A team of delegates from different subsidiaries of CIL visited Australia.
Χoncept presentation was made during CMD’s meet at CIL HQ.
It was agreed that some coal mines will be selected and CIL and Orica
will work together to improve overall productivity
The project was named as “Productivity Improvement Programme” (PIP).
The projects selected were AKWMC Project in BCCL and Dudhichua
Project in NCL.
The whole process was divided in two phases: Phase 1 was called “Study
of Ongoing Practices” and Phase 2 was called “Demonstration of benefits”
Productivity Improvement Programme
AKWMC, Katras Area
BCCL
The mine had been re-structured after amalgamation of Keshalpur and West
Mudidih Mines.
Production target for 2008-09
•Coal - 1.5 Million Tonnes.
•Overburden - 4.5 Million cubic meters.
No. of working benches
•Overburden - 08
•Coal - 03
Machineries
•Shovels:
5cuM bucket capacity rope shovel- 06 Nos.
5 cuM bucket capacity hydraulic shovel-01 No.
2.8cuM bucket capacity hyraulic shovel- 03 Nos.
•Drills:160mm drill diameter- 05 Nos.
•Drill: 250 mm. Drill diameter-01 no.
•Dumpers on roll(35 Tonnes capacity) - 53 Nos.
Achieved high operational efficiency with stripping ratio of 1:3.
Achieved Coal Production of 1.12 MT against the target of 1.20 MT in 2007-08 .
Receptive to new technologies.
Sensitive to environmental issues like ground vibration,fly rocks and noise.
Low blasting costs.
Successfully doing excavation over old underground workings.
Higher percentage percentage of utilization of HEMM 85% as compared to
other mines of BCCL.
AKWMC, Katras Area BCCL
PIP Structure
Productivity Improvement Programme was structured as follows:
Formation of Steering Team: Steering team formed with some nominated members of
Katras area and Indian Explosives Limited.The steering team meeting was scheduled
once in a week for planning the operation in next week and to review the work done in last
week.
Selection of benches: Since time period the study was very less some of the overburden
benches in the mine were selected for PIP which are very hard and geologically disturbed
where mine management was facing problems in operation.
Benchmarking of on-going practices in mine: Productivity of some of the key operations
e.g. Drilling,Blasting and Mucking was benchmarked in terms of Rs./cuM and cuM/hr by
time and motion study of each operation.
Demonstration of benefits: Productivity of the same operations e.g. Drilling,Blasting and
Mucking was determined after some blasts were done on the same benches by M/s.
Indian Explosives Limited by using modern blasting technology.
Calculations: Demonstration of benefits in terms of productivity was done by comparing
demonstration and benchmarking data of each operation.
Presentation: A presentation on work done was made to the CGM (Katras area) and
steering committee.
Project Planning by Steering Committee
Steering committee met weekly to assess the progress of work done in previous
week and to plan the work for next week.
Appointed Mr. C.B.Prasad as an officer in-charge dedicated for PIP work.
AKWMC management suggested
To select only hard and fractured due to presence of depillared and caved
goaf benches for PIP exercise, which were over VIII seam top, VIII seam
bottom and VII seam.
To do time and motion study only for some selected machines deployed on
those benches. The machines selected were:
Shovels: S-38, S-483, S-394 and S-342.
Drills: IDM 30 III, IDM 30 I and RECP 311.
To take transportation cost as a constant for both phases.
