The 3-day training program provides an overview of project management fundamentals and processes. It will define key concepts, compare methodologies, evaluate BMW's current practices, and apply the generic project lifecycle of initiation, planning, implementation, and closure. Participants will complete introductory and learning activities to develop project documents including a terms of reference, plan, schedule, and risk assessment. The program aims to establish best practices for effective project management at BMW.
Contents are sourced from different authors including PMBOK 5th Edition.
This is provided for free as part of our Continuing Practice in Project Management Professional Certification. You may download, share but please refrain from commercializing it or altering parts. Thanks.
For more on Innovations and Project Management, please visit www.facebook.com/SigmaProcessExcellence
Contents are sourced from different authors including PMBOK 5th Edition.
This is provided for free as part of our Continuing Practice in Project Management Professional Certification. You may download, share but please refrain from commercializing it or altering parts. Thanks.
For more on Innovations and Project Management, please visit www.facebook.com/SigmaProcessExcellence
it is an overview of project management. concept of project management, scope of project management with example, types of project management, generation and screening, difficulties and its importance.
Smart project management - Best Practices to Manage Project effectivelyChetan Khanzode
Best Practices to Manage project effectively.It gives overview of all five groups and ten PM knowledge areas.
Emphasis more important aspects of Project Management
Project Management is a well defined concept found in many guidebooks and Bodies of Knowledge. Putting these guides and BOK’s to work for the benefit of the enterprise is the role of Project Governance
In this chapter, you will learn how to:
✔ Use the Backstage view to open and save Project files.
✔ Work with commands on different tabs of the ribbon interface, the major visual
change introduced in Project 2010.
✔ Use different views to see Project information presented in different ways.
Project Management Professional (PMP), Certification Study Guide. To assist PMI candidates for completing the PMI certification exam administered by the Project Management Institute. Content is from “A Guide To The Project Management Body Of Knowledge” (PMBOK)
www.pmi.org
For PMP Certification Training please contact us on +1 281-670-7466 || sabya@trainerkart.com || www.trainerkart.com
Find out what are the most popular steps in Project management. This was prepared for my CIPD Intermediate Level 5 Diploma in Learning and Development.
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...Edureka!
***** PMP® Training : https://www.edureka.co/pmp *****
This Edureka tutorial on PMP® Training will give you a complete insight of PMP® Certification along with various integral topics of PMP and its exam preparation process. This tutorial helps you to learn the following topics:
1. Project & Importance of Project Management
2. Relationship of Project, Program, Portfolio & Operations Management
3. Key Components of Project Management
4. Tailoring
5. Project Management Business Documents
Follow us to never miss an update in the future.
Instagram: https://www.instagram.com/edureka_learning/
Facebook: https://www.facebook.com/edurekaIN/
Twitter: https://twitter.com/edurekain
LinkedIn: https://www.linkedin.com/company/edureka
HD version: http://1drv.ms/1i8AvZc
This is my publication on the introduction to project management. In this publication I overview important project management terms, definitions, project life cycles, and key project management software and tools
it is an overview of project management. concept of project management, scope of project management with example, types of project management, generation and screening, difficulties and its importance.
Smart project management - Best Practices to Manage Project effectivelyChetan Khanzode
Best Practices to Manage project effectively.It gives overview of all five groups and ten PM knowledge areas.
Emphasis more important aspects of Project Management
Project Management is a well defined concept found in many guidebooks and Bodies of Knowledge. Putting these guides and BOK’s to work for the benefit of the enterprise is the role of Project Governance
In this chapter, you will learn how to:
✔ Use the Backstage view to open and save Project files.
✔ Work with commands on different tabs of the ribbon interface, the major visual
change introduced in Project 2010.
✔ Use different views to see Project information presented in different ways.
Project Management Professional (PMP), Certification Study Guide. To assist PMI candidates for completing the PMI certification exam administered by the Project Management Institute. Content is from “A Guide To The Project Management Body Of Knowledge” (PMBOK)
www.pmi.org
For PMP Certification Training please contact us on +1 281-670-7466 || sabya@trainerkart.com || www.trainerkart.com
Find out what are the most popular steps in Project management. This was prepared for my CIPD Intermediate Level 5 Diploma in Learning and Development.
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...Edureka!
***** PMP® Training : https://www.edureka.co/pmp *****
This Edureka tutorial on PMP® Training will give you a complete insight of PMP® Certification along with various integral topics of PMP and its exam preparation process. This tutorial helps you to learn the following topics:
1. Project & Importance of Project Management
2. Relationship of Project, Program, Portfolio & Operations Management
3. Key Components of Project Management
4. Tailoring
5. Project Management Business Documents
Follow us to never miss an update in the future.
