TRANSFORMER MVA SIZING USING ETAP
By Waqar Hussain
Electrical Dept.
INTRODUCTIONINTRODUCTION
 In power systems, transformer is one of manyp y , y
devices whose proper size is critical to the
design of a power delivery system.
 ETAP has complied the information containedp
on standards ANSI – IEEE C57, IEC 60076-2
and IEC 60726 into a program that can easily
determine the proper size of a power
transformer
FACTORS FOR TRAFO MVA SIZING IN ETAPFACTORS FOR TRAFO MVA SIZING IN ETAP
ETAP takes into consideration the following factorsETAP takes into consideration the following factors
for trafo MVA sizing
Ambient temperatureAmbient temperature
Altitude
Cooling StageCooling Stage
Type (dry or liquid fill)
Expected future growth
Short circuit requirement (trafo impedence and BIL)
2 WINDING TRAFO MVA SIZING2 WINDING TRAFO MVA SIZING
The two winding transformer MVA sizing calculation sizes the following
parameters of a transfomer
Rated MVA
Maximum MVA
Percentage impedance
Maximum MVA is 1.25 times the
rated MVA for ONAN – ONAF
trafo.
2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.)
Transformer Loading
 This section allows you to find the operating load
( l l t d f l d fl l i ) t d(calculated from load flow analysis) or connected
load to this transformer and then use either load
for sizing purposesg p p
 Also you can manually enter the loading for the
transformer
 While sizing transformer based on connected load,
spares can also be included
2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.)
Load Variation
 Growth Factor – For allowance for future growth. Growth
factor is used for calculating the rated MVA of afactor is used for calculating the rated MVA of a
transformer. If “Use growth factor for max MVA” is
checked, then it is used for calculating the max MVA
 Load Factor – is 100 % if the transformer carries
required load continuously all the time
2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.)
Installation
 ETAP adjusts the calculated required Rated MVA
based on trafo’s altitude value. For example for Liquidp q
Immersed Forced Air Cooled trafo, the MVA rating is
derated by factor 0.5 % for every 330 ft above 3300
ftft.
 Ambient Temp. ETAP adjusts the required Rated MVA
based on ambient temperature valuebased on ambient temperature value
2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.)
Impedancep
 Basic Impulse Level (BIL) Limit - ETAP utilizes thisp ( )
value for determining the trafo minimum impedance
according to ANSI – IEC standards
 Limit Short Circuit kA – If this option is checked, then
ETAP calculates % impedance based on short circuit
kA, trafo type and BIL LimitkA, trafo type and BIL Limit
2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.)
ResultsResults
Any one of the three results can be selected:Any one of the three results can be selected:
Larger size, Required size or smaller size
OTHER REQUIRED DATA FOR TRAFO SIZING ON ETAPOTHER REQUIRED DATA FOR TRAFO SIZING ON ETAP
 Standard (IEC or ANSI) Standard (IEC or ANSI)
 Type (Liquid fill or Dry)
 Sub type (mineral oil synthetic liquid etc ) Sub type (mineral oil, synthetic liquid etc …)
 Class (ONAN, ONAN-ONAF, OFAF etc …)
 Temperature rize Temperature rize
 Primary Winding kV rating
REGULATION OF TRAFO ON MOTOR STARTREGULATION OF TRAFO ON MOTOR START
 One of the factors to be considered while sizing a trafo is the voltage drop on
the terminals of the largest motor (connected to trafo secondary) during motorthe terminals of the largest motor (connected to trafo secondary) during motor
start.
 According to IEEE Brown Book, the voltage at terminals of starting motor
should not fall below 80% of rated voltage for typical NEMA design B motors
 This voltage drop is proportional to the regulation of trafo during motor start
 The voltage drop at trafo secondary (regulation) during motor start is inversely
proportional to trafo short circuit kVA and directly proportional to motor
starting kVA
 The Transformer MVA Sizing Module of ETAP does not take into account this
factor. The regulation of trafo can be checked by Motor Starting Study on ETAP
REGULATION OF TRAFO ON MOTOR STARTREGULATION OF TRAFO ON MOTOR START
Approximate voltage drop on the transformer secondary  pp g p y
can be calculated by the following formula
Where
D = % Voltage drop on secondary sideD   % Voltage drop on secondary side
P = Peak Load on trafo in kVA other than largest Motor 
M = Starting kVA of largest MotorM = Starting kVA of largest Motor
S = Short circuit capacity of trafo in kVA
EXAMPLEEXAMPLE
UCH2 Unit Auxiliary Transformer sizing using ETAP
INPUT DATA – TRAFO PARAMETERSINPUT DATA TRAFO PARAMETERS
Standard: IEC
Type: Liquid Fill
Sub type: mineral oil
Cl ONAN ONAF T i 65Class: ONAN - ONAF Temp. rise: 65
Primary V = 14.5 kV
Sec. V = 6.6 kV
INPUT DATA – UCH2 ETAP MODELINPUT DATA UCH2 ETAP MODEL
 Plant ETAP model
is required tois required to
evaluate connected
and operating load
on a transformer
Unit Auxiliary
transformer to
be sized
Lump1 of 13869 kVAu p o 3869
represents the UCH2
