Summarised Approach - 2010
   Architecture Approach
   Architecture Development
1. Objectives




                                               2. Approach
5. Outputs




                        Preliminary




             4. Steps                   3. Inputs
1.Organisational
                                                          Context




                                   10. Architecture                         2.Identify
                                      Principles                          Stakeholders




Objectives

                                                                                                3. Stakeholder
             9. Supporting Tools
                                                                                                 Involvement




               8. Governance
                                                                                             4. Work Requirements
                Framework




                                   7. Architectural
                                                                         5. Identify Scope
                                     Framework




                                                      6. Architecture
                                                         Footprint
WHERE
                   •The Enterprise


           WHAT
                   •Define Organisational Context
Approach




           WHY
                   •Requirements for Architecture Work


           WHO
                   •Architectural Principles


           HOW
                   •Management Frameworks
Management Frameworks




           Determines how a company
           manages its change initiatives.
Approach

           Determines what business
           capabilities are required to
           deliver business value including
           the definition of return on
           investment and the requisite
           control/performance measures.
                                              Describes how a company runs its         Formalizes the way that business
                                              day-to-day operations, including IT.     systems are delivered in accordance
                                                                                       with the structures developed in the
                                                                                       IT architecture




                                                                                     Interoperability and
                                                                                     Relationships between
                                                                                     Management Frameworks
Reference Materials                        Non-Architectural Inputs
         External to the                            1. IT Strategy
         Enterprise
                                                    2. Governance
Inputs   1. TOGAF                                   Frameworks, etc,
         2. Other Frameworks




                                 Architectural Inputs
                               1. Existing Frameworks
                                2. Existing Principles
                               3. Organisational Model




                                     Input
Implement
                         Architecture Tools




                         Select and Tailor
                     Architecture Framework(s)
Steps


                 Identify and Establish Architecture
                              Principles




        Define and Establish Enterprise Architecture Team and
                             Organisation




            Confirm Governance and Support Frameworks




            Scope the Enterprise Organisations Impacted
2               3              4
                      1




           Organisational    Tailored
                                              Architecture
           Model for         Architecture                      Restatement
                                              Repository
           Enterprise        Framework
           Architecture

Output

          Inclusive of      Inclusive of     Populated with   Business
          additional        additional       framework        principles, goals,
          information       information      content          and drivers




                                     6
                  5




         Request for        Governance
         Architecture       Framework
         Work
1. Objectives




                                               2. Approach
5. Outputs




                        Architecture
                           Vision




             4. Steps                   3. Inputs
1.
                                            Recognition
                                               and
                               10.         Endorsement
                                                               2.
                             Impact of
                                                          Define and
                              Parallel
                                                           Organise
                           Architectures




Objectives
                 9.                                                          3.
               Formal                                                    Validate
             Approval to                                                 Business
              Proceed                                                      KPI’s




                 8.                                                          4.
               Create                                                    Scope and
             Comprehensi                                                  Prioritise
               ve Plan                                                    Baseline




                                                               5.
                                7.
                                                             Define
                            Articulate
                                                          Stakeholders
                           Architecture
                                                            and their
                              Vision
                                                6.          concerns
                                           Key Business
                                           Requirements
•What is in, and What is outside the scope of the architecture effort
                          •Constraints informed by the business principles and architecture
             General       principles



Approach

                          •Architecture Vision describes how the new capability will meet the
                           business goals and strategic objectives and address the
           Architecture    stakeholder concerns when implemented.
              Vision




                          •Identifying and articulating the business requirements implied in
                           new business capability to address key business drivers, and the
            Business       implied architecture requirements.
            Scenarios
Non-Architectural Inputs
         Reference Materials
                                                    1. Request for
         External to the
                                                    Architecture Work
         Enterprise
Inputs                                              2. Business principles,
         1. Architecture
                                                    goals, and drivers
         Reference Materials


                               Architectural Inputs
                               1. Organisational Model
                               for EA
                                2. Tailored Architecture
                                       Framework
                               3. Populated Architecture
                                      Repository




                                      Input
SAW


                                Business
                             transformation

                           Target Architecture
                                and KPIs

Steps                  Develop Architecture Vision


                    Architecture principles, including
                           business principles


                              Define scope


              Assess readiness for business transformation


                      Evaluate business capabilities


                 Business goals, drivers, and constraints


        Identify stakeholders, concerns, and business requirements


                    Establish the Architecture Project
2                    3                     4
                     1




           Approved                                     Tailored
                                  Refined                                       Architecture
           Statement of                                 Architecture
                                  Statements                                    Vision
           Architecture                                 Framework
           Work

Output

          Scope, Plan, Roles,                                                  Stakeholder Requirements
                                Business Principles,   Tailored architecture
          Risks, Assessment,                                                   Baseline and Target
                                Goals, Drivers         method, and content.
          Business Case and                                                    Business, Technology,
                                                       Configured and
          KPI’s                                                                Data, Application
                                                       deployed tools
                                                                               Architecture


                                          6
                 5




                                 Architecture
         Communications          Repository
         Plan




                                Additional Content
1. Objectives




                                               2. Approach
5. Outputs




                         Business
                        Architecture




             4. Steps                   3. Inputs
1.
                                       Baseline
                                      Business
                                     Architecture



Objectives
                 5.
                                                                         2.
              Tools and
             Techniques                                            Target Business
                                                                    Architecture




                           4.
                      Architecture                       3.
                      Viewpoints
                                                    Gap Analysis
•The Business Strategy typically defines What to achieve – Business Architecture’s role is to define How
                           to get there
             General




                          •The analysis of the current state often has to be done bottom-up, particularly where little or no
                           architecture assets exist
Approach    Baseline      •The goal should be to re-use existing material as much as possible
           Description




                          •Business models should be logical extensions of the business scenarios from the Architecture Vision,
                           so that the architecture can be mapped from the high-level business requirements down to the more
            Business       detailed ones
            Modelling



                          •Generic business models relevant to the organization’s industry sector
                          •Business models relevant to common high-level business domains

           Architecture   •Enter prise-specific building blocks
            Repository    •Applicable standards
Non-Architectural Inputs
         Reference Materials                                         • Request for Architecture Work
         External to the Enterprise
                                                                     • Business principles, goals, and
         •Architecture Reference                                      drivers
          Materials                                                  •Capability Assessment
                                                                     •Communication Plan
Inputs                                Architectural Inputs
                                      •Organisational Model for EA
                                      •Tailored Architecture Framework
                                      •Populated Architecture
                                       Repository
                                      •Approved SAW
                                      •Enterprise Continuum
                                      •Architecture Repository
                                      •Architecture Vision




