RESTRUCTURING OF GRID
SARAVANAN SIVAMANI 1
INTRODUCTION
• Power sector across the world is undergoing a lot of
restructuring; India is no exception to this.
• In some States of India there are multiple private
utilities, which are technically and financially in a
position to enter the phase of a competitive
electricity market.
SARAVANAN SIVAMANI 2
What is a “Grid” ?
WHAT IS AN “INTER-CONNECTION” ?
WHY DO WE NEED THIS INTER-CONNECTION ?
1)Reliability
2)Economy
3)Proper Load Sharing
Two or more generating stations are interconnected by tie lines.
Interconnection provides the best use of power resources and
ensures greater security of supply.
An Interconnected power system covering a major portion of a
country’s territory (or state) is called a Grid. The different state grids
may be a interconnected through transmission lines to form a Grid.
SARAVANAN SIVAMANI 3
All Power-Grid equipments used
Lightning Arrestor Power Transformer
Current Transformer/Potential Transformer
SARAVANAN SIVAMANI 4
Circuit Breakers Insulators Isolators
Wave Trap
SARAVANAN SIVAMANI 5
NEED FOR RESTRUCTURING
• The need for restructuring the power sector was felt
due to the scarcity of financial resources available
with Central and State Governments.
• Necessity of improving the technical and commercial
efficiency.
SARAVANAN SIVAMANI 6
PROPOSED MODEL FOR
RESTRUCTURING IN INDIA
• In many parts of the world wherever unbundling, i.e.
separation of generation, transmission and
distribution has taken place, the two models are more
prevalent for system operation.
• Independent System Operator (ISO) model
• Transmission System Operator (TSO) model.
SARAVANAN SIVAMANI 7
ISO AND TSO MODELS
• . In ISO model, transmission companies are also
permitted to own, manage and control generation and
distribution companies, an independent system operator is
created to facilitate open access and competitive markets.
• In TSO model, operation of the grid and ownership of the
grid are integrated in a single entity, which is responsible
for development of transmission system and to provide
non-discriminatory open access to all eligible market
participants.
SARAVANAN SIVAMANI 8
TO BE CONTINUED….
• TSO model seems to be most suitable for future
restructured electricity market in India.
• This is because the government owned transmission
company is merely responsible to provide non-
discriminatory open access.
SARAVANAN SIVAMANI 9
ELECTRICITY ACT 2003
• This act consolidates all the existing laws and
introduces provisions with respect to new
developments in the sector. It focuses on
creating competition, protecting consumer interests,
rationalizing tariff, etc.
• All the necessary powers including issue of licenses
are given to the regulators which
are made independent entities from the government.
SARAVANAN SIVAMANI 100
SARAVANAN SIVAMANI 111
SALIENT FEATURES
• Open access in transmission with provision of surcharge
for cross subsidy and this surcharge
will be gradually phased out.
• Distribution licensees are free to undertake generation
and generating companies are free to take up distribution
licensees.
• For rural and remote areas stand alone systems for
generation and distribution would be permitted.
• State Governments can convert State Electricity Boards
(SEBs) into companies or continue them as distribution
licensees.
SARAVANAN SIVAMANI 122
CENTRALAUTHORITY SYSTEM
SARAVANAN SIVAMANI 13
COORDINATE WITH
OTHER
SYSNCHRONOUS GRIDS
(EX NR, ER,NER)
REGIONAL (SYNCHRONOUS GRID)
LOAD DESPATCH CENTRE
STATE LOAD
DESPATCH
CENTRES
CENTRALLY
OWNED LINES
CENTRALLY
OWNED PLANTS
INTER-STATE TIE
LINES
STATE OWNED
HVDC LINES
DISTRIBUTION
SUBSTATION
POWERPLANT
OPERATORS
GENERATION OF ELECTRICITY
• The generating company should establish, operate and
maintain generating stations, tie-lines, substations and
dedicated transmission lines.
• According to the 16th Electric Power survey conducted
by CEA, the country has energy shortage of 7.8 % and
peaking shortage of 13 % (100GW).
• As per the reports published by Oxford Institute for
Energy Studies (OIES) [6] the Indian Government should
do more to encourage and facilitate local private
investment in small-scale distributed electricity
generation capacity.
SARAVANAN SIVAMANI 144
Central Authority System (contd.)
•The Central Electricity Authority of India (CEA) is a
statutory organisation constituted under section 3(1) of
Electricity Supply Act 1948
•To develop a sound adequate and uniform national power
policy, formulate short-term and perspective plans for power
