SlideShare a Scribd company logo
DA VINCI TOWER /
DYNAMIC TOWER / ROTATING TOWER
ARCHITECT
DAVID FISHER
 Dr. Fisher’s professional activity has always been focused on two concepts:
1.an industrial approach, which involves the use of prefab units,
2.and Dynamic Architecture, according to which the traditional 3D design meets a fourth
dimension: time
 According to Dr. Fisher, time is the most powerful dimension of life because it is tightly
linked with relativity. His new skyscraper, the Rotating Tower, is “shaped by life,
designed by time”
INTENTION:
 intention was to build an 80-story skyscraper in Dubai. It featured revolving floors,
some of which could have moved on command, providing the building with an ever-
changing shape along with a changing view for the residents. It is Fisher's first
skyscraper design.
Fisher is an italian architect and the founder and chairman
of Dynamic Architecture Group.
DR.DAVID FISHER
ABOUT ARCHITECT OF ROTATING TOWER
The Dynamic Tower (also known as Dynamic Architecture Building or the Da Vinci Tower) is a planned 420-metre
(1,378 ft), 80-floor moving skyscraper in Dubai, United Arab Emirates, designed by architect David Fisher
Dynamic Tower
General information
Type Hotel
Residential
Office
Location Dubai, United Arab Emirates
Cost USD 330 million
Height
Roof 420 metres (1,378 ft)
Technical details
Floor count 80
Design and construction
Architect David Fisher
Developer Dynamic Architecture
INTRODUCTION OF BUILDING
•The Idea of Dynamic Architecture was born with the desire to have buildings that adjust
themselves to life, that are part of nature.
ABOUT DYNAMIC ARCHITECTURE
•Dynamic Architecture buildings keep modifying their
shape. As each floor rotates separately, the form of the
building changes constantly; you may not see the same
building twice.
•Dynamic architecture marks a new era in architecture.
This new approach, based on motion dynamics, is in
fact a challenge to traditional architecture that until now
was based on rigid buildings
In particular, the project is based on three
fundamental concepts:
1. it is DYNAMIC because each floor can rotate
2. independently from the others allowing the building to change its’ shape continuously,
it is GREEN because it produces
3. its own energy from the wind and from the sun; it is INDUSTRIALLY PRODUCED
being made of prefabricated modules, then assembled on site
Got inspired from
Suite vollard,brazil
Similar to the Suite Vollard completed in 2001 , each floor will be able to rotate
independently. This will result in a constantly changing shape of the tower.
Building Uses
- mixed use
- hotel
- mechanical
- office
- parking garage
- residential
- retail
Architectural Style
- dynamic architecture
Materials
- glass
- steel
- concrete, reinforced
- fabric
The first 20 floors will be for retail space
(not rotating), next 15 for a hotel, next 35
floors residential apartments and the top
10 floors luxury villa-style apartments.
Structural Types
- highrise
- cantilever
- landing pad
- revolving floor
- concrete core
ELEVATION OF BUILDING
VIDEO SHOWING WORLD FIRST ROTATING SKYSCAPER (DYNAMIC TOWER)
core will serve each floor
with a special, patented
connection for clean water,
based on technology used
to refuel airplanes in mid-
flight.
It is the world's first prefabricated skyscraper
with 40 factory-built modules for each floor.
90% of the tower has built in a factory and
shipped to the construction site.
the entire building has
finished with in 22
months and saved 30%
construction time than
normal
The core of the tower has
built at the construction site.
Part of this prefabrication
had decrease in cost and
number of workers (90 at
the work site and 600 in
the factory instead of 2,000
needed).
The majority of the
workers had done in
factories, where it is much
safer. The modules has
preinstalled including
kitchen and bathroom
fixtures
ABOUT BUILDING
It's produced of complete luxury units in a factory, including all plumbing, electrical, air
conditioning and installed on the concrete core right on location.
• The floors will be connected to the core in a way that will allow a continuous rotation to either
direction, with no vibrations or noise.
•The rotation of the floors is done with
steel bearings and combination of air-
cushion, allowing the floors to rotate
smoothly and with no vibrations
• There is limited power of about 4 KW required to rotate a floor. The drive system is situated in the
base of each floor so it can not be seen and in the same time it allows easy maintenance when
required.
• The structure is based on a
reinforced concrete core of
about 22mt diameter that
carries all the vertical loads.
• The floors will be all made of steel structure, becoming a monolithic platform, with a cantilever
up to about 15 meters.
ABOUT CORE:
ABOUT ROTATION OF FLOORS:
ABOUT FLOORS:
STRUCTURAL DETAILS:
5. Once attached to the load-bearing structure, an
operation that would require...few days.
6; These pre-assembled units that make a complete
finished floor will be made of a combination of steel,
aluminium and fiber carbon.
1. The Rotating Tower will be constructed in two main
phases. The central core will take just six months to
be constructed, using slip forms that allow the
erection of a floor every two days.
2. This structural solution of a massive single concrete
