BURJ KHALIFA
Services in High rise Buildings- Intelligent
Buildings
Grace Henry (68017)
Project Profile
Location- Sheikh Mohammed bin Rashid
Blvd - Dubai - United Arab Emirates
Category- Skyscrapers
Area- 454249.0 m2
Project Year- 2010
Architects and structural engineering and
services planning- Skidmore, Owings &
Merrill LLP, Chicago, USA
Client- EMAAR Properties PJSC, Dubai, VAE
Project management- Turner Construction
International
Contractors- BeSix / Samsung /Arabtec
Hymenocallis, a
type of lily, is native
to tropical Central
America. Its flower
structure is said to
have provided the
idea for the shape
of the Burj Khalifa's
ground plan.
SERVICES BY VOLTAS
Specialized Systems
•Building Automation
•Power Monitoring and Control
•SCADA
•Lighting and Dimming Control
•Central Battery
•Lightning Protection and Earthing
•Fire Alarm System
•Steam and Condensate
•Propane Gas Distribution
•Solar Powered Hot water supply
Electrical
•74 Nos. 11kv/400 volt transformers
•5 Nos. 11kv, 2.1 MVA Generators
•22km HV Cables
•250km LV Cables
•5300km LSF Cables
•65km Fire Rated Cables
•2.8km Bus Duct
HVAC
•Total Cooling Load 13000 tons
•34km of Chilled Water Piping
•5000 Nos. Fan Coil Units
Fire Fighting
•213km Fire Fighting Pipes
Plumbing and Drainage
•100km Water Supply Pipes
•48km Drainage Pipes
The Burj Khalifa was open on January 4th 2010
It’s the world’s tallest tower at the moment more over that the height is 828 Meters
The building is previously known as the Burj Dubai.
The tower consist of several special features such as most number of the elevators
and fastest as well 64km/hr, the highest outdoor observation desk.
It consist of 162 floors which is been cladded with 28,261glass panel outside the
tower, The concrete used for paving is 2,065 Km long .
PRODUCTIVE
Vertical city due to multiple typologies
catered
5 stations of amenity services
Centralized at basement and then
distributed (building management room)
Supplementary power supply 360000
bulbs of 100 watts at a time
Condensation
collection system.
This unique system was designed to irrigate the gardens and
water features surrounding the building. Condensation created
when the hot and humid air outside combines with the cooling
equipment throughout the building. Both the cooling equipment
and the condensation collected is monitored around the clock.
The resulting condensation is collected and drained into a
holding tank beneath the structure. This water is then pumped
into the irrigation system for use on the Burj Khalifa park.
An estimated 15 million gallons of water are collected in this
fashion every year, enough to fill twenty Olympic-sized swimming
pools.
Concrete Buttressed
Core
A concrete hexagonal core with an innovative system
of Y-shaped buttresses was utilized to give the
building a unique and stable “tripod like” stance.
The main safety advantage of this “three winged”
core design is that it gives the building torsional
resistance and reduces the vortex effect of high
winds.
A large reinforced concrete mat likewise supported
by bored reinforced concrete piles—each pile is 1.5
meters in diameter and 43 meters long—supports
the structural core of the building.
Glazing
The Structure is highly durable and capable so that the glazing
installed silicones are the unrivalled technology to provide
protection from Ultraviolet light, temperature and the weather
resistance so they are specially manufactured form the Zurich of
triple glazing which gives the maximum protection.
The high performance structural silicone sealants ensure lowest
possible gas loss rates from the glazing and these are
manufactured in European standards EN 1279.
Interiors
The interior of the wall is mainly based on the
Gypsum wall rather than the main walls in order to
reduce the whole building weight. The Thermal
insulation is done at such a way that between the
two boards in the cavity they have placed the rock
wool to protect the cold loss more over that the
screws are specially manufactured and all the
accessories are provide by the company with fully
furnished including all the sockets and points to
avoid the drilling further.
Good loft insulation is also provided with a rock
wool and false ceiling with central cooling system.
Earthquake
Resistance
The Burj Khalifa building has the capacity to
withstand earthquakes up to a 7.0 magnitude. This far
surpasses the 5.9 magnitude earthquake standard
that regulations require for tall buildings in Dubai.
In addition, a system of motion sensors located
throughout the building is designed to detect and
report unusual structural movement.
The Burj Khalifa has also recently joined with a
number of tall buildings in the area to adopt the
Online Alerting of Structural Integrity and Safety
(Oasis) earthquake detection system to help
determine when to evacuate highly populated areas
in an effort to reduce casualties.
The World’s Fastest
Elevators
Boasting an “Intelligent elevator installation” that is the highest in
any building to date, the Burj Dubai has a total of 57 elevators and
8 escalators. With an average capacity of 12-14 passengers per
cabin, the elevators are capable of travelling at 10 meters per
second, which makes them among the fastest in the world. The
elevators are located within the building’s central reinforced fire-
resistant concrete core.
The Burj fire safety system mainly
consist of 3 components
As the water is sprinkled the fire
