This document provides an overview of flooding in Assam, India in 2016-17. It discusses the types and causes of flooding in the region, including heavy rainfall and overflowing rivers. The background section explains that 45% of Assam's area is flood-prone due to its location between the Brahmaputra and Barak river basins. The impact of the 2016-17 floods affected over 1 million people, and damaged crops on over 200,000 hectares of land. The document also outlines the state's flood preparedness, response, and mitigation efforts.
The 2020 Assam floods allude to a severe flood occurrence on the Brahmaputra River in the Indian state of Assam that coincided with the COVID-19 epidemic. Flooding began in May 2020 as a result of severe rain, impacting 30,000 people and ruining crops in five regions. As of October 2020, flooding had impacted over five million people, taking the lives of 123 individuals and causing an additional 26 deaths owing to landslides. 5474 villages had been devastated, and over 150 thousand people had sought refuge in relief camps.
Brief Description of Kerala Flood of 2018
and In starting some flood infomation is also discussed
and also given information about donation by diffferent peoples and commpanys and states.
Disaster Management Flooding and Landslidesonika patel
Management of disaster on the basis of Guidelines framework, of landslide & Flooding with the respective case study and flood forecasting and management
The 2020 Assam floods allude to a severe flood occurrence on the Brahmaputra River in the Indian state of Assam that coincided with the COVID-19 epidemic. Flooding began in May 2020 as a result of severe rain, impacting 30,000 people and ruining crops in five regions. As of October 2020, flooding had impacted over five million people, taking the lives of 123 individuals and causing an additional 26 deaths owing to landslides. 5474 villages had been devastated, and over 150 thousand people had sought refuge in relief camps.
Brief Description of Kerala Flood of 2018
and In starting some flood infomation is also discussed
and also given information about donation by diffferent peoples and commpanys and states.
Disaster Management Flooding and Landslidesonika patel
Management of disaster on the basis of Guidelines framework, of landslide & Flooding with the respective case study and flood forecasting and management
Presentation contains Detailed Introduction, types, classification, features, prevention & precaution, causes, effects, indications and Two case studies of Indian context.
Rapid Damage and Needs Assessment Report (RDNA), post-Cyclone Phailin in Odisha, was prepared in response to a request from the Department of Economic Affairs (DEA), Government of India (GoI). It was undertaken jointly by the Government of Odisha (GoO), the Asian Development Bank and the World Bank.
The RDNA team visited Bhubaneswar (Odisha) and the three most severely affected districts of Ganjam, Puri and Khordha, from November 26 to December 3 2013, and collaborated with the GoO to assess the damage and develop a recovery and restoration framework.
Everything you need to know about a disaster and their management. The slides start with an introduction of disaster their types, effects, and preventions to the initiatives taken by the government to manage reliefs and readiness.
This ppt is about the whole framework of Disaster Risk Management in India and its structure in India. Furthermore, it highlights the issue, challenges and suggestions regarding the September, 2014 Floods in Jammu and Kashmir state.
Disaster & Climate Risk scenario in India & Assam – A Factual Over View Date:...Bibhuti Bhusan Gadanayak
Global natural disaster trends from 1900 to 2014
Major disasters in India (1980-2016)
Top 10 natural disasters in India for the period 2005 to 2016
Top 10 natural disasters in India for the period 2005 to 2016 sorted by no. of total affected people
Top 10 natural disasters in India for the period 2005 to 2013 sorted by economic damage cost
Percentage of people affected by different disasters in India Estimate economic damage reported by disaster type
Hazard profile of Assam & India
Hazard profile of Assam
Disaster Risk Reduction
Aspects of DRR
What is Climate Change ?
Alaska Columbia glacier recedes rapidly
Increased Climate Change Threat
Manipur earthquake fresh in blood
The unforgettable pilgrimage 2013
Assam Floods in 2016 ………impact
Assam Floods in 2017 ………recent impact
Why is Safe Schools important in South Asia?
School Disasters
this presentation gives a brief about what are the different types of floods depending upon area & its cause.It is further aided with mitigation or management techniques to be implemented & types of damages.
Gram Panchayat Development Plan (GPDP) and Disaster Risk Reduction in Assam,...Bibhuti Bhusan Gadanayak
GPDP (GRAM PANCHAYAT DEVELOPMENT PLAN) is a comprehensive plan for complete development of the village panchayat (Local self Governence). It aims to expand the governing space of the Village Panchayat and to empower it as a development institution. By comprehension, it is meant to say that the plan is aimed at: Improving the basic amenities of the village panchayat. This includes sanitation, connectivity, drinking water, storm water drainage, burial grounds, etc........................................
