Line Balancing
Arranging a production line for an
even flow of production from one
work station to the next, so that
there are no delay at any work
station that will leave the next
work station with idle time
Line Balancing
Balancing may be achieved by
rearrangement of the workstations
or by adding machine and workers
at same of the station so that all
operation take about the same
amount of time
Line Balancing Procedure
1. Determine what task must be
performed to complete one unit of
finished product and the sequence
in which the task must be
performed. Draw the precedence
diagram
2. Estimate the task time (amount of
time it take a worker to perform each
task).
3. Determine Cycle Time : Cycle time
is the time between successive unit
coming off the end of the line.
4. Assign each task to a work station
and balance the line
5. Determine the number of
workstation required
Nt = sum of task time
---------------------------------------------------
cycle time
5. Determine the number of
workstation required
Nt = sum of task time
---------------------------------------------------
cycle time

More Related Content

What's hot

Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
Rohit Goutam
 
Line balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarLine balancing ppt By Wakil Kumar
Line balancing ppt By Wakil Kumar
Wakil Kumar
 
Assembly Line Production Introduction
Assembly Line Production   IntroductionAssembly Line Production   Introduction
Assembly Line Production Introduction
Dheenathayalan Ramasamy
 
79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancing
Joseph Konnully
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
Alan Wei Teck
 
Line balance
Line balanceLine balance
Line balance
Shamim Hasan
 
07 Line Balancing
07 Line Balancing07 Line Balancing
07 Line Balancing
Arif Rahman
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
Dr. Bhimsen Soragaon
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
ASHUTOSH MISHRA
 
Manual Assembly Lines
Manual Assembly LinesManual Assembly Lines
Manual Assembly Lines
VADLAJAGADEESHWARAAC
 
QCO presentation
QCO presentationQCO presentation
QCO presentation
Dababrata Mondal
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
Vishal Shinde
 
Time study
Time studyTime study
Time study
Lav Gupta
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Rajendran Ananda Krishnan
 
Work measurement
Work measurementWork measurement
Work measurement
Ratnadeepsinh Jadeja
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
bwu.nl
 

What's hot (20)

Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Line balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarLine balancing ppt By Wakil Kumar
Line balancing ppt By Wakil Kumar
 
Assembly Line Production Introduction
Assembly Line Production   IntroductionAssembly Line Production   Introduction
Assembly Line Production Introduction
 
79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancing
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
Line balance
Line balanceLine balance
Line balance
 
07 Line Balancing
07 Line Balancing07 Line Balancing
07 Line Balancing
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Manual Assembly Lines
Manual Assembly LinesManual Assembly Lines
Manual Assembly Lines
 
QCO presentation
QCO presentationQCO presentation
QCO presentation
 
Line balancing
Line balancing Line balancing
Line balancing
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 
Time study
Time studyTime study
Time study
 
Line balancing
Line balancing Line balancing
Line balancing
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Work measurement
Work measurementWork measurement
Work measurement
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 

Similar to Line balancing

Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
Dhyey Shukla
 
final Line balancing slide12.ppt
final Line balancing slide12.pptfinal Line balancing slide12.ppt
final Line balancing slide12.ppt
xicohos114
 
Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
Abrity Bhattacharya
 
production scheduling
production schedulingproduction scheduling
production scheduling
PraveenManickam2
 
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCINGPRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
International Journal of Technical Research & Application
 
Decision policies for production networks
Decision policies for production networksDecision policies for production networks
Decision policies for production networksSpringer
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
Sujeet TAMBE
 
Line study of sewing section ( a detail overview)
Line study of sewing section ( a detail overview)Line study of sewing section ( a detail overview)
Line study of sewing section ( a detail overview)
Minhazul Abedin
 
Operations Management : Line Balancing
Operations Management : Line BalancingOperations Management : Line Balancing
Operations Management : Line Balancing
Rohan Bharaj
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line Balancing
Abhishek Thakur
 
Job Shop Scheduling.pptx
Job Shop Scheduling.pptxJob Shop Scheduling.pptx
Job Shop Scheduling.pptx
SyedAmirIqbal3
 
ppt-U3 - (Programming, Memory Interfacing).pptx
ppt-U3 - (Programming, Memory Interfacing).pptxppt-U3 - (Programming, Memory Interfacing).pptx
ppt-U3 - (Programming, Memory Interfacing).pptx
RaviKiranVarma4
 
unit-4-4Operations Planning and Control-Scheduling.ppt
unit-4-4Operations Planning and Control-Scheduling.pptunit-4-4Operations Planning and Control-Scheduling.ppt
unit-4-4Operations Planning and Control-Scheduling.ppt
almazwmbashira
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
pikuoec
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
pikuoec
 
Balancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case studyBalancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case study
eSAT Journals
 

Similar to Line balancing (20)

Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
final Line balancing slide12.ppt
final Line balancing slide12.pptfinal Line balancing slide12.ppt
final Line balancing slide12.ppt
 
Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
 
production scheduling
production schedulingproduction scheduling
production scheduling
 
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCINGPRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
 
Decision policies for production networks
Decision policies for production networksDecision policies for production networks
Decision policies for production networks
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
Line study of sewing section ( a detail overview)
Line study of sewing section ( a detail overview)Line study of sewing section ( a detail overview)
Line study of sewing section ( a detail overview)
 
