TRANSFORMER TESTS
TRANSFORMER TESTS
SFRA TESTS- PURPOSE
• Transformer complex of resistance,Inductance and
Capacitance Network (R,L,C)
• Resistance of copper winding (R)
• Inductance of winding Coil (L)
• Capacitance of Insulation Layer between coil (C)
• R,L,C Circuit form frequnce dependant and response
• Any Physical damage- R,L,C value changed and
frequency response changed
• Test conduct during commissioning
• 10VAC and 20KHZ to 2MHZ Source of supply
SFRA(FRQ RESPONSE ANAL) TEST
SFRA TEST
HV phase to Neutral and LV Short
LV Ph to Neutral and HV Open
Between HV & LV Winding
2.TAN DELTA TEST
• TAN DELTA= Resitance component of Ins. Matl
Capacitive current flowing Ins.Matl
. Capacitance Value,Tan Delta(Dissipation factor)
. Change of Capacitance indicate Moisture,Short
and open circuit in winding
. Insulating Loss α Squre of the applied voltage
TAN DELTA CONNECTION
Transformer Bushing Insulation Test
MEASUREMENT OF TAN DELTA &
CAPACITANCE (winding)
• Ambient temp: 35 C
Top oil temp: 48 C
WINDING Test mode Applied
Voltage
Current
(mA)
Capacitance (pF)
Dissipation factor (Tan Delta (%)
Correction factor K= 1.75
@ 46 Dec @ 20 Dec
LV to Earth
UST-R 3.0 kv 4.467 4756.41 0.5123 0.2927
UST-R 6.0 kv 8.955 4756.75 0.5103 0.2916
HV to Earth
GST-GND 5.0 kv 17.96 11421.9 0.5006 0.2860
GST-GND 10.0kv 35.81 11425.4 0.5043 0.2881
HV to LV
UST-R 5.0kv 7.450 4757.18 0.5127 0.2929
UST-R 10.0kv 14.876 4741.3 0.5 169 0.2953
BUSHING Make: CGL Rated Amps
1250A Rated Volts 145kv
BUSHING Test mode Applied
Voltage
Current
(mA)
Capacitance (pF)
Dissipation factor (Tan Delta (%)
Correction factor K= 1.75
@ 46 Dec @ 20 Dec
‘U’-145101008
UST-R 5.0kv 0.408 260.36 0.2515
UST-R 10.0kv 0.817 260.34 0.2517
‘V’-145100923
UST-R 5.0kv 0.407 259.07 0.2477
UST-R 10.0kv 0.812 259.04. 0.2466
‘W’-145101009
UST-R 5.0kv 0.403 257.21 0.1778
UST-R 10.0kv 0.807 257.15 0.1836
Procerdure for Voltage & Turns Ratio
Test
Voltage & Turns Ratio Test
RATIO TESTS: (110000/11000)
(RATIO BY VOLTAGE METHOD)
Tap
HV
Voltage
Applied voltage on HV Measured Voltage Calculated
Ratio1U1V 1V1W 1W1U 2U-2N 2V-2N 2W-2N
1 121000 404 407 404 36.6 36.6 36.7 36.9
2 119625 404 407 404 36.9 37.0 37.1 37.1
3 118250 404 407 404 37.3 37.5 37.4 37.6
4 116875 404 407 404 37.8 38.0 38.0 38.1
5 115500 404 407 404 38.3 38.4 38.5 38.6
6 114125 404 407 404 38.9 39.0 39.0 39.1
7 112750 404 407 404 39.2 39.4 39.4 39.6
8 111375 404 407 404 39.7 39.9 40.0 40.0
9N 110000 404 407 404 40.4 40.4 40.4 40.5
10 108625 404 407 404 40.7 40.9 40.9 41.1
11 107250 404 407 404 41.3 41.5 41.5 41.6
12 105875 404 407 404 41.8 41.9 42.0 41.8
13b 104500 404 407 404 42.5 42.7 42.7 42.7
14 103125 404 407 404 43.0 43.3 43.3 43.2
15 101750 404 407 404 43.7 43.9 43.9 43.9
16 100375 404 407 404 44.3 44.4 44.5 44.4
17 99000 404 407 404 44.9 45.2 45.2 45.1
18 97625 404 407 404 45.6 45.8 45.8 45.7
19 96250 404 407 404 46.4 46.5 46.6 46.4
20 94875 404 407 404 47.0 47.2 47.2 47.1
21 93500 404 407 404 47.5 47.6 47.6 47.7
22 92125 404 407 404 48.3 48.5 48.6 48.4
23 90750 404 407 404 49.1 49.3 49.3 49.5
24 89375 404 407 404 49.9 50.0 49.9 50.0
25 88000 404 407 404 50.6 50.8 50.8 50.8
MAGNETESING CURRENT TEST
• Mesure
• Defect of Magnetic core structure
• Shiting of winding
• Failure of Turn to Turn insulation
• Problems in tap changer
MAGNETESING CURRENT TEST
MAGNETESING CURRENT TEST
• Apply 3-ph 415 V or 1-phase 230 V 0n HV or
LV keeping other side OPEN
HV side
LV side
Applied voltage Current measured Applied voltage Current measured
UN / UV = 389 4.82 mA un / uv = 206 170 mA
VN / VW = 392 3.10 mA vn / vw = 206 85 mA
WN / WU = 389 6.40 mA wn / wu = 206 96 mA
Magnetic Balance Test
• Rph Voltage = Y Ph Voltage + B Ph voltage
Magnetic Balance Test
• Apply 1-phase 230 V on HV and LV side
(whichever is have neutral) between phase
and neutral and
1U1N
1U1V
1U1N
1V1W
1W1N
1W1U
2U2N
2U2V
2V2N
2V2W
2W2N
2W2U
389 348 45
212 392 179
47 347 389
Polarity Test
IR value between Applied Voltage
IR value for
15 secs
IR value for
60 secs
Ir Value for
600 secas
PI 600/60
LV to Earth 5000 2.71 G Ω 4.64 G Ω 8.77 G Ω 1.89
HV to Earth 5000 3.19 G Ω 4.39 G Ω 7.20 G Ω 1.64
HV to Lv 5000 8.09 G Ω 9.30 G Ω 17.20 G Ω 1.84
BDV TEST (OIL TEST)
BDV TEST FINAL
Sample Taken Date Weather condition BDV
Main tank Bottom oil 23 09 2017 Good 60 KV
OLTC tank 23 09 2017 Good 54 KV

