SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Bachelor of Quantity Surveying (Honours)
INTEGRATED ASSIGNMENT:
MEASUREMENT I (QSB60104)
CONSTRUCTION TECHNOLOGY I (BLD 60104)
SITE VISIT REPORT
STUDENT NAME : LILY THEN
STUDENT ID NO : 0313973
DATE OF SUBMISSION : 27.11.2015
2
TABLE OF CONTENT
Cover Page 1
Table of Content 2
1.0 Introduction 3
2.0 Objective 4
3.0 Content/ Technical Observations 5
4.0 Foundation 6
4.1 Pad Footing 7
5.0 Casting of A Reinforced ConcretePad Footing 8-10
6.0 Conclusion / Learning Outcome 11
7.0 Photos 12-17
3
1.0 Introduction
In this assignment, we were required to produce a report on the construction site visit for
combination of 3 subjects which are Building Materials, Construction Technology 1 and
Measurement 1.
The title of this site visit is “ Cadangan membina dan menyiapkan 96 unit rumah berkembar (40’
x 60’) serta infrastruktur yang berkaitan di Sekyen 2A, Antara Gapi, Hulu Selangor, Selangor.”
On 19 November 2015, about 88 students attended the site visit. We were to be divided into two
buses. We were required to wear safety helmet, long pants and sport shoe/safety shoe while visit
the construction site.
When we started our site visit, we were given a brief talk about the safety and rules at the site.
Then we kicked off our site visit. Our site visited was leaded by a site contractor. He explained
information of the building briefly and clearly.
Below is the construction site plan that I have obtained from the site. From this plan, we can
clearly see that there are three types of houses that are being built and that are Type 1, Type 2A,
Type 2B and Type 3.
CONTRACTOR:
Siak Siong Construction Sdn Bhd
A-6-3 Block A, MeganAvenue 1,
Jalan Tun Razak, 50400 Kuala Lumpur.
4
2.0 Objective
The main objective of this site surveying is to give exposure to students where they will be able
to describe, explain and understand the method and process of construction in accordance to the
sequence of work on site, especially the Pad Footing.
The other objectives of the site visit are:
 To let us experience the actual working environment and learn more about the life of
being a Quantity Surveyor on site.
 To allow us to have a better understanding of the types of the building materials involved
in the construction site.
 To aware the important of taking care of personal safety and the safety precautions that
may lead to accident.
 To enable us to understand the building structure and the sequence of constructing a
building.
 To gain more construction technology knowledge that new to us.
 To make it easier for us to get clearer image of how the structures look like in real life.
 To make us understand the important of teamwork and communication skills while
working together with the construction team such as engineers, project managers,
contractors and workers.
 To observe the usage of the construction equipment on site such as crane and bar bending
machine.
 To understand the basics of the construction process.
 To witness the usage of construction equipment on site including mechanical plants.
 To explore and identify various types of building materials and technology on site.
 To explain the construction of buildings and the scientific principles that underpin the
design and construction.
5
3.0 Content / Technical Observations
When we reached the construction site, I saw a project information board that was placed outside
the fence. The function of the project information board is to state the role of each constructor
involved. Moreover, there are a few temporary works installed at the site which are
accommodation for workers, material storage, security and scaffolding.
Around the surrounding area of the structural buildings, there exists a few scaffolding with safety
net cast around it to protect people from falling down by limiting the distance they fail. It is used
to support people and hold materials that are to be used for construction or repair of buildings
and other structures. It aided the safety of the workmen and allowed easy access to areas that are
difficult to reach. They are constructed by using metal tubes with metal platforms. Besides that
around the inner part of the scaffolding, they have cleverly installed a series of stairs for the
purpose of easy movement of workers up and down the building structure.
6
4.0 Foundation
The foundation used in this construction is the pad foundation. The construction site had chosen
the pad foundation due to the structure of the building constructed which were double storey
house. Pad foundations are used to support individual or multiple columns, spreading the load to
the ground below. They are generally square or rectangular in plan, with the plan area being
determined by the permissible bearing pressure of the soil. The shape in plan will be dictated by
the arrangement of the columns and the load to be transferred into the soil.
Footing is the lower part of the foundation which is constructed below the ground level in solid
surface. The purpose of footing is to transfer the live and dead loads of the structure to the soil
over a large enough area so that neither the soil nor the building will move and it resist
settlement and lateral load.
No matter what type of footing and foundation is used, a certain sequence should be followed.
The sequence can change slightly according to the method involved. The basic sequence is as
follows:
1. Find the amount of site preparation needed
2. Lay out footing and foundation shape
3. Excavate to proper depth
4. Level the footing corners
5. Build the foundation forms
6. Reinforce the forms as needed
7. Estimate concrete needs
8. Pour the concrete footing
9. Build the foundation forms
10. Reinforce the forms as needed
11. Pour the concrete into forms
12. Finish the concrete and embed anchors
13. Remove the forms
14. Waterproof and drain as required
7
4.1 Pad Footing
Pad footing is the support used at a point load such as columns or framed structures. They may
be circular, square or rectangular and consist of a block or slab of the thickness. The pad footing