Instagram: https://www.instagram.com/edureka_learning/
Facebook: https://www.facebook.com/edurekaIN/
Twitter: https://twitter.com/edurekain
LinkedIn: https://www.linkedin.com/company/edureka
HD version: http://1drv.ms/1i8AvZc
This is my publication on the introduction to project management. In this publication I overview important project management terms, definitions, project life cycles, and key project management software and tools
يقدم المركز العربي للتميز ورشة عمل لمدة 3 ايام عن قانون العمل والتأمينات والضرائب
تنفذ ورشة العمل بالاسكندرية والقاهرة
للاشتراك ولمزيد من التفاصيل
http://goo.gl/8hFeFh
كل عام وانتم ومن تحبون وسورية بالف خير
اشكركم اشكر اعجابكم اعتز بصداقتكم ارجو لكم السعادة ارجو ان نبقى على تواصل
عبد الرحمن تيشوري – شهادة عليا بالادارة – شهادة عليا بالاقتصاد
طرطوس – سورية – ALRAHMANABD@GMAIL.COM
http://www.facebook.com/home.php
رابط جديد لحساب جديد من اجل اضافة المزيد من الاصدقاء
إذا كنت تعتقد ان الموارد البشرية لها دور حيوي في المنشأة
إذا كان لك خبرة لا تقل عن 5 سنوات في الموارد البشرية
إذا كنت تعمل كرئيس قسم او مدير الموارد البشرية
إذا كنت تجهز لحضور اختبار SPHRi المعتمد من HRCI
للاشتراك
https://goo.gl/forms/StjIfpDccFNtJyAq1
Management : is the process of using organizational resources to achieve organizational goals through Planning, Organizing, Controlling and leading.
It is thus, a set of activities directed at an organization’s resources with the aim of achieving organizational goals in an efficient and effective manner.
This lecture helps to learn how different types of processes are managed while executing a software project. this is core responsibility and one the most technical and difficult task of project manager.
Strategic Talent Management and Development online learning programme, facilitated by Dr Charles Cotter. Best practice principles, tools and processes.
Four (4) Critical Success Factors to Build Sustainable Remuneration Strategies_Balancing People and Profit_presented by Dr Charles Cotter at the SLAZEISI Conference on 20 November 2023
Evidence based Talent Analytics and Data driven Talent Management Strategies.pdfCharles Cotter, PhD
Evidence based Talent Analytics and Data driven Talent Management Strategies presented by Dr Charles Cotter at the 2nd African HRM Professionals Strategy Bootcamp, 30 March 2023, in Kempton Park.
Learning Prospectus of Dr Charles Cotter, of the training programmes that he specializes in:
Management/Leadership
(Strategic) Human Resources Management
(Strategic) Learning and Development
Business Communication
Power/Soft Skills
Strategic Talent Management_Best Practice Principles and Processes.pdfCharles Cotter, PhD
Strategic Talent Management - Best Practice Principles and Processes, across the S-P-A-R-M-E-D talent management value chain, facilitated by Dr Charles Cotter
Human Resources Management (HRM) Value Chain Processes, Organizational Cultur...Charles Cotter, PhD
Human Resources Management (HRM) Processes, Organizational Culture and Organizational Change Management training programme, facilitated by Dr Charles Cotter, July 2021
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...PaulBryant58
This article provides a comprehensive guide on how to
effectively manage the convert Accpac to QuickBooks , with a particular focus on utilizing online accounting services to streamline the process.
As a business owner in Delaware, staying on top of your tax obligations is paramount, especially with the annual deadline for Delaware Franchise Tax looming on March 1. One such obligation is the annual Delaware Franchise Tax, which serves as a crucial requirement for maintaining your company’s legal standing within the state. While the prospect of handling tax matters may seem daunting, rest assured that the process can be straightforward with the right guidance. In this comprehensive guide, we’ll walk you through the steps of filing your Delaware Franchise Tax and provide insights to help you navigate the process effectively.
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxmy Pandit
Explore the world of the Taurus zodiac sign. Learn about their stability, determination, and appreciation for beauty. Discover how Taureans' grounded nature and hardworking mindset define their unique personality.