core will increase the building's seismic resistance
compared to a traditional skyscraper.
3. Two months after the start of works, the first
residential units will reach the job site, complete with
all their plumbing, electric and air-conditioning
systems.
4. The units will be “hooked” to the core with a
sequence of one floor a week, allowing a 60 stories
building to be built and to saveabout 30% over a
construction time of a similar skyscraper.
SECTION
PIC SHOWING FIXING OF MODULES TO CORE
CONSTRUCTION PROCEDURE:
VIDEO SHOWING CONSTRUCTION PROCEDURE OF BUILDING AND
ADVANTAGE S OF PRE FABRICATION
Considering that each floor of the tower consists of factory-made modules that will arrive
at the building site with electrical, plumbing, air-conditioning systems ready for use, the
“Fisher Method” will provide a long series of advantages:
Advantage 1: costs and construction time:
1. the construction time will be reduced of 30%.
2. The Method will allow the completion of a 70-floor skyscraper within 18 months
(nowadays it would take around 30 working months).
3. Furthermore, the “assemblage” of the Rotating Tower would require the presence of
approximately 90 people (specialized workers, technicians and engineers) in the
building site, instead of over 2 000 people in the traditional ones.
4. The Method will turn the site into a place where the modules are only assembled
because the structural work has already been completed in the factory.
5. The structural concept of the building is very simple – in fact, the only structural
element is a single centre core made of concrete.
6. It is faster, less expensive then hundred of beams ,columns and joints and also more
sound as it is quite a homogeneous structure with no wick connections.
ADVANTAGES OF PRE FABRICATION:
Advantage 2: customization
In addition, it will be possible to customise individual
apartments according to owners' needs and style.
Due to the industrial process, the apartments will offer
excellent design and an endless variety of customizations
Plan showing how a whole floor of the
Rotating Tower can become a villaAdvantage 3: quality control
The quality standards, from the structural parts to the fittings and finishing, can easily be
guaranteed since the modules are manufactured in an industrialized structure, and not in a
building site where monitoring can be difficult
Advantage 4: safety in the working place
• Another strong point of the “Fisher Method” is safety in the working place. Building site
workers will be able to operate in comfortable and functional environmental conditions
because the various assemblage (rather than construction) phases will follow smart,
time-saving, well-organized sequences.
• The industrialization of house-building in fact is based on the optimization of the
manufacturing cycle and will turn house-building technique into an industrial model.
Advantage 5: environmental advantages
1. Thanks to this new Method, the Rotating Tower building site will definitely offer
outstanding environmental advantages to the cities: traditionally huge, polluted, unsafe
building sites will become Smart Sites, comparatively smaller, ecological and safer.
2. Considering that the modules have been pre-assembled in the factory, all the negative
factors linked to traditional sites will disappear: big space around the building, endless
loading and unloading, debris, waste material, noise and traffic
•A Green Environmental Tower – Dubai:
•The Dynamic Architecture building, which will be constantly in motion changing its
shape, will be able to generate electric energy for itself as well as for other buildings.
Seventy wind turbines fitted between each
rotating floors
•Considering per year 2,300 Hr of 16mt/sec of wind in Dubai,
it is expexting to have 460,000KwH of energy produced by
one turbine in one year. As each family consume about
24,000KwH in a year, therefore one turbine should supply
energy for 19 apartments.
The entire tower will be powered from wind turbines and solar
panels. Enough surplus electricity should be produced to
power five other similar sized buildings in the vicinity which
worths 7 million dollars.The turbines will be located between
each of the rotating floors. They could generate up to
1,200,000 kilowatt-hours of energy. The solar panels will be
located on the roof and the top of each floor
•While the floors will rotate by electric power, the turbines
will rotate by the wind power and will be connected to a
single generator, one in each floor.
As far as the photovoltaic panels are concerned they
will be placed on the roof of each rotating floor. Even
though the panels will cover only a 20% of its surface,
the roof of each floor is exposed this Rotating Tower
can be considered the first real “green” building.
In 2008, Fisher said that he expected the skyscraper to be
completed in 2010.In 2009, Fisher said construction would be
complete in late 2011. However, as of January 2013, construction
has not started yet, and there has been no official announcement
of the building site. Fisher did not "say where the tower would be
built, because he wanted to keep it a surprise."Fisher
acknowledges that he is not well known, has never built a
skyscraper before and has not practiced architecture regularly in
decades
BY
P.SWAPNIKA

