SlideShare a Scribd company logo
1 of 38
Download to read offline
GROWTH
MODEL
Overall direction for the entity to grow, it
gives a concrete framework for the entity’s
major growth strategies.
Whyneed
THAT
Elephant in the room
-How does it affect my LC?
-What benefit do I get from
this in my term?
-Does it make any difference
if it is there or not?
-How should this be useful to
me or my EB?
The answer is, to widen our line of sight & to think long term 
It’s a matter of long term thinking. It is where
we consider the most critical variable and plan
according to a unified direction. Having a
growth model enables strategic continuity and
internal guidance on operations while bringing
stable organizational health through out the
growth path in every reality by pointing out
every possible internal synergy points.
HOW WE CAME TO THIS
RESEACH
LCPs
MEETING
TASK
FORCE
MC
STRATEGIES
STRUCTURE
GROWTH
PATH
1st
IMPLEMEN
TATION
2nd
IMPLEMEN
TATION
PREVIOUS SYSTEM
iGIP
oGCDP
oGIP
iGCDP
PROTOTYP
E
NEW SYSTEM
TIERS SYSTEM
CLUSTERS COMBINATION
Where are we right now?
KATOWICE
LUBLIN
ŁÓDŹ
POZNAŃ
TORUŃ
WARSZAWA SGH
WROCŁAW UE
WROCŁAW UT
KAKÓW WARSZAWA UW
BIAŁYSTOK
GDAŃSK
KIELCE
OLSZTYN
RZESZÓW
SZCZECIN
TIER 4 TIER 3 TIER 2 TIER 1
iGCDP
KRAKÓW
POZNAŃ
WARSZAWA SGH
WARSZAWA UW
WROCŁAW UT
BIAŁYSTOK
GDAŃSK
KATOWICE
KIELCE
LUBLIN
ŁÓDŹ
OLSZTYN
RZESZÓW
SZCZECIN
TORUŃ
WROCŁAW UT
TIER 4 TIER 3 TIER 2 TIER 1
oGCDP
KATOWICE
KRAKÓW
POZNAŃ
WARSZAWA UW
BIAŁYSTOK
GDAŃSK
KIELCE
LUBLIN
ŁÓDŹ
OLSZTYN
RZESZÓW
SZCZECIN
TORUŃ
WARSZAWA SGH
WROCŁAW UT
TIER 4 TIER 3 TIER 2 TIER 1
oGIP
WARSZAWA UW WROCŁAW UE
BIAŁYSTOK
GDAŃSK
KATOWICE
KIELCE
KRAKÓW
LUBLIN
ŁÓDŹ
OLSZTYN
POZNAŃ
RZESZÓW
SZCZECIN
TORUŃ
WARSZAWA SGH
WROCŁAW UT
iGIP
TIER 4 TIER 3 TIER 2 TIER 1
e Elements OGCDP IGCDP OGIP IGIP
Tier 4 (Basic)
# of Exchanges 0-24 0-35 0-12 0 - 12
Operations
-Focus on alighment with global peaks
-Focus on IXP
-Focus on Synergy with Marketing
-Focus on University Relations.
-EP Lead implementation
- Realisation of International Kindergarden, Kid-speak,
World Talks as a priority.
- Realisation of whole national portfolio after
realisations of IK+KS/WT
- No local projects.
- Focus on may-june; september-october; january-
february realisations
- Tracking of LEAD-delivery
- work only on global peaks
- focus on one subproduct based on market research
- work on national CYPs
- ep lead implementation
- head hunting for specific offers
- focus on IXP
-1 subproduct is explored in the market
-Market segmentation
-Cold Calling
-EP Lead implementation
-Sale through LDM
S&D
-Focus on Country Partners only
-informal partnerships
- Work with level-1 and level-2 CY-partners only
- 1 LC2LC cooperation
- Opening of forms in 4 month before realisation
- focus on national partnerships - work only on them
- target specific profiles for one subproduct
-Capitalize on EP Supply only through National Country
Partners
-Minimalize the no.of Country Partners
-Working on the exchange peaks, focus on the summer
peak
(RE: March, April, MA: April, May, RE: June, July, August)
TM
-full implementation of MUST sessions from national
PEC + the biggest focus on:- Basic customer flow &
Standard Operating Principles education
- Focus on Sales Education
- Focus on MM Education
- full implementation of Team Minimums
- create an incentive systems (R&R) for OCs & OCPs
based on number of matches
- adjust recruitment timeline to exchange peaks &
timeline
- boosting IXP
- Basic education on sales
- Basic education on matching (expa)
- Basic education on delivery (S&S)
- Deep explanation of LDM and LEAD for OCPs
- team minimums full implementation
- team minimums full implementation: every person
working in oGIP has to to have specific JD - focus on
productivity
- full implementation of MUST sessions from national
PEC + the biggest focus on:- Basic customer flow &
Standard Operating Principles education
- Focus on Sales Education
- focus on understanding of program and product
- boosting IXP
- adjust recruitment timeline to exchange peaks &
timeline
-Team Mimimums full implementation:
every person working in iGIP has to to have
specific JD - focus on productivity
and bigger focus on the: functional trainings for
sale,
-From National PEC full implementaton of MUST
-JD based on sale plans
-Sale r&r driving culture of achievemet
MKT/ BRAND
- Market Analysis & Segmentation
- following National Promotional Campaign
- iXP Promotion
- Fous on Online promotion
- No strong coop from MKT
- National sales-proposals
- National materials for Global Host promotion
- Internal buddy recruitment system
- market analysis and segmentation - choose one specific
subproduct and targets
- working on national timeline, use national materials
- focus on internal promotion - showcasing EPs in
network for faster matching
- focus on pocket recruitment and online promotion
Portfolio narodowe
testymoniolane/EP storytelling już teraz
FIN
Basic financial investments in online promotion
- Legality Education
- Income from TN-takers
- No money for hosting
- Hosting is covered by TN-takers
Basic financial investments in online promotion Basic financial investment in the business card,
networking (booklet....) w co można zainwestować
Culture
Culture of Growth
Create Area culture ( Team Name, Vision, etc..)
- Start of iGCDP in LC
- Involvement in iGCDP delivery of whole local chapter
- start creating culture of oGIP - vision, team stand etc
- "every experience matters" - culture of productivity
-Creation the iGIP team purpose and team stand
Challenges
-Operational Understanding
-Market Penetration
-Talent Capacity & financial resources.
- Low engagement of structures
- Low understanding of AIESEC
- No experience in operations
- No or bad branding in market
- lack of knowledge, wrong understanding of product
- low understanding of product that can create wrong
message which atrracts wrong profiles
- lack of market research & segmentation
- not enough talent capacity
-Pipeline HR in area
-Sales knowledge
-Understanding of the MVP
-Lack of the constant Market Research
-Lack of the talent capacity in the area/ productivity
OS
-1 LCVP oGCDP
-1 OCP Project Based Structure (5OCs)
-1 LCVP Marketing
-1 OCP oGCDP Promo (3 OCs)
- 1 LC VP, responsible for this area
- (OCP+5OCs) per 12 Xchanges
- 3 teams per year (according to peaks)
- Project-based structure
- VP iGCDP works operationally (learning by doing)
- LCVP oGIP or COO oGIP
- 1 OCP Project Based Structure (EP LEAD + HR) and 1
OCP promo (under mkt)
- at least 3 OCs in project
-1 LCVP iGIP
-1 OCP + structure based on project (4 OC)
-2 Team per a year for 2 peaks: (winter, summer)
BD
- - No support from BD - sales education (!)
- help in Uni Relations
brak LCVP BD w radzie wykonawczej (w radzie jest
LCVP iGIP)
EDUKACJA W lcrobienie MRwiedza sprzedażowa finalna
odpowiedzialność za iGIP
Tier 3 (Intermediary)
# of Exchanges 24-49 36-90 13-30 13 - 26
Operations
-Standardized processes
- Promo & Match at the same time.
- EP Lead Implementation
- IXP
- Upscalling University Relations.
- Realisation of whole national portfolio
- Focus on may-june, june-july, july-august, september-
october, december-january, january-february realisations
- Start working with market expansions, if needed.
- 1 Local project
- EP-fee implementation (up to 33% of Xchange results)
- focus on 1-2 subproducts
- market analysis and segmentation
- focus on univesity relations
- allign to global exchange peaks - only
- focus on customer orientation - ep lead implementation
- optimize all procesess and focus on proper education
- IXP
-Focusing on 1-2 subproducts
-Market Segmentation ON 2 SECTORS,
FOCUS MARKET SEGMENTATION
-Focus on the re-raising
S&D
- Start working on LC2LC partnerships ( at least 5 main
partnerships )
- Work with level-1 and level-2 CY-partners
- Up to 3 LC2LC cooperations with level-1 CY-partners
- Possibility of CY2LC partnership
- Opening of forms in 4 months before realisation (minimum)
- focus only on national IR and CYP
- work on global peaks
- IR help from MC
- Capitalize on high EP Supply countries
-Working on the exchange peaks:
RE: March, April, MA: April, May, RE: June,
July, August)
and
RE: August, September, October, MA: October,
November, December, RE: December, January,
Februrary
TM
- OCPs advanced Empowerment.
- Team Minimums full implementation
- Have to deliver Must & should from national PEC- the
biggest focus on sales Education for OCs
- boost IXP
- All of the above
- Education on advanced sales(market penetration,
convertion rate etc.)
- Education on account management (CRM)
- Markteting education
- LEAD delivery education
- R&R of behaviours in iGCDP (commitment etc.)
- project based structure
- focus on education about product
- focus on productivity
- sales education
- Team Minimums full implementation