development and co-ordinate the activities of planning
agencies in relation to the control and utilisation of national
power resources.
•To collect and record the data concerning generation,
distribution and utilisation of power and carry out studies
relating to cost, efficiency, losses, benefits and such like
matters.
SARAVANAN SIVAMANI 155
What is a National load Dispatch Centre ?
The main functions assigned to NLDC are:
• Supervision Over the Regional Load Dispatch Centers.
• Scheduling and dispatch of electricity over the inter-regional
links in accordance with grid standards specified by the
authority and grid code specified by Central Commission in
coordination with Regional Load Dispatch Centers.
• Coordination with Regional Load Dispatch Centers for
achieving maximum economy and efficiency in the operation
of National Grid.
• Monitoring of operations and grid security of the National
Grid.
• Coordination for restoration of synchronous operation of
national grid with Regional Load Despatch Centres.
SARAVANAN SIVAMANI 166
Sharing Of Transmission Charges
WHEELING CHARGES:
•Wheeling is the transportation of electric power (megawatts
or megavolt-amperes) over transmission lines.
•An entity that generates power does not have to own
power transmission lines
•The entity then pays the owner of the transmission line
based on how much power is being moved and how
congested the line is.
•Charges for inter-regional lines may be shared by two
contiguous regions on 50 : 50 basis.
•Charges for the regional assets may be shared by the regional
beneficiaries
•If an inter regional asset is used for wheeling by a third party
the balance transmission charges may be shared by the
beneficiaries of the contiguous region on 50 : 50 basis.
SARAVANAN SIVAMANI 177
Ownership and Coordination
• Inter-State and other transmission links may be owned
by other independent entity (Ex: PGCIL).
• State Electricity Boards can Import or Export a pre
decided amount of power from neighboring states or
generators owned by other entities like National
Thermal Power Corporation.
• State Electricity Boards are divided into
1) Generation companies (GENCOs)
2) Distribution Companies (DISCOs)
3) Transmission Companies(TRANSCOs)
• Overall coordination is done by a Load Dispatch
Centre.
SARAVANAN SIVAMANI 188
TRANSCOs:
DISCOS:
GENCOS:
The companies which are responsible for power generation are
called as Generation Companies(GENCOs) ex: NTPC
The companies which are responsible for transmission of large
amounts of power are called as Transmission
companies(TRANSCOs) Ex: PowerGrid
The companies which are responsible for Distribution of the
large amounts of power to the general public are called as
Distribution Companies(DISCOs) Ex: UP-RVVNL
SARAVANAN SIVAMANI 199
Transmission of Electricity
• The RLDC will work as per the Indian Electricity Grid Code
(IEGC) to ensure integrated operation of the power system in
the concerned regions.
• It has to monitor grid operations, keep accounts of
the quantity of electricity transmitted through the regional
grids, exercise supervision and control over the Intra-State
transmission.
• It will be responsible for carrying out real time operations for
grid control and dispatch of electricity within the state through
secure and economic operation of the state grid in accordance
with grid standards and the state grid code.
SARAVANAN SIVAMANI 20
Distribution of Electricity
• State Commission permits a consumer or class of
consumers to receive supply of electricity from a person
other than the distribution licensee of his area of
supply, such consumer shall be liable to pay an
additional surcharge on the charges of wheeling, as may
be specified by the State Commission, to meet the fixed
cost of such distribution licensee arising out of his
obligation to supply.
• Distribution companies have been given mandate for
achieving complete metering within two years from the
enactment of the law.
SARAVANAN SIVAMANI 21
Different grids of India
SARAVANAN SIVAMANI 22
Some Landmark Events Of Power Grid
• 1948 - Growth of supply systems
• 1962- First 220KV Voltage level
• 1967- Interconnection Of state Grids to form
Regional Grids
• 1975- First 400Kv Voltage level
• 1989- HVDC Back to Back
• 1998- Installation of 765 Kv line(Charged at 400Kv)
• 2006- Synchronisation of NR with ER-NER-WR
• 2007- Transmission at 765 Kv
• 2010/11- Installation of 800Kv HVDC Bi-pole Line
SARAVANAN SIVAMANI 23
Thank You…
SARAVANAN SIVAMANI 24