Presentation contains Detailed Introduction, types, classification, features, prevention & precaution, causes, effects, indications and Two case studies of Indian context.
Rapid Damage and Needs Assessment Report (RDNA), post-Cyclone Phailin in Odisha, was prepared in response to a request from the Department of Economic Affairs (DEA), Government of India (GoI). It was undertaken jointly by the Government of Odisha (GoO), the Asian Development Bank and the World Bank.
The RDNA team visited Bhubaneswar (Odisha) and the three most severely affected districts of Ganjam, Puri and Khordha, from November 26 to December 3 2013, and collaborated with the GoO to assess the damage and develop a recovery and restoration framework.
Everything you need to know about a disaster and their management. The slides start with an introduction of disaster their types, effects, and preventions to the initiatives taken by the government to manage reliefs and readiness.
This ppt is about the whole framework of Disaster Risk Management in India and its structure in India. Furthermore, it highlights the issue, challenges and suggestions regarding the September, 2014 Floods in Jammu and Kashmir state.
Disaster & Climate Risk scenario in India & Assam – A Factual Over View Date:...Bibhuti Bhusan Gadanayak
Global natural disaster trends from 1900 to 2014
Major disasters in India (1980-2016)
Top 10 natural disasters in India for the period 2005 to 2016
Top 10 natural disasters in India for the period 2005 to 2016 sorted by no. of total affected people
Top 10 natural disasters in India for the period 2005 to 2013 sorted by economic damage cost
Percentage of people affected by different disasters in India Estimate economic damage reported by disaster type
Hazard profile of Assam & India
Hazard profile of Assam
Disaster Risk Reduction
Aspects of DRR
What is Climate Change ?
Alaska Columbia glacier recedes rapidly
Increased Climate Change Threat
Manipur earthquake fresh in blood
The unforgettable pilgrimage 2013
Assam Floods in 2016 ………impact
Assam Floods in 2017 ………recent impact
Why is Safe Schools important in South Asia?
School Disasters
this presentation gives a brief about what are the different types of floods depending upon area & its cause.It is further aided with mitigation or management techniques to be implemented & types of damages.
Gram Panchayat Development Plan (GPDP) and Disaster Risk Reduction in Assam,...Bibhuti Bhusan Gadanayak
GPDP (GRAM PANCHAYAT DEVELOPMENT PLAN) is a comprehensive plan for complete development of the village panchayat (Local self Governence). It aims to expand the governing space of the Village Panchayat and to empower it as a development institution. By comprehension, it is meant to say that the plan is aimed at: Improving the basic amenities of the village panchayat. This includes sanitation, connectivity, drinking water, storm water drainage, burial grounds, etc........................................
Myanmar is prone to different kind of natural hazards. This information sheet provides a brief overview of the disaster management system of Myanmar and its approach towards disaster management. It explains the system, legalization, the policies and plans, and the disaster management institutions.
This power point presentation gives a brief outlook about the need of Disaster Risk Management and its Structure in India. Further, it highlights issues, challenges and suggestions regarding September, 2014 Floods in Kashmir Valley.
Emergency response preparedness plan (erpp) myanmarThành Nguyễn
In 2014 the Humanitarian Country Team decided to update the response plan and apply the new guidance for Inter-Agency Response Preparedness (ERP) as an action oriented approach to enhance readiness for humanitarian response. The approach improves effectiveness by reducing both time and effort, and enhances predictability through establishing predefined roles, responsibilities and coordination mechanisms. The Emergency Response Preparedness Plan (ERPP) is divided into four components: (i) Risk Assessment and Monitoring, (ii) Minimum Preparedness Actions, (iii) Contingency Response Planning, and (iv) Standard Operating Procedures for the Initial emergency response.
in this presentation to get the knowledge about the wireless power transmission in the power system. from this presentation easy to learn about the "How to power transfer without using the wire?" . To give the advantages , Disadvantages and the applications of the Wireless Power Transmission System.
