This document discusses a case study on optimizing manpower usage through time study methods at Mahindra HINO Motors. The objectives were to minimize excessive manpower, production time, and efforts while improving production methods and ergonomics. Through time study analysis of operations like raw material unloading, inspection, numbering, and loading, solutions like hydraulic lifters and pneumatic numbering machines were implemented. This reduced the total time for a cycle from 270 seconds to 60 seconds, minimizing manpower requirements by 2-3 people per cycle while meeting objectives.