This document contains a practice question set from Test Shopping, an innovative e-learning organization, for the TNEB/TANGEDCO AE Electrical Engineering Power System exam. It includes 10 multiple choice questions related to topics like circuit breakers, transmission lines, transformers, and power stations. The questions assess understanding of concepts like fault current behavior, factors that influence arc current, gas used in air blast circuit breakers, transformer protection relays, and how installed power station capacity is calculated.
OPEN CIRCUIT AND SHORT CIRCUIT TEST OF SINGLE PHASE TRANSFORMER|DAY7| BASIC E...Prasant Kumar
#Open_circuit_short_circuit_test of single phase transformer
#OC_SC_TEST OF TRANSFORMER
#Core loss and copper loss test of single phase transformer.
After going through this session you will be able to answer the following questions.
• Which parameters are obtained from O.C test?
• Which parameters are obtained from S.C test?
• What percentage of rated voltage is needed to be applied to carry out O.C test?
• What percentage of rated voltage is needed to be applied to carry out S.C test?
• From which side of a large transformer, would you like to carry out O.C test?
• From which side of a large transformer, would you like to carry out S.C test?
Aim of conduction transformer Open Circuit & Short Circuit test
To predict its performance without actual loading.
Determination of equivalent circuit parameters
To determine parameters of a transformer like voltage regulation and efficiency
Open circuit test is carried out to determine core loss and shunt parameters.
Open circuit test is carried out at rated voltage and rated frequency . During this test, rated flux is produced in the core .
To carry out open circuit test rated voltage at rated frequency is applied to LV side of the transformer and HV side is left opened as shown in the circuit diagram.
HV side is left opened because it is easier to arrange rated voltage supply on LV side because no load current which is quite small about 2 to 5% of the rated current.
Metering instrument connected at LV side are economical & always safer to work.
The voltmeter, ammeter and the wattmeter readings are taken and suppose they are Voc , Io and Poc respectively.
Strictly speaking the wattmeter will record the core loss as well as the LV winding copper loss. But the winding copper loss is very small compared to the core loss as the flux in the core is rated.
IDEAL AND PRACTICAL TRANSFORMER, EQUIVALENT CIRCUIT OF TRANSFORMER|DAY5|BASIC...Prasant Kumar
#IDEAL_PRACTICAL_TRANSFORMER
#EQUIVALENT_CIRCUIT OF TRANSFORMER
#BASIC ELECTRICAL ENGINEERING
#IDEAL TRANSFORMER ON NO LOAD
#PRACTICAL TRANSFORMER ON LOAD
#ELECTRCL TRANSFORMER
#SINGLE PHASE TRANSFORMER
Link of all sessions are.
DAY 1 (Need/Definition)
https://youtu.be/BvaykFJ_NoE
DAY 2 (Working principle and Construction)
https://youtu.be/06rgxocihaM
DAY 3 (EMF equation and Turns Ratio)
https://youtu.be/g7e5xBPmv3Y
DAY 4 (Classification of Transformer)
https://youtu.be/6NP5L4MlvY4
DAY 5 ( Ideal and practical transformer on no load)
(Equivalent Transformer)
https://youtu.be/6LCLQC1p3lg
OPEN CIRCUIT AND SHORT CIRCUIT TEST OF SINGLE PHASE TRANSFORMER|DAY7| BASIC E...Prasant Kumar
#Open_circuit_short_circuit_test of single phase transformer
#OC_SC_TEST OF TRANSFORMER
#Core loss and copper loss test of single phase transformer.
After going through this session you will be able to answer the following questions.
• Which parameters are obtained from O.C test?
• Which parameters are obtained from S.C test?
• What percentage of rated voltage is needed to be applied to carry out O.C test?
• What percentage of rated voltage is needed to be applied to carry out S.C test?
• From which side of a large transformer, would you like to carry out O.C test?
• From which side of a large transformer, would you like to carry out S.C test?
Aim of conduction transformer Open Circuit & Short Circuit test
To predict its performance without actual loading.
Determination of equivalent circuit parameters
To determine parameters of a transformer like voltage regulation and efficiency
Open circuit test is carried out to determine core loss and shunt parameters.
Open circuit test is carried out at rated voltage and rated frequency . During this test, rated flux is produced in the core .
To carry out open circuit test rated voltage at rated frequency is applied to LV side of the transformer and HV side is left opened as shown in the circuit diagram.
HV side is left opened because it is easier to arrange rated voltage supply on LV side because no load current which is quite small about 2 to 5% of the rated current.
Metering instrument connected at LV side are economical & always safer to work.
The voltmeter, ammeter and the wattmeter readings are taken and suppose they are Voc , Io and Poc respectively.
Strictly speaking the wattmeter will record the core loss as well as the LV winding copper loss. But the winding copper loss is very small compared to the core loss as the flux in the core is rated.