More Related Content

What's hot

Objectives of shunt compensation
Objectives of shunt compensationObjectives of shunt compensation
Objectives of shunt compensationAyyarao T S L V
 
DISTRIBUTED GENERATION TECHNOLOGIES
DISTRIBUTED GENERATION TECHNOLOGIESDISTRIBUTED GENERATION TECHNOLOGIES
DISTRIBUTED GENERATION TECHNOLOGIESEditor IJMTER
 
Integration of Renewable Energy In Grid
Integration of Renewable Energy In GridIntegration of Renewable Energy In Grid
Integration of Renewable Energy In GridTejaswi Shukla
 
Power qualty conditioners
Power qualty conditionersPower qualty conditioners
Power qualty conditionersSudhanshu Goel
 
Load forecasting
Load forecastingLoad forecasting
Load forecastingsushrut p
 
Wide area network in smart grid kundan
Wide area network in smart grid kundanWide area network in smart grid kundan
Wide area network in smart grid kundanKundan Kumar
 
WIDE AREA PROTECTION IN POWER SYSTEMS
WIDE AREA PROTECTION IN POWER SYSTEMSWIDE AREA PROTECTION IN POWER SYSTEMS
WIDE AREA PROTECTION IN POWER SYSTEMSmanogna gwen
 
Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart gridAshfaq khan
 
Protection and control of Microgrid
Protection and control of MicrogridProtection and control of Microgrid
Protection and control of MicrogridAmarjeet S Pandey
 
Congestion management
Congestion managementCongestion management
Congestion managementGAURAV KUMAR
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in Indiamohkab1
 
Power system security
Power system security Power system security
Power system security MANGESHKULKARNI72
 
Electrical Load forcasting
Electrical Load forcastingElectrical Load forcasting
Electrical Load forcastingBHUPATI PRADHAN
 
Electric power system
Electric power systemElectric power system
Electric power systemKhurram Burjees
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNINGNishaDangi99
 

What's hot (20)

Objectives of shunt compensation
Objectives of shunt compensationObjectives of shunt compensation
Objectives of shunt compensation
 
DISTRIBUTED GENERATION TECHNOLOGIES
DISTRIBUTED GENERATION TECHNOLOGIESDISTRIBUTED GENERATION TECHNOLOGIES
DISTRIBUTED GENERATION TECHNOLOGIES
 
Integration of Renewable Energy In Grid
Integration of Renewable Energy In GridIntegration of Renewable Energy In Grid
Integration of Renewable Energy In Grid
 
Power qualty conditioners
Power qualty conditionersPower qualty conditioners
Power qualty conditioners
 
Load forecasting
Load forecastingLoad forecasting
Load forecasting
 
Smart grid
Smart gridSmart grid
Smart grid
 
Wide area network in smart grid kundan
Wide area network in smart grid kundanWide area network in smart grid kundan
Wide area network in smart grid kundan
 
WIDE AREA PROTECTION IN POWER SYSTEMS
WIDE AREA PROTECTION IN POWER SYSTEMSWIDE AREA PROTECTION IN POWER SYSTEMS
WIDE AREA PROTECTION IN POWER SYSTEMS
 
Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart grid
 
Protection and control of Microgrid
Protection and control of MicrogridProtection and control of Microgrid
Protection and control of Microgrid
 
Congestion management
Congestion managementCongestion management
Congestion management
 
Demand Side Management
Demand Side ManagementDemand Side Management
Demand Side Management
 
Hvdc
HvdcHvdc
Hvdc
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in India
 
Power system security
Power system security Power system security
Power system security
 
Electrical Load forcasting
Electrical Load forcastingElectrical Load forcasting
Electrical Load forcasting
 
HVDC & FACTS
HVDC & FACTSHVDC & FACTS
HVDC & FACTS
 
Electric power system
Electric power systemElectric power system
Electric power system
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNING
 
Smart grid
Smart gridSmart grid
Smart grid
 

Similar to Restructuring of power grid

Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of ElectricityRupesh Bobbili
 
Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in IndiaSandipan Chakraborty
 
Ee09 801 eed ppt
Ee09 801 eed pptEe09 801 eed ppt
Ee09 801 eed pptmanickaasagam
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power PolicyPRIYANK JAIN
 
WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015Adriann McCoy
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxmsounak95
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Dhruv Agarwal
 
IEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.pptIEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.pptssuser62f0b5
 
Glen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REGlen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REANUECI
 
Smart Grid - Future Electric Grid
Smart Grid - Future Electric GridSmart Grid - Future Electric Grid
Smart Grid - Future Electric Gridsatya prakash meena
 
Open access in india
Open access in indiaOpen access in india
Open access in indiaomtaneja
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorVijay Menghani
 
Presentation on IEA 2003.pptx
Presentation on IEA 2003.pptxPresentation on IEA 2003.pptx
Presentation on IEA 2003.pptxMaheshThombare9
 
400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...
400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...
400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...Power System Operation
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)Ravi Pohani
 
Hierarchical grid connection of Idia
Hierarchical grid connection of IdiaHierarchical grid connection of Idia
Hierarchical grid connection of IdiaMAYURSINH RATHOOD
 

Similar to Restructuring of power grid (20)

Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
 
IEGC.pptx
IEGC.pptxIEGC.pptx
IEGC.pptx
 
Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in India
 
Ee09 801 eed ppt
Ee09 801 eed pptEe09 801 eed ppt
Ee09 801 eed ppt
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power Policy
 
WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptx
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)
 
IEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.pptIEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.ppt
 
Captive gen
Captive genCaptive gen
Captive gen
 
Glen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REGlen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of RE
 
Smart Grid - Future Electric Grid
Smart Grid - Future Electric GridSmart Grid - Future Electric Grid
Smart Grid - Future Electric Grid
 
Open access in india
Open access in indiaOpen access in india
Open access in india
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 
UNIT-1-PPT.pptx
UNIT-1-PPT.pptxUNIT-1-PPT.pptx
UNIT-1-PPT.pptx
 
Presentation on IEA 2003.pptx
Presentation on IEA 2003.pptxPresentation on IEA 2003.pptx
Presentation on IEA 2003.pptx
 
400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...
400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...
400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)
 
Hierarchical grid connection of Idia
Hierarchical grid connection of IdiaHierarchical grid connection of Idia
Hierarchical grid connection of Idia
 

Recently uploaded

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoĂŁo Esperancinha
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 

Recently uploaded (20)