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...Kumar Satyam
According to TechSci Research report, “India Orthopedic Devices Market -Industry Size, Share, Trends, Competition Forecast & Opportunities, 2030”, the India Orthopedic Devices Market stood at USD 1,280.54 Million in 2024 and is anticipated to grow with a CAGR of 7.84% in the forecast period, 2026-2030F. The India Orthopedic Devices Market is being driven by several factors. The most prominent ones include an increase in the elderly population, who are more prone to orthopedic conditions such as osteoporosis and arthritis. Moreover, the rise in sports injuries and road accidents are also contributing to the demand for orthopedic devices. Advances in technology and the introduction of innovative implants and prosthetics have further propelled the market growth. Additionally, government initiatives aimed at improving healthcare infrastructure and the increasing prevalence of lifestyle diseases have led to an upward trend in orthopedic surgeries, thereby fueling the market demand for these devices.
Project Management - principles, practice and process
1. PROJECT MANAGEMENT –
PRINCIPLES AND PROCESS
CHARLES COTTER Ph.D. candidate, MBA, B.A (Hons), B.A
www.slideshare.net/CharlesCotter
BMW, ROSSLYN
27-29 SEPTEMBER 2017
2. 3-DAY, TRAINING PROGRAMME
OVERVIEW
• Introduction
• Defining the fundamental concepts
• Project Management methodologies – PMBOK and PRINCE2
• Diagnosis and Evaluation of current BMW Project Management processes and practices
• Applying the 4-step generic, Project Management life-cycle/process
Project Start-up and Initiation
Project Planning (and Scheduling)
Project Implementation (Monitoring and Evaluation)
Project Closure
• Summary and Closing
3. INTRODUCTORY ACTIVITY
• Individual Activity:
• Complete the statement by inserting one (1) word. In order to
be an effective Project Manager at BMW, I need to/to
be…………………………………….(1 word)
• Find other learners with the same word as you. Jot these
down on the flip-chart.
• Each learner will be given the opportunity to elaborate on
their own word association.
5. DEFINING THE FUNDAMENTAL PM
CONCEPTS
• Project
• Project characteristics
• Project Management
• The Triple Constraint
6. DEFINING PROJECTS
• A project is a temporary and one-time endeavour undertaken
to create a unique product or service that brings about
beneficial change or added value
• A project is a temporary piece of work with a finite starting
and ending date undertaken to create a unique product or
service
• A project is a carefully defined set of activities that use
resources to meet the pre-defined objectives
• Projects bring form or function to ideas or needs.
7. PROJECT CHARACTERISTICS
• Temporary
• Unique
• Involve new processes
• Undertaken to achieve a particular aim (deliverables)
• Value-adding driver of change and improvement
8. DEFINING PROJECT MANAGEMENT
• Project management is the application of knowledge, skills,
tools and techniques to a broad range of activities in order to
meet the requirements of the particular project.
• Project management is concerned with the overall planning
and co-ordination of a project from inception to completion
aimed at meeting the client's requirements and ensuring
completion on time, within cost and to the required quality
standards.
• These three (3) project management variables as often referred
to as the eternal triangle of project management.
11. DEFINING PROJECT SUCCESS
CRITERIA
• #1: Projects completed on time
• #2: Projects completed within budget
• #3: Projects completed according to quality standards and
performance measures
• #4: Projects completed within defined scope
• #5: Projects completed by achieving all deliverables
• #6: Projects completed to the satisfaction of all key stakeholders
and beneficiaries
12.
13. LEARNING ACTIVITY 1
• Evaluate and rate your current BMW
project management practices against
the six (6) project success criteria.
Identify performance gaps.
Recommend project improvement
interventions
• From your experience as a project
manager/team member at BMW,
identify the five most common causes
of project failure. For each of these 5
causes, identify an improvement
strategy and/or solution to ensure a
higher project success rate.
14. CAUSES OF PROJECT FAILURE
(DISTRESSED PROJECTS)
• The wrong business requirements have been addressed
• It's not possible to deliver on the original business case
• Poor project governance and management
• Project managers don't usually have any influence over who their
project sponsor is
• Poor project execution/implementation
• People lose focus on the project's benefits
• The environment changes
19. PHASE ONE: PROJECT START-UP/INITIATION –
PROCESS STEPS/FLOW
• Identification of a business problem, opportunity and/or
need
• Generation of prospective project proposal/s
• Evaluation and building of a business case for the
prospective project proposal/s
• Selection and approval of most value-adding project/s
• Compilation of Terms of Reference (ToR) document,
defining and scoping of the project
20. IDENTIFICATION OF PROBLEM, NEED OF
OPPORTUNITY
• Conduct an Environmental scan:
Micro
Market
Stakeholder Analysis
Macro
• Perform a SWOT Analysis:
Strengths
Weaknesses
Resources
Capabilities
Capacity
Opportunities
Threats
23. EVALUATION OF PROJECT
PROPOSAL/S
• Financial and numerical metrics:
Payback period
Return-on-Investment (ROI)
Net Present Value (NPV)
Internal Rate of Return (IRR)
Cost-Benefit Analysis
28. PURPOSE OF THE ToR
• Defines your project and its scope
• Justifies the project
• Secures funding for the project, if necessary
• Defines the roles and responsibilities of project
participants
• Gives people the information they need to be
productive and effective right from the start
29. CONTENTS OF A ToR
• Section 1: What?