may be stepped if they are required to spread the load from a heavy column. The pads are usually
shallow but deeps one can be found depending on the structure.
Before the installation of pad footing, there are factors that need to be observed:
 Accessibility
 Condition of ground
 Nature of the load requiring support
 Proximity to other structures
 Water table
Advantages of Pad Footing
 Economic due to control of foundation size
 Shallow form of foundation needs little excavation
 Shape can be designed to accommodate tight sites
Disadvantages of Pad Footing
 Can become very large to cope if used for high point loads
 Limited foundation to dealing with point loads of framed building
 Weak against uplift forces, wind forces and earthquake forces
Cost of Pad Footing
Additional cost for timbering, high cost compared to Trench and Strip Footing
Process in Making Pad Footing
1. Clearing the site
2. Excavate : small excavation because pad foundation requires small size of space
3. Formwork for Pad filling
4. Install reinforcement : up to ground floor, extra reinforcement called starter bar
5. Pour concrete into the formwork : column stump
6. Let concrete cured then Earth backfill
7. Place formwork and install reinforcement for ground beam
8. Pour concrete then backfill slab base and soil compaction
8
5.0 Method of Construction of Pad Footing
1. Clearing the site then pegging the site with correct position of foundation.
2. Excavation commences from the reduce level, down to the desired level (soffit of footing
with allowance for thickness of lean concrete).
3. Lay a layer of lean concrete to prepare a clean and firm base for the footing.
9
4. Build the formwork to the side of pad footing and supported by other wood to prevent the
formwork collapse when the concrete is being pour into it.
5. Spacer blocks are placed before reinforcements been laid. This is to provide sufficient
concrete cover for rebars.
6. Rebars were bent and tied before the whole thing been lowered and placed inside the
formwork. Make sure the steel is place properly on spacer blocks, avoid touching the lean
concrete below.
10
7. Stump reinforcements are then erected. Length of rebars should be extended beyond stump
level and act as starter bars for column above.
8. Provide addition ties to formwork, if necessary.
9. Concrete will set and curing shall be performed to avoid excessive lost of water during
hardening. When the concrete has gained sufficient strength, formwork can be dismantled.
11
6.0 Conclusion/ Learning Outcome
After the meaningful construction site visit done by us on 19 November, there are countless of
valuable information of knowledge gained by me after the visit. Besides, I had the opportunity to
learn something that I couldn’t learn from the lectures and textbook. I have better understanding
about how a construction site works now after the visit.
I had seen and explored various materials and tools used during the construction period. This is
an eye opener for me as I have never had the chance to see it with my own eyes. Besides, I was
taught by the site contractor about the various professional construction technique used and its
application.
Most importantly, I had the chance to witness how much they emphasize on safeties in the
construction site. They demand every worker to have their proper safety equipment on when a
construction is going on. Even we, the visitors have to wear safety helmet just like other worker
to guarantee our safety during our visit since there might be bricks or rocks that might fall from
high ground and might hit our head. Moreover, safety signboard were seen everywhere to always
remind their worker to emphasize on their own safety.
Moreover, I can see that cooperation between workers is very important through this visit. Every
worker at the construction site is cooperating with each other in order to accomplish the task
given. This shows that cooperation is very vital in doing something important.
Besides, construction site manager also plays a very important role. As I can see during the visit,
the construction site was well planned. There was a site to throw all the domestic waste, and all
the materials or tools were kept safe and sound to ensure their stability and secureness when it is
being used in the future. Through this site visit, I was able to know further more about the
method of construction of pad footing.
This site visit really helps us to visual better in method of construction of pad footing. The site
visit was very interesting and insightful.
In conclusion, this visit has greatly enhanced my knowledge about construction site. I am very
grateful to have a chance to visit there as I have gained a lot of knowledge. I wish that I could
have more chances like this in the future as in really benefit me a lot.
12
7.0 Photos
Figure 1 : Temporary Container Office
Figure 2 : Temporary Work – Wooden Cabin
Figure 3 : RC Store
13
Figure 4 : Safety Board (Safety Committee Chart, Safety Policy & Construction Site Plan)
Figure 5 : List of Information about The Construction of The Site
Figure 6 : Single Drum Roller used for compaction applications in road construction.
Figure 7 : Backhoe used to dig trenches, including laying pipes, cables and foundations.
14
Figure 8 : Bar Bending Machine used to bend the steel bars.
Figure 9 : PVC Pipes used for Plumbing.
Figure 10 : Casing for Bored Pile
15
Figure 11 : Pile Caps
Figure 12 : BRC
Figure 13 : Formwork used as support structures and moulds to create structures out of concrete
which is poured into the moulds.
Figure 14 : Temporary Works – Scaffolding used to support people and hold materials that are to
be used for construction or repair of buildings and other structures.
16
Figure 15 : Mesh Fabric
Figure 16 : Stirrup that have been tied together with the links.
Figure 17 : Roof Trusses used to support the roof.
Figure 18 : Big Concrete Block to test the compression or the stability of the site.
17
Figure 19 : Excavator used to dig the ground.
Figure 20 : Reinforcement Bar
Figure 21 : Construction of Pad Footing.