                                                 Input
Create
                           Architecture
                            Definition
                            Document
                           Finalize the
                             Business
                           Architecture

                   Conduct for mal stakeholder
                             review

Steps
             Resolve impacts across the Architecture
                           Landscape



                  Define roadmap components



                      Perform gap analysis



        Develop Target Business Architecture Description



        Develop Baseline Business Architecture Description



          Select reference models, viewpoints, and tools
2                      3                       4
                    1




                                    Draft                Draft
                                                                                   Business
                                    Architecture         Architecture
            Architecture                                                           Architecture
                                    Definition           Requirements
            Vision Updates                                                         Components
                                    Document             Specifications




Output
         SAW, Validate
                                 Baseline, Target and   Gap Analysis, Technical
         Business principles,                                                     Of an Architecture
                                 Views for Business     Requirements, Updated
         drivers, Architecture                                                    Roadmap
                                 Architecture           Business Requirements
         Principles
1. Objectives




                                               2. Approach
5. Outputs




                        Information
                          Systems
                        Architecture




             4. Steps                   3. Inputs
1. Target
                           Architectures




Objectives

                                               b.
                                           Application
                  a.
                                            System
             Data System
                                            Domain
               Domain
• Combination of Data and Application
                              Architecture
            Development
Approach




                            • implementation approach is top-down
                              design and bottom-up
           Implementation     implementation
Non-Architectural
         Reference Materials
                                                                   Inputs
         External to the
         Enterprise                                                • Request for Architecture
                                                                    Work
         •Architecture
Inputs                                                             • Capability Assessment
          Reference Materials
                                                                   •Communication Plan
                                Architectural Inputs
                                •Organisational Model for EA
                                •Tailored Architecture Framework
                                •Architecture Repository
                                •Approved SAW
                                •Enterprise Continuum
                                •Architecture Repository
                                •Architecture Vision
                                •Data and Application Principles
                                •Draft Architecture Document




                                              Input
Application Architecture
Steps




           Data Architecture
2                        3                       4
                   1




                                Draft                  Draft                     Information
                                Architecture           Architecture              System
            Architecture        Definition             Requirements              Architecture
            Vision Updates      Document               Specifications            Components



Output

                                                      Gap Analysis Results,
         Statement of        Baseline, Target and
                                                      Technical Requirements,   Of an Architecture
         Architecture Work   Views for Application
                                                      Updated Business          Roadmap
         (SAW)               and Data Architectures
                                                      Requirements
1. Objectives




                                               2. Approach
5. Outputs




                           Data
                        Architecture




             4. Steps                   3. Inputs
1.
                                   Data Sources
                                 understandable by
Objectives                         Stakeholders




                                                       2.
                    3.
                                                Data Sources that
             Data Sources that
                                                are complete and
                are stable
                                                    consistent
• Data Management
                                   • Data Migration
            Key Considerations
           for Data Architecture   • Data Governance

Approach


                                   • generic data models relevant to the
               Architecture          organization’s industry ‘‘vertical’’ sector
                Repository
Reference Materials
                                                                  Non-Architectural
         External to the                                          Inputs
         Enterprise                                               • Request for
         •Architecture                                            Architecture Work

          Reference                                               • Capability Assessment
                               Architectural Inputs
Inputs    Materials                                               •Communication Plan
                               •Organisational Model for EA
                               •Tailored Architecture Framework
                               •Architecture Repository
                               •SAW
                               •Enterprise Continuum
                               •Architecture Repository
                               •Architecture Vision
                               •Data Principles
                               •Draft Architecture Document
                               •Draft Arch. Req. Spec
                               •Bus Arch. Road Map




                                              Input
Definition
                         Document


                      Finalize the Data
                        Architecture


                 Conduct for mal stakeholder
                           review

Steps
           Resolve impacts across the Architecture
                         Landscape



                Define roadmap components



                    Perform gap analysis



        Develop Target Data Architecture Description



        Develop Baseline Data Architecture Description



        Select reference models, viewpoints, and tools
2                      3                       4
                    1




                                    Draft                Draft
                                                                                   Data
                                    Architecture         Architecture
            Architecture                                                           Architecture
                                    Definition           Requirements
            Vision Updates                                                         Components
                                    Document             Specifications



Output

         Statement of                                   Gap Analysis Results,
                                 Baseline, Target and
         Architecture Work                              Technical Requirements,   Of an Architecture
                                 Views for Data
         (SAW), Validated Data                          Updated Business          Roadmap
                                 Architectures
         Principles                                     Requirements
1. Objectives




                                               2. Approach
5. Outputs




                        Application
                        Architecture




             4. Steps                   3. Inputs
1.
                                       Define the
                                       application
                                        system to
                                      process data
                                      and support
                                        business

Objectives         5.                                                        2.
               applications                                             Define what
             that are stable                                             application
              and relatively                                            systems are
               unchanging                                              relevant to the
                                                                        organisation




                               4.                          3.
                         Technology                  Logical groups
                          agnostic                   of Capabilities
                                                      that manage
                                                      data objects
• Generic business models relevant to the
           Architecture
            Repository
                            organization’s industry sector
Approach
Non-Architectural
         Reference Materials                                       Inputs
         External to the
         Enterprise                                                • Request for Architecture
                                                                    Work
         •Architecture                                             • Capability Assessment
Inputs    Reference Materials   Architectural Inputs               •Communication Plan
                                •Organisational Model for EA
                                •Tailored Architecture Framework
                                •Architecture Repository
                                •Approved SAW
                                •Enterprise Continuum
                                •Architecture Repository
                                •Architecture Vision
                                •Application Principles
                                •Draft Architecture Document
                                •Draft Architecture Req. Spec.
                                •Bus and Data Components




                                              Input
Create
                            Architecture
                             Definition
                             Document
                            Finalize the
                            Application
                            Architecture

                    Conduct for mal stakeholder
                              review
Steps

              Resolve impacts across the Architecture
                            Landscape



                    Define roadmap components



                        Perform gap analysis



        Develop Target Application Architecture Description



        Develop Baseline Application Architecture Description



           Select reference models, viewpoints, and tools
2                       3                       4
                   1




                                Draft                 Draft
                                                                                Application
                                Architecture          Architecture
            Architecture                                                        Architecture
                                Definition            Requirements
            Vision Updates                                                      Components
                                Document              Specifications