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 

Restructuring of power grid

  • 2. INTRODUCTION • Power sector across the world is undergoing a lot of restructuring; India is no exception to this. • In some States of India there are multiple private utilities, which are technically and financially in a position to enter the phase of a competitive electricity market. SARAVANAN SIVAMANI 2
  • 3. What is a “Grid” ? WHAT IS AN “INTER-CONNECTION” ? WHY DO WE NEED THIS INTER-CONNECTION ? 1)Reliability 2)Economy 3)Proper Load Sharing Two or more generating stations are interconnected by tie lines. Interconnection provides the best use of power resources and ensures greater security of supply. An Interconnected power system covering a major portion of a country’s territory (or state) is called a Grid. The different state grids may be a interconnected through transmission lines to form a Grid. SARAVANAN SIVAMANI 3
  • 4. All Power-Grid equipments used Lightning Arrestor Power Transformer Current Transformer/Potential Transformer SARAVANAN SIVAMANI 4
  • 5. Circuit Breakers Insulators Isolators Wave Trap SARAVANAN SIVAMANI 5
  • 6. NEED FOR RESTRUCTURING • The need for restructuring the power sector was felt due to the scarcity of financial resources available with Central and State Governments. • Necessity of improving the technical and commercial efficiency. SARAVANAN SIVAMANI 6
  • 7. PROPOSED MODEL FOR RESTRUCTURING IN INDIA • In many parts of the world wherever unbundling, i.e. separation of generation, transmission and distribution has taken place, the two models are more prevalent for system operation. • Independent System Operator (ISO) model • Transmission System Operator (TSO) model. SARAVANAN SIVAMANI 7
  • 8. ISO AND TSO MODELS • . In ISO model, transmission companies are also permitted to own, manage and control generation and distribution companies, an independent system operator is created to facilitate open access and competitive markets. • In TSO model, operation of the grid and ownership of the grid are integrated in a single entity, which is responsible for development of transmission system and to provide non-discriminatory open access to all eligible market participants. SARAVANAN SIVAMANI 8
  • 9. TO BE CONTINUED…. • TSO model seems to be most suitable for future restructured electricity market in India. • This is because the government owned transmission company is merely responsible to provide non- discriminatory open access. SARAVANAN SIVAMANI 9
  • 10. ELECTRICITY ACT 2003 • This act consolidates all the existing laws and introduces provisions with respect to new developments in the sector. It focuses on creating competition, protecting consumer interests, rationalizing tariff, etc. • All the necessary powers including issue of licenses are given to the regulators which are made independent entities from the government. SARAVANAN SIVAMANI 100
  • 12. SALIENT FEATURES • Open access in transmission with provision of surcharge for cross subsidy and this surcharge will be gradually phased out. • Distribution licensees are free to undertake generation and generating companies are free to take up distribution licensees. • For rural and remote areas stand alone systems for generation and distribution would be permitted. • State Governments can convert State Electricity Boards (SEBs) into companies or continue them as distribution licensees. SARAVANAN SIVAMANI 122
  • 13. CENTRALAUTHORITY SYSTEM SARAVANAN SIVAMANI 13 COORDINATE WITH OTHER SYSNCHRONOUS GRIDS (EX NR, ER,NER) REGIONAL (SYNCHRONOUS GRID) LOAD DESPATCH CENTRE STATE LOAD DESPATCH CENTRES CENTRALLY OWNED LINES CENTRALLY OWNED PLANTS INTER-STATE TIE LINES STATE OWNED HVDC LINES DISTRIBUTION SUBSTATION POWERPLANT OPERATORS
  • 14. GENERATION OF ELECTRICITY • The generating company should establish, operate and maintain generating stations, tie-lines, substations and dedicated transmission lines. • According to the 16th Electric Power survey conducted by CEA, the country has energy shortage of 7.8 % and peaking shortage of 13 % (100GW). • As per the reports published by Oxford Institute for Energy Studies (OIES) [6] the Indian Government should do more to encourage and facilitate local private investment in small-scale distributed electricity generation capacity. SARAVANAN SIVAMANI 144