- bigger focus on building specific JD for everyone
- Have to deliver Must & should from national PEC- the biggest
focus on sales Education for OCs
- boost IXP
- R&R boosting matching
Team Minimums focus on the sale knowledge
- Create member JD (productivity at least
1ex per a person)
Team Minums
optimaization of the recrutiment process for the peaks (dodać
też do 4)
PEC z should have to be delivered (poprawić narodowy PEC
-optimalization of the recrutiment and
adjusting for the exchange peaks
--Sale r&r driving culture of achievemet
MKT/ BRAND
-Focus on Market Expansions(New Universities)
-Keep on focus on online promo, start devolping stronlgy
offline promotion
-Development of promo campaign (based on history and
analytics)
-Focus on working and developing Market Analysis
- First Global Host team/coordinator under MKT
- National sales/promo materials
- External buddy recruitment system
- EwA2ELD implementation into external buddy system.
- Global Village start
- B2B showcasing events (gala for partners) starts
- Partner-servicing and re-raising &EwA2ELD strategies
developed with VP Mkt
- focus on targeted promotion for specific subproducts
- allign to national promo timeline
- focus more on online promotion and reintegration events for
attracting new students (like ComeBack Story events)
- focus on headhunting and internal promotion (done by OGX
team)
-infosessions or workshops delivered by @ers and Alumni
- Ensure Clear and Strong Brand for Focus SP (Enforce Brand
Guidelines etc.)
- Generate leads through networking
- Alumni Relations
-Linkedin management
-EP stories showcasing
-RETENCJA KLIENTÓW AKTYWNOŚCI: reraising
mailng, newsletter pod iGIP
-Account Management (
FIN - Investment in Offline promo campaigns.
- Sales GH+Opportunity-fee.
- Investments in accomodation (only in EP-fee projects)
- Investment on expansions raising (post expendatures,
travels with EPs for first working day)
- Printing of external buddy promo-materials
- Income from national partners
- investments in offline promotions and events
-Basic financial investment in the business card,
networking
-Invest in sales education and B2B Marketing
opportunities (Linkedin premum account)
INVESTMENT IN S&S
DELIVERY!!!
Culture - Culture of achievement & Growth
- iGCDP as a Growth Driver (oGCDP synergy mainly)
- Culture of growth
- International atmosphere
- culture of achievements & growth mindset
- spread oGIP culture among other LC members
-iGIP as a focus programme
-created culture of the iGIP area in the LC THROUGH
showcasing of the EP story inside the LC
Challenges
Matching Efficiency,
New Markets Penetration.
Team minimums implementation & OCPs/OCs Productivity
- Big spendings on accomodation
- Unapropriate spendings of money for "extra" benefits
- Bigger amount of operations
- Managing of big realisation peaks (may-july+dec-feb)
- LEAD delivered not in every experience
- lack of understanding of product and market
- OCs engagement and productivity
- processes efficiency
- culture of achievment implementation
- targeted promotion and working on specific subproducts
- IR focus
-wrong understanding of the MVP
-lack of the Market understanding
-> PEC szkolenie do tego
-small OCPs/OCs engagement
-lack of culture of achievement
-not working on the exchange peaks
OS
1 LCVP oGCDP
1 OCP HR (5 OCs)
1 OCP Matching (EP Development) (3 OCs)
1 LCVP Marketing
2 OCP oGCDP Promo (3 OCs per project)
- One LC VP iGCDP
- For projects - (1OCP+5OCs) per 15Xchanges
- (Reception) iGCDP GH-teams for may-july and dec-feb
realisations (1OCP+1OCGH+1OCLog+1OCShowcase), as a
supporting body of project-teams
- VP iGCDP almost not working operationally
LCVP oGIP
COO HR (shortlisting, RB certification, education)
OCP Project Based Structure - min 5 OCs
OCP Promo (Under MKT)
1 LCVP (iGIP+BD)
OCP Raising+4 OCs (1Subproduct)
OCP Delivery +5 OCs (1st subproduct)
Coo B2B na peak bRAND pOSITIONING
LCVP BD ODPOWIEDZIANY zas przedaż
- Common sales education with VP BD - sales education (!)
-clear exchange MoS during every employer
branding event/activity
-Common sales boosting activities
-Common CRM
-Common AM standarization
Tier 2 (Advanced)
# of Exchanges 50-75 91-140 31-55 27 - 53
Operations
-More online and optimized processes.
-Creating a CRM system.
-EP Lead Implementation & Development
-Sub-products development
- Realisation of whole national portfolio
- Several projects running at the same realisation time
- Up to 3 local projects
- EP-fee projects fully functioning and are 50% of results
- Local development of CY-based project
- Start of work for off-peak projects
- allign to global peaks but also focus on opportunities to do
pocket recruitment and match not in the peak ffor specific
opportunities
- creating CRM system to optimize processes
- EP LEAD implementation and development
- subproducts development
- focus up to 3 subproducts
- focus on market expansions
-Working on the at least 2 Subporducts
(marketing+education)
-Working on the JD-based project (national portfolio)
-Upscaling the current partnerships/clients/ op TAKERS from 1 to
5 f.ex
-local BoP for iGIP area
S&D
-Focus on LC2LC Partnerships and upscalling it. ( minimum 10
Partnerships ).
-Focus on selling new countries.
-Raised TNs based on EPs preferences.
- Matching with level-1, level-2 CY-partners
- 8 LC2LC cooprations
- Up to 3 CY2LC cooperations
- Opening of forms not later than 3 months before realisation
- Random matching is not more than 30% of Realisation
- focus on LC2LC partnershios and upscalling it (be coherent with
national partnerships - LC2LC cooperation with national
partnerships
- focus on selling different subproducts to different target groups
- focus on headhunting
- Focused Entity Partnerships
- Co-delivery strategy
-Starting working on the LC2LC partnerships
-Working on the global exchange peaks
TM
Development in OCs JDs.
- Must, should and can from PEC have to be delivered
- TMP recruitment from expansions for oGCDP expansion
structure
- All of the above
- Education on process-structure management
- Education on OP-taker servicing
- Education on massive-sales
- advanced education - create space for innovation
- team minimums fully implemented - focus on tracking
- R&R focused on increase productivity of every member
- Must, should and can from PEC have to be delivered
- work on synergies (include it in JDs)
- focus on sales and marketing education
- recruitment timeline adjusted to exchange peak
- internal CEEDs
- IXP
- Increase Sales Intensity
- Create member JD (productivity at least
2ex per a person)
-Internal CEEDership
-Reallocation to the area
MKT/ BRAND
Focus on PR activities - devolpemnt of media partnerships,
events with returnees etc.
Evolvment in Promo campaigns.
Development of usage of existing channels + think (good
analysis needed!) of adding new channels
- Development of local promo-materials for local projects
- EwA2ELD for external buddies
- Global Village showcasing
- B2B press-conference/gala-report for partners
- Government relations started
- focus on PR activities (events wit EPs + media) and market
expansion
- focus on expanding the reach - new activites and targeted
promotion for specific subproduct
- focus on sales education - how to sell specific subproduct using
our value propositon
- use new channels of promotion - more investments in promo
- evolve in promo campaigns - more diversified campaigns for
specific target groups
- B2B Marketing (Participating in External Events,
-Website Managem0ent)
- Showcasing partnerships to provide more value
- Media Engagement (minimal)
- Alumni Relations
-Pozycjonowanie strony narodowej: fimliniki,
portale na innych stronach, kongresy sprzedażowe
-
FIN
Advanced financial investment in oGCDP Promotional
campaigns
- Money from EP-fee
- Money from OP-takers
- Cost-cutting on Global Host
- Spendings on housing for EP-fee projects
- Income from local grants (for EP-fee projects)
- Income from local partners
- Income from national partners
investments in oGIP - materials, events, online promotion,
offline activities, matching days
-Investment in the networking event
-Organization of the networking event for
the main partners
-Local Landing Pages creation
-Invest in sales education and B2B Marketing opportunities
Culture Culture of achievment & competition
- Strong Growth Driver culture (synergy with iGIP/OGX)
- Culture of innovation
- Culture of growth
- Culture of challenge-breaking
- Culture of enjoyement
- Culture of "One iGCDP in Poland"
culture of achievment and growth, culture of enjoyment, sales
approach, culture of challenges and competition
EXPLORING THE MARKET
Bulding long-term relations with the client
-AM
co-creation of the product with the market
Challenges
EPs Management & tracking
More Market reach
Increase Talent capacity and productivity
- 2 VPs iGCDP
