UNIT- 2
TOOLS OF EDUCATIONAL
MANAGEMENT
Muhammad Inam Waris
OUTLINES
Today we will learn about:
 EDUCATIONAL MANAGEMENT AND ITS IMPORTANCE
 1. Control Charts
 2. Gantt Chart
 3. Critical Path Method
 4. Program Evaluation and Review Technique (PERT)
 5. Planning Programming Budgeting System(PPBS)
EDUCATIONAL MANAGEMENT AND ITS
IMPORTANCE
 Provide Useful Insight to Managers
 Optimum Utilization of Resources and Effective Administration
 Scientific Decisions
 Meeting Changing Environmental Requirement
 Fulfilling Social Responsibility (‘Fair Remuneration’)
 Management Training, Education and Research (managers have
come to acquire an attitude tilted towards research and development)
1. CONTROL CHART
 The control chart is a graph used to study
how a process changes over time. Data are
plotted in time order. A control chart always
has a central line for the average, an upper
line for the upper control limit, and a lower line
for the lower control limit. These lines are
determined from historical data.
CONTINUE…
A control chart is made up of three lines.
Central line (CL) which indicates
the standard of process.
Upper Control Limit (UCL).
Lower Control Limit (LCL).
2. GANTT CHART
 A chart in which a series of horizontal lines shows the amount of work
done or production completed in certain periods of time in relation to the
amount planned for those periods.
 Gantt charts are helpful for planning and guiding projects. They are most
appropriate for small- to medium-sized projects, but can be used for larger
projects, such as capital projects on occasion. They are ideal for most planning
projects that a department or college would be involved in.
TO DRAW UP A GANTT CHART
 To draw up a Gantt chart, follow these steps:
1. List all activities in the plan.
2. Head up graph paper with the days or weeks through completion.
3. Plot tasks onto graph paper.
4. Schedule activities.
5. Presenting the analysis.
3. CRITICAL PATH METHOD
 The critical path method (CPM), or critical path analysis (CPA), is
an algorithm for scheduling a set of project activities. A critical path is
determined by identifying the longest stretch of dependent activities
and measuring the time required to complete them from start to finish.
 In project management, a critical path is the sequence of project
network activities which add up to the longest overall duration,
regardless if that longest duration has float or not. This determines the
shortest time possible to complete the project. There can be 'total
float' (unused time) within the critical path.
3.1 KEY STEPS IN CRITICAL PATH METHOD
 The process of using critical path method in project planning phase has six steps.
 Step 1: Activity specification:
 Step 2: Activity sequence establishment:
 Step 3: Network diagram:
 Step 4: Estimates for each activity:
 Step 5: Identification of the critical path:
 Step 6: Critical path diagram to show project progresses
3.2 ADVANTAGES OF CRITICAL PATH METHOD
 Offers a visual representation of the project activities.
 Presents the time to complete the tasks and the overall project.
 Tracking of critical activities.
 Define the required tasks and put them down in an ordered (sequenced) list.
 Create a flowchart or other diagram showing each task in relation to the others.
 Identify the critical and non-critical relationships (paths) among tasks.
 Determine the expected completion or execution time for each task.
 Locate or devise alternatives (backups) for the most critical paths.
3.3 CRITICAL PATH ANALYSIS
 The critical path is the sequence of activities with the longest duration. A delay in
any of these activities will result in a delay for the whole project. Below are some
critical path examples to help you understand the key elements...
FLOAT DETERMINATION
 Once you’ve identified the critical path for the project, you can determine the float
for each activity. Float is the amount of time an activity can slip before it causes
your project to be delayed. Float is sometimes referred to as slack.
3.4 DISADVANTAGES OF CRITICAL PATH METHOD
 1. The CPA process can become complicated as the scope and extent of the project increases. Too
many interconnecting activities can result in the network diagram becoming very complicated.
 2. The CPA depends on the fundamental concept that the managers and personnel involved in the
project team are well versed with the various activities. “Unfortunately, practical experience has
shown that the principal assumption underlying CPM techniques, i.e., the project team’s ability to
reasonably predict the scope, schedule, and cost of each project, is frequently far beyond control.”
(Knoke and Garza, 2003)
 3. The task of understanding the needs of the critical path get more complicated when there is
more than one critical path in the project.
 4. In many cases, as the project progresses, the critical paths might change and evolve and past
critical paths may no longer be valid and new CP have to be identified for the project at regular
intervals.
 5. “The use of total float as a measure for assigning activities to their representative paths can
become problematic when analyzing as built schedules.
CONTINUE…
 6. As critical paths and floats change the scheduling of personnel also changes. Reallocation of
personnel is often very tricky as the individual might be working on more than one project at a
time.
 7. Very often, critical paths are not easy to identify especially if the project is unique and has never
been undertaken by the organization in the past.
 8. Traditionally, any good CPA requires that the process is understood and evaluated using the
forward and the backward pass to determine slack or float times. In reality, however, the time
constraints often result in decision makers using only one method to find the time and cost
requirements.
 9. CPA and network diagrams are highly dependent of information technology and computer
software. The cost of set up of software systems in the organization can have high initial cost.
 10. Organizations are also becoming increasingly global and political.
 11. In order to improve profits, it is necessary for companies to streamline their operations to
maintain their position in a constantly evolving product market.
4. PROGRAM EVALUATION AND REVIEW
TECHNIQUE (PERT)
 PERT is a planning and control tool used for defining and controlling the
tasks necessary to complete a project. PERT charts and Critical Path Method
(CPM) charts are often used interchangeably; the only difference is how task
times are computed. Both charts display the total project with all scheduled
tasks shown in sequence. The displayed tasks show which ones are in
parallel, those tasks that can be performed at the same time.
STEPS IN PERT PLANNING
1. Identify the specific activities and milestones.
2. Determine the proper sequence of activities.
3. Construct a network diagram
4. Estimate the time required for each activity.
5. Determine the critical path.
6. Update the PERT chart as the project progresses. An example of a PERT chart is
provided below
BENEFITS TO USING A PERT CHART OR THE CRITICAL PATH
METHOD
 Improved planning and scheduling of activities.
 Improved forecasting of resource requirements.
 Identification of repetitive planning patterns which can be followed in projects,
thus simplifying the planning process.
 Ability to see and thus reschedule activities to reflect inter-project dependencies
and resource limitations following know priority rules. .
5. PROCESS CAPABILITY CALCULATIONS
 Process capability is the long-term performance level of the process after it has
been brought under statistical control. In other words, process capability is the
range over which the natural variation of the process occurs as determined by the
system of common causes.
 Process capability is also the ability of the combination of people, machine,
methods, material, and measurements to produce a product that will consistently
meet the design requirements or customer expectation.
 The purpose of the process capability study is to determine the variation spread
and to find the effect of time on both the average and the spread.
6. PLANNING PROGRAMMING BUDGETING
SYSTEM
 Planning-Programming-Budgeting System (PPBS), a management tool to provide a
better analytical basis for decision making and for putting such decisions into
operation. A PPBS is constituted, basically, of five elements:
1. A program structure — a classification of the courses of action open to an
organization for attaining its objectives;
2. An approved program document that includes precise, quantitative data on needs,
resource inputs, and program outputs extending a number of years into the future;
3. A decision making process that establishes the functions, rules, and timetables for the
actions required by the PPBS;
4. An analysis process for measuring effectiveness and for weighing alternatives; and
5. An information system that supplies the data required to implement the system.
Thanks