Output

                                                     Gap Analysis Results,
         Statement of        Baseline, Target and
                                                     Technical Requirements,   Of an Architecture
         Architecture Work   Views for Application
                                                     Updated Business          Roadmap
         (SAW)               Architectures
                                                     Requirements
1. Objectives




                                               2. Approach
5. Outputs




                        Technology
                        Architecture




             4. Steps                   3. Inputs
1.
                                      To map
                                    Application
                                  Components into
                                    Technology
                                    Components

Objectives
                   4.
              Supports costs
             assessments for
                particular                                2.
                migration
                                                     Strong links to
                scenarios
                                                    implementation
                                                     and migration
                                                        planning


                                      3.
                               Logical groups of
                                Capabilities that
                                 manage data
                                    objects
•Existing IT services as documented in the IT repository
                          •TOGAF Reference Model
           Architecture   •Generic Technology Models
Approach    Repository    •Technology Models relevant to Common Systems Architecture
Non-Architectural
         Reference Materials                                            Inputs
         External to the
         Enterprise                                                     • Request for Architecture
                                                                         Work
         •Architecture                                                  • Capability Assessment
Inputs    Reference Materials   Architectural Inputs                    •Communication Plan
                                •Organisational Model for EA
                                •Tailored Architecture Framework
                                •Architecture Repository
                                •Approved SAW
                                •Enterprise Continuum
                                •Architecture Repository
                                •Architecture Vision
                                •Technology Principles
                                •Draft Architecture Document
                                •Draft Architecture Req. Spec.
                                •Bus, Application and Data Components




                                              Input
Definition
                             Document

                            Finalize the
                            Technology
                            Architecture

                    Conduct for mal stakeholder
                              review

Steps
              Resolve impacts across the Architecture
                            Landscape



                    Define roadmap components



                       Perform gap analysis



        Develop Target Technology Architecture Description



        Develop Baseline Technology Architecture Description



           Select reference models, viewpoints, and tools
2                       3                     4
                   1




                                Draft                 Draft
                                                                              Technology
                                Architecture          Architecture
            Architecture                                                      Architecture
                                Definition            Requirements
            Vision Updates                                                    Components
                                Document              Specifications



Output

                                                     Gap Analysis Results,
         Statement of        Baseline, Target and    Outputs from Phase B
                                                                             Of an Architecture
         Architecture Work   Views for Application   and C, Updated
                                                                             Roadmap
         (SAW)               Architectures           Technology
                                                     Requirements
1. Objectives




                                                2. Approach
5. Outputs




                        Opportunities
                        and Solutions




             4. Steps                    3. Inputs
1.
                                 Review Business
                                  Objectives and
                                 Consolidate Gaps




                   4.
              Consensus on
Objectives   Implementation                             2.
              and Migration
                                                    Review and
                Strategy
                                                    confirm the
                                                     enterprise
                                                      current
                                                    parameters


                                     3.
                              Derive Transition
                              Architectures for
                              continuous value
•Concentrates on how to deliver the Architecture
                                  •Logical Grouping within a IT Portfolio
                                  •Assess the organization’s business transformation readiness
           Target Architecture
            Implementation        •Identify all implementation constraints




                                  •Opportunities and solutions is done in a top-down fashion or is approached in a
                                   tactical opportunistic way
           Enterprise Strategic   •Phased deliver y working towards the Target Architecture
           Change Perspective
Approach


                                  •Architecture artefacts (especially the gap analysis results) are consolidated and their
                                   inter-dependencies closely assessed to derive an initial critical path
           Consolidation and      •A high-level Implementation and Migration Strategy is developed
              Integration




                                  •Transition Architectures consist of a set of co-ordinated and well-defined building
                                   blocks grouped into work packages that define the scope of deliver y vehicles
                                  •Transition Architecture delivers discrete business value based upon the overall
               Transition
              Architectures        enterprise capabilities
Non-Architectural
         Reference Materials                                                 Inputs
           External to the
                                                                      •Request for Architecture
             Enterprise                                                Work
         •Architecture Reference                                      •Capability Assessment
          Materials
                                            Architectural Inputs
                                                                      •Communication Plan
         •Product Information      •Organisational Model for EA       •Planning Methodologies
                                   •Governance Models & Frameworks
                                   •Tailored Architecture Framework
                                   •Architecture Repository
                                   •SAW
                                   •Enterprise Continuum
                                   •Architecture Repository
                                   •Architecture Vision
Inputs                             •Draft Architecture Document
                                   •Draft Architecture Req. Spec.
                                   •Change Requests




                                                Input
Portfolio
                                 and Project
                                  charters
                                 Transition
                                Architectures


                               work packages


                        Implementation and Migration
                                 Strategy

Steps              Confirm readiness and risk for business
                              transformation


                      Refine and validate dependencies


           Consolidate and reconcile interoperability requirements


            Review IT requirements from a functional perspective


        Review and consolidate gap analysis results from Phases B to D


             Determine business constraints for implementation


             Deter mine/confirm key corporate change attributes
2                  3                        4
                    1




            Updates of               Consolidate and
            Architecture             Validated          Capability                Transition
            Vision and               Architecture       Assessment                Architecture
            other                    Road Map
            architectures




                                                                                 Consolidated Gaps, Risk
                                                       Enterprise Architecture
         (SAW), Draft                                                            Register, Impact Analysis,
                                                       Maturity Profile,
         Architecture                                                            Dependency analysis
Output                                                 Transformation
         Definition Doc                                                          Report, Implementation
                                           5           Readiness Report
                                                                                 Factor and Deduction
                                                                                 Matrix




                                  Implementation
                                  and Migration
                                  Plan




                            including the high-level
                            Implementation and
                            Migration Strategy
1. Objectives




                                               2. Approach
5. Outputs




                        Migration
                        Planning




             4. Steps                   3. Inputs
1.
                                        Coordination
                                           with
                                        Management
                                        Frameworks


                   5.
                                                                            2.
              Create, evolve
               and monitor                                              Assigning
             implementation                                           Business Value
Objectives    and migration                                            and conduct
                  plan                                                cost/business
                                                                         analysis




                               4.                           3.
                          Confirm                        Finalise
                         Transition                    Architecture
                        Architectures                   Vision and
                                                        Definition
                                                       Documents
•Creation of plan in cooperation with project and portfolio managers
           Implementation and
             Migration Plan




                                  •Assessing the dependencies, costs, and benefits of the various migration projects.
                                  •Prioritized list of projects will for m the basis of the detailed Implementation and
           Prioritised Projects    Migration Plan