More Related Content

What's hot

Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protectionRakesh Joshi
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformerPreet_patel
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenancekarikalan123
 
Current Transformer and Potential Transformer
Current Transformer and Potential TransformerCurrent Transformer and Potential Transformer
Current Transformer and Potential TransformerRidwanul Hoque
 
Impulse test for power transformers
Impulse test for power transformersImpulse test for power transformers
Impulse test for power transformersjibinjoy1988
 
Presentation on Power transformer
Presentation on Power transformerPresentation on Power transformer
Presentation on Power transformerSudarshan Pandey
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformerKapil Singh
 
Hv module 3 Impulse voltage generation
Hv module 3 Impulse voltage generationHv module 3 Impulse voltage generation
Hv module 3 Impulse voltage generationAsha Anu Kurian
 

What's hot (20)

Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformer
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
Transformer
TransformerTransformer
Transformer
 
Full transformer
Full transformerFull transformer
Full transformer
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
Transformer basic
Transformer basicTransformer basic
Transformer basic
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
 
Current Transformer and Potential Transformer
Current Transformer and Potential TransformerCurrent Transformer and Potential Transformer
Current Transformer and Potential Transformer
 
Impulse test for power transformers
Impulse test for power transformersImpulse test for power transformers
Impulse test for power transformers
 
Presentation on Power transformer
Presentation on Power transformerPresentation on Power transformer
Presentation on Power transformer
 
Motor starter
Motor starterMotor starter
Motor starter
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Motor Protection
Motor ProtectionMotor Protection
Motor Protection
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Hv module 3 Impulse voltage generation
Hv module 3 Impulse voltage generationHv module 3 Impulse voltage generation
Hv module 3 Impulse voltage generation
 
