TRANSFORMER MVA SIZING USING ETAP
By Waqar Hussain
Electrical Dept.
INTRODUCTIONINTRODUCTION
 In power systems, transformer is one of manyp y , y
devices whose proper size is critical to the
design of a power delivery system.
 ETAP has complied the information containedp
on standards ANSI – IEEE C57, IEC 60076-2
and IEC 60726 into a program that can easily
determine the proper size of a power
transformer
FACTORS FOR TRAFO MVA SIZING IN ETAPFACTORS FOR TRAFO MVA SIZING IN ETAP
ETAP takes into consideration the following factorsETAP takes into consideration the following factors
for trafo MVA sizing
Ambient temperatureAmbient temperature
Altitude
Cooling StageCooling Stage
Type (dry or liquid fill)
Expected future growth
Short circuit requirement (trafo impedence and BIL)
2 WINDING TRAFO MVA SIZING2 WINDING TRAFO MVA SIZING
The two winding transformer MVA sizing calculation sizes the following
parameters of a transfomer
Rated MVA
Maximum MVA
Percentage impedance
Maximum MVA is 1.25 times the
rated MVA for ONAN – ONAF
trafo.
2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.)
Transformer Loading
 This section allows you to find the operating load
( l l t d f l d fl l i ) t d(calculated from load flow analysis) or connected
load to this transformer and then use either load
for sizing purposesg p p
 Also you can manually enter the loading for the
transformer
 While sizing transformer based on connected load,
spares can also be included
2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.)
Load Variation
 Growth Factor – For allowance for future growth. Growth
factor is used for calculating the rated MVA of afactor is used for calculating the rated MVA of a
transformer. If “Use growth factor for max MVA” is
checked, then it is used for calculating the max MVA
 Load Factor – is 100 % if the transformer carries
required load continuously all the time
2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.)
Installation
 ETAP adjusts the calculated required Rated MVA
based on trafo’s altitude value. For example for Liquidp q
Immersed Forced Air Cooled trafo, the MVA rating is
derated by factor 0.5 % for every 330 ft above 3300
ftft.
 Ambient Temp. ETAP adjusts the required Rated MVA
based on ambient temperature valuebased on ambient temperature value
2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.)
Impedancep
 Basic Impulse Level (BIL) Limit - ETAP utilizes thisp ( )
value for determining the trafo minimum impedance
according to ANSI – IEC standards
 Limit Short Circuit kA – If this option is checked, then
ETAP calculates % impedance based on short circuit
kA, trafo type and BIL LimitkA, trafo type and BIL Limit
2 WINDING TRAFO MVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.)
ResultsResults
Any one of the three results can be selected:Any one of the three results can be selected:
Larger size, Required size or smaller size
OTHER REQUIRED DATA FOR TRAFO SIZING ON ETAPOTHER REQUIRED DATA FOR TRAFO SIZING ON ETAP
 Standard (IEC or ANSI) Standard (IEC or ANSI)
 Type (Liquid fill or Dry)
 Sub type (mineral oil synthetic liquid etc ) Sub type (mineral oil, synthetic liquid etc …)
 Class (ONAN, ONAN-ONAF, OFAF etc …)
 Temperature rize Temperature rize
 Primary Winding kV rating
REGULATION OF TRAFO ON MOTOR STARTREGULATION OF TRAFO ON MOTOR START
 One of the factors to be considered while sizing a trafo is the voltage drop on
the terminals of the largest motor (connected to trafo secondary) during motorthe terminals of the largest motor (connected to trafo secondary) during motor
start.
