SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
AUGUST INTAKE 2015
SEMESTER 1
NAME: DEONG KHAI KEAT
STUDENT ID: 0320055
MEASUREMENT I ( Ms Ang Fuey Ling )
CONSTRUCTIONTECHNOLOGYI ( Azrina Binti Md Yaakob )
BUILDING MATERIALS( Myzatul Aishah Binti Kamarazaly )
TITLE NO.
Introduction. 3
Objectives. 4
Content and Technical Observation 5-8
Photo and Description 9-10
Learning Out come and Conclusion 11
Introduction
For this assignment is an individual assignment, we
are required to visit an construction site which is held
on 26th of June, we are required to gather at Taylor's
Lakeside University at 8am for attendance before
going to the site. The visit was organized by our 3
lecturers, Miss Ang, Miss Azrina, and Miss Aishah.
We are required to wear proper attire which are
long pants, covered shoes and white helmet. The site
is located at around Rawang area which is located at
Sekyen 2A, Antara Gapi, Hulu Selangor which has a
journey of around 1 hour from the campus.
After we arrive the site, the contractor brief us and
told us what not to do on the site for our safety
purposes. After that, contractor took us around the site,
explaining to us about the construction.
Objective
 To gain more knowledge from the site visit
 To understand how the construction process go
on.
 Explore and identify various types of building
materials and technology on site
 To explore and identify various types of building
materials and technology on site.
 To emphasize the importance of safety on site
 To recognize the items measurable for sub-
structure and reinforced concrete frame works
 To discover the types of construction
technologies used in real life.
Pad Footing
Pad foundations are generally used to transfer the
load from a column, pier or heavy machinery to the
ground. Pad foundations are usually square or
rectangular in plan. They are formed of either
unreinforced concrete or reinforced concrete. Pad
foundations are generally designed to support higher
loads over a limited area. A pad footing is mainly
used for isolated loads and the process which is
adopted for pad footings is very similar to the process
used for strip footings.
Construction of Pad Footing
1. Site Clearance
2. Excavation
3. Lean Concrete
4. Formwork for Pad Footing
5. Add some spacer blocks
6. Reinforcement Bar
7. Concrete for Pad Footing
8. Remove Formwork
The process of construction RC pad footing begin with
pegging the site. After pegging the site, we need to
excavate to the desired level. Next, we need to put layer
of lean concrete provide a level surface, where Pad
foundation can be placed. After that, we need to build a
formwork for pad to mold the pad footing shape. Spacer
block are required to place before the reinforcement been
laid. Before we put reinforcement bar, we need put fill in
concrete cover to provide thermal insulation, which
protects the reinforcement bars from fire. After concrete
cover, we can start to put reinforcement bar. Once we
place all reinforcement bar, we can fill up concrete into
the formwork. Last, when the concrete has the sufficient
strength, we can remove all the formwork.
Materials involved in constructing a
Pad Footing
-Concrete
Concrete is a composite material composed of aggregate
bonded together with a fluid cement which hardens over
time. Base on the information from contractor, the building
on site is using Grade30. The ratio of Grade30 is 1:1:2
which is very strong.
-Reinforcement bar
Reinforcement bar is structures to strengthen and hold the
concrete in tension. Rebar's surface is often patterned to
form a better bond with the concrete. There are 2 type of
rebar which is High Tensile Rebar and Mild Steel rebar. In
the site, they are using High Tensile Rebar because it is a
standard reinforcing steel rod that is used as a tension
device in concrete structures to strengthen and hold the
concrete together. It is incredibly versatile and very long
lasting. It is able to be cut to desired size and welded into
position.
-Formwork
Formwork is the term given to either temporary or
permanent molds into which concrete or similar materials
are poured. In the context of concrete construction, the
falsework supports the shuttering moulds. In the site, they
are using timber formwork. Timber formwork similar to
the traditional method, but stringers and joist are replaced
with engineered wood beams and supports are replaced
with metal props. This makes this method more systematic
and reusable.
Photo and Description
Reinforcement Bar in
the site.
Piles Foundation
Mesh Fabric scaffolding Pad Footing
Formwork
Metal TrussStirrup
s
Column and Slab
Learning Out Come
Throughout the site visit, I have seen the basic
process of a construction and how the workers work
on the site. This site visit has provide us the basic
knowledge on construction site and this has help us
further understanding on what we had study in class.
I learnt about the building materials and able to
identify different types of building materials as well as
the technology being used on site. I understand more
and can recognize many of the items for sub-
structure and reinforced concrete frame works. It was
a great experience and fun to me.

