This document provides information about garment merchandising. It discusses key aspects of merchandising including objectives, workflow, sampling, consumption and costing calculations, booking, follow up, inspection, commercial documents, payment methods, and more. The main points are:
1) Garment merchandising involves matching goods to customer needs, ensuring quality and timely delivery of orders.
2) The merchandiser's role includes obtaining orders, costing, sourcing materials, quality control, and coordinating production and shipping.
3) Effective merchandising requires planning through tools like time and action calendars to track order progress.
4) Samples are crucial to securing orders and must demonstrate quality, fit
Prepared By :Mazadul Hasan sheshir
ID: 2010000400008
13th
Batch (session 2009-2013)
Department : Wet Processing Technology
Email: mazadulhasan@yahoo.com
Blog : www. Textilelab.blogspot.com (visit)
Southeast University
Department Of Textile Engineering
I/A 251,252 Tejgaon Dhaka Bangladesh
Prepared By :
Introduction
The “Merchandising” isknown to the persons specially involved in
garments trade. The term merchandising has been derived from the
merchandise. Merchandise means goods that are bought & sold.
The term “Merchandiser” may be defined as Person who merchandises
the goods, specifically for export purposes. Garments merchandising
means buying raw materials & accessories, producing garments,
maintaining required quality level and exporting the garments within
schedule time.
Merchandising is the business art of matching goods to the needs and
preferences of customers to ensure shelf off take. How a product is
presented, how much is displayed, and in what form, size shape, color,
etc. can determine the rate of speed at which a product is bought.
In other words merchandising is the marketing activity responsible for
ensuring a product’s “desirability”, both qualitatively and quantitatively.
This means that at the store end, your product has to be perceived as
“just right” by your market. It is a whole lot of psyche satisfaction. The
personnel who acts the merchandising activities is called
“Merchandiser”.
5.
Objectives of GarmentsMerchandising
1. To try to get garments order inquiry from buyer
through various sources.
2. To find out the consumptions of fabrics &
accessories.
3. To make costing on the garments inquiry.
4. Procurement of raw materials.
5. Follow up.
6. Regular correspondence with buyer, suppliers and
related personnel.
7. Help and follow up in commercial activities.
8. Arrange tests & inspections.
9. To do shipment.
6.
Work flow ofGarments
Merchandising
To collect buyers addresses.
To establish contact with the buyers sending formal letters/profile.
Receiving buyer’s response and providing price quotation along with making of sample as
counter/approval.
Receiving samples comments from the buyer.
Receiving Purchase Order from buyer.
To furnish the pro-forma invoice and sending the buyer.
Receiving the master L/C & verify clauses of the L/C both in technical and commercial point of view.
To estimate time schedule for the exports of those garments as per L/C.
To confirm floor booking of the order with factory.
Taking necessary steps to develop lab-dips of the materials (FAB & ACC)
To confirm transfer authentication of the L/C in favor of fact.
Pushing the factory taking initial procurement to open the back-to-back L/C by bank.
Searching reliable fabric and accessories sources and finalize supplying of the required materials
relevant to the order.
To monitor the shipment of raw materials and arrival in the factory.
To monitor of the supplying materials while receiving factory.
To order the test cutting with quality.
To check/inspect/advise for the bulk production.
To monitor production, quality and delivery.
To advise factory if buyer change any instruction both in technical/commercial point of view to the
order.
To maintain continuous liaison with his or her controlling authorities.
Arrange inspections.
Sea vessel / air ship booking & insurance
Shipment
7.
Some Influential Buyer’sName
Calvin Klein
Tommy Hilfiger
Armani Exchange
Dolce and Gabbana
Mark and Spencer
Zara
Nike
Matalan
Primark
Ted Barker
PUMA
Diesel
Levis
Lee Cooper
Police Brand
U. S. Polo
Massimodutti
Bershka
Pullandbear
River Island
Diesel
Austin Reed
Blue Inc
ASOS
Ann Harvey
Jack Willis
Topshop
Boden
8.
