Project Delivery Method
Selection Tool
2016 CTR Annual Symposium
April 13, 2016
COLLABORATE. INNOVATE. EDUCATE.
Project Delivery Selection Tool
• History
– TxDOT received legislative authority in 2012
to use Design-Build
• Other approaches (CMAR) had been considered
• TxDOT previously limited to design-bid-build (DBB) method or
limited application of comprehensive development agreements
• Need
– Decision tool as projects are developed
– Objective analysis for determining project delivery method
– Specific to Texas
COLLABORATE. INNOVATE. EDUCATE.
AGENDA
• Motivation and goals
• Relation to prior work
• Selection approach
• Expert input and validation
• Tool demonstration
• Concluding remarks
COLLABORATE. INNOVATE. EDUCATE.
Motivation: Main Goals of the Tool
• Help decision makers make an objective choice of project
delivery method, driven by:
– weighted project goals
– applicable project characteristics
• Transparent and flexible
• Modifiable and updateable (based on MS Excel)
• Recommendations will be consistent across projects and
users
COLLABORATE. INNOVATE. EDUCATE.
Project Delivery Method Selection
Tool
• Design - Bid - Build
• Design - Build
• Future – CMAR, others
These alternatives only represent major approaches. Specific contract
strategies (such as A+B, multiple primes, Incentives, Operate & Maintain)
should be analyzed after determining the delivery method, and are out of
the scope at this time.
Project Delivery Alternatives
COLLABORATE. INNOVATE. EDUCATE.
Project Team
CTR/UT Team
• Nabeel Khwaja, P.E
• Mayra Martinez
• Bill O’Brien, Ph.D., P.E.
• Jim O’Connor, Ph.D., P.E.
TxDOT Team
• Bill Hale, P.E. (sponsor)
• Richard Kirby, P.E.
• Tracey Friggle Logan, P.E.
• Duane Milligan, P.E.
• Katie Nees, P.E.
COLLABORATE. INNOVATE. EDUCATE.
Prior Work
• TRB – Evaluation of Project Delivery Methods
• Colorado DOT Methodology
• CII – Project Delivery Contract Strategy
• Georgia DOT Tool
• Florida DOT
• Virginia DOT
• Minnesota DOT
• New York DOT
• Washington DOT
• NTTA Model
• AASHTO
COLLABORATE. INNOVATE. EDUCATE.
Transit Cooperative Research Program
Framework for Texas Model
3 stages:
- Tier 1 – Qualitative (Like CDOT)
Structured discussion
- Tier 2 – Quantitative (Texas model)
Decision Matrix
- Tier 3 – Risk Analysis (contracting strategies)
Detailed analysis of specific risks
Objective:
“To assist transit agencies in evaluating and selecting
the most appropriate project delivery method for their
projects and in documenting this decision in a Project
Delivery Decision Report”
COLLABORATE. INNOVATE. EDUCATE.
Tier 1 Qualitative Tools
CDOT matrix
COLLABORATE. INNOVATE. EDUCATE.
Tier 2 Qualitative Tools
GDOT Design-Build
Suitability Assessment
30.0
40.0
50.0
60.0
70.0
80.0
90.0
11 7 8 6 12 2 5 3 9 4 1 10
PDCS Rating
CII’s Delivery
Methods’ Ranking
COLLABORATE. INNOVATE. EDUCATE.
Prior Work: Our Findings
• All mix dependent and independent variables:
– Mix Cause: project characteristics, and
– Effect: Project goals
• Commonality among factors
• Extracted a list of 34 factors that owners
consider when selecting a delivery method
• Factor list was consolidated with TxDOT input
COLLABORATE. INNOVATE. EDUCATE.
34 Factors from existing methods & literature review
INDEPENDENT VARIABLES
PROJECT
CHARACTERISTICS
Inherent to the
project. Cannot be
changed.
DEPENDENT VARIABLES
PROJECT GOALS
Owner objectives.
Achievement will
depend on the project
characteristics and
the delivery method
chosen.
COLLABORATE. INNOVATE. EDUCATE.
Selection Approach – Method Overview
Delivery
methods
Project
performance
by objectives
and priorities.
Project
characteristics
Hinder or
leverage
Influence
2. Choose outcomes1. Score characteristics
3. Recommend method
(heat map – not absolutes)
COLLABORATE. INNOVATE. EDUCATE.
Project Delivery Selection Tool:
Project Goals
Lower capital
cost
The contractual cost of the project must be the lowest reasonable;
the budget available is tight.
Higher cost
predictability
The project must be completed within the budget. The agency
wants to avoid cost growth.
Higher schedule
predictability
The project must be completed within the target schedule. The
agency wants to avoid schedule growth.
Lower capital
maintenance
costs
The agency is concerned about minimizing the maintenance costs
during the life cycle of the project.
-Safety & Quality are always considered target objectives
-Target duration can be met with any Delivery Method and the proper incentives
COLLABORATE. INNOVATE. EDUCATE.
Project Delivery Selection Tool:
Project Characteristics
-34 Characteristics from review of prior work
-The team refined the list based on:
• Scope definition characteristics
• Overlaps
• Non-differentiating factors
• Applicability to TxDOT projects
COLLABORATE. INNOVATE. EDUCATE.
Project Delivery Selection Tool:
Project Characteristics