BASIC TRANSFORMER CALCULATIONS
BASIC TRANSFORMER CALCULATIONSBASIC TRANSFORMER CALCULATIONS
BASIC TRANSFORMER CALCULATIONS
 

Similar to Transformer tests

Testing of transformer.pptx
Testing of transformer.pptxTesting of transformer.pptx
Testing of transformer.pptxNoorulAmin67
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptChristinaBoyd12
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.pptsantubanga333
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptssuser1f60f6
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, IndiaRajuMondal18
 
Introduction of transfromer
Introduction of transfromerIntroduction of transfromer
Introduction of transfromerpretty gurna
 
Module 2 ee369 KTU syllabus-high voltage ac generation,resonant circuits
Module 2 ee369 KTU syllabus-high voltage ac generation,resonant circuitsModule 2 ee369 KTU syllabus-high voltage ac generation,resonant circuits
Module 2 ee369 KTU syllabus-high voltage ac generation,resonant circuitsAsha Anu Kurian
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerRaveendranath Macherla
 
Voltage regulation techniques used in power systems
Voltage regulation techniques used in power systemsVoltage regulation techniques used in power systems
Voltage regulation techniques used in power systemsDr. Amjad Hussain
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transientsmichaeljmack
 
Transformer Course Lab.pdf
Transformer Course Lab.pdfTransformer Course Lab.pdf
Transformer Course Lab.pdfsmuftah
 
OPEN CIRCUIT AND SHORT CIRCUIT TEST OF SINGLE PHASE TRANSFORMER|DAY7| BASIC E...
OPEN CIRCUIT AND SHORT CIRCUIT TEST OF SINGLE PHASE TRANSFORMER|DAY7| BASIC E...OPEN CIRCUIT AND SHORT CIRCUIT TEST OF SINGLE PHASE TRANSFORMER|DAY7| BASIC E...
OPEN CIRCUIT AND SHORT CIRCUIT TEST OF SINGLE PHASE TRANSFORMER|DAY7| BASIC E...Prasant Kumar
 
Power Electronics - Phase Controlled Converters.pptx
Power Electronics - Phase Controlled Converters.pptxPower Electronics - Phase Controlled Converters.pptx
Power Electronics - Phase Controlled Converters.pptxPoornima D
 
Catastrophic failure of system equipment during switching of 115kV shunt reac...
Catastrophic failure of system equipment during switching of 115kV shunt reac...Catastrophic failure of system equipment during switching of 115kV shunt reac...
Catastrophic failure of system equipment during switching of 115kV shunt reac...rannaluru
 
Electric Vehicle @ RUK.pptx
Electric Vehicle  @ RUK.pptxElectric Vehicle  @ RUK.pptx
Electric Vehicle @ RUK.pptxRahmanUllahKhan7
 
Analog and Digital Electronics Lab Manual
Analog and Digital Electronics Lab ManualAnalog and Digital Electronics Lab Manual
Analog and Digital Electronics Lab ManualChirag Shetty
 
Insulation co cordination design
Insulation co cordination designInsulation co cordination design
Insulation co cordination designNaresh Surisetti
 

Similar to Transformer tests (20)

Testing of transformer.pptx
Testing of transformer.pptxTesting of transformer.pptx
Testing of transformer.pptx
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 
Transformer ppt.
Transformer ppt.Transformer ppt.
Transformer ppt.
 
Introduction of transfromer
Introduction of transfromerIntroduction of transfromer
Introduction of transfromer
 
Module 2 ee369 KTU syllabus-high voltage ac generation,resonant circuits
Module 2 ee369 KTU syllabus-high voltage ac generation,resonant circuitsModule 2 ee369 KTU syllabus-high voltage ac generation,resonant circuits
Module 2 ee369 KTU syllabus-high voltage ac generation,resonant circuits
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformer
 
Voltage regulation techniques used in power systems
Voltage regulation techniques used in power systemsVoltage regulation techniques used in power systems
Voltage regulation techniques used in power systems
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Transformer Course Lab.pdf
Transformer Course Lab.pdfTransformer Course Lab.pdf
Transformer Course Lab.pdf
 
OPEN CIRCUIT AND SHORT CIRCUIT TEST OF SINGLE PHASE TRANSFORMER|DAY7| BASIC E...
OPEN CIRCUIT AND SHORT CIRCUIT TEST OF SINGLE PHASE TRANSFORMER|DAY7| BASIC E...OPEN CIRCUIT AND SHORT CIRCUIT TEST OF SINGLE PHASE TRANSFORMER|DAY7| BASIC E...
OPEN CIRCUIT AND SHORT CIRCUIT TEST OF SINGLE PHASE TRANSFORMER|DAY7| BASIC E...
 