Vera Wang
Valentino
Ralph Lauren
Max Mara
Hugo Boss
Next
H&M
Lacoste
Gap
Forever 21
Forever New
FCUK
Laura Ashley
House of Fraser
Debenhams
New Look
Lagos
Trussardi
Explosion
Ed Hardy
Dsquared
Sisley
Aftershock
Promod
Mango
La Senza
Karen Miller
Esprit
Tesco
12.
Different Types oforder placed
by buyers
FOB(free on board) Order
FOA(Free on Air) Order
C& F(Cost & Freight) Order
CIF(Cost Insurance & Freight) Order
CIFC(Cost Insurance & Freight &
Commission) Order
15.
FOB: Thisis the export term of delivery and price quotation. The sellers
send the goods for export and deliver them on ship. The risk is passed from
seller to buyer when the goods are loaded in the ship at the port of
departure. The buyer paid the freight charges. The seller doesn’t include the
freight charge with his costing.
FOA: The supplier delivers the goods to the air Carrier at the air port of
departure, the buyer bear the risk from that moment and pays the air
transport cost. The seller bears the cost of materials and making, doesn’t
include air freight.
C&F: The sellers send the goods for export & pay the freight charge and
deliver them on ship. The risk is passes to the buyer when the goods are
left the port of departure as buyer recommends the shipping line.
CIF (Cost Insurance & Freight): The seller ensures the goods against
loss and damage at his own cost.
CIFC(Cost Insurance & Freight & Commission) : The seller includes the
cost of insurance, freight and commission for local buying house.
16.
TIME AND ACTIONCALENDAR
Normally merchandisers prepare a plan in a
spreadsheet listing down key processes in
one column and planned date of action for
each process is noted in another. This
planning sheet is called time and action
calendar. Once TNA calendar is made,
merchandiser can easily list down her daily
'to do list' for the day and start doing work
one by one. According to TNA schedule
processes are executed on daily basis to
track whether an order is on track or
getting delayed.
SAMPLE
The samples decidethe ability of an exporter.
The buyer will access the exporter and his
organization only by the samples. If the samples
are of good quality and with reasonable price
naturally the buyers will be forced to place the
order. So it is essential that the samples should
be innovative and with optimum quality. The
purpose of sampling is not only to get bulk
orders and also give some additional benefits to
the exporters. By doing sampling the exporter
can estimate the yarn consumption for
developing the fabric, a clear idea on costing
more ever the manufacturing difficulties.
19.
Types of Sample
Salesmen samples or promotional
samples
Proto samples
fit samples
Pre-production samples
Size-set sample
Production samples
Shipment samples
20.
Proto Sample:This samples are proto type of new design created by
designers. This is the first sample in product development stage. Proto
sample is made to communicate the design of a style or a line or to present
garment structure. In proto samples fit and fabric detailing is not been
considered.
FIT Sample: Once proto sample is approved, FIT is being made with actual
measurement. Modification on the pattern is done to get desired fit of the
garment. FIT is one of the most important factor to be considered during
sample development. FIT sample is being tested on live model or Dress
form for to verify garment fit and fall.
Salesman Sample: Salesman samples are made to put on display in the
retail showroom. Salesman sample (SMS) are displayed for assessing
customer's feedback and according to customers response buyers forecast
demand of an particular style. Sales samples are made with actual fabric
and trims and accessories. Buyer pays for salesman samples to the
developer.
21.
Size setSample: The purpose of the size set is to check fit of the garment
in different sizes. In this stage factory develops samples in multiple sizes.
Generally, buyers ask size set sample in jump sizes, like S, L, XXL. Buyer
check size set sample and give feedback to factory if anything need to be
corrected.
Pre-production Sample: All the above samples are made in sampling
department. Buyer wants pre-production sample (PP sample) to be made in
actual production line, so that operators know what are they going to make.