1
Project has well known site conditions that won't cause significant field
changes.
2
The project will benefit from the introduction of innovative methodologies
early in the planning/design phase.
3
The project design (PS&E) is currently at an advanced stage; the agency
wants to avoid changes or rework in design.
4
The project requires the benefit of designer-contractor integration to
reduce coordination challenges.
5
Prescriptive project requirements for methods, materials, and/or
procedures limit contractor innovation in terms of alternatives.
6
For this project, alternate delivery methods shall create incremental
agency efforts and expenses that are expected to be greater than the
savings in capital expenses.
COLLABORATE. INNOVATE. EDUCATE.
Project Delivery Selection Tool:
Project Characteristics
7
Early completion will add significant extra value for key project
stakeholders.
8
The agency is better equipped than the contractor to manage third party
issues.
9
The project is likely to benefit from shifting the risk of third party issues to
the contractor
10 Completion date of ROW acquisition is highly uncertain.
11
Utility relocations have not been completely identified and are likely to
result in important changes in the design, cost, and/or schedule of the
project.
12
The project includes permits requiring coordination and regulatory approval
during the design and/or construction phases of the project
COLLABORATE. INNOVATE. EDUCATE.
Obtaining Data to Assess
Weightings
TxDOT
FHWA
AGC
ACEC
Workshop Participants
Two workshops
• Refine characteristics
• Weight characteristics against
goals for each method
• Validation and review of
responses – understand outliers
• Weightings reflect summary
wisdom of community
COLLABORATE. INNOVATE. EDUCATE.
Project Delivery Selection Tool
1. Project
characteristics
2. Project
objectives.
COLLABORATE. INNOVATE. EDUCATE.
Project Delivery Selection Tool
3. Delivery
methods
COLLABORATE. INNOVATE. EDUCATE.
Project Delivery Selection Tool
Design- Build Delivery Method (Most Suitable)
Most Supportive Characteristics Least Supportive Characteristics
The project will benefit from the introduction of
innovative methodologies early in the
planning/design phase.
The agency is better equipped than the
contractor to manage third party issues.
The project requires the benefit of designer-
contractor integration to reduce coordination
challenges.
Prescriptive project requirements for methods,
materials, and/or procedures limit contractor
innovation in terms of alternatives.
Early completion will add significant extra value
for key project stakeholders.
For this project, alternate delivery methods shall
create incremental agency efforts and expenses
that are expected to be greater than the savings
in capital expenses.
Design- Bid-Build Delivery Method (Least Suitable)
Most Supportive Characteristics Least Supportive Characteristics
The project has well-known site conditions that
won’t cause significant field changes.
Completion date of ROW acquisition is highly
uncertain.
The agency is better equipped than the
contractor to manage third party issues.
Utility relocations have not been completely
identified and are likely to result in important
changes in the design, cost, and/or schedule of
the project.
The project will benefit from the introduction of
innovative methodologies early in the
planning/design phase.
The project includes permits requiring
coordination and regulator approval during the
design and/or construction phases of the project.
Most and least
supportive
characteristics
for each
delivery method
COLLABORATE. INNOVATE. EDUCATE.
Tool Validation
• Case-study based
• Tool should reproduce human decision making
• To ensure the tool gives recommendations aligned with
experts’ expectations
1
• Projects’
characteristics
& objectives
provided by PM
2
• Project ran
through the
tool
3
• Final recom-
mendation is
discussed
COLLABORATE. INNOVATE. EDUCATE.
Tool Validation
• Projects Tested
Project DBB DB Dif. Recommendation
1 75 Rehabilitation 0.32 -0.07 0.39 DBB
2 I-69 0.08 -0.02 0.1 Tier 3
3 Roger Deck Park 0.16 0.18 -0.02 Tier 3
4 SH 360 0 0.13 -0.13 Tier 3
5
Midtown Express
(SH183)
-0.07 0.27 -0.34 DB
6 LBJ East -0.16 0.32 -0.48 DB
7 SH-146 -0.26 0.24 -0.5 DB
COLLABORATE. INNOVATE. EDUCATE.
Tool Demonstration
COLLABORATE. INNOVATE. EDUCATE.
Concluding Remarks
• Creation of an objective MS Excel-based decision-support
tool (Tier 2)
– Including and differentiation of project goals and projects’
characteristics
– Giving quantitative measures for each alternative: DBB and DB
• Developed with the input of experienced TxDOT personnel
• Weighted with input from broad community of experts in
TxDOT projects
• Validated with range of TxDOT projects
• Flexible tool: easily auditable and modifiable