operating BOP load other
than 1 No. circulation
water pump motor. The
lump load contains all
the plant cable lossesthe plant cable losses
and loading factors of
different loads
SIZING MODULESIZING MODULE
 Based on Operating
t f l d 120 %transformer load, 120 %
growth factor (for max MVA
or ONAF) and 28 degree C
ambient temp. , thep ,
recommended size by
ETAP is 20-25 MVA at
ONAN-ONAF
 Here worst case load is
considered for GT, HRSG
and ST MCC as providedand ST MCC, as provided
by HET. (This load is
included as “lump 1” in
ETAP model)
UCH2 LOAD FLOW AT 3 DIFFERENT UNIT AUX. TRAFO
RATINGS – WORST CASE LOADING
16‐20 MVA trafo 20‐25 MVA trafo 25‐31.5 MVA trafo
% Z = 10, XR = 22.2 % Z = 10, XR = 22.2 % Z = 10, XR = 22.2
Trafo Input kVA 16198 16046 15932
Trafo Output kVA 15217 15286 15339
Increase in trafo
output kVA as
trafo rating is
Decrease in trafo
input kVA as trafo
rating is increased. For ONAN – ONAFg
increased. ?
20 % of the lump
load in UCH2 ETAP
g
?
Trafo % Z is taken
For ONAN ONAF
rated trafo, ETAP
performs Load flow
at ONAN rating
load in UCH2 ETAP
model is static
For good voltage
as contant at 10 %
For good voltage
regulation at trafo
sec. the static load
consumes more
kVA
ETAP MOTOR START STUDY AT 3 DIFFERENT TRAFO
RATINGS – NORMAL CASE LOADING
Motor Starting Analysis
Trafo Input MVA
Load Flow after
For Circulation Water 
Pump Motor
Load Flow before 
Motor start
Load Flow at 
Motor start
Load Flow after
Motor start (steady 
state)
16‐20 MVA trafo
13 607 20 865 15 277
% Z = 8, XR = 22.2
13.607 20.865 15.277
20‐25 MVA trafo
% Z = 8, XR = 22.2
13.655 21.345 15.333
20‐25 MVA trafo
% Z = 10, XR = 22.2
13.632 20.865 15.277
If Normal loading is considered
(i e lump 1 = 13600 kVA ) then(i.e lump 1 = 13600 kVA ), then
the sizing module recommends
16 – 20 MVA trafo
ETAP MOTOR START STUDY AT 3 DIFFERENT TRAFO
RATINGS – NORMAL CASE LOADING ….. CONTD
Motor Starting Analysis
For Circulation Water
Trafo sec. Voltage at 
Motor Terminal 
Voltage at Motor
Motor Terminal 
Voltage at SteadyFor Circulation Water 
Pump Motor
Motor Start
Voltage at Motor 
Start
Voltage at Steady 
State
16‐20 MVA trafo
% Z = 8, XR = 22.2
88.35% 92.09% 98.38%
20‐25 MVA trafo
% Z = 8, XR = 22.2
90.34% 94.18% 99.49%
20 25 MVA trafo20‐25 MVA trafo
% Z = 10, XR = 22.2
88.35% 92.09% 98.38%
Motor Rated Voltage:
As per IEEE Standard 399-1997, IEEE Recommended Practice
for Industrial and Commercial Power System Analysis (Brown
Book), the Voltage at terminal of Motor
during starting shall not fall below 80 % of rated voltage.
Please note that the motor rated
voltage is 6.3 kA where as the MV bus
and trafo sec. rated voltage is 6.6 kV
g g g
Hence this condition is satistfied for all the three
different trafo ratings
For ONAN – ONAF rated
trafo, ETAP performs
Motor Start at ONAN
rating
CALCULATION OF TRAFO SEC. VOLTAGE AT MOTOR
START USING FORMULA …… COMPARISON
Motor Starting Analysis
For Circulation Water
Trafo sec. Voltage at Motor Start
calculated usingFor Circulation Water 
Pump Motor
calculated using ETAP
calculated using 
Formula
16‐20 MVA trafo
% Z = 8, XR = 22.2
88.35% 87.36%
Almost same results using
formula and ETAP, confirms
the validity of the formula
20‐25 MVA trafo
% Z = 8, XR = 22.2
90.34% 89.89%
20‐25 MVA trafo
% Z = 10 XR = 22 2
88.35% 87.35%
used in UCH2 trafo sizing
calculations
% Z = 10, XR = 22.2
Starting kVA of motor = Full Load kVA x 6 = 11412 kVA
Peak load on trafo excluding motor load = 13869 kVA
SUMMARY UCH2 UAT SIZINGSUMMARY ……. UCH2 UAT SIZING
Growth
16 20
ETAP
Normal load
for GT, ST,
HRSG
Factor at
ONAF
Growth
Factor at
16 – 20
MVA
20 – 25
ETAP
Transformer
Sizing Module
Worst load
Factor at
ONAN MVA
20 25Worst load
for GT, ST,
HRSG
20 – 25
MVA
AT Normal Load for GT, ST, HRSG – Total BOP Load including UAT losses = 15.9 MVA approx
AT Worst Load for GT, ST, HRSG – Total BOP Load including UAT losses = 15.3 – 15.6 MVA approx
The Motor starting Condition is satisfied for both transformer ratings as indicated in previous slides
SUMMARY ……. UPSIZING OF UCH2 UAT FROM 16 -20
MVA TO 20 – 25 MVAMVA TO 20 25 MVA
Before addition of 1 MW
colony feeder and two
For 16 – 20 MVA trafo, at
motor start the voltage at
825 kW HSD Electric
Heaters
MV bus was greater than
90 %
After addition of 1 MW
colony feeder and two
825 kW HSD Electric
Heaters
For 16 – 20 MVA trafo, at
motor start the voltage at
MV bus became lesser
than 90 %
Mushtaq Sb. (from PMT)
required the voltage to
be greater than 90 %
To incorporate this
comment, UAT rating was
increased to 20 – 25increased to 20 25
MVA trafo at 8 % Z
STANDARDIZATION ON ETAP FOR TRAFO SIZINGSTANDARDIZATION ON ETAP FOR TRAFO SIZING
 Having witnessed the harmony between ETAPg y
transformer sizing module and manual sizing
through formulae, the sizing calculations can
be standardized on ETAP
 Following documents can be issued if sizing is
done using ETAP
ETAP Load Flow Snapshot of ETAP ETAP Motor StartETAP Load Flow
analysis Report
Snapshot of ETAP
sizing Module
ETAP Motor Start
Study Report
THANK YOUTHANK YOUOU
Q & A
OU
Q & AQ & AQ & A