More Related Content

What's hot

BUILDING CONSTRUCTION Presentation
BUILDING CONSTRUCTION PresentationBUILDING CONSTRUCTION Presentation
BUILDING CONSTRUCTION PresentationDrazzer_Dhruv
 
Mat foundation
Mat foundationMat foundation
Mat foundationshuvo293
 
Final CT Assignment
Final CT AssignmentFinal CT Assignment
Final CT AssignmentXinYee Khoo
 
Building Materials & Construction Module-2
Building Materials & Construction Module-2Building Materials & Construction Module-2
Building Materials & Construction Module-2Abhilash B L
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...Bhaddin Al-Naqshabandi
 
special foundation techniques
 special foundation techniques special foundation techniques
special foundation techniquesShrideviAnil
 
04.chapter ii
04.chapter ii04.chapter ii
04.chapter iiGTVT
 
PPT on Commerical building
PPT on Commerical buildingPPT on Commerical building
PPT on Commerical buildingLOKESH
 
Presentation on construction process and Classification of slab
Presentation on construction process and Classification of slabPresentation on construction process and Classification of slab
Presentation on construction process and Classification of slabarnob293
 
basement excavation, underpinning
basement excavation, underpinningbasement excavation, underpinning
basement excavation, underpinningOkwera David
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabDivineGraceFernando
 

What's hot (20)

BUILDING CONSTRUCTION Presentation
BUILDING CONSTRUCTION PresentationBUILDING CONSTRUCTION Presentation
BUILDING CONSTRUCTION Presentation
 
Mat foundation
Mat foundationMat foundation
Mat foundation
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
FORM WORK & SLIPFORM
FORM WORK & SLIPFORMFORM WORK & SLIPFORM
FORM WORK & SLIPFORM
 
Temporary works
Temporary worksTemporary works
Temporary works
 
Final CT Assignment
Final CT AssignmentFinal CT Assignment
Final CT Assignment
 
Shore pile
Shore pileShore pile
Shore pile
 
Retaining wall (1)
Retaining wall (1)Retaining wall (1)
Retaining wall (1)
 
Slip formwork technique
Slip formwork techniqueSlip formwork technique
Slip formwork technique
 
Building Materials & Construction Module-2
Building Materials & Construction Module-2Building Materials & Construction Module-2
Building Materials & Construction Module-2
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...
 
special foundation techniques
 special foundation techniques special foundation techniques
special foundation techniques
 
04.chapter ii
04.chapter ii04.chapter ii
04.chapter ii
 
Structural elements and their arrangements
Structural elements and their arrangementsStructural elements and their arrangements
Structural elements and their arrangements
 
PPT on Commerical building
PPT on Commerical buildingPPT on Commerical building
PPT on Commerical building
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Retaining Walls
Retaining WallsRetaining Walls
Retaining Walls
 
Presentation on construction process and Classification of slab
Presentation on construction process and Classification of slabPresentation on construction process and Classification of slab
Presentation on construction process and Classification of slab
 
basement excavation, underpinning
basement excavation, underpinningbasement excavation, underpinning
basement excavation, underpinning
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slab
 

Viewers also liked

Indirect bonding and newer adhesives
Indirect bonding and newer adhesivesIndirect bonding and newer adhesives
Indirect bonding and newer adhesivesIndian dental academy
 
Operation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrOperation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrSidhanath Singh
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile FoundationSubham Kundu
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipmentswetha110
 
Footing and Its Types
Footing and Its TypesFooting and Its Types
Footing and Its TypesAbid Javaid
 
footing
footingfooting
footingillpa
 
types of Foundations with animated sketches
types of Foundations with animated sketchestypes of Foundations with animated sketches
types of Foundations with animated sketchesGiri Babu S V
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building ConstructionHamdija Velagic
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationSagar Radadiya
 

Viewers also liked (15)

Indirect bonding and newer adhesives
Indirect bonding and newer adhesivesIndirect bonding and newer adhesives
Indirect bonding and newer adhesives
 
Bonding
BondingBonding
Bonding
 
Bonding (2)
Bonding (2)Bonding (2)
Bonding (2)
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Operation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrOperation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel Rr
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile Foundation
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipment
 
Footing and Its Types
Footing and Its TypesFooting and Its Types
Footing and Its Types
 
footing
footingfooting
footing
 
Foundation
FoundationFoundation
Foundation
 
types of Foundations with animated sketches
types of Foundations with animated sketchestypes of Foundations with animated sketches
types of Foundations with animated sketches
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building Construction
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 

Similar to Site Report

Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docxShze Hwa Lee
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report I'mMiss Lily
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
individual site report sem 1 degree
individual site report sem 1 degreeindividual site report sem 1 degree
individual site report sem 1 degreeLam Wee
 
Site visit report
Site visit reportSite visit report
Site visit reportDoreen Yeo
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit reportMomo Poyi
 
Site visit report
Site visit reportSite visit report
Site visit reportJordon Wong
 
