SlideShare a Scribd company logo
P a g e | 2
Foundation for Success ....................................................................................................................................... 2
Services................................................................................................................................................................ 2
The Value to Clients of Early Engagement .......................................................................................................... 3
The NCON Process............................................................................................................................................... 3
Phase I – Fact Finding & Needs Assessment ................................................................................................... 3
Phase II – Programming, Planning & Procurement......................................................................................... 4
Phase III – Final Design & Construction........................................................................................................... 4
Aesthetics & Cost Management...................................................................................................................... 4
About NCON Corporation ................................................................................................................................... 4
Value Added Case Studies................................................................................................................................... 4
Current Projects .................................................................................................................................................. 7
Completed Projects........................................................................................................................................... 12
National Clients................................................................................................................................................. 21
What Others Are Saying About NCON & Chris Nash…...................................................................................... 23
References......................................................................................................................................................... 24
Contact Information.......................................................................................................................................... 24
Foundation for Success
NCON Corporation draws on Chris Nash’s 36 years of high level achievement in the business of construction project
management and real estate development. In roles ranging from field engineering and supervision to executive level
positions, Nash has directed or overseen the building of over 13 million square feet of major civil projects, office, residential,
commercial, industrial, manufacturing, education and institutional projects, valued at $1.59 billion.
Nash is widely known in the industry for his ability to create value, minimize risk, and delivering relentless customer service.
With acute attention to detail, each project is viewed through a risk mitigation lens while never losing sight of the big
picture—a requisite in a business that is high risk, at times volatile, and where tight margins can disappear overnight.
With a reputation for fairness, professionalism, resourcefulness, creativity, efficiency, and an undying commitment to
excellence, the company has built trusting relationships with clients and leading industry professionals nationwide. Access
to this valuable pool of resources is central to a continued record of project success. Decades of experience, solid
leadership, and the ability to anticipate pitfalls before they arise, cast a “Foundation for Success” that enables the firm the
capacity to deliver creative and cost-effective solutions for complex, deadline-driven real estate development projects.
Services
The company caters to developers, owners, investors, landlords, tenants, and first time builders in the due diligence,
design, and construction process. Services offered generally include the following and can be tailored to suit individual
needs of the client.
Site selection and analysis
Guidance in the re-zoning process
Budgeting & estimating for project and total development costs
P a g e | 3
Scheduling
Preparing proposals in response to developer RFP’s
Solicitation of all professional services, architectural, civil engineer, geotechnical & environmental services
Preparing competitive and complete bid packages for all design, construction, and professional services
Bid analysis of professional services and general contracting
Support in negotiating lease, purchase and sale, and financing agreements
Orchestrating the due diligence effort of site selection to include but not limited to geotechnical &
environmental studies
Guiding the development group during the permitting process
Expediting the permitting process
Preparing RFP’s for construction , design services, and professional services
Stimulating the market for competitive pricing and complete scope of work and services from all project
participants
Soliciting, preparing, and negotiating all construction, design , and consulting contracts
Managing the design and construction groups from groundbreaking to final completion
Mitigating costly Change Orders through a thorough pre-development phase
Negotiating Change Orders
Creative and cost effective solutions to challenges inherent in construction and real estate development
Closing out the design and construction phases to include compilation of closeout documents from all
participants
The Value to Clients of Early Engagement
NCON’s involvement early in the project has helped clients dramatically reduce risks and costs and achieve other important
project objectives. Early engagement maximizes the Owner’s return on investment for NCON’s services as it allows for a
detailed, well planned, thorough, and competitive procurement process for professional and construction services that
yields better cost/benefit options immediate and long term. Time and time again, history has proven when NCON is
engaged ahead of the designers and contractors, projects are always more successful, more cost effective, and less risky.
Testament to the firm’s competence is the record of involvement in legal disputes. Legal battles are usually indicative of
assembling the wrong partners in a deal, compiling ambiguous, less than complete and inaccurate construction and project
documents, or a combination thereof. Conflicts are disruptive, can impact schedule and costs, but more than anything
divert attention from building the project as well as distracting the client’s focus on his new facility. Until 2012, Chris Nash
was never encumbered in legal conflicts. In this particular case NCON represented the designers against a developer by
relying on accurate project records and Chris Nash’s knowledge of contract law in overturning a $3.5 million dollar lawsuit
filed against the design group. In addition the design group was able to recover past due design fees of $700,000.
The NCON Process
The three phases of the planning stage before blueprints are produced are the most critical of the building process. This is
where money, project goals, and time can be lost or gained. Years of success has garnished a large database of resources
that are tailored for each engagement. Skilled guidance in the conceptual phase and planning stages of a project will
eliminate unanticipated delays and extra costs, enabling a project to complete successfully, and creating value for the client
and end user.
Phase I – Fact Finding & Needs Assessment
An initial meeting with the client is geared toward understanding project objectives, budget, timeline, constraints,
challenges, and delivery method. The client may either retain the designers or choose a design/build arrangement whereby
the contractor designs and builds the project. Touted as a way of building cheaper, the downside of the design/build method
of delivery is a diminished layer of protection for the Owner with the loss of professional representation when the architect
and engineers work directly for the contractor. After being presented with a range of options, the client will be in an optimal
position to choose the method or combination of delivery methods best suited for the project.
P a g e | 4
Phase II – Programming, Planning & Procurement
Upon engagement NCON studies the client’s business operations and proceeds with design development, budgeting, and
scheduling. A detailed understanding of business operations is necessary to determine resources and will minimize the need
for costly changes that can negatively impact scheduling.
Phase III – Final Design & Construction
There are two methods to choose from in Phase III: (1) execution on a “fast track” basis wherein the design is only a few
steps ahead of construction or (2) the traditional approach of producing complete construction documents that are put
out to bid under a lump sum arrangement. Each method has its own risks, benefits, and downside. Approximately 70
percent of the work in NCON’s portfolio has been delivered on a fast-track basis. It is in this phase where the diligence put
forth in the previous two phases pays off as construction risk has been mitigated through pro-active management, and solid
documents compiled through a systematic approach that form the basis for successful negotiations.
Aesthetics & Cost Management
One very important component of the design process that many in the business do not place enough emphasis on is
aesthetics and creating a product with everlasting curb appeal. This is more prevalent on the design/build side where not
