This document discusses risk management in the residential construction sector using Primavera software. It first defines risk management and its importance in construction projects. It then reviews literature on risk identification and assessment methods. A case study of a residential building project in Pune, India is presented where risks are identified through a survey, categorized as high, medium, or low probability and impact, and recommendations are provided to manage high risk areas like time, people, market and cost. The study aims to develop a better understanding of key risks in the construction industry and show how forecasted risk assessment results can help reduce project risks.
EFFECTIVE RISK MANAGEMENT IN CONSTRUCTION PROJECTSvivatechijri
Risk management can be directly related to the successful project completion as it is very much
essential. Project management literature describes a detailed and widely accepted risk management process,
which is constructed basically from four iterative phases: risk identification, risk estimation, risk response
planning and execution, often managing the risk management process is included. Construction project planning is
an essential element in the management and execution of construction projects which involves the definition of
work tasks and their interactions as well as the assessment of required resource sand expected activity durations.
The study, therefore, examined the awareness of professionals in construction industry of the various types of
planning techniques and tools used on construction sites, Questionnaires were administered on selected building
professionals (Project Managers, Engineers, Architects), and Contractors and Sub-contractors directly involved
in construction work on sites in planning and the use of planning tools and techniques as major tools for successful
project execution
A study of various factors affecting risk management techniques in constructi...eSAT Journals
Abstract
Risk management is an important step which should not be neglect or ignore in every project. Because of various risk involved in construction, it is difficult to maintain time, cost and quality as planned. Project undertaken in the construction sector are widely complex and have often significant budgets, and thus reducing the risk associated should be a priority for each project manager. The main purpose of this paper is to identify the key risk factors that affect construction project. Questionnaires has been prepared incorporating of 50 difference questions after which questionnaire survey was conducted where the questions has been focused based on (component of questionnaire) the respondents were selected based on their susceptibility to the risk. The data was analyzed using the Statistical package for social sciences (SPSS) version 21. The result shows that the inadequate planning in construction project, poor adoption of site safety, supply and use of defective materials and poor resources management in construction project are all among the forefront key risk factors which affect construction project, meanwhile, effective recommendations have been developed to increases the efficiency, speedy and minimises risk and abortive work in construction project.
Keywords: Construction Industries, Construction Projects, Risks Management, Techniques
EFFECTIVE RISK MANAGEMENT IN CONSTRUCTION PROJECTSvivatechijri
Risk management can be directly related to the successful project completion as it is very much
essential. Project management literature describes a detailed and widely accepted risk management process,
which is constructed basically from four iterative phases: risk identification, risk estimation, risk response
planning and execution, often managing the risk management process is included. Construction project planning is
an essential element in the management and execution of construction projects which involves the definition of
work tasks and their interactions as well as the assessment of required resource sand expected activity durations.
The study, therefore, examined the awareness of professionals in construction industry of the various types of
planning techniques and tools used on construction sites, Questionnaires were administered on selected building
professionals (Project Managers, Engineers, Architects), and Contractors and Sub-contractors directly involved
in construction work on sites in planning and the use of planning tools and techniques as major tools for successful
project execution
A study of various factors affecting risk management techniques in constructi...eSAT Journals
Abstract
Risk management is an important step which should not be neglect or ignore in every project. Because of various risk involved in construction, it is difficult to maintain time, cost and quality as planned. Project undertaken in the construction sector are widely complex and have often significant budgets, and thus reducing the risk associated should be a priority for each project manager. The main purpose of this paper is to identify the key risk factors that affect construction project. Questionnaires has been prepared incorporating of 50 difference questions after which questionnaire survey was conducted where the questions has been focused based on (component of questionnaire) the respondents were selected based on their susceptibility to the risk. The data was analyzed using the Statistical package for social sciences (SPSS) version 21. The result shows that the inadequate planning in construction project, poor adoption of site safety, supply and use of defective materials and poor resources management in construction project are all among the forefront key risk factors which affect construction project, meanwhile, effective recommendations have been developed to increases the efficiency, speedy and minimises risk and abortive work in construction project.
