SlideShare a Scribd company logo
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 887
“STUDY AND IMPLEMENTATION OF ‘5 S’ SYSTEM IN MANUFACTURING
INDUSTRY”
Prof. (Dr.) Gujar Anantkumar Jotiram1, Sawant Vikrant Sanjay2, Gharge Manoj Mahadev3, Mulla
Amirsuhel Dastagir4, Hirugade Shubham Dilip 5, Patil Avadhut Ashokrao 6.
1 Head of Department, Department of Mechanical Engineering, D. Y. Patil College of Engineering and Technology,
Kolhapur, Maharashtra, India.
2,3,4,5,6 Student, Department of Mechanical Engineering, D. Y. Patil College of Engineering and Technology,
Kolhapur, Maharashtra, India.
-------------------------------------------------------------------------***------------------------------------------------------------------------
Abstract - Each and Every company in today’s scenario is
in search of tools and techniques for improving or
increasing their profit rates for the growth of the
organization, but at the same time the market needs quality
products at minimum prices. So it is very important to
consider that the companies can’t increase their product’s
sales cost. In this situation it is very necessary to minimize
the manufacturing cost .So as to minimize the
manufacturing cost we have to increase the efficiency of the
available resources that are basically men, machines,
material, plant layout, method, and at the same time
minimize the wastage. All the above stated things can be
achieved by implementing the TQM (Total Quality
Management) tools and techniques in the organization.
There are numbers of various tools and techniques used in
TQM like Kaizen, ‘5 S’ Poka-Yoke, Baka-Yoke, Just in Time
(JIT) etc. Out of these above techniques the ‘5 S’ is the basic
and easy to implement technique, so we firstly start with ‘5
S’ implementation. This paper aims at the study and
implementation of ‘5 S’ system in manufacturing industry
efficiently and the practical approach of ‘5 S’
implementation. This study provides basic steps or
guidelines to implement each ‘S’ of the ‘5 S’ methodology
with the reference pictures at of the implementation of ‘5 S’
In Avison Industries M.I.D.C. Shiroli, Kolhapur.
Key Words: ‘5 S’Methodology, Sieri, Seiton, Seiso
Seiketsu, Shitsuke, etc….
1. INTRODUCTION
‘A standard place of each and every object and each and
every object on its standard specified place’ this can be
observed as the basic formula of overall ‘5 S’ system. The
term ‘5 S’ relates to the 5 supports of the visual workplace
as mentioned these are –
 Sieri Sort
 Seiton Set in Order or Store
 Seiso Shine
 Seiketsu Standardize
 Shitsuke Sustain
In the above information the Japanese original words and
their respective meanings in English is given [1].
These above 5 words relates to 5 steps in the ‘5 S’ system.
Basically it is a housekeeping approach but in practical
implementation in can play a vital role in the industry to
increase the benefit of the organization. In Japan ‘5 S’ is
termed as a philosophy, whereas in U. K. (United
Kingdom) or U.S.A. (United States of America) it is framed
as a tool or technique. But in simple perspective it is a
formula which marks the superiority of any organization
from its competitors [2]. In the next point we will go
through the actual implementation of ‘5 S’ system and
practical steps and guidelines which needs to be followed
for easy and effective implementation.
2. STEPS AND GUIDELINES OF ‘5 S’
2.1 Sort (Seiri)
Firstly we need to allocate the Seiri zone or Red zone, so in
the initial stage the unnecessary objects, scrap, and not
frequently required objects tools will be then transferred
to the Sieri zone. The things that are unwanted and laying
on the shop floor must be collected and placed into the
Red zone for about one week. In the duration of that one
week the workers will take out the necessary objects
which they require from the Red zone. After that
remaining things will be transferred to Permanent Red
zone. And then the things that are required and not
required must be sorted as per various factors as per the
situation.
Figure 1 Proper allocating Red Zone
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 888
Figure 2 Collecting the Unwanted Material from Machine
floor
Figure 3 Sorting the Collected Material
2.2 Set in Order (Seiton)
After the Seiri has been done the next step is Set in Order.
In this step the sorted material has to keep in the sorted
manner and its temporary location has to be given. In this
step the basic thing is to keep the objects on accessible
locations. [3] This location must ensure the accessibility of
each employee and smooth work or material flow.
Figure 4 Sorting and Storing is Done for Standard Parts
2.3 Seiso (Shine)
The basic idea behind this step is that, if the work space is
clean and clear, it will definitely results in much higher
morale of the employees to work harder. So we need to
take the cleanliness factor into account while considering
the changes to be made in the shop floor. For the