 According to IEEE Brown Book, the voltage at terminals of starting motor
should not fall below 80% of rated voltage for typical NEMA design B motors
 This voltage drop is proportional to the regulation of trafo during motor start
 The voltage drop at trafo secondary (regulation) during motor start is inversely
proportional to trafo short circuit kVA and directly proportional to motor
starting kVA
 The Transformer MVA Sizing Module of ETAP does not take into account this
factor. The regulation of trafo can be checked by Motor Starting Study on ETAP
REGULATION OF TRAFO ON MOTOR STARTREGULATION OF TRAFO ON MOTOR START
Approximate voltage drop on the transformer secondary  pp g p y
can be calculated by the following formula
Where
D = % Voltage drop on secondary sideD   % Voltage drop on secondary side
P = Peak Load on trafo in kVA other than largest Motor 
M = Starting kVA of largest MotorM = Starting kVA of largest Motor
S = Short circuit capacity of trafo in kVA
EXAMPLEEXAMPLE
UCH2 Unit Auxiliary Transformer sizing using ETAP
INPUT DATA – TRAFO PARAMETERSINPUT DATA TRAFO PARAMETERS
Standard: IEC
Type: Liquid Fill
Sub type: mineral oil
Cl ONAN ONAF T i 65Class: ONAN - ONAF Temp. rise: 65
Primary V = 14.5 kV
Sec. V = 6.6 kV
INPUT DATA – UCH2 ETAP MODELINPUT DATA UCH2 ETAP MODEL
 Plant ETAP model
is required tois required to
evaluate connected
and operating load
on a transformer
Unit Auxiliary
transformer to
be sized
Lump1 of 13869 kVAu p o 3869
represents the UCH2
operating BOP load other
than 1 No. circulation
water pump motor. The
lump load contains all
the plant cable lossesthe plant cable losses
and loading factors of
different loads
SIZING MODULESIZING MODULE
 Based on Operating
t f l d 120 %transformer load, 120 %
growth factor (for max MVA
or ONAF) and 28 degree C
ambient temp. , thep ,
recommended size by
ETAP is 20-25 MVA at
ONAN-ONAF
 Here worst case load is
considered for GT, HRSG
and ST MCC as providedand ST MCC, as provided
by HET. (This load is
included as “lump 1” in
ETAP model)
UCH2 LOAD FLOW AT 3 DIFFERENT UNIT AUX. TRAFO
RATINGS – WORST CASE LOADING
16‐20 MVA trafo 20‐25 MVA trafo 25‐31.5 MVA trafo
% Z = 10, XR = 22.2 % Z = 10, XR = 22.2 % Z = 10, XR = 22.2
Trafo Input kVA 16198 16046 15932
Trafo Output kVA 15217 15286 15339
Increase in trafo
output kVA as
trafo rating is
Decrease in trafo
input kVA as trafo
rating is increased. For ONAN – ONAFg
increased. ?
20 % of the lump
load in UCH2 ETAP
g
?
Trafo % Z is taken
For ONAN ONAF
rated trafo, ETAP
performs Load flow
at ONAN rating
load in UCH2 ETAP
model is static
For good voltage
as contant at 10 %
For good voltage
regulation at trafo
sec. the static load
consumes more
kVA
ETAP MOTOR START STUDY AT 3 DIFFERENT TRAFO
RATINGS – NORMAL CASE LOADING
Motor Starting Analysis
Trafo Input MVA
Load Flow after
For Circulation Water 
Pump Motor
Load Flow before 
Motor start
Load Flow at 
Motor start
Load Flow after
Motor start (steady 
state)
16‐20 MVA trafo
13 607 20 865 15 277
% Z = 8, XR = 22.2
13.607 20.865 15.277
20‐25 MVA trafo
% Z = 8, XR = 22.2
13.655 21.345 15.333
20‐25 MVA trafo
% Z = 10, XR = 22.2
13.632 20.865 15.277
If Normal loading is considered
(i e lump 1 = 13600 kVA ) then(i.e lump 1 = 13600 kVA ), then
the sizing module recommends
16 – 20 MVA trafo
ETAP MOTOR START STUDY AT 3 DIFFERENT TRAFO
RATINGS – NORMAL CASE LOADING ….. CONTD
Motor Starting Analysis
For Circulation Water
Trafo sec. Voltage at 
Motor Terminal 
Voltage at Motor
Motor Terminal 
Voltage at SteadyFor Circulation Water 
Pump Motor
Motor Start
Voltage at Motor 
Start
Voltage at Steady 
State
16‐20 MVA trafo
% Z = 8, XR = 22.2
88.35% 92.09% 98.38%
20‐25 MVA trafo
% Z = 8, XR = 22.2
90.34% 94.18% 99.49%
20 25 MVA trafo20‐25 MVA trafo
% Z = 10, XR = 22.2
88.35% 92.09% 98.38%
Motor Rated Voltage:
As per IEEE Standard 399-1997, IEEE Recommended Practice
for Industrial and Commercial Power System Analysis (Brown
Book), the Voltage at terminal of Motor
during starting shall not fall below 80 % of rated voltage.