gets extinguished and the high
power fans supplies fresh air by
pushing the smoke out
These are all tied in with the
aforementioned home
automation system featuring
smart multi-alarm smoke, heat
and optical sensors found in all
rooms throughout the building.
The Burj is also equipped with 38
fire and smoke resistant
evacuation lifts.
As an added safety precaution in
the event of a fire, sandstorm or
earthquake, a highly trained team
of emergency specialists will
remain onsite at the Burj building
24 hours a day, seven days a
week.
• Reinforced Stairways and Refuge Areas – In the aftermath of unthinkable events
such as the 2001 terrorist attacks that brought down the Twin Towers at the World
Trade Center, architects and engineers have had to rethink safety measures designed
to protect the occupants of extremely tall buildings.
• Among these special types of safety features found at the Burj Khalifa building are
stairways reinforced with fireproof concrete.
• Recognizing that it’s unreasonable for building occupants to walk down 160 flights of
steps in the event of a major emergency, specially constructed refuge areas are found
on roughly every 25 floors. (9 in total)
• Separated from the building’s main structure by a “two-hour fire-resistant
construction”, the refuge areas are air-conditioned and pressurized to mitigate the
migration of smoke. The refuge areas are designed on a “defend-in-place” strategy,
wherein occupants are isolated and protected from danger nearby, or allowed to
stop and catch their breath in a protected environment on the way down in the event
of a full building evacuation.
Environment Friendly
Water heating
The Burj utilizes solar power 378 panels each with an area of 2.7sq.m were installed. These panels have
the ability to heat 140,000 lit of water when supplied with just 7hrs of day light. This is equal to 32,000KW
of energy provided .
Air ventilation provided at the top reduces the energy consumption. Air at the top of the building is
cooler, has low density and relatively humid. Its ideal for ventilation. Less energy is required to maintain
the comfortable condition
• The Burj Khalifa team partnered with Honeywell Building HVAC
system.
• The OBS software as a service solution involves collating real-time
field data, pushing this data to the Honeywell Sentience IoT
Platform, identifying anomalies, and running smart algorithms for
predictive and prescriptive maintenance of the building’s
mechanical assets.
• This service has enabled Burj Khalifa’s maintenance team to
transform from a traditional planned and preventative
maintenance regime to a predictive maintenance program for
mechanical systems, which is also known as a Reliability Centered
Maintenance (RCM) approach.
• At the core of OBS is Honeywell Sentience, a cloud-based IoT
platform that delivers secure big data capabilities for all of
Honeywell’s connected solutions. The platform allows Burj Khalifa’s
facility managers to use building data analytics for predictive and
prescriptive maintenance.
• Honeywell highlighted that the pilot has resulted in a significant
reduction in preventative mechanical maintenance tasks and an
overall 40% reduction in total maintenance hours for mechanical
assets, while improving the availability to 99.95%, enabling a
significant reduction of unplanned reactive maintenance.
• Burj Khalifa also uses Honeywell’s EBI system, a technology that
provides a unified view of building systems and increases the
connectivity of smart devices to improve efficiency, increase
responsiveness and maximize operational control. With access to
real-time facility data, Burj Khalifa’s facility management team is
now able to detect incidents faster, respond more quickly and
mitigate any impact, more cost effectively
OCCUPANT SAFETY
To further ensure safety, the Burj is equipped with a sophisticated home
automation system. Featuring multi-alarm sensors in all rooms that are tied into
LCD displays located in refuge areas and residential units throughout the building,
the automated system can monitor and display emergency information to all
occupants if needed. In addition, an Arabic/English voice alarm communications
system is in place to alert all building occupants of emergency events.
Technology enhances comfort of Burj building occupants
In addition to the security management solution, Johnson Controls installed low-
voltage systems that enable many of the high-end amenities enjoyed by tenants
and residents. The nearly 900 residences of the Burj feature E-Home, a smart home
technology installed by Johnson Controls. Each residence is equipped with a single
control system that interfaces with lighting, curtains, HVAC, home theater and
security management. Similar controls are installed in the hotel’s 324 guest rooms.
If an unauthorized person accesses a secure area, the building sub-systems,
including cameras and intercoms, are immediately activated. If a fire is detected,
the airflow system will automatically deactivate to confine or smother a fire.
Audio/visual systems, including project screens and video displays, and
conferencing systems are installed throughout the tower.
A two-way radio system allows facility and hotel management to communicate
with maintenance and security personnel throughout the building.
Architects- J. J. Pan & Partners
Location- No. 27, Wende Road, Guishan District,
Taoyuan City, Taiwan 333
Area- 36600.0 sqm