enough emphasis is placed on architectural value. Like a talented artist NCON is highly skilled at directing the designers in
drawing attractive and functional buildings without breaking the bank.
About NCON Corporation
Chris Nash is founder and president of NCON Corporation. He holds a B.S. in Civil Engineering from the Virginia Military
Institute. An accomplished leader and skilled negotiator, Nash is acknowledged for trust based relationships with an
unrelenting commitment to excellence.
Since childhood Mr. Nash aspired to be a builder and has a deeply ingrained drive to “leave the campsite cleaner and in
better shape than it was found.” It is through a relentless passion to improve that drives the firm. He is passionate about
the business and takes great pride in his portfolio of completed projects. A strong entrepreneurial spirit has driven Nash in
the successful start-up of three contracting firms, a real estate development group, and NCON.
Outside of work, Nash has been involved with various civic organizations to include Big Brothers Big Sisters, Special
Olympics, Habitat for Humanity, Optimist International, Saint Gabriel Church Mens Club, The Good Fellows Club in
Charlotte, and a volunteer youth sports football, soccer, and baseball coach. He has served on various boards for his alma
mater VMI, the Virginia Military Institute. He has been a devoted financial supporter of the Institute participating in raising
millions of dollars to support athletics at VMI and the VMI Foundation. He is married to the former Lisa Torre. They are
the parents of with two teenage children, Christopher & Olivia.
Value Added Case Studies
Ballantyne Village – Charlotte, North Carolina
Ballantyne Village is a mixed-use retail, office, hotel, and residential development valued in phase one at $75M with the
potential for $60M more in subsequent phases. It is on a 10-acre site at a major intersection in Ballantyne, a growing urban
center on Charlotte’s outer loop. NCON was engaged to be development and construction manager responsible for
directing the fast-track design and building of the site work, shell, and interior upfit of retail, office, medical, a performing
arts theatre, and parking garage. Phases I and II overlapped and at one point in time there were three general contractors
working on the site simultaneously.
Because of close proximity to existing buildings in future phases, in Phase I NCON orchestrated the planning and design to
pre-blast rock down to suitable bedrock for ease of excavation without risk of damage to existing buildings or major
disruption to daily activities and businesses during subsequent phases. Two future towers are designed for 25 plus floors,
and another 12 floors can be added to the cast in place concrete parking deck. Other improvements anticipated for the
future and incorporated in the master planning effort include all underground mechanical, electrical, and communications
infrastructure in anticipation of future phases with a potential for another 1,000,000 square feet of build out.
P a g e | 5
Blue Cross Blue Shield of SC – Columbia, South Carolina - L J Hooker Developments
The initial design for this 110,000 sf, $10M build-to-suit office building for Blue Cross Blue Shield of SC was literally sketched
on a cocktail napkin in a meeting with architects, the developer, and the Tenant. Four and a half months later the tenant
moved in, three days ahead of schedule. The timely completion meant that LJ Hooker would not be assessed a lump sum
$500,000 in late penalty damages. The success of this project resulted in repeat business for Hooker.
Blue Cross Blue Shield of SC – Columbia, South Carolina - Holmes Smith Developments
This single tenant, 348,410 sf build-to-suit was developed for Blue Cross Blue Shield in Columbia, South Carolina. The simple
yet highly functional design initially consisted of two wings attached to a central shaped core forming an “L” shaped building.
Early in the project BCBS decided it needed more space so the third wing was built and the shape now formed a “T.” Despite
the increased building size no schedule extensions were granted and the project completed as originally scheduled. After
Chris Nash’s involvement another wing was added, increasing the building size to 456,304 sf. The end result was a full cross
shape and a structure that is the largest single-tenant, low-rise office building in South Carolina.
Because of existing wetlands, the South Carolina Department of Health and Environmental Control, the U.S. Army Corp of
Engineers, the South Carolina Department of Natural Resources, and the U.S. Environmental Protection Agency each had
sets of regulations that needed to be complied with. Chris Nash led the effort that obtained the necessary permits in six
weeks— a process that normally took six months.
150,000 SF Build to Suit Office Building
NCON represented the joint venture development partnership during the pre-development and procurement phases of this
2 story 150,000 square foot build to suit office building. The partnership had earlier issued a Letter of Intent to a general
contractor seeking to enter into a guaranteed maximum contract with a split savings. In the first meeting with the client,
tenant, and contractor, Chris Nash uncovered $500K of fluff in the budget that resulted in a reduction in the budget and
the tenant’s rental rate. Based on this demonstration of value added, NCON was engaged for subsequent projects.
100,000 SF Build to Suit Office Building
Chris Nash became involved with this project after it was awarded and construction was underway. The steel frame was
clad with a high-end brick veneer that started to show efflorescence shortly after the brickwork began. The contractor
claimed the condition was seasonal and would go away after a year. Not comfortable with the contractor’s claim Nash
brought in professionals to investigate. They determined the cause of the efflorescence was water trapped in the cavity
between the inside face of the brick and the exterior sheathing where mortar droppings had blocked the weep holes. The
new brick had to be remediated and quality control measures were established to prevent mortar from getting into the
cavity. Eventually the building continued to leak and more forensic investigations revealed additional blockages. After
another phase of remediation, the project was finally rendered absent any leaks or efflorescence. To this day, there is no
evidence of any efflorescence.
180,000 SF Build to Suit Office Building
Shortly after the tenant moved into this two-story build-to-suit office building that housed a national mortgage lender,
fireproofing on the structural steel and metal deck began to delaminate and at times crashed through the acoustical ceiling.
It was determined that the spray fireproofing was not compatible with the metal deck. The second floor was subject to
more serious dropping of fireproofing because crews had begun working on the roof before the spray waterproofing had
fully cured, which caused deflection of the deck due to loads and thus movement. After a tedious and lengthy remediation
and inspection process, Nash led the effort that fixed the problem with very little disruption to the tenant’s business
operations.
Governors Lakes – Atlanta, Georgia
This $15M project was a 250,000 sf two-building class development with six-story cast-in-place parking deck in Atlanta,
Georgia built for then what was NCNB, North Carolina National Bank as trustee for the NC Teachers Fund. When bid the
project was over budget by about $3M. As a young assistant project manager, Nash led the fast-track value engineering
effort that reduced costs primarily by altering pieces of a $2M granite package without major aesthetic impact, and re-
designing the cast-in-place concrete frame to reduce rebar weight per square foot from 12 lbs. to 7 lbs.
P a g e | 6
Douglas County Middle School – Atlanta, Georgia
Nash successfully bid and was assigned to serve as project manager on a 120,000 sf, $5.4M middle school project in Atlanta
for a hard bid general contractor out of Alabama. The masonry package, a large part of the total budget, was self-performed
primarily for control and budgetary reasons. The project was completed on time despite weather challenges and the original
fee of $250K increased to $700K largely due to buy out and tight management of the masonry material procurement process
and labor control. Deemed by the client as the most successful and judged the highest quality of 4 similar projects
constructed in the same period.
720,000 SF Manufacturing Facility
NCON represented the financier and future landlord for this build-to-suit 720,000 sf manufacturing and distribution center.
During the punchlist walkthrough areas of the floor slab showed evidence of delamination as the top ¼” to ¾” of the
concrete surface was spalling at random locations throughout the building. Approximately 42,000 sf of slab was removed
and replaced because of the extent of the problem in the initial floor pours. The building had areas of lesser severity, yet
with the potential to negatively impact the performance of the floor over time as the floor could spall, these areas were
identified and documented for future monitoring.
We knew the only way to determine the extent of the problem was to find the cause. When the contractor could not offer
a reasonable explanation, NCON brought in forensic engineers who determined the “bleed water was trapped” during the
curing process. They proceeded to inspect the entire floor to evaluate the potential for further problems. To ensure the
integrity of the floor slab and protect the client, NCON orchestrated securing a five-year extended warranty backed by a
performance and payment bond.
Various Projects – Kingdom of Saudi Arabia