sustainability of the shine we came with the idea of
curtains for the racks available in the company for
protection from the dust particles.
Figure 5 Before image of the rack
Figure 6 After image of the rack (Racks are covered by
Curtains Made up of Rexin Material for Protection from
Dirt)
2.4 Seiketsu (Standardize)
The plant layout plays an important role while studying
any manufacturing industry. So the first step of
standardization must be started with the plant layout. In
initial stage the layout has been marked with chalk. After
brief discussions with company managers and C.E.O. the
permanent marking has been done. After that we marked
the corners of each and every object for ensuring that the
object will remain at that position for sustain point. The
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 889
spanner board was color coded for standardization
purpose. [4].
Figure 7 Color Coding to the Spanner Boards
Figure 8 Color coded spanner board
Figure 9 Marking on the Shop Floor by Chalk in the
Primary Stage
Figure 10 Change in Gangway and Plant Layout in the
final stage (Observing More Space Available for Material in
the Left Side of the Image)
2.5 Shitsuke (Sustain)
At last this ‘5 S’ changes needs to be sustained. So for that
the awareness to the system must be created among the
employees of the company, so for the awareness of ‘5 S’
importance we fixed the digital flex informing the
importance of the ‘5 S’ system. All these above boards can
be observed in the next pictures taken inside the company.
Figure 11 Banners showing importance of 5’S attached all
over the shop
Figure 12 Banners printed in regional language for
workers convenience
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 890
Figure 13 Explanations of ‘5 S’
3. CHANGE IN THE STANDARD STEPS
We suggest a basic change in the standard procedure of
implementation of ‘5 S’. That if we follow the standard
procedure after sorting the next stage is store the shine is
done that is cleaning and after that we standardize the
Locations. So after standardization we also have to again
store the object at the standard place. So if the
standardization is done before the storing then at the time
of Store Stage we have the standard location of the
product to be stored. This may save the time and efforts
while implementation is carried. Resulting we suggest the
following Steps in another sequence of order.
Chart 1 Standard and Proposed Sequence of Procedure
4. CONCLUSIONS
Implementation of ‘5 S’, the changes can be observed from
the photographs captured while the implementation work
was carried out inside the company. The before after
images and standardization system techniques can be
observed from the pictures that are indicating that the
implementation work is successfully completed in the
organization.
By implementing the‘5 S’ system there is extra free space
has been created by just moving the unnecessary and
storing necessary objects at standard places.
This increased available space is been generated without
expanding the shop floor. This is very important
advantage of this system.
ACKNOWLEDGEMENT
The team of ‘5 S’ (Authors) would like to thank for
sponsorship and valuable co-operation from Avison
industries, M. I. D. C. Shiroli, Kolhapur, India.
D. Y. Patil College of Engineering and Technology, Kasaba
Bavada, Kolhapur, Maharashtra, India. for supporting and
guiding the implementation process of the ‘5 S’ System.
REFERENCES
[1]. Implementation of 5S Methodology in a
Manufacturing Industry by Soumya R. Purohit, V.
Shantha. International Journal of Scientific &
Engineering Research, Volume 6, Issue 8, August-2015
[2]. https://en.wikipedia.org/wiki/5S_(methodology)
[3]. Implementation Of 5S Methodology In The Small
Scale Industry: A Case Study by R. S. Agrahari, P.A.
Dangle, K.V.Chandratre INTERNATIONAL JOURNAL
OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME
4, ISSUE 04, APRIL 2015
[4]. Implementation Of 5S Quality Tool In
Manufacturing Company: A Case Study by Vibhor
Kakkar, Vijay Singh Dalal, Vineet Choraria, Ashish S.
Pareta, Anmol Bhatia INTERNATIONAL JOURNAL OF
SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME 4,
ISSUE 02, FEBRUARY 2015
BIOGRAPHIES
Hirugade Shubham Dilip
Student, D. Y. Patil College of
Engineering and Technology,
Kolhapur, MH, India.
Patil Avadhut Ashokrao
Student, D. Y. Patil College of
Engineering and Technology,
Kolhapur, MH, India.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 891
Prof. (Dr.) Gujar A. J.
B.E., M.E., Ph.D. (Mech. Engg.)
Head of Department of
Mechanical Engineering.
D. Y. Patil College of Engineering
and Technology, Kolhapur, MH,
India.
Sawant Vikrant Sanjay
Student, D. Y. Patil College of
Engineering and Technology,
Kolhapur, MH, India.
Gharge Manoj Mahadev
Student, D. Y. Patil College of
Engineering and Technology,
Kolhapur, MH, India.
Mulla Amirsuhel Dastagir
Student, D. Y. Patil College of
Engineering and Technology,
Kolhapur, MH, India.