making a review seminar on the topic of flywheel energy storage system. For easy to learn about the flywheel energy storage system . this presentation making from the one ieee standard research paper on the flywheel energy storage system
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...Open Access Research Paper
Micro RNAs (miRNAs) are small non-coding RNAs molecules having approximately 18-25 nucleotides, they are present in both plants and animals genomes. MiRNAs have diverse spatial expression patterns and regulate various developmental metabolisms, stress responses and other physiological processes. The dynamic gene expression playing major roles in phenotypic differences in organisms are believed to be controlled by miRNAs. Mutations in regions of regulatory factors, such as miRNA genes or transcription factors (TF) necessitated by dynamic environmental factors or pathogen infections, have tremendous effects on structure and expression of genes. The resultant novel gene products presents potential explanations for constant evolving desirable traits that have long been bred using conventional means, biotechnology or genetic engineering. Rice grain quality, yield, disease tolerance, climate-resilience and palatability properties are not exceptional to miRN Asmutations effects. There are new insights courtesy of high-throughput sequencing and improved proteomic techniques that organisms’ complexity and adaptations are highly contributed by miRNAs containing regulatory networks. This article aims to expound on how rice miRNAs could be driving evolution of traits and highlight the latest miRNA research progress. Moreover, the review accentuates miRNAs grey areas to be addressed and gives recommendations for further studies.
Diabetes is a rapidly and serious health problem in Pakistan. This chronic condition is associated with serious long-term complications, including higher risk of heart disease and stroke. Aggressive treatment of hypertension and hyperlipideamia can result in a substantial reduction in cardiovascular events in patients with diabetes 1. Consequently pharmacist-led diabetes cardiovascular risk (DCVR) clinics have been established in both primary and secondary care sites in NHS Lothian during the past five years. An audit of the pharmaceutical care delivery at the clinics was conducted in order to evaluate practice and to standardize the pharmacists’ documentation of outcomes. Pharmaceutical care issues (PCI) and patient details were collected both prospectively and retrospectively from three DCVR clinics. The PCI`s were categorized according to a triangularised system consisting of multiple categories. These were ‘checks’, ‘changes’ (‘change in drug therapy process’ and ‘change in drug therapy’), ‘drug therapy problems’ and ‘quality assurance descriptors’ (‘timer perspective’ and ‘degree of change’). A verified medication assessment tool (MAT) for patients with chronic cardiovascular disease was applied to the patients from one of the clinics. The tool was used to quantify PCI`s and pharmacist actions that were centered on implementing or enforcing clinical guideline standards. A database was developed to be used as an assessment tool and to standardize the documentation of achievement of outcomes. Feedback on the audit of the pharmaceutical care delivery and the database was received from the DCVR clinic pharmacist at a focus group meeting.
Natural farming @ Dr. Siddhartha S. Jena.pptxsidjena70
A brief about organic farming/ Natural farming/ Zero budget natural farming/ Subash Palekar Natural farming which keeps us and environment safe and healthy. Next gen Agricultural practices of chemical free farming.
UNDERSTANDING WHAT GREEN WASHING IS!.pdfJulietMogola
Many companies today use green washing to lure the public into thinking they are conserving the environment but in real sense they are doing more harm. There have been such several cases from very big companies here in Kenya and also globally. This ranges from various sectors from manufacturing and goes to consumer products. Educating people on greenwashing will enable people to make better choices based on their analysis and not on what they see on marketing sites.
WRI’s brand new “Food Service Playbook for Promoting Sustainable Food Choices” gives food service operators the very latest strategies for creating dining environments that empower consumers to choose sustainable, plant-rich dishes. This research builds off our first guide for food service, now with industry experience and insights from nearly 350 academic trials.
Characterization and the Kinetics of drying at the drying oven and with micro...Open Access Research Paper
The objective of this work is to contribute to valorization de Nephelium lappaceum by the characterization of kinetics of drying of seeds of Nephelium lappaceum. The seeds were dehydrated until a constant mass respectively in a drying oven and a microwawe oven. The temperatures and the powers of drying are respectively: 50, 60 and 70°C and 140, 280 and 420 W. The results show that the curves of drying of seeds of Nephelium lappaceum do not present a phase of constant kinetics. The coefficients of diffusion vary between 2.09.10-8 to 2.98. 10-8m-2/s in the interval of 50°C at 70°C and between 4.83×10-07 at 9.04×10-07 m-8/s for the powers going of 140 W with 420 W the relation between Arrhenius and a value of energy of activation of 16.49 kJ. mol-1 expressed the effect of the temperature on effective diffusivity.