Keywords: Construction Industries, Construction Projects, Risks Management, Techniques
Risk Management in High Rise Construction Projects: A ReviewA Makwana
This paper gives information about identification of risk factors and perceptions of Indian construction practitioners i.e., contractors, owners, project managers and Engineers on the importance of different construction risks and how the risks should be assigned between the different parties of the contract. As the very common project styles, construction projects have so many characteristics likewise time limitation, specific items, financial restrictions and requirements, extraordinary structural and legal situations, complexity features. For this situation every construction project has own complex method. Risks constantly happen at construction projects and frequently cause time overrun or cost overrun. If you don’t contemplate these risk factors, or neglect the main factors, these risk factors will affect the damage because of the managerial errors. Risk management is the process which covers to identify the risks, for assessment with the help of qualitatively and quantitatively, to response with appropriate technique for management and controlling. The concept has gain popularity in various industries. Various companies frequently found the method in their projects for upgrading their performance, reducing their losses and increasing their profits. Questionnaire survey among clients, contractors, engineers and architects is analyzed using, Relative Importance Index (RII) and Importance Index (IMP.I) methods. The focus of this study is to understand what Risk Management is, understand the process of risk management at construction project and have depth knowledge on the use of risk management in high-rise construction projects.
RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIOIAEME Publication
Construction industry is highly risk prone, with complex and dynamic project
environments creating an atmosphere of high uncertainty and risk. The industry is
vulnerable to various technical, sociopolitical and business risks. The track record
to cope with these risks has not been very good in construction industry. As a
result, the people working in the industry bear various failures, such as, failure of
abiding by quality and operational requirements, cost overruns and uncertain delays
in project completion. In light of this, it can be said that an effective systems of risk
assessment and management for construction industry remains a challenging task
for the industry practitioners. The aim of the this research is to identify and evaluate
current risks and uncertainties in the construction industry through extensive
literature survey and aims to make a basis for future studies for development of a
risk management framework to be adopted by prospective investors, developers and
contractors
RISK MANAGEMENT IN HIGH RISE CONSTRUCTION PROJECTS IN SURAT CITYA Makwana
This paper gives information about identification of risk factors and perceptions of Indian construction practitioners i.e., contractors, owners, project managers and Engineers on the importance of different construction risks and how the risks should be assigned between the different parties of the contract. As the very common project styles, construction projects have so many characteristics likewise time limitation, specific items, financial restrictions and requirements, extraordinary structural and legal situations, complexity features. For this situation every construction project has own complex method. Risks constantly happen at construction projects and frequently cause time overrun or cost overrun. If you don’t contemplate these risk factors, or neglect the main factors, these risk factors will affect the damage because of the managerial errors. Risk management is the process which covers to identify the risks, for assessment with the help of qualitatively and quantitatively, to response with appropriate technique for management and controlling. The concept has gain popularity in various industries. Various companies frequently found the method in their projects for upgrading their performance, reducing their losses and increasing their profits. Questionnaire survey among clients, contractors, engineers and architects is analysed using, Relative Importance Index (RII)) method. The focus of this study is to understand what Risk Management is, understand the process of risk management at construction project and have depth knowledge on the use of risk management in high-rise construction projects.
A Study on Risk Assessment in Construction ProjectsIJMER
Risks are very common in construction sector. Risk management includes identifying risks,
assessing risks either quantitatively or qualitatively, choosing the appropriate method for handling the
risks, and then monitoring and documenting risks. By identifying risks in an early stage of planning and
assessing their relative importance, project managers can identify methods used to reduce risks and
allocate the best people to mitigate them. Thus, this research focuses on risk identification, as opposed
to other processes of risk management. "Brain-storming sessions" is the most popular method used
frequently to identify the risks in projects as deduced from a questionnaire survey from participants in
large construction projects. Time and cost management need to be fully integrated with the
identification process. Time constraints and project managers with sufficient experience are critical
when identifying the level of risk for large and/or complex projects. The most considerable types of risk
in construction projects are financial risks, construction risks, and demand or product risks
International Journal of Engineering and Science Invention (IJESI)inventionjournals
International Journal of Engineering and Science Invention (IJESI) is an international journal intended for professionals and researchers in all fields of computer science and electronics. IJESI publishes research articles and reviews within the whole field Engineering Science and Technology, new teaching methods, assessment, validation and the impact of new technologies and it will continue to provide information on the latest trends and developments in this ever-expanding subject. The publications of papers are selected through double peer reviewed to ensure originality, relevance, and readability. The articles published in our journal can be accessed online.