Nash worked for Santa Fe International, who in the early 1980’s was the largest oil exploration company in the world. Santa
Fe’s construction arm, C F Braun, had a construction management contract with ARAMCO, (the Arab American Oil Company)
located in ARAMCO’s world headquarters in Dhahran on the east coast of Saudi Arabia. After 4 months of service, Nash
was promoted and given charge of leading design and construction professionals for 20 building projects valued in excess
of $156,000,000.
Current Projects
Gateway Plaza
Richmond, Virginia
Office & Retail
20 Story
411,000 SF
$120,000,000
P a g e | 8
Gateway Plaza Main Entrance
Gateway Plaza Main Lobby
P a g e | 9
Gateway Plaza Aerial
Electrolux North America
R&D and Office
385,239 SF
$85,000,000
P a g e | 10
Gander Mountain
Albany, Georgia
Retail
54,000 SF
$6,000,000
Calsonic Kansei of
North America “CKNA”
Lewisburg, Tennessee
Distribution
310,000 SF
$15,000,000
P a g e | 11
TMG Medical
Jessup, Pennsylvania
Office
150,000 SF
$23,000,000
Hollander Sleep Products
Thomson, Georgia
Manufacturing/Distribution
210,000 SF
$10,245,000
P a g e | 12
Completed Projects
The remaining photographs are a sampling of some of the projects completed by Chris Nash and NCON.
Ballantyne Village
Charlotte, NC
Office & Retail
230,000SF
$75,000,000
Ballantyne Village Plaza
P a g e | 13
Ballantyne Village Theatre Atrium
Ballantyne Village Theatre
P a g e | 14
ASICS USA
Byhalia, Mississippi
Distribution
550,000 SF
$24,000,000
Clearwater Paper
Shelby, NC
Manufacturing & Distribution
700,000 SF
$24,000,000
P a g e | 15
Tire Rack Distribution
Shreveport, LA
Distribution
250,000 SF
$24,000,000
MED 3000
Florence, SC
Office
32,000 SF
$5,165,000
P a g e | 16
IKON Office Solutions
Columbia, SC
Office
88,000 SF
$7,000,000
Rooms To Go
Charlotte, NC
Distribution
430,000 SF
$18,000,000
Columbia, SC
Office
88,000 SF
$7,000,000
P a g e | 17
Blue Cross and Blue
Shield
Columbia, SC
Office
348,410 SF
$36,000,000
Blue Cross and Blue
Shield
Columbia, SC
Office
110,000 SF
$10,000,000
P a g e | 18
Cultured Stone
Manufacturing & Distribution
Chester, SC
215,000 SF
$23,000,000
Belden Wire & Cable
Manufacturing & Distribution
Fort Mill, SC
250,000 SF
$11,000,000
P a g e | 19
Fleet Mortgage Group
Office
Florence, SC
180,000 SF
$11,500,000
Adidas USA
Spartanburg, SC
Distribution
580,000 SF
$14,500,000
P a g e | 20
OakCreek I
Atlanta, GA
125,000 SF
Office
300 Car Garage
$15,000,000
OakCreek II
Atlanta, GA
110,000 SF
Office
$11,000,000
P a g e | 21
National Clients
P a g e | 22
P a g e | 23
What Others Are Saying About NCON & Chris Nash…..
George Sheild – Executive Vice President – Pavilion Properties, Inc. (Mr. Sheild was formerly with Ballantyne Village
Partners)
“In December 2000, my partner in Ballantyne Village Development and I closed on property at a high profile corner in south
Charlotte, NC, with an ambitious goal of developing a large mixed-use commercial property. We quickly needed to assemble
the “A” team for the development. Due to the complexity of development we set out to do, we knew a critical need would
be a top notch professional construction manager to insure a “no surprises, zero defects” project, from the beginning to
delivery. Having worked with Chris Nash of NCON in the past I felt he would be the best choice. Indeed he proved to be the
right choice in every regard. Chris provided considerable knowledge and experience and managed what became a
complicated multi-year $70,000,000 project. The project included decked parking below grade and above grade. The early
stages required extensive rock removal. We designed the project to have a multi-story commercial core of 165,000 sf with
an independent movie theater, retail shops, restaurants, and offices. The plan also included two mid-rise towers to be a mix
of retail, office, hotel, and hi-rise residential units. The ultimate scope of the project was to achieve as much as 450,000 sf
of mixed use development.”
“With eyes on the future, NCON recommended and orchestrated the initiative that incorporated infrastructure and
foundation modifications in the initial stages that ultimately will allow for a maximum build out, dramatically reducing the
cost for future development and creating much value for the years ahead.”
“Anyone seeking a competent development and project manager would be well served to include NCON in the process; Chris
Nash proved his competence many times over. I can gladly attest to his well-deserved reputation.”
Richard D. Kirschner – Vice President Manufacturing – Belden Wire & Cable Company
“Looking back over the life of this project, we could not have done it without Holmes Smith and Chris Nash. Your aid in bringing us
to Lancaster County has saved Belden and estimated $2M in land and development costs….. We are 110 percent pleased…”
Frank Buonanotte – Founder – The Shopping Center Group & Chain-Links
“I have known Chris for over 5 years and worked with him extensively when he was based in Atlanta. His construction company did
all of the build out of my Party City stores at that time. He is extremely competent and professional. He is honest, ethical, and very
reliable. As you know, these are valued and rare traits in a general contractor or construction company.”
Derek Gruner – Director Corporate Facilities Design Group – Jenkins Hancock & Sides Architects
“IknowChrisNashtobeoffinemoralcharacterandinsituationswhicharoseduringconstruction;heexhibitedfairnesstoallparties
and resolved issues in an equitable manner. He consistently demonstrated a high level of competency in the field of construction
and his attention to detail always impressed me.”
Brendan Mullinix – Vice President – Lexington Corporate Properties Trust
“We have found Mr. Nash tobeof very professional in all of thebusiness dealings we havehadwith him. He is characterized asone
of uncompromising integrity, of sound moral character, and very knowledgeable and experienced in the field of construction and
construction management. Heprovided us solidcounseling andadviceduring the course of constructing amost complexprojectwe
developed for Cultured Stone, a division of Owens Corning, in Chester, South Carolina”.
Martin L Homes – President – Holmes Smith Developments
“As Vice President of Construction for our firm, Chris’s service to HSD and our clients has been exemplary. His integrity, knowledge
of the construction industry, loyalty and dedication to our clients best interests, and his leadership skills have allowed Holmes Smith
Developments to deliver our projects on time, within budget, with the end product being of exceptional quality. His professional
approach to business and his successes while at HSD have helped to strengthen our reputation in the marketplace and grow our
company as a whole. We are very grateful to have been associated with him throughout the years and look forward to continuing
our relationship for years to come.”
P a g e | 24
Ted Schwartz – Managing Director – TenCal, LLC
“Our company’s experience working with Chris Nash and NCON has been excellent. Chris represented our lender on the
build to suit of a 257,400 SF industrial building in Shreveport, Louisiana. His expertise was instrumental in coordinating the
construction of the project between ourselves as developer, our general contractor, our lender, and our tenant. Chris’
knowledge, attention to detail, creativity and persistence kept all parties to the transaction informed on a timely basis and
beneficiaries of his pro-active approach to project management. We would not hesitate to engage Chris to work on future
development projects.”
Rob Fischer – VP Construction IDI (Industrial Development International) Memphis
“We have had an affiliation with Chris Nash that spans 3 decades having worked for and with him. He is a person of
uncompromising integrity, very knowledgeable in the ways of real estate development, and one of the best constructors I
know. His ideals of fairness, the ability to get the most out of people, and professionalism have contributed to his company’s
success. I know of many instances where he has demonstrated an innate ability to get things done under trying
conditions. He is capable of heading off potential problems, and when a problem does occur, his expert handling has saved
many a client’s neck and kept projects on track. Anyone hiring NCON can be assured of a successful project, especially in
instances where engagement is early in the development process. You cannot go wrong with NCON.”
Tom McGroarty – Director of Facilities TMG Medical
“I highly recommend Chris Nash and NCON for any type of building, property, and construction management, issues you
may need. He is highly knowledgeable, and a true professional in this field. I have worked with Chris since June of 2012, in
conjunction with our landlord, to finalize and get final repairs completed at a newly constructed 150,000 sq. ft. office
building. He has excellent written and verbal communication skills, is extremely organized and takes control of the situation
until it is resolved. He has been relentless on the company who built this building; construction companies like to build and
move on, but with Chris’ diligence, they are following up on their mistakes, at no charge. NCON would be an excellent choice
if you are in need of his services. Please do not hesitate to call to discuss.”
References
George Sheild Pavilion Development Client 704 400 4561
Rob Fischer Industrial Developments Intl Associate 901 385 7000
Tom McGroarty TMG Medical Client 570 344 9237
Frank Buonanotte Shopping Center Group Client 770 955 2434
Richard Rouse Lexington Corporate Properties Client 212 692 7220
Brendan Mullinix Lexington Corporate Properties Client 212 692 7227
Jim Sharp Regents Bank Client 704 609 5252
Bill Smith Red Rock Developments Client 803 779 3025
Contact Information
Chris Nash
President
NCON Corporation
704.650.5281
cnashncon@att.net
www.nconcorp.com

