Project Selection
By SamiuR Rahman
 Project selection is the process of evaluating individual
projects or groups of projects, and then choosing to
implement some set of them so that the objectives of the
parent organization will be achieved.
 Managers often use decision-aiding models to extract the
relevant issues of a problem from the details in which the
problem is embedded.
 Models represent the problem’s structure and can be useful in
selecting and evaluating projects.
 Models do not give any decision, it partially represent the
reality.
Criteria of Project Selection Models
 Realism - reality of manager’s decision
 Capability- able to simulate different scenarios and optimize the decision
 Flexibility - provide valid results within the range of conditions
 Ease of Use - reasonably convenient, easy execution, and easily
understood
 Cost - Data gathering and modeling costs should be low relative to the
cost of the project
 Easy Computerization - must be easy and convenient to gather, store
and manipulate data in the model
Project Feasibility Study
Project Selection Models: Non Numeric
 Sacred Cow - project is suggested by a senior and powerful
official in the organization
Operating Necessity - the project is required to keep the system
running
Competitive Necessity - project is necessary to sustain a
competitive position
Product Line Extension - projects are judged on how they fit
with current product line, fill a gap, strengthen a weak link, or extend
the line in a new desirable way.
Comparative Benefit Model - several projects are considered
and the one with the most benefit to the firm is selected
Numeric Models: Profit/Profitability
Basic questions
 Is the project worthwhile financially (that is whether it will
generate sufficient cash flows to repay debt and produce a
satisfactory rate of return on investment)?
How to select the "best" project from a list of projects?
Most common measures
Net Present Value (NPV), Internal Rate of Return (IRR), Payback
Period, Return on Investment (ROI), Discounted Cash Flow.
Payback Period
 The amount of time required to recover the initial investment
that the sponsors inject in the project.
yearduringflowCash
yearofstartatcostdUnrecovere
recoveryfullbeforeYearPayback +=
Net Present Value (NPV)
 Calculate the present value of all future cash flows with the
discounting factor (MARR)
 Add all the present values of cash in-flows (cash revenues) and
subtract all the present values of cash out-flows (cash expenses)
 What we obtain is the Net Present Value or NPV
 Positive NPV means attractive financial return, and larger NPV
means more attractive project alternative.
∑= ++
+=
n
1t
t
t
t
0
)pk(1
F
A(project)NPV
∑= +
+=
n
1t
t
t
0
k)(1
F
A(project)NPV (Without Inflation)
(With Inflation)
Internal Rate of Return (IRR)
 IRR is defined as the value of discount rate for which NPV
is exactly zero.The calculation should be carried out using
financial calculators or computer software (like Excel)
Larger IRR indicates that the project is more attractive financially.
NPV(IRR) = 0 =
Several Comments
Advantages of Profit/Profitibility Models
1. The undiscounted models are simple to use and understand.
2. All use readily available accounting data to determine the
cash flows.
3. Model output is in terms familiar to business decision
makers.
4. With a few exceptions, model output is on an “absolute”
profit/profitability scale and allows
“absolute” go/no-go decisions.
5. Some profit models can be amended to account for project
risk.
Disadvantages of Profit/Profitibility Models
1. These models ignore all nonmonetary factors except risk.
2. Models that do not include discounting ignore the timing of the cash
flows and the time–value of money.
3. Models that reduce cash flows to their present value are strongly
biased toward the short run.
4. Payback-type models ignore cash flows beyond the payback period.
5. The internal rate of return model can result in multiple solutions.
6. All are sensitive to errors in the input data for the early years of the
project.
7. All discounting models are nonlinear, and the effects of changes (or
errors) in the variables or parameters are generally not obvious to most
decision makers.
8. All these models depend for input on a determination of cash flows,
but it is not clear exactly how the concept of cash flow is properly
defined for the purpose of evaluating projects.
Unweighted 0-1 Factor Model
Unweighted Factor Scoring Model
Weighted Factor Scoring Model
Constrained Weighted Factor Scoring Model
Goal Programming with Multiple Objectives
Project Selection Models: Scoring
Unweighted 0-1 Factor Model
A set of relevant factors is selected by management and then
usually listed in a preprinted form.
One or more raters score the project on each factor, depending