More Related Content

What's hot

EDUCATIONAL MANAGEMENT AND ADMINISTRATION
EDUCATIONAL MANAGEMENT AND ADMINISTRATIONEDUCATIONAL MANAGEMENT AND ADMINISTRATION
EDUCATIONAL MANAGEMENT AND ADMINISTRATION
Fidy Zegge
 
Education mangement powerpoint
Education mangement powerpointEducation mangement powerpoint
Education mangement powerpoint
Edward Phiri
 
Educational Leadership
Educational LeadershipEducational Leadership
Educational Leadership
R.A Duhdra
 
educational planning
educational planningeducational planning
educational planning
Shafiqur Rehman
 
Educational management
Educational managementEducational management
Educational management
FazlulKabir1
 
Educational Planning
Educational PlanningEducational Planning
Educational Planning
Paula Marie Llido
 
Concept of educational management
Concept of educational managementConcept of educational management
Concept of educational management
AMNA IJAZ
 
Strategic Planning In Education
Strategic Planning In EducationStrategic Planning In Education
Strategic Planning In Education
Péter Radó
 
Educational leadership
Educational leadershipEducational leadership
Educational leadership
Anjali Sharma
 
Educational Planning Process in Pakistan
Educational Planning Process in PakistanEducational Planning Process in Pakistan
Educational Planning Process in Pakistan
mystique2015
 
Educational Planning
Educational PlanningEducational Planning
Educational Planning
Ladie Ballesteros
 
Educational management
Educational management Educational management
Educational management
Dr. Satish Kumar
 
Educational Leadership
Educational LeadershipEducational Leadership
Educational Leadership
Anjali Sharma
 
Strategic planning
Strategic planningStrategic planning
Strategic planning
Jerome dela Cruz
 
Maed educ 214 educ planning
Maed educ 214 educ planningMaed educ 214 educ planning
Maed educ 214 educ planning
MaryGemelieSorsogon2
 
School finance
School financeSchool finance
School finance
rjcordes
 
Introduction to the Process of Educational Planning
Introduction to the Process of Educational Planning Introduction to the Process of Educational Planning
Introduction to the Process of Educational Planning
IbrashPasha
 
Function and principles of school administration
Function and principles of school administrationFunction and principles of school administration
Function and principles of school administration
Mary Anne Colico-Bantiling
 
APPLICATION OF TECHNOLOGICAL TOOLS OF MANAGEMENT-8615
APPLICATION OF TECHNOLOGICAL TOOLS OF MANAGEMENT-8615APPLICATION OF TECHNOLOGICAL TOOLS OF MANAGEMENT-8615
APPLICATION OF TECHNOLOGICAL TOOLS OF MANAGEMENT-8615
EqraBaig
 