Approach


                                  •Co-ordination to ensure that business value is delivered and that the resources are
                                   made available to complete the necessary work.
               Enterprise
              Management          •Agencies outside of the enterprise architecture world are aware of the scope
              Frameworks




                                  •Ensure that the architecture stays relevant, and lessons learned should be documented
                                   to enable continuous process improvement
              Architecture
             Evolution Cycle
Non-
           Reference                                              Architectural
           Materials                                                 Inputs
         External to the
                                   Architectural Inputs         •Request for
           Enterprise
                           •Organisational Model for EA          Architecture Work
         •Architecture                                          •Capability
                           •Governance Models & Frameworks
          Reference                                              Assessment
                           •Tailored Architecture Framework
          Materials                                             •Communication Plan
                           •Architecture Repository
                           •SAW
                           •Enterprise Continuum
                           •Architecture Repository
                           •Architecture Vision
                           •Draft Architecture Document
                           •Draft Architecture Req. Spec.
Inputs                     •Change Requests
                           •Transition Architecture
                           •Capability Assessment
                           •Implementation and Migration Plan




                                       Input
architecture
                                         evolution cycle



                                   Generate the Architecture
                                   Implementation Roadmap



                                Confirm Transition Architecture
                                      increments/phases
Steps

                         conduct of a cost/benefit assessment and risk
                                           validation



                      Estimate resource requirements, project timings, and
                                  availability/deliver y vehicle




                             Assign a business value to each project




        Confirm management framework interactions for Implementation and Migration Plan
2                   3               4
                          1




                                  Finalised        Finalised
                                                                      Finalised
            Implementation        Architecture     Architecture
                                                                      Architecture
            and Migration         Definition       Requirement
                                                                      Roadmap
            Plan                  Document         Specification




                      5                6                  7                 8



Output

                                                                    Architecture
          Finalised           Re-Usable          Request for
                                                                    Contracts for
          Transition          Architecture       Architecture
                                                                    Implementation
          Architecture        Building Blocks    Work
                                                                    projects




                  9                    10




                              Change
         Implementation
                              Request arising
         Governance
                              for Lessons
         Model
                              Learned
1. Objectives




                                                 2. Approach
5. Outputs




                        Implementation
                          Governance




             4. Steps                     3. Inputs
1.
                                          Recommenda
                                          tions for each
                                          implementati                  2.
                                            on project
                       7.                                            Govern
                                                                   Architecture
                    Mobilise
                                                                    Contract
                   Supporting
                   Operations




Objectives
                 6.
                Ensure                                                   3.
             Conformance                                             Appropriate
                 with                                                Governance
               deployed                                               Functions
               solution



                                5.                         4.
                             Successful                Ensure
                            Deployment              Conformance
                                                    with defined
                                                    architecture
•Establish an implementation program that will enable the deliver y of the
                                    Transition Architectures agreed for implementation during the Migration
                                    Planning phase
              Implementation
                Programme




                                   •Adopt a phased deployment schedule that reflects the business priorities
            Phased Deployment       embodied in the Architecture Roadmap
                 Schedule




Approach
                                   •Follow the organization’s standard for corporate, IT, and architecture
           Organisation Standard
                                    governance




                                   •Use the organization’s established portfolio/program management
               Management           approach, where this exists
                Approach




                                   •Define an operations framework to ensure the effective long life of the
           Operations Framework
                                    deployed solution
Non-
           Reference                                              Architectural
           Materials                                                 Inputs
         External to the
                                   Architectural Inputs         •Request for
           Enterprise
                           •Organisational Model for EA          Architecture Work
         •Architecture                                          •Capability
                           •Governance Models & Frameworks
          Reference                                              Assessment
                           •Tailored Architecture Framework
          Materials                                             •Communication Plan
                           •Architecture Repository
                           •SAW
                           •Enterprise Continuum
                           •Architecture Repository
                           •Architecture Vision and Contract
                           •Draft Architecture Document
                           •Draft Architecture Req. Spec.
Inputs                     •Change Requests
                           •Transition Architecture
                           •Capability Assessment
                           •Implementation and Migration Plan




                                       Input
post-implementation
                                         review




                               Implement business and IT
                                      operations




Steps                  Perform enter prise architecture compliance
                                         reviews




                      Guide development of solutions deployment




                        Identify deployment resources and skills




        Confirm scope and priorities for deployment with development management
2               3            4
                 1




                                                    Architecture –
                        Compliance   Change         compliant
         Architecture   Assessment   Requests       solutions
         Contract                                   deployed




Output
1. Objectives




                                                2. Approach
5. Outputs




                        Architecture
                          Change
                        Management




             4. Steps                    3. Inputs
1.
                                  Baseline Fit-
                                  for-purpose
                                                            2.

                 6.                                     Assess
                                                     Performance
              Operate
                                                      and Make
             Governance
                                                    recommendati
             Framework
                                                         ons


Objectives




                   5.
               Maximise                             3.
             Business Value
                                                   Assess
                                                  Changes
                                   4.
                              Architecture
                                Change
                              Management
                                Process
•Strategic, top-down directed change to enhance or create new capability (capital)
                                  •Bottom-up changes to correct or enhance capability (operations and maintenance) for
                                   infrastructure under operations management

           Drivers for Change •Experiences with the previously delivered project increments




                                  •Simplification change: A simplification change can normally be handled via change
                                   management techniques.
Approach                          •Incremental change: An incremental change may be capable of being handled via change
                                   management techniques
               EA Change
              Management          •Re-architecting change: A re-architecting change requires putting the whole architecture
                                   through the architecture development cycle again
                Process




                                  •If the change impacts two stakeholders or more, then it is likely to require an architecture
                                   redesign and re-entry to the ADM.
                                  •If the change impacts only one stakeholder, then it is more likely to be a candidate for
                                   change management
             Guidelines for
           Maintenance vs. Re- •If the change can be allowed under a dispensation, then it is more likely to be a candidate
                                for change management.
                 Design
Non-
           Reference                                              Architectural
           Materials                                                 Inputs
         External to the
                                   Architectural Inputs         •Request for
           Enterprise
                           •Organisational Model for EA          Architecture Work
         •Architecture                                          •Capability
                           •Governance Models & Frameworks
          Reference                                              Assessment
                           •Tailored Architecture Framework
          Materials                                             •Communication Plan
                           •Architecture Repository
                           •SAW
                           •Enterprise Continuum
                           •Architecture Repository
                           •Architecture Vision and Contract
                           •Draft Architecture Document
                           •Draft Architecture Req. Spec.
Inputs                     •Change Requests
                           •Transition Architecture
                           •Capability Assessment
                           •Implementation and Migration Plan