More Related Content

Similar to IRJET- Study and Implementation of ‘5 S’ System in Manufacturing Industry

IRJET- Implementation of 5S in the Manufacturing Industry
IRJET-  	  Implementation of 5S in the Manufacturing IndustryIRJET-  	  Implementation of 5S in the Manufacturing Industry
IRJET- Implementation of 5S in the Manufacturing Industry
IRJET Journal
 
IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...
IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...
IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...
IRJET Journal
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in Company
IRJET Journal
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IRJET Journal
 
Analysis of Productivity Improvement And Safety Measures By 5-S Technique
Analysis of Productivity Improvement And Safety Measures By 5-S TechniqueAnalysis of Productivity Improvement And Safety Measures By 5-S Technique
Analysis of Productivity Improvement And Safety Measures By 5-S Technique
IJERA Editor
 
Eb4301774779
Eb4301774779Eb4301774779
Eb4301774779
IJERA Editor
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
IRJET Journal
 
IJSETR-VOL-4-ISSUE-4-927-931
IJSETR-VOL-4-ISSUE-4-927-931IJSETR-VOL-4-ISSUE-4-927-931
IJSETR-VOL-4-ISSUE-4-927-931
Ansari Noor
 
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyImplementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
IRJET Journal
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
IRJET Journal
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
Nahar spinning mills bhopal
 
Bpg 5 s Lean
Bpg 5 s LeanBpg 5 s Lean
Bpg 5 s Lean
Deal Point
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six Sigma
IRJET Journal
 
report li azim
report li azimreport li azim
report li azim
Azrul Azim
 
Implementation of 5S in College(Shree Mahavir Education Society's Institute ...
Implementation of 5S in College(Shree Mahavir Education Society's  Institute ...Implementation of 5S in College(Shree Mahavir Education Society's  Institute ...
Implementation of 5S in College(Shree Mahavir Education Society's Institute ...
chiragkolambe
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
IRJET Journal
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET Journal
 
Lean tool 5 s
Lean tool    5 sLean tool    5 s
Lean tool 5 s
Prashant Uttarkar
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET Journal
 
Lean project plan
Lean project plan Lean project plan
Lean project plan
Western Kentucky University
 

Similar to IRJET- Study and Implementation of ‘5 S’ System in Manufacturing Industry (20)

IRJET- Implementation of 5S in the Manufacturing Industry
IRJET-  	  Implementation of 5S in the Manufacturing IndustryIRJET-  	  Implementation of 5S in the Manufacturing Industry
IRJET- Implementation of 5S in the Manufacturing Industry
 
IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...
IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...
IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in Company
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
 
Analysis of Productivity Improvement And Safety Measures By 5-S Technique
Analysis of Productivity Improvement And Safety Measures By 5-S TechniqueAnalysis of Productivity Improvement And Safety Measures By 5-S Technique
Analysis of Productivity Improvement And Safety Measures By 5-S Technique
 
Eb4301774779
Eb4301774779Eb4301774779
Eb4301774779
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
 
IJSETR-VOL-4-ISSUE-4-927-931
IJSETR-VOL-4-ISSUE-4-927-931IJSETR-VOL-4-ISSUE-4-927-931
IJSETR-VOL-4-ISSUE-4-927-931
 
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyImplementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
Bpg 5 s Lean
Bpg 5 s LeanBpg 5 s Lean
Bpg 5 s Lean
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six Sigma
 
report li azim
report li azimreport li azim
report li azim
 
Implementation of 5S in College(Shree Mahavir Education Society's Institute ...
Implementation of 5S in College(Shree Mahavir Education Society's  Institute ...Implementation of 5S in College(Shree Mahavir Education Society's  Institute ...
Implementation of 5S in College(Shree Mahavir Education Society's Institute ...
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
Lean tool 5 s
Lean tool    5 sLean tool    5 s
Lean tool 5 s
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
 
Lean project plan
Lean project plan Lean project plan
Lean project plan
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 

Recently uploaded (20)