Background
Project Definition
• Section 2: Why?
Project Business Case
• Section 3: Who?
Project Roles and Responsibilities
• Section 4: How and When?
Defined milestones and target dates
Initial/head-line project plan
30. LEARNING ACTIVITY 2
• By referring to the process flow
chart, initiate a BMW project of
your choice.
• By referring to the 4 Sections of a
ToR document, compile a
comprehensive ToR document
(project definition/scoping)
• Present your ToR to the facilitator
and get authorization to proceed
with Stage 2: Planning and
Scheduling.
32. PROJECT PLANNING
• Project planning defines project activities that will be
performed, the deliverables and describes how these activities
will be accomplished and managed
• A Project Plan sets out the phases, activities and tasks needed
to deliver a project
• The timeframes required to deliver the project, along with the
resources and milestones are also shown in the Project Plan
• The project plan establishes a baseline which identifies and
documents project scope, tasks, schedules, cost, risk, quality
and staffing needs throughout the entire project life-cycle
33. COMPONENTS OF PROJECT
PLANNING
• Resource plan
• Financial plan (project budget)
• Quality plan
• Risk management plan
• Communications plan
• Procurement plan
38. LEARNING ACTIVITY 3
• By referring to the Learning
Activity 2 (selected and
approved project), compile a
Project Baseline Plan. Use the
provided Project Action Plan
template.
• Compile a project Financial
Plan (budget) for the selected,
BMW project.
39. PROJECT SCHEDULING
• Project scheduling means detailing what activities have to be
done, the order (sequence) in which they are to be completed,
who is to do each, and how they are to be completed.
• Project scheduling entails the planning and plotting the
following project variables:
Tasks (e.g. Work Breakdown Structure)
Time (e.g. Gantt chart and PERT/network diagramme)
Resources (e.g. Resource Allocation Matrix and Resource
Histogram)
Responsibility (e.g. Load Chart and Responsibility Matrix)
40. WORK BREAKDOWN STRUCTURE
(WBS)
• A Work Breakdown Structure (WBS) is a detailed list of all of the things
that need to be delivered and the activities that need to be carried out to
complete the project.
• A WBS is a chart in which the critical work elements, called tasks, of a
project are illustrated to portray their relationships to each other and to the
project as a whole.
• It's represented as a tree-structure, with each deliverable or activity broken
down into further components.
• When completed, a well-structured WBS resembles a flowchart in which all
elements are logically connected, redundancy is avoided and no critical
elements are left out.
• The graphical nature of the WBS can help a project manager predict
outcomes based on various scenarios, which can ensure that optimum
decisions are made about whether or not to adopt suggested procedures or
changes.
42. GANTT CHARTS
(SCHEDULING TIME)
• Project Managers need to estimate time accurately if they’re going to
deliver their project on time (and on budget)
• Without this skill, PM’s won't know how long your project will take,
and won't be able to get commitment from the people required to
help achieve the project objectives
• Gantt Charts are useful tools for analyzing and planning more
complex projects. It plots scheduled projects tasks/activities on a
time-line.
• When a project is under way, Gantt Charts help PM’s to monitor
whether the project is on schedule. If it is not, it allows PM’s to
pinpoint the remedial action necessary to put it back on schedule.
46. LEARNING ACTIVITY 4
• By referring to the Learning Activity 3
project, schedule the BMW project by
means of any two (2) of the following
scheduling tools:
Work Breakdown Structure (WBS)
Gantt Chart
Resource histogram
RAM
• Graphically illustrate and present your
project schedule to the facilitator.
53. PHASE THREE: PROJECT
IMPLEMENTATION
• The most important issue in this phase is to ensure project
activities are properly executed and controlled
• This phase involves the execution of each activity and task
listed in the project plan.
• While the activities and tasks are being executed, a series of
project management and quality assurance processes are
undertaken by the Project Manager to observe, monitor,
analyze and control the project deliverables to ensure that the
key project objectives are achieved.
