2
Building Materials(BLD 62003)
Table of Content
No. Title Pages
1 Cover Page 1
2 Table of Content 2
3 Introduction 3
4 Objectives 4
5 Technical Observations 5
6 Types of Foundation 6
7 Photos & Descriptions 7-10
8 Conclusion 11
3
Introduction
This report is to illustrate about the construction site and tell what we have learnt and seen
from the construction site, The Andes. The site visit is held on Friday, 26th June, 2015. It
was organized by Sr. Ang Fuey Lin. We were separated by 2 buses to the site and RM15 per
person is for the bus fees.
The site is located at Bukit Kinrara 1, Puchong. The Andes is strategically located between
the borderline of Puchong and Bukit Jalil, The Andes can be easily accessible via a wide
network of major expressways.
Before going to the site, every one of us need to buy a safety helmet. We also need to give
our name as per IC, student ID and IC number to the lecturer, Ms Ang. An idenmity form is
necessary before going to the construction site as well.
Figure 1. Location of the construction site
4
Figure 2. The construction site
Objectives
To become a professional quantity surveyor, there are a lot of things need to be learnt. The
most important point is to understand the basics of the construction process. Visiting the
construction site can make us understand the practical aspect of construction techniques in
comparison to the theory aspect in books and its application on site.
Other than that, visiting a construction site can let us know the exposure to actual working
environment on site including uncertainty circumstances, like weather.
Besides that, this report also improves our ability to communicate with the construction
team members on site and to see the importance of teamwork in the building team.
Witness the usage of construction equipment on site including mechanical plants also one
of the steps of becoming a professional quantity surveyor.
One of the important objectives of visiting construction site is to explore and identify
various types of building materials and technology on site. The importance of safety on site
and understanding of safety problems and site conditions have to aware. We are able to
recognize the items measurable for sub-structure and reinforced concrete frame works.
5
Technical Observation
Beforegoingto the site, we havepreparedthe safety helmet for visiting the construction site.
Wearing a safety helmet is to protect our safety. On the day of the site visiting, we gathered
in front of 7-eleven located in Taylor’s University at 930am. We took about 15 minutes to
reach the destination.
Once we reached the construction site, the first thing I saw is the information board of the
construction. Then, we were asked to gather under a tent. James Siow who is the project
managergave us a brief what they have finished and what they are still doing. Then, we were
separated by 3 groups and there’s a leader for each group.
Firstly, we followed our leader to the basement floor level. We saw columns, slab, wall, a lot
of steel bars, links, pile caps, concrete cover, etc. We were told that the types of foundation
of this construction is bored piled foundation.
The concretegradeof column is Grade40while the concretegradeof beam, slaband pile cap
are Grade 35. Grade 35 reinforced concrete is cheaper than Grade 40, which is why it is
widely used in the construction. Grade 35 reinforced concrete has better resistance to fire
and low maintenance cost. However, Grade 35 reinforced concrete has lower strength, it can
get cracked easily.
On the other hand, Grade 40 is expensive but it is highly compressive strength, it can extend
its life cycles. When you use Grade 40 reinforced concrete, the size of the structure may be
reduced, so that you can save the costs.
6
Types of foundation
PILED FOUNDATION
It’s a groupofpiles that supportsasuperstructure.
It can be used with multi storey buildings. One of
the function of piled foundation is too transmit
load through weak and unstable soil conditions.
Pile cap will connect the piles together and
distributes the superstructure loads the layer
beneath.
In this construction, they used concrete bored
piling. The concrete grade of pile cap is Grade 35.
Piled foundation inadequate bearing capacity of
shallow foundations. This type of foundation
prevent uplift force and reduce excessive
settlement.
Advantages:
1. Piles of any size and length may be constructed at the site.
2. Damage due to driving and handling that is common in precast piles is eliminated in
this case.
7
3. These piles are ideally suited in places where vibrations of any type are required to
be avoided to preserve the safety of the adjoining structure.
4. Suitable in soils of poor drainage qualities since cast-in-situ piles do not significantly
disturb the surrounding soil.
Disadvantages:
1. Installation of cast-in-situ piles requires careful supervision and quality control of
all the materials used in the construction.
2. The method is quite cumbersome. It needs sufficient storage space for all the
materials used in the construction.
3. The advantage of increased bearing capacity due to compaction in granular soil that
could be obtained by a driven pile is not produced by a cast-in-situ pile.
4. Construction of piles in holes where there is heavy current of ground water flow or
artesian pressure is very difficult.
Photos & Descriptions
Figure 3. The information board Figure 4. Tower crane
8
Figure 4. Column Figure 5. Reinforcement Bars
Figure 6. Links Figure 7. Wall Formwork
9
Figure 8. Excavator Figure 9. Bored Pile
Figure 10. Concrete Cover Figure 11. Sheet pile
10
Figure 12. Pile caps Figure 13. Reinforcement bars for column
Figure 14. The basement Figure 15. The excavators
11
Figure 16. Column for Retaining wall Figure 17. Reinforcement bars of wall
Conclusion
Site visiting was not as tough as I thought. The half of the reason is the weather that day is
not too hot. It was fun about looking at those building elements which we have learnt in the
class. Basically, after visiting the construction, I understand the construction process, like
how did they start and construct everything step by step.
Site visiting also improves my communication ability with the team and understand that
teamwork is important in site visiting. It improves my understanding of theories of
building structure can able to apply in practical tasks. My eyes were widely open after I had
12
seen various types of construction equipment and its application on site. I found that the
awareness of safety on site is very important which you have to be clear with it before
going to site.
Besides that, I believed that writing the site report shows that our understanding level of
everything that we have learnt before. From recognize the items measurable for sub-
structure and reinforced concrete frame works, I am able to do better in every practical
tasks.
The most important thing that I have learnt about is I think in a construction, every roles
are important. No matter small until workers of carrying heavy materials or big until a
project manager. They are all very important, not even one can be lost. It is because every
finished buildings are done with teamwork and cooperation.
In the conclusion, I have gained a lot of knowledge in this construction site visit. I am glad
that I have this chance to visit a construction site before I go to work. I wish there is
another chance to visit another construction site.