whether or not it qualifies for an individual criterion.
The criteria for choices are:
 A clear understanding of organizational goals
 A good knowledge of the firm’s potential project portfolio
Advantage of this model is that it uses several criteria.
Disadvantages are that it assumes all criteria are of equal
importance and it allows for no gradation of the degree to which
a specific project meets the various criteria.
Project Criteria Qualifies Not Qualifies
A Payoff Potential x
Lack of Risk x
Safety x
Competitive
Advantage
x
Total Score 3 1
Unweighted Factor Scoring Model
This model is used by constructing a simple linear measure of
the degree to which the project being evaluated meets each of the
criteria.
Often a five-point scale is used to evaluate the project.
A variant of this selection process might choose the highest
scoring
project.
The criteria are all assumed to be of equal importance.
Project
Criteria
Project A Project B Project C Project D
A Payoff
Potential
High Low Medium High
Lack of Risk Low Medium Medium High
Safety High Medium Low Medium
Competitive
Advantage
Medium Medium Low Medium
High = 3
Medium = 2
Low = 1
Project
Criteria
Project A Project B Project C Project D
A Payoff
Potential
3 1 2 3
Lack of Risk 1 2 2 3
Safety 3 2 1 2
Competitive
Advantage
2 2 1 2
Total 9 7 6 10
Weighted Factor Scoring Model
A weighted factor scoring model is when each of the relevant
factors selected by management is given numeric weights to reflect
the importance of each of them in the project.
The weights may be generated by any technique that is acceptable
to the organization’s policy makers.
Each project receives a score that is the weighted sum of its grade
on a list of criteria. Scoring models require:
agreement on criteria
agreement on weights for criteria
a score assigned for each criteria
Assessment Criteria Importance Weights
1. Payoff potential 4
2. Lack of risk 3
3. Safety 1
4. Competitive advantage 3
Project
Criteria
Project A Project B Project C Project D
A Payoff
Potential
12 4 8 12
Lack of Risk 3 6 6 9
Safety 3 2 1 2
Competitive
Advantage
6 6 3 6
Total 24 18 18 29
1. These models allow multiple criteria to be used for evaluation
and decision making, including profit/profitability models and both
tangible and intangible criteria.
2. They are structurally simple and therefore easy to understand
and use.
3. They are a direct reflection of managerial policy.
4. They are easily altered to accommodate changes in the
environment or managerial policy.
5. Weighted scoring models allow for the fact that some criteria are
more important than others.
6. These models allow easy sensitivity analysis. The trade-offs
between the several criteria
are readily observable.
Several Comments
Advantages of Scoring Models
Disadvantages of Profit/Profitibility Models
1. The output of a scoring model is strictly a relative measure.
Project scores do not represent the value or “utility” associated with
a project and thus do not directly indicate whether or not the project
should be supported.
2. In general, scoring models are linear in form and the elements of
such models are assumed to be independent.
3. The ease of use of these models is conducive to the inclusion of
a large number of criteria, most of which have such small weights
that they have little impact on the total project score.
4. Unweighted scoring models assume all criteria are of equal
importance, which is almost certainly contrary to fact.
5. To the extent that profit/profitability is included as an element in
the scoring model, this element has the advantages and
disadvantages noted earlier for the profitability models themselves.
Example#1
Seddet International is considering two major projects each of
which has four year lives. The firm has raised all of its capital in
the form of equity and has never borrowed money. This is partly
due to the success of the business in generating income and partly
due to an insistence by the dominant managing director that
borrowing is to be avoided if at all possible. Shareholders in
Seddet International regard the firm as relatively risky, given its
existing portfolio of projects. Other firms’ shares in this risk class
have generally given a return of 10 per cent per annum and this is
taken as the opportunity cost of capital for the investment
projects. The risk level for the proposed projects is the same as
that of the existing range of activities.
Year Cash Flow
Project S Project L
0 (1000) (1000)
1 500 100
2 400 300
3 300 400
4 100 600
(a) State which is the best project if they are mutually exclusive
using NPV.
(b) Use the IRR decision rule to choose between the projects.
(c) What is the payback period for the projects.
IRRS
IRRL
IRRS= 14.49% IRRL= 11.79%