Trends in curriculum development
Trends in curriculum developmentTrends in curriculum development
Trends in curriculum development
Ghulam Mujtaba
 

What's hot (20)

EDUCATIONAL MANAGEMENT AND ADMINISTRATION
EDUCATIONAL MANAGEMENT AND ADMINISTRATIONEDUCATIONAL MANAGEMENT AND ADMINISTRATION
EDUCATIONAL MANAGEMENT AND ADMINISTRATION
 
Education mangement powerpoint
Education mangement powerpointEducation mangement powerpoint
Education mangement powerpoint
 
Educational Leadership
Educational LeadershipEducational Leadership
Educational Leadership
 
educational planning
educational planningeducational planning
educational planning
 
Educational management
Educational managementEducational management
Educational management
 
Educational Planning
Educational PlanningEducational Planning
Educational Planning
 
Concept of educational management
Concept of educational managementConcept of educational management
Concept of educational management
 
Strategic Planning In Education
Strategic Planning In EducationStrategic Planning In Education
Strategic Planning In Education
 
Educational leadership
Educational leadershipEducational leadership
Educational leadership
 
Educational Planning Process in Pakistan
Educational Planning Process in PakistanEducational Planning Process in Pakistan
Educational Planning Process in Pakistan
 
Educational Planning
Educational PlanningEducational Planning
Educational Planning
 
Educational management
Educational management Educational management
Educational management
 
Educational Leadership
Educational LeadershipEducational Leadership
Educational Leadership
 
Strategic planning
Strategic planningStrategic planning
Strategic planning
 
Maed educ 214 educ planning
Maed educ 214 educ planningMaed educ 214 educ planning
Maed educ 214 educ planning
 
School finance
School financeSchool finance
School finance
 
Introduction to the Process of Educational Planning
Introduction to the Process of Educational Planning Introduction to the Process of Educational Planning
Introduction to the Process of Educational Planning
 
Function and principles of school administration
Function and principles of school administrationFunction and principles of school administration
Function and principles of school administration
 
APPLICATION OF TECHNOLOGICAL TOOLS OF MANAGEMENT-8615
APPLICATION OF TECHNOLOGICAL TOOLS OF MANAGEMENT-8615APPLICATION OF TECHNOLOGICAL TOOLS OF MANAGEMENT-8615
APPLICATION OF TECHNOLOGICAL TOOLS OF MANAGEMENT-8615
 
Trends in curriculum development
Trends in curriculum developmentTrends in curriculum development
Trends in curriculum development
 

Similar to TOOLS OF EDUCATIONAL MANAGEMENT-8615

Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
Golam Bitonsir
 
Control techniques
Control techniquesControl techniques
Control techniques
Adnan Shakir
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
Golam Bitonsir
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
Golam Bitonsir
 
programmed evaluation and review technique,
programmed evaluation and review technique,programmed evaluation and review technique,
programmed evaluation and review technique,
siddhagiri nursing institute kaneri kolhapur
 
TIME MANAGEMENT chapter(6), PMBOK5
TIME MANAGEMENT chapter(6), PMBOK5TIME MANAGEMENT chapter(6), PMBOK5
TIME MANAGEMENT chapter(6), PMBOK5
Hisham Ali,PMP
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
rielaantonio
 
Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
Naveed Salman
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
dyaksa hanindito
 
PROJECT PLANNING METHODOLOGIES.pdf
PROJECT  PLANNING METHODOLOGIES.pdfPROJECT  PLANNING METHODOLOGIES.pdf
PROJECT PLANNING METHODOLOGIES.pdf
Surashmie Kaalmegh
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
KHUSHBU SHAH
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
Jignesh Kariya
 
Stopping the insanity
Stopping the insanityStopping the insanity
Stopping the insanity
Renzo Streglio
 
Advanced project management mod 4
Advanced project management mod 4Advanced project management mod 4
Advanced project management mod 4
POOJA UDAYAN
 
Scheduling coordination and control of projects
Scheduling coordination and control of projects Scheduling coordination and control of projects
Scheduling coordination and control of projects
Somashekar S.M
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP Workgroup
Tùng Trần Thanh
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursing
Hariasha
 
Pert and gantt chart
Pert and gantt chartPert and gantt chart
Pert and gantt chart
Yogesh Dengale
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based project
eSAT Journals
 

Similar to TOOLS OF EDUCATIONAL MANAGEMENT-8615 (20)

Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
Control techniques
Control techniquesControl techniques
Control techniques
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
programmed evaluation and review technique,
programmed evaluation and review technique,programmed evaluation and review technique,
programmed evaluation and review technique,
 
TIME MANAGEMENT chapter(6), PMBOK5
TIME MANAGEMENT chapter(6), PMBOK5TIME MANAGEMENT chapter(6), PMBOK5
TIME MANAGEMENT chapter(6), PMBOK5
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
 
Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
PROJECT PLANNING METHODOLOGIES.pdf
PROJECT  PLANNING METHODOLOGIES.pdfPROJECT  PLANNING METHODOLOGIES.pdf
PROJECT PLANNING METHODOLOGIES.pdf
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
 
Stopping the insanity
Stopping the insanityStopping the insanity
Stopping the insanity
 