IDEAL AND PRACTICAL TRANSFORMER, EQUIVALENT CIRCUIT OF TRANSFORMER|DAY5|BASIC...Prasant Kumar
#IDEAL_PRACTICAL_TRANSFORMER
#EQUIVALENT_CIRCUIT OF TRANSFORMER
#BASIC ELECTRICAL ENGINEERING
#IDEAL TRANSFORMER ON NO LOAD
#PRACTICAL TRANSFORMER ON LOAD
#ELECTRCL TRANSFORMER
#SINGLE PHASE TRANSFORMER
Link of all sessions are.
DAY 1 (Need/Definition)
https://youtu.be/BvaykFJ_NoE
DAY 2 (Working principle and Construction)
https://youtu.be/06rgxocihaM
DAY 3 (EMF equation and Turns Ratio)
https://youtu.be/g7e5xBPmv3Y
DAY 4 (Classification of Transformer)
https://youtu.be/6NP5L4MlvY4
DAY 5 ( Ideal and practical transformer on no load)
(Equivalent Transformer)
https://youtu.be/6LCLQC1p3lg
O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficienc...Abhishek Choksi
Sub: DC Machines and Transformer (2130904)
Active Learning Assignment
Topic: O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficiency, All day Efficiency
Voltage Regulation of Transformer ,Efficiency of transformer|Day 8| Basic ele...Prasant Kumar
#Voltage_Regulation_Efficiency_Transformer
#Efficiency of transformer in Hindi
#Basic Electrical Engineering
#Electrical Transformer
#All Day efficiency of transformer
#What is regulation and its importance?
#How to estimate regulation at a given load and power factor?
#How to calculate efficiency of the transformer at a given load and power factor?
#Under what condition does the transformer operate at maximum efficiency?
#What is the difference between efficiency and all day efficiency?
Test done on Power transformers.
Insulation Resistance test, Winding Resistance test, Ratio Measurements, Magnetic balance test, Tan delta test, DIssolved gas analysis for transformer, Sweep frequency response analysis.
O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficienc...Abhishek Choksi
Sub: DC Machines and Transformer (2130904)
Active Learning Assignment
Topic: O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficiency, All day Efficiency
Voltage Regulation of Transformer ,Efficiency of transformer|Day 8| Basic ele...Prasant Kumar
#Voltage_Regulation_Efficiency_Transformer
#Efficiency of transformer in Hindi
#Basic Electrical Engineering
#Electrical Transformer
#All Day efficiency of transformer
#What is regulation and its importance?
#How to estimate regulation at a given load and power factor?
#How to calculate efficiency of the transformer at a given load and power factor?
#Under what condition does the transformer operate at maximum efficiency?
#What is the difference between efficiency and all day efficiency?
Test done on Power transformers.
Insulation Resistance test, Winding Resistance test, Ratio Measurements, Magnetic balance test, Tan delta test, DIssolved gas analysis for transformer, Sweep frequency response analysis.
Implementationof over voltageunder-voltageprotectionsystemSumaira Mustafa
The under/over voltage protection circuit with time delay presented here is a low cost and reliable circuit for protecting such equipment’s from damages. Whenever the power line is switched on it gets connected to the appliance only after a delay of a fixed time. If there is hi/low fluctuations beyond sets limits the appliance get disconnected. The system tries to connect the power back after the specific time delay, the delay being counted from the time of disconnection. If the power down time (time for which the voltage is beyond limits) is less than the delay time, the power resumes after the delay: If it is equal or more, then the power resumes directly.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
Ethnobotany and Ethnopharmacology:
Ethnobotany in herbal drug evaluation,
Impact of Ethnobotany in traditional medicine,
New development in herbals,
Bio-prospecting tools for drug discovery,
Role of Ethnopharmacology in drug evaluation,
Reverse Pharmacology.
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
How to Create Map Views in the Odoo 17 ERPCeline George
The map views are useful for providing a geographical representation of data. They allow users to visualize and analyze the data in a more intuitive manner.
The Indian economy is classified into different sectors to simplify the analysis and understanding of economic activities. For Class 10, it's essential to grasp the sectors of the Indian economy, understand their characteristics, and recognize their importance. This guide will provide detailed notes on the Sectors of the Indian Economy Class 10, using specific long-tail keywords to enhance comprehension.
For more information, visit-www.vavaclasses.com
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Unit 8 - Information and Communication Technology (Paper I).pdf
TNEB AE Power System Practice Question Part 1
1. Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
TNEB / TANGEDCO AE
ELECTRICAL ENGINEERING
POWER SYSTEM
Practice Question Set
2. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
In circuit breaker operating condition, at the instant of
current zero point, the fault current is.
1. Leads the arc voltage by 𝟗𝟎𝟎
2. Lags the arc voltage by 𝟑𝟎𝟎
3. Leads the arc voltage by 𝟑𝟎𝟎
4. Lags the arc voltage by 𝟗𝟎𝟎
3. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
In circuit breaker operating condition, at the instant of
current zero point, the fault current is.