To take average of four months costs for determination of existing operating
cost.
To conduct at least one blast in each bench for demonstration of the benefits.
It was finalized by the Steering Committee that Orica
 Will conduct 4 stand up blasts by using advanced blasting technologies.
 Will mark drill holes, supervise drilling operations and provide relevant training
to drill operators.
 Will present the results obtained in both the phases of the study.
Project Planning by Steering Committee
Benchmarking of On-going Practices
Drilling operation
Time and motion study of drill machines IDM 30 III, IDM 30 I and RECP 311 and
productivity was determined in terms of Rs./m and Rs./cuM.
Drilling operation
Drilling cost
Blasting operation
Blast design parameters are studied and tabulated.Bench wise powder factor was
determined and cost in Rs./cuM was determined.
Blasting operation
Blasting cost
Mucking operation
Time and motion study for shovels S-38,S-342,S-394 and S-493 was done and
productivity of mucking operation was determined in terms of Rs./cuM and
material handled in cuM/hr.
Mucking operation
Mucking cost
Transportation cost
Transportation cost was constant for both phases and material handled per trip
was taken as 11cuM/trip as fixed by previous survey data.
Total mining cost
Total mining cost was determined by adding up drilling cost,blasting cost and
mucking cost.
COST COMPONENTS
DATA SOURCES
Study of On-going Practices- Phase I
Phase II-Demonstration of Benefits
Methodology adopted in demonstration exercise :
DRILLING OPERATION
•Marking of drill holes in staggered pattern on the patch.
•Monitoring of the drilling operation for ensuring proper depth and pattern
•Training imparted to the drill operators and helpers.
Training of drill operators and Helpers
BLASTING OPERATION
•To ensure proper charging of blast holes according to the plan.
•To model each blast with Orica’s patented softwares.
•To design each blast with the help of Shotplus-i software.
•To use hole liners in the crack holes.
Blasting cost
MUCKING OPERATION
•Time and motion study of the shovels is done by dividing the blasted muck
into three sections e.g. Initial, middle and last section as in study of on-going
practice.
•Material handled in cuM/hr. was determined with the study data.
Mucking cost
TRANSPORTATION COST
Transportation cost is taken constant as in study of on-going practice.
Demonstration of Benefits
Blast Design & Model – Blast 2
Blast 2 in shotplus-i
Photographs of the blasted muck pile
during demonstration
Results
Head Cost during
benchmarking
operation in
Rs./cuM
Cost during
demonstratio
n operation
in Rs./cuM
Savings
in cost in
Rs./cuM
Percentage
savings
Drilling cost in Rs./cuM 13.23 10.27 2.96 22.39%
Blasting cost in Rs./cuM 19.59 13.80 5.79 29.54%
Drilling and blasting cost in
Rs/cuM 32.82 24.07 8.75 26.65%
Mucking cost in Rs./cuM 23.46 14.8 8.66 36.91%
Total mining cost in Rs./cuM 56.28 38.87 17.41 30.93%
Overall savings in mining
cost* in Rs./cuM 17.41 (30.93%)
Benefits
Improvement in Fragmentation.
Drilling cost (per cuM) was saved by optimization of blast design parameters
Savings in production hours due to bigger blasts.
Exposure of mine management to advanced blasting technology.
Sharing of knowledge between BCCL and IEL.
Scope of improvement in Future
To Merge two small benches (5 to 6 m height) for faster development of the
mine. The mine is having capacity to drill 15m. Drill holes.
Application of Stratablast (a product of Orica’s Blast Based Services) for
mining of thin seams along with partings in a single blast for faster