More Related Content

What's hot

Site visit report
Site visit report Site visit report
Site visit report Liming Hiew
 
Site visit report
Site visit reportSite visit report
Site visit reportJıa Yıı
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit reportMomo Poyi
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit ReportHasif Alias
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
Site report algel
Site report algelSite report algel
Site report algelAlgel Yee
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Site visit report
Site visit reportSite visit report
Site visit reportJordon Wong
 
CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site reportw ss
 
Site visit report
Site visit reportSite visit report
Site visit reportWen Crystal
 
SITE VISIT ARCHITECTRE
SITE VISIT ARCHITECTRE  SITE VISIT ARCHITECTRE
SITE VISIT ARCHITECTRE Shourya Puri
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)Jia Hong Mui
 
Site visit report
Site visit reportSite visit report
Site visit reportDoreen Yeo
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Individual site report brief
Individual site report briefIndividual site report brief
Individual site report briefMomo Poyi
 

What's hot (20)

Site visit report
Site visit report Site visit report
Site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
Site report
Site reportSite report
Site report
 
site report
site reportsite report
site report
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Site report algel
Site report algelSite report algel
Site report algel
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Site visit report
Site visit reportSite visit report
Site visit report
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
SITE VISIT ARCHITECTRE
SITE VISIT ARCHITECTRE  SITE VISIT ARCHITECTRE
SITE VISIT ARCHITECTRE
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site report
Site reportSite report
Site report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Individual site report brief
Individual site report briefIndividual site report brief
Individual site report brief
 

Similar to Site report

Project SlideShare
Project SlideShareProject SlideShare
Project SlideShareYung Kai
 
bqs Site report
bqs Site reportbqs Site report
bqs Site reportFelix Vong
 
Final Report
Final Report Final Report
Final Report Jack Ng
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visitPui San
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorAssignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorKai Yun Pang
 
Site report
Site reportSite report
Site reportHuiYik
 
Measurement 1 site report
Measurement 1 site reportMeasurement 1 site report
Measurement 1 site reportJessyca Than
 
SUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMASUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMAvjverma123
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
Site visit report.
Site visit report.Site visit report.
Site visit report.Man Yee
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportYee Len Wan
 

Similar to Site report (20)

Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Site report
Site reportSite report
Site report
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Final Report
Final Report Final Report
Final Report
 
Ez
EzEz
Ez
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Report
ReportReport
Report
 
Site report
Site reportSite report
Site report
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorAssignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
 
Site report
Site reportSite report
Site report
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
 
Measurement 1 site report
Measurement 1 site reportMeasurement 1 site report
Measurement 1 site report
 
SUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMASUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMA
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Site visit report.
Site visit report.Site visit report.
Site visit report.
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit Report
 
