REGULATORY GUIDELINES FOR URBAN
UPGRADATION
THE CASE OF MUMBAI
by
Society for the Promotion of Area Resource
Centers (SPARC), India
September 2003
by
Society for the Promotion of Area Resource
Centers (SPARC), India
September 2003
Specifically look at:
–The crisis of slums in Mumbai
–The attempts by government to improve the situation of the
poor
–The case of SPARC, an NGO, and Rajiv Indira-Suryodaya, a
housing society of slum dwellers, who are working to redevelop
a slum
– How a central government legislation checks these efforts
– What changes need to occur to make slum redevelopment
efforts successful
Agenda for this Presentation
September 2003
Aim: Present regulations for slum redevelopment in Mumbai
Illustrate the case of SPARC and a housing society of slum dwellers
Slums in Mumbai
In Mumbai 6.6 million people live in slums.
Although 55% of the city lives in slums, they occupy only about 20%
of city land.
These slums are located throughout the city on:
-- private land
-- state government lands
-- municipal lands
-- central government lands
There are about 4000 slum pockets in Mumbai.
They exist on any open unprotected land such as pavements,
railway tracks, airports, open drains and dumping grounds.
All slums have inadequate housing, water and sanitation and are
overcrowded.
September 2003
In Mumbai, more than 70,000 families live in slums
along the airport
September 2003
In Mumbai, thousands of families live in slums
along the railway tracks
September 2003
In Mumbai, thousands of families live in slums
along pavements
September 2003
Government Efforts to improve living conditions
The government has made several attempts to change this
situation.
Slum eradication and relocation
Slum improvement
Slum upgradation
Slum redevelopment and rehabilitation
But there was little change in living conditions and slums
continued to grow
September 2003
In 1995, the state government initiated the Slum
Rehabilitation Scheme.
This is widely considered the most progressive effort so far
All those living in slum structures prior to 1.1.95 are eligible
for SRS
They can get a 225 sq. feet house free of cost
The funding for this scheme is extremely innovative
Slum Rehabilitation Scheme
Innovative Funding for Slum Upgradation
Incentive Built Up Area
For every 10 square meters of free rehabilitation tenements
constructed, developers are allowed to construct a certain amount
of for-sale tenements
In the island city, the ratio is 1:0.75
In suburbs and extended suburbs the ratio is 1:1
In particularly difficult areas, such as Dharavi where this case
study is based, the ratio is 1:1.33
September 2003
Premise: Real estate prices are high and land is a scarce resource
Transferable Development Rights
Development Control Regulations restrict the built up area on a
particular plot of land. This is called Floor Space Index (FSI)
Since SRS provides incentive built up area, the total amount of
FSI granted exceeds the amount that can be constructed on
one particular plot
SRS allows for extra FSI to be sold – as if it were land itself – in
the open market in suburbs and extended suburbs of Mumbai.
This is called Transferable Development Rights
Innovative Funding for Slum Upgradation
An example (in Dharavi)
Rehabilitation Area : 1500 sq. meters
Incentive FSI @ 1:1.33 : 1999 sq. meters for sale
Total BUA granted : 3499 sq. meters
Permissible BUA: 2500 sq. meters
Extra BUA as TDR: 999 sq. meters
Innovative Funding for Slum Upgradation
The case study of Rajiv Indira-Suryodaya
212 slum families belong of Rajiv Indira-
Suryodaya Cooperative Housing Society
SPARC is developing their land
5 buildings are planned -- 3 for rehabilitation
and 2 buildings for sale
So far, 1 rehab building with 90 tenements
completed and occupied
Second building for 64 tenements almost
ready
Third building for 56 tenements is underway
September 2003
However there is a problem
Central government regulations restrict development along the coast
in order to protect the environment
This is known as the Coastal Regulations Zone and it overrides the
benefits of the Slum Rehabilitation Scheme
In fact, more than half of the plot area i.e.1564 sq. meters is affected
by CRZ II
September 2003
Coastal Regulations Zone
There are three zones.
CRZ I – Area between the high tide and
low tide line, where no development is
permitted
CRZ II – where substantial development
has already occurred, but further
development is controlled
CRZ III –where sporadic development
has occurred, and only repairs and
reconstruction is allowed
September 2003
How CRZ affects Mumbai
A very large part of Mumbai falls into CRZ area. This means
No construction is allowed on the seaward side of existing
roads or authorized structures
FSI in CRZ II is frozen
Design and construction had to be consistent with the
surrounding landscape
Lands on either side of a creek also fall into CRZ II
September 2003
How CRZ affects slums in Mumbai
Nearly 134 slums or 30,000 households fall within CRZ.
All slums are considered unauthorized structures
Slums on seaward side cannot access SRS
Slums on landward side have restricted FSI
September 2003
Slums on the seaward side cannot be redeveloped
September 2003
Slums on the landward side have restricted
development
September 2003
Slums along creeks also fall into CRZ
September 2003
Dharavi, which is along the Mithi River, falls into
CRZ II
September 2003
In fact, more than 3080 families in Dharavi are
affected by CRZ II
September 2003
SPARC’s construction falls into CRZ II
September 2003
EXISTINGROAD
C.R.Z. ZONE
C.R.Z.LINE
C.R.Z. AFFECTED AREA
(G+3)
SALE BLDG. REHAB. BLDG.