More Related Content

What's hot

Project identification
Project identificationProject identification
Project identification
christopher abne
 
project management concepts
project management conceptsproject management concepts
project management concepts
Aswin prakash i , Xantus Technologies
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
Kaustubh Gupta
 
Presentation on project appraisal
Presentation on project appraisalPresentation on project appraisal
Presentation on project appraisal
jeni kayastha
 
Market and demand analysis
Market and demand analysisMarket and demand analysis
Market and demand analysis
Meenakshi Gautam
 
Project planning
Project planning Project planning
Project planning
Dipnarayan Thakur
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
Tata Dinyuy
 
Generation & Screening of Project Idea
Generation & Screening of Project IdeaGeneration & Screening of Project Idea
Generation & Screening of Project Idea
MOHAMMAD IQBAL
 
Project appraisal and its techniques
Project appraisal and its techniquesProject appraisal and its techniques
Project appraisal and its techniques
AksharaMahesh
 
Project Financing
Project FinancingProject Financing
Project Financing
khankm
 
Project controls
Project controlsProject controls
Project controls
Ashok Kumar
 
Project management PPT
Project management  PPTProject management  PPT
Project management PPT
Raj Sampat
 
Project appraisal and Analysis
Project appraisal and AnalysisProject appraisal and Analysis
Project appraisal and Analysis
Suhail Hussain
 
Objectives of Project evaluation
Objectives of Project evaluationObjectives of Project evaluation
Objectives of Project evaluation
Robina Nasir
 
Meaning, Definition and Scope of Project Appraisal
Meaning, Definition and Scope of Project AppraisalMeaning, Definition and Scope of Project Appraisal
Meaning, Definition and Scope of Project Appraisal
JithaAsokan
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Manager
kanti choudhary
 
Project formulation (1)
Project formulation (1)Project formulation (1)
Project formulation (1)
Revathy Rajasekaran
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management Notes
Haris Hassan
 
Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]Fahad Mahmud Mirza
 
Project audit
Project auditProject audit
Project audit
Sajna Fathima
 

What's hot (20)

Project identification
Project identificationProject identification
Project identification
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Presentation on project appraisal
Presentation on project appraisalPresentation on project appraisal
Presentation on project appraisal
 
Market and demand analysis
Market and demand analysisMarket and demand analysis
Market and demand analysis
 
Project planning
Project planning Project planning
Project planning
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
Generation & Screening of Project Idea
Generation & Screening of Project IdeaGeneration & Screening of Project Idea
Generation & Screening of Project Idea
 
Project appraisal and its techniques
Project appraisal and its techniquesProject appraisal and its techniques
Project appraisal and its techniques
 
Project Financing
Project FinancingProject Financing
Project Financing
 
Project controls
Project controlsProject controls
Project controls
 
Project management PPT
Project management  PPTProject management  PPT
Project management PPT
 
Project appraisal and Analysis
Project appraisal and AnalysisProject appraisal and Analysis
Project appraisal and Analysis
 
Objectives of Project evaluation
Objectives of Project evaluationObjectives of Project evaluation
Objectives of Project evaluation
 
Meaning, Definition and Scope of Project Appraisal
Meaning, Definition and Scope of Project AppraisalMeaning, Definition and Scope of Project Appraisal
Meaning, Definition and Scope of Project Appraisal
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Manager
 
Project formulation (1)
Project formulation (1)Project formulation (1)
Project formulation (1)
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management Notes
 
Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]
 
Project audit
Project auditProject audit
Project audit
 

Viewers also liked

The Process of Project Selection
The Process of Project SelectionThe Process of Project Selection
The Process of Project Selection
IES-Social Business School
 
project selection
project selectionproject selection
project selection
Shivam Singhal
 
Facets of project analysis
Facets of project analysisFacets of project analysis
Facets of project analysisdmkanchepalya
 
Project Selection Model
Project Selection ModelProject Selection Model
Project Selection ModelErsen çelebi
 
project management information system
project management information systemproject management information system
project management information system
Aswin prakash i , Xantus Technologies
 