Operations Management : Line Balancing
Operations Management : Line BalancingOperations Management : Line Balancing
Operations Management : Line Balancing
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line Balancing
 
Job Shop Scheduling.pptx
Job Shop Scheduling.pptxJob Shop Scheduling.pptx
Job Shop Scheduling.pptx
 
ppt-U3 - (Programming, Memory Interfacing).pptx
ppt-U3 - (Programming, Memory Interfacing).pptxppt-U3 - (Programming, Memory Interfacing).pptx
ppt-U3 - (Programming, Memory Interfacing).pptx
 
AE0202_203-210
AE0202_203-210AE0202_203-210
AE0202_203-210
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
 
unit-4-4Operations Planning and Control-Scheduling.ppt
unit-4-4Operations Planning and Control-Scheduling.pptunit-4-4Operations Planning and Control-Scheduling.ppt
unit-4-4Operations Planning and Control-Scheduling.ppt
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Balancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case studyBalancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case study
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 

More from D. Palani Kumar / Kamaraj College of Engineering & Technology

Process Planning and Cost Estimation
Process Planning and Cost EstimationProcess Planning and Cost Estimation
BALLISTIC PARTICLE MANUFACTURING (BPM).pdf
BALLISTIC PARTICLE MANUFACTURING (BPM).pdfBALLISTIC PARTICLE MANUFACTURING (BPM).pdf
BALLISTIC PARTICLE MANUFACTURING (BPM).pdf
D. Palani Kumar / Kamaraj College of Engineering & Technology
 
Laser Engineered Net Shaping.pdf
Laser Engineered Net Shaping.pdfLaser Engineered Net Shaping.pdf
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Manufacturing models and metrics costs
Manufacturing models and metrics costsManufacturing models and metrics costs
Geometric Modelling approaches
Geometric Modelling approachesGeometric Modelling approaches
Solid modelling
Solid modellingSolid modelling
CAPP
CAPPCAPP
Benefits of GT
Benefits of GTBenefits of GT

More from D. Palani Kumar / Kamaraj College of Engineering & Technology (20)

6 categories of workplace hazards in industries
6 categories of workplace hazards in industries6 categories of workplace hazards in industries
6 categories of workplace hazards in industries
 
Disaster Management
Disaster ManagementDisaster Management
Disaster Management
 
Industrial Safety mechanical
Industrial Safety mechanicalIndustrial Safety mechanical
Industrial Safety mechanical
 
Process Planning and Cost Estimation
Process Planning and Cost EstimationProcess Planning and Cost Estimation
Process Planning and Cost Estimation
 
Industrial Safety mech.PPT
Industrial Safety mech.PPTIndustrial Safety mech.PPT
Industrial Safety mech.PPT
 
Unit - I .ppt
Unit - I .pptUnit - I .ppt
Unit - I .ppt
 
UNIT – IV.pptx
UNIT – IV.pptxUNIT – IV.pptx
UNIT – IV.pptx
 
BALLISTIC PARTICLE MANUFACTURING (BPM).pdf
BALLISTIC PARTICLE MANUFACTURING (BPM).pdfBALLISTIC PARTICLE MANUFACTURING (BPM).pdf
BALLISTIC PARTICLE MANUFACTURING (BPM).pdf
 
Additive_Manufacturing_Macro-and-Micro.pdf
Additive_Manufacturing_Macro-and-Micro.pdfAdditive_Manufacturing_Macro-and-Micro.pdf
Additive_Manufacturing_Macro-and-Micro.pdf
 
Laser Engineered Net Shaping.pdf
Laser Engineered Net Shaping.pdfLaser Engineered Net Shaping.pdf
Laser Engineered Net Shaping.pdf
 
Estimation_and_Costing.ppt
Estimation_and_Costing.pptEstimation_and_Costing.ppt
Estimation_and_Costing.ppt
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Scope of CIM
Scope of CIMScope of CIM
Scope of CIM
 
Manufacturing models and metrics costs
Manufacturing models and metrics costsManufacturing models and metrics costs
Manufacturing models and metrics costs
 
Geometric Modelling approaches
Geometric Modelling approachesGeometric Modelling approaches
Geometric Modelling approaches
 
Solid modelling
Solid modellingSolid modelling
Solid modelling
 
CAPP
CAPPCAPP
CAPP
 
PPC
PPCPPC
PPC
 
Benefits of GT
Benefits of GTBenefits of GT
Benefits of GT
 

Recently uploaded

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 

Recently uploaded (20)

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 

Line balancing

  • 1. Line Balancing Arranging a production line for an even flow of production from one work station to the next, so that there are no delay at any work station that will leave the next work station with idle time
  • 2. Line Balancing Balancing may be achieved by rearrangement of the workstations or by adding machine and workers at same of the station so that all operation take about the same amount of time
  • 3. Line Balancing Procedure 1. Determine what task must be performed to complete one unit of finished product and the sequence in which the task must be performed. Draw the precedence diagram
  • 4. 2. Estimate the task time (amount of time it take a worker to perform each task). 3. Determine Cycle Time : Cycle time is the time between successive unit coming off the end of the line. 4. Assign each task to a work station and balance the line
  • 5. 5. Determine the number of workstation required Nt = sum of task time --------------------------------------------------- cycle time
  • 6. 5. Determine the number of workstation required Nt = sum of task time --------------------------------------------------- cycle time