More Related Content

What's hot

ETAP - optimal power flow (OPF)
ETAP - optimal power flow (OPF)ETAP - optimal power flow (OPF)
ETAP - optimal power flow (OPF)
Himmelstern
 
ETAP - Transient stability
ETAP - Transient stabilityETAP - Transient stability
ETAP - Transient stability
Himmelstern
 
ETAP - Short circuit ansi standard
ETAP - Short circuit ansi standardETAP - Short circuit ansi standard
ETAP - Short circuit ansi standard
Himmelstern
 
ETAP - Iec 60364 - cable sizing (dimensionamiento de cables)
ETAP - Iec 60364 - cable sizing (dimensionamiento de cables)ETAP - Iec 60364 - cable sizing (dimensionamiento de cables)
ETAP - Iec 60364 - cable sizing (dimensionamiento de cables)
Himmelstern
 
ETAP - Arcflash analysis & mitigation methods
ETAP - Arcflash analysis &  mitigation  methodsETAP - Arcflash analysis &  mitigation  methods
ETAP - Arcflash analysis & mitigation methods
Himmelstern
 
Transformer Differential Protection Setting Calculations
Transformer Differential Protection Setting CalculationsTransformer Differential Protection Setting Calculations
Transformer Differential Protection Setting Calculations
Power System Operation
 
Lecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptxLecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptx
ssuserb444c3
 
ETAP - Ac networks
ETAP - Ac networksETAP - Ac networks
ETAP - Ac networks
Himmelstern
 