2. contain
1. Introduction
2. Type of flood
3. Causing of flood
4. Background of Assam state
5. Impact of flood disaster
6. Preparedness
7. Response
8.Mitigation
9.Refrence
6. 4.Background of Assam state
Floods are a recurring phenomenon in Assam, as 45% of its area is prone to
floods.
Assam lies in the middle of the Brahmaputra and Barak basins. The
Brahmaputra basin is one of the largest river basin in the northeast region
of India. The river Brahmaputra originates from the semi-arid region of
south Tibet.
Apart from the heavy rainfall that occurs in the State, the Brahmaputra
and its tributaries and the Barak river and their tributaries swell up during
the monsoon on account of rains in the upper reaches of the catchment
areas of various rivers, which include China, Myanmar and Bhutan, besides
the neighbouring states of India i.e. Arunachal Pradesh, Meghalaya and
Nagaland.
12. 5.1 Pre impact
Early warning
Mobilization
Organizing of team, role of definition
Emergency center open
13. 5.2 On Impact
The situation began to turn critical ever since the state experienced pre-monsoon showers in April and
May this year. The breach in embankments along the Brahmaputra river and its various tributaries has
caused flooding in 23 out of 35 districts in the state and has submerged crops in over 2 lakh
hectares.
Consequently, 1.1 million people have been affected, with 28 persons losing their lives and over 1.5
lakh persons seeking shelter in over 460 relief camps.
With 80% of the famous Kaziranga National Park submerged, Assam’s pride – the one-horned
Rhinos and other wildlife across the state, have had to face the brunt of swelling waters.
Over the years, maximum erosion has taken place in South Assam region, with Makalmua in Nalbari ,
Majuli island , Goalpara area and Morigaon being most affected.
14.
15. 5.3 post impact
Post flood
Recovery action
Clearing up Public health advice
Flood supporting
scheme
Insurance co.
Special team
Removal & disposal
contaminated
material
Drinking water,
external
environment
Health register after
flood
Repair & renew
grant
Business supporting
scheme
Flooding relief
16. 6. Preparedness
Preparedness action is carried out within the context of disaster risk management and
aims to build the capacities needed to efficiently manage all types of emergencies and
achieve orderly transitions from response through to sustained recovery.
Preparedness is based on a analysis of disaster risks (risk assessment) and good linkages
with early warning systems and including such activities as:
1. contingency planning
2 stockpiling of equipment and supplies
3. the development of arrangements for coordination
4. evacuation and public information, and
5. associated training and field exercises
17. 6.1 Preparedness Plane
Business continuity plan Operational plan
Addition private sector and
utility/lifeline agencies
should prepare plan that
threaten to disrupt their
normal operations during
events. The output of these
processes can be captured in
business continuity plan.
which provides details of
tasks (before, during and
after disaster), timeline for
actions and roles and
responsibilities for
response and minimize
service outages.
18. Hazard specific plan
Rupture, Liquefaction – Ground Failure,
Landslides – Earth movement, water
bodies/reservoirs caused by Earthquake.
19. Hazard Primary Agency Supporting Guidelines
and Plans (issued by
National / State)
Floods Water Resources
Department
NDMG on Floods
Primary
Responsibility
Department Plan title
Flood Protection and
River Erosion
Management &
Drainage
Development Works
Water Resources
Department
Embankment
Protection/Restoration
and Contingency Plan
Flood Preparedness
Contingency Plan
20. 6.2 Continuing Community Awareness, Education &
Training
Community is the key
stakeholder and action taken
across will build resilience.
Capacity is enhanced through
focused and targeted means
of awareness building,
education and training, and
practice through drills.
21. The pedagogy, content of packages
and approach of delivery will
depend on range of parameters
including geographical, social,
economic and cultural aspects.
ASDMA has outlined the needs
through conduct of Training and
Needs Assessment study for all key
stakeholders in the State.
22. 6.3 Training and Certification
Standardization of training is important and for this there is a need to develop target
oriented course, evaluation and certification.
Reporting of training across the State should be made available through the form of annual
report.
Assam State Disaster Management Authority(ASDMA) has already undertaken Training
Need Assessment study to identify the training and non-training requirements of the
different departments and capacity gap in DM.
ASDMA has identified key national resource institutions to develop training module and
impart quality assured trainings.