Advanced project management mod 4
Advanced project management mod 4Advanced project management mod 4
Advanced project management mod 4
 
Scheduling coordination and control of projects
Scheduling coordination and control of projects Scheduling coordination and control of projects
Scheduling coordination and control of projects
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Network Analysis- CPM ppt..pptx
 
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP Workgroup
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursing
 
Pert and gantt chart
Pert and gantt chartPert and gantt chart
Pert and gantt chart
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based project
 

More from EqraBaig

Inferential Statistics: Chi Square (X2) - DAY 6 - B.ED - 8614 - AIOU
Inferential Statistics: Chi Square (X2) - DAY 6 - B.ED - 8614 - AIOUInferential Statistics: Chi Square (X2) - DAY 6 - B.ED - 8614 - AIOU
Inferential Statistics: Chi Square (X2) - DAY 6 - B.ED - 8614 - AIOU
EqraBaig
 
Correlation and Regression - ANOVA - DAY 5 - B.Ed - 8614 - AIOU
Correlation and Regression - ANOVA - DAY 5 - B.Ed - 8614 - AIOUCorrelation and Regression - ANOVA - DAY 5 - B.Ed - 8614 - AIOU
Correlation and Regression - ANOVA - DAY 5 - B.Ed - 8614 - AIOU
EqraBaig
 
Inferential Statistics - DAY 4 - B.Ed - AIOU
Inferential Statistics - DAY 4 - B.Ed - AIOUInferential Statistics - DAY 4 - B.Ed - AIOU
Inferential Statistics - DAY 4 - B.Ed - AIOU
EqraBaig
 
Descriptive Statistics: Measures of Central Tendency - Measures of Dispersion...
Descriptive Statistics: Measures of Central Tendency - Measures of Dispersion...Descriptive Statistics: Measures of Central Tendency - Measures of Dispersion...
Descriptive Statistics: Measures of Central Tendency - Measures of Dispersion...
EqraBaig
 
Statistical Graphics / Exploratory Data Analysis - DAY 2 - 8614 - B.Ed - AIOU
Statistical Graphics / Exploratory Data Analysis - DAY 2 - 8614 - B.Ed - AIOUStatistical Graphics / Exploratory Data Analysis - DAY 2 - 8614 - B.Ed - AIOU
Statistical Graphics / Exploratory Data Analysis - DAY 2 - 8614 - B.Ed - AIOU
EqraBaig
 
Introduction to Statistics - Basics Statistics Concepts - Day 1- 8614 - B.Ed ...
Introduction to Statistics - Basics Statistics Concepts - Day 1- 8614 - B.Ed ...Introduction to Statistics - Basics Statistics Concepts - Day 1- 8614 - B.Ed ...
Introduction to Statistics - Basics Statistics Concepts - Day 1- 8614 - B.Ed ...
EqraBaig
 
Laboratory organization, management and safety methods - Chapter # 03 : LABOR...
Laboratory organization, management and safety methods - Chapter # 03 : LABOR...Laboratory organization, management and safety methods - Chapter # 03 : LABOR...
Laboratory organization, management and safety methods - Chapter # 03 : LABOR...
EqraBaig
 
Laboratory organization, management and safety methods - Chapter # 02 : MANAG...
Laboratory organization, management and safety methods - Chapter # 02 : MANAG...Laboratory organization, management and safety methods - Chapter # 02 : MANAG...
Laboratory organization, management and safety methods - Chapter # 02 : MANAG...
EqraBaig
 
Laboratory organization, management and safety methods - Chapter # 04 : PRACT...
Laboratory organization, management and safety methods - Chapter # 04 : PRACT...Laboratory organization, management and safety methods - Chapter # 04 : PRACT...
Laboratory organization, management and safety methods - Chapter # 04 : PRACT...
EqraBaig
 
Laboratory organization, management and safety methods - LABORATORY DESIGN ​-...
Laboratory organization, management and safety methods - LABORATORY DESIGN ​-...Laboratory organization, management and safety methods - LABORATORY DESIGN ​-...
Laboratory organization, management and safety methods - LABORATORY DESIGN ​-...
EqraBaig
 
Laboratory organization, management and safety methods - Chapter # 05 : Aims ...
Laboratory organization, management and safety methods - Chapter # 05 : Aims ...Laboratory organization, management and safety methods - Chapter # 05 : Aims ...
Laboratory organization, management and safety methods - Chapter # 05 : Aims ...
EqraBaig
 
COMPUTERS IN EDUCATION - UNIT 9 - PROBLEMS OF USING COMPUTER FOR EDUCATION - ...
COMPUTERS IN EDUCATION - UNIT 9 - PROBLEMS OF USING COMPUTER FOR EDUCATION - ...COMPUTERS IN EDUCATION - UNIT 9 - PROBLEMS OF USING COMPUTER FOR EDUCATION - ...
COMPUTERS IN EDUCATION - UNIT 9 - PROBLEMS OF USING COMPUTER FOR EDUCATION - ...
EqraBaig
 