                                       Input
Activate process




                  Manage governance
                       process



        Develop change requirements to meet
                performance targets
Steps

        Provide analysis for architecture change
                     management




                     Manage risks




               Deploy monitoring tools




          Establish value realization process
2                  3                4
                        1




                            Changes to
                                            New Request        Statement of
                            Architecture
             Architecture                   for Architecture   Architecture
                            Framework and
             Updates                        Work               Work
                            Principles




                    5                   6
Output



         Updated             Updated
         Architecture        Compliance
         Contract            Assessments
1. Objectives




                                                2. Approach
5. Outputs




                        Requirements
                        Management




             4. Steps                    3. Inputs
1.
                                     Define an EA Process:
                                       requirements are
                                           identified




Objectives



                      3.
                                                                      2.
             Define an EA Process:
                                                             Define an EA Process:
               requirements are
                                                               requirements are
              synched with ADM
                                                                     stored
                     Phases
•Dynamic process whereby requirements for enterprise
                        architecture and subsequent changes to those
                        requirements are identified
                       •Process for managing requirements throughout the
            General     overall ADM.




Approach
                       •Business Scenarios
                       •Volere Requirements Specification
                       •Requirements Tools
           Resources
Tailored           Requirements
                            Architecture            Impact
         A populated                              Assessment              Architecture
                            Framework
         Architecture                                                        Vision
          Repository



                                                           Architecture
                          Tailored                        Requirements
                        Architecture
                        Framework

                                           Statement of
Inputs                                     Architecture
                                               Work




                                  Input
Requirements Management Steps                          ADM Phase Steps
        Step 1                                           Identify/document requirements — use business
                                                         scenarios, or an analogous technique
        Step 2   Baseline requirements:
                 a. Determine priorities arising from
                    current phase of ADM
                 b. Confirm stakeholder buy-in to
                    resultant priorities
                 c. Record requirements priorities and
                    place in requirements repository
        Step 3   Monitor baseline requirements

Steps   Step 4                                           Identify changed requirements:
                                                         a. Remove or re-assess priorities
                                                         b. Add requirements and reassess priorities
                                                         c. Modify existing requirements
        Step 5   Identify changed requirements and
                 record priorities:
        Step 6                                           a. Assess impact of changed requirements on current
                                                            (active) phase
                                                         b. Assess impact of changed requirements on
                                                            previous phases
                                                         c. Determine whether to implement change, or defer
                                                            to later ADM cycle; if decision is to implement,
                                                            assess timescale for change management
                                                            implementation
                                                         d. Issue Requirements Impact Statement, Version n+1
        Step 7                                           Implement requirements arising from
                                                         Phase H
Requirements Management Steps                            ADM Phase Steps
        Step 8    Update the requirements repository with
                  information relating to the changes
                  requested, including stakeholder views
                  affected
        Step 9                                              Implement change in the current phase

        Step 10                                             Assess and revise gap analysis for past phases
                                                            The gap analysis in the ADM Phases B through D
                                                            identifies the gaps between Baseline and Target
                                                            Architectures.
                                                            Certain types of gap can give rise to gap requirements.
                                                            The ADM describes two kinds of gap:
Steps                                                               •Something that is present in the baseline, but
                                                                    not in the target (i.e., eliminated — by accident
                                                                    or design)
                                                                    • Something not in the baseline, but present in
                                                                    the target (i.e., new)
2
                1




                        Updated
         Requirements   Architecture
         Impact         Requirements
         Assessment     Specification




Output
   TOGAF Version 9, The Open Group
    Architecture Framework (TOGAF), 2009
If you have one last breath
use it to say...