Please note that the motor rated
voltage is 6.3 kA where as the MV bus
and trafo sec. rated voltage is 6.6 kV
g g g
Hence this condition is satistfied for all the three
different trafo ratings
For ONAN – ONAF rated
trafo, ETAP performs
Motor Start at ONAN
rating
CALCULATION OF TRAFO SEC. VOLTAGE AT MOTOR
START USING FORMULA …… COMPARISON
Motor Starting Analysis
For Circulation Water
Trafo sec. Voltage at Motor Start
calculated usingFor Circulation Water 
Pump Motor
calculated using ETAP
calculated using 
Formula
16‐20 MVA trafo
% Z = 8, XR = 22.2
88.35% 87.36%
Almost same results using
formula and ETAP, confirms
the validity of the formula
20‐25 MVA trafo
% Z = 8, XR = 22.2
90.34% 89.89%
20‐25 MVA trafo
% Z = 10 XR = 22 2
88.35% 87.35%
used in UCH2 trafo sizing
calculations
% Z = 10, XR = 22.2
Starting kVA of motor = Full Load kVA x 6 = 11412 kVA
Peak load on trafo excluding motor load = 13869 kVA
SUMMARY UCH2 UAT SIZINGSUMMARY ……. UCH2 UAT SIZING
Growth
16 20
ETAP
Normal load
for GT, ST,
HRSG
Factor at
ONAF
Growth
Factor at
16 – 20
MVA
20 – 25
ETAP
Transformer
Sizing Module
Worst load
Factor at
ONAN MVA
20 25Worst load
for GT, ST,
HRSG
20 – 25
MVA
AT Normal Load for GT, ST, HRSG – Total BOP Load including UAT losses = 15.9 MVA approx
AT Worst Load for GT, ST, HRSG – Total BOP Load including UAT losses = 15.3 – 15.6 MVA approx
The Motor starting Condition is satisfied for both transformer ratings as indicated in previous slides
SUMMARY ……. UPSIZING OF UCH2 UAT FROM 16 -20
MVA TO 20 – 25 MVAMVA TO 20 25 MVA
Before addition of 1 MW
colony feeder and two
For 16 – 20 MVA trafo, at
motor start the voltage at
825 kW HSD Electric
Heaters
MV bus was greater than
90 %
After addition of 1 MW
colony feeder and two
825 kW HSD Electric
Heaters
For 16 – 20 MVA trafo, at
motor start the voltage at
MV bus became lesser
than 90 %
Mushtaq Sb. (from PMT)
required the voltage to
be greater than 90 %
To incorporate this
comment, UAT rating was
increased to 20 – 25increased to 20 25
MVA trafo at 8 % Z
STANDARDIZATION ON ETAP FOR TRAFO SIZINGSTANDARDIZATION ON ETAP FOR TRAFO SIZING
 Having witnessed the harmony between ETAPg y
transformer sizing module and manual sizing
through formulae, the sizing calculations can
be standardized on ETAP
 Following documents can be issued if sizing is
done using ETAP
ETAP Load Flow Snapshot of ETAP ETAP Motor StartETAP Load Flow
analysis Report
Snapshot of ETAP
sizing Module
ETAP Motor Start
Study Report
THANK YOUTHANK YOUOU
Q & A
OU
Q & AQ & AQ & A

ETAP - Transformer sizing using etap

  • 1.