More Related Content

What's hot

ACH 121 Lecture 02 (Arch. Basic Services )
ACH 121 Lecture 02 (Arch. Basic Services )ACH 121 Lecture 02 (Arch. Basic Services )
ACH 121 Lecture 02 (Arch. Basic Services )
Anne Arundel Community College
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
Timun Loh
 
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisProject Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Seta Ohanesian, PMP, LEED AP
 
Consensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in ConstructionConsensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in Construction
DBL Law
 
Alliance Contracting
Alliance ContractingAlliance Contracting
Alliance Contracting
Water Design-Build Council
 
Design-Build Procurement Approaches
Design-Build Procurement ApproachesDesign-Build Procurement Approaches
Design-Build Procurement Approaches
Water Design-Build Council
 
Akinjiyan_Olufemi_DRP14-15 Submitted
Akinjiyan_Olufemi_DRP14-15 SubmittedAkinjiyan_Olufemi_DRP14-15 Submitted
Akinjiyan_Olufemi_DRP14-15 Submitted
Olufemi Isaac Akinjiyan
 
Capital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_GasCapital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_Gas
Mircea Tomescu
 
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
Charles S. Maggio
 
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
marcus evans Network
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
Lilian Nwachukwu
 
Comparison of Design Bid Build vs. Design Build Finance Operate & Maintain
Comparison of Design Bid Build vs. Design Build Finance Operate & MaintainComparison of Design Bid Build vs. Design Build Finance Operate & Maintain
Comparison of Design Bid Build vs. Design Build Finance Operate & Maintain
Bob Prieto
 
RFPs and RFQs: Selecting the Design-Builder
RFPs and RFQs: Selecting the Design-BuilderRFPs and RFQs: Selecting the Design-Builder
RFPs and RFQs: Selecting the Design-Builder
Water Design-Build Council
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
Michael Audu
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
Sarah Fox
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
Chris Nash
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
 
20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management
raymond_wan2005
 
Alternative Delivery
Alternative DeliveryAlternative Delivery
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
Doreen Yeo
 

What's hot (20)

ACH 121 Lecture 02 (Arch. Basic Services )
ACH 121 Lecture 02 (Arch. Basic Services )ACH 121 Lecture 02 (Arch. Basic Services )
ACH 121 Lecture 02 (Arch. Basic Services )
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
 
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisProject Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative Analysis
 
Consensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in ConstructionConsensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in Construction
 
Alliance Contracting
Alliance ContractingAlliance Contracting
Alliance Contracting
 
Design-Build Procurement Approaches
Design-Build Procurement ApproachesDesign-Build Procurement Approaches
Design-Build Procurement Approaches
 
Akinjiyan_Olufemi_DRP14-15 Submitted
Akinjiyan_Olufemi_DRP14-15 SubmittedAkinjiyan_Olufemi_DRP14-15 Submitted
Akinjiyan_Olufemi_DRP14-15 Submitted
 
Capital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_GasCapital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_Gas
 
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
 
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
 
Comparison of Design Bid Build vs. Design Build Finance Operate & Maintain
Comparison of Design Bid Build vs. Design Build Finance Operate & MaintainComparison of Design Bid Build vs. Design Build Finance Operate & Maintain
Comparison of Design Bid Build vs. Design Build Finance Operate & Maintain
 
RFPs and RFQs: Selecting the Design-Builder
RFPs and RFQs: Selecting the Design-BuilderRFPs and RFQs: Selecting the Design-Builder
RFPs and RFQs: Selecting the Design-Builder
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management
 
Alternative Delivery
Alternative DeliveryAlternative Delivery
Alternative Delivery
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 