More Related Content

What's hot

High rise
High rise High rise
High rise
Kamrul Hasan Sagar
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
chuhonsan
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
Anas Adel
 
Intelligent building envelopes
Intelligent building envelopesIntelligent building envelopes
Intelligent building envelopes
Rajat Nainwal
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
Soumitra Smart
 
World one (Lodha Tower)
World one (Lodha Tower)World one (Lodha Tower)
World one (Lodha Tower)
Nikunj Rathod
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
Meer Musabber ali (joyous)
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
Nicholas Socrates
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY
Rifquthsb1
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
Karthik Suresh
 
World trade centre,bahrain
World trade centre,bahrainWorld trade centre,bahrain
World trade centre,bahrain
Dishant Rautela
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
Simi Sayed
 
high rise case study
high rise case studyhigh rise case study
high rise case study
ParthPatel1739
 
suite_vollard_presentation AH
suite_vollard_presentation AHsuite_vollard_presentation AH
suite_vollard_presentation AHDias Koshumbekov
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
chuhonsan
 
High-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterHigh-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock Center
Nuruzzamanpeash
 
IIM Bangalore
IIM BangaloreIIM Bangalore
IIM Bangalore
Sandhya Singh
 
Futuristic architecture dynamic architecture
Futuristic architecture    dynamic architectureFuturistic architecture    dynamic architecture
Futuristic architecture dynamic architecture
Soumitra Smart
 
Empire state building
Empire state buildingEmpire state building
Empire state building
dishani chauhan
 

What's hot (20)

High rise
High rise High rise
High rise
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
Intelligent building envelopes
Intelligent building envelopesIntelligent building envelopes
Intelligent building envelopes
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
World one (Lodha Tower)
World one (Lodha Tower)World one (Lodha Tower)
World one (Lodha Tower)
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
World trade centre,bahrain
World trade centre,bahrainWorld trade centre,bahrain
World trade centre,bahrain
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 
high rise case study
high rise case studyhigh rise case study
high rise case study
 
suite_vollard_presentation AH
suite_vollard_presentation AHsuite_vollard_presentation AH
suite_vollard_presentation AH
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
presentation ON TALL BUILDING
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
 
High-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterHigh-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock Center
 
IIM Bangalore
IIM BangaloreIIM Bangalore
IIM Bangalore
 
Futuristic architecture dynamic architecture
Futuristic architecture    dynamic architectureFuturistic architecture    dynamic architecture
Futuristic architecture dynamic architecture
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 

Similar to DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI

74 77 global project focus EPC Age magazine 2008
74 77 global project focus EPC Age magazine 200874 77 global project focus EPC Age magazine 2008
74 77 global project focus EPC Age magazine 2008
Remona Divekar
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
Nayan Rao
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologies
Akshey Sharma
 
The spinning skyscrapers
The spinning skyscrapersThe spinning skyscrapers
The spinning skyscrapers
Joji Mathew
 
High rise archive research
High rise archive researchHigh rise archive research
High rise archive research
denverdieza
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
Nekumi Kida
 
