 Work design
involves the methods
and motions used to
perform a task. Work
design is the design of
the work system.
 Motion study
Involves the analysis
of the basic hand,
arm, and body
movements of workers
as they perform work.
• What does work design include?
• the workplace layout and
environment
• the tooling and equipment
(e.g., work holders, fixtures,
hand tools, portable power
tools, and machine tools).
Selaam! Hi!
Merhaba!
I’m Çelik. I help u. 
If you want to get extra information
about Frank Gilbreth you can look
at this web side :
Google Hazretleri  or add me as a friend
on facebook ;)
I should catalog the
basic motion elements
and I should call them
‘therbligs’.
Frank Gilbreth
Therbligs are the basic
building blocks of virtually
all manual work performed
at a single workplace and
consisting primarily of
hand motions.
Each therblig represents time and
energy expended by a worker to
perform a task.
17 Therbligs
1. Transport empty (TE) – reach for an object
with empty hand – today we call it “reach”.
2. Grasp (G) – grasp an object by contacting
and closing the fingers until control has been
achived.
3. Transport loaded (TL) – move an object with
hand and arm – today we call it “move”.
4. Hold (H) – hold an object with one hand.
5. Release load (RL) – release control of an
Object.
6. Use (U) – manipulate/use a tool.
7. Pre- position (PP) – position object for
next
operation
8. Position (P) – position object in defined
location
9. Assemble (A) – join two parts
10. Disassemble (DA) – seperate multiple
parts
that were previously joined
17 Therbligs
That’s All, Guys… 
12. Select (St) – choose among several objects in a group (hand- eye
coordination is involved).
13. Plan (Pn) – decide on an action (a short pause or hesitation in the
motions)
14. Inspect (I) – determine quality of object using the eyes.
15. Unavoidable delay (UD) – waiting due to factors beyond worker control.
16. Avoidable delay (AD) – worker waiting.
17. Rest (R) – resting to overcome fatigue.
If the task is repetitive, of relatively
short duration, and will be
performed many times, it may be
appropriate to analyze the therbligs
that make up the work cycle as
part of the work design process.
The term micromotion analysis
is sometimes used for this type of
analysis.
Effective therbligs:
Transport empty
Grasp
Transport loaded
Release load
Use
Assemble
Disassemble
Inspect
Rest
Ineffective
therbligs:
Hold
Pre-position
Position
SearchSelect
Plan
Unavoidable
delay
Avoidable
delay
Ohhh My God! it’s so nice
I love so much 
Canbe organizedinto 3 catogories :
1 . Principles related to the use of human body.
2 . Principles relatedto workplace arrangement.
3 . Principles relatedto the design of tooling and equipment.
» The two hands should begin and end
their motions at the same time.
» Both hands should be fully utilized.
Both hands should be used as equally as possible.
•The work is evenly divided between the right-hand side and the left-
hand side of the workplace.
•In this case, the division of work should be organized according to the
following principle.
» The motions of the hands and arms should
be symmetrical and simultaneous.
 Minimize hand-eye coordination.If both hands are doing the
same movements at the same time ;
 Less concentration will be required.
Okey, sorry… I’ve gained weight so much… 
now I’m going to IUS fitness center… ;)
» The work should be designed to emphasize the worker’s preferred
hand.
 The preferred hand is faster,stronger and
more dexterous.
 For exp: Work units should enter the
work place on the side of the worker’s
preffered hand.
» The worker’s two
hands should never
be idle at the same
time.
» Method should consist of smooth
continuous curved motions rather than
straight motions with sudden changes in
direction.
» Use momentum to facilitate
task.
Using of momentum to
make a task easier.
» The method should take advantage of gravity ,instead of opposing it !
Less time and energy are required to move a
heavy object from a higher elevation to a lower
elevation than to move the object upward.
» Method should achieve a natural rhythm of
the motions involved.
Basically, the worker learns the rhythm and performs the motions without
thinking, much like the natural and instinctive motion pattern that occurs
in walking.
» The lowest classification of hand and arm motions should be used.
 There are five classification.
 The worker can perform the hand and arm
motion more quickly and with less affort.
I Movement of the fingers only.
II Fingers and wrist motion.
III Fingers, wrist, and
forearm
IV Finger,wrist ,forearm,upper arm and shoulder
» Minimize eye focus and eye travel activities.
 Eye focus occors when the eye must adjust to
change in viewing distance.
 Eye travel occors when the eye must adjust to
a line-of-sight change.
 Since eye focus and eye travel each take time,
it is desirable to minimize the need for the
worker to make these adjustments as much as