Viewers also liked

Lte By Aziz
Lte By AzizLte By Aziz
Lte By Aziz
Aziz Zoaib
 
Automotive Use Cases for LTE-based V2X Study Item
Automotive Use Cases for LTE-based V2X Study ItemAutomotive Use Cases for LTE-based V2X Study Item
Automotive Use Cases for LTE-based V2X Study Item
Yi-Hsueh Tsai
 
Organization
OrganizationOrganization
Planning for a Connected and Autonomous Future
Planning for a Connected and Autonomous FuturePlanning for a Connected and Autonomous Future
Planning for a Connected and Autonomous Future
Center for Transportation Research - UT Austin
 
Evoluton to LTE an overview June 2010
Evoluton to LTE an overview June 2010Evoluton to LTE an overview June 2010
Evoluton to LTE an overview June 2010
Global mobile Suppliers Association (GSA)
 
Session b3. jen duthie data
Session b3. jen duthie dataSession b3. jen duthie data
Data Analytics: Challenges and the Internet of Moving Things
Data Analytics: Challenges and the Internet of Moving ThingsData Analytics: Challenges and the Internet of Moving Things
Data Analytics: Challenges and the Internet of Moving Things
Center for Transportation Research - UT Austin
 
CommTech Talks: Vehicle-to-Vehicle Communications in LTE and beyond
CommTech Talks: Vehicle-to-Vehicle Communications in LTE and beyondCommTech Talks: Vehicle-to-Vehicle Communications in LTE and beyond
CommTech Talks: Vehicle-to-Vehicle Communications in LTE and beyond
Antonio Capone
 
V2X, V2I, and the Cellular Infrastructure
V2X, V2I, and the Cellular InfrastructureV2X, V2I, and the Cellular Infrastructure
V2X, V2I, and the Cellular Infrastructure
Center for Transportation Research - UT Austin
 
Connected and Automated Vehicles (CAVs): Implications for Travel and Infrastr...
Connected and Automated Vehicles (CAVs): Implications for Travel and Infrastr...Connected and Automated Vehicles (CAVs): Implications for Travel and Infrastr...
Connected and Automated Vehicles (CAVs): Implications for Travel and Infrastr...
Center for Transportation Research - UT Austin
 
Build - Operate - Transfer
Build - Operate - TransferBuild - Operate - Transfer
Build - Operate - Transfer
Kshitij Gupta
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
Mohd. Ikhwan
 
Connected and Autonomous Vehicles: The Enabling Technologies
Connected and Autonomous Vehicles: The Enabling TechnologiesConnected and Autonomous Vehicles: The Enabling Technologies
Connected and Autonomous Vehicles: The Enabling Technologies
Center for Transportation Research - UT Austin
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
Rajesh Sharma
 
Assimilating Self-Driving Cars Into Society: Travel Impacts & Transport Polic...
Assimilating Self-Driving Cars Into Society: Travel Impacts & Transport Polic...Assimilating Self-Driving Cars Into Society: Travel Impacts & Transport Polic...
Assimilating Self-Driving Cars Into Society: Travel Impacts & Transport Polic...
Center for Transportation Research - UT Austin
 

Viewers also liked (15)

Lte By Aziz
Lte By AzizLte By Aziz
Lte By Aziz
 
Automotive Use Cases for LTE-based V2X Study Item
Automotive Use Cases for LTE-based V2X Study ItemAutomotive Use Cases for LTE-based V2X Study Item
Automotive Use Cases for LTE-based V2X Study Item
 
Organization
OrganizationOrganization
Organization
 
Planning for a Connected and Autonomous Future
Planning for a Connected and Autonomous FuturePlanning for a Connected and Autonomous Future
Planning for a Connected and Autonomous Future
 
Evoluton to LTE an overview June 2010
Evoluton to LTE an overview June 2010Evoluton to LTE an overview June 2010
Evoluton to LTE an overview June 2010
 
Session b3. jen duthie data
Session b3. jen duthie dataSession b3. jen duthie data
Session b3. jen duthie data
 
Data Analytics: Challenges and the Internet of Moving Things
Data Analytics: Challenges and the Internet of Moving ThingsData Analytics: Challenges and the Internet of Moving Things
Data Analytics: Challenges and the Internet of Moving Things
 
CommTech Talks: Vehicle-to-Vehicle Communications in LTE and beyond
CommTech Talks: Vehicle-to-Vehicle Communications in LTE and beyondCommTech Talks: Vehicle-to-Vehicle Communications in LTE and beyond
CommTech Talks: Vehicle-to-Vehicle Communications in LTE and beyond
 
V2X, V2I, and the Cellular Infrastructure
V2X, V2I, and the Cellular InfrastructureV2X, V2I, and the Cellular Infrastructure
V2X, V2I, and the Cellular Infrastructure
 
Connected and Automated Vehicles (CAVs): Implications for Travel and Infrastr...
Connected and Automated Vehicles (CAVs): Implications for Travel and Infrastr...Connected and Automated Vehicles (CAVs): Implications for Travel and Infrastr...
Connected and Automated Vehicles (CAVs): Implications for Travel and Infrastr...
 