4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 

IRJET- Study and Implementation of ‘5 S’ System in Manufacturing Industry

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 887 “STUDY AND IMPLEMENTATION OF ‘5 S’ SYSTEM IN MANUFACTURING INDUSTRY” Prof. (Dr.) Gujar Anantkumar Jotiram1, Sawant Vikrant Sanjay2, Gharge Manoj Mahadev3, Mulla Amirsuhel Dastagir4, Hirugade Shubham Dilip 5, Patil Avadhut Ashokrao 6. 1 Head of Department, Department of Mechanical Engineering, D. Y. Patil College of Engineering and Technology, Kolhapur, Maharashtra, India. 2,3,4,5,6 Student, Department of Mechanical Engineering, D. Y. Patil College of Engineering and Technology, Kolhapur, Maharashtra, India. -------------------------------------------------------------------------***------------------------------------------------------------------------ Abstract - Each and Every company in today’s scenario is in search of tools and techniques for improving or increasing their profit rates for the growth of the organization, but at the same time the market needs quality products at minimum prices. So it is very important to consider that the companies can’t increase their product’s sales cost. In this situation it is very necessary to minimize the manufacturing cost .So as to minimize the manufacturing cost we have to increase the efficiency of the available resources that are basically men, machines, material, plant layout, method, and at the same time minimize the wastage. All the above stated things can be achieved by implementing the TQM (Total Quality Management) tools and techniques in the organization. There are numbers of various tools and techniques used in TQM like Kaizen, ‘5 S’ Poka-Yoke, Baka-Yoke, Just in Time (JIT) etc. Out of these above techniques the ‘5 S’ is the basic and easy to implement technique, so we firstly start with ‘5 S’ implementation. This paper aims at the study and implementation of ‘5 S’ system in manufacturing industry efficiently and the practical approach of ‘5 S’ implementation. This study provides basic steps or guidelines to implement each ‘S’ of the ‘5 S’ methodology with the reference pictures at of the implementation of ‘5 S’ In Avison Industries M.I.D.C. Shiroli, Kolhapur. Key Words: ‘5 S’Methodology, Sieri, Seiton, Seiso Seiketsu, Shitsuke, etc…. 1. INTRODUCTION ‘A standard place of each and every object and each and every object on its standard specified place’ this can be observed as the basic formula of overall ‘5 S’ system. The term ‘5 S’ relates to the 5 supports of the visual workplace as mentioned these are –  Sieri Sort  Seiton Set in Order or Store  Seiso Shine  Seiketsu Standardize  Shitsuke Sustain In the above information the Japanese original words and their respective meanings in English is given [1]. These above 5 words relates to 5 steps in the ‘5 S’ system. Basically it is a housekeeping approach but in practical implementation in can play a vital role in the industry to increase the benefit of the organization. In Japan ‘5 S’ is termed as a philosophy, whereas in U. K. (United Kingdom) or U.S.A. (United States of America) it is framed as a tool or technique. But in simple perspective it is a formula which marks the superiority of any organization from its competitors [2]. In the next point we will go through the actual implementation of ‘5 S’ system and practical steps and guidelines which needs to be followed for easy and effective implementation. 2. STEPS AND GUIDELINES OF ‘5 S’ 2.1 Sort (Seiri) Firstly we need to allocate the Seiri zone or Red zone, so in the initial stage the unnecessary objects, scrap, and not frequently required objects tools will be then transferred to the Sieri zone. The things that are unwanted and laying on the shop floor must be collected and placed into the Red zone for about one week. In the duration of that one week the workers will take out the necessary objects which they require from the Red zone. After that remaining things will be transferred to Permanent Red zone. And then the things that are required and not required must be sorted as per various factors as per the situation. Figure 1 Proper allocating Red Zone
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 888 Figure 2 Collecting the Unwanted Material from Machine floor Figure 3 Sorting the Collected Material 2.2 Set in Order (Seiton) After the Seiri has been done the next step is Set in Order. In this step the sorted material has to keep in the sorted manner and its temporary location has to be given. In this step the basic thing is to keep the objects on accessible locations. [3] This location must ensure the accessibility of each employee and smooth work or material flow. Figure 4 Sorting and Storing is Done for Standard Parts 2.3 Seiso (Shine) The basic idea behind this step is that, if the work space is clean and clear, it will definitely results in much higher morale of the employees to work harder. So we need to take the cleanliness factor into