COMPUTERS IN EDUCATION - UNIT 8 - ROLE OF COMPUTER IN EDUCATION - B.ED - 8620...
COMPUTERS IN EDUCATION - UNIT 8 - ROLE OF COMPUTER IN EDUCATION - B.ED - 8620...COMPUTERS IN EDUCATION - UNIT 8 - ROLE OF COMPUTER IN EDUCATION - B.ED - 8620...
COMPUTERS IN EDUCATION - UNIT 8 - ROLE OF COMPUTER IN EDUCATION - B.ED - 8620...
EqraBaig
 
COMPUTERS IN EDUCATION - UNIT 7 - COMPUTER APPLICATIONS IN CONTENT AREAS - B....
COMPUTERS IN EDUCATION - UNIT 7 - COMPUTER APPLICATIONS IN CONTENT AREAS - B....COMPUTERS IN EDUCATION - UNIT 7 - COMPUTER APPLICATIONS IN CONTENT AREAS - B....
COMPUTERS IN EDUCATION - UNIT 7 - COMPUTER APPLICATIONS IN CONTENT AREAS - B....
EqraBaig
 
COMPUTERS IN EDUCATION - UNIT 6 - COMPUTER MANAGED LEARNING (CML) - B.ED - 8...
 COMPUTERS IN EDUCATION - UNIT 6 - COMPUTER MANAGED LEARNING (CML) - B.ED - 8... COMPUTERS IN EDUCATION - UNIT 6 - COMPUTER MANAGED LEARNING (CML) - B.ED - 8...
COMPUTERS IN EDUCATION - UNIT 6 - COMPUTER MANAGED LEARNING (CML) - B.ED - 8...
EqraBaig
 
COMPUTERS IN EDUCATION - UNIT 4 - COMPUTER ASSISTED INSTRUCTION - B.ED - 8620...
COMPUTERS IN EDUCATION - UNIT 4 - COMPUTER ASSISTED INSTRUCTION - B.ED - 8620...COMPUTERS IN EDUCATION - UNIT 4 - COMPUTER ASSISTED INSTRUCTION - B.ED - 8620...
COMPUTERS IN EDUCATION - UNIT 4 - COMPUTER ASSISTED INSTRUCTION - B.ED - 8620...
EqraBaig
 
COMPUTERS IN EDUCATION - UNIT 1 - INTRODUCTION TO COMPUTER - B.ED - 8620 - AIOU
COMPUTERS IN EDUCATION - UNIT 1 - INTRODUCTION TO COMPUTER - B.ED - 8620 - AIOUCOMPUTERS IN EDUCATION - UNIT 1 - INTRODUCTION TO COMPUTER - B.ED - 8620 - AIOU
COMPUTERS IN EDUCATION - UNIT 1 - INTRODUCTION TO COMPUTER - B.ED - 8620 - AIOU
EqraBaig
 
COMPUTERS IN EDUCATION - UNIT 5 - TOOLS AND PACKAGES USED FOR CAI - B.ED - 86...
COMPUTERS IN EDUCATION - UNIT 5 - TOOLS AND PACKAGES USED FOR CAI - B.ED - 86...COMPUTERS IN EDUCATION - UNIT 5 - TOOLS AND PACKAGES USED FOR CAI - B.ED - 86...
COMPUTERS IN EDUCATION - UNIT 5 - TOOLS AND PACKAGES USED FOR CAI - B.ED - 86...
EqraBaig
 
TEACHER EDUCATION - TEACHER EDUCATION PROBLEMS , PROSPECTS AND FUTURE - UNIT ...
TEACHER EDUCATION - TEACHER EDUCATION PROBLEMS , PROSPECTS AND FUTURE - UNIT ...TEACHER EDUCATION - TEACHER EDUCATION PROBLEMS , PROSPECTS AND FUTURE - UNIT ...
TEACHER EDUCATION - TEACHER EDUCATION PROBLEMS , PROSPECTS AND FUTURE - UNIT ...
EqraBaig
 
TEACHER EDUCATION - TEACHER EDUCATION IN PAKISTAN - UNIT 2 - COURSE CODE 8626...
TEACHER EDUCATION - TEACHER EDUCATION IN PAKISTAN - UNIT 2 - COURSE CODE 8626...TEACHER EDUCATION - TEACHER EDUCATION IN PAKISTAN - UNIT 2 - COURSE CODE 8626...
TEACHER EDUCATION - TEACHER EDUCATION IN PAKISTAN - UNIT 2 - COURSE CODE 8626...
EqraBaig
 

More from EqraBaig (20)

Inferential Statistics: Chi Square (X2) - DAY 6 - B.ED - 8614 - AIOU
Inferential Statistics: Chi Square (X2) - DAY 6 - B.ED - 8614 - AIOUInferential Statistics: Chi Square (X2) - DAY 6 - B.ED - 8614 - AIOU
Inferential Statistics: Chi Square (X2) - DAY 6 - B.ED - 8614 - AIOU
 
Correlation and Regression - ANOVA - DAY 5 - B.Ed - 8614 - AIOU
Correlation and Regression - ANOVA - DAY 5 - B.Ed - 8614 - AIOUCorrelation and Regression - ANOVA - DAY 5 - B.Ed - 8614 - AIOU
Correlation and Regression - ANOVA - DAY 5 - B.Ed - 8614 - AIOU
 
Inferential Statistics - DAY 4 - B.Ed - AIOU
Inferential Statistics - DAY 4 - B.Ed - AIOUInferential Statistics - DAY 4 - B.Ed - AIOU
Inferential Statistics - DAY 4 - B.Ed - AIOU
 
Descriptive Statistics: Measures of Central Tendency - Measures of Dispersion...
Descriptive Statistics: Measures of Central Tendency - Measures of Dispersion...Descriptive Statistics: Measures of Central Tendency - Measures of Dispersion...
Descriptive Statistics: Measures of Central Tendency - Measures of Dispersion...
 