Btech report
Btech reportBtech report
Btech report
Chong Chin Pin
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
Quinn Liew
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 Report
Bolin Loong
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
sauravavantador
 
Three Innovative Structures
Three Innovative StructuresThree Innovative Structures
Three Innovative StructuresKevin Sonico
 
Pre-engineered bldg.pptx
Pre-engineered bldg.pptxPre-engineered bldg.pptx
Pre-engineered bldg.pptx
hdssitacinhdssitacin
 
Btech
BtechBtech
Btech
kerneng
 
96382022 pre-engineered-buildings
96382022 pre-engineered-buildings96382022 pre-engineered-buildings
96382022 pre-engineered-buildingshlksd
 
Modular Volumetric Construction
Modular Volumetric ConstructionModular Volumetric Construction
Modular Volumetric Construction
philwdm
 
Dr. ar. david h. fisher
Dr. ar. david h. fisherDr. ar. david h. fisher
Dr. ar. david h. fishervikashsaini78
 
Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02
Gopinan
 

Similar to DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI (20)

74 77 global project focus EPC Age magazine 2008
74 77 global project focus EPC Age magazine 200874 77 global project focus EPC Age magazine 2008
74 77 global project focus EPC Age magazine 2008
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
Presentation1
Presentation1Presentation1
Presentation1
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologies
 
The spinning skyscrapers
The spinning skyscrapersThe spinning skyscrapers
The spinning skyscrapers
 
High rise archive research
High rise archive researchHigh rise archive research
High rise archive research
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Btech report
Btech reportBtech report
Btech report
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 Report
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Three Innovative Structures
Three Innovative StructuresThree Innovative Structures
Three Innovative Structures
 
Pre-engineered bldg.pptx
Pre-engineered bldg.pptxPre-engineered bldg.pptx
Pre-engineered bldg.pptx
 
Btech
BtechBtech
Btech
 
96382022 pre-engineered-buildings
96382022 pre-engineered-buildings96382022 pre-engineered-buildings
96382022 pre-engineered-buildings
 
Prefabricated
PrefabricatedPrefabricated
Prefabricated
 
Modular Volumetric Construction
Modular Volumetric ConstructionModular Volumetric Construction
Modular Volumetric Construction
 
Dr. ar. david h. fisher
Dr. ar. david h. fisherDr. ar. david h. fisher
Dr. ar. david h. fisher
 
Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02
 
MMC Revision Notes
MMC Revision NotesMMC Revision Notes
MMC Revision Notes
 

More from padamatikona swapnika

Composite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhiComposite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhi
padamatikona swapnika
 
factors behind the development of Noida
factors behind the development of Noida factors behind the development of Noida
factors behind the development of Noida
padamatikona swapnika
 
tele communications and community services
tele communications and community servicestele communications and community services
tele communications and community services
padamatikona swapnika
 
Fibre glass
Fibre glassFibre glass
History of washington DC
History of washington DCHistory of washington DC
History of washington DC
padamatikona swapnika
 
water conservation and policies for sustainable future
water conservation and policies for sustainable futurewater conservation and policies for sustainable future
water conservation and policies for sustainable future
padamatikona swapnika
 
Urban housing scenario and rental housing in india
Urban housing scenario and rental housing in indiaUrban housing scenario and rental housing in india
Urban housing scenario and rental housing in india
padamatikona swapnika
 
Tsunami disaster managment
Tsunami disaster managmentTsunami disaster managment
Tsunami disaster managment
padamatikona swapnika
 
Stake holders role in water conservation
Stake holders role in water conservationStake holders role in water conservation
Stake holders role in water conservation
padamatikona swapnika
 
Peri urbanisation
Peri urbanisationPeri urbanisation
Peri urbanisation
padamatikona swapnika
 
Institutions in housing market and housing finance in india
Institutions in housing market and housing finance in indiaInstitutions in housing market and housing finance in india
Institutions in housing market and housing finance in india
padamatikona swapnika
 
Basic services to urban poor (Bsup)
Basic services to urban poor (Bsup)Basic services to urban poor (Bsup)
Basic services to urban poor (Bsup)
padamatikona swapnika
 