More Related Content

What's hot

Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...
Tehmas Saeed
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
McCarthy Holdings, Inc.
 
PP1 - Presentation Slides
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides
Pang Khai Shuen
 
Ipd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalIpd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalAndrew Huseman
 
Capital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_GasCapital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_GasMircea Tomescu
 
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET Journal
 
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remediesProcurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remedies
Pavitr1203
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Sow Wei Henn
 
6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods
McCarthy Holdings, Inc.
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
MahSobeh
 
Pp 1-report-complete
Pp 1-report-completePp 1-report-complete
Pp 1-report-complete
Yong Sy
 
How to Choose a Project Delivery Method
How to Choose a Project Delivery MethodHow to Choose a Project Delivery Method
How to Choose a Project Delivery Method
PMA Consultants
 
Jiby\'s Resume
Jiby\'s ResumeJiby\'s Resume
Jiby\'s Resumejibymanuel
 
Consensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in ConstructionConsensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in Construction
DBL Law
 
Design build risks and rewards for public owner
Design build risks and rewards for public ownerDesign build risks and rewards for public owner
Design build risks and rewards for public owner
Jon Straw
 

What's hot (20)

Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
 
PP1 - Presentation Slides
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides
 
Ipd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalIpd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation Final
 
Capital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_GasCapital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_Gas
 
ACH 231 Lecture 06 (Project Delivery)
ACH 231 Lecture 06 (Project Delivery)ACH 231 Lecture 06 (Project Delivery)
ACH 231 Lecture 06 (Project Delivery)
 
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
 
Akinjiyan_Olufemi_DRP14-15 Submitted
Akinjiyan_Olufemi_DRP14-15 SubmittedAkinjiyan_Olufemi_DRP14-15 Submitted
Akinjiyan_Olufemi_DRP14-15 Submitted
 
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remediesProcurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remedies
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Pp 1-report-complete
Pp 1-report-completePp 1-report-complete
Pp 1-report-complete
 
How to Choose a Project Delivery Method
How to Choose a Project Delivery MethodHow to Choose a Project Delivery Method
How to Choose a Project Delivery Method
 
Jiby\'s Resume
Jiby\'s ResumeJiby\'s Resume
Jiby\'s Resume
 
Contract management
Contract managementContract management
Contract management
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
 
Consensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in ConstructionConsensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in Construction
 
Design build risks and rewards for public owner
Design build risks and rewards for public ownerDesign build risks and rewards for public owner
Design build risks and rewards for public owner
 

Viewers also liked

Unidad educativa-desechos-organicos-joselynterminada.docx nuev
Unidad educativa-desechos-organicos-joselynterminada.docx nuevUnidad educativa-desechos-organicos-joselynterminada.docx nuev
Unidad educativa-desechos-organicos-joselynterminada.docx nuev
abby041314
 
USAkitchen - Modern kitchens in life
USAkitchen - Modern kitchens in lifeUSAkitchen - Modern kitchens in life
USAkitchen - Modern kitchens in life
USA Kitchen
 
Threshold setting for reduction of false positives
Threshold setting for reduction of false positivesThreshold setting for reduction of false positives
Threshold setting for reduction of false positives
Reshma Sekar
 
Threshold setting for reduction of false positives
Threshold setting for reduction of false positivesThreshold setting for reduction of false positives
Threshold setting for reduction of false positives
Reshma Sekar
 
PROPOSAL KERJASAMA
PROPOSAL KERJASAMAPROPOSAL KERJASAMA
PROPOSAL KERJASAMAedi musfikar
 
Usakitchen basic kitchen designings
Usakitchen basic kitchen designingsUsakitchen basic kitchen designings
Usakitchen basic kitchen designings
USA Kitchen
 
Three things in life that are never certain
Three things in life that are never certainThree things in life that are never certain
Three things in life that are never certainsaeideh sadat mousavi
 
CV_Salem_Zaklit_2016_Science and Math_updated
CV_Salem_Zaklit_2016_Science and Math_updatedCV_Salem_Zaklit_2016_Science and Math_updated
CV_Salem_Zaklit_2016_Science and Math_updatedSalem Zaklit
 
Claudio cerullo dedicated professional
Claudio cerullo dedicated professionalClaudio cerullo dedicated professional
Claudio cerullo dedicated professional
Claudio Cerullo
 