(G+5)
(G+3)
SALE
BLDG.
REHAB BLDG.
SALE BUILDING
(G+7)
REHAB.BLDG.
C.R.Z. FREE AREA
REHAB.BLDG.
(G+4)
FOR GANGA C.H.S.
Map of SPARC plot
100 meters
Three Rehabilitation
Buildings
Two for-sale buildings
High Tide Line
This plot abuts the Mahim Creek and half the land falls into CRZ II
Here, FSI is restricted to 1.33
SPARC can only construct 3 story buildings and must sell rest as TDR
Selling already built tenements is more lucrative than selling TDR
Community loses Rs. 900 per square foot
Community totally loses Rs. 17 million
How this affects the financial viability of SPARC’s
construction
September 2003
SPARC’s efforts
SPARC found that there was a mistake on the CZMP plan
On Chief Naval Hydrogapher’s map, the width of creek is only
50 meters
But CRZ marked as 100 meters
However CRZ Rules say CRZ along creeks should be either
100 meters or the width of the creek, whichever is less.
SPARC appealed to state led authority to request correction
Authority has agreed and will recommend change to the central
government authority to support
SPARC is now lobbying its case in Delhi.
September 2003
CRZ relaxation will greatly benefit SPARC’s project
EXISTINGROAD
SALEBLDG.
SALEBLDG.
(G+3)
C.R.Z.AFFECTEDAREA
(G+3)
C.R.Z.ZONE
C.R.Z.LINE
(G+5)
REHAB.BLDG.
C.R.Z.FREE AREA
(G+4)
REHAB.BLDG.
REHAB.BLDG.
(G+7)
FORGANGAC.H.S.
SALEBUILDING
REHABBLDG.
C.R.Z.LINE
Total BUA allowed
will increase by
1104.90 sq. meters
SPARC will make
Rs. 10 million more
This will be used to
support other slum
communities
undertake SRS
September 2003
50 meters
100 meters
3 Rehabilitation
High Tide Line
2 For-sale
Conclusion
This will also greatly benefit other slums
3080 families who live in this 100 meter CRZ belt in Dharavi will
be able to access SRS
This will set a precedent for getting CRZ relaxations for other
slum pockets – both on landward and seaward side
September 2003

2.6.2 slum case study mumbai sparc

  • 1.
    REGULATORY GUIDELINES FORURBAN UPGRADATION THE CASE OF MUMBAI by Society for the Promotion of Area Resource Centers (SPARC), India September 2003 by Society for the Promotion of Area Resource Centers (SPARC), India September 2003
  • 2.
    Specifically look at: –Thecrisis of slums in Mumbai –The attempts by government to improve the situation of the poor –The case of SPARC, an NGO, and Rajiv Indira-Suryodaya, a housing society of slum dwellers, who are working to redevelop a slum – How a central government legislation checks these efforts – What changes need to occur to make slum redevelopment efforts successful Agenda for this Presentation September 2003 Aim: Present regulations for slum redevelopment in Mumbai Illustrate the case of SPARC and a housing society of slum dwellers
  • 3.
    Slums in Mumbai InMumbai 6.6 million people live in slums. Although 55% of the city lives in slums, they occupy only about 20% of city land. These slums are located throughout the city on: -- private land -- state government lands -- municipal lands -- central government lands There are about 4000 slum pockets in Mumbai. They exist on any open unprotected land such as pavements, railway tracks, airports, open drains and dumping grounds. All slums have inadequate housing, water and sanitation and are overcrowded. September 2003
  • 4.
    In Mumbai, morethan 70,000 families live in slums along the airport September 2003
  • 5.
    In Mumbai, thousandsof families live in slums along the railway tracks September 2003
  • 6.
    In Mumbai, thousandsof families live in slums along pavements September 2003
  • 7.
    Government Efforts toimprove living conditions The government has made several attempts to change this situation. Slum eradication and relocation Slum improvement Slum upgradation Slum redevelopment and rehabilitation But there was little change in living conditions and slums continued to grow September 2003
  • 8.
    In 1995, thestate government initiated the Slum Rehabilitation Scheme. This is widely considered the most progressive effort so far All those living in slum structures prior to 1.1.95 are eligible for SRS They can get a 225 sq. feet house free of cost The funding for this scheme is extremely innovative Slum Rehabilitation Scheme
  • 9.
    Innovative Funding forSlum Upgradation Incentive Built Up Area For every 10 square meters of free rehabilitation tenements constructed, developers are allowed to construct a certain amount of for-sale tenements In the island city, the ratio is 1:0.75 In suburbs and extended suburbs the ratio is 1:1 In particularly difficult areas, such as Dharavi where this case study is based, the ratio is 1:1.33 September 2003 Premise: Real estate prices are high and land is a scarce resource
  • 10.