This sample is made with actual fabric, trims and accessories and made by
sewing line tailors. PP sample must be approved by buyer or buying house
merchants (technical persons) prior to proceeding actual production.
Shipment Sample: When style is being finished and packed for shipment,
2-3 finished and packed pieces with all packing details are kept for future
reference. Shipment sample is kept by factory merchants and buyer's
merchant. The approved shipment is sent directly to warehouse and
merchants at the buyer do not get garment out of the shipment. That is why
they keep shipment sample for future reference.
22.
Consumption & Costing
Knitgarments consumption:
Fabric Consumption:
Before calculate the fabric consumption, we must
need the followings information as mentioned below:
1) Measurement chart with technical spec.
2) Style Description.
3) Fabric Description.
4) Fabrics width/weight.
5) Washing shrinkage if any.
23.
Calculation:
{(Body length +Sleeve length +
Sewing Allowance) X (1/2 Chest
+ Sewing Allowance)}X 2 X GSM X 12
/ 10000000 + Wastage (For 12 pcs of
garments)
Cost of Manufacturing(CM) Calculation:
COST OF MAKING (CM) ={(Monthly total expenditure
of the following factory / 26) / (Qty of running
Machine of your factory of the following month) X
(Number of machine to complete the layout)} /
[{(Production capacity per hr from the existing layout,
excluding alter & reject) X 8}] X 12 / (Dollar
conversion rate)
26.
CBM calculation:
The cubicvolume occupied by a shipment in Cubic
Meters is referred to as the shipments CBM. To
calculate CBM we first need to know the length, width
and height of the carton in cm. If carton
measurement is in inch, we have to convert
measurement in inch. Simply multiply length, width
and height to find cubic centimeter and divide by
1000000 to find cubic meter (CBM). formula as
follows:
CBM= (LENGTH in cm X WIDTH in cm X HEIGHT
IN cm/1000000)
27.
BOOKING
Booking is theorder sheet given from
the manufacturer to the suppliers.
After getting the master LC from the
buyer the manufacturer,
Merchandisers are supposed to make
the booking and send the suppliers.
By booking merchandisers procure
the raw materials e.g. fabric,
accessories and trims.
28.
Fabric booking:
Knit fabricbooking is done mentioning the
following criteria:
Composition: 100% cotton, 95% cotton
5% spandex etc
Construction: S/J, 1x1 rib etc
GSM: 140 gsm, 180 gsm etc
Quantity in Weight: e.g. 5000 kg
Color: Red, White, Blue etc
Woven fabric bookingis done mentioning
the following criteria:
Composition: 100% cotton, 95% cotton
5% spandex etc
Construction: e.g. 40 X40 /120 X 60
Width: e.g. 44”, 46”
Quantity in length: e.g. 10000 yards
Color: Red, White, Blue etc
Follow up andupdates
Regular and timely follow ups are important
to ensure that everybody involves in the
execution of the style is updated and is
performing his / her activities on time.
A merchandiser should plan his / her day
based on the time and action activities that
are due for the day. Ideally the
merchandiser should look at the activities
the are due for the coming 2-3 days and
should start his follow up accordingly.
33.
Merchandiser’s follow uptasks:
1. Product Package Analysis for Merchandising Follow up and
Procurement Planning.
2. Preparation of Time and Action Calendar for Merchandising Follow
up.
3. Follow up of all BB L/C on receipt of Master L/C in respect of Yarn,
Knitting, Dyeing, Printing, Embroidery, Value-addition works and
Accessories.
6. Follow up of Procurement of Yarn. Fabric and accessories.
8. Follow up of Lab-dip Preparation, Submission and Approval.
10. Follow up of Dyeing, Finishing.
34.
11. Follow upCutting in respect of Production and Finishing
requirement.
12. Follow up of Accessories Development, Submission, Approval,
Procurement and Inventory.
13. Follow up of all Samples, Pattern Correction, Graded Nest, Size Set
and arrangement of Pre-production Meeting.