China urban tranformation
China urban tranformationChina urban tranformation
China urban tranformation
padamatikona swapnika
 
urban fringes
urban fringesurban fringes
urban fringes
padamatikona swapnika
 
case study on v.v. puram's food street, bangalore
case study on v.v. puram's food street, bangalorecase study on v.v. puram's food street, bangalore
case study on v.v. puram's food street, bangalore
padamatikona swapnika
 
ahmedabad BRTS study
ahmedabad BRTS studyahmedabad BRTS study
ahmedabad BRTS study
padamatikona swapnika
 
Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)
padamatikona swapnika
 
state of urban service delivery in inda
state of urban service delivery in indastate of urban service delivery in inda
state of urban service delivery in inda
padamatikona swapnika
 
74th amendment act
74th amendment act74th amendment act
74th amendment act
padamatikona swapnika
 
cognitive, behaviour and activity mapping
cognitive, behaviour and activity mappingcognitive, behaviour and activity mapping
cognitive, behaviour and activity mapping
padamatikona swapnika
 

More from padamatikona swapnika (20)

Composite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhiComposite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhi
 
factors behind the development of Noida
factors behind the development of Noida factors behind the development of Noida
factors behind the development of Noida
 
tele communications and community services
tele communications and community servicestele communications and community services
tele communications and community services
 
Fibre glass
Fibre glassFibre glass
Fibre glass
 
History of washington DC
History of washington DCHistory of washington DC
History of washington DC
 
water conservation and policies for sustainable future
water conservation and policies for sustainable futurewater conservation and policies for sustainable future
water conservation and policies for sustainable future
 
Urban housing scenario and rental housing in india
Urban housing scenario and rental housing in indiaUrban housing scenario and rental housing in india
Urban housing scenario and rental housing in india
 
Tsunami disaster managment
Tsunami disaster managmentTsunami disaster managment
Tsunami disaster managment
 
Stake holders role in water conservation
Stake holders role in water conservationStake holders role in water conservation
Stake holders role in water conservation
 
Peri urbanisation
Peri urbanisationPeri urbanisation
Peri urbanisation
 
Institutions in housing market and housing finance in india
Institutions in housing market and housing finance in indiaInstitutions in housing market and housing finance in india
Institutions in housing market and housing finance in india
 
Basic services to urban poor (Bsup)
Basic services to urban poor (Bsup)Basic services to urban poor (Bsup)
Basic services to urban poor (Bsup)
 
China urban tranformation
China urban tranformationChina urban tranformation
China urban tranformation
 
urban fringes
urban fringesurban fringes
urban fringes
 
case study on v.v. puram's food street, bangalore
case study on v.v. puram's food street, bangalorecase study on v.v. puram's food street, bangalore
case study on v.v. puram's food street, bangalore
 
ahmedabad BRTS study
ahmedabad BRTS studyahmedabad BRTS study
ahmedabad BRTS study
 
Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)
 
state of urban service delivery in inda
state of urban service delivery in indastate of urban service delivery in inda
state of urban service delivery in inda
 
74th amendment act
74th amendment act74th amendment act
74th amendment act
 
cognitive, behaviour and activity mapping
cognitive, behaviour and activity mappingcognitive, behaviour and activity mapping
cognitive, behaviour and activity mapping
 

Recently uploaded

weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 

Recently uploaded (20)

weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 

DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI

  • 1. DA VINCI TOWER / DYNAMIC TOWER / ROTATING TOWER ARCHITECT DAVID FISHER
  • 2.  Dr. Fisher’s professional activity has always been focused on two concepts: 1.an industrial approach, which involves the use of prefab units, 2.and Dynamic Architecture, according to which the traditional 3D design meets a fourth dimension: time  According to Dr. Fisher, time is the most powerful dimension of life because it is tightly linked with relativity. His new skyscraper, the Rotating Tower, is “shaped by life, designed by time” INTENTION:  intention was to build an 80-story skyscraper in Dubai. It featured revolving floors, some of which could have moved on command, providing the building with an ever- changing shape along with a changing view for the residents. It is Fisher's first skyscraper design. Fisher is an italian architect and the founder and chairman of Dynamic Architecture Group. DR.DAVID FISHER ABOUT ARCHITECT OF ROTATING TOWER
  • 3. The Dynamic Tower (also known as Dynamic Architecture Building or the Da Vinci Tower) is a planned 420-metre (1,378 ft), 80-floor moving skyscraper in Dubai, United Arab Emirates, designed by architect David Fisher Dynamic Tower General information Type Hotel Residential Office Location Dubai, United Arab Emirates Cost USD 330 million Height Roof 420 metres (1,378 ft) Technical details Floor count 80 Design and construction Architect David Fisher Developer Dynamic Architecture INTRODUCTION OF BUILDING
  • 4. •The Idea of Dynamic Architecture was born with the desire to have buildings that adjust themselves to life, that are part of nature. ABOUT DYNAMIC ARCHITECTURE •Dynamic Architecture buildings keep modifying their shape. As each floor rotates separately, the form of the building changes constantly; you may not see the same building twice. •Dynamic architecture marks a new era in architecture. This new approach, based on motion dynamics, is in fact a challenge to traditional architecture that until now was based on rigid buildings In particular, the project is based on three fundamental concepts: 1. it is DYNAMIC because each floor can rotate 2. independently from the others allowing the building to change its’ shape continuously, it is GREEN because it produces 3. its own energy from the wind and from the sun; it is INDUSTRIALLY PRODUCED being made of prefabricated modules, then assembled on site
  • 5. Got inspired from Suite vollard,brazil Similar to the Suite Vollard completed in 2001 , each floor will be able to rotate independently. This will result in a constantly changing shape of the tower.
  • 6. Building Uses - mixed use - hotel - mechanical - office - parking garage - residential - retail Architectural Style - dynamic architecture Materials - glass - steel - concrete, reinforced - fabric The first 20 floors will be for retail space (not rotating), next 15 for a hotel, next 35 floors residential apartments and the top 10 floors luxury villa-style apartments. Structural Types - highrise - cantilever - landing pad - revolving floor - concrete core ELEVATION OF BUILDING
  • 7. VIDEO SHOWING WORLD FIRST ROTATING SKYSCAPER (DYNAMIC TOWER)
  • 8. core will serve each floor with a special, patented connection for clean water, based on technology used to refuel airplanes in mid- flight. It is the world's first prefabricated skyscraper with 40 factory-built modules for each floor. 90% of the tower has built in a factory and shipped to the construction site. the entire building has finished with in 22 months and saved 30% construction time than normal The core of the tower has built at the construction site. Part of this prefabrication had decrease in cost and number of workers (90 at the work site and 600 in the factory instead of 2,000 needed). The majority of the workers had done in factories, where it is much safer. The modules has preinstalled including kitchen and bathroom fixtures ABOUT BUILDING It's produced of complete luxury units in a factory, including all plumbing, electrical, air conditioning and installed on the concrete core right on location.
  • 9. • The floors will be connected to the core in a way that will allow a continuous rotation to either direction, with no vibrations or noise. •The rotation of the floors is done with steel bearings and combination of air- cushion, allowing the floors to rotate smoothly and with no vibrations • There is limited power of about 4 KW required to rotate a floor. The drive system is situated in the base of each floor so it can not be seen and in the same time it allows easy maintenance when required. • The structure is based on a reinforced concrete core of about 22mt diameter that carries all the vertical loads. • The floors will be all made of steel structure, becoming a monolithic platform, with a cantilever up to about 15 meters. ABOUT CORE: ABOUT ROTATION OF FLOORS: ABOUT FLOORS: STRUCTURAL DETAILS:
  • 10. 5. Once attached to the load-bearing structure, an operation that would require...few days. 6; These pre-assembled units that make a complete finished floor will be made of a combination of steel, aluminium and fiber carbon. 1. The Rotating Tower will be constructed in two main phases. The central core will take just six months to be constructed, using slip forms that allow the erection of a floor every two days. 2. This structural solution of a massive single concrete core will increase the building's seismic resistance compared to a traditional skyscraper. 3. Two months after the start of works, the first residential units will reach the job site, complete with all their plumbing, electric and air-conditioning systems. 4. The units will be “hooked” to the core with a sequence of one floor a week, allowing a 60 stories building to be built and to saveabout 30% over a construction time of a similar skyscraper. SECTION PIC SHOWING FIXING OF MODULES TO CORE CONSTRUCTION PROCEDURE:
  • 11. VIDEO SHOWING CONSTRUCTION PROCEDURE OF BUILDING AND ADVANTAGE S OF PRE FABRICATION
  • 12. Considering that each floor of the tower consists of factory-made modules that will arrive at the building site with electrical, plumbing, air-conditioning systems ready for use, the “Fisher Method” will provide a long series of advantages: Advantage 1: costs and construction time: 1. the construction time will be reduced of 30%. 2. The Method will allow the completion of a 70-floor skyscraper within 18 months (nowadays it would take around 30 working months). 3. Furthermore, the “assemblage” of the Rotating Tower would require the presence of approximately 90 people (specialized workers, technicians and engineers) in the building site, instead of over 2 000 people in the traditional ones. 4. The Method will turn the site into a place where the modules are only assembled because the structural work has already been completed in the factory. 5. The structural concept of the building is very simple – in fact, the only structural element is a single centre core made of concrete. 6. It is faster, less expensive then hundred of beams ,columns and joints and also more sound as it is quite a homogeneous structure with no wick connections. ADVANTAGES OF PRE FABRICATION:
  • 13. Advantage 2: customization In addition, it will be possible to customise individual apartments according to owners' needs and style. Due to the industrial process, the apartments will offer excellent design and an endless variety of customizations Plan showing how a whole floor of the Rotating Tower can become a villaAdvantage 3: quality control The quality standards, from the structural parts to the fittings and finishing, can easily be guaranteed since the modules are manufactured in an industrialized structure, and not in a building site where monitoring can be difficult
  • 14. Advantage 4: safety in the working place • Another strong point of the “Fisher Method” is safety in the working place. Building site workers will be able to operate in comfortable and functional environmental conditions because the various assemblage (rather than construction) phases will follow smart, time-saving, well-organized sequences. • The industrialization of house-building in fact is based on the optimization of the manufacturing cycle and will turn house-building technique into an industrial model. Advantage 5: environmental advantages 1. Thanks to this new Method, the Rotating Tower building site will definitely offer outstanding environmental advantages to the cities: traditionally huge, polluted, unsafe building sites will become Smart Sites, comparatively smaller, ecological and safer. 2. Considering that the modules have been pre-assembled in the factory, all the negative factors linked to traditional sites will disappear: big space around the building, endless loading and unloading, debris, waste material, noise and traffic
  • 15. •A Green Environmental Tower – Dubai: •The Dynamic Architecture building, which will be constantly in motion changing its shape, will be able to generate electric energy for itself as well as for other buildings. Seventy wind turbines fitted between each rotating floors •Considering per year 2,300 Hr of 16mt/sec of wind in Dubai, it is expexting to have 460,000KwH of energy produced by one turbine in one year. As each family consume about 24,000KwH in a year, therefore one turbine should supply energy for 19 apartments. The entire tower will be powered from wind turbines and solar panels. Enough surplus electricity should be produced to power five other similar sized buildings in the vicinity which worths 7 million dollars.The turbines will be located between each of the rotating floors. They could generate up to 1,200,000 kilowatt-hours of energy. The solar panels will be located on the roof and the top of each floor •While the floors will rotate by electric power, the turbines will rotate by the wind power and will be connected to a single generator, one in each floor. As far as the photovoltaic panels are concerned they will be placed on the roof of each rotating floor. Even though the panels will cover only a 20% of its surface, the roof of each floor is exposed this Rotating Tower can be considered the first real “green” building.
  • 16. In 2008, Fisher said that he expected the skyscraper to be completed in 2010.In 2009, Fisher said construction would be complete in late 2011. However, as of January 2013, construction has not started yet, and there has been no official announcement of the building site. Fisher did not "say where the tower would be built, because he wanted to keep it a surprise."Fisher acknowledges that he is not well known, has never built a skyscraper before and has not practiced architecture regularly in decades