More Related Content

What's hot

Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System마 이환
 
Construction of Brick Wall
Construction of Brick WallConstruction of Brick Wall
Construction of Brick WallI'mMiss Lily
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 
modular coordination
modular coordinationmodular coordination
modular coordinationShailja km
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSKHUSHBU SHAH
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSDigital Space Consultancy Ltd
 
Cube test REPORT - DCC2042
Cube test REPORT - DCC2042Cube test REPORT - DCC2042
Cube test REPORT - DCC2042Pavitrah Segaran
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remediesSOUMYA KHANDELWAL
 
Site report
Site reportSite report
Site reportYunshi94
 
Blockwork system
Blockwork systemBlockwork system
Blockwork systemWen Crystal
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group reportXingYue0907
 
SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042 SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042 YASMINE HASLAN
 
Site visit report
Site visit reportSite visit report
Site visit reportJıa Yıı
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 

What's hot (20)

Stairs
StairsStairs
Stairs
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
Construction of Brick Wall
Construction of Brick WallConstruction of Brick Wall
Construction of Brick Wall
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
modular coordination
modular coordinationmodular coordination
modular coordination
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
Cube test REPORT - DCC2042
Cube test REPORT - DCC2042Cube test REPORT - DCC2042
Cube test REPORT - DCC2042
 
Slump test report
Slump test reportSlump test report
Slump test report
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
Site report
Site reportSite report
Site report
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
 
Earthwork
EarthworkEarthwork
Earthwork
 
SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042 SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Btech report final
Btech report finalBtech report final
Btech report final
 

Viewers also liked

Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
footing
footingfooting
footingillpa
 
Building Construction 1: Experiencing Construction
Building Construction 1: Experiencing ConstructionBuilding Construction 1: Experiencing Construction
Building Construction 1: Experiencing ConstructionCalvinSuah
 
Footing and Its Types
Footing and Its TypesFooting and Its Types
Footing and Its TypesAbid Javaid
 
types of Foundations with animated sketches
types of Foundations with animated sketchestypes of Foundations with animated sketches
types of Foundations with animated sketchesGiri Babu S V
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction Mereia Kali
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
Pembinaan
PembinaanPembinaan
Pembinaananis
 