Build - Operate - Transfer
Build - Operate - TransferBuild - Operate - Transfer
Build - Operate - Transfer
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
 
Connected and Autonomous Vehicles: The Enabling Technologies
Connected and Autonomous Vehicles: The Enabling TechnologiesConnected and Autonomous Vehicles: The Enabling Technologies
Connected and Autonomous Vehicles: The Enabling Technologies
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Assimilating Self-Driving Cars Into Society: Travel Impacts & Transport Polic...
Assimilating Self-Driving Cars Into Society: Travel Impacts & Transport Polic...Assimilating Self-Driving Cars Into Society: Travel Impacts & Transport Polic...
Assimilating Self-Driving Cars Into Society: Travel Impacts & Transport Polic...
 

Similar to Project Delivery Method Selection Tool

CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
sombat nirund
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
sachin kumar sharma
 
pmppgoav14.ppt
pmppgoav14.pptpmppgoav14.ppt
pmppgoav14.ppt
AmrikSingh922379
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cards
Jacobs Engineering
 
PME UNIT-3.pptx
PME UNIT-3.pptxPME UNIT-3.pptx
PME UNIT-3.pptx
MayankVasisthGandhi
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
SAJJAD KHUDHUR ABBAS
 
Project Management
Project ManagementProject Management
Project Management
Xubitech
 
Collaboration Case Study Antec 2016
Collaboration Case Study Antec 2016Collaboration Case Study Antec 2016
Collaboration Case Study Antec 2016
David Tucker
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptx
vamsnrsfdevuqsrtmy
 
Episode 21 : Project Scope Management
Episode 21 :  Project Scope ManagementEpisode 21 :  Project Scope Management
Episode 21 : Project Scope Management
SAJJAD KHUDHUR ABBAS
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
Project Management Solutions
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
Durga Prasad Mishra
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
Rasan Samarasinghe
 
Project Management - principles, practice and process
Project Management - principles, practice and process Project Management - principles, practice and process
Project Management - principles, practice and process
Charles Cotter, PhD
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education Program
Frank Cunha
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
Carla Fair-Wright
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
Reetesh Gupta
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdf
amirashraf61
 
project analysis and management for the masters students.
project analysis and management for the masters students.project analysis and management for the masters students.
project analysis and management for the masters students.
abuzertaju
 

Similar to Project Delivery Method Selection Tool (20)

CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 
pmppgoav14.ppt
pmppgoav14.pptpmppgoav14.ppt
pmppgoav14.ppt
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cards
 
PME UNIT-3.pptx
PME UNIT-3.pptxPME UNIT-3.pptx
PME UNIT-3.pptx
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Project Management
Project ManagementProject Management
Project Management
 
Collaboration Case Study Antec 2016
Collaboration Case Study Antec 2016Collaboration Case Study Antec 2016
Collaboration Case Study Antec 2016
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptx
 
Episode 21 : Project Scope Management
Episode 21 :  Project Scope ManagementEpisode 21 :  Project Scope Management
Episode 21 : Project Scope Management
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Project Management - principles, practice and process
Project Management - principles, practice and process Project Management - principles, practice and process
Project Management - principles, practice and process
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education Program
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdf
 
project analysis and management for the masters students.
project analysis and management for the masters students.project analysis and management for the masters students.
project analysis and management for the masters students.
 