development of the mine.Presently the mine is excavating no. of thin seams
in different benches.
To conduct bigger blasts for faster exposure of coal and better efficiency.
Help the mine meet environmental compliance norms.
DISCUSSIONS?????….
Thank you!!!
PHASE-I
STUDY OF ON-GOING PRACTICE
Method of study
DRILLING
Time study of:
• Drilling time.
• Rod changing time.
• Spotting time.
• Idle time.
• Meterage drilling.
 Rate of drilling (m/hr.) = Meterage drilling/ Total time taken in drilling (excluding
idle time).
 Drilling cost (Rs./m.) = Total cost incurred during the period of study/ Total
meterage of drilling done by the machine.
Back to main slide
MUCKING
Back to main
Time study of the shovels by:
• Study of the cycle time of loading of one dumper.
• Study of the spotting time of one dumper.
• Idle time of the shovel due to non availability of dumpers at the face.
 Material handled by the shovel (cuM / Hr) = Volume of the material carried by
the dumper per trip* / Total time taken in filling one dumper by shovel
(excluding idle time of the shovel)
 Mucking cost (Rs. / cuM) = Total cost incurred for the shovel during the study
period/ Total volume handled by the shovel during the period.
* Standard volume carried by each dumper is considered as 11cuM.
COST COMPONENTS
Back to main
Following cost components are taken into consideration in determination of mining cost of OB
in Rs./cuM.
 Cost of Diesel, lubes and other consumables
 Cost of spares.
 Cost of maintenance manpower.
 Cost of operation manpower.
 Cost of depreciation.
Following cost components are considered as a constant in determination of per cubic
mining cost of OB due to non-availability of sufficient data:
 Electric power consumption cost.
 Hauling cost.
 Dozing cost.
 Administration cost.
DATA SOURCES
Back to main
DATA SOURCE
Cost of HSD and consumables. New Keshalpur and West Mudidih
Workshop.
Cost of Spares and maintenance. New Keshalpur and West Mudidih
Workshop.
Cost of maintenance manpower. Finance deptt. of the project and
Workshops.
Machine performance as per BCCL data. Excavations deptt. of the Katras area.
Monthly cost sheet. Computer deptt. Katras area.
Cost of explosives and blasting
accessories.
AKWMC magazine.
Meterage drilling and cuM handled by
machines per month.
Office of the project officer AKWMC and
pit office.
Study of blasting operation in case study
Back to main
Study of following operations in blasting operation:
• Blast design parameters like burden, spacing and depth of the drill holes.
• Charging operation.
• Drilling cost per cuM.
• Blasting cost per cuM.
• Bench wise powder factor.
Study of drilling operation
Back to main slide
Drilling cost( Rs./m.) in case study (Excluding administration cost)
HEAD IDM 30 III RECP 311 IDM 30 I
COST in Rs.(from Jan to Apr.08)
HSD,LUBES & CONS. 867627.00 1087946.00 830952.00
SPARE PARTS 172092.00 300237.00 185208.00
MAINTE.MANPOWER COST 388601.24 388601.24 582901.86
OPERATION MANPOWER COST* 584093.60 683766.03 564717.08
DEPRECIATION COST 359852.00 291333.00 327407.00
TOTAL COST 2372265.84 2751883.27 2491185.94
DRILL METERAGE 14402.00 13318.00 12861.00
WORKING HOURS 779.70 1101.50 842.90
DRILLING COST /M 164.72 206.63 193.70
COST/HR 3042.54 2498.31 2955.49
Avg. drilling cost/m
*includes one drill operator, one
helper and half supervisor.
188.35
Mucking operation in case study.(Back to main)
Operation Cost of Shovel as per field study data (in Rs./cuM)
(excluding electric power and administration cost)