Footing design(09.02.03.096)
Footing design(09.02.03.096)Footing design(09.02.03.096)
Footing design(09.02.03.096)Zawad khalil
 
Construction of Mid Valley Report for Construction Technology
Construction of Mid Valley Report for Construction Technology Construction of Mid Valley Report for Construction Technology
Construction of Mid Valley Report for Construction Technology I'mMiss Lily
 
Building Construction Assignment 1
Building Construction Assignment 1 Building Construction Assignment 1
Building Construction Assignment 1 Tan Jaden
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSYousuf Dinar
 

Viewers also liked (20)

TYPES OF FOUNDATION(PPT)
TYPES OF FOUNDATION(PPT)TYPES OF FOUNDATION(PPT)
TYPES OF FOUNDATION(PPT)
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
footing
footingfooting
footing
 
Foundation
FoundationFoundation
Foundation
 
Building Construction 1: Experiencing Construction
Building Construction 1: Experiencing ConstructionBuilding Construction 1: Experiencing Construction
Building Construction 1: Experiencing Construction
 
Footing and Its Types
Footing and Its TypesFooting and Its Types
Footing and Its Types
 
types of Foundations with animated sketches
types of Foundations with animated sketchestypes of Foundations with animated sketches
types of Foundations with animated sketches
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Pembinaan
PembinaanPembinaan
Pembinaan
 
Footing design(09.02.03.096)
Footing design(09.02.03.096)Footing design(09.02.03.096)
Footing design(09.02.03.096)
 
Construction of Mid Valley Report for Construction Technology
Construction of Mid Valley Report for Construction Technology Construction of Mid Valley Report for Construction Technology
Construction of Mid Valley Report for Construction Technology
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Building Construction Assignment 1
Building Construction Assignment 1 Building Construction Assignment 1
Building Construction Assignment 1
 
Foundation ppt
Foundation pptFoundation ppt
Foundation ppt
 
Different types of pile
Different types of pile Different types of pile
Different types of pile
 
Foundation
FoundationFoundation
Foundation
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABS
 

Similar to SITE REPORT (PAD FOOTING)

Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report I'mMiss Lily
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportYee Len Wan
 
Site visit report
Site visit reportSite visit report
Site visit reportDoreen Yeo
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Site report
Site reportSite report
Site reportvaylu
 
Site visit report
Site visit reportSite visit report
Site visit reportWen Crystal
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit reportMomo Poyi
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visitPui San
 
bqs Site report
bqs Site reportbqs Site report
bqs Site reportFelix Vong
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShareYung Kai
 
Site visit report
Site visit reportSite visit report
Site visit reportJordon Wong
 
Site report algel
Site report algelSite report algel
Site report algelAlgel Yee
 
Site report
Site reportSite report
Site reportHuiYik
 
Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docxShze Hwa Lee
 

Similar to SITE REPORT (PAD FOOTING) (20)

Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit Report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site report
Site reportSite report
Site report
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Site report
Site reportSite report
Site report
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site report algel
Site report algelSite report algel
Site report algel
 
Site report
Site reportSite report
Site report
 
site report
site reportsite report
site report
 
Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docx
 
Site report
Site reportSite report
Site report
 
Ez
EzEz
Ez
 

More from I'mMiss Lily

Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyI'mMiss Lily
 
Windows and Ironmongery Presentation for Construction Technology
Windows and Ironmongery Presentation for Construction TechnologyWindows and Ironmongery Presentation for Construction Technology
Windows and Ironmongery Presentation for Construction TechnologyI'mMiss Lily
 
Concrete Presentation of Building Materials
Concrete Presentation of Building MaterialsConcrete Presentation of Building Materials
Concrete Presentation of Building MaterialsI'mMiss Lily
 
Ceramic Presentation of Building Materials
Ceramic Presentation of Building MaterialsCeramic Presentation of Building Materials
Ceramic Presentation of Building MaterialsI'mMiss Lily
 