TOGAF 9 Methodology Ver1 0

  • 1.
  • 2.
    Architecture Approach  Architecture Development
  • 11.
    1. Objectives 2. Approach 5. Outputs Preliminary 4. Steps 3. Inputs
  • 12.
    1.Organisational Context 10. Architecture 2.Identify Principles Stakeholders Objectives 3. Stakeholder 9. Supporting Tools Involvement 8. Governance 4. Work Requirements Framework 7. Architectural 5. Identify Scope Framework 6. Architecture Footprint
  • 13.
    WHERE •The Enterprise WHAT •Define Organisational Context Approach WHY •Requirements for Architecture Work WHO •Architectural Principles HOW •Management Frameworks
  • 14.
    Management Frameworks Determines how a company manages its change initiatives. Approach Determines what business capabilities are required to deliver business value including the definition of return on investment and the requisite control/performance measures. Describes how a company runs its Formalizes the way that business day-to-day operations, including IT. systems are delivered in accordance with the structures developed in the IT architecture Interoperability and Relationships between Management Frameworks
  • 15.
    Reference Materials Non-Architectural Inputs External to the 1. IT Strategy Enterprise 2. Governance Inputs 1. TOGAF Frameworks, etc, 2. Other Frameworks Architectural Inputs 1. Existing Frameworks 2. Existing Principles 3. Organisational Model Input
  • 16.
    Implement Architecture Tools Select and Tailor Architecture Framework(s) Steps Identify and Establish Architecture Principles Define and Establish Enterprise Architecture Team and Organisation Confirm Governance and Support Frameworks Scope the Enterprise Organisations Impacted
  • 17.
    2 3 4 1 Organisational Tailored Architecture Model for Architecture Restatement Repository Enterprise Framework Architecture Output Inclusive of Inclusive of Populated with Business additional additional framework principles, goals, information information content and drivers 6 5 Request for Governance Architecture Framework Work
  • 19.
    1. Objectives 2. Approach 5. Outputs Architecture Vision 4. Steps 3. Inputs
  • 20.
    1. Recognition and 10. Endorsement 2. Impact of Define and Parallel Organise Architectures Objectives 9. 3. Formal Validate Approval to Business Proceed KPI’s 8. 4. Create Scope and Comprehensi Prioritise ve Plan Baseline 5. 7. Define Articulate Stakeholders Architecture and their Vision 6. concerns Key Business Requirements
  • 21.
    •What is in,and What is outside the scope of the architecture effort •Constraints informed by the business principles and architecture General principles Approach •Architecture Vision describes how the new capability will meet the business goals and strategic objectives and address the Architecture stakeholder concerns when implemented. Vision •Identifying and articulating the business requirements implied in new business capability to address key business drivers, and the Business implied architecture requirements. Scenarios
  • 22.
    Non-Architectural Inputs Reference Materials 1. Request for External to the Architecture Work Enterprise Inputs 2. Business principles, 1. Architecture goals, and drivers Reference Materials Architectural Inputs 1. Organisational Model for EA 2. Tailored Architecture Framework 3. Populated Architecture Repository Input
  • 23.
    SAW Business transformation Target Architecture and KPIs Steps Develop Architecture Vision Architecture principles, including business principles Define scope Assess readiness for business transformation Evaluate business capabilities Business goals, drivers, and constraints Identify stakeholders, concerns, and business requirements Establish the Architecture Project
  • 24.
    2 3 4 1 Approved Tailored Refined Architecture Statement of Architecture Statements Vision Architecture Framework Work Output Scope, Plan, Roles, Stakeholder Requirements Business Principles, Tailored architecture Risks, Assessment, Baseline and Target Goals, Drivers method, and content. Business Case and Business, Technology, Configured and KPI’s Data, Application deployed tools Architecture 6 5 Architecture Communications Repository Plan Additional Content
  • 26.
    1. Objectives 2. Approach 5. Outputs Business Architecture 4. Steps 3. Inputs
  • 27.
    1. Baseline Business Architecture Objectives 5. 2. Tools and Techniques Target Business Architecture 4. Architecture 3. Viewpoints Gap Analysis
  • 28.
    •The Business Strategytypically defines What to achieve – Business Architecture’s role is to define How to get there General •The analysis of the current state often has to be done bottom-up, particularly where little or no architecture assets exist Approach Baseline •The goal should be to re-use existing material as much as possible Description •Business models should be logical extensions of the business scenarios from the Architecture Vision, so that the architecture can be mapped from the high-level business requirements down to the more Business detailed ones Modelling •Generic business models relevant to the organization’s industry sector •Business models relevant to common high-level business domains Architecture •Enter prise-specific building blocks Repository •Applicable standards
  • 29.
    Non-Architectural Inputs Reference Materials • Request for Architecture Work External to the Enterprise • Business principles, goals, and •Architecture Reference drivers Materials •Capability Assessment •Communication Plan Inputs Architectural Inputs •Organisational Model for EA •Tailored Architecture Framework •Populated Architecture Repository •Approved SAW •Enterprise Continuum •Architecture Repository •Architecture Vision Input
  • 30.
    Create Architecture Definition Document Finalize the Business Architecture Conduct for mal stakeholder review Steps Resolve impacts across the Architecture Landscape Define roadmap components Perform gap analysis Develop Target Business Architecture Description Develop Baseline Business Architecture Description Select reference models, viewpoints, and tools
  • 31.
    2 3 4 1 Draft Draft Business Architecture Architecture Architecture Architecture Definition Requirements Vision Updates Components Document Specifications Output SAW, Validate Baseline, Target and Gap Analysis, Technical Business principles, Of an Architecture Views for Business Requirements, Updated drivers, Architecture Roadmap Architecture Business Requirements Principles
  • 33.
    1. Objectives 2. Approach 5. Outputs Information Systems Architecture 4. Steps 3. Inputs
  • 34.
    1. Target Architectures Objectives b. Application a. System Data System Domain Domain
  • 35.
    • Combination ofData and Application Architecture Development Approach • implementation approach is top-down design and bottom-up Implementation implementation
  • 36.
    Non-Architectural Reference Materials Inputs External to the Enterprise • Request for Architecture Work •Architecture Inputs • Capability Assessment Reference Materials •Communication Plan Architectural Inputs •Organisational Model for EA •Tailored Architecture Framework •Architecture Repository •Approved SAW •Enterprise Continuum •Architecture Repository •Architecture Vision •Data and Application Principles •Draft Architecture Document Input
  • 37.
  • 38.
    2 3 4 1 Draft Draft Information Architecture Architecture System Architecture Definition Requirements Architecture Vision Updates Document Specifications Components Output Gap Analysis Results, Statement of Baseline, Target and Technical Requirements, Of an Architecture Architecture Work Views for Application Updated Business Roadmap (SAW) and Data Architectures Requirements
  • 40.
    1. Objectives 2. Approach 5. Outputs Data Architecture 4. Steps 3. Inputs
  • 41.
    1. Data Sources understandable by Objectives Stakeholders 2. 3. Data Sources that Data Sources that are complete and are stable consistent
  • 42.
    • Data Management • Data Migration Key Considerations for Data Architecture • Data Governance Approach • generic data models relevant to the Architecture organization’s industry ‘‘vertical’’ sector Repository
  • 43.
    Reference Materials Non-Architectural External to the Inputs Enterprise • Request for •Architecture Architecture Work Reference • Capability Assessment Architectural Inputs Inputs Materials •Communication Plan •Organisational Model for EA •Tailored Architecture Framework •Architecture Repository •SAW •Enterprise Continuum •Architecture Repository •Architecture Vision •Data Principles •Draft Architecture Document •Draft Arch. Req. Spec •Bus Arch. Road Map Input