Project Year- 2013
Building Contractor- Chung-Lin General Contractors,
Ltd. Hao Chih Construction & Engineering Co., Ltd
Structural Consultant- Far Exp Engineering
Consultants
MEP Consultant- Yuan Heng Electrical Engineers
Office
Interior Consultant- JJPan, Shaper Park Interior
Design
Landscape Consultant- JJPan
Advantech Linkou Campus Phase 1
Phase I: Office
Building and
Intelligent
Greenhouse
Phase II:
Manufacturing
and Distribution
Center
Phase III:
Innovative R&D
Department and
Employee
Recreational
Center.
1
2
3
4
5
• BEMS
• INTELLIGENT AGRICULTURE
• HR AND VIDEO MONITORING
• TAILORED SERVICES
PARKING GUIDANCE
LIGHT
MANAGEMENT
CAR SEARCHING
SYSTEM
Starting with the intelligent parking application, after an employee books a meeting
room and inputs visitor information (license plate number, cell phone or e-mail
address), the system will automatically send a confirmation message, including a
building photograph and route map to the visitor.
The car license plate number will be sent to the car park’s recognition system to
allow it to identify and permit the visitor’s vehicle to enter.
Meanwhile, digital signs, integrated with the car park’s lights, will lead the visitor to
their assigned parking space.
Arrival information will be synchronously sent to employees so they can prepare to
greet their guest.
In addition to the car park entrance, the license plate recognition system is also
placed in front of the digital signs and at the parking spaces. The former is used to
check the vehicle identification in order to correctly display the direction information;
the latter helps the system rearrange empty parking spaces if the driver parks in the
wrong place.
These intelligent parking systems also implement energy efficient air quality
monitoring by installing many sensors and tying them in with the control program to
schedule the lighting and air extraction system. For example, vehicles come and go
frequently during rush hour; so at these times, the lighting will be kept on instead of
repeatedly switching on and off with each vehicle. Once rush hour is over the system
will return to normal operation and use sensors to detect cars entering and leaving
the lot, and provide enough light to illuminate the road ahead. This saves a lot of
energy as well as optimizing parking management.
MAIN MENU
SCENARIO CONTROL
LIGHTING
ROOM TEMPERATURE
AV SETTINGS
The meeting room also integrates digital signs to show the daily conference
schedule and adds scenario control to offer different modes such as video
conferencing, presentation, and whiteboard discussions for a range of needs.
HUMAN SENSING CONTROL
• Air conditioning and Lighting
• Human sensing controls and Intelligent HVAC utilise wireless sensing
devices detect the no. of people in a given area.
• By zoning and scheduling- 30% energy consumption SAVED!
MAIN MENU
DIGITAL SIGNAGE
SELF- SERVICE
SYSTEM
In the reception area, the interactive digital sign
display information such as: surrounding
introduction, conference room guide and QR code for
the product catalog so visitors can learn more about
Advantech’s corporate philosophy and product ranges
MAIN MENU
Through rainwater recycling and green
energy utilization (solar and wind),
Advantech introduces renewable
energy into the building.
Solar panels are installed on the roof
to block the sunlight and test energy
efficiency.
Rainwater will be stored and recycled
so it can be used for such functions as
flushing toilets and watering the
garden, and the elevated terraced
terrain near Linkou campus is a terrific
location to install wind turbines to
demonstrate Advantech’s wind power
solution.
MAIN MENU
Building materials used include brick cavity
wall, exposed concrete, steel truss, low-E
insulated glass and vertical shading panel.
Together they relate the interior functions
to the exterior and therefore enhance the
liveliness of the façade. Furthermore, an
intelligent greenhouse with sun-tracking
solar panels installed creates a space
enriched with natural lighting through its
environmental control system.
MAIN MENU
MAIN MENU
BEMS- The central control room- brain of the
iBuilding.
This service ready package includes hardware and
software such as SCADA and DDC control,
industrial PC and energy management system and
networks
Raw data- graphical information
Its statistical analysis function help customers to
find an optimised energy saving strategy and
allows management of multiple buildings along
regions (iLinkage) enhancing energy efficiency.
Apart from automated systems, solutions must
have the ability to monitor and carefully control a
building’s energy consumption. So, Advantech
applied a Web-based Building Energy
Management System (BEMS) in both campuses to
help the building management staff, even without
professional HVAC backgrounds, to effortlessly
analyze and improve the energy management via
an easy to operate Graphical User Interface (GUI).
MAIN MENU
INTELLIGENT
AGRICULTURE
• Automatic control systems are used
• Highly efficient resource management to
produce high value agricultural products
MAIN MENU
SMART
CARD
Access to parking, attendance, catering and
accommodation - HR system
INTELLIGENT
VIDEO
SYSTEM
Video system and high quality image analysis
It allows automated prompting in an emergency situation to
minimize risk and maintain safety in workspace
MAIN MENU
TAILORED SERVICES- CONSULTATION SERVICE
MAIN MENU
The End