possible.
» The method should be designed
to utilize the worker’s feet and
legs when appropriate.
 The legs are stronger than the arms.
 The feet are not as dextrous as the hands.
The work should be designed to take advantage of the
greater strength of the legs. For example : Lifting tasks.
1 . Tools and materials should be located in fixed positions within work area.
The worker eventually learns the fixed locations, allowing him to reach for the object without
wasting time looking and searching.‘A place for everything, and everyting in its place.’
3. Locate tools and materials to be
consistent with sequence of work
elements in work cycle. Decrease the
time required for searching.
2. Tools and
materials should
be located close
to where they
are used.To
minimize the
distances to be
covered.
Normal working area in the workplace. Maximum working area in the
workplace.
For working area dimensions of average
male and female workers.
» Poor arrangement of parts and tools in workplace
» Good arrangement of parts and tools in workplace
Elements in relation to locations of hand tools and parts bins.
4 . Use gravity feed bins to deliver small parts and fasteners
A gravity feed bin is a container
that uses gravity to move the
items in it to a convenient access
point for the worker.
 It generally allows for quicker
acquisition of an item than a
conventional rectangular tray
shown in Figure (b).
 One possible
design is
shown in
Figure (a).
5 . Use gravity drop chutes for
completed work units where
appropriate.The drop chutes should lead to a container
adjacent to the worktable.
6 . Provide adequate illumination
» The issue of illumination is normally associated with ergonomics.
» However, illumination has long been known to be an important factor
in work design.
» Illumination is especially important in visual inspection tasks.
7 . A proper chair should be provided for the
worker.
 This usually means an
adjustable chair that can
be fitted to the size of the
worker.
 The adjustments usually
include seat height and
back height. Both the seat
and back are padded.
 The chair height should be
in proper relationship with
the work height. An
adjustable chair for the
workplace is shown in
Figure .
1. Work-holding devices should be designed for
the task.
A mechanical work-holder with a fast-acting clamp permits the work
unit to be loaded quickly and frees both hands to work on the task
productively.
2 . The Hands should be relieved of work elements that can performed by
the feet. Foot pedal controls can be
provided instead of hand
controls to operate certain
types of equipment. Sewing
machines are examples in
which foot pedals are used as
integral components in the
operation of the equipment.
3 . Combine multiple functions into one tool where
possible.Many of common hand tooks and
implements exhibit this principle.
 The head of a claw hammer is
designed for both striking and
pulling nails.
 All pencils are designed for both
writing and erasing.
Less time is usually required to reposition such a double-function tool
than to put one tool down and pick another one up.
4.Multiple operations should be performed simultaneously rather than
sequentially.
The work method can be designed so
that the steps are accomplished at the
same time rather than sequentially.
Special tooling and processes can
often be designed to simultaneously
accomplish the multiple operations.
5 . Equipment controls should be designed for operator convenience and error
avoidance.Equipment controls include dials, cranks, levers, switches, push buttons, and other
devices that regulate the operation of the equipment. >>>All of the controls needed
by the operator should be located within easy reach, so as to minimize the body
motions required to access and activate them.
6. Hand tools and portable powered tools should be designed for operator
comport and convenience.
The location of the handle or grip relative to
the working end of the tool should be
designed for maximum operator safety,
convenience, and effectiveness of the tool.
 If possible, the tool should
accommodate both right-handed and left
handed workers.
7 . Manual operations should be mechanized or automated wherever
economically and technologically feasible.
It’s time to watch my film 
• Groover,Mikell P.(2007) Work Systems and the Methods, Measurement, and
Management of Work. United States of America:Pearson Education,Inc.
• Transtutors(2012) Educational solutions
[online]available from <http://www.transtutors.com/homework-help/Industrial-
Management/Work-Study/working-area.aspx> [2012]
• Original source was R.Farley,’’Some Principles of Methods and Motion Study as
Used in Development,’’ General Motors and Engineering Journal 2,no.6:20-25.)
• http://www.rehabcare.org/ergonomics/ergonomics.html
• Purdue University(2012)
• [online]available from <https://engineering.purdue.edu/IE/GilbrethLibrary
• /frankmotion.html> [2012]
Bye! 