Site report
Site reportSite report
Site reportHuiYik
 
Site report
Site reportSite report
Site reportvaylu
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)Jia Hong Mui
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 ReportWilden How
 

Similar to Site Report (20)

Site report
Site reportSite report
Site report
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docx
 
Site report
Site reportSite report
Site report
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
individual site report sem 1 degree
individual site report sem 1 degreeindividual site report sem 1 degree
individual site report sem 1 degree
 
Site report
Site reportSite report
Site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site report
Site reportSite report
Site report
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site report
Site reportSite report
Site report
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
Site Report
Site Report Site Report
Site Report
 
INDL PPT 1.pptx
INDL PPT 1.pptxINDL PPT 1.pptx
INDL PPT 1.pptx
 
Site report
Site reportSite report
Site report
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 Report
 

More from khaikeat16

Bs2 presentation slide
Bs2 presentation slide Bs2 presentation slide
Bs2 presentation slide khaikeat16
 
Bs2 INDIVIDUaL
Bs2 INDIVIDUaLBs2 INDIVIDUaL
Bs2 INDIVIDUaLkhaikeat16
 
Bs2 group report
Bs2 group reportBs2 group report
Bs2 group reportkhaikeat16
 
Presentation bs
Presentation bsPresentation bs
Presentation bskhaikeat16
 
Bs assignment-final
Bs assignment-finalBs assignment-final
Bs assignment-finalkhaikeat16
 
SITE REPORT (CT).pdf
SITE REPORT (CT).pdfSITE REPORT (CT).pdf
SITE REPORT (CT).pdfkhaikeat16
 
SITE REPORT (CT).pdf
SITE REPORT (CT).pdfSITE REPORT (CT).pdf
SITE REPORT (CT).pdfkhaikeat16
 
Chinese Architecture Report
Chinese Architecture ReportChinese Architecture Report
Chinese Architecture Reportkhaikeat16
 
Economics Final - Report
Economics Final - ReportEconomics Final - Report
Economics Final - Reportkhaikeat16
 
Psychology 5 journal
Psychology 5 journalPsychology 5 journal
Psychology 5 journalkhaikeat16
 
English Essay Assignment One
English Essay Assignment OneEnglish Essay Assignment One
English Essay Assignment Onekhaikeat16
 
English Assignment2 - Interview Report
English Assignment2 - Interview ReportEnglish Assignment2 - Interview Report
English Assignment2 - Interview Reportkhaikeat16
 
English Assignment2 - Interview Presentation Slide
English Assignment2 - Interview Presentation SlideEnglish Assignment2 - Interview Presentation Slide
English Assignment2 - Interview Presentation Slidekhaikeat16
 
English II Assignment One
English II Assignment One English II Assignment One
English II Assignment One khaikeat16
 
Final enbe report
Final enbe reportFinal enbe report
Final enbe reportkhaikeat16
 
ICI Project 2
ICI Project 2 ICI Project 2
ICI Project 2 khaikeat16
 
ICI final report
ICI final reportICI final report
ICI final reportkhaikeat16
 

More from khaikeat16 (20)

Estimating
EstimatingEstimating
Estimating
 
Bs2 presentation slide
Bs2 presentation slide Bs2 presentation slide
Bs2 presentation slide
 
Bs2 INDIVIDUaL
Bs2 INDIVIDUaLBs2 INDIVIDUaL
Bs2 INDIVIDUaL
 
Bs2 group report
Bs2 group reportBs2 group report
Bs2 group report
 
Ct3
Ct3Ct3
Ct3
 
Presentation bs
Presentation bsPresentation bs
Presentation bs
 
Bs assignment-final
Bs assignment-finalBs assignment-final
Bs assignment-final
 
SITE REPORT (CT).pdf
SITE REPORT (CT).pdfSITE REPORT (CT).pdf
SITE REPORT (CT).pdf
 
SITE REPORT (CT).pdf
SITE REPORT (CT).pdfSITE REPORT (CT).pdf
SITE REPORT (CT).pdf
 
Chinese Architecture Report
Chinese Architecture ReportChinese Architecture Report
Chinese Architecture Report
 
Economics Final - Report
Economics Final - ReportEconomics Final - Report
Economics Final - Report
 
Psychology 5 journal
Psychology 5 journalPsychology 5 journal
Psychology 5 journal
 
Mural ART
Mural ARTMural ART
Mural ART
 
English Essay Assignment One
English Essay Assignment OneEnglish Essay Assignment One
English Essay Assignment One
 
English Assignment2 - Interview Report
English Assignment2 - Interview ReportEnglish Assignment2 - Interview Report
English Assignment2 - Interview Report
 
English Assignment2 - Interview Presentation Slide
English Assignment2 - Interview Presentation SlideEnglish Assignment2 - Interview Presentation Slide
English Assignment2 - Interview Presentation Slide
 