More Related Content

What's hot

Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case Study
Shivangi Shankar
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
Simi Sayed
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
Shubham Jain
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Prateek Srivastava
 
Case study on Mixed use building
Case study on Mixed use buildingCase study on Mixed use building
Case study on Mixed use building
Tonmoy Barua
 
Emirates towers
Emirates towersEmirates towers
Emirates towers
Palak Khandelwal
 
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsF.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsAr. Md Shahroz Alam
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
Shubham Jain
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
iftekhar rafat
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Ar. M. Senthil [ senthilmani ]
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
Soumitra Smart
 
High rise
High rise High rise
High rise
Kamrul Hasan Sagar
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study
Nitesh Parmar
 
Sears tower
Sears towerSears tower
Sears tower
Neelesh Sharma
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
Anurag Mathur
 
The Gherkin.
The Gherkin.The Gherkin.
The Gherkin.
Mayur Waghulde
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square Mumbai
Tapu Taba
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
Prasad Thanthratey
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
Sanskriti Jindal
 

What's hot (20)

Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case Study
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
 
Case study on Mixed use building
Case study on Mixed use buildingCase study on Mixed use building
Case study on Mixed use building
 
Emirates towers
Emirates towersEmirates towers
Emirates towers
 
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsF.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
presentation ON TALL BUILDING
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
High rise
High rise High rise
High rise
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study
 
Sears tower
Sears towerSears tower
Sears tower
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
 
The Gherkin.
The Gherkin.The Gherkin.
The Gherkin.
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square Mumbai
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 

Similar to Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1

Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
Nayan Rao
 
THE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptxTHE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptx
Dimple954080
 
Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2
ong93
 
MANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATIONMANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATION
Manjeera Group
 
casestudytrilium-190419191926.pdf
casestudytrilium-190419191926.pdfcasestudytrilium-190419191926.pdf
casestudytrilium-190419191926.pdf
Pradeep889886
 
Case study trilium MALL AMRITSAR
Case study trilium MALL AMRITSARCase study trilium MALL AMRITSAR
Case study trilium MALL AMRITSAR
Prince Pathania
 
Da vinci tower
Da vinci towerDa vinci tower
Da vinci tower
Rajat Nainwal
 
Case study Surf Coast Shire Civic Building - mySmart
Case study Surf Coast Shire Civic Building - mySmartCase study Surf Coast Shire Civic Building - mySmart
Case study Surf Coast Shire Civic Building - mySmart
mySmart
 
How to build a very green DC
How to build a very green DCHow to build a very green DC
How to build a very green DC
Heembouw
 
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAIDYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
padamatikona swapnika
 
Intelligent building (Link in Description for Download)
Intelligent building  (Link in Description for Download)Intelligent building  (Link in Description for Download)
Intelligent building (Link in Description for Download)
Dimple Poddar
 
Report on HIGH RISE
Report on HIGH RISE Report on HIGH RISE
Report on HIGH RISE
Isratul Shaon
 
High rise archive research
High rise archive researchHigh rise archive research
High rise archive research
denverdieza
 
Architecture as technology and case studies
Architecture as technology and case studiesArchitecture as technology and case studies
Architecture as technology and case studies
LamaJassim1
 
Album engineering solutions for modern building
Album engineering solutions for modern buildingAlbum engineering solutions for modern building
Album engineering solutions for modern building
CROC
 
Building Services Project 2 Diary
Building Services Project 2 DiaryBuilding Services Project 2 Diary
Building Services Project 2 Diary
Nekumi Kida
 
Design of HVAC system for commercial building
Design of HVAC system for commercial buildingDesign of HVAC system for commercial building
Design of HVAC system for commercial building
jayeshmahajan24
 
services
servicesservices
services
archar2
 
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...ISCN_Secretariat
 

Similar to Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1 (20)

Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
THE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptxTHE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptx
 
Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2
 
Presentation1
Presentation1Presentation1
Presentation1
 
MANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATIONMANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATION
 
casestudytrilium-190419191926.pdf
casestudytrilium-190419191926.pdfcasestudytrilium-190419191926.pdf
casestudytrilium-190419191926.pdf
 
Case study trilium MALL AMRITSAR
Case study trilium MALL AMRITSARCase study trilium MALL AMRITSAR
Case study trilium MALL AMRITSAR
 
Da vinci tower
Da vinci towerDa vinci tower
Da vinci tower
 
Case study Surf Coast Shire Civic Building - mySmart
Case study Surf Coast Shire Civic Building - mySmartCase study Surf Coast Shire Civic Building - mySmart
Case study Surf Coast Shire Civic Building - mySmart
 
How to build a very green DC
How to build a very green DCHow to build a very green DC
How to build a very green DC
 
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAIDYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
 
Intelligent building (Link in Description for Download)
Intelligent building  (Link in Description for Download)Intelligent building  (Link in Description for Download)
Intelligent building (Link in Description for Download)
 
Report on HIGH RISE
Report on HIGH RISE Report on HIGH RISE
Report on HIGH RISE
 
High rise archive research
High rise archive researchHigh rise archive research
High rise archive research
 
Architecture as technology and case studies
Architecture as technology and case studiesArchitecture as technology and case studies
Architecture as technology and case studies
 