More Related Content

What's hot

Principles of motion economy By Mazedin Reza
Principles of motion economy By Mazedin RezaPrinciples of motion economy By Mazedin Reza
Principles of motion economy By Mazedin Reza
Mazedin Reza
 
Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
Abrity Bhattacharya
 
Lecture 2 process charts work study
Lecture 2 process charts work studyLecture 2 process charts work study
Lecture 2 process charts work study
rahulmeshram14
 
5s- English.ppt
5s- English.ppt5s- English.ppt
5s- English.ppt
pratima Bharati
 
Work study
Work studyWork study
Work study
Dharam Ranka.Rvd
 
Method Study
Method Study Method Study
Method Study
Ira Tobing
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
Muhammad Hassan
 
Motion study on shopfloor and design of work
Motion study on shopfloor and design of workMotion study on shopfloor and design of work
Motion study on shopfloor and design of work
avijit biswas
 
Micro-Macro Motion Study
Micro-Macro Motion StudyMicro-Macro Motion Study
Micro-Macro Motion Study
Manthan Kanani
 
8 Wastes of Lean
8 Wastes of Lean8 Wastes of Lean
8 Wastes of Lean
Praneet Surti
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
Rohit Goutam
 
Work factor-Anant Patel
Work factor-Anant PatelWork factor-Anant Patel
Work factor-Anant Patel
Anant Patel
 
5s lean manufacturing tool
5s  lean manufacturing tool5s  lean manufacturing tool
5s lean manufacturing tool
DnyaneshwarJagtap5
 
Improvement of Plant Layout by using 5S technique-An industrial case study
Improvement of Plant Layout by using 5S technique-An industrial case studyImprovement of Plant Layout by using 5S technique-An industrial case study
Improvement of Plant Layout by using 5S technique-An industrial case study
IJMER
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
ahmad bassiouny
 
Time study part 2
Time study part 2Time study part 2
Time study part 2
Lorenzo Angelo Jubli
 
5 s training pack
5 s training pack5 s training pack
5 s training pack
Filippo Frattini
 
Work study and ergonomics
Work study and ergonomicsWork study and ergonomics
Work study and ergonomics
Akshay Karande
 
Training Within Industry (TWI): Job Instruction Program by Operational Excell...
Training Within Industry (TWI): Job Instruction Program by Operational Excell...Training Within Industry (TWI): Job Instruction Program by Operational Excell...
Training Within Industry (TWI): Job Instruction Program by Operational Excell...
Operational Excellence Consulting
 
Line balancing
Line balancingLine balancing
Line balancing
Hiwa Gaffari
 

What's hot (20)

Principles of motion economy By Mazedin Reza
Principles of motion economy By Mazedin RezaPrinciples of motion economy By Mazedin Reza
Principles of motion economy By Mazedin Reza
 
Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
 
Lecture 2 process charts work study
Lecture 2 process charts work studyLecture 2 process charts work study
Lecture 2 process charts work study
 