ETAP - Power system modeling
ETAP - Power system modelingETAP - Power system modeling
ETAP - Power system modeling
Himmelstern
 
ETAP - Harmonics Analysis
ETAP - Harmonics AnalysisETAP - Harmonics Analysis
ETAP - Harmonics Analysis
Himmelstern
 
ETAP - Analisis de cortocircuito etap 11
ETAP - Analisis de cortocircuito etap 11ETAP - Analisis de cortocircuito etap 11
ETAP - Analisis de cortocircuito etap 11
Himmelstern
 
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROLLOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
Preet_patel
 
ETAP - Ground grid systems
ETAP - Ground grid systemsETAP - Ground grid systems
ETAP - Ground grid systems
Himmelstern
 
Transformer differential protection
Transformer differential protection Transformer differential protection
Transformer differential protection
michaeljmack
 
Transformer overcurrent
Transformer overcurrentTransformer overcurrent
Transformer overcurrent
michaeljmack
 
ETAP - Modelado de dispositivos de proteccion etap 12
ETAP - Modelado de dispositivos de proteccion etap 12ETAP - Modelado de dispositivos de proteccion etap 12
ETAP - Modelado de dispositivos de proteccion etap 12
Himmelstern
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 
ETAP - real time
ETAP - real timeETAP - real time
ETAP - real time
Himmelstern
 
ETAP - 09 motor acceleration
ETAP - 09 motor accelerationETAP - 09 motor acceleration
ETAP - 09 motor acceleration
Himmelstern
 
ETAP - Arc flash introduction
ETAP - Arc flash introductionETAP - Arc flash introduction
ETAP - Arc flash introduction
Himmelstern
 

What's hot (20)

ETAP - optimal power flow (OPF)
ETAP - optimal power flow (OPF)ETAP - optimal power flow (OPF)
ETAP - optimal power flow (OPF)
 
ETAP - Transient stability
ETAP - Transient stabilityETAP - Transient stability
ETAP - Transient stability
 
ETAP - Short circuit ansi standard
ETAP - Short circuit ansi standardETAP - Short circuit ansi standard
ETAP - Short circuit ansi standard
 
ETAP - Iec 60364 - cable sizing (dimensionamiento de cables)
ETAP - Iec 60364 - cable sizing (dimensionamiento de cables)ETAP - Iec 60364 - cable sizing (dimensionamiento de cables)
ETAP - Iec 60364 - cable sizing (dimensionamiento de cables)
 
ETAP - Arcflash analysis & mitigation methods
ETAP - Arcflash analysis &  mitigation  methodsETAP - Arcflash analysis &  mitigation  methods
ETAP - Arcflash analysis & mitigation methods
 
Transformer Differential Protection Setting Calculations
Transformer Differential Protection Setting CalculationsTransformer Differential Protection Setting Calculations
Transformer Differential Protection Setting Calculations
 
Lecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptxLecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptx
 
ETAP - Ac networks
ETAP - Ac networksETAP - Ac networks
ETAP - Ac networks
 
ETAP - Power system modeling
ETAP - Power system modelingETAP - Power system modeling
ETAP - Power system modeling
 
ETAP - Harmonics Analysis
ETAP - Harmonics AnalysisETAP - Harmonics Analysis
ETAP - Harmonics Analysis
 
ETAP - Analisis de cortocircuito etap 11
ETAP - Analisis de cortocircuito etap 11ETAP - Analisis de cortocircuito etap 11
ETAP - Analisis de cortocircuito etap 11
 
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROLLOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
 
ETAP - Ground grid systems
ETAP - Ground grid systemsETAP - Ground grid systems
ETAP - Ground grid systems
 
Transformer differential protection
Transformer differential protection Transformer differential protection
Transformer differential protection
 
Transformer overcurrent
Transformer overcurrentTransformer overcurrent
Transformer overcurrent
 
ETAP - Modelado de dispositivos de proteccion etap 12
ETAP - Modelado de dispositivos de proteccion etap 12ETAP - Modelado de dispositivos de proteccion etap 12
ETAP - Modelado de dispositivos de proteccion etap 12
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
ETAP - real time
ETAP - real timeETAP - real time
ETAP - real time
 
ETAP - 09 motor acceleration
ETAP - 09 motor accelerationETAP - 09 motor acceleration
ETAP - 09 motor acceleration
 
ETAP - Arc flash introduction
ETAP - Arc flash introductionETAP - Arc flash introduction
ETAP - Arc flash introduction
 