Viewers also liked (6)

The Process of Project Selection
The Process of Project SelectionThe Process of Project Selection
The Process of Project Selection
 
project selection
project selectionproject selection
project selection
 
Facets of project analysis
Facets of project analysisFacets of project analysis
Facets of project analysis
 
Technical analysis
Technical analysisTechnical analysis
Technical analysis
 
Project Selection Model
Project Selection ModelProject Selection Model
Project Selection Model
 
project management information system
project management information systemproject management information system
project management information system
 

Similar to Project selection

OL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptxOL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptx
SajibDas40
 
OL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptxOL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptx
SajibDas40
 
OL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptxOL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptx
SajibDas40
 
Be aers-fara-modellinginsolvency-nov2010
Be aers-fara-modellinginsolvency-nov2010Be aers-fara-modellinginsolvency-nov2010
Be aers-fara-modellinginsolvency-nov2010Dodi Mulyadi
 
Project selection
Project selectionProject selection
Project selection
Jubayer Alam Shoikat
 
2장 전략적+프로젝트+선정
2장 전략적+프로젝트+선정2장 전략적+프로젝트+선정
2장 전략적+프로젝트+선정guestedf8c60
 
2장 전략적+프로젝트+선정
2장 전략적+프로젝트+선정2장 전략적+프로젝트+선정
2장 전략적+프로젝트+선정guestedf8c60
 
Module 2.pdf
Module 2.pdfModule 2.pdf
Module 2.pdf
SaffanAhmed1
 
software-project-management-unit-2-220808125214-00921612 (1).pdf
software-project-management-unit-2-220808125214-00921612 (1).pdfsoftware-project-management-unit-2-220808125214-00921612 (1).pdf
software-project-management-unit-2-220808125214-00921612 (1).pdf
Vinoth Kumar
 
software-project-management-unit-2.ppt
software-project-management-unit-2.pptsoftware-project-management-unit-2.ppt
software-project-management-unit-2.ppt
Maanbahadurkhadka
 
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
Robert Greiner
 
Chapter 8 information system Strategy
Chapter 8 information system StrategyChapter 8 information system Strategy
Chapter 8 information system Strategy
ahmadjaini_97
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
MohammedYusuf609377
 
Enterprise 360 degree risk management
Enterprise 360 degree risk managementEnterprise 360 degree risk management
Enterprise 360 degree risk management
Infosys
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
muhammadrizal149
 
Business Case Template
Business Case TemplateBusiness Case Template
Business Case Template
Demand Metric
 
Capítulo disponibilizado na Internet pela editora..pdf
Capítulo disponibilizado na Internet pela editora..pdfCapítulo disponibilizado na Internet pela editora..pdf
Capítulo disponibilizado na Internet pela editora..pdf
PrakharDwivedi30
 
An Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and ExamplesAn Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and Examples
Axiom EPM
 
Strategic Management.pptx
Strategic Management.pptxStrategic Management.pptx
Strategic Management.pptx
GermelynPea1
 

Similar to Project selection (20)

OL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptxOL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptx
 
OL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptxOL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptx
 
OL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptxOL_04-05_IPE 4111_ Project Selection.pptx
OL_04-05_IPE 4111_ Project Selection.pptx
 
Be aers-fara-modellinginsolvency-nov2010
Be aers-fara-modellinginsolvency-nov2010Be aers-fara-modellinginsolvency-nov2010
Be aers-fara-modellinginsolvency-nov2010
 
Project selection
Project selectionProject selection
Project selection
 
2장 전략적+프로젝트+선정
2장 전략적+프로젝트+선정2장 전략적+프로젝트+선정
2장 전략적+프로젝트+선정
 
2장 전략적+프로젝트+선정
2장 전략적+프로젝트+선정2장 전략적+프로젝트+선정
2장 전략적+프로젝트+선정
 
Module 2.pdf
Module 2.pdfModule 2.pdf
Module 2.pdf
 
software-project-management-unit-2-220808125214-00921612 (1).pdf
software-project-management-unit-2-220808125214-00921612 (1).pdfsoftware-project-management-unit-2-220808125214-00921612 (1).pdf
software-project-management-unit-2-220808125214-00921612 (1).pdf
 
software-project-management-unit-2.ppt
software-project-management-unit-2.pptsoftware-project-management-unit-2.ppt
software-project-management-unit-2.ppt
 