5s- English.ppt
5s- English.ppt5s- English.ppt
5s- English.ppt
 
Work study
Work studyWork study
Work study
 
Method Study
Method Study Method Study
Method Study
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
 
Motion study on shopfloor and design of work
Motion study on shopfloor and design of workMotion study on shopfloor and design of work
Motion study on shopfloor and design of work
 
Micro-Macro Motion Study
Micro-Macro Motion StudyMicro-Macro Motion Study
Micro-Macro Motion Study
 
8 Wastes of Lean
8 Wastes of Lean8 Wastes of Lean
8 Wastes of Lean
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Work factor-Anant Patel
Work factor-Anant PatelWork factor-Anant Patel
Work factor-Anant Patel
 
5s lean manufacturing tool
5s  lean manufacturing tool5s  lean manufacturing tool
5s lean manufacturing tool
 
Improvement of Plant Layout by using 5S technique-An industrial case study
Improvement of Plant Layout by using 5S technique-An industrial case studyImprovement of Plant Layout by using 5S technique-An industrial case study
Improvement of Plant Layout by using 5S technique-An industrial case study
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 
Time study part 2
Time study part 2Time study part 2
Time study part 2
 
5 s training pack
5 s training pack5 s training pack
5 s training pack
 
Work study and ergonomics
Work study and ergonomicsWork study and ergonomics
Work study and ergonomics
 
Training Within Industry (TWI): Job Instruction Program by Operational Excell...
Training Within Industry (TWI): Job Instruction Program by Operational Excell...Training Within Industry (TWI): Job Instruction Program by Operational Excell...
Training Within Industry (TWI): Job Instruction Program by Operational Excell...
 
Line balancing
Line balancingLine balancing
Line balancing
 

Similar to Motion economy work design by selman kaymaz

all about basis of -Motion-Economy.pptx
all about  basis of -Motion-Economy.pptxall about  basis of -Motion-Economy.pptx
all about basis of -Motion-Economy.pptx
janet736113
 
Motion Economy
Motion EconomyMotion Economy
Motion economy and work design
Motion economy and work designMotion economy and work design
Motion economy and work design
Bosna Tour
 
motion study
motion studymotion study
motion study
MarhainiNurry
 
Lecture 3 motion economy work study
Lecture 3 motion economy work studyLecture 3 motion economy work study
Lecture 3 motion economy work study
rahulmeshram14
 
INDUSTRAIL PPT.pptx
INDUSTRAIL PPT.pptxINDUSTRAIL PPT.pptx
INDUSTRAIL PPT.pptx
SahilTanweer1
 
Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...
মোঃ ফুরকান উদ্দিন জুয়েল
 
Flashlight assembly - Methods Engineering
Flashlight assembly - Methods EngineeringFlashlight assembly - Methods Engineering
Flashlight assembly - Methods Engineering
Angelica Angelo Ocon
 
Principle of motion economy presented at BSTQM
Principle of motion economy presented at BSTQMPrinciple of motion economy presented at BSTQM
Principle of motion economy presented at BSTQM
Engr. Abdun Noor
 
Motion Study
Motion StudyMotion Study
Motion Study
ahmad bassiouny
 
3...work study
3...work study3...work study
3...work study
DEVIKA ANTHARJANAM
 
OP Chapter 1 PPT.pptx
OP Chapter 1 PPT.pptxOP Chapter 1 PPT.pptx
OP Chapter 1 PPT.pptx
LakshmiKVN1
 
Toy ship assembly - Methods Engineering
Toy ship assembly - Methods EngineeringToy ship assembly - Methods Engineering
Toy ship assembly - Methods Engineering
Angelica Angelo Ocon
 
Chronocycle graph
Chronocycle graphChronocycle graph
Chronocycle graph
Binoy Benny
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
shiwakantmaurya
 
Work study
Work studyWork study
Work study
Akshay Punde
 
Importance of ergonomics in designing workplace
Importance of ergonomics in designing workplaceImportance of ergonomics in designing workplace
Importance of ergonomics in designing workplace
Parth Shukla
 