* includes one shovel operator, one cableman and half supervisor.
HEAD S-38 S-394 S-342 S-483
Material handled in cuM/hr.( Mar. to Apr.08)
Initial Section 74.94 99.27 88.5 100.54
Middle Section 75.51 115.96 105.42 112.45
Last section 72.3 77.83 77.34 103.97
Average 74.25 97.69 90.42 105.65
Total working Hrs. (Jan. to Apr.08) 506.5 827.7 848.5 1968.2
COST in Rs. (From Jan. to Apr. 08) (Avg.muckig cost in Rs./cuM – 23.46 )
Cost of Maintenance Manpower 680052.13 1165803.70 874352.81 971503.10
Cost of operation manpower* 274395.85 547849.15 441606.15 791548.65
Cost of Spares & Consumable
# due to comp. rep’g of undercarriage 87759.00 44410.00 311664.00# 132600.00
Cost of Depreciation 0.00 568028.00 0.00 1464724.00
Total Cost 1042206.98 2326090.85 1627622.95 3360375.75
Composite Material handled (cuM) 37607.63 80855.25 76721.37 207946.89
Cost/Hr 2057.66 2810.31 1918.24 1707.33
Cost per cuM in Rs. 27.71 28.77 21.21 16.16
Study of blasting operation
Back to main
Bench
Avg.
depth in
M
Av.
Burden
in M
Av.
spacing
in M
P.F.
in
cuM/K
g.
Avg. drilling
and blasting
cost in
Rs/cuM
Avg.
blasting
Cost* in
Rs./cuM
S-38
(VIII seam bottom) 11.38 3.53 4.25 1.27 32.51 20.10
S-394
(VIII seam bottom) 11.20 3.27 3.87 1.19 34.29 20.76
S-483
(VIII seam top) 6.41 3.04 3.90 1.31 38.47 22.52
S-483
( VIII seam top) 11.19 3.80 4.70 1.51 27.68 14.99
*includes explosives cost and
salary cost of blasting crew. Avg. 1.32 32.82 19.59
Drilling and Blasting
BENCH WISE P.F. AND BLASTING COST (Rs./cuM)
Bench
Date of
blast
Avg.
depth
in M
Av.
Burde
n in M
Av.
spacing
in M
P.F.in
cuM/K
g.
Blastin
g cost
in
Rs./cu
M
Drilling
cost in
Rs./cu
M
Avg.
drilling
and
blasting
cost in
Rs/cuM
S-394 19.05.08 6.52 3.7 4.2 1.37 15.89 16.17 30.93
S-394 27.05.08 6.09 3.7 4.2 1.84 11.77 12.32 22.73
S-342 30.05.08 11.73 4 4.5 1.93 10.96 10.38 20.75
S-38 15.06.08 14.34 4 4.5 1.84 11.58 12.06 21.87
Back to main Avg. 1.75 12.55 12.73 24.07
Mucking operation
Ongoing practice
Operation Cost of Shovel as per field study data (in Rs./cuM)
(Excluding Electric Power and administration cost)
HEAD S-38 S-394 S-342 S-483
Material handled in cuM/hr. (From May - June 08)
Initial Section 138.03 147.86 171.81 N.A.
Middle Section 157.57 191.05 204.18 N.A.
Last section 114.17 124.46 140.89 N.A.
Average material handled
(cuM/Hr)
136.59 154.46 172.29 N.A.
Cost/Hr 2057.66 2810.31 1918.24 N.A
Cost per cuM in Rs. 15.06 18.19 11.13 N.A.
Mucking cost in Rs./cuM (Avg.) 14.80
Mucking operation
Ongoing practice
Back to main
Operation Cost of Shovel as per field study data (in Rs./cuM)
(Excluding Electric Power and administration cost)
HEAD S-38 S-394 S-342 S-483
Material handled in cuM/hr. (From May - June 08)
Initial Section 138.03 147.86 171.81 N.A.
Middle Section 157.57 191.05 204.18 N.A.
Last section 114.17 124.46 140.89 N.A.
Average material handled
(cuM/Hr)
136.59 154.46 172.29 N.A.
Cost/Hr 2057.66 2810.31 1918.24 N.A
Cost per cuM in Rs. 15.06 18.19 11.13 N.A.
Mucking cost in Rs./cuM (Avg.) 14.80
Cost comparison in study and
demonstration exercise
Cost Analysis
Head
Cost during
benchmarkin
g operation
in Rs./cuM
Cost during
demonstrati
on
operation in
Rs./cuM
Savings
in cost in
Rs./cuM
Percentage
savings
Drilling cost in Rs./cuM 13.23 10.27 2.96 22.39
Blasting cost in Rs./cuM 19.59 13.80 5.79 29.54
Drilling and blasting cost in
Rs/cuM 32.82 24.07 8.75 26.65
Mucking cost in Rs./cuM 23.46 14.8 8.66 36.91
Total mining cost in Rs./cuM 56.28 38.87 17.41 30.93
Overall savings in mining
cost* in Rs./cuM
*Mining cost includes
drilling,Blasting & mucking
cost. 17.41 (30.93%)