  • 15. Central Authority System (contd.) •The Central Electricity Authority of India (CEA) is a statutory organisation constituted under section 3(1) of Electricity Supply Act 1948 •To develop a sound adequate and uniform national power policy, formulate short-term and perspective plans for power development and co-ordinate the activities of planning agencies in relation to the control and utilisation of national power resources. •To collect and record the data concerning generation, distribution and utilisation of power and carry out studies relating to cost, efficiency, losses, benefits and such like matters. SARAVANAN SIVAMANI 155
  • 16. What is a National load Dispatch Centre ? The main functions assigned to NLDC are: • Supervision Over the Regional Load Dispatch Centers. • Scheduling and dispatch of electricity over the inter-regional links in accordance with grid standards specified by the authority and grid code specified by Central Commission in coordination with Regional Load Dispatch Centers. • Coordination with Regional Load Dispatch Centers for achieving maximum economy and efficiency in the operation of National Grid. • Monitoring of operations and grid security of the National Grid. • Coordination for restoration of synchronous operation of national grid with Regional Load Despatch Centres. SARAVANAN SIVAMANI 166
  • 17. Sharing Of Transmission Charges WHEELING CHARGES: •Wheeling is the transportation of electric power (megawatts or megavolt-amperes) over transmission lines. •An entity that generates power does not have to own power transmission lines •The entity then pays the owner of the transmission line based on how much power is being moved and how congested the line is. •Charges for inter-regional lines may be shared by two contiguous regions on 50 : 50 basis. •Charges for the regional assets may be shared by the regional beneficiaries •If an inter regional asset is used for wheeling by a third party the balance transmission charges may be shared by the beneficiaries of the contiguous region on 50 : 50 basis. SARAVANAN SIVAMANI 177
  • 18. Ownership and Coordination • Inter-State and other transmission links may be owned by other independent entity (Ex: PGCIL). • State Electricity Boards can Import or Export a pre decided amount of power from neighboring states or generators owned by other entities like National Thermal Power Corporation. • State Electricity Boards are divided into 1) Generation companies (GENCOs) 2) Distribution Companies (DISCOs) 3) Transmission Companies(TRANSCOs) • Overall coordination is done by a Load Dispatch Centre. SARAVANAN SIVAMANI 188
  • 19. TRANSCOs: DISCOS: GENCOS: The companies which are responsible for power generation are called as Generation Companies(GENCOs) ex: NTPC The companies which are responsible for transmission of large amounts of power are called as Transmission companies(TRANSCOs) Ex: PowerGrid The companies which are responsible for Distribution of the large amounts of power to the general public are called as Distribution Companies(DISCOs) Ex: UP-RVVNL SARAVANAN SIVAMANI 199
  • 20. Transmission of Electricity • The RLDC will work as per the Indian Electricity Grid Code (IEGC) to ensure integrated operation of the power system in the concerned regions. • It has to monitor grid operations, keep accounts of the quantity of electricity transmitted through the regional grids, exercise supervision and control over the Intra-State transmission. • It will be responsible for carrying out real time operations for grid control and dispatch of electricity within the state through secure and economic operation of the state grid in accordance with grid standards and the state grid code. SARAVANAN SIVAMANI 20
  • 21. Distribution of Electricity • State Commission permits a consumer or class of consumers to receive supply of electricity from a person other than the distribution licensee of his area of supply, such consumer shall be liable to pay an additional surcharge on the charges of wheeling, as may be specified by the State Commission, to meet the fixed cost of such distribution licensee arising out of his obligation to supply. • Distribution companies have been given mandate for achieving complete metering within two years from the enactment of the law. SARAVANAN SIVAMANI 21
  • 22. Different grids of India SARAVANAN SIVAMANI 22
  • 23. Some Landmark Events Of Power Grid • 1948 - Growth of supply systems • 1962- First 220KV Voltage level • 1967- Interconnection Of state Grids to form Regional Grids • 1975- First 400Kv Voltage level • 1989- HVDC Back to Back • 1998- Installation of 765 Kv line(Charged at 400Kv) • 2006- Synchronisation of NR with ER-NER-WR • 2007- Transmission at 765 Kv • 2010/11- Installation of 800Kv HVDC Bi-pole Line SARAVANAN SIVAMANI 23