Workplace Design I Gaurav Singh Rajput
Workplace Design I Gaurav Singh RajputWorkplace Design I Gaurav Singh Rajput
Workplace Design I Gaurav Singh Rajput
Gaurav Singh Rajput
 
Garments
Garments Garments
metodos de estudio
metodos de estudiometodos de estudio
metodos de estudio
Santiago Vega Villacis
 

Similar to Motion economy work design by selman kaymaz (20)

all about basis of -Motion-Economy.pptx
all about  basis of -Motion-Economy.pptxall about  basis of -Motion-Economy.pptx
all about basis of -Motion-Economy.pptx
 
Motion Economy
Motion EconomyMotion Economy
Motion Economy
 
Motion economy and work design
Motion economy and work designMotion economy and work design
Motion economy and work design
 
motion study
motion studymotion study
motion study
 
Lecture 3 motion economy work study
Lecture 3 motion economy work studyLecture 3 motion economy work study
Lecture 3 motion economy work study
 
INDUSTRAIL PPT.pptx
INDUSTRAIL PPT.pptxINDUSTRAIL PPT.pptx
INDUSTRAIL PPT.pptx
 
Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...
 
Flashlight assembly - Methods Engineering
Flashlight assembly - Methods EngineeringFlashlight assembly - Methods Engineering
Flashlight assembly - Methods Engineering
 
Principle of motion economy presented at BSTQM
Principle of motion economy presented at BSTQMPrinciple of motion economy presented at BSTQM
Principle of motion economy presented at BSTQM
 
Motion Study
Motion StudyMotion Study
Motion Study
 
3...work study
3...work study3...work study
3...work study
 
OP Chapter 1 PPT.pptx
OP Chapter 1 PPT.pptxOP Chapter 1 PPT.pptx
OP Chapter 1 PPT.pptx
 
Toy ship assembly - Methods Engineering
Toy ship assembly - Methods EngineeringToy ship assembly - Methods Engineering
Toy ship assembly - Methods Engineering
 
Chronocycle graph
Chronocycle graphChronocycle graph
Chronocycle graph
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
Work study
Work studyWork study
Work study
 
Importance of ergonomics in designing workplace
Importance of ergonomics in designing workplaceImportance of ergonomics in designing workplace
Importance of ergonomics in designing workplace
 
Workplace Design I Gaurav Singh Rajput
Workplace Design I Gaurav Singh RajputWorkplace Design I Gaurav Singh Rajput
Workplace Design I Gaurav Singh Rajput
 
Garments
Garments Garments
Garments
 
metodos de estudio
metodos de estudiometodos de estudio
metodos de estudio
 

More from Selman Kaymaz

Temettü teorileri
Temettü teorileri Temettü teorileri
Temettü teorileri
Selman Kaymaz
 
Stok yöneti̇mi̇
Stok yöneti̇mi̇Stok yöneti̇mi̇
Stok yöneti̇mi̇
Selman Kaymaz
 
öRgüt; algılama farlılıklar öğrenme yaratıcılık
öRgüt; algılama  farlılıklar  öğrenme yaratıcılıköRgüt; algılama  farlılıklar  öğrenme yaratıcılık
öRgüt; algılama farlılıklar öğrenme yaratıcılık
Selman Kaymaz
 
İnavasyon değişim
İnavasyon değişimİnavasyon değişim
İnavasyon değişim
Selman Kaymaz
 
İlişkisel pazarlama relationship marketing
İlişkisel pazarlama relationship marketingİlişkisel pazarlama relationship marketing
İlişkisel pazarlama relationship marketing
Selman Kaymaz
 
İçerik pazarlama
İçerik pazarlamaİçerik pazarlama
İçerik pazarlama
Selman Kaymaz
 
3 swot pest stratejik analiz_SK
3 swot pest stratejik analiz_SK3 swot pest stratejik analiz_SK
3 swot pest stratejik analiz_SK
Selman Kaymaz
 