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...A Makwana
Success of Public Private Partnership projects is greatly influenced by proper management of the risks associated with the project. All projects which are undertaken using conventional procurement method or using a PPP approach have known risks and unknown risks. Risk identification plays an important role in development of PPP framework. The participation and investment of Private sector has been the main stay of the Government of India policy toward infrastructural growth. In this study main risk categories and factors of Public Private Partnership projects have been recognized. A total of 7 risk categories and 31 risk sub-factors for each category were identified for PPP projects safety listed under subheads. The questionnaire was prepared on the basis of literature review and was filled by 100 Stakeholders namely Consultant/Client, Project Manager/ Contractor, Engineer. Generally Analytic Hierarchy Process (AHP) is widely used as multi criteria decision making. Normally it is very hard to meet the consistence need of a comparison matrix in analytic hierarchy process. In this study AHP is used to categories the risks of PPP projects in different levels and the impact of those risks on the PPP projects are identified.
RISK LEVEL ASSESSMENT ON ROAD CONSTRUCTION’S CONTRACTORS USING CULTURAL – PRO...IAEME Publication
This study aimed to analyze the characteristics of potential risk and the risk levels to the contractors in a road construction project and its impact on service providers (contractors), and to make a risk assessment model with multi-criteria to the contractors in road construction projects. Objective contractors road construction is not optimal due to non-performance risk management in the project with the right. This study is done in the form of a survey by capturing the opinions or perceptions, experiences and attitudes of respondents implementing on road construction. Parameters indicating the risk of road construction projects were model and tested using the methodology of Expert Choice to describe, quantify and demonstrate the risk level, allocation, and response in road construction projects with different risk variables. Results of the study firstly identified 281 risks for the road construction including 57 non-technical, 39 technical, 36 financial, 76 cultural, 38 work health and safety management aspect and 35 environmental aspects.
Exploring the risk factors associated with peb projects in lahore.Rizwan Khurram
The construction industry is more exposed to risk than other industry. If the risk is not handled properly it may causes the poor performance on the industry. The Scale of building projects is large in nature and having large amount of investment. Wastage of any resource influence is high loss in project. All the losses are associated with risk factors. In Pakistan, only few researches have been done so far in this area. Thus this study needs focus of risk management in field of construction projects. We conclude from study that financial issue, skillful workers, shortage and inaccurate design are significant risk factors affecting the projects. Contractors are responsible for risk linked with machinery, material and quality related issues. While clients are responsible for the risk associated with scope of work. Study concludes that good coordination and communication between stakeholders and proper drawings works are key factors to control the project.
Recently, Construction IQ conducted an online survey on construction project risk management. Some valuable statistics emerged from the results. Have a look at what your colleagues and peers in the industry had to say…
Risk Management in High Rise Construction Projects: A ReviewA Makwana
This paper gives information about identification of risk factors and perceptions of Indian construction practitioners i.e., contractors, owners, project managers and Engineers on the importance of different construction risks and how the risks should be assigned between the different parties of the contract. As the very common project styles, construction projects have so many characteristics likewise time limitation, specific items, financial restrictions and requirements, extraordinary structural and legal situations, complexity features. For this situation every construction project has own complex method. Risks constantly happen at construction projects and frequently cause time overrun or cost overrun. If you don’t contemplate these risk factors, or neglect the main factors, these risk factors will affect the damage because of the managerial errors. Risk management is the process which covers to identify the risks, for assessment with the help of qualitatively and quantitatively, to response with appropriate technique for management and controlling. The concept has gain popularity in various industries. Various companies frequently found the method in their projects for upgrading their performance, reducing their losses and increasing their profits. Questionnaire survey among clients, contractors, engineers and architects is analyzed using, Relative Importance Index (RII) and Importance Index (IMP.I) methods. The focus of this study is to understand what Risk Management is, understand the process of risk management at construction project and have depth knowledge on the use of risk management in high-rise construction projects.
RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIOIAEME Publication
Construction industry is highly risk prone, with complex and dynamic project
environments creating an atmosphere of high uncertainty and risk. The industry is
vulnerable to various technical, sociopolitical and business risks. The track record
to cope with these risks has not been very good in construction industry. As a
result, the people working in the industry bear various failures, such as, failure of
abiding by quality and operational requirements, cost overruns and uncertain delays
in project completion. In light of this, it can be said that an effective systems of risk
assessment and management for construction industry remains a challenging task
for the industry practitioners. The aim of the this research is to identify and evaluate
current risks and uncertainties in the construction industry through extensive
literature survey and aims to make a basis for future studies for development of a
risk management framework to be adopted by prospective investors, developers and
contractors
RISK MANAGEMENT IN HIGH RISE CONSTRUCTION PROJECTS IN SURAT CITYA Makwana
This paper gives information about identification of risk factors and perceptions of Indian construction practitioners i.e., contractors, owners, project managers and Engineers on the importance of different construction risks and how the risks should be assigned between the different parties of the contract. As the very common project styles, construction projects have so many characteristics likewise time limitation, specific items, financial restrictions and requirements, extraordinary structural and legal situations, complexity features. For this situation every construction project has own complex method. Risks constantly happen at construction projects and frequently cause time overrun or cost overrun. If you don’t contemplate these risk factors, or neglect the main factors, these risk factors will affect the damage because of the managerial errors. Risk management is the process which covers to identify the risks, for assessment with the help of qualitatively and quantitatively, to response with appropriate technique for management and controlling. The concept has gain popularity in various industries. Various companies frequently found the method in their projects for upgrading their performance, reducing their losses and increasing their profits. Questionnaire survey among clients, contractors, engineers and architects is analysed using, Relative Importance Index (RII)) method. The focus of this study is to understand what Risk Management is, understand the process of risk management at construction project and have depth knowledge on the use of risk management in high-rise construction projects.
A Study on Risk Assessment in Construction ProjectsIJMER
Risks are very common in construction sector. Risk management includes identifying risks,
assessing risks either quantitatively or qualitatively, choosing the appropriate method for handling the
risks, and then monitoring and documenting risks. By identifying risks in an early stage of planning and
assessing their relative importance, project managers can identify methods used to reduce risks and
allocate the best people to mitigate them. Thus, this research focuses on risk identification, as opposed
to other processes of risk management. "Brain-storming sessions" is the most popular method used
frequently to identify the risks in projects as deduced from a questionnaire survey from participants in
large construction projects. Time and cost management need to be fully integrated with the
identification process. Time constraints and project managers with sufficient experience are critical
when identifying the level of risk for large and/or complex projects. The most considerable types of risk
in construction projects are financial risks, construction risks, and demand or product risks
International Journal of Engineering and Science Invention (IJESI)inventionjournals
International Journal of Engineering and Science Invention (IJESI) is an international journal intended for professionals and researchers in all fields of computer science and electronics. IJESI publishes research articles and reviews within the whole field Engineering Science and Technology, new teaching methods, assessment, validation and the impact of new technologies and it will continue to provide information on the latest trends and developments in this ever-expanding subject. The publications of papers are selected through double peer reviewed to ensure originality, relevance, and readability. The articles published in our journal can be accessed online.
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...A Makwana
Success of Public Private Partnership projects is greatly influenced by proper management of the risks associated with the project. All projects which are undertaken using conventional procurement method or using a PPP approach have known risks and unknown risks. Risk identification plays an important role in development of PPP framework. The participation and investment of Private sector has been the main stay of the Government of India policy toward infrastructural growth. In this study main risk categories and factors of Public Private Partnership projects have been recognized. A total of 7 risk categories and 31 risk sub-factors for each category were identified for PPP projects safety listed under subheads. The questionnaire was prepared on the basis of literature review and was filled by 100 Stakeholders namely Consultant/Client, Project Manager/ Contractor, Engineer. Generally Analytic Hierarchy Process (AHP) is widely used as multi criteria decision making. Normally it is very hard to meet the consistence need of a comparison matrix in analytic hierarchy process. In this study AHP is used to categories the risks of PPP projects in different levels and the impact of those risks on the PPP projects are identified.
RISK LEVEL ASSESSMENT ON ROAD CONSTRUCTION’S CONTRACTORS USING CULTURAL – PRO...IAEME Publication
This study aimed to analyze the characteristics of potential risk and the risk levels to the contractors in a road construction project and its impact on service providers (contractors), and to make a risk assessment model with multi-criteria to the contractors in road construction projects. Objective contractors road construction is not optimal due to non-performance risk management in the project with the right. This study is done in the form of a survey by capturing the opinions or perceptions, experiences and attitudes of respondents implementing on road construction. Parameters indicating the risk of road construction projects were model and tested using the methodology of Expert Choice to describe, quantify and demonstrate the risk level, allocation, and response in road construction projects with different risk variables. Results of the study firstly identified 281 risks for the road construction including 57 non-technical, 39 technical, 36 financial, 76 cultural, 38 work health and safety management aspect and 35 environmental aspects.