- Mess with process/project based structures
- Lack of standarts fulfillement
- Big money flow
- EP servicing and tracking
- increasing capacity and productivity
- not structured activities
- LCVP focused more on operational work (LCVP's approach
should be more strategic)
- quality of delivered services
- focusing on delivery
-Scale of the operations
OS
Double Layered structure
1 LCVP oGCDP > 3 OCPs project based Structure
1 LCVP oGCDP for expansions 2 OCPs process based Structure
1 LCVP Marketing> 2 OCPs Marketing 1 OCP Online
promotion 1 OCP Offline promotion
- 2 VPs iGCDP are recomended (one responsible for national
portfolio market, other is responsible for EP-fee prj market)
- Project-based structure for project with realisations less
than 18X
- Process-based structure for projects with same OP-takers,
with total realisations >26X
- (OCP+5OCs) per 18X
- Separate reception(OCP+3OCs) team for the months with
realisations of >35X
- VP iGCDP working strategically
LCVP oGIP, COO market expansions + university relations, 3 OCPs
(5 OCs mininmum) Project Based Structure, COO oGIP Mkt + 2
OCPs Promo ( under mkt) divided by subproducts
1 LCVP iGIP/LCVP BD
OCP Raising+4/5 OCs (1Subproduct)
OCP Delivery +3/4 OCs (1st subproduct)
OCP Raising+4/5 OCs (2nd subproduct)
OCP Delivery +3/4 OCs (2nd subproduct)
OCP Brand Positioning under Mkt
no.of clients
account management for stable current
Tier 1 ( Mature )
# of Exchanges 75< 140< 55< 53 <
Operations
-Developed online processes
-Process innovation and optimization
-Sub Products innovation
-Developed CRM system
-Focus on Expansions
- Realisation of whole national portfolio
- Several projects running at the same realisation time
- Innovation on local projects (especially CY-based), based on external
national dyrections
- EP-fee projects fully functioning and are 50% of results
- Focus on increasing of MKT-penetration
- Work on off-peak projects
- developed online processes (EP servicing), sales approach
- work on global peaks, but focus also on off peaks and pocket recruitment
- developed CRM system
- focus on expansions and innovations
- focus on all subproducts, also work on others subproducts (like HR, B&A,
Accounting)
- processes innovation and optimization
-Working on the at least 3 Subporducts
(marketing+education+business)
-Working on the JD-based project (national portfolio)
-Upscaling partnerships
-Local BoP for iGIP area
-Deep Market Exploration
-Market Expansion outside the city
-Reaching new stakeholders / local projects /
new market segments
-praca na buzz marketing
-reraising-rekomendacje
S&D
-Developed LC2LC partnerships ( at least 20 Partnerships )
-Creation of mutual projects with country partners
- LC2LC cooperations with level-1 CY-partners
- CY2LC cooperations
- Work on supply for off-peak
- upscale LC2LC partnerships (possibility of partners which are not country
partners)
- work on mutual projects with country partnets to increase productivity
and efficency
- Promote clustered forms from IR (provide national IR support).
- Specific country based LC to LC partnerships for bulk realizations.
- Co-delivery strategy
-LC2LC partnership
-LC2LC CEEDerships
-80% of exchange comes form the global exchange peaks:
winter+summer
TM
- involvement of OCs in creation,
- external ceeds,
- external education,
- online educational platform.
- All of the above
- Deeper focus on increasing of productivity- innovative initiatives
- Focus on bottom-up initiatives from OCs
- education with external
- innovative initiatives: focus on efficency and productivity of each member
+ R&R
- education: focus on sales
- external CEEDs
- external education
- Focus on bottom-up initiatives from OCs
- IXP
- Increase Sales Intensity
-Creating own sale channels (mkt)
- Create member JD (productivity at least
2ex per a person)
-Internal CEEDerships
-Team Minimums for iGIP (Delivery Part)
-Big pipeline
MKT/ BRAND
University Relations Development
New Promo Strategies
Increased online reach - new metods in online usage
Developed PR activites (mentioned in tier 3)
- SUs creation
Seeking for New Markets
- Showcasing of projects
- Press-conference are hold after all projects
- Government relations developed
- Separate team from MKT department, working on constant
showcasing of iGCDP area on local level
- increase online reach - new metods in online usage
- focus on innovations in promotion
- more events for showcasing (PR activities)
- University Relations helping in promotion
- showcasing (use testimionials)
- B2B Marketing (cREATING in External Events,
-Website Managem0ent)
- Showcasing partnerships to provide more value
- Media Engagement (minimal)
- Alumni Relations-może super wspierać
PR pod iGIP
Robienie glai kończącej edycję
-New sale channel exploration
-EP strorytelling showcasing
-OP Takers testimonials collecting
FIN Bigger investment in Marketing &PR Activties
- Income from local TN-takers
- Income from local grants
- Income from locla and national partners
- Income from EP-fee
- Spendings on accomodation for EP-fee projects
- Cost-cutting initiatives and income initiatives for EP-fee projects
investments in PR activites, online promotion
- Long term investment in the promotional materials
-Invest in sales education and B2B Marketing opportunities
Culture Culture of Over achievement & Global competition
- Culture of achievement
- Culture of global competition
- Culture of enjoyement
- Culture of solution-orientation
- Culture of "One iGCDP in Poland"
culture of achievement, working with other countries on competitions,
massive growth and innovative thinking, culture of sharing, mutual
cooperation with network
-iGIP as a focus programme
-created culture of the iGIP area in the LC
-showcasing of the EP story inside the LC
-inside LC's area positioning
-Strong sale culture
- Goal achievement and ownership at TL and TM level
Challenges
Big Structure Management.
Quality Cases Management
Increasing members Productivity
- Big amount of operations
- 2 LCVPs
- Need of development of products, due to huge market reach.
- EP servicing , tracking
- increase members' productivity
-Forgetting sales intensity
-small NPS
-not working of Standards and Satisfactions
OS
1 LCVP oGCDP > 3 OCPs Project Based structure (5 OCs)
1 LCVP for exapnsions> 3 OCPs each process based structure (2HR
team- 5 OCs each, Delivery- 3 OCs)
1 LCVP Marketing 3 OCPs 1 OCP Offline, 1 Ocp online, 1 OCP expansions
(for SUs)
1 LCVP PR - only if LC is in Tier 1 in all programs (or tier 1 in 3 or tier1 in
2 and tier 2 in 2)
- 2 LCVPs iGCDP
- Project-based structure for project with realisation 20x/prj
- Process-based structure for projects with realisations more than 30X
LCVP oGIP, 1 OCP innovation (at least 5 OCs), 1 OCP HR, 3 OCPs project
based structure, 1 COO MKT, 1 OCP PR, 1 OCP Promo
1 LCVP iGIP, 1 LCVP iGIP albo duży LET, 1 lcvp ER
OCP Raising+5 OCs (1Subproduct)
OCP Delivery +5 OCs (1st subproduct)
OCP Raising+5 OCs (2nd subproduct)
OCP Delivery +5 OCs (2nd subproduct)
OCP Brand Positioning under Mkt
albo 2 zespoły????
BD
cooperation with companies to fund EP fee, insurance companies,
exchange partners
- Support sales
- Common selling manias
- Supporting with CRM and servicing standarts
- uni relations (top student on massive scale)
- cooperation with companies to fund EP fee, insurance companies,
exchange partners
-AM for the more that 5 ex
-Creation local iGIP BoP
-Downscalling national partners to the local level
-Common sales boosting activities
-Cooperation with the Chamber of Comerce
-Cooperation with Governance
CLUSTER SYSTEM
CLUSTER SYSTEM
KATOWICE
LUBLIN
ŁÓDŹ
POZNAŃ
TORUŃ
WARSZAWA SGH
WROCŁAW UT
KRAKÓW
WROCŁAW UE
WARSZAWA UW
BIAŁYSTOK
GDAŃSK
KIELCE
OLSZTYN
RZESZÓW
SZCZECIN
FINAL CLUSTERS
CLUSTER 4 CLUSTER 3 CLUSTER 2 CLUSTER 1
BIAŁYSTOK
GDAŃSK
KIELCE
OLSZTYN
RZESZÓW
SZCZECIN
RECOMENDATION
CLUSTER 4
FOCUS GROWTH IN:
1 (iGCDP) or 2 Exchange PROGRAMS ONLY: iGCDP and (oGCDP | oGIP | iGIP)
KATOWICE
LUBLIN
ŁÓDŹ
POZNAŃ
TORUŃ
WARSZAWA SGH
WROCŁAW UT
CLUSTER 3
FOCUSED GROWTH IN 2 OR 3 Exchange PROGRAMS:
iGCDP and (oGCDP | oGIP | iGIP).
(For now, the growth path is piloted in selected entities)
RECOMENDATION
•
KRAKÓW
WROCŁAW UE
WARSZAWA UW
CLUSTER 2
FOCUS ON (iGCDP) IN 3 OR 4 Exchange PROGRAMS:
iGCDP and (oGCDP | oGIP | iGIP)
(For now, the growth path is piloted in selected entities)
RECOMENDATION
CLUSTER 1
FOCUS ON 3 OR 4 Exchange PROGRAMS: iGCDP and (oGCDP | oGIP | iGIP)
RECOMENDATION
WHAT IS OUTCOME OF GROWTH
MODEL ?
- Coaching
- Planning
- RnR model
- FO/BO alignment
- Implementation framework
- Internal communication (Conferences etc. included)
- Long term goals planning
Q&A
THANK YOU SO MUCH 
Go to the following link to see the GM:
https://docs.google.com/spreadsheets/d/13HStK6Id2XQk0XgCYpMxoB
Q5j92tpnEei1tqyQ_m-1Q/edit#gid=416915909