    TRANSFORMER MVA SIZINGUSING ETAP By Waqar Hussain Electrical Dept.
  • 2.
    INTRODUCTIONINTRODUCTION  In powersystems, transformer is one of manyp y , y devices whose proper size is critical to the design of a power delivery system.  ETAP has complied the information containedp on standards ANSI – IEEE C57, IEC 60076-2 and IEC 60726 into a program that can easily determine the proper size of a power transformer
  • 3.
    FACTORS FOR TRAFOMVA SIZING IN ETAPFACTORS FOR TRAFO MVA SIZING IN ETAP ETAP takes into consideration the following factorsETAP takes into consideration the following factors for trafo MVA sizing Ambient temperatureAmbient temperature Altitude Cooling StageCooling Stage Type (dry or liquid fill) Expected future growth Short circuit requirement (trafo impedence and BIL)
  • 4.
    2 WINDING TRAFOMVA SIZING2 WINDING TRAFO MVA SIZING The two winding transformer MVA sizing calculation sizes the following parameters of a transfomer Rated MVA Maximum MVA Percentage impedance Maximum MVA is 1.25 times the rated MVA for ONAN – ONAF trafo.
  • 5.
    2 WINDING TRAFOMVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.) Transformer Loading  This section allows you to find the operating load ( l l t d f l d fl l i ) t d(calculated from load flow analysis) or connected load to this transformer and then use either load for sizing purposesg p p  Also you can manually enter the loading for the transformer  While sizing transformer based on connected load, spares can also be included
  • 6.
    2 WINDING TRAFOMVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.) Load Variation  Growth Factor – For allowance for future growth. Growth factor is used for calculating the rated MVA of afactor is used for calculating the rated MVA of a transformer. If “Use growth factor for max MVA” is checked, then it is used for calculating the max MVA  Load Factor – is 100 % if the transformer carries required load continuously all the time
  • 7.
    2 WINDING TRAFOMVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.) Installation  ETAP adjusts the calculated required Rated MVA based on trafo’s altitude value. For example for Liquidp q Immersed Forced Air Cooled trafo, the MVA rating is derated by factor 0.5 % for every 330 ft above 3300 ftft.  Ambient Temp. ETAP adjusts the required Rated MVA based on ambient temperature valuebased on ambient temperature value
  • 8.
    2 WINDING TRAFOMVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.) Impedancep  Basic Impulse Level (BIL) Limit - ETAP utilizes thisp ( ) value for determining the trafo minimum impedance according to ANSI – IEC standards  Limit Short Circuit kA – If this option is checked, then ETAP calculates % impedance based on short circuit kA, trafo type and BIL LimitkA, trafo type and BIL Limit
  • 9.
    2 WINDING TRAFOMVA SIZING (CONTD )2 WINDING TRAFO MVA SIZING (CONTD.) ResultsResults Any one of the three results can be selected:Any one of the three results can be selected: Larger size, Required size or smaller size
  • 10.
    OTHER REQUIRED DATAFOR TRAFO SIZING ON ETAPOTHER REQUIRED DATA FOR TRAFO SIZING ON ETAP  Standard (IEC or ANSI) Standard (IEC or ANSI)  Type (Liquid fill or Dry)  Sub type (mineral oil synthetic liquid etc ) Sub type (mineral oil, synthetic liquid etc …)  Class (ONAN, ONAN-ONAF, OFAF etc …)  Temperature rize Temperature rize  Primary Winding kV rating
  • 11.
    REGULATION OF TRAFOON MOTOR STARTREGULATION OF TRAFO ON MOTOR START  One of the factors to be considered while sizing a trafo is the voltage drop on the terminals of the largest motor (connected to trafo secondary) during motorthe terminals of the largest motor (connected to trafo secondary) during motor start.  According to IEEE Brown Book, the voltage at terminals of starting motor should not fall below 80% of rated voltage for typical NEMA design B motors  This voltage drop is proportional to the regulation of trafo during motor start  The voltage drop at trafo secondary (regulation) during motor start is inversely proportional to trafo short circuit kVA and directly proportional to motor starting kVA  The Transformer MVA Sizing Module of ETAP does not take into account this factor. The regulation of trafo can be checked by Motor Starting Study on ETAP
  • 12.