Statistical Graphics / Exploratory Data Analysis - DAY 2 - 8614 - B.Ed - AIOU
Statistical Graphics / Exploratory Data Analysis - DAY 2 - 8614 - B.Ed - AIOUStatistical Graphics / Exploratory Data Analysis - DAY 2 - 8614 - B.Ed - AIOU
Statistical Graphics / Exploratory Data Analysis - DAY 2 - 8614 - B.Ed - AIOU
 
Introduction to Statistics - Basics Statistics Concepts - Day 1- 8614 - B.Ed ...
Introduction to Statistics - Basics Statistics Concepts - Day 1- 8614 - B.Ed ...Introduction to Statistics - Basics Statistics Concepts - Day 1- 8614 - B.Ed ...
Introduction to Statistics - Basics Statistics Concepts - Day 1- 8614 - B.Ed ...
 
Laboratory organization, management and safety methods - Chapter # 03 : LABOR...
Laboratory organization, management and safety methods - Chapter # 03 : LABOR...Laboratory organization, management and safety methods - Chapter # 03 : LABOR...
Laboratory organization, management and safety methods - Chapter # 03 : LABOR...
 
Laboratory organization, management and safety methods - Chapter # 02 : MANAG...
Laboratory organization, management and safety methods - Chapter # 02 : MANAG...Laboratory organization, management and safety methods - Chapter # 02 : MANAG...
Laboratory organization, management and safety methods - Chapter # 02 : MANAG...
 
Laboratory organization, management and safety methods - Chapter # 04 : PRACT...
Laboratory organization, management and safety methods - Chapter # 04 : PRACT...Laboratory organization, management and safety methods - Chapter # 04 : PRACT...
Laboratory organization, management and safety methods - Chapter # 04 : PRACT...
 
Laboratory organization, management and safety methods - LABORATORY DESIGN ​-...
Laboratory organization, management and safety methods - LABORATORY DESIGN ​-...Laboratory organization, management and safety methods - LABORATORY DESIGN ​-...
Laboratory organization, management and safety methods - LABORATORY DESIGN ​-...
 
Laboratory organization, management and safety methods - Chapter # 05 : Aims ...
Laboratory organization, management and safety methods - Chapter # 05 : Aims ...Laboratory organization, management and safety methods - Chapter # 05 : Aims ...
Laboratory organization, management and safety methods - Chapter # 05 : Aims ...
 
COMPUTERS IN EDUCATION - UNIT 9 - PROBLEMS OF USING COMPUTER FOR EDUCATION - ...
COMPUTERS IN EDUCATION - UNIT 9 - PROBLEMS OF USING COMPUTER FOR EDUCATION - ...COMPUTERS IN EDUCATION - UNIT 9 - PROBLEMS OF USING COMPUTER FOR EDUCATION - ...
COMPUTERS IN EDUCATION - UNIT 9 - PROBLEMS OF USING COMPUTER FOR EDUCATION - ...
 
COMPUTERS IN EDUCATION - UNIT 8 - ROLE OF COMPUTER IN EDUCATION - B.ED - 8620...
COMPUTERS IN EDUCATION - UNIT 8 - ROLE OF COMPUTER IN EDUCATION - B.ED - 8620...COMPUTERS IN EDUCATION - UNIT 8 - ROLE OF COMPUTER IN EDUCATION - B.ED - 8620...
COMPUTERS IN EDUCATION - UNIT 8 - ROLE OF COMPUTER IN EDUCATION - B.ED - 8620...
 
COMPUTERS IN EDUCATION - UNIT 7 - COMPUTER APPLICATIONS IN CONTENT AREAS - B....
COMPUTERS IN EDUCATION - UNIT 7 - COMPUTER APPLICATIONS IN CONTENT AREAS - B....COMPUTERS IN EDUCATION - UNIT 7 - COMPUTER APPLICATIONS IN CONTENT AREAS - B....
COMPUTERS IN EDUCATION - UNIT 7 - COMPUTER APPLICATIONS IN CONTENT AREAS - B....
 
COMPUTERS IN EDUCATION - UNIT 6 - COMPUTER MANAGED LEARNING (CML) - B.ED - 8...
 COMPUTERS IN EDUCATION - UNIT 6 - COMPUTER MANAGED LEARNING (CML) - B.ED - 8... COMPUTERS IN EDUCATION - UNIT 6 - COMPUTER MANAGED LEARNING (CML) - B.ED - 8...
COMPUTERS IN EDUCATION - UNIT 6 - COMPUTER MANAGED LEARNING (CML) - B.ED - 8...
 