More Related Content

What's hot

Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement maggie4667
 
AIESEC Romania 12-13 Job Descriptions
AIESEC Romania 12-13 Job DescriptionsAIESEC Romania 12-13 Job Descriptions
AIESEC Romania 12-13 Job DescriptionsMichael Omescu
 
Balancing growth in both OGX programmes
Balancing growth in both OGX programmesBalancing growth in both OGX programmes
Balancing growth in both OGX programmesAIESEC
 
Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3AIESEC
 
Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP AIESEC
 
oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences AIESEC
 
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4AIESEC
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DAIESEC
 
Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1AIESEC
 
iGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsiGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsAIESEC
 
Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP AIESEC
 
AIESEC Marketing OGX Structures
AIESEC Marketing OGX StructuresAIESEC Marketing OGX Structures
AIESEC Marketing OGX StructuresCrisette Arcilla
 
AIESEC in Poland Expansions report.pdf
AIESEC in Poland Expansions report.pdfAIESEC in Poland Expansions report.pdf
AIESEC in Poland Expansions report.pdfaiesec_poland
 
iGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DiGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DAIESEC
 
Tier 1 IXP for oGIP
Tier 1 IXP for oGIPTier 1 IXP for oGIP
Tier 1 IXP for oGIPAIESEC
 
6. AF Specific Questions
6. AF Specific Questions6. AF Specific Questions
6. AF Specific QuestionsRoxana Caragea
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementAIESEC
 

What's hot (20)

Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement
 
AIESEC Romania 12-13 Job Descriptions
AIESEC Romania 12-13 Job DescriptionsAIESEC Romania 12-13 Job Descriptions
AIESEC Romania 12-13 Job Descriptions
 
Balancing growth in both OGX programmes
Balancing growth in both OGX programmesBalancing growth in both OGX programmes
Balancing growth in both OGX programmes
 
Synergy, Raising,MOS and OS
Synergy, Raising,MOS and OSSynergy, Raising,MOS and OS
Synergy, Raising,MOS and OS
 
Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3
 
Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP
 
oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences
 
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&D
 
Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1
 
iGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsiGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projects
 
Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP
 
AIESEC Marketing OGX Structures
AIESEC Marketing OGX StructuresAIESEC Marketing OGX Structures
AIESEC Marketing OGX Structures
 
AIESEC in Poland Expansions report.pdf
AIESEC in Poland Expansions report.pdfAIESEC in Poland Expansions report.pdf
AIESEC in Poland Expansions report.pdf
 
IXP
IXPIXP
IXP
 
iGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DiGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&D
 
Tier 1 IXP for oGIP
Tier 1 IXP for oGIPTier 1 IXP for oGIP
Tier 1 IXP for oGIP
 
TD Area Plan
TD Area PlanTD Area Plan
TD Area Plan
 
6. AF Specific Questions
6. AF Specific Questions6. AF Specific Questions
6. AF Specific Questions
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline Management
 

Viewers also liked

Blank paper challenge
Blank paper challengeBlank paper challenge
Blank paper challengeRadu Matei
 
Blank paper challenge
Blank paper challengeBlank paper challenge
Blank paper challengeMihai Vîlcu
 
NSC2015 - our growth path ogip
NSC2015 - our growth path  ogipNSC2015 - our growth path  ogip
NSC2015 - our growth path ogipAIESEC UNDIP
 
NSC2015 - Ir & matching
NSC2015 - Ir & matchingNSC2015 - Ir & matching
NSC2015 - Ir & matchingAIESEC UNDIP
 
AIESEC Academy | Exchange Processes
AIESEC Academy | Exchange ProcessesAIESEC Academy | Exchange Processes
AIESEC Academy | Exchange Processesaiesecacademy
 
Membership Education Cycle - Talent Development
Membership Education Cycle - Talent DevelopmentMembership Education Cycle - Talent Development
Membership Education Cycle - Talent DevelopmentFlora Liu
 
AIESEC - IR GUIDELINES FOR LC
AIESEC - IR GUIDELINES FOR LC AIESEC - IR GUIDELINES FOR LC
AIESEC - IR GUIDELINES FOR LC Ahmed Abdulshafi
 
AIESEC Academy | Talent Education
AIESEC Academy | Talent EducationAIESEC Academy | Talent Education
AIESEC Academy | Talent Educationaiesecacademy
 
AIESEC: Develop
AIESEC: DevelopAIESEC: Develop
AIESEC: DevelopAIESEC
 
GET: Membership Selection
GET: Membership SelectionGET: Membership Selection
GET: Membership SelectionAIESEC
 
People Analytics
People AnalyticsPeople Analytics
People AnalyticsAIESEC
 
GET: Membership Planning
GET: Membership PlanningGET: Membership Planning
GET: Membership PlanningAIESEC
 
AIESEC: How to downscale the team standards
AIESEC: How to downscale the team standardsAIESEC: How to downscale the team standards
AIESEC: How to downscale the team standardsAIESEC
 
AIESEC: The Team Standards & Explanation
AIESEC: The Team Standards & ExplanationAIESEC: The Team Standards & Explanation
AIESEC: The Team Standards & ExplanationAIESEC
 
Role of Talent Management
Role of Talent ManagementRole of Talent Management
Role of Talent ManagementAIESEC
 
GET: Induction Guideline
GET: Induction GuidelineGET: Induction Guideline
GET: Induction GuidelineAIESEC
 

Viewers also liked (18)

Blank paper challenge
Blank paper challengeBlank paper challenge
Blank paper challenge
 
Blank paper challenge
Blank paper challengeBlank paper challenge
Blank paper challenge
 
Blank paper challenge
Blank paper challengeBlank paper challenge
Blank paper challenge
 
NSC2015 - our growth path ogip
NSC2015 - our growth path  ogipNSC2015 - our growth path  ogip
NSC2015 - our growth path ogip
 
NSC2015 - Ir & matching
NSC2015 - Ir & matchingNSC2015 - Ir & matching
NSC2015 - Ir & matching
 
AIESEC Academy | Exchange Processes
AIESEC Academy | Exchange ProcessesAIESEC Academy | Exchange Processes
AIESEC Academy | Exchange Processes
 
Membership Education Cycle - Talent Development
Membership Education Cycle - Talent DevelopmentMembership Education Cycle - Talent Development
Membership Education Cycle - Talent Development
 
AIESEC - IR GUIDELINES FOR LC
AIESEC - IR GUIDELINES FOR LC AIESEC - IR GUIDELINES FOR LC
AIESEC - IR GUIDELINES FOR LC
 
AIESEC Academy | Talent Education
AIESEC Academy | Talent EducationAIESEC Academy | Talent Education
AIESEC Academy | Talent Education
 
Local Education Cycle
Local Education CycleLocal Education Cycle
Local Education Cycle
 
AIESEC: Develop
AIESEC: DevelopAIESEC: Develop
AIESEC: Develop
 
GET: Membership Selection
GET: Membership SelectionGET: Membership Selection
GET: Membership Selection
 
People Analytics
People AnalyticsPeople Analytics
People Analytics
 
GET: Membership Planning
GET: Membership PlanningGET: Membership Planning
GET: Membership Planning
 
AIESEC: How to downscale the team standards
AIESEC: How to downscale the team standardsAIESEC: How to downscale the team standards
AIESEC: How to downscale the team standards
 
AIESEC: The Team Standards & Explanation
AIESEC: The Team Standards & ExplanationAIESEC: The Team Standards & Explanation
AIESEC: The Team Standards & Explanation
 
Role of Talent Management
Role of Talent ManagementRole of Talent Management
Role of Talent Management
 
GET: Induction Guideline
GET: Induction GuidelineGET: Induction Guideline
GET: Induction Guideline
 

Similar to AIESEC Poland LC's growth model launch at NPM 2015

Specific questions mcvp corporate development
Specific questions   mcvp corporate developmentSpecific questions   mcvp corporate development
Specific questions mcvp corporate developmentBogdanManeaM
 