Album engineering solutions for modern building
Album engineering solutions for modern buildingAlbum engineering solutions for modern building
Album engineering solutions for modern building
 
Building Services Project 2 Diary
Building Services Project 2 DiaryBuilding Services Project 2 Diary
Building Services Project 2 Diary
 
Design of HVAC system for commercial building
Design of HVAC system for commercial buildingDesign of HVAC system for commercial building
Design of HVAC system for commercial building
 
services
servicesservices
services
 
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
 

More from Grace Henry

Land Use and Legibility- Urban Design Terminology
Land Use and Legibility- Urban Design TerminologyLand Use and Legibility- Urban Design Terminology
Land Use and Legibility- Urban Design Terminology
Grace Henry
 
Kanakakunnu palace and grounds
Kanakakunnu palace and groundsKanakakunnu palace and grounds
Kanakakunnu palace and grounds
Grace Henry
 
Tadao Anto- Critical Regionalism
Tadao Anto- Critical Regionalism Tadao Anto- Critical Regionalism
Tadao Anto- Critical Regionalism
Grace Henry
 
Pneumatic, Kinetic and Mobile Structures
Pneumatic, Kinetic and Mobile StructuresPneumatic, Kinetic and Mobile Structures
Pneumatic, Kinetic and Mobile Structures
Grace Henry
 
Lens and Frames, Pattom
Lens and Frames, PattomLens and Frames, Pattom
Lens and Frames, Pattom
Grace Henry
 
William Le Baron Jenney
William Le Baron JenneyWilliam Le Baron Jenney
William Le Baron Jenney
Grace Henry
 
White color
White colorWhite color
White color
Grace Henry
 
Landscape Architecture- Hardscaping elements
Landscape Architecture- Hardscaping elements Landscape Architecture- Hardscaping elements
Landscape Architecture- Hardscaping elements
Grace Henry
 
Door Designs- Building Materials and Construction
Door Designs- Building Materials and Construction Door Designs- Building Materials and Construction
Door Designs- Building Materials and Construction
Grace Henry
 
Timber- Building material
Timber- Building materialTimber- Building material
Timber- Building material
Grace Henry
 
Offshore Oil Drilling
Offshore Oil DrillingOffshore Oil Drilling
Offshore Oil Drilling
Grace Henry
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
Grace Henry
 
MINORU YAMASAKI- A life in architecture (World trade center)
MINORU YAMASAKI- A life in architecture (World trade center)MINORU YAMASAKI- A life in architecture (World trade center)
MINORU YAMASAKI- A life in architecture (World trade center)
Grace Henry
 
Padmanabhapuram palace (Also for Archies!)
Padmanabhapuram palace (Also for Archies!)Padmanabhapuram palace (Also for Archies!)
Padmanabhapuram palace (Also for Archies!)
Grace Henry
 
AGRICULTURE
AGRICULTUREAGRICULTURE
AGRICULTURE
Grace Henry
 
The history of pi
The history of piThe history of pi
The history of pi
Grace Henry
 
PATOL BABU - a creation of Satyajith Ray
PATOL BABU - a creation of Satyajith RayPATOL BABU - a creation of Satyajith Ray
PATOL BABU - a creation of Satyajith Ray
Grace Henry
 

More from Grace Henry (17)

Land Use and Legibility- Urban Design Terminology
Land Use and Legibility- Urban Design TerminologyLand Use and Legibility- Urban Design Terminology
Land Use and Legibility- Urban Design Terminology
 
Kanakakunnu palace and grounds
Kanakakunnu palace and groundsKanakakunnu palace and grounds
Kanakakunnu palace and grounds
 
Tadao Anto- Critical Regionalism
Tadao Anto- Critical Regionalism Tadao Anto- Critical Regionalism
Tadao Anto- Critical Regionalism
 
Pneumatic, Kinetic and Mobile Structures
Pneumatic, Kinetic and Mobile StructuresPneumatic, Kinetic and Mobile Structures
Pneumatic, Kinetic and Mobile Structures
 
Lens and Frames, Pattom
Lens and Frames, PattomLens and Frames, Pattom
Lens and Frames, Pattom
 
William Le Baron Jenney
William Le Baron JenneyWilliam Le Baron Jenney
William Le Baron Jenney
 
White color
White colorWhite color
White color
 
Landscape Architecture- Hardscaping elements
Landscape Architecture- Hardscaping elements Landscape Architecture- Hardscaping elements
Landscape Architecture- Hardscaping elements
 
Door Designs- Building Materials and Construction
Door Designs- Building Materials and Construction Door Designs- Building Materials and Construction
Door Designs- Building Materials and Construction
 
Timber- Building material
Timber- Building materialTimber- Building material
Timber- Building material
 
Offshore Oil Drilling
Offshore Oil DrillingOffshore Oil Drilling
Offshore Oil Drilling
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
MINORU YAMASAKI- A life in architecture (World trade center)
MINORU YAMASAKI- A life in architecture (World trade center)MINORU YAMASAKI- A life in architecture (World trade center)
MINORU YAMASAKI- A life in architecture (World trade center)
 
Padmanabhapuram palace (Also for Archies!)
Padmanabhapuram palace (Also for Archies!)Padmanabhapuram palace (Also for Archies!)
Padmanabhapuram palace (Also for Archies!)
 