  • 44.
    Definition Document Finalize the Data Architecture Conduct for mal stakeholder review Steps Resolve impacts across the Architecture Landscape Define roadmap components Perform gap analysis Develop Target Data Architecture Description Develop Baseline Data Architecture Description Select reference models, viewpoints, and tools
  • 45.
    2 3 4 1 Draft Draft Data Architecture Architecture Architecture Architecture Definition Requirements Vision Updates Components Document Specifications Output Statement of Gap Analysis Results, Baseline, Target and Architecture Work Technical Requirements, Of an Architecture Views for Data (SAW), Validated Data Updated Business Roadmap Architectures Principles Requirements
  • 47.
    1. Objectives 2. Approach 5. Outputs Application Architecture 4. Steps 3. Inputs
  • 48.
    1. Define the application system to process data and support business Objectives 5. 2. applications Define what that are stable application and relatively systems are unchanging relevant to the organisation 4. 3. Technology Logical groups agnostic of Capabilities that manage data objects
  • 49.
    • Generic businessmodels relevant to the Architecture Repository organization’s industry sector Approach
  • 50.
    Non-Architectural Reference Materials Inputs External to the Enterprise • Request for Architecture Work •Architecture • Capability Assessment Inputs Reference Materials Architectural Inputs •Communication Plan •Organisational Model for EA •Tailored Architecture Framework •Architecture Repository •Approved SAW •Enterprise Continuum •Architecture Repository •Architecture Vision •Application Principles •Draft Architecture Document •Draft Architecture Req. Spec. •Bus and Data Components Input
  • 51.
    Create Architecture Definition Document Finalize the Application Architecture Conduct for mal stakeholder review Steps Resolve impacts across the Architecture Landscape Define roadmap components Perform gap analysis Develop Target Application Architecture Description Develop Baseline Application Architecture Description Select reference models, viewpoints, and tools
  • 52.
    2 3 4 1 Draft Draft Application Architecture Architecture Architecture Architecture Definition Requirements Vision Updates Components Document Specifications Output Gap Analysis Results, Statement of Baseline, Target and Technical Requirements, Of an Architecture Architecture Work Views for Application Updated Business Roadmap (SAW) Architectures Requirements
  • 54.
    1. Objectives 2. Approach 5. Outputs Technology Architecture 4. Steps 3. Inputs
  • 55.
    1. To map Application Components into Technology Components Objectives 4. Supports costs assessments for particular 2. migration Strong links to scenarios implementation and migration planning 3. Logical groups of Capabilities that manage data objects
  • 56.
    •Existing IT servicesas documented in the IT repository •TOGAF Reference Model Architecture •Generic Technology Models Approach Repository •Technology Models relevant to Common Systems Architecture
  • 57.
    Non-Architectural Reference Materials Inputs External to the Enterprise • Request for Architecture Work •Architecture • Capability Assessment Inputs Reference Materials Architectural Inputs •Communication Plan •Organisational Model for EA •Tailored Architecture Framework •Architecture Repository •Approved SAW •Enterprise Continuum •Architecture Repository •Architecture Vision •Technology Principles •Draft Architecture Document •Draft Architecture Req. Spec. •Bus, Application and Data Components Input
  • 58.
    Definition Document Finalize the Technology Architecture Conduct for mal stakeholder review Steps Resolve impacts across the Architecture Landscape Define roadmap components Perform gap analysis Develop Target Technology Architecture Description Develop Baseline Technology Architecture Description Select reference models, viewpoints, and tools
  • 59.
    2 3 4 1 Draft Draft Technology Architecture Architecture Architecture Architecture Definition Requirements Vision Updates Components Document Specifications Output Gap Analysis Results, Statement of Baseline, Target and Outputs from Phase B Of an Architecture Architecture Work Views for Application and C, Updated Roadmap (SAW) Architectures Technology Requirements
  • 61.
    1. Objectives 2. Approach 5. Outputs Opportunities and Solutions 4. Steps 3. Inputs
  • 62.
    1. Review Business Objectives and Consolidate Gaps 4. Consensus on Objectives Implementation 2. and Migration Review and Strategy confirm the enterprise current parameters 3. Derive Transition Architectures for continuous value
  • 63.
    •Concentrates on howto deliver the Architecture •Logical Grouping within a IT Portfolio •Assess the organization’s business transformation readiness Target Architecture Implementation •Identify all implementation constraints •Opportunities and solutions is done in a top-down fashion or is approached in a tactical opportunistic way Enterprise Strategic •Phased deliver y working towards the Target Architecture Change Perspective Approach •Architecture artefacts (especially the gap analysis results) are consolidated and their inter-dependencies closely assessed to derive an initial critical path Consolidation and •A high-level Implementation and Migration Strategy is developed Integration •Transition Architectures consist of a set of co-ordinated and well-defined building blocks grouped into work packages that define the scope of deliver y vehicles •Transition Architecture delivers discrete business value based upon the overall Transition Architectures enterprise capabilities
  • 64.
    Non-Architectural Reference Materials Inputs External to the •Request for Architecture Enterprise Work •Architecture Reference •Capability Assessment Materials Architectural Inputs •Communication Plan •Product Information •Organisational Model for EA •Planning Methodologies •Governance Models & Frameworks •Tailored Architecture Framework •Architecture Repository •SAW •Enterprise Continuum •Architecture Repository •Architecture Vision Inputs •Draft Architecture Document •Draft Architecture Req. Spec. •Change Requests Input
  • 65.
    Portfolio and Project charters Transition Architectures work packages Implementation and Migration Strategy Steps Confirm readiness and risk for business transformation Refine and validate dependencies Consolidate and reconcile interoperability requirements Review IT requirements from a functional perspective Review and consolidate gap analysis results from Phases B to D Determine business constraints for implementation Deter mine/confirm key corporate change attributes
  • 66.
    2 3 4 1 Updates of Consolidate and Architecture Validated Capability Transition Vision and Architecture Assessment Architecture other Road Map architectures Consolidated Gaps, Risk Enterprise Architecture (SAW), Draft Register, Impact Analysis, Maturity Profile, Architecture Dependency analysis Output Transformation Definition Doc Report, Implementation 5 Readiness Report Factor and Deduction Matrix Implementation and Migration Plan including the high-level Implementation and Migration Strategy
  • 68.
    1. Objectives 2. Approach 5. Outputs Migration Planning 4. Steps 3. Inputs
  • 69.
    1. Coordination with Management Frameworks 5. 2. Create, evolve and monitor Assigning implementation Business Value Objectives and migration and conduct plan cost/business analysis 4. 3. Confirm Finalise Transition Architecture Architectures Vision and Definition Documents
  • 70.
    •Creation of planin cooperation with project and portfolio managers Implementation and Migration Plan •Assessing the dependencies, costs, and benefits of the various migration projects. •Prioritized list of projects will for m the basis of the detailed Implementation and Prioritised Projects Migration Plan Approach •Co-ordination to ensure that business value is delivered and that the resources are made available to complete the necessary work. Enterprise Management •Agencies outside of the enterprise architecture world are aware of the scope Frameworks •Ensure that the architecture stays relevant, and lessons learned should be documented to enable continuous process improvement Architecture Evolution Cycle
  • 71.