Specific questionnaire
Specific questionnaireSpecific questionnaire
Specific questionnaireAlexandru Popa
 
AM1415_Talent Capacity_iGIP
AM1415_Talent Capacity_iGIPAM1415_Talent Capacity_iGIP
AM1415_Talent Capacity_iGIPDenise Tai
 
Codelivery strategy
Codelivery strategyCodelivery strategy
Codelivery strategyPaulo Cortez
 
Specific questionnaire gi po tania serbanoiu
Specific questionnaire gi po tania serbanoiuSpecific questionnaire gi po tania serbanoiu
Specific questionnaire gi po tania serbanoiuTania Serbanoiu
 
Od framework and role across tiers
Od framework and role across tiersOd framework and role across tiers
Od framework and role across tiersChristina Kelman
 
iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DAIESEC
 
National strategic plan AIESEC Romania 12 - 13
National strategic plan   AIESEC Romania 12 - 13National strategic plan   AIESEC Romania 12 - 13
National strategic plan AIESEC Romania 12 - 13alexnegurici
 
NST & MANAGER MC 18 19 AIESEC in CIV 2nd round
NST & MANAGER MC 18 19 AIESEC in CIV 2nd roundNST & MANAGER MC 18 19 AIESEC in CIV 2nd round
NST & MANAGER MC 18 19 AIESEC in CIV 2nd roundKOMENAN Boka
 
Application NST & Manager MC 18 19 AIESEC in CIV
Application NST & Manager MC 18 19 AIESEC in CIVApplication NST & Manager MC 18 19 AIESEC in CIV
Application NST & Manager MC 18 19 AIESEC in CIVKOMENAN Boka
 
Growth model per lcp
Growth model per lcpGrowth model per lcp
Growth model per lcpAIESEC
 
Corporate Development plan
Corporate Development planCorporate Development plan
Corporate Development planOana Burlacu
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyAIESEC
 
Ixp strategy (updated)
Ixp strategy (updated)Ixp strategy (updated)
Ixp strategy (updated)Sophia Fan
 
iGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPiGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPAIESEC
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationAIESEC
 

Similar to AIESEC Poland LC's growth model launch at NPM 2015 (20)

Specific questions mcvp corporate development
Specific questions   mcvp corporate developmentSpecific questions   mcvp corporate development
Specific questions mcvp corporate development
 
Specific questionnaire
Specific questionnaireSpecific questionnaire
Specific questionnaire
 
Big aiesec 1
Big aiesec 1Big aiesec 1
Big aiesec 1
 
AM1415_Talent Capacity_iGIP
AM1415_Talent Capacity_iGIPAM1415_Talent Capacity_iGIP
AM1415_Talent Capacity_iGIP
 
6. edu cycle
6. edu cycle6. edu cycle
6. edu cycle
 
Codelivery strategy
Codelivery strategyCodelivery strategy
Codelivery strategy
 
NCF Customized in oGIP
NCF Customized in oGIPNCF Customized in oGIP
NCF Customized in oGIP
 
Specific questionnaire gi po tania serbanoiu
Specific questionnaire gi po tania serbanoiuSpecific questionnaire gi po tania serbanoiu
Specific questionnaire gi po tania serbanoiu
 
Od framework and role across tiers
Od framework and role across tiersOd framework and role across tiers
Od framework and role across tiers
 
iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&D
 
National strategic plan AIESEC Romania 12 - 13
National strategic plan   AIESEC Romania 12 - 13National strategic plan   AIESEC Romania 12 - 13
National strategic plan AIESEC Romania 12 - 13
 
NST & MANAGER MC 18 19 AIESEC in CIV 2nd round
NST & MANAGER MC 18 19 AIESEC in CIV 2nd roundNST & MANAGER MC 18 19 AIESEC in CIV 2nd round
NST & MANAGER MC 18 19 AIESEC in CIV 2nd round
 
Application NST & Manager MC 18 19 AIESEC in CIV
Application NST & Manager MC 18 19 AIESEC in CIVApplication NST & Manager MC 18 19 AIESEC in CIV
Application NST & Manager MC 18 19 AIESEC in CIV
 
Growth model per lcp
Growth model per lcpGrowth model per lcp
Growth model per lcp
 
Corporate Development plan
Corporate Development planCorporate Development plan
Corporate Development plan
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergy
 
Lc plan how_to
Lc plan how_toLc plan how_to
Lc plan how_to
 
Ixp strategy (updated)
Ixp strategy (updated)Ixp strategy (updated)
Ixp strategy (updated)
 
iGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPiGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDP
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementation
 

More from aiesec_poland

The Ultimate Growth Hacker summer 2016 - Monthly Update 2
The Ultimate Growth Hacker summer 2016 - Monthly Update 2The Ultimate Growth Hacker summer 2016 - Monthly Update 2
The Ultimate Growth Hacker summer 2016 - Monthly Update 2aiesec_poland
 
The Ultimate Growth Hacker summer 2016 - Monthly Update 1
The Ultimate Growth Hacker summer 2016 - Monthly Update 1The Ultimate Growth Hacker summer 2016 - Monthly Update 1
The Ultimate Growth Hacker summer 2016 - Monthly Update 1aiesec_poland
 
MC 1617 booklet fourth round
MC 1617 booklet fourth roundMC 1617 booklet fourth round
MC 1617 booklet fourth roundaiesec_poland
 
AIESEC in Poland MC 16/17 Third Round Application Booklet
AIESEC in Poland MC 16/17 Third Round Application BookletAIESEC in Poland MC 16/17 Third Round Application Booklet
AIESEC in Poland MC 16/17 Third Round Application Bookletaiesec_poland
 
iGIP+Carrer Days follow up Spring 2016
iGIP+Carrer Days follow up Spring 2016iGIP+Carrer Days follow up Spring 2016
iGIP+Carrer Days follow up Spring 2016aiesec_poland
 
AIESEC in Poland MC 16/17 Second Round Application Booklet
AIESEC in Poland MC 16/17 Second Round Application BookletAIESEC in Poland MC 16/17 Second Round Application Booklet
AIESEC in Poland MC 16/17 Second Round Application Bookletaiesec_poland
 
IGIP General Rules 2016
IGIP General Rules 2016IGIP General Rules 2016
IGIP General Rules 2016aiesec_poland
 
Customer Flow Understanding
Customer Flow UnderstandingCustomer Flow Understanding
Customer Flow Understandingaiesec_poland
 
Re looking the way we plan Sumco 2015 session
Re looking the way we plan Sumco 2015 sessionRe looking the way we plan Sumco 2015 session
Re looking the way we plan Sumco 2015 sessionaiesec_poland
 
Process flow re-planning 2015
Process flow re-planning 2015Process flow re-planning 2015
Process flow re-planning 2015aiesec_poland
 
Planning process session Nat-co 2016
Planning process session Nat-co 2016Planning process session Nat-co 2016
Planning process session Nat-co 2016aiesec_poland
 
National Talent Plan Aug-Sept 2015
National Talent Plan Aug-Sept 2015National Talent Plan Aug-Sept 2015
National Talent Plan Aug-Sept 2015aiesec_poland
 

More from aiesec_poland (20)

The Ultimate Growth Hacker summer 2016 - Monthly Update 2
The Ultimate Growth Hacker summer 2016 - Monthly Update 2The Ultimate Growth Hacker summer 2016 - Monthly Update 2
The Ultimate Growth Hacker summer 2016 - Monthly Update 2
 
The Ultimate Growth Hacker summer 2016 - Monthly Update 1
The Ultimate Growth Hacker summer 2016 - Monthly Update 1The Ultimate Growth Hacker summer 2016 - Monthly Update 1
The Ultimate Growth Hacker summer 2016 - Monthly Update 1
 
MC 1617 booklet fourth round
MC 1617 booklet fourth roundMC 1617 booklet fourth round
MC 1617 booklet fourth round
 
AIESEC in Poland MC 16/17 Third Round Application Booklet
AIESEC in Poland MC 16/17 Third Round Application BookletAIESEC in Poland MC 16/17 Third Round Application Booklet
AIESEC in Poland MC 16/17 Third Round Application Booklet
 
Sona intro + why
Sona intro + whySona intro + why
Sona intro + why
 
Internal ceed
Internal ceedInternal ceed
Internal ceed
 
iGIP+Carrer Days follow up Spring 2016
iGIP+Carrer Days follow up Spring 2016iGIP+Carrer Days follow up Spring 2016
iGIP+Carrer Days follow up Spring 2016
 
AIESEC in Poland MC 16/17 Second Round Application Booklet
AIESEC in Poland MC 16/17 Second Round Application BookletAIESEC in Poland MC 16/17 Second Round Application Booklet
AIESEC in Poland MC 16/17 Second Round Application Booklet
 
IGIP General Rules 2016
IGIP General Rules 2016IGIP General Rules 2016
IGIP General Rules 2016
 
