INTRODUCTION
WORK STUDY:-
 Motion study
 Time study:-
o A qualified, well trained operator
o Normal pace
o Doing a specific task
OBJECTIVES OF TIME STUDY
• To increase productivity
 To set labour standard for satisfactory performance.
 To determine basic times/normal times.
 To determine the number of machines an operator can
handle.
 To determine standards costs.
Advantages
To develop suitable working conditions
To improve utilization of resources
To reduce human effort by proper design of
processes
TIME STUDY MOTION STUDY
 Notes the time involved
in carrying out each
element of operation.
 Aims at fixing the
standard time for
carrying out a job.
 Is not suitable for
workers where quality is
prime consideration
 Study of motions on an
operation
 To reduce wastage of
time
 Suitable for all types of
jobs.
Diff between time & motion study
Types of elements involved in a job
 Repetitive element:- Occurs in every work cycle of the job.
 Occasional element:- Occurs at intervals.
 Constant element:- Basic or normal time remains constant.
 Variable element:- Basic or normal time varies.
 Manual element:- Performed manually.
 Governing element :- Occupies a longer time than any other
element.
Methods
 1.Predetermined time standard system
 2.Stop watch reading
a) Continuous
b) Snap-back
 3.Work sampling
Sample calculation
1. E=2√
𝒑(𝟏−𝒑)
𝒏
2. 𝒏 =
𝟒𝒑(𝟏−𝒑)
𝑬 𝟐
P=proportion of phoning of
activity
E=error
n=sample size
Que. A preliminary study indicates that the proportion of
idle time of a machine is 30% ; rest of the time it is
working . To get a good estimate of the idle time with a
precision of ±1% , then what should be the sample size?
n=
4(0.30)(1−0.30)
(0.01)2 =8400
Computation of NT & ST
Work
element
a b c d*
Obs. rating 0.56min 0.25min 0.50min 1.10min
Performanc
e rating
100% 80% 110% 100%
* Irregular element performed every 5
cycles
PFD allowance=15%
Normal
time=0.56(1.0)+0.25(0.80)+0.50(1.10)+1.10(1.0)/5=1.53min
Standard time=1.53(1+0.15)=1.76
Applications
 In decision making
 Provides accuracy
 Organisation and method
Conclusion
TIME STUDY

More Related Content

What's hot

cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
Pratibha Khemchandani
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
Akash Bakshi
 
Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copy
Hareesh M
 

What's hot (20)

cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Work study
Work studyWork study
Work study
 
Line balancing
Line balancingLine balancing
Line balancing
 
Work sampling
Work samplingWork sampling
Work sampling
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work sampling
Work samplingWork sampling
Work sampling
 
Work Study
Work StudyWork Study
Work Study
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
Work study
Work studyWork study
Work study
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
 
Work study and method study
Work study and method studyWork study and method study
Work study and method study
 
Method study
Method studyMethod study
Method study
 
Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copy
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Work sample
Work sampleWork sample
Work sample
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
 

Viewers also liked

Operation strategy at galanze
Operation strategy at galanzeOperation strategy at galanze
Operation strategy at galanze
Niilm-Cms
 
Operations strategy and competitiveness
Operations strategy and competitivenessOperations strategy and competitiveness
Operations strategy and competitiveness
Arun Kandukuri
 
Product design and development
Product design and developmentProduct design and development
Product design and development
Vishal Kachhdiya
 

Viewers also liked (20)

Learning curve
Learning curveLearning curve
Learning curve
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layout
 
Learning Curve Sample Problem
Learning Curve Sample ProblemLearning Curve Sample Problem
Learning Curve Sample Problem
 
Operations strategy and competitiveness
Operations strategy and competitivenessOperations strategy and competitiveness
Operations strategy and competitiveness
 
Product designing strategy
Product designing strategyProduct designing strategy
Product designing strategy
 
Product design and development ch2
Product design and development ch2Product design and development ch2
Product design and development ch2
 
MARUTI SUZUKI PRODUCT ANALYSIS REPORT
MARUTI SUZUKI PRODUCT ANALYSIS REPORTMARUTI SUZUKI PRODUCT ANALYSIS REPORT
MARUTI SUZUKI PRODUCT ANALYSIS REPORT
 
Learn curve
Learn curveLearn curve
Learn curve
 
Learning curve
Learning curveLearning curve
Learning curve
 
Product design and development ch4
Product design and development ch4Product design and development ch4
Product design and development ch4
 
Learning Curves in Production Management
Learning Curves in Production ManagementLearning Curves in Production Management
Learning Curves in Production Management
 
Product design and development ch3
Product design and development ch3Product design and development ch3
Product design and development ch3
 
Product design
Product designProduct design
Product design
 
Operation strategy at galanze
Operation strategy at galanzeOperation strategy at galanze
Operation strategy at galanze
 
operations strategy and competitiveness
operations strategy and competitivenessoperations strategy and competitiveness
operations strategy and competitiveness
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Operations strategy and competitiveness
Operations strategy and competitivenessOperations strategy and competitiveness
Operations strategy and competitiveness
 