COMPUTERS IN EDUCATION - UNIT 4 - COMPUTER ASSISTED INSTRUCTION - B.ED - 8620...
COMPUTERS IN EDUCATION - UNIT 4 - COMPUTER ASSISTED INSTRUCTION - B.ED - 8620...COMPUTERS IN EDUCATION - UNIT 4 - COMPUTER ASSISTED INSTRUCTION - B.ED - 8620...
COMPUTERS IN EDUCATION - UNIT 4 - COMPUTER ASSISTED INSTRUCTION - B.ED - 8620...
 
COMPUTERS IN EDUCATION - UNIT 1 - INTRODUCTION TO COMPUTER - B.ED - 8620 - AIOU
COMPUTERS IN EDUCATION - UNIT 1 - INTRODUCTION TO COMPUTER - B.ED - 8620 - AIOUCOMPUTERS IN EDUCATION - UNIT 1 - INTRODUCTION TO COMPUTER - B.ED - 8620 - AIOU
COMPUTERS IN EDUCATION - UNIT 1 - INTRODUCTION TO COMPUTER - B.ED - 8620 - AIOU
 
COMPUTERS IN EDUCATION - UNIT 5 - TOOLS AND PACKAGES USED FOR CAI - B.ED - 86...
COMPUTERS IN EDUCATION - UNIT 5 - TOOLS AND PACKAGES USED FOR CAI - B.ED - 86...COMPUTERS IN EDUCATION - UNIT 5 - TOOLS AND PACKAGES USED FOR CAI - B.ED - 86...
COMPUTERS IN EDUCATION - UNIT 5 - TOOLS AND PACKAGES USED FOR CAI - B.ED - 86...
 
TEACHER EDUCATION - TEACHER EDUCATION PROBLEMS , PROSPECTS AND FUTURE - UNIT ...
TEACHER EDUCATION - TEACHER EDUCATION PROBLEMS , PROSPECTS AND FUTURE - UNIT ...TEACHER EDUCATION - TEACHER EDUCATION PROBLEMS , PROSPECTS AND FUTURE - UNIT ...
TEACHER EDUCATION - TEACHER EDUCATION PROBLEMS , PROSPECTS AND FUTURE - UNIT ...
 
TEACHER EDUCATION - TEACHER EDUCATION IN PAKISTAN - UNIT 2 - COURSE CODE 8626...
TEACHER EDUCATION - TEACHER EDUCATION IN PAKISTAN - UNIT 2 - COURSE CODE 8626...TEACHER EDUCATION - TEACHER EDUCATION IN PAKISTAN - UNIT 2 - COURSE CODE 8626...
TEACHER EDUCATION - TEACHER EDUCATION IN PAKISTAN - UNIT 2 - COURSE CODE 8626...
 

Recently uploaded

Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
Bisnar Chase Personal Injury Attorneys
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 

Recently uploaded (20)

Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 

TOOLS OF EDUCATIONAL MANAGEMENT-8615

  • 1. UNIT- 2 TOOLS OF EDUCATIONAL MANAGEMENT Muhammad Inam Waris
  • 2. OUTLINES Today we will learn about:  EDUCATIONAL MANAGEMENT AND ITS IMPORTANCE  1. Control Charts  2. Gantt Chart  3. Critical Path Method  4. Program Evaluation and Review Technique (PERT)  5. Planning Programming Budgeting System(PPBS)
  • 3. EDUCATIONAL MANAGEMENT AND ITS IMPORTANCE  Provide Useful Insight to Managers  Optimum Utilization of Resources and Effective Administration  Scientific Decisions  Meeting Changing Environmental Requirement  Fulfilling Social Responsibility (‘Fair Remuneration’)  Management Training, Education and Research (managers have come to acquire an attitude tilted towards research and development)
  • 4. 1. CONTROL CHART  The control chart is a graph used to study how a process changes over time. Data are plotted in time order. A control chart always has a central line for the average, an upper line for the upper control limit, and a lower line for the lower control limit. These lines are determined from historical data.
  • 5. CONTINUE… A control chart is made up of three lines. Central line (CL) which indicates the standard of process. Upper Control Limit (UCL). Lower Control Limit (LCL).
  • 6. 2. GANTT CHART  A chart in which a series of horizontal lines shows the amount of work done or production completed in certain periods of time in relation to the amount planned for those periods.  Gantt charts are helpful for planning and guiding projects. They are most appropriate for small- to medium-sized projects, but can be used for larger projects, such as capital projects on occasion. They are ideal for most planning projects that a department or college would be involved in.
  • 7.
  • 8. TO DRAW UP A GANTT CHART  To draw up a Gantt chart, follow these steps: 1. List all activities in the plan. 2. Head up graph paper with the days or weeks through completion. 3. Plot tasks onto graph paper. 4. Schedule activities. 5. Presenting the analysis.
  • 9. 3. CRITICAL PATH METHOD  The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.  In project management, a critical path is the sequence of project network activities which add up to the longest overall duration, regardless if that longest duration has float or not. This determines the shortest time possible to complete the project. There can be 'total float' (unused time) within the critical path.
  • 10.
  • 11. 3.1 KEY STEPS IN CRITICAL PATH METHOD  The process of using critical path method in project planning phase has six steps.  Step 1: Activity specification:  Step 2: Activity sequence establishment:  Step 3: Network diagram:  Step 4: Estimates for each activity:  Step 5: Identification of the critical path:  Step 6: Critical path diagram to show project progresses
  • 12. 3.2 ADVANTAGES OF CRITICAL PATH METHOD  Offers a visual representation of the project activities.  Presents the time to complete the tasks and the overall project.  Tracking of critical activities.  Define the required tasks and put them down in an ordered (sequenced) list.  Create a flowchart or other diagram showing each task in relation to the others.  Identify the critical and non-critical relationships (paths) among tasks.  Determine the expected completion or execution time for each task.  Locate or devise alternatives (backups) for the most critical paths.
  • 13. 3.3 CRITICAL PATH ANALYSIS  The critical path is the sequence of activities with the longest duration. A delay in any of these activities will result in a delay for the whole project. Below are some critical path examples to help you understand the key elements...
  • 14. FLOAT DETERMINATION  Once you’ve identified the critical path for the project, you can determine the float for each activity. Float is the amount of time an activity can slip before it causes your project to be delayed. Float is sometimes referred to as slack.
  • 15. 3.4 DISADVANTAGES OF CRITICAL PATH METHOD  1. The CPA process can become complicated as the scope and extent of the project increases. Too many interconnecting activities can result in the network diagram becoming very complicated.  2. The CPA depends on the fundamental concept that the managers and personnel involved in the project team are well versed with the various activities. “Unfortunately, practical experience has shown that the principal assumption underlying CPM techniques, i.e., the project team’s ability to reasonably predict the scope, schedule, and cost of each project, is frequently far beyond control.” (Knoke and Garza, 2003)  3. The task of understanding the needs of the critical path get more complicated when there is more than one critical path in the project.  4. In many cases, as the project progresses, the critical paths might change and evolve and past critical paths may no longer be valid and new CP have to be identified for the project at regular intervals.  5. “The use of total float as a measure for assigning activities to their representative paths can become problematic when analyzing as built schedules.
  • 16. CONTINUE…  6. As critical paths and floats change the scheduling of personnel also changes. Reallocation of personnel is often very tricky as the individual might be working on more than one project at a time.  7. Very often, critical paths are not easy to identify especially if the project is unique and has never been undertaken by the organization in the past.  8. Traditionally, any good CPA requires that the process is understood and evaluated using the forward and the backward pass to determine slack or float times. In reality, however, the time constraints often result in decision makers using only one method to find the time and cost requirements.  9. CPA and network diagrams are highly dependent of information technology and computer software. The cost of set up of software systems in the organization can have high initial cost.  10. Organizations are also becoming increasingly global and political.  11. In order to improve profits, it is necessary for companies to streamline their operations to maintain their position in a constantly evolving product market.
  • 17. 4. PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)  PERT is a planning and control tool used for defining and controlling the tasks necessary to complete a project. PERT charts and Critical Path Method (CPM) charts are often used interchangeably; the only difference is how task times are computed. Both charts display the total project with all scheduled tasks shown in sequence. The displayed tasks show which ones are in parallel, those tasks that can be performed at the same time.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. STEPS IN PERT PLANNING 1. Identify the specific activities and milestones. 2. Determine the proper sequence of activities. 3. Construct a network diagram 4. Estimate the time required for each activity. 5. Determine the critical path. 6. Update the PERT chart as the project progresses. An example of a PERT chart is provided below
  • 23. BENEFITS TO USING A PERT CHART OR THE CRITICAL PATH METHOD  Improved planning and scheduling of activities.  Improved forecasting of resource requirements.  Identification of repetitive planning patterns which can be followed in projects, thus simplifying the planning process.  Ability to see and thus reschedule activities to reflect inter-project dependencies and resource limitations following know priority rules. .
  • 24. 5. PROCESS CAPABILITY CALCULATIONS  Process capability is the long-term performance level of the process after it has been brought under statistical control. In other words, process capability is the range over which the natural variation of the process occurs as determined by the system of common causes.  Process capability is also the ability of the combination of people, machine, methods, material, and measurements to produce a product that will consistently meet the design requirements or customer expectation.  The purpose of the process capability study is to determine the variation spread and to find the effect of time on both the average and the spread.
  • 25. 6. PLANNING PROGRAMMING BUDGETING SYSTEM  Planning-Programming-Budgeting System (PPBS), a management tool to provide a better analytical basis for decision making and for putting such decisions into operation. A PPBS is constituted, basically, of five elements: 1. A program structure — a classification of the courses of action open to an organization for attaining its objectives; 2. An approved program document that includes precise, quantitative data on needs, resource inputs, and program outputs extending a number of years into the future; 3. A decision making process that establishes the functions, rules, and timetables for the actions required by the PPBS; 4. An analysis process for measuring effectiveness and for weighing alternatives; and 5. An information system that supplies the data required to implement the system.