    REGULATION OF TRAFOON MOTOR STARTREGULATION OF TRAFO ON MOTOR START Approximate voltage drop on the transformer secondary  pp g p y can be calculated by the following formula Where D = % Voltage drop on secondary sideD   % Voltage drop on secondary side P = Peak Load on trafo in kVA other than largest Motor  M = Starting kVA of largest MotorM = Starting kVA of largest Motor S = Short circuit capacity of trafo in kVA
  • 13.
    EXAMPLEEXAMPLE UCH2 Unit AuxiliaryTransformer sizing using ETAP
  • 14.
    INPUT DATA –TRAFO PARAMETERSINPUT DATA TRAFO PARAMETERS Standard: IEC Type: Liquid Fill Sub type: mineral oil Cl ONAN ONAF T i 65Class: ONAN - ONAF Temp. rise: 65 Primary V = 14.5 kV Sec. V = 6.6 kV
  • 15.
    INPUT DATA –UCH2 ETAP MODELINPUT DATA UCH2 ETAP MODEL  Plant ETAP model is required tois required to evaluate connected and operating load on a transformer Unit Auxiliary transformer to be sized Lump1 of 13869 kVAu p o 3869 represents the UCH2 operating BOP load other than 1 No. circulation water pump motor. The lump load contains all the plant cable lossesthe plant cable losses and loading factors of different loads
  • 16.
    SIZING MODULESIZING MODULE Based on Operating t f l d 120 %transformer load, 120 % growth factor (for max MVA or ONAF) and 28 degree C ambient temp. , thep , recommended size by ETAP is 20-25 MVA at ONAN-ONAF  Here worst case load is considered for GT, HRSG and ST MCC as providedand ST MCC, as provided by HET. (This load is included as “lump 1” in ETAP model)
  • 17.
    UCH2 LOAD FLOWAT 3 DIFFERENT UNIT AUX. TRAFO RATINGS – WORST CASE LOADING 16‐20 MVA trafo 20‐25 MVA trafo 25‐31.5 MVA trafo % Z = 10, XR = 22.2 % Z = 10, XR = 22.2 % Z = 10, XR = 22.2 Trafo Input kVA 16198 16046 15932 Trafo Output kVA 15217 15286 15339 Increase in trafo output kVA as trafo rating is Decrease in trafo input kVA as trafo rating is increased. For ONAN – ONAFg increased. ? 20 % of the lump load in UCH2 ETAP g ? Trafo % Z is taken For ONAN ONAF rated trafo, ETAP performs Load flow at ONAN rating load in UCH2 ETAP model is static For good voltage as contant at 10 % For good voltage regulation at trafo sec. the static load consumes more kVA
  • 18.
    ETAP MOTOR STARTSTUDY AT 3 DIFFERENT TRAFO RATINGS – NORMAL CASE LOADING Motor Starting Analysis Trafo Input MVA Load Flow after For Circulation Water  Pump Motor Load Flow before  Motor start Load Flow at  Motor start Load Flow after Motor start (steady  state) 16‐20 MVA trafo 13 607 20 865 15 277 % Z = 8, XR = 22.2 13.607 20.865 15.277 20‐25 MVA trafo % Z = 8, XR = 22.2 13.655 21.345 15.333 20‐25 MVA trafo % Z = 10, XR = 22.2 13.632 20.865 15.277 If Normal loading is considered (i e lump 1 = 13600 kVA ) then(i.e lump 1 = 13600 kVA ), then the sizing module recommends 16 – 20 MVA trafo
  • 19.