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
 
ROI-Institute-Brochure1
ROI-Institute-Brochure1ROI-Institute-Brochure1
ROI-Institute-Brochure1
 
Chapter 8 information system Strategy
Chapter 8 information system StrategyChapter 8 information system Strategy
Chapter 8 information system Strategy
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
Enterprise 360 degree risk management
Enterprise 360 degree risk managementEnterprise 360 degree risk management
Enterprise 360 degree risk management
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 
Business Case Template
Business Case TemplateBusiness Case Template
Business Case Template
 
Capítulo disponibilizado na Internet pela editora..pdf
Capítulo disponibilizado na Internet pela editora..pdfCapítulo disponibilizado na Internet pela editora..pdf
Capítulo disponibilizado na Internet pela editora..pdf
 
An Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and ExamplesAn Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and Examples
 
Strategic Management.pptx
Strategic Management.pptxStrategic Management.pptx
Strategic Management.pptx
 

More from SamiuR RahmaN

20 countries information
20 countries information20 countries information
20 countries information
SamiuR RahmaN
 
History of money and types with features.
History of money and types with features. History of money and types with features.
History of money and types with features.
SamiuR RahmaN
 
Padma Oil Company Limited of Financial Position and Statement of profit or loss.
Padma Oil Company Limited of Financial Position and Statement of profit or loss.Padma Oil Company Limited of Financial Position and Statement of profit or loss.
Padma Oil Company Limited of Financial Position and Statement of profit or loss.
SamiuR RahmaN
 
Sectors of developing bangladesh and the problems behind it and the remedy of...
Sectors of developing bangladesh and the problems behind it and the remedy of...Sectors of developing bangladesh and the problems behind it and the remedy of...
Sectors of developing bangladesh and the problems behind it and the remedy of...
SamiuR RahmaN
 
Bangladesh towards development 2015-2050
Bangladesh   towards development 2015-2050Bangladesh   towards development 2015-2050
Bangladesh towards development 2015-2050
SamiuR RahmaN
 
Network Devices
Network DevicesNetwork Devices
Network Devices
SamiuR RahmaN
 
Financial institution
Financial institutionFinancial institution
Financial institution
SamiuR RahmaN
 
Budget : 2016-17
Budget : 2016-17 Budget : 2016-17
Budget : 2016-17
SamiuR RahmaN
 
Letter of credit for Finance
Letter of credit for FinanceLetter of credit for Finance
Letter of credit for Finance
SamiuR RahmaN
 
Asean Presentation for international Business
Asean Presentation for international Business Asean Presentation for international Business
Asean Presentation for international Business
SamiuR RahmaN
 

More from SamiuR RahmaN (10)

20 countries information
20 countries information20 countries information
20 countries information
 
History of money and types with features.
History of money and types with features. History of money and types with features.
History of money and types with features.
 
Padma Oil Company Limited of Financial Position and Statement of profit or loss.
Padma Oil Company Limited of Financial Position and Statement of profit or loss.Padma Oil Company Limited of Financial Position and Statement of profit or loss.
Padma Oil Company Limited of Financial Position and Statement of profit or loss.
 
Sectors of developing bangladesh and the problems behind it and the remedy of...
Sectors of developing bangladesh and the problems behind it and the remedy of...Sectors of developing bangladesh and the problems behind it and the remedy of...
Sectors of developing bangladesh and the problems behind it and the remedy of...
 