1. Leads the arc voltage by 𝟗𝟎𝟎
2. Lags the arc voltage by 𝟑𝟎𝟎
3. Leads the arc voltage by 𝟑𝟎𝟎
4. Lags the arc voltage by 𝟗𝟎𝟎
4. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
During arcing period of circuit breaker, the current flowing
through the electrodes is depends on.
1. Degree of ionization
2. Length of arc
3. Arc resistance
4. All of the above
5. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
During arcing period of circuit breaker, the current flowing
through the electrodes is depends on.
1. Degree of ionization
2. Length of arc
3. Arc resistance
4. All of the above
6. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following gases used as arc quenching medium
in Air blast circuit breaker?
1. Nitrogen
2. Carbon dioxide
3. Hydrogen
4. All of the above
7. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following gases used as arc quenching medium
in Air blast circuit breaker?
1. Nitrogen
2. Carbon dioxide
3. Hydrogen
4. All of the above
8. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The operating time for circuit breaker is about.
1. 0.002 sec
2. 0.5 sec
3. 0.18 sec
4. 0.05 sec
9. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The operating time for circuit breaker is about.
1. 0.002 sec
2. 0.5 sec
3. 0.18 sec
4. 0.05 sec
10. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The operating time of distance relay is depends on.
1. Voltage
2. Current
3. Distance
4. All of the above
11. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The operating time of distance relay is depends on.
1. Voltage
2. Current
3. Distance
4. All of the above
12. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following relay used to protect the system of
transformer?
1. Earth fault relay
2. Over current relay
3. Merz-Price relay
4. All of the above
13. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following relay used to protect the system of
transformer?
1. Earth fault relay
2. Over current relay
3. Merz-Price relay
4. All of the above
14. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following expression denotes the volume of
conductor material affected by power factor in transmission
line?
1. 𝑪𝒐𝒔𝟐𝝋
2. 𝟏
𝑪𝒐𝒔𝟐𝝋
3. 𝑪𝒐𝒔𝝋
4. 𝟏
𝑺𝒊𝒏𝟐𝝋
15. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following expression denotes the volume of
conductor material affected by power factor in transmission
line?
1. 𝑪𝒐𝒔𝟐𝝋
2. 𝟏
𝑪𝒐𝒔𝟐𝝋
3. 𝑪𝒐𝒔𝝋
4. 𝟏
𝑺𝒊𝒏𝟐𝝋
16. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
In the power transformer is connected with Delta-Star, then
the current transformer should be in.
1. Delta – Star
2. Star – Delta
3. Star – Star
4. Delta – Delta
17. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
In the power transformer is connected with Delta-Star, then
the current transformer should be in.
1. Delta – Star
2. Star – Delta
3. Star – Star
4. Delta – Delta
18. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The maloperation of differential protection of transformer due to
magnetizing inrush current is prevented by filtering.
1. 2nd harmonic content with rate of change of core flux and supply
voltage is 𝟗𝟎𝟎 out of phase.
2. 2nd harmonic content with rate of change of core flux and supply
voltage is 𝟏𝟖𝟎𝟎 in-phase.
3. 5th harmonic content with rate of change of core flux and supply
voltage is 𝟗𝟎𝟎
out of phase.
4. 5th harmonic content with rate of change of core flux and supply
voltage is 𝟏𝟖𝟎𝟎 in-phase.
19. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The maloperation of differential protection of transformer due to
magnetizing inrush current is prevented by filtering.
1. 2nd harmonic content with rate of change of core flux and supply
voltage is 𝟗𝟎𝟎 out of phase.
2. 2nd harmonic content with rate of change of core flux and supply
voltage is 𝟏𝟖𝟎𝟎 in-phase.
3. 5th harmonic content with rate of change of core flux and supply
voltage is 𝟗𝟎𝟎
out of phase.
4. 5th harmonic content with rate of change of core flux and supply
voltage is 𝟏𝟖𝟎𝟎 in-phase.
20. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The annual load duration curve of a certain power station can be
considered as a straight line from 20 MW to 4 MW. To meet this
load, three turbine-generator units, two rated at 10 MW each and
one rated at 5 MW are installed. The installed capacity is.
1. 10 MW
2. 20 MW
3. 25 MW
4. 4 MW
21. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The annual load duration curve of a certain power station can be
considered as a straight line from 20 MW to 4 MW. To meet this
load, three turbine-generator units, two rated at 10 MW each and
one rated at 5 MW are installed. The installed capacity is.
1. 10 MW
2. 20 MW
3. 25 MW
4. 4 MW
Installed Capacity = 10 +10 +5
= 25 MW
22. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The annual load duration curve of a certain power station can be
considered as a straight line from 20 MW to 4 MW. To meet this
load, three turbine-generator units, two rated at 10 MW each and
one rated at 5 MW are installed. The installed capacity is.
1. 10 MW
2. 20 MW
3. 25 MW
4. 4 MW
Installed Capacity = 10 +10 +5
= 25 MW
23. THANK YOU
For Practice Question paper Set order
Contact: 9345779192
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192