Exploring the risk factors associated with peb projects in lahore.Rizwan Khurram
The construction industry is more exposed to risk than other industry. If the risk is not handled properly it may causes the poor performance on the industry. The Scale of building projects is large in nature and having large amount of investment. Wastage of any resource influence is high loss in project. All the losses are associated with risk factors. In Pakistan, only few researches have been done so far in this area. Thus this study needs focus of risk management in field of construction projects. We conclude from study that financial issue, skillful workers, shortage and inaccurate design are significant risk factors affecting the projects. Contractors are responsible for risk linked with machinery, material and quality related issues. While clients are responsible for the risk associated with scope of work. Study concludes that good coordination and communication between stakeholders and proper drawings works are key factors to control the project.
Recently, Construction IQ conducted an online survey on construction project risk management. Some valuable statistics emerged from the results. Have a look at what your colleagues and peers in the industry had to say…
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...Sibo Kanyambari Aimable
Risks are very common in construction sector. Risk is the Possibility of suffering loss and the impact on the involved parties. According to APM (2006), all projects are inherently risky because they are unique, constrained, complex, based on assumptions, and performed by people. As a result, project risk management methods must be built into the management of projects and should be used throughout the project lifecycle.
Many construction projects fail because organizations assume that all the projects would succeed and they therefore do not identify, analyze, and provide mitigation or contingencies for the risk elements involved in the project.
Society desires that all projects should be performing and has become less tolerant of failure (Edwards and Bowen, 2005). Pressure is exerted on project managers to minimize the chance of project failure. This increasing pressure for performance which suggests that it is prudent for anyone involved in a project to be concerned about the associated risks and how they can be effectively managed.
Traditionally, performance of a project is analyzed on the criteria of quality, budget and time of completion. Two more criteria to determine the performance of a project were added by Kerzner (2001). Firstly, the project would effectively and efficiently manage risks and, secondly, it should be accepted by the customer.
It is known that the cause of the projects failure can be directly related to the extent of risk management methods undertaken. Besides, the level of risk management methods undertaken during project lifecycle impacts directly on the performance or otherwise of the project. Furthermore, using risk management methods effectively to manage risk should be continuously undertaken throughout the project lifecycle to enhance project performance. Risk management methods are thus an important tool to cope with such substantial risks in projects performance.
The main objective of the enquiry work that underpins this research is to investigate the effect of risk management methods on project performance. In this paper, a case study of RSSB multi-storey already executed project is considered.
Effect or Risk Management Methods on project performance in Rwandan Construct...Sibo Kanyambari Aimable
Risks are very common in construction sector. Risk is the Possibility of suffering loss and the impact on the involved parties. According to APM (2006), all projects are inherently risky because they are unique, constrained, complex, based on assumptions, and performed by people. As a result, project risk management methods must be built into the management of projects and should be used throughout the project lifecycle.
Many construction projects fail because organizations assume that all the projects would succeed and they therefore do not identify, analyze, and provide mitigation or contingencies for the risk elements involved in the project.
Society desires that all projects should be performing and has become less tolerant of failure (Edwards and Bowen, 2005). Pressure is exerted on project managers to minimize the chance of project failure. This increasing pressure for performance which suggests that it is prudent for anyone involved in a project to be concerned about the associated risks and how they can be effectively managed.
Traditionally, performance of a project is analyzed on the criteria of quality, budget and time of completion. Two more criteria to determine the performance of a project were added by Kerzner (2001). Firstly, the project would effectively and efficiently manage risks and, secondly, it should be accepted by the customer.
It is known that the cause of the projects failure can be directly related to the extent of risk management methods undertaken. Besides, the level of risk management methods undertaken during project lifecycle impacts directly on the performance or otherwise of the project. Furthermore, using risk management methods effectively to manage risk should be continuously undertaken throughout the project lifecycle to enhance project performance. Risk management methods are thus an important tool to cope with such substantial risks in projects performance.
The main objective of the enquiry work that underpins this research is to investigate the effect of risk management methods on project performance. In this paper, a case study of RSSB multi-storey already executed project is considered.