Bangladesh towards development 2015-2050
Bangladesh   towards development 2015-2050Bangladesh   towards development 2015-2050
Bangladesh towards development 2015-2050
 
Network Devices
Network DevicesNetwork Devices
Network Devices
 
Financial institution
Financial institutionFinancial institution
Financial institution
 
Budget : 2016-17
Budget : 2016-17 Budget : 2016-17
Budget : 2016-17
 
Letter of credit for Finance
Letter of credit for FinanceLetter of credit for Finance
Letter of credit for Finance
 
Asean Presentation for international Business
Asean Presentation for international Business Asean Presentation for international Business
Asean Presentation for international Business
 

Recently uploaded

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
PedroFerreira53928
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
EduSkills OECD
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
Celine George
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 

Recently uploaded (20)

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 

Project selection

  • 2.  Project selection is the process of evaluating individual projects or groups of projects, and then choosing to implement some set of them so that the objectives of the parent organization will be achieved.  Managers often use decision-aiding models to extract the relevant issues of a problem from the details in which the problem is embedded.  Models represent the problem’s structure and can be useful in selecting and evaluating projects.  Models do not give any decision, it partially represent the reality.
  • 3. Criteria of Project Selection Models  Realism - reality of manager’s decision  Capability- able to simulate different scenarios and optimize the decision  Flexibility - provide valid results within the range of conditions  Ease of Use - reasonably convenient, easy execution, and easily understood  Cost - Data gathering and modeling costs should be low relative to the cost of the project  Easy Computerization - must be easy and convenient to gather, store and manipulate data in the model
  • 5. Project Selection Models: Non Numeric  Sacred Cow - project is suggested by a senior and powerful official in the organization Operating Necessity - the project is required to keep the system running Competitive Necessity - project is necessary to sustain a competitive position Product Line Extension - projects are judged on how they fit with current product line, fill a gap, strengthen a weak link, or extend the line in a new desirable way. Comparative Benefit Model - several projects are considered and the one with the most benefit to the firm is selected
  • 6. Numeric Models: Profit/Profitability Basic questions  Is the project worthwhile financially (that is whether it will generate sufficient cash flows to repay debt and produce a satisfactory rate of return on investment)? How to select the "best" project from a list of projects? Most common measures Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period, Return on Investment (ROI), Discounted Cash Flow.
  • 7. Payback Period  The amount of time required to recover the initial investment that the sponsors inject in the project. yearduringflowCash yearofstartatcostdUnrecovere recoveryfullbeforeYearPayback +=
  • 8. Net Present Value (NPV)  Calculate the present value of all future cash flows with the discounting factor (MARR)  Add all the present values of cash in-flows (cash revenues) and subtract all the present values of cash out-flows (cash expenses)  What we obtain is the Net Present Value or NPV  Positive NPV means attractive financial return, and larger NPV means more attractive project alternative. ∑= ++ += n 1t t t t 0 )pk(1 F A(project)NPV ∑= + += n 1t t t 0 k)(1 F A(project)NPV (Without Inflation) (With Inflation)
  • 9. Internal Rate of Return (IRR)  IRR is defined as the value of discount rate for which NPV is exactly zero.The calculation should be carried out using financial calculators or computer software (like Excel) Larger IRR indicates that the project is more attractive financially. NPV(IRR) = 0 =
  • 10. Several Comments Advantages of Profit/Profitibility Models 1. The undiscounted models are simple to use and understand. 2. All use readily available accounting data to determine the cash flows. 3. Model output is in terms familiar to business decision makers. 4. With a few exceptions, model output is on an “absolute” profit/profitability scale and allows “absolute” go/no-go decisions. 5. Some profit models can be amended to account for project risk.
  • 11. Disadvantages of Profit/Profitibility Models 1. These models ignore all nonmonetary factors except risk. 2. Models that do not include discounting ignore the timing of the cash flows and the time–value of money. 3. Models that reduce cash flows to their present value are strongly biased toward the short run. 4. Payback-type models ignore cash flows beyond the payback period. 5. The internal rate of return model can result in multiple solutions. 6. All are sensitive to errors in the input data for the early years of the project. 7. All discounting models are nonlinear, and the effects of changes (or errors) in the variables or parameters are generally not obvious to most decision makers. 8. All these models depend for input on a determination of cash flows, but it is not clear exactly how the concept of cash flow is properly defined for the purpose of evaluating projects.