    ETAP MOTOR STARTSTUDY AT 3 DIFFERENT TRAFO RATINGS – NORMAL CASE LOADING ….. CONTD Motor Starting Analysis For Circulation Water Trafo sec. Voltage at  Motor Terminal  Voltage at Motor Motor Terminal  Voltage at SteadyFor Circulation Water  Pump Motor Motor Start Voltage at Motor  Start Voltage at Steady  State 16‐20 MVA trafo % Z = 8, XR = 22.2 88.35% 92.09% 98.38% 20‐25 MVA trafo % Z = 8, XR = 22.2 90.34% 94.18% 99.49% 20 25 MVA trafo20‐25 MVA trafo % Z = 10, XR = 22.2 88.35% 92.09% 98.38% Motor Rated Voltage: As per IEEE Standard 399-1997, IEEE Recommended Practice for Industrial and Commercial Power System Analysis (Brown Book), the Voltage at terminal of Motor during starting shall not fall below 80 % of rated voltage. Please note that the motor rated voltage is 6.3 kA where as the MV bus and trafo sec. rated voltage is 6.6 kV g g g Hence this condition is satistfied for all the three different trafo ratings For ONAN – ONAF rated trafo, ETAP performs Motor Start at ONAN rating
  • 20.
    CALCULATION OF TRAFOSEC. VOLTAGE AT MOTOR START USING FORMULA …… COMPARISON Motor Starting Analysis For Circulation Water Trafo sec. Voltage at Motor Start calculated usingFor Circulation Water  Pump Motor calculated using ETAP calculated using  Formula 16‐20 MVA trafo % Z = 8, XR = 22.2 88.35% 87.36% Almost same results using formula and ETAP, confirms the validity of the formula 20‐25 MVA trafo % Z = 8, XR = 22.2 90.34% 89.89% 20‐25 MVA trafo % Z = 10 XR = 22 2 88.35% 87.35% used in UCH2 trafo sizing calculations % Z = 10, XR = 22.2 Starting kVA of motor = Full Load kVA x 6 = 11412 kVA Peak load on trafo excluding motor load = 13869 kVA
  • 21.
    SUMMARY UCH2 UATSIZINGSUMMARY ……. UCH2 UAT SIZING Growth 16 20 ETAP Normal load for GT, ST, HRSG Factor at ONAF Growth Factor at 16 – 20 MVA 20 – 25 ETAP Transformer Sizing Module Worst load Factor at ONAN MVA 20 25Worst load for GT, ST, HRSG 20 – 25 MVA AT Normal Load for GT, ST, HRSG – Total BOP Load including UAT losses = 15.9 MVA approx AT Worst Load for GT, ST, HRSG – Total BOP Load including UAT losses = 15.3 – 15.6 MVA approx The Motor starting Condition is satisfied for both transformer ratings as indicated in previous slides
  • 22.
    SUMMARY ……. UPSIZINGOF UCH2 UAT FROM 16 -20 MVA TO 20 – 25 MVAMVA TO 20 25 MVA Before addition of 1 MW colony feeder and two For 16 – 20 MVA trafo, at motor start the voltage at 825 kW HSD Electric Heaters MV bus was greater than 90 % After addition of 1 MW colony feeder and two 825 kW HSD Electric Heaters For 16 – 20 MVA trafo, at motor start the voltage at MV bus became lesser than 90 % Mushtaq Sb. (from PMT) required the voltage to be greater than 90 % To incorporate this comment, UAT rating was increased to 20 – 25increased to 20 25 MVA trafo at 8 % Z
  • 23.
    STANDARDIZATION ON ETAPFOR TRAFO SIZINGSTANDARDIZATION ON ETAP FOR TRAFO SIZING  Having witnessed the harmony between ETAPg y transformer sizing module and manual sizing through formulae, the sizing calculations can be standardized on ETAP  Following documents can be issued if sizing is done using ETAP ETAP Load Flow Snapshot of ETAP ETAP Motor StartETAP Load Flow analysis Report Snapshot of ETAP sizing Module ETAP Motor Start Study Report
  • 24.
    THANK YOUTHANK YOUOU Q& A OU Q & AQ & AQ & A