Content Creation
Content CreationContent Creation
Content Creation
 
oGCDP understanding
oGCDP understandingoGCDP understanding
oGCDP understanding
 
Customer Flow Understanding
Customer Flow UnderstandingCustomer Flow Understanding
Customer Flow Understanding
 
Lcp role (elects)
Lcp role (elects)Lcp role (elects)
Lcp role (elects)
 
Mc role
Mc roleMc role
Mc role
 
Re looking the way we plan Sumco 2015 session
Re looking the way we plan Sumco 2015 sessionRe looking the way we plan Sumco 2015 session
Re looking the way we plan Sumco 2015 session
 
Process flow re-planning 2015
Process flow re-planning 2015Process flow re-planning 2015
Process flow re-planning 2015
 
Planning process session Nat-co 2016
Planning process session Nat-co 2016Planning process session Nat-co 2016
Planning process session Nat-co 2016
 
NPM growth model
NPM  growth modelNPM  growth model
NPM growth model
 
MC buddies 2016
MC buddies 2016MC buddies 2016
MC buddies 2016
 
National Talent Plan Aug-Sept 2015
National Talent Plan Aug-Sept 2015National Talent Plan Aug-Sept 2015
National Talent Plan Aug-Sept 2015
 

Recently uploaded

Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationAadityaSharma884161
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 

Recently uploaded (20)

Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint Presentation
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 