Site report
Site reportSite report
Site report
 

More from vaylu

psychology final assignment
psychology final assignmentpsychology final assignment
psychology final assignmentvaylu
 
Psychology second individual journal
Psychology second individual journalPsychology second individual journal
Psychology second individual journalvaylu
 
oral presentation 2
oral presentation 2oral presentation 2
oral presentation 2vaylu
 
Oral Presentation 1
Oral Presentation 1Oral Presentation 1
Oral Presentation 1vaylu
 
Accounting Final Assignment
Accounting Final AssignmentAccounting Final Assignment
Accounting Final Assignmentvaylu
 
Economics Final Assignment
Economics Final AssignmentEconomics Final Assignment
Economics Final Assignmentvaylu
 
Statistics Report
Statistics ReportStatistics Report
Statistics Reportvaylu
 
Circles & Sphere
Circles & SphereCircles & Sphere
Circles & Spherevaylu
 
Research Report
Research ReportResearch Report
Research Reportvaylu
 
James bond essay
James bond essayJames bond essay
James bond essayvaylu
 
Final Project ICI
Final Project ICIFinal Project ICI
Final Project ICIvaylu
 
English Oral presentation
English Oral presentationEnglish Oral presentation
English Oral presentationvaylu
 
Processing essay
Processing essayProcessing essay
Processing essayvaylu
 

More from vaylu (14)

Ct
CtCt
Ct
 
psychology final assignment
psychology final assignmentpsychology final assignment
psychology final assignment
 
Psychology second individual journal
Psychology second individual journalPsychology second individual journal
Psychology second individual journal
 
oral presentation 2
oral presentation 2oral presentation 2
oral presentation 2
 
Oral Presentation 1
Oral Presentation 1Oral Presentation 1
Oral Presentation 1
 
Accounting Final Assignment
Accounting Final AssignmentAccounting Final Assignment
Accounting Final Assignment
 
Economics Final Assignment
Economics Final AssignmentEconomics Final Assignment
Economics Final Assignment
 
Statistics Report
Statistics ReportStatistics Report
Statistics Report
 
Circles & Sphere
Circles & SphereCircles & Sphere
Circles & Sphere
 
Research Report
Research ReportResearch Report
Research Report
 
James bond essay
James bond essayJames bond essay
James bond essay
 
Final Project ICI
Final Project ICIFinal Project ICI
Final Project ICI
 
English Oral presentation
English Oral presentationEnglish Oral presentation
English Oral presentation
 
Processing essay
Processing essayProcessing essay
Processing essay
 

Recently uploaded

Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 

Recently uploaded (20)

