unchanged). Area 1 Area 2 Load=19,000 MW Load=40,000 MW Gen=18,000 MW Gen=41,000 MW