More from Center for Transportation Research - UT Austin

Flying with SAVES
Flying with SAVESFlying with SAVES
Regret of Queueing Bandits
Regret of Queueing BanditsRegret of Queueing Bandits
Advances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2XAdvances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2X
Center for Transportation Research - UT Austin
 
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular FleetsCollaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
Center for Transportation Research - UT Austin
 
Collaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated VehiclesCollaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated Vehicles
Center for Transportation Research - UT Austin
 
Statistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient DescentStatistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient Descent
Center for Transportation Research - UT Austin
 
CAV/Mixed Transportation Modeling
CAV/Mixed Transportation ModelingCAV/Mixed Transportation Modeling
CAV/Mixed Transportation Modeling
Center for Transportation Research - UT Austin
 
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
Center for Transportation Research - UT Austin
 
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
Center for Transportation Research - UT Austin
 
UT SAVES: Situation Aware Vehicular Engineering Systems
UT SAVES: Situation Aware Vehicular Engineering SystemsUT SAVES: Situation Aware Vehicular Engineering Systems
UT SAVES: Situation Aware Vehicular Engineering Systems
Center for Transportation Research - UT Austin
 
Regret of Queueing Bandits
Regret of Queueing BanditsRegret of Queueing Bandits
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
Center for Transportation Research - UT Austin
 
CAV/Mixed Transportation Modeling
CAV/Mixed Transportation ModelingCAV/Mixed Transportation Modeling
CAV/Mixed Transportation Modeling
Center for Transportation Research - UT Austin
 
Collaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated VehiclesCollaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated Vehicles
Center for Transportation Research - UT Austin
 
Advances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2XAdvances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2X
Center for Transportation Research - UT Austin
 
Statistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient DescentStatistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient Descent
Center for Transportation Research - UT Austin
 
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Center for Transportation Research - UT Austin
 
SAVES general overview
SAVES general overviewSAVES general overview
D-STOP Overview April 2018
D-STOP Overview April 2018D-STOP Overview April 2018
Managing Mobility during Design-Build Highway Construction: Successes and Les...
Managing Mobility during Design-Build Highway Construction: Successes and Les...Managing Mobility during Design-Build Highway Construction: Successes and Les...
Managing Mobility during Design-Build Highway Construction: Successes and Les...
Center for Transportation Research - UT Austin
 

More from Center for Transportation Research - UT Austin (20)

Flying with SAVES
Flying with SAVESFlying with SAVES
Flying with SAVES
 
Regret of Queueing Bandits
Regret of Queueing BanditsRegret of Queueing Bandits
Regret of Queueing Bandits
 
Advances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2XAdvances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2X
 
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular FleetsCollaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
 
Collaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated VehiclesCollaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated Vehicles
 
Statistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient DescentStatistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient Descent
 
CAV/Mixed Transportation Modeling
CAV/Mixed Transportation ModelingCAV/Mixed Transportation Modeling
CAV/Mixed Transportation Modeling
 
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
 
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
 
UT SAVES: Situation Aware Vehicular Engineering Systems
UT SAVES: Situation Aware Vehicular Engineering SystemsUT SAVES: Situation Aware Vehicular Engineering Systems
UT SAVES: Situation Aware Vehicular Engineering Systems
 
Regret of Queueing Bandits
Regret of Queueing BanditsRegret of Queueing Bandits
Regret of Queueing Bandits
 
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
 
CAV/Mixed Transportation Modeling
CAV/Mixed Transportation ModelingCAV/Mixed Transportation Modeling
CAV/Mixed Transportation Modeling
 
Collaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated VehiclesCollaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated Vehicles
 
Advances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2XAdvances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2X
 
Statistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient DescentStatistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient Descent
 
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
 
SAVES general overview
SAVES general overviewSAVES general overview
SAVES general overview
 
D-STOP Overview April 2018
D-STOP Overview April 2018D-STOP Overview April 2018
D-STOP Overview April 2018
 
Managing Mobility during Design-Build Highway Construction: Successes and Les...
Managing Mobility during Design-Build Highway Construction: Successes and Les...Managing Mobility during Design-Build Highway Construction: Successes and Les...
Managing Mobility during Design-Build Highway Construction: Successes and Les...
 

Recently uploaded

Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
Prakhyath Rai
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
Kamal Acharya
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt
abdatawakjira
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
AnasAhmadNoor
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
Addu25809
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
AlvianRamadhani5
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 

Recently uploaded (20)

Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 

Project Delivery Method Selection Tool

  • 1. COLLABORATE. INNOVATE. EDUCATE. Project Delivery Method Selection Tool 2016 CTR Annual Symposium April 13, 2016
  • 2. COLLABORATE. INNOVATE. EDUCATE. Project Delivery Selection Tool • History – TxDOT received legislative authority in 2012 to use Design-Build • Other approaches (CMAR) had been considered • TxDOT previously limited to design-bid-build (DBB) method or limited application of comprehensive development agreements • Need – Decision tool as projects are developed – Objective analysis for determining project delivery method – Specific to Texas
  • 3. COLLABORATE. INNOVATE. EDUCATE. AGENDA • Motivation and goals • Relation to prior work • Selection approach • Expert input and validation • Tool demonstration • Concluding remarks
  • 4. COLLABORATE. INNOVATE. EDUCATE. Motivation: Main Goals of the Tool • Help decision makers make an objective choice of project delivery method, driven by: – weighted project goals – applicable project characteristics • Transparent and flexible • Modifiable and updateable (based on MS Excel) • Recommendations will be consistent across projects and users
  • 5. COLLABORATE. INNOVATE. EDUCATE. Project Delivery Method Selection Tool • Design - Bid - Build • Design - Build • Future – CMAR, others These alternatives only represent major approaches. Specific contract strategies (such as A+B, multiple primes, Incentives, Operate & Maintain) should be analyzed after determining the delivery method, and are out of the scope at this time. Project Delivery Alternatives
  • 6. COLLABORATE. INNOVATE. EDUCATE. Project Team CTR/UT Team • Nabeel Khwaja, P.E • Mayra Martinez • Bill O’Brien, Ph.D., P.E. • Jim O’Connor, Ph.D., P.E. TxDOT Team • Bill Hale, P.E. (sponsor) • Richard Kirby, P.E. • Tracey Friggle Logan, P.E. • Duane Milligan, P.E. • Katie Nees, P.E.
  • 7. COLLABORATE. INNOVATE. EDUCATE. Prior Work • TRB – Evaluation of Project Delivery Methods • Colorado DOT Methodology • CII – Project Delivery Contract Strategy • Georgia DOT Tool • Florida DOT • Virginia DOT • Minnesota DOT • New York DOT • Washington DOT • NTTA Model • AASHTO
  • 8. COLLABORATE. INNOVATE. EDUCATE. Transit Cooperative Research Program Framework for Texas Model 3 stages: - Tier 1 – Qualitative (Like CDOT) Structured discussion - Tier 2 – Quantitative (Texas model) Decision Matrix - Tier 3 – Risk Analysis (contracting strategies) Detailed analysis of specific risks Objective: “To assist transit agencies in evaluating and selecting the most appropriate project delivery method for their projects and in documenting this decision in a Project Delivery Decision Report”
  • 9. COLLABORATE. INNOVATE. EDUCATE. Tier 1 Qualitative Tools CDOT matrix
  • 10. COLLABORATE. INNOVATE. EDUCATE. Tier 2 Qualitative Tools GDOT Design-Build Suitability Assessment 30.0 40.0 50.0 60.0 70.0 80.0 90.0 11 7 8 6 12 2 5 3 9 4 1 10 PDCS Rating CII’s Delivery Methods’ Ranking
  • 11. COLLABORATE. INNOVATE. EDUCATE. Prior Work: Our Findings • All mix dependent and independent variables: – Mix Cause: project characteristics, and – Effect: Project goals • Commonality among factors • Extracted a list of 34 factors that owners consider when selecting a delivery method • Factor list was consolidated with TxDOT input
  • 12. COLLABORATE. INNOVATE. EDUCATE. 34 Factors from existing methods & literature review INDEPENDENT VARIABLES PROJECT CHARACTERISTICS Inherent to the project. Cannot be changed. DEPENDENT VARIABLES PROJECT GOALS Owner objectives. Achievement will depend on the project characteristics and the delivery method chosen.
  • 13. COLLABORATE. INNOVATE. EDUCATE. Selection Approach – Method Overview Delivery methods Project performance by objectives and priorities. Project characteristics Hinder or leverage Influence 2. Choose outcomes1. Score characteristics 3. Recommend method (heat map – not absolutes)
  • 14. COLLABORATE. INNOVATE. EDUCATE. Project Delivery Selection Tool: Project Goals Lower capital cost The contractual cost of the project must be the lowest reasonable; the budget available is tight. Higher cost predictability The project must be completed within the budget. The agency wants to avoid cost growth. Higher schedule predictability The project must be completed within the target schedule. The agency wants to avoid schedule growth. Lower capital maintenance costs The agency is concerned about minimizing the maintenance costs during the life cycle of the project. -Safety & Quality are always considered target objectives -Target duration can be met with any Delivery Method and the proper incentives
  • 15. COLLABORATE. INNOVATE. EDUCATE. Project Delivery Selection Tool: Project Characteristics -34 Characteristics from review of prior work -The team refined the list based on: • Scope definition characteristics • Overlaps • Non-differentiating factors • Applicability to TxDOT projects