9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 

Site report

  • 1. 1 School of Architecture, Building & Design Bachelor Of Quantity Surveying Semester 1 / March 2015 Name : Lu Siau Vay Student ID : 0318567 Title : Site Report --- The Andes Subject : Measurement I (QSB 60104) Construction Technology (BLD 60104)
  • 2. 2 Building Materials(BLD 62003) Table of Content No. Title Pages 1 Cover Page 1 2 Table of Content 2 3 Introduction 3 4 Objectives 4 5 Technical Observations 5 6 Types of Foundation 6 7 Photos & Descriptions 7-10 8 Conclusion 11
  • 3. 3 Introduction This report is to illustrate about the construction site and tell what we have learnt and seen from the construction site, The Andes. The site visit is held on Friday, 26th June, 2015. It was organized by Sr. Ang Fuey Lin. We were separated by 2 buses to the site and RM15 per person is for the bus fees. The site is located at Bukit Kinrara 1, Puchong. The Andes is strategically located between the borderline of Puchong and Bukit Jalil, The Andes can be easily accessible via a wide network of major expressways. Before going to the site, every one of us need to buy a safety helmet. We also need to give our name as per IC, student ID and IC number to the lecturer, Ms Ang. An idenmity form is necessary before going to the construction site as well. Figure 1. Location of the construction site
  • 4. 4 Figure 2. The construction site Objectives To become a professional quantity surveyor, there are a lot of things need to be learnt. The most important point is to understand the basics of the construction process. Visiting the construction site can make us understand the practical aspect of construction techniques in comparison to the theory aspect in books and its application on site. Other than that, visiting a construction site can let us know the exposure to actual working environment on site including uncertainty circumstances, like weather. Besides that, this report also improves our ability to communicate with the construction team members on site and to see the importance of teamwork in the building team. Witness the usage of construction equipment on site including mechanical plants also one of the steps of becoming a professional quantity surveyor. One of the important objectives of visiting construction site is to explore and identify various types of building materials and technology on site. The importance of safety on site and understanding of safety problems and site conditions have to aware. We are able to recognize the items measurable for sub-structure and reinforced concrete frame works.
  • 5. 5 Technical Observation Beforegoingto the site, we havepreparedthe safety helmet for visiting the construction site. Wearing a safety helmet is to protect our safety. On the day of the site visiting, we gathered in front of 7-eleven located in Taylor’s University at 930am. We took about 15 minutes to reach the destination. Once we reached the construction site, the first thing I saw is the information board of the construction. Then, we were asked to gather under a tent. James Siow who is the project managergave us a brief what they have finished and what they are still doing. Then, we were separated by 3 groups and there’s a leader for each group. Firstly, we followed our leader to the basement floor level. We saw columns, slab, wall, a lot of steel bars, links, pile caps, concrete cover, etc. We were told that the types of foundation of this construction is bored piled foundation. The concretegradeof column is Grade40while the concretegradeof beam, slaband pile cap are Grade 35. Grade 35 reinforced concrete is cheaper than Grade 40, which is why it is widely used in the construction. Grade 35 reinforced concrete has better resistance to fire and low maintenance cost. However, Grade 35 reinforced concrete has lower strength, it can get cracked easily. On the other hand, Grade 40 is expensive but it is highly compressive strength, it can extend its life cycles. When you use Grade 40 reinforced concrete, the size of the structure may be reduced, so that you can save the costs.
  • 6. 6 Types of foundation PILED FOUNDATION It’s a groupofpiles that supportsasuperstructure. It can be used with multi storey buildings. One of the function of piled foundation is too transmit load through weak and unstable soil conditions. Pile cap will connect the piles together and distributes the superstructure loads the layer beneath. In this construction, they used concrete bored piling. The concrete grade of pile cap is Grade 35. Piled foundation inadequate bearing capacity of shallow foundations. This type of foundation prevent uplift force and reduce excessive settlement. Advantages: 1. Piles of any size and length may be constructed at the site. 2. Damage due to driving and handling that is common in precast piles is eliminated in this case.
  • 7. 7 3. These piles are ideally suited in places where vibrations of any type are required to be avoided to preserve the safety of the adjoining structure. 4. Suitable in soils of poor drainage qualities since cast-in-situ piles do not significantly disturb the surrounding soil. Disadvantages: 1. Installation of cast-in-situ piles requires careful supervision and quality control of all the materials used in the construction. 2. The method is quite cumbersome. It needs sufficient storage space for all the materials used in the construction. 3. The advantage of increased bearing capacity due to compaction in granular soil that could be obtained by a driven pile is not produced by a cast-in-situ pile. 4. Construction of piles in holes where there is heavy current of ground water flow or artesian pressure is very difficult. Photos & Descriptions Figure 3. The information board Figure 4. Tower crane
  • 8. 8 Figure 4. Column Figure 5. Reinforcement Bars Figure 6. Links Figure 7. Wall Formwork
  • 9. 9 Figure 8. Excavator Figure 9. Bored Pile Figure 10. Concrete Cover Figure 11. Sheet pile
  • 10. 10 Figure 12. Pile caps Figure 13. Reinforcement bars for column Figure 14. The basement Figure 15. The excavators
  • 11. 11 Figure 16. Column for Retaining wall Figure 17. Reinforcement bars of wall Conclusion Site visiting was not as tough as I thought. The half of the reason is the weather that day is not too hot. It was fun about looking at those building elements which we have learnt in the class. Basically, after visiting the construction, I understand the construction process, like how did they start and construct everything step by step. Site visiting also improves my communication ability with the team and understand that teamwork is important in site visiting. It improves my understanding of theories of building structure can able to apply in practical tasks. My eyes were widely open after I had
  • 12. 12 seen various types of construction equipment and its application on site. I found that the awareness of safety on site is very important which you have to be clear with it before going to site. Besides that, I believed that writing the site report shows that our understanding level of everything that we have learnt before. From recognize the items measurable for sub- structure and reinforced concrete frame works, I am able to do better in every practical tasks. The most important thing that I have learnt about is I think in a construction, every roles are important. No matter small until workers of carrying heavy materials or big until a project manager. They are all very important, not even one can be lost. It is because every finished buildings are done with teamwork and cooperation. In the conclusion, I have gained a lot of knowledge in this construction site visit. I am glad that I have this chance to visit a construction site before I go to work. I wish there is another chance to visit another construction site.