    Transferable Development Rights DevelopmentControl Regulations restrict the built up area on a particular plot of land. This is called Floor Space Index (FSI) Since SRS provides incentive built up area, the total amount of FSI granted exceeds the amount that can be constructed on one particular plot SRS allows for extra FSI to be sold – as if it were land itself – in the open market in suburbs and extended suburbs of Mumbai. This is called Transferable Development Rights Innovative Funding for Slum Upgradation
  • 11.
    An example (inDharavi) Rehabilitation Area : 1500 sq. meters Incentive FSI @ 1:1.33 : 1999 sq. meters for sale Total BUA granted : 3499 sq. meters Permissible BUA: 2500 sq. meters Extra BUA as TDR: 999 sq. meters Innovative Funding for Slum Upgradation
  • 12.
    The case studyof Rajiv Indira-Suryodaya 212 slum families belong of Rajiv Indira- Suryodaya Cooperative Housing Society SPARC is developing their land 5 buildings are planned -- 3 for rehabilitation and 2 buildings for sale So far, 1 rehab building with 90 tenements completed and occupied Second building for 64 tenements almost ready Third building for 56 tenements is underway September 2003
  • 13.
    However there isa problem Central government regulations restrict development along the coast in order to protect the environment This is known as the Coastal Regulations Zone and it overrides the benefits of the Slum Rehabilitation Scheme In fact, more than half of the plot area i.e.1564 sq. meters is affected by CRZ II September 2003
  • 14.
    Coastal Regulations Zone Thereare three zones. CRZ I – Area between the high tide and low tide line, where no development is permitted CRZ II – where substantial development has already occurred, but further development is controlled CRZ III –where sporadic development has occurred, and only repairs and reconstruction is allowed September 2003
  • 15.
    How CRZ affectsMumbai A very large part of Mumbai falls into CRZ area. This means No construction is allowed on the seaward side of existing roads or authorized structures FSI in CRZ II is frozen Design and construction had to be consistent with the surrounding landscape Lands on either side of a creek also fall into CRZ II September 2003
  • 16.
    How CRZ affectsslums in Mumbai Nearly 134 slums or 30,000 households fall within CRZ. All slums are considered unauthorized structures Slums on seaward side cannot access SRS Slums on landward side have restricted FSI September 2003
  • 17.
    Slums on theseaward side cannot be redeveloped September 2003
  • 18.
    Slums on thelandward side have restricted development September 2003
  • 19.
    Slums along creeksalso fall into CRZ September 2003
  • 20.
    Dharavi, which isalong the Mithi River, falls into CRZ II September 2003
  • 21.
    In fact, morethan 3080 families in Dharavi are affected by CRZ II September 2003
  • 22.
    SPARC’s construction fallsinto CRZ II September 2003 EXISTINGROAD C.R.Z. ZONE C.R.Z.LINE C.R.Z. AFFECTED AREA (G+3) SALE BLDG. REHAB. BLDG. (G+5) (G+3) SALE BLDG. REHAB BLDG. SALE BUILDING (G+7) REHAB.BLDG. C.R.Z. FREE AREA REHAB.BLDG. (G+4) FOR GANGA C.H.S. Map of SPARC plot 100 meters Three Rehabilitation Buildings Two for-sale buildings High Tide Line
  • 23.
    This plot abutsthe Mahim Creek and half the land falls into CRZ II Here, FSI is restricted to 1.33 SPARC can only construct 3 story buildings and must sell rest as TDR Selling already built tenements is more lucrative than selling TDR Community loses Rs. 900 per square foot Community totally loses Rs. 17 million How this affects the financial viability of SPARC’s construction September 2003
  • 24.
    SPARC’s efforts SPARC foundthat there was a mistake on the CZMP plan On Chief Naval Hydrogapher’s map, the width of creek is only 50 meters But CRZ marked as 100 meters However CRZ Rules say CRZ along creeks should be either 100 meters or the width of the creek, whichever is less. SPARC appealed to state led authority to request correction Authority has agreed and will recommend change to the central government authority to support SPARC is now lobbying its case in Delhi. September 2003
  • 25.
    CRZ relaxation willgreatly benefit SPARC’s project EXISTINGROAD SALEBLDG. SALEBLDG. (G+3) C.R.Z.AFFECTEDAREA (G+3) C.R.Z.ZONE C.R.Z.LINE (G+5) REHAB.BLDG. C.R.Z.FREE AREA (G+4) REHAB.BLDG. REHAB.BLDG. (G+7) FORGANGAC.H.S. SALEBUILDING REHABBLDG. C.R.Z.LINE Total BUA allowed will increase by 1104.90 sq. meters SPARC will make Rs. 10 million more This will be used to support other slum communities undertake SRS September 2003 50 meters 100 meters 3 Rehabilitation High Tide Line 2 For-sale
  • 26.
    Conclusion This will alsogreatly benefit other slums 3080 families who live in this 100 meter CRZ belt in Dharavi will be able to access SRS This will set a precedent for getting CRZ relaxations for other slum pockets – both on landward and seaward side September 2003