account while considering the changes to be made in the shop floor. For the sustainability of the shine we came with the idea of curtains for the racks available in the company for protection from the dust particles. Figure 5 Before image of the rack Figure 6 After image of the rack (Racks are covered by Curtains Made up of Rexin Material for Protection from Dirt) 2.4 Seiketsu (Standardize) The plant layout plays an important role while studying any manufacturing industry. So the first step of standardization must be started with the plant layout. In initial stage the layout has been marked with chalk. After brief discussions with company managers and C.E.O. the permanent marking has been done. After that we marked the corners of each and every object for ensuring that the object will remain at that position for sustain point. The
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 889 spanner board was color coded for standardization purpose. [4]. Figure 7 Color Coding to the Spanner Boards Figure 8 Color coded spanner board Figure 9 Marking on the Shop Floor by Chalk in the Primary Stage Figure 10 Change in Gangway and Plant Layout in the final stage (Observing More Space Available for Material in the Left Side of the Image) 2.5 Shitsuke (Sustain) At last this ‘5 S’ changes needs to be sustained. So for that the awareness to the system must be created among the employees of the company, so for the awareness of ‘5 S’ importance we fixed the digital flex informing the importance of the ‘5 S’ system. All these above boards can be observed in the next pictures taken inside the company. Figure 11 Banners showing importance of 5’S attached all over the shop Figure 12 Banners printed in regional language for workers convenience
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 890 Figure 13 Explanations of ‘5 S’ 3. CHANGE IN THE STANDARD STEPS We suggest a basic change in the standard procedure of implementation of ‘5 S’. That if we follow the standard procedure after sorting the next stage is store the shine is done that is cleaning and after that we standardize the Locations. So after standardization we also have to again store the object at the standard place. So if the standardization is done before the storing then at the time of Store Stage we have the standard location of the product to be stored. This may save the time and efforts while implementation is carried. Resulting we suggest the following Steps in another sequence of order. Chart 1 Standard and Proposed Sequence of Procedure 4. CONCLUSIONS Implementation of ‘5 S’, the changes can be observed from the photographs captured while the implementation work was carried out inside the company. The before after images and standardization system techniques can be observed from the pictures that are indicating that the implementation work is successfully completed in the organization. By implementing the‘5 S’ system there is extra free space has been created by just moving the unnecessary and storing necessary objects at standard places. This increased available space is been generated without expanding the shop floor. This is very important advantage of this system. ACKNOWLEDGEMENT The team of ‘5 S’ (Authors) would like to thank for sponsorship and valuable co-operation from Avison industries, M. I. D. C. Shiroli, Kolhapur, India. D. Y. Patil College of Engineering and Technology, Kasaba Bavada, Kolhapur, Maharashtra, India. for supporting and guiding the implementation process of the ‘5 S’ System. REFERENCES [1]. Implementation of 5S Methodology in a Manufacturing Industry by Soumya R. Purohit, V. Shantha. International Journal of Scientific & Engineering Research, Volume 6, Issue 8, August-2015 [2]. https://en.wikipedia.org/wiki/5S_(methodology) [3]. Implementation Of 5S Methodology In The Small Scale Industry: A Case Study by R. S. Agrahari, P.A. Dangle, K.V.Chandratre INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME 4, ISSUE 04, APRIL 2015 [4]. Implementation Of 5S Quality Tool In Manufacturing Company: A Case Study by Vibhor Kakkar, Vijay Singh Dalal, Vineet Choraria, Ashish S. Pareta, Anmol Bhatia INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME 4, ISSUE 02, FEBRUARY 2015 BIOGRAPHIES Hirugade Shubham Dilip Student, D. Y. Patil College of Engineering and Technology, Kolhapur, MH, India. Patil Avadhut Ashokrao Student, D. Y. Patil College of Engineering and Technology, Kolhapur, MH, India.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 891 Prof. (Dr.) Gujar A. J. B.E., M.E., Ph.D. (Mech. Engg.) Head of Department of Mechanical Engineering. D. Y. Patil College of Engineering and Technology, Kolhapur, MH, India. Sawant Vikrant Sanjay Student, D. Y. Patil College of Engineering and Technology, Kolhapur, MH, India. Gharge Manoj Mahadev Student, D. Y. Patil College of Engineering and Technology, Kolhapur, MH, India. Mulla Amirsuhel Dastagir Student, D. Y. Patil College of Engineering and Technology, Kolhapur, MH, India.