  • 16. COLLABORATE. INNOVATE. EDUCATE. Project Delivery Selection Tool: Project Characteristics 1 Project has well known site conditions that won't cause significant field changes. 2 The project will benefit from the introduction of innovative methodologies early in the planning/design phase. 3 The project design (PS&E) is currently at an advanced stage; the agency wants to avoid changes or rework in design. 4 The project requires the benefit of designer-contractor integration to reduce coordination challenges. 5 Prescriptive project requirements for methods, materials, and/or procedures limit contractor innovation in terms of alternatives. 6 For this project, alternate delivery methods shall create incremental agency efforts and expenses that are expected to be greater than the savings in capital expenses.
  • 17. COLLABORATE. INNOVATE. EDUCATE. Project Delivery Selection Tool: Project Characteristics 7 Early completion will add significant extra value for key project stakeholders. 8 The agency is better equipped than the contractor to manage third party issues. 9 The project is likely to benefit from shifting the risk of third party issues to the contractor 10 Completion date of ROW acquisition is highly uncertain. 11 Utility relocations have not been completely identified and are likely to result in important changes in the design, cost, and/or schedule of the project. 12 The project includes permits requiring coordination and regulatory approval during the design and/or construction phases of the project
  • 18. COLLABORATE. INNOVATE. EDUCATE. Obtaining Data to Assess Weightings TxDOT FHWA AGC ACEC Workshop Participants Two workshops • Refine characteristics • Weight characteristics against goals for each method • Validation and review of responses – understand outliers • Weightings reflect summary wisdom of community
  • 19. COLLABORATE. INNOVATE. EDUCATE. Project Delivery Selection Tool 1. Project characteristics 2. Project objectives.
  • 20. COLLABORATE. INNOVATE. EDUCATE. Project Delivery Selection Tool 3. Delivery methods
  • 21. COLLABORATE. INNOVATE. EDUCATE. Project Delivery Selection Tool Design- Build Delivery Method (Most Suitable) Most Supportive Characteristics Least Supportive Characteristics The project will benefit from the introduction of innovative methodologies early in the planning/design phase. The agency is better equipped than the contractor to manage third party issues. The project requires the benefit of designer- contractor integration to reduce coordination challenges. Prescriptive project requirements for methods, materials, and/or procedures limit contractor innovation in terms of alternatives. Early completion will add significant extra value for key project stakeholders. For this project, alternate delivery methods shall create incremental agency efforts and expenses that are expected to be greater than the savings in capital expenses. Design- Bid-Build Delivery Method (Least Suitable) Most Supportive Characteristics Least Supportive Characteristics The project has well-known site conditions that won’t cause significant field changes. Completion date of ROW acquisition is highly uncertain. The agency is better equipped than the contractor to manage third party issues. Utility relocations have not been completely identified and are likely to result in important changes in the design, cost, and/or schedule of the project. The project will benefit from the introduction of innovative methodologies early in the planning/design phase. The project includes permits requiring coordination and regulator approval during the design and/or construction phases of the project. Most and least supportive characteristics for each delivery method
  • 22. COLLABORATE. INNOVATE. EDUCATE. Tool Validation • Case-study based • Tool should reproduce human decision making • To ensure the tool gives recommendations aligned with experts’ expectations 1 • Projects’ characteristics & objectives provided by PM 2 • Project ran through the tool 3 • Final recom- mendation is discussed
  • 23. COLLABORATE. INNOVATE. EDUCATE. Tool Validation • Projects Tested Project DBB DB Dif. Recommendation 1 75 Rehabilitation 0.32 -0.07 0.39 DBB 2 I-69 0.08 -0.02 0.1 Tier 3 3 Roger Deck Park 0.16 0.18 -0.02 Tier 3 4 SH 360 0 0.13 -0.13 Tier 3 5 Midtown Express (SH183) -0.07 0.27 -0.34 DB 6 LBJ East -0.16 0.32 -0.48 DB 7 SH-146 -0.26 0.24 -0.5 DB
  • 25. COLLABORATE. INNOVATE. EDUCATE. Concluding Remarks • Creation of an objective MS Excel-based decision-support tool (Tier 2) – Including and differentiation of project goals and projects’ characteristics – Giving quantitative measures for each alternative: DBB and DB • Developed with the input of experienced TxDOT personnel • Weighted with input from broad community of experts in TxDOT projects • Validated with range of TxDOT projects • Flexible tool: easily auditable and modifiable