Similar to ETAP - Transformer sizing using etap

BASICS+OF+ASM+WITH+VSD.ppt
BASICS+OF+ASM+WITH+VSD.pptBASICS+OF+ASM+WITH+VSD.ppt
BASICS+OF+ASM+WITH+VSD.ppt
KhairulBashar83
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
michaeljmack
 
Ee 791 drives lab maual
Ee 791 drives lab maualEe 791 drives lab maual
Ee 791 drives lab maual
Divya15121983
 
Test schedule hvr tr rev02
Test schedule hvr tr rev02Test schedule hvr tr rev02
Test schedule hvr tr rev02
praveenraj1435
 
gas turbine generator set operation and maintenance
gas turbine generator set operation and maintenancegas turbine generator set operation and maintenance
gas turbine generator set operation and maintenance
AmrSherif54
 
Automatic voltage regulations And V curves of alternators
Automatic voltage regulations And V curves of alternatorsAutomatic voltage regulations And V curves of alternators
Automatic voltage regulations And V curves of alternators
MUDASSARHABIB5
 
Single Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space ApplicationSingle Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space Application
IRJET Journal
 
D Var Statcom Introduction
D Var Statcom IntroductionD Var Statcom Introduction
D Var Statcom Introduction
johnwrightsmith
 
Integrated-Circuit-Regulator-1.pptx
Integrated-Circuit-Regulator-1.pptxIntegrated-Circuit-Regulator-1.pptx
Integrated-Circuit-Regulator-1.pptx
Elmar7
 
455816491-ESP-Start-up-and-operation.pdf
455816491-ESP-Start-up-and-operation.pdf455816491-ESP-Start-up-and-operation.pdf
455816491-ESP-Start-up-and-operation.pdf
ZehronChemicals
 
electrical.ppt
electrical.pptelectrical.ppt
electrical.ppt
AdityanshuBehera
 
Advanced motion controls 10a8
Advanced motion controls 10a8Advanced motion controls 10a8
Advanced motion controls 10a8
Electromate
 
APFC AMTL 30.01.2015
APFC  AMTL  30.01.2015APFC  AMTL  30.01.2015
APFC AMTL 30.01.2015
Avanindra Yadav
 
SWINBURNE’S TEST
SWINBURNE’S TESTSWINBURNE’S TEST
SWINBURNE’S TEST
suresh shindhe
 
Sinopak Electric Catalogue
Sinopak Electric CatalogueSinopak Electric Catalogue
Sinopak Electric CatalogueDaniel Wu
 
Sinopak Electric Catalogue
Sinopak Electric CatalogueSinopak Electric Catalogue
Sinopak Electric CatalogueAshley Lin
 
Sinopak Electric Catalogue
Sinopak Electric CatalogueSinopak Electric Catalogue
Sinopak Electric CatalogueAshley Lin
 
Advanced motion controls ab200a100
Advanced motion controls ab200a100Advanced motion controls ab200a100
Advanced motion controls ab200a100
Electromate
 
Chapter 5 - DC-AC Conversion.pdf
Chapter 5 - DC-AC Conversion.pdfChapter 5 - DC-AC Conversion.pdf
Chapter 5 - DC-AC Conversion.pdf
benson215
 

Similar to ETAP - Transformer sizing using etap (20)

BASICS+OF+ASM+WITH+VSD.ppt
BASICS+OF+ASM+WITH+VSD.pptBASICS+OF+ASM+WITH+VSD.ppt
BASICS+OF+ASM+WITH+VSD.ppt
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
 
Ee 791 drives lab maual
Ee 791 drives lab maualEe 791 drives lab maual
Ee 791 drives lab maual
 
Test schedule hvr tr rev02
Test schedule hvr tr rev02Test schedule hvr tr rev02
Test schedule hvr tr rev02
 
gas turbine generator set operation and maintenance
gas turbine generator set operation and maintenancegas turbine generator set operation and maintenance
gas turbine generator set operation and maintenance
 
Automatic voltage regulations And V curves of alternators
Automatic voltage regulations And V curves of alternatorsAutomatic voltage regulations And V curves of alternators
Automatic voltage regulations And V curves of alternators
 
Single Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space ApplicationSingle Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space Application
 
D Var Statcom Introduction
D Var Statcom IntroductionD Var Statcom Introduction
D Var Statcom Introduction
 