Software Project Risk Management Practice in OmanEECJOURNAL
Oman is a member of Gulf Cooperation Council (GCC). It is located in Southwest Asia and it has strategic significant boundaries, Overlooking the Arabian Sea, Gulf of Oman, and the Persian Gulf. It is the 80th in Global Innovation Index in 2019 and 63 in E-Government Development Index in 2018. Oman is an effective member of the Greater Arab Free Trade Agreement (GAFTA) and the World Trade Organization (WTO). Furthermore, Oman's government has continued efforts to develop local and foreign investments by signing a Free Trade Agreement (FTA) with the USA. Oman plays a significant role in investments due to its strategic location connected to the markets in the Gulf, the Middle East, Asia, and Africa. Oman's vision is to involve all new technologies to be always beside the developed countries. To achieve that, Oman established The Government Innovation Initiative to encourage government entities in creativity and introduce their suggestions to enhance governmental performance and enhance the efficiency in different fields. This is realized by involving modern technologies like the Internet of Things (IoT), Artificial Intelligence (AI), Cloud Computing, Virtual Reality Applications, and Blockchain. In Oman, the risk management approach is a core technique. Three major stages are applied systematically in risk management in software projects. These stages involve a) identifying the risk; b) analyzing and assessing the risk, and c) reaction to the risk. There is no doubt that the high risk belonged to business will have negative impacts on all of its participants. Wherefore, this paper sheds the light on that knowledge area. The aim of this paper is to review the present literature on risk management processes implemented in software projects. There is a dearth in the literature which covers the risk management area knowledge in Oman's organizations. This paper target finding out the commonly used frameworks or mechanisms in risk management in software projects. It also tries to collect the responses to state the various types of risk origins in the existing profit and non-profit organizations in Oman and to recognize the coming research trends in this area.
Risks have a significant impact on a construction
project’s performance in terms of cost, time and quality. As
the size and complexity of the projects have increased, an
ability to manage risks throughout the construction process
has become a central element preventing unwanted
consequences. How risks are shared between the project
actors is to a large extent governed by the procurement
option and the content of the related contract documents.
Therefore, selecting an appropriate project procurement
option is a key issue for project actors.
The overall aim of this research is to increase the
understanding of risk management in the different
procurement options: design-bid-build contracts, designbuild contracts and collaborative form of partnering. Deeper
understanding is expected to contribute to a more effective
risk management and, therefore, a better project output and
better value for both clients and contractors. The study
involves nine construction projects recently performed in
Sweden and comprises a questionnaire survey and a series of
interviews with clients, contractors and consultants involved
in these construction projects.
The findings of this work show a lack of an iterative
approach to risk management, which is a weakness in current
procurement practices. This aspect must be addressed if the
risk management process is to serve projects and, thus, their
clients. The absence of systematic risk management is
especially noted in the programme phase, where it arguably
has the greatest potential impact. The production phase is
where most interest and activity are to be found. As a matter
of practice, the communication of risks between the actors
simply does not work to the extent that it must if projects are
to be delivered with certainty, irrespective of the form of
procurement.
A clear connection between the procurement option
and risk management in construction projects has been
found. Traditional design-bid-build contracts do not create
opportunities for open discussion of project risks and joint
risk management. A number of drivers of and obstacles to
effective risk management have been explored in the study.
Every actor’s involvement in dialogue, effective
communication and information exchange, open attitudes
and trustful relationship are the factors that support open
discussion of project risks and, therefore, contribute to
successful risk management.
Based on the findings, a number of recommendations
facilitating more effective risk management have been
developed for the industry practitioners.
International Journal of Engineering Research and DevelopmentIJERD Editor
Electrical, Electronics and Computer Engineering,
Information Engineering and Technology,
Mechanical, Industrial and Manufacturing Engineering,
Automation and Mechatronics Engineering,
Material and Chemical Engineering,
Civil and Architecture Engineering,
Biotechnology and Bio Engineering,
Environmental Engineering,
Petroleum and Mining Engineering,
Marine and Agriculture engineering,
Aerospace Engineering.
The length of the implementation period in the construction of projects may lead to a change in
circumstances which expose them to many risks because of the length of the implementation period and multiple
stages, beginning with the start-up phase and even phase of the project, and this leads to increased circumstances of
uncertainty and increasing the probability of the occurrence of risks, and this is reflected negatively on the
construction contracting and construction economy.In this research questionnaire was developed to identify the
risks encountered in construction. Projects have been distributed to some local and foreign construction companies
in Libya, having been identified the risks that may face the projects. Through questionnaires and interviews with
engineers and project managers of companies, and making risk analysis qualitatively, there was a need to prepare a
checklist of the risks facing projects in Libya, and know the benefit of the contractor and the owner based on the
results. This paper examines the most important risks faced by construction projects in Libya, which is difficult and
how they are able to implement these projects and housing companies, the research explains a formulated model to
evaluate companies before being contracted to know the financial and technical capabilities.
Similar to IRJET- Risk Management using Primavera Software for Residential Sector (20)
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.