Power Electronics - Phase Controlled Converters.pptx
Power Electronics - Phase Controlled Converters.pptxPower Electronics - Phase Controlled Converters.pptx
Power Electronics - Phase Controlled Converters.pptx
 
Catastrophic failure of system equipment during switching of 115kV shunt reac...
Catastrophic failure of system equipment during switching of 115kV shunt reac...Catastrophic failure of system equipment during switching of 115kV shunt reac...
Catastrophic failure of system equipment during switching of 115kV shunt reac...
 
Electric Vehicle @ RUK.pptx
Electric Vehicle  @ RUK.pptxElectric Vehicle  @ RUK.pptx
Electric Vehicle @ RUK.pptx
 
tcee-161003100321.pptx
tcee-161003100321.pptxtcee-161003100321.pptx
tcee-161003100321.pptx
 
Analog and Digital Electronics Lab Manual
Analog and Digital Electronics Lab ManualAnalog and Digital Electronics Lab Manual
Analog and Digital Electronics Lab Manual
 
Insulation co cordination design
Insulation co cordination designInsulation co cordination design
Insulation co cordination design
 

Recently uploaded

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 

Recently uploaded (20)

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 

Transformer tests

  • 3. SFRA TESTS- PURPOSE • Transformer complex of resistance,Inductance and Capacitance Network (R,L,C) • Resistance of copper winding (R) • Inductance of winding Coil (L) • Capacitance of Insulation Layer between coil (C) • R,L,C Circuit form frequnce dependant and response • Any Physical damage- R,L,C value changed and frequency response changed • Test conduct during commissioning • 10VAC and 20KHZ to 2MHZ Source of supply
  • 6. HV phase to Neutral and LV Short
  • 7. LV Ph to Neutral and HV Open
  • 8. Between HV & LV Winding
  • 9. 2.TAN DELTA TEST • TAN DELTA= Resitance component of Ins. Matl Capacitive current flowing Ins.Matl . Capacitance Value,Tan Delta(Dissipation factor) . Change of Capacitance indicate Moisture,Short and open circuit in winding . Insulating Loss α Squre of the applied voltage
  • 11.
  • 12.
  • 13.
  • 15. MEASUREMENT OF TAN DELTA & CAPACITANCE (winding) • Ambient temp: 35 C Top oil temp: 48 C WINDING Test mode Applied Voltage Current (mA) Capacitance (pF) Dissipation factor (Tan Delta (%) Correction factor K= 1.75 @ 46 Dec @ 20 Dec LV to Earth UST-R 3.0 kv 4.467 4756.41 0.5123 0.2927 UST-R 6.0 kv 8.955 4756.75 0.5103 0.2916 HV to Earth GST-GND 5.0 kv 17.96 11421.9 0.5006 0.2860 GST-GND 10.0kv 35.81 11425.4 0.5043 0.2881 HV to LV UST-R 5.0kv 7.450 4757.18 0.5127 0.2929 UST-R 10.0kv 14.876 4741.3 0.5 169 0.2953