Integrated-Circuit-Regulator-1.pptx
Integrated-Circuit-Regulator-1.pptxIntegrated-Circuit-Regulator-1.pptx
Integrated-Circuit-Regulator-1.pptx
 
455816491-ESP-Start-up-and-operation.pdf
455816491-ESP-Start-up-and-operation.pdf455816491-ESP-Start-up-and-operation.pdf
455816491-ESP-Start-up-and-operation.pdf
 
sujesh
sujeshsujesh
sujesh
 
electrical.ppt
electrical.pptelectrical.ppt
electrical.ppt
 
Advanced motion controls 10a8
Advanced motion controls 10a8Advanced motion controls 10a8
Advanced motion controls 10a8
 
APFC AMTL 30.01.2015
APFC  AMTL  30.01.2015APFC  AMTL  30.01.2015
APFC AMTL 30.01.2015
 
SWINBURNE’S TEST
SWINBURNE’S TESTSWINBURNE’S TEST
SWINBURNE’S TEST
 
Sinopak Electric Catalogue
Sinopak Electric CatalogueSinopak Electric Catalogue
Sinopak Electric Catalogue
 
Sinopak Electric Catalogue
Sinopak Electric CatalogueSinopak Electric Catalogue
Sinopak Electric Catalogue
 
Sinopak Electric Catalogue
Sinopak Electric CatalogueSinopak Electric Catalogue
Sinopak Electric Catalogue
 
Advanced motion controls ab200a100
Advanced motion controls ab200a100Advanced motion controls ab200a100
Advanced motion controls ab200a100
 
Chapter 5 - DC-AC Conversion.pdf
Chapter 5 - DC-AC Conversion.pdfChapter 5 - DC-AC Conversion.pdf
Chapter 5 - DC-AC Conversion.pdf
 

Recently uploaded

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 

Recently uploaded (20)