ENGLISH 1 ASSIGNMENT - Essay Writing
ENGLISH 1 ASSIGNMENT - Essay WritingENGLISH 1 ASSIGNMENT - Essay Writing
ENGLISH 1 ASSIGNMENT - Essay WritingI'mMiss Lily
 
CTS FINAL PROJECT - COMB FIGHTER
CTS FINAL PROJECT - COMB FIGHTERCTS FINAL PROJECT - COMB FIGHTER
CTS FINAL PROJECT - COMB FIGHTERI'mMiss Lily
 
Elements of Natural and Built Environments (Project One)
Elements of Natural and Built Environments (Project One)Elements of Natural and Built Environments (Project One)
Elements of Natural and Built Environments (Project One)I'mMiss Lily
 

More from I'mMiss Lily (7)

Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Windows and Ironmongery Presentation for Construction Technology
Windows and Ironmongery Presentation for Construction TechnologyWindows and Ironmongery Presentation for Construction Technology
Windows and Ironmongery Presentation for Construction Technology
 
Concrete Presentation of Building Materials
Concrete Presentation of Building MaterialsConcrete Presentation of Building Materials
Concrete Presentation of Building Materials
 
Ceramic Presentation of Building Materials
Ceramic Presentation of Building MaterialsCeramic Presentation of Building Materials
Ceramic Presentation of Building Materials
 
ENGLISH 1 ASSIGNMENT - Essay Writing
ENGLISH 1 ASSIGNMENT - Essay WritingENGLISH 1 ASSIGNMENT - Essay Writing
ENGLISH 1 ASSIGNMENT - Essay Writing
 
CTS FINAL PROJECT - COMB FIGHTER
CTS FINAL PROJECT - COMB FIGHTERCTS FINAL PROJECT - COMB FIGHTER
CTS FINAL PROJECT - COMB FIGHTER
 
Elements of Natural and Built Environments (Project One)
Elements of Natural and Built Environments (Project One)Elements of Natural and Built Environments (Project One)
Elements of Natural and Built Environments (Project One)
 

Recently uploaded

ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 

Recently uploaded (20)

ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 

SITE REPORT (PAD FOOTING)