4 i̇şplanı hazırlama
4 i̇şplanı hazırlama4 i̇şplanı hazırlama
4 i̇şplanı hazırlama
Selman Kaymaz
 
Analysis of sarajevo transit system and Increasing Capacity
Analysis of sarajevo transit system and Increasing Capacity Analysis of sarajevo transit system and Increasing Capacity
Analysis of sarajevo transit system and Increasing Capacity
Selman Kaymaz
 
Stratification and discrimination
Stratification and discriminationStratification and discrimination
Stratification and discrimination
Selman Kaymaz
 
Financial managerial technical analysis and portfolio
Financial managerial technical analysis and portfolioFinancial managerial technical analysis and portfolio
Financial managerial technical analysis and portfolio
Selman Kaymaz
 
Money, the Price Level, and Inflation
Money, the Price Level, and InflationMoney, the Price Level, and Inflation
Money, the Price Level, and Inflation
Selman Kaymaz
 

More from Selman Kaymaz (12)

Temettü teorileri
Temettü teorileri Temettü teorileri
Temettü teorileri
 
Stok yöneti̇mi̇
Stok yöneti̇mi̇Stok yöneti̇mi̇
Stok yöneti̇mi̇
 
öRgüt; algılama farlılıklar öğrenme yaratıcılık
öRgüt; algılama  farlılıklar  öğrenme yaratıcılıköRgüt; algılama  farlılıklar  öğrenme yaratıcılık
öRgüt; algılama farlılıklar öğrenme yaratıcılık
 
İnavasyon değişim
İnavasyon değişimİnavasyon değişim
İnavasyon değişim
 
İlişkisel pazarlama relationship marketing
İlişkisel pazarlama relationship marketingİlişkisel pazarlama relationship marketing
İlişkisel pazarlama relationship marketing
 
İçerik pazarlama
İçerik pazarlamaİçerik pazarlama
İçerik pazarlama
 
3 swot pest stratejik analiz_SK
3 swot pest stratejik analiz_SK3 swot pest stratejik analiz_SK
3 swot pest stratejik analiz_SK
 
4 i̇şplanı hazırlama
4 i̇şplanı hazırlama4 i̇şplanı hazırlama
4 i̇şplanı hazırlama
 
Analysis of sarajevo transit system and Increasing Capacity
Analysis of sarajevo transit system and Increasing Capacity Analysis of sarajevo transit system and Increasing Capacity
Analysis of sarajevo transit system and Increasing Capacity
 
Stratification and discrimination
Stratification and discriminationStratification and discrimination
Stratification and discrimination
 
Financial managerial technical analysis and portfolio
Financial managerial technical analysis and portfolioFinancial managerial technical analysis and portfolio
Financial managerial technical analysis and portfolio
 
Money, the Price Level, and Inflation
Money, the Price Level, and InflationMoney, the Price Level, and Inflation
Money, the Price Level, and Inflation
 

Recently uploaded

Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
MiscAnnoy1
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
shahdabdulbaset
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
Addu25809
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 

Recently uploaded (20)

Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 

Motion economy work design by selman kaymaz

  • 1.
  • 2.  Work design involves the methods and motions used to perform a task. Work design is the design of the work system.  Motion study Involves the analysis of the basic hand, arm, and body movements of workers as they perform work. • What does work design include? • the workplace layout and environment • the tooling and equipment (e.g., work holders, fixtures, hand tools, portable power tools, and machine tools). Selaam! Hi! Merhaba! I’m Çelik. I help u. 
  • 3. If you want to get extra information about Frank Gilbreth you can look at this web side : Google Hazretleri  or add me as a friend on facebook ;) I should catalog the basic motion elements and I should call them ‘therbligs’. Frank Gilbreth
  • 4. Therbligs are the basic building blocks of virtually all manual work performed at a single workplace and consisting primarily of hand motions. Each therblig represents time and energy expended by a worker to perform a task.
  • 5. 17 Therbligs 1. Transport empty (TE) – reach for an object with empty hand – today we call it “reach”. 2. Grasp (G) – grasp an object by contacting and closing the fingers until control has been achived. 3. Transport loaded (TL) – move an object with hand and arm – today we call it “move”. 4. Hold (H) – hold an object with one hand. 5. Release load (RL) – release control of an Object. 6. Use (U) – manipulate/use a tool. 7. Pre- position (PP) – position object for next operation 8. Position (P) – position object in defined location 9. Assemble (A) – join two parts 10. Disassemble (DA) – seperate multiple parts that were previously joined
  • 6. 17 Therbligs That’s All, Guys…  12. Select (St) – choose among several objects in a group (hand- eye coordination is involved). 13. Plan (Pn) – decide on an action (a short pause or hesitation in the motions) 14. Inspect (I) – determine quality of object using the eyes. 15. Unavoidable delay (UD) – waiting due to factors beyond worker control. 16. Avoidable delay (AD) – worker waiting. 17. Rest (R) – resting to overcome fatigue. If the task is repetitive, of relatively short duration, and will be performed many times, it may be appropriate to analyze the therbligs that make up the work cycle as part of the work design process. The term micromotion analysis is sometimes used for this type of analysis.
  • 7. Effective therbligs: Transport empty Grasp Transport loaded Release load Use Assemble Disassemble Inspect Rest Ineffective therbligs: Hold Pre-position Position SearchSelect Plan Unavoidable delay Avoidable delay Ohhh My God! it’s so nice I love so much 
  • 8.
  • 9. Canbe organizedinto 3 catogories : 1 . Principles related to the use of human body. 2 . Principles relatedto workplace arrangement. 3 . Principles relatedto the design of tooling and equipment.
  • 10. » The two hands should begin and end their motions at the same time. » Both hands should be fully utilized. Both hands should be used as equally as possible. •The work is evenly divided between the right-hand side and the left- hand side of the workplace. •In this case, the division of work should be organized according to the following principle.
  • 11. » The motions of the hands and arms should be symmetrical and simultaneous.  Minimize hand-eye coordination.If both hands are doing the same movements at the same time ;  Less concentration will be required. Okey, sorry… I’ve gained weight so much…  now I’m going to IUS fitness center… ;)
  • 12. » The work should be designed to emphasize the worker’s preferred hand.  The preferred hand is faster,stronger and more dexterous.  For exp: Work units should enter the work place on the side of the worker’s preffered hand. » The worker’s two hands should never be idle at the same time.
  • 13. » Method should consist of smooth continuous curved motions rather than straight motions with sudden changes in direction. » Use momentum to facilitate task. Using of momentum to make a task easier.
  • 14. » The method should take advantage of gravity ,instead of opposing it ! Less time and energy are required to move a heavy object from a higher elevation to a lower elevation than to move the object upward.
  • 15. » Method should achieve a natural rhythm of the motions involved. Basically, the worker learns the rhythm and performs the motions without thinking, much like the natural and instinctive motion pattern that occurs in walking.
  • 16. » The lowest classification of hand and arm motions should be used.  There are five classification.  The worker can perform the hand and arm motion more quickly and with less affort. I Movement of the fingers only. II Fingers and wrist motion. III Fingers, wrist, and forearm IV Finger,wrist ,forearm,upper arm and shoulder