SC=DCPP Final Report=JA= 29-7-2012
SC=DCPP Final Report=JA= 29-7-2012SC=DCPP Final Report=JA= 29-7-2012
SC=DCPP Final Report=JA= 29-7-2012ASM Amanullah
 
Unit 2 soc
Unit 2 socUnit 2 soc
Unit 2 soc
Juan José Grande
 

Viewers also liked (12)

Unidad educativa-desechos-organicos-joselynterminada.docx nuev
Unidad educativa-desechos-organicos-joselynterminada.docx nuevUnidad educativa-desechos-organicos-joselynterminada.docx nuev
Unidad educativa-desechos-organicos-joselynterminada.docx nuev
 
USAkitchen - Modern kitchens in life
USAkitchen - Modern kitchens in lifeUSAkitchen - Modern kitchens in life
USAkitchen - Modern kitchens in life
 
Threshold setting for reduction of false positives
Threshold setting for reduction of false positivesThreshold setting for reduction of false positives
Threshold setting for reduction of false positives
 
Threshold setting for reduction of false positives
Threshold setting for reduction of false positivesThreshold setting for reduction of false positives
Threshold setting for reduction of false positives
 
PROPOSAL KERJASAMA
PROPOSAL KERJASAMAPROPOSAL KERJASAMA
PROPOSAL KERJASAMA
 
Usakitchen basic kitchen designings
Usakitchen basic kitchen designingsUsakitchen basic kitchen designings
Usakitchen basic kitchen designings
 
Three things in life that are never certain
Three things in life that are never certainThree things in life that are never certain
Three things in life that are never certain
 
CV_Salem_Zaklit_2016_Science and Math_updated
CV_Salem_Zaklit_2016_Science and Math_updatedCV_Salem_Zaklit_2016_Science and Math_updated
CV_Salem_Zaklit_2016_Science and Math_updated
 
Claudio cerullo dedicated professional
Claudio cerullo dedicated professionalClaudio cerullo dedicated professional
Claudio cerullo dedicated professional
 
SC=DCPP Final Report=JA= 29-7-2012
SC=DCPP Final Report=JA= 29-7-2012SC=DCPP Final Report=JA= 29-7-2012
SC=DCPP Final Report=JA= 29-7-2012
 
Unit 2
Unit 2Unit 2
Unit 2
 
Unit 2 soc
Unit 2 socUnit 2 soc
Unit 2 soc
 

Similar to pdf 25 NCON Brochure 1.19.2016

Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14마 이환
 
CRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsCRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management Benefits
Chris Gorga
 
092811 Updated Contech Brochure
092811 Updated Contech Brochure092811 Updated Contech Brochure
092811 Updated Contech BrochurePaul Smith
 
[Report] Who's protecting your blindside? Construction Management: Protectin...
[Report] Who's protecting your blindside?  Construction Management: Protectin...[Report] Who's protecting your blindside?  Construction Management: Protectin...
[Report] Who's protecting your blindside? Construction Management: Protectin...
JLL
 
Construction project management
Construction project managementConstruction project management
Construction project management
saif hasan
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016L Douglas Sargent Jr
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project Management
Chris Gorga
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
asim78
 
Pp1 final
Pp1 finalPp1 final
Pp1 final
Timun Loh
 
Professional practice 1 (1)
Professional practice 1 (1)Professional practice 1 (1)
Professional practice 1 (1)
tfkc1212
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Lee Pei Gie
 
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTHOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
IRJET Journal
 
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
ssusered96e2
 
Suvarna consultancy services
Suvarna consultancy services Suvarna consultancy services
Suvarna consultancy services
Ashok Tundare
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.Lilian Nwachukwu
 
Apt portfolio
Apt portfolioApt portfolio

Similar to pdf 25 NCON Brochure 1.19.2016 (20)

Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14
 
CRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsCRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management Benefits
 
092811 Updated Contech Brochure
092811 Updated Contech Brochure092811 Updated Contech Brochure
092811 Updated Contech Brochure
 
[Report] Who's protecting your blindside? Construction Management: Protectin...
[Report] Who's protecting your blindside?  Construction Management: Protectin...[Report] Who's protecting your blindside?  Construction Management: Protectin...
[Report] Who's protecting your blindside? Construction Management: Protectin...
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project Management
 
Construction process
Construction processConstruction process
Construction process
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Pp report
Pp reportPp report
Pp report
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
Pp1 final
Pp1 finalPp1 final
Pp1 final
 
Professional practice 1 (1)
Professional practice 1 (1)Professional practice 1 (1)
Professional practice 1 (1)
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
COMPANY PORTFOLIO
COMPANY PORTFOLIOCOMPANY PORTFOLIO
COMPANY PORTFOLIO
 
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTHOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
 
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
 
Suvarna consultancy services
Suvarna consultancy services Suvarna consultancy services
Suvarna consultancy services
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.
 