54. PROJECT IMPLEMENTATION ACTIONS
• Resource mobilization and deployment
• Organizing and delegating tasks
• Performance Management
Project (time, cost, quality and scope)
Project team members
Contractors and sub-contractors (SLA)
Earned Value Management
• Leading and motivating project team
55.
56. PROJECT IMPLEMENTATION ACTIONS
• Problem-solving/Trouble-shooting
• Conflict Management/Resolution
• Change and Scope Management
• Communication
Project (progress/status) meetings
Stakeholder engagement and liaising
58. PROJECT CONTROL
• The purpose of the control process is to ensure that the project
work can be carried out as scheduled.
• Checkpoints are held throughout the project at weekly
intervals and provide the mechanism for monitoring and
controlling the day to day work on the project.
• Performance information is captured and plans are updated
prior to the Project Status meeting. This enables the meeting to
concentrate on determining what to do next.
• Defining the control procedures includes the setting of
tolerance levels for project performance.
60. WHOLE BRAINING THINKING
• Blue – Logical and Rational (upper left hemisphere)
• Green – Organized and Planned (lower left
hemisphere)
• Yellow – Big Picture and Creative (upper right
hemisphere)
• Red – Interpersonal feelings and Intuitive (lower
right hemisphere)
61. WHOLE BRAIN PROBLEM-SOLVING
PROCESS
• Step 1: Problem identification, analysis and definition
• Step 2: Search for information and generate alternative solutions
• Step 3: Evaluate alternative solutions
• Step 4: Select the most appropriate solution
• Step 5: Implement the appropriate solution
• Step 6: Evaluate the effectiveness of the implemented solution
63. THE 4-STEP CONFLICT RESOLUTION
PROCESS
• Step 1: Identify sources of potential and actual conflict
(DIAGNOSIS)
• Step 2: Develop conflict resolution strategies/techniques
(EXAMINATION)
• Step 3: Apply conflict resolution strategies/techniques
(REMEDY)
• Step 4: Control and review the effectiveness of the conflict
resolution strategy/technique (FOLLOW-UP)
65. LEARNING ACTIVITY 6
• By referring to the Learning Activity 4
project, describe the project monitoring,
evaluation and control process,
mechanisms and tools that will be applied
to red-flag deviations from the project base
line. Specifically refer to controls
regarding time; cost and quality and other
success criteria.
• Describe how the project management
team will resolve conflict within and
external to the team.
• Describe how the project team will resolve
an unstructured problem in the project.
66.
67.
68. PROJECT CHANGE
• Project change is inevitable.
• These project changes cannot always be avoided, but their
impact can be predicted and controlled.
• The impact of these changes must be considered and factored
in terms:
time;
cost;
quality and
customer satisfaction
69.
70. PROJECT CHANGE REQUESTS
• Change requests to the project scope or functionality may come from
a variety of sources, but they will require Project Board sponsorship
to be processed.
• The originator will describe the change request and provide a
justification.
• Alternative solutions and their respective impacts on the project will
be identified and a recommendation made.
• The recommendation will be presented to the Project Board who will
decide whether to accept it or make an alternative recommendation.
• These change requests are formalized through the completion of a
Project Change Request Form (CRF).
71.
72.
73.
74. LEARNING ACTIVITY 7
• By referring to the change
request process and –form,
initiate a change in the
selected, BMW project.
• Indicate whether this
change request was
approved/declined and
motivate the reasons.
75. PHASE FOUR: PROJECT CLOSURE
• This process verifies that the project has delivered the
required outcomes and that stakeholder expectations have
been met.
• It also makes sure that everyone involved in the project knows
how to move forward.
• Project closeout is a fairly routine process, but it remains an
important process.
• By properly completing the project closeout, organizations can
benefit from lessons learned and information compiled at
closure.
76. PROJECT CLOSURE ACTIVITIES
• Releasing the final deliverables to the customer
• Handing over project documentation and
administration and terminating contracts
• Communicating the closure to all stakeholders
• Releasing staff
• Closing the Project Office
77. PROJECT CLOSURE ACTIVITIES
• Perform a Post Implementation Review of the project
• Close-out report:
Assessment of the project against actual performance
Quality of management (focusing on quality and risk
management)
The lessons learnt that can be applied to future projects
78.
79. LEARNING ACTIVITY 8
• As part of the Project Closure phase,
simulate a project close-out de-
briefing meeting in which the
following items are reviewed and
discussed:
Overall project performance
Individual project team member
performance
Lessons learned – mistakes and best
practice principles
Project team cohesion and synergy
Mapping the way forward