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 

ETAP - Transformer sizing using etap

  • 1. TRANSFORMER MVA SIZING USING ETAP By Waqar Hussain Electrical Dept.
  • 2. INTRODUCTIONINTRODUCTION  In power systems, transformer is one of manyp y , y devices whose proper size is critical to the design of a power delivery system.  ETAP has complied the information containedp on standards ANSI – IEEE C57, IEC 60076-2 and IEC 60726 into a program that can easily determine the proper size of a power transformer
  • 3. FACTORS FOR TRAFO MVA SIZING IN ETAPFACTORS FOR TRAFO MVA SIZING IN ETAP ETAP takes into consideration the following factorsETAP takes into consideration the following factors for trafo MVA sizing Ambient temperatureAmbient temperature Altitude Cooling StageCooling Stage Type (dry or liquid fill) Expected future growth Short circuit requirement (trafo impedence and BIL)
  • 4. 2 WINDING TRAFO MVA SIZING2 WINDING TRAFO MVA SIZING The two winding transformer MVA sizing calculation sizes the following parameters of a transfomer Rated MVA Maximum MVA Percentage impedance Maximum MVA is 1.25 times the rated MVA for ONAN – ONAF trafo.
  • 5. 2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.) Transformer Loading  This section allows you to find the operating load ( l l t d f l d fl l i ) t d(calculated from load flow analysis) or connected load to this transformer and then use either load for sizing purposesg p p  Also you can manually enter the loading for the transformer  While sizing transformer based on connected load, spares can also be included
  • 6. 2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.) Load Variation  Growth Factor – For allowance for future growth. Growth factor is used for calculating the rated MVA of afactor is used for calculating the rated MVA of a transformer. If “Use growth factor for max MVA” is checked, then it is used for calculating the max MVA  Load Factor – is 100 % if the transformer carries required load continuously all the time
  • 7. 2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.) Installation  ETAP adjusts the calculated required Rated MVA based on trafo’s altitude value. For example for Liquidp q Immersed Forced Air Cooled trafo, the MVA rating is derated by factor 0.5 % for every 330 ft above 3300 ftft.  Ambient Temp. ETAP adjusts the required Rated MVA based on ambient temperature valuebased on ambient temperature value
  • 8. 2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.) Impedancep  Basic Impulse Level (BIL) Limit - ETAP utilizes thisp ( ) value for determining the trafo minimum impedance according to ANSI – IEC standards  Limit Short Circuit kA – If this option is checked, then ETAP calculates % impedance based on short circuit kA, trafo type and BIL LimitkA, trafo type and BIL Limit
  • 9. 2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.) ResultsResults Any one of the three results can be selected:Any one of the three results can be selected: Larger size, Required size or smaller size
  • 10. OTHER REQUIRED DATA FOR TRAFO SIZING ON ETAPOTHER REQUIRED DATA FOR TRAFO SIZING ON ETAP  Standard (IEC or ANSI) Standard (IEC or ANSI)  Type (Liquid fill or Dry)  Sub type (mineral oil synthetic liquid etc ) Sub type (mineral oil, synthetic liquid etc …)  Class (ONAN, ONAN-ONAF, OFAF etc …)  Temperature rize Temperature rize  Primary Winding kV rating
  • 11. REGULATION OF TRAFO ON MOTOR STARTREGULATION OF TRAFO ON MOTOR START  One of the factors to be considered while sizing a trafo is the voltage drop on the terminals of the largest motor (connected to trafo secondary) during motorthe terminals of the largest motor (connected to trafo secondary) during motor start.  According to IEEE Brown Book, the voltage at terminals of starting motor should not fall below 80% of rated voltage for typical NEMA design B motors  This voltage drop is proportional to the regulation of trafo during motor start  The voltage drop at trafo secondary (regulation) during motor start is inversely proportional to trafo short circuit kVA and directly proportional to motor starting kVA  The Transformer MVA Sizing Module of ETAP does not take into account this factor. The regulation of trafo can be checked by Motor Starting Study on ETAP
  • 12. REGULATION OF TRAFO ON MOTOR STARTREGULATION OF TRAFO ON MOTOR START Approximate voltage drop on the transformer secondary  pp g p y can be calculated by the following formula Where D = % Voltage drop on secondary sideD   % Voltage drop on secondary side P = Peak Load on trafo in kVA other than largest Motor  M = Starting kVA of largest MotorM = Starting kVA of largest Motor S = Short circuit capacity of trafo in kVA
  • 13. EXAMPLEEXAMPLE UCH2 Unit Auxiliary Transformer sizing using ETAP
  • 14. INPUT DATA – TRAFO PARAMETERSINPUT DATA TRAFO PARAMETERS Standard: IEC Type: Liquid Fill Sub type: mineral oil Cl ONAN ONAF T i 65Class: ONAN - ONAF Temp. rise: 65 Primary V = 14.5 kV Sec. V = 6.6 kV