    Non- Reference Architectural Materials Inputs External to the Architectural Inputs •Request for Enterprise •Organisational Model for EA Architecture Work •Architecture •Capability •Governance Models & Frameworks Reference Assessment •Tailored Architecture Framework Materials •Communication Plan •Architecture Repository •SAW •Enterprise Continuum •Architecture Repository •Architecture Vision •Draft Architecture Document •Draft Architecture Req. Spec. Inputs •Change Requests •Transition Architecture •Capability Assessment •Implementation and Migration Plan Input
  • 72.
    architecture evolution cycle Generate the Architecture Implementation Roadmap Confirm Transition Architecture increments/phases Steps conduct of a cost/benefit assessment and risk validation Estimate resource requirements, project timings, and availability/deliver y vehicle Assign a business value to each project Confirm management framework interactions for Implementation and Migration Plan
  • 73.
    2 3 4 1 Finalised Finalised Finalised Implementation Architecture Architecture Architecture and Migration Definition Requirement Roadmap Plan Document Specification 5 6 7 8 Output Architecture Finalised Re-Usable Request for Contracts for Transition Architecture Architecture Implementation Architecture Building Blocks Work projects 9 10 Change Implementation Request arising Governance for Lessons Model Learned
  • 75.
    1. Objectives 2. Approach 5. Outputs Implementation Governance 4. Steps 3. Inputs
  • 76.
    1. Recommenda tions for each implementati 2. on project 7. Govern Architecture Mobilise Contract Supporting Operations Objectives 6. Ensure 3. Conformance Appropriate with Governance deployed Functions solution 5. 4. Successful Ensure Deployment Conformance with defined architecture
  • 77.
    •Establish an implementationprogram that will enable the deliver y of the Transition Architectures agreed for implementation during the Migration Planning phase Implementation Programme •Adopt a phased deployment schedule that reflects the business priorities Phased Deployment embodied in the Architecture Roadmap Schedule Approach •Follow the organization’s standard for corporate, IT, and architecture Organisation Standard governance •Use the organization’s established portfolio/program management Management approach, where this exists Approach •Define an operations framework to ensure the effective long life of the Operations Framework deployed solution
  • 78.
    Non- Reference Architectural Materials Inputs External to the Architectural Inputs •Request for Enterprise •Organisational Model for EA Architecture Work •Architecture •Capability •Governance Models & Frameworks Reference Assessment •Tailored Architecture Framework Materials •Communication Plan •Architecture Repository •SAW •Enterprise Continuum •Architecture Repository •Architecture Vision and Contract •Draft Architecture Document •Draft Architecture Req. Spec. Inputs •Change Requests •Transition Architecture •Capability Assessment •Implementation and Migration Plan Input
  • 79.
    post-implementation review Implement business and IT operations Steps Perform enter prise architecture compliance reviews Guide development of solutions deployment Identify deployment resources and skills Confirm scope and priorities for deployment with development management
  • 80.
    2 3 4 1 Architecture – Compliance Change compliant Architecture Assessment Requests solutions Contract deployed Output
  • 82.
    1. Objectives 2. Approach 5. Outputs Architecture Change Management 4. Steps 3. Inputs
  • 83.
    1. Baseline Fit- for-purpose 2. 6. Assess Performance Operate and Make Governance recommendati Framework ons Objectives 5. Maximise 3. Business Value Assess Changes 4. Architecture Change Management Process
  • 84.
    •Strategic, top-down directedchange to enhance or create new capability (capital) •Bottom-up changes to correct or enhance capability (operations and maintenance) for infrastructure under operations management Drivers for Change •Experiences with the previously delivered project increments •Simplification change: A simplification change can normally be handled via change management techniques. Approach •Incremental change: An incremental change may be capable of being handled via change management techniques EA Change Management •Re-architecting change: A re-architecting change requires putting the whole architecture through the architecture development cycle again Process •If the change impacts two stakeholders or more, then it is likely to require an architecture redesign and re-entry to the ADM. •If the change impacts only one stakeholder, then it is more likely to be a candidate for change management Guidelines for Maintenance vs. Re- •If the change can be allowed under a dispensation, then it is more likely to be a candidate for change management. Design
  • 85.
    Non- Reference Architectural Materials Inputs External to the Architectural Inputs •Request for Enterprise •Organisational Model for EA Architecture Work •Architecture •Capability •Governance Models & Frameworks Reference Assessment •Tailored Architecture Framework Materials •Communication Plan •Architecture Repository •SAW •Enterprise Continuum •Architecture Repository •Architecture Vision and Contract •Draft Architecture Document •Draft Architecture Req. Spec. Inputs •Change Requests •Transition Architecture •Capability Assessment •Implementation and Migration Plan Input
  • 86.
    Activate process Manage governance process Develop change requirements to meet performance targets Steps Provide analysis for architecture change management Manage risks Deploy monitoring tools Establish value realization process
  • 87.
    2 3 4 1 Changes to New Request Statement of Architecture Architecture for Architecture Architecture Framework and Updates Work Work Principles 5 6 Output Updated Updated Architecture Compliance Contract Assessments
  • 89.
    1. Objectives 2. Approach 5. Outputs Requirements Management 4. Steps 3. Inputs
  • 90.
    1. Define an EA Process: requirements are identified Objectives 3. 2. Define an EA Process: Define an EA Process: requirements are requirements are synched with ADM stored Phases
  • 91.
    •Dynamic process wherebyrequirements for enterprise architecture and subsequent changes to those requirements are identified •Process for managing requirements throughout the General overall ADM. Approach •Business Scenarios •Volere Requirements Specification •Requirements Tools Resources
  • 92.
    Tailored Requirements Architecture Impact A populated Assessment Architecture Framework Architecture Vision Repository Architecture Tailored Requirements Architecture Framework Statement of Inputs Architecture Work Input
  • 93.
    Requirements Management Steps ADM Phase Steps Step 1 Identify/document requirements — use business scenarios, or an analogous technique Step 2 Baseline requirements: a. Determine priorities arising from current phase of ADM b. Confirm stakeholder buy-in to resultant priorities c. Record requirements priorities and place in requirements repository Step 3 Monitor baseline requirements Steps Step 4 Identify changed requirements: a. Remove or re-assess priorities b. Add requirements and reassess priorities c. Modify existing requirements Step 5 Identify changed requirements and record priorities: Step 6 a. Assess impact of changed requirements on current (active) phase b. Assess impact of changed requirements on previous phases c. Determine whether to implement change, or defer to later ADM cycle; if decision is to implement, assess timescale for change management implementation d. Issue Requirements Impact Statement, Version n+1 Step 7 Implement requirements arising from Phase H
  • 94.
    Requirements Management Steps ADM Phase Steps Step 8 Update the requirements repository with information relating to the changes requested, including stakeholder views affected Step 9 Implement change in the current phase Step 10 Assess and revise gap analysis for past phases The gap analysis in the ADM Phases B through D identifies the gaps between Baseline and Target Architectures. Certain types of gap can give rise to gap requirements. The ADM describes two kinds of gap: Steps •Something that is present in the baseline, but not in the target (i.e., eliminated — by accident or design) • Something not in the baseline, but present in the target (i.e., new)
  • 95.
    2 1 Updated Requirements Architecture Impact Requirements Assessment Specification Output
  • 96.
    TOGAF Version 9, The Open Group Architecture Framework (TOGAF), 2009