23.
24. • Earthquake resistant design for engineers and
architects
• Seismic strengthening and Retrofitting of buildings
and infrastructure
• Construction technology training for construction
workers
• Assessment of seismic safety of buildings and
infrastructure
• Damage and Needs Assessment Search and Rescue
& First Aid
• Flood Rescue
• Mass Casualty Management
• Trauma Management
• Hospital preparedness and Mass Casualty
Management
• Collapsed Structure Search and Rescue and
Medical First Response
• Climate Change and cross cutting themes
25.
26. 6.4 Knowledge Management Strategy
Networking of knowledge is essential for strategic thinking in DM.
There is need for establishing a platform which can feed to the needs of information
sharing in DM as well as provide access to knowledge database on DM in Assam and the
North-East region.
ASDMA shall establish knowledge hub in disaster management with an aim to collaborate
and connect stakeholders, share information and capture knowledge.
The knowledge hub can serve as a regional hub for exchange of information and
knowledge products in Disaster Management across North-East States of India.
27. 7. Response
Natural disasters and other severe incidents have shown the importance of emergency
response in order to save lives, minimize damage and ensure continuity of social functions
as well as business operations of the State.
Response activities are sequence of actions required including conduct of search and
Rescue, mobilization of emergency equipment's and services, undertake operations to
keep population and assets from harm’s way.
Response requires immediate activation of functions, high level of planning, understand
nature of the hazards/disaster (sudden onset, slow onset, extend incident), interpretation of
warning, gathering of structured information, mobilization/deployment of resources and
demonstrate coordination skills while undertaking operations.
29. L0
denotes normal times which are expected to be utilized for close monitoring,
documentation, prevention, mitigation and preparatory activities.
L1
L2
L3
specifies disasters that can be managed at the district level, however, the state
and center will remain in readiness to provide assistance if needed
specifies disaster situations that may require assistance and active
participation of the state, and the mobilization of resources at the state level.
disaster situations arise from largescale disasters where districts and the state
may not have the capacity to respond adequately and require assistance from
the central government for reinstating the state and district machinery.
Response Severity Level Description of the Level
32. 7.3 Community Participation in Disaster Response
A number of community based organizations like NGOs, Self
Help Groups (SHGs), Youth Organizations, Volunteers of
Nehru Yuva Kendra sangthan (NYK), Civil Defense (CD) &
Home Guard, etc., and workers of different projects funded by
Government of India like National Rural Health Mission
(NRHM), Integrated Child Development Services (ICDS) etc.,
normally volunteer their services in the aftermath of any
disaster.
A large number of community based Disaster Management
Teams (DMTs) / volunteer were also formulated in the United
National Development Programed (GoI-UNDP).
34. 8. Mitigation
Mitigation means lessening or
limitation of the adverse impacts of
hazards and related disasters .
The adverse impacts of hazards often
cannot be prevented fully, but their
scale or severity can be substantially
lessened by various strategies and
actions.
35. 8.1 Mitigation Measures Encompass
Design
improvements or
hardenings the
infrastructure to
hazard risks
Engineering
techniques
Enhancing the
serviceability of
systems and its
elements under the
action of the
hazard
Non-structural
elements
Risk sensitive future
land use planning
and regulatory
frameworks
for building
standards
Improved policies
Planning/buildings
resilience of the
communities and
systems including
lifeline
infrastructure
Ability to recover
36. 8.2 Goals for Hazard Risk Mitigation
Hazard identification
Minimize loss of life
and injuries
Minimize damage, disruption of
services
Minimize damage to environment
37. 01
02
Monitoring safety and strengthening of
critical infrastructure/facilities,
lifeline infrastructure from all hazards
03
Implementation of National Building Code
2007 and relevant BIS code
for life safety in all construction and
development activities
04
Development of State wide comprehensive
mitigation policy and plan
PATH TOWARDS
HAZARD
MITIGATION
Integration of DM in future/
development plan, new
programmes/schemes and projects
38. 9.Refrences
http://ndma.gov.in (National Disaster Management Authority)
http://sdmassam.nic.in (Assam State Disaster Management Authority)
http://asfo.org (State Fire Service Organization, Assam)
http://dpeasom.gov.in/index.html (Department of Public Enterprises, Govt
of Assam)
http://assamforest.in/common/ (Department of Environment & Forests,
Govt of Assam)