  • 12. Unweighted 0-1 Factor Model Unweighted Factor Scoring Model Weighted Factor Scoring Model Constrained Weighted Factor Scoring Model Goal Programming with Multiple Objectives Project Selection Models: Scoring
  • 13. Unweighted 0-1 Factor Model A set of relevant factors is selected by management and then usually listed in a preprinted form. One or more raters score the project on each factor, depending whether or not it qualifies for an individual criterion. The criteria for choices are:  A clear understanding of organizational goals  A good knowledge of the firm’s potential project portfolio Advantage of this model is that it uses several criteria. Disadvantages are that it assumes all criteria are of equal importance and it allows for no gradation of the degree to which a specific project meets the various criteria.
  • 14. Project Criteria Qualifies Not Qualifies A Payoff Potential x Lack of Risk x Safety x Competitive Advantage x Total Score 3 1
  • 15. Unweighted Factor Scoring Model This model is used by constructing a simple linear measure of the degree to which the project being evaluated meets each of the criteria. Often a five-point scale is used to evaluate the project. A variant of this selection process might choose the highest scoring project. The criteria are all assumed to be of equal importance.
  • 16. Project Criteria Project A Project B Project C Project D A Payoff Potential High Low Medium High Lack of Risk Low Medium Medium High Safety High Medium Low Medium Competitive Advantage Medium Medium Low Medium High = 3 Medium = 2 Low = 1
  • 17. Project Criteria Project A Project B Project C Project D A Payoff Potential 3 1 2 3 Lack of Risk 1 2 2 3 Safety 3 2 1 2 Competitive Advantage 2 2 1 2 Total 9 7 6 10
  • 18. Weighted Factor Scoring Model A weighted factor scoring model is when each of the relevant factors selected by management is given numeric weights to reflect the importance of each of them in the project. The weights may be generated by any technique that is acceptable to the organization’s policy makers. Each project receives a score that is the weighted sum of its grade on a list of criteria. Scoring models require: agreement on criteria agreement on weights for criteria a score assigned for each criteria
  • 19. Assessment Criteria Importance Weights 1. Payoff potential 4 2. Lack of risk 3 3. Safety 1 4. Competitive advantage 3
  • 20. Project Criteria Project A Project B Project C Project D A Payoff Potential 12 4 8 12 Lack of Risk 3 6 6 9 Safety 3 2 1 2 Competitive Advantage 6 6 3 6 Total 24 18 18 29
  • 21. 1. These models allow multiple criteria to be used for evaluation and decision making, including profit/profitability models and both tangible and intangible criteria. 2. They are structurally simple and therefore easy to understand and use. 3. They are a direct reflection of managerial policy. 4. They are easily altered to accommodate changes in the environment or managerial policy. 5. Weighted scoring models allow for the fact that some criteria are more important than others. 6. These models allow easy sensitivity analysis. The trade-offs between the several criteria are readily observable. Several Comments Advantages of Scoring Models
  • 22. Disadvantages of Profit/Profitibility Models 1. The output of a scoring model is strictly a relative measure. Project scores do not represent the value or “utility” associated with a project and thus do not directly indicate whether or not the project should be supported. 2. In general, scoring models are linear in form and the elements of such models are assumed to be independent. 3. The ease of use of these models is conducive to the inclusion of a large number of criteria, most of which have such small weights that they have little impact on the total project score. 4. Unweighted scoring models assume all criteria are of equal importance, which is almost certainly contrary to fact. 5. To the extent that profit/profitability is included as an element in the scoring model, this element has the advantages and disadvantages noted earlier for the profitability models themselves.
  • 23. Example#1 Seddet International is considering two major projects each of which has four year lives. The firm has raised all of its capital in the form of equity and has never borrowed money. This is partly due to the success of the business in generating income and partly due to an insistence by the dominant managing director that borrowing is to be avoided if at all possible. Shareholders in Seddet International regard the firm as relatively risky, given its existing portfolio of projects. Other firms’ shares in this risk class have generally given a return of 10 per cent per annum and this is taken as the opportunity cost of capital for the investment projects. The risk level for the proposed projects is the same as that of the existing range of activities.
  • 24. Year Cash Flow Project S Project L 0 (1000) (1000) 1 500 100 2 400 300 3 300 400 4 100 600 (a) State which is the best project if they are mutually exclusive using NPV. (b) Use the IRR decision rule to choose between the projects. (c) What is the payback period for the projects.