Apt portfolio
Apt portfolioApt portfolio
Apt portfolio
 

pdf 25 NCON Brochure 1.19.2016

  • 1.
  • 2. P a g e | 2 Foundation for Success ....................................................................................................................................... 2 Services................................................................................................................................................................ 2 The Value to Clients of Early Engagement .......................................................................................................... 3 The NCON Process............................................................................................................................................... 3 Phase I – Fact Finding & Needs Assessment ................................................................................................... 3 Phase II – Programming, Planning & Procurement......................................................................................... 4 Phase III – Final Design & Construction........................................................................................................... 4 Aesthetics & Cost Management...................................................................................................................... 4 About NCON Corporation ................................................................................................................................... 4 Value Added Case Studies................................................................................................................................... 4 Current Projects .................................................................................................................................................. 7 Completed Projects........................................................................................................................................... 12 National Clients................................................................................................................................................. 21 What Others Are Saying About NCON & Chris Nash…...................................................................................... 23 References......................................................................................................................................................... 24 Contact Information.......................................................................................................................................... 24 Foundation for Success NCON Corporation draws on Chris Nash’s 36 years of high level achievement in the business of construction project management and real estate development. In roles ranging from field engineering and supervision to executive level positions, Nash has directed or overseen the building of over 13 million square feet of major civil projects, office, residential, commercial, industrial, manufacturing, education and institutional projects, valued at $1.59 billion. Nash is widely known in the industry for his ability to create value, minimize risk, and delivering relentless customer service. With acute attention to detail, each project is viewed through a risk mitigation lens while never losing sight of the big picture—a requisite in a business that is high risk, at times volatile, and where tight margins can disappear overnight. With a reputation for fairness, professionalism, resourcefulness, creativity, efficiency, and an undying commitment to excellence, the company has built trusting relationships with clients and leading industry professionals nationwide. Access to this valuable pool of resources is central to a continued record of project success. Decades of experience, solid leadership, and the ability to anticipate pitfalls before they arise, cast a “Foundation for Success” that enables the firm the capacity to deliver creative and cost-effective solutions for complex, deadline-driven real estate development projects. Services The company caters to developers, owners, investors, landlords, tenants, and first time builders in the due diligence, design, and construction process. Services offered generally include the following and can be tailored to suit individual needs of the client. Site selection and analysis Guidance in the re-zoning process Budgeting & estimating for project and total development costs
  • 3. P a g e | 3 Scheduling Preparing proposals in response to developer RFP’s Solicitation of all professional services, architectural, civil engineer, geotechnical & environmental services Preparing competitive and complete bid packages for all design, construction, and professional services Bid analysis of professional services and general contracting Support in negotiating lease, purchase and sale, and financing agreements Orchestrating the due diligence effort of site selection to include but not limited to geotechnical & environmental studies Guiding the development group during the permitting process Expediting the permitting process Preparing RFP’s for construction , design services, and professional services Stimulating the market for competitive pricing and complete scope of work and services from all project participants Soliciting, preparing, and negotiating all construction, design , and consulting contracts Managing the design and construction groups from groundbreaking to final completion Mitigating costly Change Orders through a thorough pre-development phase Negotiating Change Orders Creative and cost effective solutions to challenges inherent in construction and real estate development Closing out the design and construction phases to include compilation of closeout documents from all participants The Value to Clients of Early Engagement NCON’s involvement early in the project has helped clients dramatically reduce risks and costs and achieve other important project objectives. Early engagement maximizes the Owner’s return on investment for NCON’s services as it allows for a detailed, well planned, thorough, and competitive procurement process for professional and construction services that yields better cost/benefit options immediate and long term. Time and time again, history has proven when NCON is engaged ahead of the designers and contractors, projects are always more successful, more cost effective, and less risky. Testament to the firm’s competence is the record of involvement in legal disputes. Legal battles are usually indicative of assembling the wrong partners in a deal, compiling ambiguous, less than complete and inaccurate construction and project documents, or a combination thereof. Conflicts are disruptive, can impact schedule and costs, but more than anything divert attention from building the project as well as distracting the client’s focus on his new facility. Until 2012, Chris Nash was never encumbered in legal conflicts. In this particular case NCON represented the designers against a developer by relying on accurate project records and Chris Nash’s knowledge of contract law in overturning a $3.5 million dollar lawsuit filed against the design group. In addition the design group was able to recover past due design fees of $700,000. The NCON Process The three phases of the planning stage before blueprints are produced are the most critical of the building process. This is where money, project goals, and time can be lost or gained. Years of success has garnished a large database of resources that are tailored for each engagement. Skilled guidance in the conceptual phase and planning stages of a project will eliminate unanticipated delays and extra costs, enabling a project to complete successfully, and creating value for the client and end user. Phase I – Fact Finding & Needs Assessment An initial meeting with the client is geared toward understanding project objectives, budget, timeline, constraints, challenges, and delivery method. The client may either retain the designers or choose a design/build arrangement whereby the contractor designs and builds the project. Touted as a way of building cheaper, the downside of the design/build method of delivery is a diminished layer of protection for the Owner with the loss of professional representation when the architect and engineers work directly for the contractor. After being presented with a range of options, the client will be in an optimal position to choose the method or combination of delivery methods best suited for the project.