  • 16. BUSHING Make: CGL Rated Amps 1250A Rated Volts 145kv BUSHING Test mode Applied Voltage Current (mA) Capacitance (pF) Dissipation factor (Tan Delta (%) Correction factor K= 1.75 @ 46 Dec @ 20 Dec ‘U’-145101008 UST-R 5.0kv 0.408 260.36 0.2515 UST-R 10.0kv 0.817 260.34 0.2517 ‘V’-145100923 UST-R 5.0kv 0.407 259.07 0.2477 UST-R 10.0kv 0.812 259.04. 0.2466 ‘W’-145101009 UST-R 5.0kv 0.403 257.21 0.1778 UST-R 10.0kv 0.807 257.15 0.1836
  • 17.
  • 18. Procerdure for Voltage & Turns Ratio Test
  • 19. Voltage & Turns Ratio Test
  • 20. RATIO TESTS: (110000/11000) (RATIO BY VOLTAGE METHOD) Tap HV Voltage Applied voltage on HV Measured Voltage Calculated Ratio1U1V 1V1W 1W1U 2U-2N 2V-2N 2W-2N 1 121000 404 407 404 36.6 36.6 36.7 36.9 2 119625 404 407 404 36.9 37.0 37.1 37.1 3 118250 404 407 404 37.3 37.5 37.4 37.6 4 116875 404 407 404 37.8 38.0 38.0 38.1 5 115500 404 407 404 38.3 38.4 38.5 38.6 6 114125 404 407 404 38.9 39.0 39.0 39.1 7 112750 404 407 404 39.2 39.4 39.4 39.6 8 111375 404 407 404 39.7 39.9 40.0 40.0 9N 110000 404 407 404 40.4 40.4 40.4 40.5 10 108625 404 407 404 40.7 40.9 40.9 41.1 11 107250 404 407 404 41.3 41.5 41.5 41.6 12 105875 404 407 404 41.8 41.9 42.0 41.8 13b 104500 404 407 404 42.5 42.7 42.7 42.7 14 103125 404 407 404 43.0 43.3 43.3 43.2 15 101750 404 407 404 43.7 43.9 43.9 43.9 16 100375 404 407 404 44.3 44.4 44.5 44.4 17 99000 404 407 404 44.9 45.2 45.2 45.1 18 97625 404 407 404 45.6 45.8 45.8 45.7 19 96250 404 407 404 46.4 46.5 46.6 46.4 20 94875 404 407 404 47.0 47.2 47.2 47.1 21 93500 404 407 404 47.5 47.6 47.6 47.7 22 92125 404 407 404 48.3 48.5 48.6 48.4 23 90750 404 407 404 49.1 49.3 49.3 49.5 24 89375 404 407 404 49.9 50.0 49.9 50.0 25 88000 404 407 404 50.6 50.8 50.8 50.8
  • 21. MAGNETESING CURRENT TEST • Mesure • Defect of Magnetic core structure • Shiting of winding • Failure of Turn to Turn insulation • Problems in tap changer
  • 23. MAGNETESING CURRENT TEST • Apply 3-ph 415 V or 1-phase 230 V 0n HV or LV keeping other side OPEN HV side LV side Applied voltage Current measured Applied voltage Current measured UN / UV = 389 4.82 mA un / uv = 206 170 mA VN / VW = 392 3.10 mA vn / vw = 206 85 mA WN / WU = 389 6.40 mA wn / wu = 206 96 mA
  • 24. Magnetic Balance Test • Rph Voltage = Y Ph Voltage + B Ph voltage
  • 25. Magnetic Balance Test • Apply 1-phase 230 V on HV and LV side (whichever is have neutral) between phase and neutral and 1U1N 1U1V 1U1N 1V1W 1W1N 1W1U 2U2N 2U2V 2V2N 2V2W 2W2N 2W2U 389 348 45 212 392 179 47 347 389
  • 27.
  • 28. IR value between Applied Voltage IR value for 15 secs IR value for 60 secs Ir Value for 600 secas PI 600/60 LV to Earth 5000 2.71 G Ω 4.64 G Ω 8.77 G Ω 1.89 HV to Earth 5000 3.19 G Ω 4.39 G Ω 7.20 G Ω 1.64 HV to Lv 5000 8.09 G Ω 9.30 G Ω 17.20 G Ω 1.84
  • 29.
  • 30.
  • 31.
  • 32. BDV TEST (OIL TEST)
  • 33. BDV TEST FINAL Sample Taken Date Weather condition BDV Main tank Bottom oil 23 09 2017 Good 60 KV OLTC tank 23 09 2017 Good 54 KV