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Bachelor of Quantity Surveying (Honours) INTEGRATED ASSIGNMENT: MEASUREMENT I (QSB60104) CONSTRUCTION TECHNOLOGY I (BLD 60104) SITE VISIT REPORT STUDENT NAME : LILY THEN STUDENT ID NO : 0313973 DATE OF SUBMISSION : 27.11.2015
  • 2. 2 TABLE OF CONTENT Cover Page 1 Table of Content 2 1.0 Introduction 3 2.0 Objective 4 3.0 Content/ Technical Observations 5 4.0 Foundation 6 4.1 Pad Footing 7 5.0 Casting of A Reinforced ConcretePad Footing 8-10 6.0 Conclusion / Learning Outcome 11 7.0 Photos 12-17
  • 3. 3 1.0 Introduction In this assignment, we were required to produce a report on the construction site visit for combination of 3 subjects which are Building Materials, Construction Technology 1 and Measurement 1. The title of this site visit is “ Cadangan membina dan menyiapkan 96 unit rumah berkembar (40’ x 60’) serta infrastruktur yang berkaitan di Sekyen 2A, Antara Gapi, Hulu Selangor, Selangor.” On 19 November 2015, about 88 students attended the site visit. We were to be divided into two buses. We were required to wear safety helmet, long pants and sport shoe/safety shoe while visit the construction site. When we started our site visit, we were given a brief talk about the safety and rules at the site. Then we kicked off our site visit. Our site visited was leaded by a site contractor. He explained information of the building briefly and clearly. Below is the construction site plan that I have obtained from the site. From this plan, we can clearly see that there are three types of houses that are being built and that are Type 1, Type 2A, Type 2B and Type 3. CONTRACTOR: Siak Siong Construction Sdn Bhd A-6-3 Block A, MeganAvenue 1, Jalan Tun Razak, 50400 Kuala Lumpur.
  • 4. 4 2.0 Objective The main objective of this site surveying is to give exposure to students where they will be able to describe, explain and understand the method and process of construction in accordance to the sequence of work on site, especially the Pad Footing. The other objectives of the site visit are:  To let us experience the actual working environment and learn more about the life of being a Quantity Surveyor on site.  To allow us to have a better understanding of the types of the building materials involved in the construction site.  To aware the important of taking care of personal safety and the safety precautions that may lead to accident.  To enable us to understand the building structure and the sequence of constructing a building.  To gain more construction technology knowledge that new to us.  To make it easier for us to get clearer image of how the structures look like in real life.  To make us understand the important of teamwork and communication skills while working together with the construction team such as engineers, project managers, contractors and workers.  To observe the usage of the construction equipment on site such as crane and bar bending machine.  To understand the basics of the construction process.  To witness the usage of construction equipment on site including mechanical plants.  To explore and identify various types of building materials and technology on site.  To explain the construction of buildings and the scientific principles that underpin the design and construction.
  • 5. 5 3.0 Content / Technical Observations When we reached the construction site, I saw a project information board that was placed outside the fence. The function of the project information board is to state the role of each constructor involved. Moreover, there are a few temporary works installed at the site which are accommodation for workers, material storage, security and scaffolding. Around the surrounding area of the structural buildings, there exists a few scaffolding with safety net cast around it to protect people from falling down by limiting the distance they fail. It is used to support people and hold materials that are to be used for construction or repair of buildings and other structures. It aided the safety of the workmen and allowed easy access to areas that are difficult to reach. They are constructed by using metal tubes with metal platforms. Besides that around the inner part of the scaffolding, they have cleverly installed a series of stairs for the purpose of easy movement of workers up and down the building structure.
  • 6. 6 4.0 Foundation The foundation used in this construction is the pad foundation. The construction site had chosen the pad foundation due to the structure of the building constructed which were double storey house. Pad foundations are used to support individual or multiple columns, spreading the load to the ground below. They are generally square or rectangular in plan, with the plan area being determined by the permissible bearing pressure of the soil. The shape in plan will be dictated by the arrangement of the columns and the load to be transferred into the soil. Footing is the lower part of the foundation which is constructed below the ground level in solid surface. The purpose of footing is to transfer the live and dead loads of the structure to the soil over a large enough area so that neither the soil nor the building will move and it resist settlement and lateral load. No matter what type of footing and foundation is used, a certain sequence should be followed. The sequence can change slightly according to the method involved. The basic sequence is as follows: 1. Find the amount of site preparation needed 2. Lay out footing and foundation shape 3. Excavate to proper depth 4. Level the footing corners 5. Build the foundation forms 6. Reinforce the forms as needed 7. Estimate concrete needs 8. Pour the concrete footing 9. Build the foundation forms 10. Reinforce the forms as needed 11. Pour the concrete into forms 12. Finish the concrete and embed anchors 13. Remove the forms 14. Waterproof and drain as required