  • 17. » Minimize eye focus and eye travel activities.  Eye focus occors when the eye must adjust to change in viewing distance.  Eye travel occors when the eye must adjust to a line-of-sight change.  Since eye focus and eye travel each take time, it is desirable to minimize the need for the worker to make these adjustments as much as possible. » The method should be designed to utilize the worker’s feet and legs when appropriate.  The legs are stronger than the arms.  The feet are not as dextrous as the hands. The work should be designed to take advantage of the greater strength of the legs. For example : Lifting tasks.
  • 18. 1 . Tools and materials should be located in fixed positions within work area. The worker eventually learns the fixed locations, allowing him to reach for the object without wasting time looking and searching.‘A place for everything, and everyting in its place.’ 3. Locate tools and materials to be consistent with sequence of work elements in work cycle. Decrease the time required for searching. 2. Tools and materials should be located close to where they are used.To minimize the distances to be covered.
  • 19. Normal working area in the workplace. Maximum working area in the workplace. For working area dimensions of average male and female workers. » Poor arrangement of parts and tools in workplace » Good arrangement of parts and tools in workplace Elements in relation to locations of hand tools and parts bins.
  • 20. 4 . Use gravity feed bins to deliver small parts and fasteners A gravity feed bin is a container that uses gravity to move the items in it to a convenient access point for the worker.  It generally allows for quicker acquisition of an item than a conventional rectangular tray shown in Figure (b).  One possible design is shown in Figure (a). 5 . Use gravity drop chutes for completed work units where appropriate.The drop chutes should lead to a container adjacent to the worktable.
  • 21. 6 . Provide adequate illumination » The issue of illumination is normally associated with ergonomics. » However, illumination has long been known to be an important factor in work design. » Illumination is especially important in visual inspection tasks.
  • 22. 7 . A proper chair should be provided for the worker.  This usually means an adjustable chair that can be fitted to the size of the worker.  The adjustments usually include seat height and back height. Both the seat and back are padded.  The chair height should be in proper relationship with the work height. An adjustable chair for the workplace is shown in Figure .
  • 23. 1. Work-holding devices should be designed for the task. A mechanical work-holder with a fast-acting clamp permits the work unit to be loaded quickly and frees both hands to work on the task productively.
  • 24. 2 . The Hands should be relieved of work elements that can performed by the feet. Foot pedal controls can be provided instead of hand controls to operate certain types of equipment. Sewing machines are examples in which foot pedals are used as integral components in the operation of the equipment. 3 . Combine multiple functions into one tool where possible.Many of common hand tooks and implements exhibit this principle.  The head of a claw hammer is designed for both striking and pulling nails.  All pencils are designed for both writing and erasing. Less time is usually required to reposition such a double-function tool than to put one tool down and pick another one up.
  • 25. 4.Multiple operations should be performed simultaneously rather than sequentially. The work method can be designed so that the steps are accomplished at the same time rather than sequentially. Special tooling and processes can often be designed to simultaneously accomplish the multiple operations. 5 . Equipment controls should be designed for operator convenience and error avoidance.Equipment controls include dials, cranks, levers, switches, push buttons, and other devices that regulate the operation of the equipment. >>>All of the controls needed by the operator should be located within easy reach, so as to minimize the body motions required to access and activate them.
  • 26. 6. Hand tools and portable powered tools should be designed for operator comport and convenience. The location of the handle or grip relative to the working end of the tool should be designed for maximum operator safety, convenience, and effectiveness of the tool.  If possible, the tool should accommodate both right-handed and left handed workers. 7 . Manual operations should be mechanized or automated wherever economically and technologically feasible.
  • 27. It’s time to watch my film 
  • 28.
  • 29.
  • 30. • Groover,Mikell P.(2007) Work Systems and the Methods, Measurement, and Management of Work. United States of America:Pearson Education,Inc. • Transtutors(2012) Educational solutions [online]available from <http://www.transtutors.com/homework-help/Industrial- Management/Work-Study/working-area.aspx> [2012] • Original source was R.Farley,’’Some Principles of Methods and Motion Study as Used in Development,’’ General Motors and Engineering Journal 2,no.6:20-25.) • http://www.rehabcare.org/ergonomics/ergonomics.html • Purdue University(2012) • [online]available from <https://engineering.purdue.edu/IE/GilbrethLibrary • /frankmotion.html> [2012] Bye! 