  • 4. P a g e | 4 Phase II – Programming, Planning & Procurement Upon engagement NCON studies the client’s business operations and proceeds with design development, budgeting, and scheduling. A detailed understanding of business operations is necessary to determine resources and will minimize the need for costly changes that can negatively impact scheduling. Phase III – Final Design & Construction There are two methods to choose from in Phase III: (1) execution on a “fast track” basis wherein the design is only a few steps ahead of construction or (2) the traditional approach of producing complete construction documents that are put out to bid under a lump sum arrangement. Each method has its own risks, benefits, and downside. Approximately 70 percent of the work in NCON’s portfolio has been delivered on a fast-track basis. It is in this phase where the diligence put forth in the previous two phases pays off as construction risk has been mitigated through pro-active management, and solid documents compiled through a systematic approach that form the basis for successful negotiations. Aesthetics & Cost Management One very important component of the design process that many in the business do not place enough emphasis on is aesthetics and creating a product with everlasting curb appeal. This is more prevalent on the design/build side where not enough emphasis is placed on architectural value. Like a talented artist NCON is highly skilled at directing the designers in drawing attractive and functional buildings without breaking the bank. About NCON Corporation Chris Nash is founder and president of NCON Corporation. He holds a B.S. in Civil Engineering from the Virginia Military Institute. An accomplished leader and skilled negotiator, Nash is acknowledged for trust based relationships with an unrelenting commitment to excellence. Since childhood Mr. Nash aspired to be a builder and has a deeply ingrained drive to “leave the campsite cleaner and in better shape than it was found.” It is through a relentless passion to improve that drives the firm. He is passionate about the business and takes great pride in his portfolio of completed projects. A strong entrepreneurial spirit has driven Nash in the successful start-up of three contracting firms, a real estate development group, and NCON. Outside of work, Nash has been involved with various civic organizations to include Big Brothers Big Sisters, Special Olympics, Habitat for Humanity, Optimist International, Saint Gabriel Church Mens Club, The Good Fellows Club in Charlotte, and a volunteer youth sports football, soccer, and baseball coach. He has served on various boards for his alma mater VMI, the Virginia Military Institute. He has been a devoted financial supporter of the Institute participating in raising millions of dollars to support athletics at VMI and the VMI Foundation. He is married to the former Lisa Torre. They are the parents of with two teenage children, Christopher & Olivia. Value Added Case Studies Ballantyne Village – Charlotte, North Carolina Ballantyne Village is a mixed-use retail, office, hotel, and residential development valued in phase one at $75M with the potential for $60M more in subsequent phases. It is on a 10-acre site at a major intersection in Ballantyne, a growing urban center on Charlotte’s outer loop. NCON was engaged to be development and construction manager responsible for directing the fast-track design and building of the site work, shell, and interior upfit of retail, office, medical, a performing arts theatre, and parking garage. Phases I and II overlapped and at one point in time there were three general contractors working on the site simultaneously. Because of close proximity to existing buildings in future phases, in Phase I NCON orchestrated the planning and design to pre-blast rock down to suitable bedrock for ease of excavation without risk of damage to existing buildings or major disruption to daily activities and businesses during subsequent phases. Two future towers are designed for 25 plus floors, and another 12 floors can be added to the cast in place concrete parking deck. Other improvements anticipated for the future and incorporated in the master planning effort include all underground mechanical, electrical, and communications infrastructure in anticipation of future phases with a potential for another 1,000,000 square feet of build out.
  • 5. P a g e | 5 Blue Cross Blue Shield of SC – Columbia, South Carolina - L J Hooker Developments The initial design for this 110,000 sf, $10M build-to-suit office building for Blue Cross Blue Shield of SC was literally sketched on a cocktail napkin in a meeting with architects, the developer, and the Tenant. Four and a half months later the tenant moved in, three days ahead of schedule. The timely completion meant that LJ Hooker would not be assessed a lump sum $500,000 in late penalty damages. The success of this project resulted in repeat business for Hooker. Blue Cross Blue Shield of SC – Columbia, South Carolina - Holmes Smith Developments This single tenant, 348,410 sf build-to-suit was developed for Blue Cross Blue Shield in Columbia, South Carolina. The simple yet highly functional design initially consisted of two wings attached to a central shaped core forming an “L” shaped building. Early in the project BCBS decided it needed more space so the third wing was built and the shape now formed a “T.” Despite the increased building size no schedule extensions were granted and the project completed as originally scheduled. After Chris Nash’s involvement another wing was added, increasing the building size to 456,304 sf. The end result was a full cross shape and a structure that is the largest single-tenant, low-rise office building in South Carolina. Because of existing wetlands, the South Carolina Department of Health and Environmental Control, the U.S. Army Corp of Engineers, the South Carolina Department of Natural Resources, and the U.S. Environmental Protection Agency each had sets of regulations that needed to be complied with. Chris Nash led the effort that obtained the necessary permits in six weeks— a process that normally took six months. 150,000 SF Build to Suit Office Building NCON represented the joint venture development partnership during the pre-development and procurement phases of this 2 story 150,000 square foot build to suit office building. The partnership had earlier issued a Letter of Intent to a general contractor seeking to enter into a guaranteed maximum contract with a split savings. In the first meeting with the client, tenant, and contractor, Chris Nash uncovered $500K of fluff in the budget that resulted in a reduction in the budget and the tenant’s rental rate. Based on this demonstration of value added, NCON was engaged for subsequent projects. 100,000 SF Build to Suit Office Building Chris Nash became involved with this project after it was awarded and construction was underway. The steel frame was clad with a high-end brick veneer that started to show efflorescence shortly after the brickwork began. The contractor claimed the condition was seasonal and would go away after a year. Not comfortable with the contractor’s claim Nash brought in professionals to investigate. They determined the cause of the efflorescence was water trapped in the cavity between the inside face of the brick and the exterior sheathing where mortar droppings had blocked the weep holes. The new brick had to be remediated and quality control measures were established to prevent mortar from getting into the cavity. Eventually the building continued to leak and more forensic investigations revealed additional blockages. After another phase of remediation, the project was finally rendered absent any leaks or efflorescence. To this day, there is no evidence of any efflorescence. 180,000 SF Build to Suit Office Building Shortly after the tenant moved into this two-story build-to-suit office building that housed a national mortgage lender, fireproofing on the structural steel and metal deck began to delaminate and at times crashed through the acoustical ceiling. It was determined that the spray fireproofing was not compatible with the metal deck. The second floor was subject to more serious dropping of fireproofing because crews had begun working on the roof before the spray waterproofing had fully cured, which caused deflection of the deck due to loads and thus movement. After a tedious and lengthy remediation and inspection process, Nash led the effort that fixed the problem with very little disruption to the tenant’s business operations. Governors Lakes – Atlanta, Georgia This $15M project was a 250,000 sf two-building class development with six-story cast-in-place parking deck in Atlanta, Georgia built for then what was NCNB, North Carolina National Bank as trustee for the NC Teachers Fund. When bid the project was over budget by about $3M. As a young assistant project manager, Nash led the fast-track value engineering effort that reduced costs primarily by altering pieces of a $2M granite package without major aesthetic impact, and re- designing the cast-in-place concrete frame to reduce rebar weight per square foot from 12 lbs. to 7 lbs.
  • 6. P a g e | 6 Douglas County Middle School – Atlanta, Georgia Nash successfully bid and was assigned to serve as project manager on a 120,000 sf, $5.4M middle school project in Atlanta for a hard bid general contractor out of Alabama. The masonry package, a large part of the total budget, was self-performed primarily for control and budgetary reasons. The project was completed on time despite weather challenges and the original fee of $250K increased to $700K largely due to buy out and tight management of the masonry material procurement process and labor control. Deemed by the client as the most successful and judged the highest quality of 4 similar projects constructed in the same period. 720,000 SF Manufacturing Facility NCON represented the financier and future landlord for this build-to-suit 720,000 sf manufacturing and distribution center. During the punchlist walkthrough areas of the floor slab showed evidence of delamination as the top ¼” to ¾” of the concrete surface was spalling at random locations throughout the building. Approximately 42,000 sf of slab was removed and replaced because of the extent of the problem in the initial floor pours. The building had areas of lesser severity, yet with the potential to negatively impact the performance of the floor over time as the floor could spall, these areas were identified and documented for future monitoring. We knew the only way to determine the extent of the problem was to find the cause. When the contractor could not offer a reasonable explanation, NCON brought in forensic engineers who determined the “bleed water was trapped” during the curing process. They proceeded to inspect the entire floor to evaluate the potential for further problems. To ensure the integrity of the floor slab and protect the client, NCON orchestrated securing a five-year extended warranty backed by a performance and payment bond. Various Projects – Kingdom of Saudi Arabia Nash worked for Santa Fe International, who in the early 1980’s was the largest oil exploration company in the world. Santa Fe’s construction arm, C F Braun, had a construction management contract with ARAMCO, (the Arab American Oil Company) located in ARAMCO’s world headquarters in Dhahran on the east coast of Saudi Arabia. After 4 months of service, Nash was promoted and given charge of leading design and construction professionals for 20 building projects valued in excess of $156,000,000.