AIESEC Poland LC's growth model launch at NPM 2015

  • 2. Overall direction for the entity to grow, it gives a concrete framework for the entity’s major growth strategies.
  • 4. Elephant in the room -How does it affect my LC? -What benefit do I get from this in my term? -Does it make any difference if it is there or not? -How should this be useful to me or my EB? The answer is, to widen our line of sight & to think long term 
  • 5. It’s a matter of long term thinking. It is where we consider the most critical variable and plan according to a unified direction. Having a growth model enables strategic continuity and internal guidance on operations while bringing stable organizational health through out the growth path in every reality by pointing out every possible internal synergy points.
  • 6. HOW WE CAME TO THIS RESEACH LCPs MEETING TASK FORCE MC STRATEGIES STRUCTURE GROWTH PATH 1st IMPLEMEN TATION 2nd IMPLEMEN TATION
  • 7.
  • 9.
  • 10.
  • 11.
  • 12.
  • 18. Where are we right now?
  • 19. KATOWICE LUBLIN ŁÓDŹ POZNAŃ TORUŃ WARSZAWA SGH WROCŁAW UE WROCŁAW UT KAKÓW WARSZAWA UW BIAŁYSTOK GDAŃSK KIELCE OLSZTYN RZESZÓW SZCZECIN TIER 4 TIER 3 TIER 2 TIER 1 iGCDP
  • 20. KRAKÓW POZNAŃ WARSZAWA SGH WARSZAWA UW WROCŁAW UT BIAŁYSTOK GDAŃSK KATOWICE KIELCE LUBLIN ŁÓDŹ OLSZTYN RZESZÓW SZCZECIN TORUŃ WROCŁAW UT TIER 4 TIER 3 TIER 2 TIER 1 oGCDP
  • 22. WARSZAWA UW WROCŁAW UE BIAŁYSTOK GDAŃSK KATOWICE KIELCE KRAKÓW LUBLIN ŁÓDŹ OLSZTYN POZNAŃ RZESZÓW SZCZECIN TORUŃ WARSZAWA SGH WROCŁAW UT iGIP TIER 4 TIER 3 TIER 2 TIER 1
  • 23. e Elements OGCDP IGCDP OGIP IGIP Tier 4 (Basic) # of Exchanges 0-24 0-35 0-12 0 - 12 Operations -Focus on alighment with global peaks -Focus on IXP -Focus on Synergy with Marketing -Focus on University Relations. -EP Lead implementation - Realisation of International Kindergarden, Kid-speak, World Talks as a priority. - Realisation of whole national portfolio after realisations of IK+KS/WT - No local projects. - Focus on may-june; september-october; january- february realisations - Tracking of LEAD-delivery - work only on global peaks - focus on one subproduct based on market research - work on national CYPs - ep lead implementation - head hunting for specific offers - focus on IXP -1 subproduct is explored in the market -Market segmentation -Cold Calling -EP Lead implementation -Sale through LDM S&D -Focus on Country Partners only -informal partnerships - Work with level-1 and level-2 CY-partners only - 1 LC2LC cooperation - Opening of forms in 4 month before realisation - focus on national partnerships - work only on them - target specific profiles for one subproduct -Capitalize on EP Supply only through National Country Partners -Minimalize the no.of Country Partners -Working on the exchange peaks, focus on the summer peak (RE: March, April, MA: April, May, RE: June, July, August) TM -full implementation of MUST sessions from national PEC + the biggest focus on:- Basic customer flow & Standard Operating Principles education - Focus on Sales Education - Focus on MM Education - full implementation of Team Minimums - create an incentive systems (R&R) for OCs & OCPs based on number of matches - adjust recruitment timeline to exchange peaks & timeline - boosting IXP - Basic education on sales - Basic education on matching (expa) - Basic education on delivery (S&S) - Deep explanation of LDM and LEAD for OCPs - team minimums full implementation - team minimums full implementation: every person working in oGIP has to to have specific JD - focus on productivity - full implementation of MUST sessions from national PEC + the biggest focus on:- Basic customer flow & Standard Operating Principles education - Focus on Sales Education - focus on understanding of program and product - boosting IXP - adjust recruitment timeline to exchange peaks & timeline -Team Mimimums full implementation: every person working in iGIP has to to have specific JD - focus on productivity and bigger focus on the: functional trainings for sale, -From National PEC full implementaton of MUST -JD based on sale plans -Sale r&r driving culture of achievemet MKT/ BRAND - Market Analysis & Segmentation - following National Promotional Campaign - iXP Promotion - Fous on Online promotion - No strong coop from MKT - National sales-proposals - National materials for Global Host promotion - Internal buddy recruitment system - market analysis and segmentation - choose one specific subproduct and targets - working on national timeline, use national materials - focus on internal promotion - showcasing EPs in network for faster matching - focus on pocket recruitment and online promotion Portfolio narodowe testymoniolane/EP storytelling już teraz FIN Basic financial investments in online promotion - Legality Education - Income from TN-takers - No money for hosting - Hosting is covered by TN-takers Basic financial investments in online promotion Basic financial investment in the business card, networking (booklet....) w co można zainwestować Culture Culture of Growth Create Area culture ( Team Name, Vision, etc..) - Start of iGCDP in LC - Involvement in iGCDP delivery of whole local chapter - start creating culture of oGIP - vision, team stand etc - "every experience matters" - culture of productivity -Creation the iGIP team purpose and team stand Challenges -Operational Understanding -Market Penetration -Talent Capacity & financial resources. - Low engagement of structures - Low understanding of AIESEC - No experience in operations - No or bad branding in market - lack of knowledge, wrong understanding of product - low understanding of product that can create wrong message which atrracts wrong profiles - lack of market research & segmentation - not enough talent capacity -Pipeline HR in area -Sales knowledge -Understanding of the MVP -Lack of the constant Market Research -Lack of the talent capacity in the area/ productivity OS -1 LCVP oGCDP -1 OCP Project Based Structure (5OCs) -1 LCVP Marketing -1 OCP oGCDP Promo (3 OCs) - 1 LC VP, responsible for this area - (OCP+5OCs) per 12 Xchanges - 3 teams per year (according to peaks) - Project-based structure - VP iGCDP works operationally (learning by doing) - LCVP oGIP or COO oGIP - 1 OCP Project Based Structure (EP LEAD + HR) and 1 OCP promo (under mkt) - at least 3 OCs in project -1 LCVP iGIP -1 OCP + structure based on project (4 OC) -2 Team per a year for 2 peaks: (winter, summer) BD - - No support from BD - sales education (!) - help in Uni Relations brak LCVP BD w radzie wykonawczej (w radzie jest LCVP iGIP) EDUKACJA W lcrobienie MRwiedza sprzedażowa finalna odpowiedzialność za iGIP
  • 24. Tier 3 (Intermediary) # of Exchanges 24-49 36-90 13-30 13 - 26 Operations -Standardized processes - Promo & Match at the same time. - EP Lead Implementation - IXP - Upscalling University Relations. - Realisation of whole national portfolio - Focus on may-june, june-july, july-august, september- october, december-january, january-february realisations - Start working with market expansions, if needed. - 1 Local project - EP-fee implementation (up to 33% of Xchange results) - focus on 1-2 subproducts - market analysis and segmentation - focus on univesity relations - allign to global exchange peaks - only - focus on customer orientation - ep lead implementation - optimize all procesess and focus on proper education - IXP -Focusing on 1-2 subproducts -Market Segmentation ON 2 SECTORS, FOCUS MARKET SEGMENTATION -Focus on the re-raising S&D - Start working on LC2LC partnerships ( at least 5 main partnerships ) - Work with level-1 and level-2 CY-partners - Up to 3 LC2LC cooperations with level-1 CY-partners - Possibility of CY2LC partnership - Opening of forms in 4 months before realisation (minimum) - focus only on national IR and CYP - work on global peaks - IR help from MC - Capitalize on high EP Supply countries -Working on the exchange peaks: RE: March, April, MA: April, May, RE: June, July, August) and RE: August, September, October, MA: October, November, December, RE: December, January, Februrary TM - OCPs advanced Empowerment. - Team Minimums full implementation - Have to deliver Must & should from national PEC- the biggest focus on sales Education for OCs - boost IXP - All of the above - Education on advanced sales(market penetration, convertion rate etc.) - Education on account management (CRM) - Markteting education - LEAD delivery education - R&R of behaviours in iGCDP (commitment etc.) - project based structure - focus on education about product - focus on productivity - sales education - Team Minimums full implementation - bigger focus on building specific JD for everyone - Have to deliver Must & should from national PEC- the biggest focus on sales Education for OCs - boost IXP - R&R boosting matching Team Minimums focus on the sale knowledge - Create member JD (productivity at least 1ex per a person) Team Minums optimaization of the recrutiment process for the peaks (dodać też do 4) PEC z should have to be delivered (poprawić narodowy PEC -optimalization of the recrutiment and adjusting for the exchange peaks --Sale r&r driving culture of achievemet MKT/ BRAND -Focus on Market Expansions(New Universities) -Keep on focus on online promo, start devolping stronlgy offline promotion -Development of promo campaign (based on history and analytics) -Focus on working and developing Market Analysis - First Global Host team/coordinator under MKT - National sales/promo materials - External buddy recruitment system - EwA2ELD implementation into external buddy system. - Global Village start - B2B showcasing events (gala for partners) starts - Partner-servicing and re-raising &EwA2ELD strategies developed with VP Mkt - focus on targeted promotion for specific subproducts - allign to national promo timeline - focus more on online promotion and reintegration events for attracting new students (like ComeBack Story events) - focus on headhunting and internal promotion (done by OGX team) -infosessions or workshops delivered by @ers and Alumni - Ensure Clear and Strong Brand for Focus SP (Enforce Brand Guidelines etc.) - Generate leads through networking - Alumni Relations -Linkedin management -EP stories showcasing -RETENCJA KLIENTÓW AKTYWNOŚCI: reraising mailng, newsletter pod iGIP -Account Management ( FIN - Investment in Offline promo campaigns. - Sales GH+Opportunity-fee. - Investments in accomodation (only in EP-fee projects) - Investment on expansions raising (post expendatures, travels with EPs for first working day) - Printing of external buddy promo-materials - Income from national partners - investments in offline promotions and events -Basic financial investment in the business card, networking -Invest in sales education and B2B Marketing opportunities (Linkedin premum account) INVESTMENT IN S&S DELIVERY!!! Culture - Culture of achievement & Growth - iGCDP as a Growth Driver (oGCDP synergy mainly) - Culture of growth - International atmosphere - culture of achievements & growth mindset - spread oGIP culture among other LC members -iGIP as a focus programme -created culture of the iGIP area in the LC THROUGH showcasing of the EP story inside the LC Challenges Matching Efficiency, New Markets Penetration. Team minimums implementation & OCPs/OCs Productivity - Big spendings on accomodation - Unapropriate spendings of money for "extra" benefits - Bigger amount of operations - Managing of big realisation peaks (may-july+dec-feb) - LEAD delivered not in every experience - lack of understanding of product and market - OCs engagement and productivity - processes efficiency - culture of achievment implementation - targeted promotion and working on specific subproducts - IR focus -wrong understanding of the MVP -lack of the Market understanding -> PEC szkolenie do tego -small OCPs/OCs engagement -lack of culture of achievement -not working on the exchange peaks OS 1 LCVP oGCDP 1 OCP HR (5 OCs) 1 OCP Matching (EP Development) (3 OCs) 1 LCVP Marketing 2 OCP oGCDP Promo (3 OCs per project) - One LC VP iGCDP - For projects - (1OCP+5OCs) per 15Xchanges - (Reception) iGCDP GH-teams for may-july and dec-feb realisations (1OCP+1OCGH+1OCLog+1OCShowcase), as a supporting body of project-teams - VP iGCDP almost not working operationally LCVP oGIP COO HR (shortlisting, RB certification, education) OCP Project Based Structure - min 5 OCs OCP Promo (Under MKT) 1 LCVP (iGIP+BD) OCP Raising+4 OCs (1Subproduct) OCP Delivery +5 OCs (1st subproduct) Coo B2B na peak bRAND pOSITIONING LCVP BD ODPOWIEDZIANY zas przedaż - Common sales education with VP BD - sales education (!) -clear exchange MoS during every employer branding event/activity -Common sales boosting activities -Common CRM -Common AM standarization