AGRICULTURE
AGRICULTUREAGRICULTURE
AGRICULTURE
 
The history of pi
The history of piThe history of pi
The history of pi
 
PATOL BABU - a creation of Satyajith Ray
PATOL BABU - a creation of Satyajith RayPATOL BABU - a creation of Satyajith Ray
PATOL BABU - a creation of Satyajith Ray
 

Recently uploaded

Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
GeoBlogs
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
PedroFerreira53928
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 

Recently uploaded (20)

Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 

Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1

  • 1. BURJ KHALIFA Services in High rise Buildings- Intelligent Buildings Grace Henry (68017)
  • 2. Project Profile Location- Sheikh Mohammed bin Rashid Blvd - Dubai - United Arab Emirates Category- Skyscrapers Area- 454249.0 m2 Project Year- 2010 Architects and structural engineering and services planning- Skidmore, Owings & Merrill LLP, Chicago, USA Client- EMAAR Properties PJSC, Dubai, VAE Project management- Turner Construction International Contractors- BeSix / Samsung /Arabtec
  • 3. Hymenocallis, a type of lily, is native to tropical Central America. Its flower structure is said to have provided the idea for the shape of the Burj Khalifa's ground plan.
  • 4. SERVICES BY VOLTAS Specialized Systems •Building Automation •Power Monitoring and Control •SCADA •Lighting and Dimming Control •Central Battery •Lightning Protection and Earthing •Fire Alarm System •Steam and Condensate •Propane Gas Distribution •Solar Powered Hot water supply Electrical •74 Nos. 11kv/400 volt transformers •5 Nos. 11kv, 2.1 MVA Generators •22km HV Cables •250km LV Cables •5300km LSF Cables •65km Fire Rated Cables •2.8km Bus Duct HVAC •Total Cooling Load 13000 tons •34km of Chilled Water Piping •5000 Nos. Fan Coil Units Fire Fighting •213km Fire Fighting Pipes Plumbing and Drainage •100km Water Supply Pipes •48km Drainage Pipes
  • 5. The Burj Khalifa was open on January 4th 2010 It’s the world’s tallest tower at the moment more over that the height is 828 Meters The building is previously known as the Burj Dubai. The tower consist of several special features such as most number of the elevators and fastest as well 64km/hr, the highest outdoor observation desk. It consist of 162 floors which is been cladded with 28,261glass panel outside the tower, The concrete used for paving is 2,065 Km long . PRODUCTIVE Vertical city due to multiple typologies catered 5 stations of amenity services Centralized at basement and then distributed (building management room) Supplementary power supply 360000 bulbs of 100 watts at a time
  • 6. Condensation collection system. This unique system was designed to irrigate the gardens and water features surrounding the building. Condensation created when the hot and humid air outside combines with the cooling equipment throughout the building. Both the cooling equipment and the condensation collected is monitored around the clock. The resulting condensation is collected and drained into a holding tank beneath the structure. This water is then pumped into the irrigation system for use on the Burj Khalifa park. An estimated 15 million gallons of water are collected in this fashion every year, enough to fill twenty Olympic-sized swimming pools.
  • 7. Concrete Buttressed Core A concrete hexagonal core with an innovative system of Y-shaped buttresses was utilized to give the building a unique and stable “tripod like” stance. The main safety advantage of this “three winged” core design is that it gives the building torsional resistance and reduces the vortex effect of high winds. A large reinforced concrete mat likewise supported by bored reinforced concrete piles—each pile is 1.5 meters in diameter and 43 meters long—supports the structural core of the building.
  • 8. Glazing The Structure is highly durable and capable so that the glazing installed silicones are the unrivalled technology to provide protection from Ultraviolet light, temperature and the weather resistance so they are specially manufactured form the Zurich of triple glazing which gives the maximum protection. The high performance structural silicone sealants ensure lowest possible gas loss rates from the glazing and these are manufactured in European standards EN 1279.
  • 9. Interiors The interior of the wall is mainly based on the Gypsum wall rather than the main walls in order to reduce the whole building weight. The Thermal insulation is done at such a way that between the two boards in the cavity they have placed the rock wool to protect the cold loss more over that the screws are specially manufactured and all the accessories are provide by the company with fully furnished including all the sockets and points to avoid the drilling further. Good loft insulation is also provided with a rock wool and false ceiling with central cooling system.
  • 10. Earthquake Resistance The Burj Khalifa building has the capacity to withstand earthquakes up to a 7.0 magnitude. This far surpasses the 5.9 magnitude earthquake standard that regulations require for tall buildings in Dubai. In addition, a system of motion sensors located throughout the building is designed to detect and report unusual structural movement. The Burj Khalifa has also recently joined with a number of tall buildings in the area to adopt the Online Alerting of Structural Integrity and Safety (Oasis) earthquake detection system to help determine when to evacuate highly populated areas in an effort to reduce casualties.