English II Assignment One
English II Assignment One English II Assignment One
English II Assignment One
 
Final enbe report
Final enbe reportFinal enbe report
Final enbe report
 
ICI Project 2
ICI Project 2 ICI Project 2
ICI Project 2
 
ICI final report
ICI final reportICI final report
ICI final report
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Site Report

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) AUGUST INTAKE 2015 SEMESTER 1 NAME: DEONG KHAI KEAT STUDENT ID: 0320055 MEASUREMENT I ( Ms Ang Fuey Ling ) CONSTRUCTIONTECHNOLOGYI ( Azrina Binti Md Yaakob ) BUILDING MATERIALS( Myzatul Aishah Binti Kamarazaly )
  • 2. TITLE NO. Introduction. 3 Objectives. 4 Content and Technical Observation 5-8 Photo and Description 9-10 Learning Out come and Conclusion 11
  • 3. Introduction For this assignment is an individual assignment, we are required to visit an construction site which is held on 26th of June, we are required to gather at Taylor's Lakeside University at 8am for attendance before going to the site. The visit was organized by our 3 lecturers, Miss Ang, Miss Azrina, and Miss Aishah. We are required to wear proper attire which are long pants, covered shoes and white helmet. The site is located at around Rawang area which is located at Sekyen 2A, Antara Gapi, Hulu Selangor which has a journey of around 1 hour from the campus. After we arrive the site, the contractor brief us and told us what not to do on the site for our safety purposes. After that, contractor took us around the site, explaining to us about the construction.
  • 4. Objective  To gain more knowledge from the site visit  To understand how the construction process go on.  Explore and identify various types of building materials and technology on site  To explore and identify various types of building materials and technology on site.  To emphasize the importance of safety on site  To recognize the items measurable for sub- structure and reinforced concrete frame works  To discover the types of construction technologies used in real life.
  • 5. Pad Footing Pad foundations are generally used to transfer the load from a column, pier or heavy machinery to the ground. Pad foundations are usually square or rectangular in plan. They are formed of either unreinforced concrete or reinforced concrete. Pad foundations are generally designed to support higher loads over a limited area. A pad footing is mainly used for isolated loads and the process which is adopted for pad footings is very similar to the process used for strip footings.
  • 6. Construction of Pad Footing 1. Site Clearance 2. Excavation 3. Lean Concrete 4. Formwork for Pad Footing 5. Add some spacer blocks 6. Reinforcement Bar 7. Concrete for Pad Footing 8. Remove Formwork The process of construction RC pad footing begin with pegging the site. After pegging the site, we need to excavate to the desired level. Next, we need to put layer of lean concrete provide a level surface, where Pad foundation can be placed. After that, we need to build a formwork for pad to mold the pad footing shape. Spacer block are required to place before the reinforcement been laid. Before we put reinforcement bar, we need put fill in concrete cover to provide thermal insulation, which protects the reinforcement bars from fire. After concrete cover, we can start to put reinforcement bar. Once we place all reinforcement bar, we can fill up concrete into the formwork. Last, when the concrete has the sufficient strength, we can remove all the formwork.
  • 7. Materials involved in constructing a Pad Footing -Concrete Concrete is a composite material composed of aggregate bonded together with a fluid cement which hardens over time. Base on the information from contractor, the building on site is using Grade30. The ratio of Grade30 is 1:1:2 which is very strong. -Reinforcement bar Reinforcement bar is structures to strengthen and hold the concrete in tension. Rebar's surface is often patterned to form a better bond with the concrete. There are 2 type of rebar which is High Tensile Rebar and Mild Steel rebar. In the site, they are using High Tensile Rebar because it is a standard reinforcing steel rod that is used as a tension device in concrete structures to strengthen and hold the concrete together. It is incredibly versatile and very long lasting. It is able to be cut to desired size and welded into position.
  • 8. -Formwork Formwork is the term given to either temporary or permanent molds into which concrete or similar materials are poured. In the context of concrete construction, the falsework supports the shuttering moulds. In the site, they are using timber formwork. Timber formwork similar to the traditional method, but stringers and joist are replaced with engineered wood beams and supports are replaced with metal props. This makes this method more systematic and reusable.
  • 9. Photo and Description Reinforcement Bar in the site. Piles Foundation Mesh Fabric scaffolding Pad Footing
  • 11. Learning Out Come Throughout the site visit, I have seen the basic process of a construction and how the workers work on the site. This site visit has provide us the basic knowledge on construction site and this has help us further understanding on what we had study in class. I learnt about the building materials and able to identify different types of building materials as well as the technology being used on site. I understand more and can recognize many of the items for sub- structure and reinforced concrete frame works. It was a great experience and fun to me.