  • 25. Tier 2 (Advanced) # of Exchanges 50-75 91-140 31-55 27 - 53 Operations -More online and optimized processes. -Creating a CRM system. -EP Lead Implementation & Development -Sub-products development - Realisation of whole national portfolio - Several projects running at the same realisation time - Up to 3 local projects - EP-fee projects fully functioning and are 50% of results - Local development of CY-based project - Start of work for off-peak projects - allign to global peaks but also focus on opportunities to do pocket recruitment and match not in the peak ffor specific opportunities - creating CRM system to optimize processes - EP LEAD implementation and development - subproducts development - focus up to 3 subproducts - focus on market expansions -Working on the at least 2 Subporducts (marketing+education) -Working on the JD-based project (national portfolio) -Upscaling the current partnerships/clients/ op TAKERS from 1 to 5 f.ex -local BoP for iGIP area S&D -Focus on LC2LC Partnerships and upscalling it. ( minimum 10 Partnerships ). -Focus on selling new countries. -Raised TNs based on EPs preferences. - Matching with level-1, level-2 CY-partners - 8 LC2LC cooprations - Up to 3 CY2LC cooperations - Opening of forms not later than 3 months before realisation - Random matching is not more than 30% of Realisation - focus on LC2LC partnershios and upscalling it (be coherent with national partnerships - LC2LC cooperation with national partnerships - focus on selling different subproducts to different target groups - focus on headhunting - Focused Entity Partnerships - Co-delivery strategy -Starting working on the LC2LC partnerships -Working on the global exchange peaks TM Development in OCs JDs. - Must, should and can from PEC have to be delivered - TMP recruitment from expansions for oGCDP expansion structure - All of the above - Education on process-structure management - Education on OP-taker servicing - Education on massive-sales - advanced education - create space for innovation - team minimums fully implemented - focus on tracking - R&R focused on increase productivity of every member - Must, should and can from PEC have to be delivered - work on synergies (include it in JDs) - focus on sales and marketing education - recruitment timeline adjusted to exchange peak - internal CEEDs - IXP - Increase Sales Intensity - Create member JD (productivity at least 2ex per a person) -Internal CEEDership -Reallocation to the area MKT/ BRAND Focus on PR activities - devolpemnt of media partnerships, events with returnees etc. Evolvment in Promo campaigns. Development of usage of existing channels + think (good analysis needed!) of adding new channels - Development of local promo-materials for local projects - EwA2ELD for external buddies - Global Village showcasing - B2B press-conference/gala-report for partners - Government relations started - focus on PR activities (events wit EPs + media) and market expansion - focus on expanding the reach - new activites and targeted promotion for specific subproduct - focus on sales education - how to sell specific subproduct using our value propositon - use new channels of promotion - more investments in promo - evolve in promo campaigns - more diversified campaigns for specific target groups - B2B Marketing (Participating in External Events, -Website Managem0ent) - Showcasing partnerships to provide more value - Media Engagement (minimal) - Alumni Relations -Pozycjonowanie strony narodowej: fimliniki, portale na innych stronach, kongresy sprzedażowe - FIN Advanced financial investment in oGCDP Promotional campaigns - Money from EP-fee - Money from OP-takers - Cost-cutting on Global Host - Spendings on housing for EP-fee projects - Income from local grants (for EP-fee projects) - Income from local partners - Income from national partners investments in oGIP - materials, events, online promotion, offline activities, matching days -Investment in the networking event -Organization of the networking event for the main partners -Local Landing Pages creation -Invest in sales education and B2B Marketing opportunities Culture Culture of achievment & competition - Strong Growth Driver culture (synergy with iGIP/OGX) - Culture of innovation - Culture of growth - Culture of challenge-breaking - Culture of enjoyement - Culture of "One iGCDP in Poland" culture of achievment and growth, culture of enjoyment, sales approach, culture of challenges and competition EXPLORING THE MARKET Bulding long-term relations with the client -AM co-creation of the product with the market Challenges EPs Management & tracking More Market reach Increase Talent capacity and productivity - 2 VPs iGCDP - Mess with process/project based structures - Lack of standarts fulfillement - Big money flow - EP servicing and tracking - increasing capacity and productivity - not structured activities - LCVP focused more on operational work (LCVP's approach should be more strategic) - quality of delivered services - focusing on delivery -Scale of the operations OS Double Layered structure 1 LCVP oGCDP > 3 OCPs project based Structure 1 LCVP oGCDP for expansions 2 OCPs process based Structure 1 LCVP Marketing> 2 OCPs Marketing 1 OCP Online promotion 1 OCP Offline promotion - 2 VPs iGCDP are recomended (one responsible for national portfolio market, other is responsible for EP-fee prj market) - Project-based structure for project with realisations less than 18X - Process-based structure for projects with same OP-takers, with total realisations >26X - (OCP+5OCs) per 18X - Separate reception(OCP+3OCs) team for the months with realisations of >35X - VP iGCDP working strategically LCVP oGIP, COO market expansions + university relations, 3 OCPs (5 OCs mininmum) Project Based Structure, COO oGIP Mkt + 2 OCPs Promo ( under mkt) divided by subproducts 1 LCVP iGIP/LCVP BD OCP Raising+4/5 OCs (1Subproduct) OCP Delivery +3/4 OCs (1st subproduct) OCP Raising+4/5 OCs (2nd subproduct) OCP Delivery +3/4 OCs (2nd subproduct) OCP Brand Positioning under Mkt no.of clients account management for stable current
  • 26. Tier 1 ( Mature ) # of Exchanges 75< 140< 55< 53 < Operations -Developed online processes -Process innovation and optimization -Sub Products innovation -Developed CRM system -Focus on Expansions - Realisation of whole national portfolio - Several projects running at the same realisation time - Innovation on local projects (especially CY-based), based on external national dyrections - EP-fee projects fully functioning and are 50% of results - Focus on increasing of MKT-penetration - Work on off-peak projects - developed online processes (EP servicing), sales approach - work on global peaks, but focus also on off peaks and pocket recruitment - developed CRM system - focus on expansions and innovations - focus on all subproducts, also work on others subproducts (like HR, B&A, Accounting) - processes innovation and optimization -Working on the at least 3 Subporducts (marketing+education+business) -Working on the JD-based project (national portfolio) -Upscaling partnerships -Local BoP for iGIP area -Deep Market Exploration -Market Expansion outside the city -Reaching new stakeholders / local projects / new market segments -praca na buzz marketing -reraising-rekomendacje S&D -Developed LC2LC partnerships ( at least 20 Partnerships ) -Creation of mutual projects with country partners - LC2LC cooperations with level-1 CY-partners - CY2LC cooperations - Work on supply for off-peak - upscale LC2LC partnerships (possibility of partners which are not country partners) - work on mutual projects with country partnets to increase productivity and efficency - Promote clustered forms from IR (provide national IR support). - Specific country based LC to LC partnerships for bulk realizations. - Co-delivery strategy -LC2LC partnership -LC2LC CEEDerships -80% of exchange comes form the global exchange peaks: winter+summer TM - involvement of OCs in creation, - external ceeds, - external education, - online educational platform. - All of the above - Deeper focus on increasing of productivity- innovative initiatives - Focus on bottom-up initiatives from OCs - education with external - innovative initiatives: focus on efficency and productivity of each member + R&R - education: focus on sales - external CEEDs - external education - Focus on bottom-up initiatives from OCs - IXP - Increase Sales Intensity -Creating own sale channels (mkt) - Create member JD (productivity at least 2ex per a person) -Internal CEEDerships -Team Minimums for iGIP (Delivery Part) -Big pipeline MKT/ BRAND University Relations Development New Promo Strategies Increased online reach - new metods in online usage Developed PR activites (mentioned in tier 3) - SUs creation Seeking for New Markets - Showcasing of projects - Press-conference are hold after all projects - Government relations developed - Separate team from MKT department, working on constant showcasing of iGCDP area on local level - increase online reach - new metods in online usage - focus on innovations in promotion - more events for showcasing (PR activities) - University Relations helping in promotion - showcasing (use testimionials) - B2B Marketing (cREATING in External Events, -Website Managem0ent) - Showcasing partnerships to provide more value - Media Engagement (minimal) - Alumni Relations-może super wspierać PR pod iGIP Robienie glai kończącej edycję -New sale channel exploration -EP strorytelling showcasing -OP Takers testimonials collecting FIN Bigger investment in Marketing &PR Activties - Income from local TN-takers - Income from local grants - Income from locla and national partners - Income from EP-fee - Spendings on accomodation for EP-fee projects - Cost-cutting initiatives and income initiatives for EP-fee projects investments in PR activites, online promotion - Long term investment in the promotional materials -Invest in sales education and B2B Marketing opportunities Culture Culture of Over achievement & Global competition - Culture of achievement - Culture of global competition - Culture of enjoyement - Culture of solution-orientation - Culture of "One iGCDP in Poland" culture of achievement, working with other countries on competitions, massive growth and innovative thinking, culture of sharing, mutual cooperation with network -iGIP as a focus programme -created culture of the iGIP area in the LC -showcasing of the EP story inside the LC -inside LC's area positioning -Strong sale culture - Goal achievement and ownership at TL and TM level Challenges Big Structure Management. Quality Cases Management Increasing members Productivity - Big amount of operations - 2 LCVPs - Need of development of products, due to huge market reach. - EP servicing , tracking - increase members' productivity -Forgetting sales intensity -small NPS -not working of Standards and Satisfactions OS 1 LCVP oGCDP > 3 OCPs Project Based structure (5 OCs) 1 LCVP for exapnsions> 3 OCPs each process based structure (2HR team- 5 OCs each, Delivery- 3 OCs) 1 LCVP Marketing 3 OCPs 1 OCP Offline, 1 Ocp online, 1 OCP expansions (for SUs) 1 LCVP PR - only if LC is in Tier 1 in all programs (or tier 1 in 3 or tier1 in 2 and tier 2 in 2) - 2 LCVPs iGCDP - Project-based structure for project with realisation 20x/prj - Process-based structure for projects with realisations more than 30X LCVP oGIP, 1 OCP innovation (at least 5 OCs), 1 OCP HR, 3 OCPs project based structure, 1 COO MKT, 1 OCP PR, 1 OCP Promo 1 LCVP iGIP, 1 LCVP iGIP albo duży LET, 1 lcvp ER OCP Raising+5 OCs (1Subproduct) OCP Delivery +5 OCs (1st subproduct) OCP Raising+5 OCs (2nd subproduct) OCP Delivery +5 OCs (2nd subproduct) OCP Brand Positioning under Mkt albo 2 zespoły???? BD cooperation with companies to fund EP fee, insurance companies, exchange partners - Support sales - Common selling manias - Supporting with CRM and servicing standarts - uni relations (top student on massive scale) - cooperation with companies to fund EP fee, insurance companies, exchange partners -AM for the more that 5 ex -Creation local iGIP BoP -Downscalling national partners to the local level -Common sales boosting activities -Cooperation with the Chamber of Comerce -Cooperation with Governance
  • 29. KATOWICE LUBLIN ŁÓDŹ POZNAŃ TORUŃ WARSZAWA SGH WROCŁAW UT KRAKÓW WROCŁAW UE WARSZAWA UW BIAŁYSTOK GDAŃSK KIELCE OLSZTYN RZESZÓW SZCZECIN FINAL CLUSTERS CLUSTER 4 CLUSTER 3 CLUSTER 2 CLUSTER 1
  • 30. BIAŁYSTOK GDAŃSK KIELCE OLSZTYN RZESZÓW SZCZECIN RECOMENDATION CLUSTER 4 FOCUS GROWTH IN: 1 (iGCDP) or 2 Exchange PROGRAMS ONLY: iGCDP and (oGCDP | oGIP | iGIP)
  • 31. KATOWICE LUBLIN ŁÓDŹ POZNAŃ TORUŃ WARSZAWA SGH WROCŁAW UT CLUSTER 3 FOCUSED GROWTH IN 2 OR 3 Exchange PROGRAMS: iGCDP and (oGCDP | oGIP | iGIP). (For now, the growth path is piloted in selected entities) RECOMENDATION
  • 32. • KRAKÓW WROCŁAW UE WARSZAWA UW CLUSTER 2 FOCUS ON (iGCDP) IN 3 OR 4 Exchange PROGRAMS: iGCDP and (oGCDP | oGIP | iGIP) (For now, the growth path is piloted in selected entities) RECOMENDATION
  • 33. CLUSTER 1 FOCUS ON 3 OR 4 Exchange PROGRAMS: iGCDP and (oGCDP | oGIP | iGIP) RECOMENDATION
  • 34. WHAT IS OUTCOME OF GROWTH MODEL ?
  • 35. - Coaching - Planning - RnR model - FO/BO alignment - Implementation framework - Internal communication (Conferences etc. included) - Long term goals planning
  • 36. Q&A
  • 37. THANK YOU SO MUCH 
  • 38. Go to the following link to see the GM: https://docs.google.com/spreadsheets/d/13HStK6Id2XQk0XgCYpMxoB Q5j92tpnEei1tqyQ_m-1Q/edit#gid=416915909