  • 11. The World’s Fastest Elevators Boasting an “Intelligent elevator installation” that is the highest in any building to date, the Burj Dubai has a total of 57 elevators and 8 escalators. With an average capacity of 12-14 passengers per cabin, the elevators are capable of travelling at 10 meters per second, which makes them among the fastest in the world. The elevators are located within the building’s central reinforced fire- resistant concrete core.
  • 12. The Burj fire safety system mainly consist of 3 components As the water is sprinkled the fire gets extinguished and the high power fans supplies fresh air by pushing the smoke out These are all tied in with the aforementioned home automation system featuring smart multi-alarm smoke, heat and optical sensors found in all rooms throughout the building. The Burj is also equipped with 38 fire and smoke resistant evacuation lifts. As an added safety precaution in the event of a fire, sandstorm or earthquake, a highly trained team of emergency specialists will remain onsite at the Burj building 24 hours a day, seven days a week.
  • 13. • Reinforced Stairways and Refuge Areas – In the aftermath of unthinkable events such as the 2001 terrorist attacks that brought down the Twin Towers at the World Trade Center, architects and engineers have had to rethink safety measures designed to protect the occupants of extremely tall buildings. • Among these special types of safety features found at the Burj Khalifa building are stairways reinforced with fireproof concrete. • Recognizing that it’s unreasonable for building occupants to walk down 160 flights of steps in the event of a major emergency, specially constructed refuge areas are found on roughly every 25 floors. (9 in total) • Separated from the building’s main structure by a “two-hour fire-resistant construction”, the refuge areas are air-conditioned and pressurized to mitigate the migration of smoke. The refuge areas are designed on a “defend-in-place” strategy, wherein occupants are isolated and protected from danger nearby, or allowed to stop and catch their breath in a protected environment on the way down in the event of a full building evacuation.
  • 14. Environment Friendly Water heating The Burj utilizes solar power 378 panels each with an area of 2.7sq.m were installed. These panels have the ability to heat 140,000 lit of water when supplied with just 7hrs of day light. This is equal to 32,000KW of energy provided . Air ventilation provided at the top reduces the energy consumption. Air at the top of the building is cooler, has low density and relatively humid. Its ideal for ventilation. Less energy is required to maintain the comfortable condition
  • 15. • The Burj Khalifa team partnered with Honeywell Building HVAC system. • The OBS software as a service solution involves collating real-time field data, pushing this data to the Honeywell Sentience IoT Platform, identifying anomalies, and running smart algorithms for predictive and prescriptive maintenance of the building’s mechanical assets. • This service has enabled Burj Khalifa’s maintenance team to transform from a traditional planned and preventative maintenance regime to a predictive maintenance program for mechanical systems, which is also known as a Reliability Centered Maintenance (RCM) approach. • At the core of OBS is Honeywell Sentience, a cloud-based IoT platform that delivers secure big data capabilities for all of Honeywell’s connected solutions. The platform allows Burj Khalifa’s facility managers to use building data analytics for predictive and prescriptive maintenance. • Honeywell highlighted that the pilot has resulted in a significant reduction in preventative mechanical maintenance tasks and an overall 40% reduction in total maintenance hours for mechanical assets, while improving the availability to 99.95%, enabling a significant reduction of unplanned reactive maintenance. • Burj Khalifa also uses Honeywell’s EBI system, a technology that provides a unified view of building systems and increases the connectivity of smart devices to improve efficiency, increase responsiveness and maximize operational control. With access to real-time facility data, Burj Khalifa’s facility management team is now able to detect incidents faster, respond more quickly and mitigate any impact, more cost effectively
  • 16. OCCUPANT SAFETY To further ensure safety, the Burj is equipped with a sophisticated home automation system. Featuring multi-alarm sensors in all rooms that are tied into LCD displays located in refuge areas and residential units throughout the building, the automated system can monitor and display emergency information to all occupants if needed. In addition, an Arabic/English voice alarm communications system is in place to alert all building occupants of emergency events. Technology enhances comfort of Burj building occupants In addition to the security management solution, Johnson Controls installed low- voltage systems that enable many of the high-end amenities enjoyed by tenants and residents. The nearly 900 residences of the Burj feature E-Home, a smart home technology installed by Johnson Controls. Each residence is equipped with a single control system that interfaces with lighting, curtains, HVAC, home theater and security management. Similar controls are installed in the hotel’s 324 guest rooms.
  • 17. If an unauthorized person accesses a secure area, the building sub-systems, including cameras and intercoms, are immediately activated. If a fire is detected, the airflow system will automatically deactivate to confine or smother a fire. Audio/visual systems, including project screens and video displays, and conferencing systems are installed throughout the tower. A two-way radio system allows facility and hotel management to communicate with maintenance and security personnel throughout the building.