14. Follow up and Arrangement of all Inspection as per Buyer’s
requirement.
15. Follow up of all Lab-Test of Garments and Accessories.
16. Monitor Final Inspection and Transportation of Cargo to Port with
proper Load Calculation on time.
17. Monitor submission of Documents and Realization of Payment as
per shipped qty and approved price.
35.
INSPECTION
After making ofthe garments,
merchandisers are supposed to
arrange pre-final and final inspection.
Inspection can be carried out in several
ways:
Inspection by buyer
Inspection by buying house
Inspection by third party
AQL:
AQL is Acceptablequality limit. A statistical
measurement of the maximum number of defective
goods considered acceptable in a particular sample
size. If the acceptable quality level (AQL) is not
reached for a particular sampling of goods,
manufacturers will review the various parameters in
the production process to determine the areas causing
the defects. AQL chart is used to inspect garments.
41.
Commercial documents
Proformainvoice (PI)
Purchase order (PO)
Bill of lading
Insurance document
Certificate of origin
Packing list
Air way bill
Commercial invoice etc
Cash-in-Advance
With this paymentmethod, the exporter can avoid credit risk, since
payment is received prior to the transfer of ownership of the goods. There
are three types of cash- in advance- payment method: wire transfer, credit
card, and payment by check.
Letters of Credit
Letters of credit (LCs) are among the most secure instruments available to
international traders. An LC is a commitment by a bank on behalf of the
buyer that payment will be made to the exporter provided that the terms
and conditions have been met, as verified through the presentation of all
required documents. The buyer pays its bank to render this service. An LC
is useful when reliable credit information about a foreign buyer is difficult to
obtain, but you are satisfied with the creditworthiness of your buyer’s
foreign bank. An LC also protects the buyer since no payment obligation
arises until the goods have been shipped or delivered as promised. The
letters of credit can take many forms: irrevocable or revocable,
confirmed, or special (transferable, revolving or standby).
44.
Documentary Collections
A documentarycollection is a transaction whereby the
exporter entrusts the collection of a payment to the
remitting bank (exporter’s bank), which sends documents
to a collecting bank (importer’s bank), along with
instructions for payment. Funds are received from the
importer and remitted to the exporter through the banks
involved in the collection in exchange for those documents.
Documentary collections involve the use of a draft that
requires the importer to pay the face amount either on sight
(document against payment—D/P) or on a specified
date in the future (document against acceptance—D/A).
45.
Open Account
An openaccount transaction means that the goods
are shipped and delivered before payment is due,
usually in 30 to 90 days. Obviously, this is the most
advantageous option to the importer in cash flow and
cost terms, but it is consequently the highest risk
option for an exporter. Due to the intense competition
for export markets, foreign buyers often press
exporters for open account terms since the extension
of credit by the seller to the buyer is more common
abroad. Therefore, exporters who are reluctant to
extend credit may face the possibility of the loss of
the sale to their competitors.
46.
Conclusion
Merchandising is undoubtlythe most
impostant section of a garments
industry. Merchandisers coordinates
between all the sections. So a good
garments merchandiser should have
concepts about every section of the
textile.
49.
1. Yarn ManufacturingTechnology
Link : http://www.facebook.com/pages/Yarn-Manufacturing-
Technology/485014954866808
2. Fabric Manufacturing Technology
Link : http://www.facebook.com/pages/Fabric-Manufacturing-
Technology/459520217425605
3. Garments Manufacturing Technology
Link : http://www.facebook.com/pages/Garments-Manufacturing-
Technology/472364799463126
3. Wet processing Technology
Link : http://www.facebook.com/pages/Wet-Processing-Technology-
Dyeing-/468645219825404
4. Fashion-Design-and-Technology
Link : http://www.facebook.com/pages/Fashion-Design-and-
Technology/587655294583875?ref=ts&fref=ts
My Facebook Textile related Pages
http://www.textilelab.blogspot.com (Visit )