  • 7. 7 4.1 Pad Footing Pad footing is the support used at a point load such as columns or framed structures. They may be circular, square or rectangular and consist of a block or slab of the thickness. The pad footing may be stepped if they are required to spread the load from a heavy column. The pads are usually shallow but deeps one can be found depending on the structure. Before the installation of pad footing, there are factors that need to be observed:  Accessibility  Condition of ground  Nature of the load requiring support  Proximity to other structures  Water table Advantages of Pad Footing  Economic due to control of foundation size  Shallow form of foundation needs little excavation  Shape can be designed to accommodate tight sites Disadvantages of Pad Footing  Can become very large to cope if used for high point loads  Limited foundation to dealing with point loads of framed building  Weak against uplift forces, wind forces and earthquake forces Cost of Pad Footing Additional cost for timbering, high cost compared to Trench and Strip Footing Process in Making Pad Footing 1. Clearing the site 2. Excavate : small excavation because pad foundation requires small size of space 3. Formwork for Pad filling 4. Install reinforcement : up to ground floor, extra reinforcement called starter bar 5. Pour concrete into the formwork : column stump 6. Let concrete cured then Earth backfill 7. Place formwork and install reinforcement for ground beam 8. Pour concrete then backfill slab base and soil compaction
  • 8. 8 5.0 Method of Construction of Pad Footing 1. Clearing the site then pegging the site with correct position of foundation. 2. Excavation commences from the reduce level, down to the desired level (soffit of footing with allowance for thickness of lean concrete). 3. Lay a layer of lean concrete to prepare a clean and firm base for the footing.
  • 9. 9 4. Build the formwork to the side of pad footing and supported by other wood to prevent the formwork collapse when the concrete is being pour into it. 5. Spacer blocks are placed before reinforcements been laid. This is to provide sufficient concrete cover for rebars. 6. Rebars were bent and tied before the whole thing been lowered and placed inside the formwork. Make sure the steel is place properly on spacer blocks, avoid touching the lean concrete below.
  • 10. 10 7. Stump reinforcements are then erected. Length of rebars should be extended beyond stump level and act as starter bars for column above. 8. Provide addition ties to formwork, if necessary. 9. Concrete will set and curing shall be performed to avoid excessive lost of water during hardening. When the concrete has gained sufficient strength, formwork can be dismantled.
  • 11. 11 6.0 Conclusion/ Learning Outcome After the meaningful construction site visit done by us on 19 November, there are countless of valuable information of knowledge gained by me after the visit. Besides, I had the opportunity to learn something that I couldn’t learn from the lectures and textbook. I have better understanding about how a construction site works now after the visit. I had seen and explored various materials and tools used during the construction period. This is an eye opener for me as I have never had the chance to see it with my own eyes. Besides, I was taught by the site contractor about the various professional construction technique used and its application. Most importantly, I had the chance to witness how much they emphasize on safeties in the construction site. They demand every worker to have their proper safety equipment on when a construction is going on. Even we, the visitors have to wear safety helmet just like other worker to guarantee our safety during our visit since there might be bricks or rocks that might fall from high ground and might hit our head. Moreover, safety signboard were seen everywhere to always remind their worker to emphasize on their own safety. Moreover, I can see that cooperation between workers is very important through this visit. Every worker at the construction site is cooperating with each other in order to accomplish the task given. This shows that cooperation is very vital in doing something important. Besides, construction site manager also plays a very important role. As I can see during the visit, the construction site was well planned. There was a site to throw all the domestic waste, and all the materials or tools were kept safe and sound to ensure their stability and secureness when it is being used in the future. Through this site visit, I was able to know further more about the method of construction of pad footing. This site visit really helps us to visual better in method of construction of pad footing. The site visit was very interesting and insightful. In conclusion, this visit has greatly enhanced my knowledge about construction site. I am very grateful to have a chance to visit there as I have gained a lot of knowledge. I wish that I could have more chances like this in the future as in really benefit me a lot.
  • 12. 12 7.0 Photos Figure 1 : Temporary Container Office Figure 2 : Temporary Work – Wooden Cabin Figure 3 : RC Store
  • 13. 13 Figure 4 : Safety Board (Safety Committee Chart, Safety Policy & Construction Site Plan) Figure 5 : List of Information about The Construction of The Site Figure 6 : Single Drum Roller used for compaction applications in road construction. Figure 7 : Backhoe used to dig trenches, including laying pipes, cables and foundations.
  • 14. 14 Figure 8 : Bar Bending Machine used to bend the steel bars. Figure 9 : PVC Pipes used for Plumbing. Figure 10 : Casing for Bored Pile
  • 15. 15 Figure 11 : Pile Caps Figure 12 : BRC Figure 13 : Formwork used as support structures and moulds to create structures out of concrete which is poured into the moulds. Figure 14 : Temporary Works – Scaffolding used to support people and hold materials that are to be used for construction or repair of buildings and other structures.
  • 16. 16 Figure 15 : Mesh Fabric Figure 16 : Stirrup that have been tied together with the links. Figure 17 : Roof Trusses used to support the roof. Figure 18 : Big Concrete Block to test the compression or the stability of the site.
  • 17. 17 Figure 19 : Excavator used to dig the ground. Figure 20 : Reinforcement Bar Figure 21 : Construction of Pad Footing.