  • 7. Current Projects Gateway Plaza Richmond, Virginia Office & Retail 20 Story 411,000 SF $120,000,000
  • 8. P a g e | 8 Gateway Plaza Main Entrance Gateway Plaza Main Lobby
  • 9. P a g e | 9 Gateway Plaza Aerial Electrolux North America R&D and Office 385,239 SF $85,000,000
  • 10. P a g e | 10 Gander Mountain Albany, Georgia Retail 54,000 SF $6,000,000 Calsonic Kansei of North America “CKNA” Lewisburg, Tennessee Distribution 310,000 SF $15,000,000
  • 11. P a g e | 11 TMG Medical Jessup, Pennsylvania Office 150,000 SF $23,000,000 Hollander Sleep Products Thomson, Georgia Manufacturing/Distribution 210,000 SF $10,245,000
  • 12. P a g e | 12 Completed Projects The remaining photographs are a sampling of some of the projects completed by Chris Nash and NCON. Ballantyne Village Charlotte, NC Office & Retail 230,000SF $75,000,000 Ballantyne Village Plaza
  • 13. P a g e | 13 Ballantyne Village Theatre Atrium Ballantyne Village Theatre
  • 14. P a g e | 14 ASICS USA Byhalia, Mississippi Distribution 550,000 SF $24,000,000 Clearwater Paper Shelby, NC Manufacturing & Distribution 700,000 SF $24,000,000
  • 15. P a g e | 15 Tire Rack Distribution Shreveport, LA Distribution 250,000 SF $24,000,000 MED 3000 Florence, SC Office 32,000 SF $5,165,000
  • 16. P a g e | 16 IKON Office Solutions Columbia, SC Office 88,000 SF $7,000,000 Rooms To Go Charlotte, NC Distribution 430,000 SF $18,000,000 Columbia, SC Office 88,000 SF $7,000,000
  • 17. P a g e | 17 Blue Cross and Blue Shield Columbia, SC Office 348,410 SF $36,000,000 Blue Cross and Blue Shield Columbia, SC Office 110,000 SF $10,000,000
  • 18. P a g e | 18 Cultured Stone Manufacturing & Distribution Chester, SC 215,000 SF $23,000,000 Belden Wire & Cable Manufacturing & Distribution Fort Mill, SC 250,000 SF $11,000,000
  • 19. P a g e | 19 Fleet Mortgage Group Office Florence, SC 180,000 SF $11,500,000 Adidas USA Spartanburg, SC Distribution 580,000 SF $14,500,000
  • 20. P a g e | 20 OakCreek I Atlanta, GA 125,000 SF Office 300 Car Garage $15,000,000 OakCreek II Atlanta, GA 110,000 SF Office $11,000,000
  • 21. P a g e | 21 National Clients
  • 22. P a g e | 22
  • 23. P a g e | 23 What Others Are Saying About NCON & Chris Nash….. George Sheild – Executive Vice President – Pavilion Properties, Inc. (Mr. Sheild was formerly with Ballantyne Village Partners) “In December 2000, my partner in Ballantyne Village Development and I closed on property at a high profile corner in south Charlotte, NC, with an ambitious goal of developing a large mixed-use commercial property. We quickly needed to assemble the “A” team for the development. Due to the complexity of development we set out to do, we knew a critical need would be a top notch professional construction manager to insure a “no surprises, zero defects” project, from the beginning to delivery. Having worked with Chris Nash of NCON in the past I felt he would be the best choice. Indeed he proved to be the right choice in every regard. Chris provided considerable knowledge and experience and managed what became a complicated multi-year $70,000,000 project. The project included decked parking below grade and above grade. The early stages required extensive rock removal. We designed the project to have a multi-story commercial core of 165,000 sf with an independent movie theater, retail shops, restaurants, and offices. The plan also included two mid-rise towers to be a mix of retail, office, hotel, and hi-rise residential units. The ultimate scope of the project was to achieve as much as 450,000 sf of mixed use development.” “With eyes on the future, NCON recommended and orchestrated the initiative that incorporated infrastructure and foundation modifications in the initial stages that ultimately will allow for a maximum build out, dramatically reducing the cost for future development and creating much value for the years ahead.” “Anyone seeking a competent development and project manager would be well served to include NCON in the process; Chris Nash proved his competence many times over. I can gladly attest to his well-deserved reputation.” Richard D. Kirschner – Vice President Manufacturing – Belden Wire & Cable Company “Looking back over the life of this project, we could not have done it without Holmes Smith and Chris Nash. Your aid in bringing us to Lancaster County has saved Belden and estimated $2M in land and development costs….. We are 110 percent pleased…” Frank Buonanotte – Founder – The Shopping Center Group & Chain-Links “I have known Chris for over 5 years and worked with him extensively when he was based in Atlanta. His construction company did all of the build out of my Party City stores at that time. He is extremely competent and professional. He is honest, ethical, and very reliable. As you know, these are valued and rare traits in a general contractor or construction company.” Derek Gruner – Director Corporate Facilities Design Group – Jenkins Hancock & Sides Architects “IknowChrisNashtobeoffinemoralcharacterandinsituationswhicharoseduringconstruction;heexhibitedfairnesstoallparties and resolved issues in an equitable manner. He consistently demonstrated a high level of competency in the field of construction and his attention to detail always impressed me.” Brendan Mullinix – Vice President – Lexington Corporate Properties Trust “We have found Mr. Nash tobeof very professional in all of thebusiness dealings we havehadwith him. He is characterized asone of uncompromising integrity, of sound moral character, and very knowledgeable and experienced in the field of construction and construction management. Heprovided us solidcounseling andadviceduring the course of constructing amost complexprojectwe developed for Cultured Stone, a division of Owens Corning, in Chester, South Carolina”. Martin L Homes – President – Holmes Smith Developments “As Vice President of Construction for our firm, Chris’s service to HSD and our clients has been exemplary. His integrity, knowledge of the construction industry, loyalty and dedication to our clients best interests, and his leadership skills have allowed Holmes Smith Developments to deliver our projects on time, within budget, with the end product being of exceptional quality. His professional approach to business and his successes while at HSD have helped to strengthen our reputation in the marketplace and grow our company as a whole. We are very grateful to have been associated with him throughout the years and look forward to continuing our relationship for years to come.”
  • 24. P a g e | 24 Ted Schwartz – Managing Director – TenCal, LLC “Our company’s experience working with Chris Nash and NCON has been excellent. Chris represented our lender on the build to suit of a 257,400 SF industrial building in Shreveport, Louisiana. His expertise was instrumental in coordinating the construction of the project between ourselves as developer, our general contractor, our lender, and our tenant. Chris’ knowledge, attention to detail, creativity and persistence kept all parties to the transaction informed on a timely basis and beneficiaries of his pro-active approach to project management. We would not hesitate to engage Chris to work on future development projects.” Rob Fischer – VP Construction IDI (Industrial Development International) Memphis “We have had an affiliation with Chris Nash that spans 3 decades having worked for and with him. He is a person of uncompromising integrity, very knowledgeable in the ways of real estate development, and one of the best constructors I know. His ideals of fairness, the ability to get the most out of people, and professionalism have contributed to his company’s success. I know of many instances where he has demonstrated an innate ability to get things done under trying conditions. He is capable of heading off potential problems, and when a problem does occur, his expert handling has saved many a client’s neck and kept projects on track. Anyone hiring NCON can be assured of a successful project, especially in instances where engagement is early in the development process. You cannot go wrong with NCON.” Tom McGroarty – Director of Facilities TMG Medical “I highly recommend Chris Nash and NCON for any type of building, property, and construction management, issues you may need. He is highly knowledgeable, and a true professional in this field. I have worked with Chris since June of 2012, in conjunction with our landlord, to finalize and get final repairs completed at a newly constructed 150,000 sq. ft. office building. He has excellent written and verbal communication skills, is extremely organized and takes control of the situation until it is resolved. He has been relentless on the company who built this building; construction companies like to build and move on, but with Chris’ diligence, they are following up on their mistakes, at no charge. NCON would be an excellent choice if you are in need of his services. Please do not hesitate to call to discuss.” References George Sheild Pavilion Development Client 704 400 4561 Rob Fischer Industrial Developments Intl Associate 901 385 7000 Tom McGroarty TMG Medical Client 570 344 9237 Frank Buonanotte Shopping Center Group Client 770 955 2434 Richard Rouse Lexington Corporate Properties Client 212 692 7220 Brendan Mullinix Lexington Corporate Properties Client 212 692 7227 Jim Sharp Regents Bank Client 704 609 5252 Bill Smith Red Rock Developments Client 803 779 3025 Contact Information Chris Nash President NCON Corporation 704.650.5281 cnashncon@att.net www.nconcorp.com