  • 15. INPUT DATA – UCH2 ETAP MODELINPUT DATA UCH2 ETAP MODEL  Plant ETAP model is required tois required to evaluate connected and operating load on a transformer Unit Auxiliary transformer to be sized Lump1 of 13869 kVAu p o 3869 represents the UCH2 operating BOP load other than 1 No. circulation water pump motor. The lump load contains all the plant cable lossesthe plant cable losses and loading factors of different loads
  • 16. SIZING MODULESIZING MODULE  Based on Operating t f l d 120 %transformer load, 120 % growth factor (for max MVA or ONAF) and 28 degree C ambient temp. , thep , recommended size by ETAP is 20-25 MVA at ONAN-ONAF  Here worst case load is considered for GT, HRSG and ST MCC as providedand ST MCC, as provided by HET. (This load is included as “lump 1” in ETAP model)
  • 17. UCH2 LOAD FLOW AT 3 DIFFERENT UNIT AUX. TRAFO RATINGS – WORST CASE LOADING 16‐20 MVA trafo 20‐25 MVA trafo 25‐31.5 MVA trafo % Z = 10, XR = 22.2 % Z = 10, XR = 22.2 % Z = 10, XR = 22.2 Trafo Input kVA 16198 16046 15932 Trafo Output kVA 15217 15286 15339 Increase in trafo output kVA as trafo rating is Decrease in trafo input kVA as trafo rating is increased. For ONAN – ONAFg increased. ? 20 % of the lump load in UCH2 ETAP g ? Trafo % Z is taken For ONAN ONAF rated trafo, ETAP performs Load flow at ONAN rating load in UCH2 ETAP model is static For good voltage as contant at 10 % For good voltage regulation at trafo sec. the static load consumes more kVA
  • 18. ETAP MOTOR START STUDY AT 3 DIFFERENT TRAFO RATINGS – NORMAL CASE LOADING Motor Starting Analysis Trafo Input MVA Load Flow after For Circulation Water  Pump Motor Load Flow before  Motor start Load Flow at  Motor start Load Flow after Motor start (steady  state) 16‐20 MVA trafo 13 607 20 865 15 277 % Z = 8, XR = 22.2 13.607 20.865 15.277 20‐25 MVA trafo % Z = 8, XR = 22.2 13.655 21.345 15.333 20‐25 MVA trafo % Z = 10, XR = 22.2 13.632 20.865 15.277 If Normal loading is considered (i e lump 1 = 13600 kVA ) then(i.e lump 1 = 13600 kVA ), then the sizing module recommends 16 – 20 MVA trafo
  • 19. ETAP MOTOR START STUDY AT 3 DIFFERENT TRAFO RATINGS – NORMAL CASE LOADING ….. CONTD Motor Starting Analysis For Circulation Water Trafo sec. Voltage at  Motor Terminal  Voltage at Motor Motor Terminal  Voltage at SteadyFor Circulation Water  Pump Motor Motor Start Voltage at Motor  Start Voltage at Steady  State 16‐20 MVA trafo % Z = 8, XR = 22.2 88.35% 92.09% 98.38% 20‐25 MVA trafo % Z = 8, XR = 22.2 90.34% 94.18% 99.49% 20 25 MVA trafo20‐25 MVA trafo % Z = 10, XR = 22.2 88.35% 92.09% 98.38% Motor Rated Voltage: As per IEEE Standard 399-1997, IEEE Recommended Practice for Industrial and Commercial Power System Analysis (Brown Book), the Voltage at terminal of Motor during starting shall not fall below 80 % of rated voltage. Please note that the motor rated voltage is 6.3 kA where as the MV bus and trafo sec. rated voltage is 6.6 kV g g g Hence this condition is satistfied for all the three different trafo ratings For ONAN – ONAF rated trafo, ETAP performs Motor Start at ONAN rating
  • 20. CALCULATION OF TRAFO SEC. VOLTAGE AT MOTOR START USING FORMULA …… COMPARISON Motor Starting Analysis For Circulation Water Trafo sec. Voltage at Motor Start calculated usingFor Circulation Water  Pump Motor calculated using ETAP calculated using  Formula 16‐20 MVA trafo % Z = 8, XR = 22.2 88.35% 87.36% Almost same results using formula and ETAP, confirms the validity of the formula 20‐25 MVA trafo % Z = 8, XR = 22.2 90.34% 89.89% 20‐25 MVA trafo % Z = 10 XR = 22 2 88.35% 87.35% used in UCH2 trafo sizing calculations % Z = 10, XR = 22.2 Starting kVA of motor = Full Load kVA x 6 = 11412 kVA Peak load on trafo excluding motor load = 13869 kVA
  • 21. SUMMARY UCH2 UAT SIZINGSUMMARY ……. UCH2 UAT SIZING Growth 16 20 ETAP Normal load for GT, ST, HRSG Factor at ONAF Growth Factor at 16 – 20 MVA 20 – 25 ETAP Transformer Sizing Module Worst load Factor at ONAN MVA 20 25Worst load for GT, ST, HRSG 20 – 25 MVA AT Normal Load for GT, ST, HRSG – Total BOP Load including UAT losses = 15.9 MVA approx AT Worst Load for GT, ST, HRSG – Total BOP Load including UAT losses = 15.3 – 15.6 MVA approx The Motor starting Condition is satisfied for both transformer ratings as indicated in previous slides
  • 22. SUMMARY ……. UPSIZING OF UCH2 UAT FROM 16 -20 MVA TO 20 – 25 MVAMVA TO 20 25 MVA Before addition of 1 MW colony feeder and two For 16 – 20 MVA trafo, at motor start the voltage at 825 kW HSD Electric Heaters MV bus was greater than 90 % After addition of 1 MW colony feeder and two 825 kW HSD Electric Heaters For 16 – 20 MVA trafo, at motor start the voltage at MV bus became lesser than 90 % Mushtaq Sb. (from PMT) required the voltage to be greater than 90 % To incorporate this comment, UAT rating was increased to 20 – 25increased to 20 25 MVA trafo at 8 % Z
  • 23. STANDARDIZATION ON ETAP FOR TRAFO SIZINGSTANDARDIZATION ON ETAP FOR TRAFO SIZING  Having witnessed the harmony between ETAPg y transformer sizing module and manual sizing through formulae, the sizing calculations can be standardized on ETAP  Following documents can be issued if sizing is done using ETAP ETAP Load Flow Snapshot of ETAP ETAP Motor StartETAP Load Flow analysis Report Snapshot of ETAP sizing Module ETAP Motor Start Study Report
  • 24. THANK YOUTHANK YOUOU Q & A OU Q & AQ & AQ & A