Product design and development
Product design and developmentProduct design and development
Product design and development
 
2.6 & 2.7 & 2.8 Operations Strategy and Competitiveness
2.6 & 2.7 & 2.8 Operations Strategy and Competitiveness2.6 & 2.7 & 2.8 Operations Strategy and Competitiveness
2.6 & 2.7 & 2.8 Operations Strategy and Competitiveness
 

Similar to TIME STUDY

Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11
Rahul Jain
 
02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx
Ahmed Sobhi
 

Similar to TIME STUDY (20)

Work Measurement
Work MeasurementWork Measurement
Work Measurement
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
 
Good work measurement
Good work measurementGood work measurement
Good work measurement
 
Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
 
IE training
IE training IE training
IE training
 
IE Training
IE Training IE Training
IE Training
 
Work measurement
Work measurementWork measurement
Work measurement
 
Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11
 
Cu mba operation managment module 4 calicut university
Cu mba operation managment module 4 calicut universityCu mba operation managment module 4 calicut university
Cu mba operation managment module 4 calicut university
 
02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptx
 
Work measurement ppt @ bec doms
Work measurement ppt @ bec domsWork measurement ppt @ bec doms
Work measurement ppt @ bec doms
 
Performance rating
Performance ratingPerformance rating
Performance rating
 
WORK MEASUREMENT
WORK MEASUREMENTWORK MEASUREMENT
WORK MEASUREMENT
 
Work study and productivity index
Work study and productivity indexWork study and productivity index
Work study and productivity index
 
Motion and time study english
Motion and time study englishMotion and time study english
Motion and time study english
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work study method-and_time_study-final
Work study method-and_time_study-finalWork study method-and_time_study-final
Work study method-and_time_study-final
 

Recently uploaded

NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Dubai Multi Commodity Centre
 

Recently uploaded (20)

The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdf
 
Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and Employees
 
FEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service Lightning
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to Know
 
The Ultimate Guide to IPTV App Development Process_ Step-By-Step Instructions
The Ultimate Guide to IPTV App Development Process_ Step-By-Step InstructionsThe Ultimate Guide to IPTV App Development Process_ Step-By-Step Instructions
The Ultimate Guide to IPTV App Development Process_ Step-By-Step Instructions
 
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsSalesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
 
What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?
 
India’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfIndia’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdf
 
The Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdfThe Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdf
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings release
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
Evolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfEvolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdf
 
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
 
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best FilmmakerDid Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 

TIME STUDY

  • 1. Time Study Presented by:- Chhavi Narayan Khushboo singh Abhishek sahoo Dhondup
  • 2. CONTENTS • Introduction • Objectives of Time study • Advantages • Time study by stop watch • Diff between Time and Motion study • Type of Elements • Methods • Sample calculation • Computation of NT & ST • Applications • Conclusion
  • 3. INTRODUCTION WORK STUDY:-  Motion study  Time study:- o A qualified, well trained operator o Normal pace o Doing a specific task
  • 4. OBJECTIVES OF TIME STUDY • To increase productivity  To set labour standard for satisfactory performance.  To determine basic times/normal times.  To determine the number of machines an operator can handle.  To determine standards costs.
  • 5. Advantages To develop suitable working conditions To improve utilization of resources To reduce human effort by proper design of processes
  • 6. TIME STUDY MOTION STUDY  Notes the time involved in carrying out each element of operation.  Aims at fixing the standard time for carrying out a job.  Is not suitable for workers where quality is prime consideration  Study of motions on an operation  To reduce wastage of time  Suitable for all types of jobs. Diff between time & motion study
  • 7.
  • 8. Types of elements involved in a job  Repetitive element:- Occurs in every work cycle of the job.  Occasional element:- Occurs at intervals.  Constant element:- Basic or normal time remains constant.  Variable element:- Basic or normal time varies.  Manual element:- Performed manually.  Governing element :- Occupies a longer time than any other element.
  • 9.
  • 10. Methods  1.Predetermined time standard system  2.Stop watch reading a) Continuous b) Snap-back  3.Work sampling
  • 11.
  • 12. Sample calculation 1. E=2√ 𝒑(𝟏−𝒑) 𝒏 2. 𝒏 = 𝟒𝒑(𝟏−𝒑) 𝑬 𝟐 P=proportion of phoning of activity E=error n=sample size Que. A preliminary study indicates that the proportion of idle time of a machine is 30% ; rest of the time it is working . To get a good estimate of the idle time with a precision of ±1% , then what should be the sample size? n= 4(0.30)(1−0.30) (0.01)2 =8400
  • 13. Computation of NT & ST Work element a b c d* Obs. rating 0.56min 0.25min 0.50min 1.10min Performanc e rating 100% 80% 110% 100% * Irregular element performed every 5 cycles PFD allowance=15% Normal time=0.56(1.0)+0.25(0.80)+0.50(1.10)+1.10(1.0)/5=1.53min Standard time=1.53(1+0.15)=1.76
  • 14. Applications  In decision making  Provides accuracy  Organisation and method