  • 18. Architects- J. J. Pan & Partners Location- No. 27, Wende Road, Guishan District, Taoyuan City, Taiwan 333 Area- 36600.0 sqm Project Year- 2013 Building Contractor- Chung-Lin General Contractors, Ltd. Hao Chih Construction & Engineering Co., Ltd Structural Consultant- Far Exp Engineering Consultants MEP Consultant- Yuan Heng Electrical Engineers Office Interior Consultant- JJPan, Shaper Park Interior Design Landscape Consultant- JJPan Advantech Linkou Campus Phase 1
  • 19. Phase I: Office Building and Intelligent Greenhouse Phase II: Manufacturing and Distribution Center Phase III: Innovative R&D Department and Employee Recreational Center.
  • 20.
  • 21.
  • 22. 1 2 3 4 5 • BEMS • INTELLIGENT AGRICULTURE • HR AND VIDEO MONITORING • TAILORED SERVICES
  • 23. PARKING GUIDANCE LIGHT MANAGEMENT CAR SEARCHING SYSTEM Starting with the intelligent parking application, after an employee books a meeting room and inputs visitor information (license plate number, cell phone or e-mail address), the system will automatically send a confirmation message, including a building photograph and route map to the visitor. The car license plate number will be sent to the car park’s recognition system to allow it to identify and permit the visitor’s vehicle to enter. Meanwhile, digital signs, integrated with the car park’s lights, will lead the visitor to their assigned parking space. Arrival information will be synchronously sent to employees so they can prepare to greet their guest. In addition to the car park entrance, the license plate recognition system is also placed in front of the digital signs and at the parking spaces. The former is used to check the vehicle identification in order to correctly display the direction information; the latter helps the system rearrange empty parking spaces if the driver parks in the wrong place. These intelligent parking systems also implement energy efficient air quality monitoring by installing many sensors and tying them in with the control program to schedule the lighting and air extraction system. For example, vehicles come and go frequently during rush hour; so at these times, the lighting will be kept on instead of repeatedly switching on and off with each vehicle. Once rush hour is over the system will return to normal operation and use sensors to detect cars entering and leaving the lot, and provide enough light to illuminate the road ahead. This saves a lot of energy as well as optimizing parking management. MAIN MENU
  • 24. SCENARIO CONTROL LIGHTING ROOM TEMPERATURE AV SETTINGS The meeting room also integrates digital signs to show the daily conference schedule and adds scenario control to offer different modes such as video conferencing, presentation, and whiteboard discussions for a range of needs. HUMAN SENSING CONTROL • Air conditioning and Lighting • Human sensing controls and Intelligent HVAC utilise wireless sensing devices detect the no. of people in a given area. • By zoning and scheduling- 30% energy consumption SAVED! MAIN MENU
  • 25. DIGITAL SIGNAGE SELF- SERVICE SYSTEM In the reception area, the interactive digital sign display information such as: surrounding introduction, conference room guide and QR code for the product catalog so visitors can learn more about Advantech’s corporate philosophy and product ranges MAIN MENU
  • 26. Through rainwater recycling and green energy utilization (solar and wind), Advantech introduces renewable energy into the building. Solar panels are installed on the roof to block the sunlight and test energy efficiency. Rainwater will be stored and recycled so it can be used for such functions as flushing toilets and watering the garden, and the elevated terraced terrain near Linkou campus is a terrific location to install wind turbines to demonstrate Advantech’s wind power solution. MAIN MENU
  • 27. Building materials used include brick cavity wall, exposed concrete, steel truss, low-E insulated glass and vertical shading panel. Together they relate the interior functions to the exterior and therefore enhance the liveliness of the façade. Furthermore, an intelligent greenhouse with sun-tracking solar panels installed creates a space enriched with natural lighting through its environmental control system. MAIN MENU
  • 28.
  • 30. BEMS- The central control room- brain of the iBuilding. This service ready package includes hardware and software such as SCADA and DDC control, industrial PC and energy management system and networks Raw data- graphical information Its statistical analysis function help customers to find an optimised energy saving strategy and allows management of multiple buildings along regions (iLinkage) enhancing energy efficiency. Apart from automated systems, solutions must have the ability to monitor and carefully control a building’s energy consumption. So, Advantech applied a Web-based Building Energy Management System (BEMS) in both campuses to help the building management staff, even without professional HVAC backgrounds, to effortlessly analyze and improve the energy management via an easy to operate Graphical User Interface (GUI). MAIN MENU
  • 31. INTELLIGENT AGRICULTURE • Automatic control systems are used • Highly efficient resource management to produce high value agricultural products MAIN MENU
  • 32. SMART CARD Access to parking, attendance, catering and accommodation - HR system INTELLIGENT VIDEO SYSTEM Video system and high quality image analysis It allows automated prompting in an emergency situation to minimize risk and maintain safety in workspace MAIN MENU
  • 33. TAILORED SERVICES- CONSULTATION SERVICE MAIN MENU