More Related Content

Similar to blastinginprovementtechniques-131019092354-phpapp01 (1).pdf

Development Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismDevelopment Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismIRJET Journal
 
Practical training at shapoorji pallonji & co
Practical training at shapoorji pallonji & coPractical training at shapoorji pallonji & co
Practical training at shapoorji pallonji & coManjula Damodaran
 
IRJET- Experimental Analysis and Geometrical Effect on Mild Steel with Un...
IRJET-  	  Experimental Analysis and Geometrical Effect on Mild Steel with Un...IRJET-  	  Experimental Analysis and Geometrical Effect on Mild Steel with Un...
IRJET- Experimental Analysis and Geometrical Effect on Mild Steel with Un...IRJET Journal
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...irvan septyan mulyana
 
Study on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingStudy on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingAlwin Thomas
 
IRJET- Optimization of Mechanical Pencil by using Value Engineering
IRJET- Optimization of Mechanical Pencil by using Value EngineeringIRJET- Optimization of Mechanical Pencil by using Value Engineering
IRJET- Optimization of Mechanical Pencil by using Value EngineeringIRJET Journal
 
WELL COSTING
WELL COSTINGWELL COSTING
WELL COSTINGAFATous
 
Reducing Manufacturing Cost through Value Stream Mapping
Reducing Manufacturing Cost through Value Stream MappingReducing Manufacturing Cost through Value Stream Mapping
Reducing Manufacturing Cost through Value Stream MappingEditor IJCATR
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CVAli Khidr
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersVR M
 

Similar to blastinginprovementtechniques-131019092354-phpapp01 (1).pdf (20)

AH15019
AH15019AH15019
AH15019
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
PROJECT
PROJECTPROJECT
PROJECT
 
Development Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismDevelopment Of Tipper Unloading Mechanism
Development Of Tipper Unloading Mechanism
 
01_HVAC-R5_Tecni
01_HVAC-R5_Tecni01_HVAC-R5_Tecni
01_HVAC-R5_Tecni
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
Practical training at shapoorji pallonji & co
Practical training at shapoorji pallonji & coPractical training at shapoorji pallonji & co
Practical training at shapoorji pallonji & co
 
IRJET- Experimental Analysis and Geometrical Effect on Mild Steel with Un...
IRJET-  	  Experimental Analysis and Geometrical Effect on Mild Steel with Un...IRJET-  	  Experimental Analysis and Geometrical Effect on Mild Steel with Un...
IRJET- Experimental Analysis and Geometrical Effect on Mild Steel with Un...
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
 
Study on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingStudy on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream Mapping
 
Sip
SipSip
Sip
 
IRJET- Optimization of Mechanical Pencil by using Value Engineering
IRJET- Optimization of Mechanical Pencil by using Value EngineeringIRJET- Optimization of Mechanical Pencil by using Value Engineering
IRJET- Optimization of Mechanical Pencil by using Value Engineering
 
WELL COSTING
WELL COSTINGWELL COSTING
WELL COSTING
 
vijay cv
vijay cvvijay cv
vijay cv
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
Reducing Manufacturing Cost through Value Stream Mapping
Reducing Manufacturing Cost through Value Stream MappingReducing Manufacturing Cost through Value Stream Mapping
Reducing Manufacturing Cost through Value Stream Mapping
 
Resume.DOC
Resume.DOCResume.DOC
Resume.DOC
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 

blastinginprovementtechniques-131019092354-phpapp01 (1).pdf

  • 1.
  • 2. A team of delegates from different subsidiaries of CIL visited Australia. Χoncept presentation was made during CMD’s meet at CIL HQ. It was agreed that some coal mines will be selected and CIL and Orica will work together to improve overall productivity The project was named as “Productivity Improvement Programme” (PIP). The projects selected were AKWMC Project in BCCL and Dudhichua Project in NCL. The whole process was divided in two phases: Phase 1 was called “Study of Ongoing Practices” and Phase 2 was called “Demonstration of benefits” Productivity Improvement Programme
  • 3. AKWMC, Katras Area BCCL The mine had been re-structured after amalgamation of Keshalpur and West Mudidih Mines. Production target for 2008-09 •Coal - 1.5 Million Tonnes. •Overburden - 4.5 Million cubic meters. No. of working benches •Overburden - 08 •Coal - 03
  • 4. Machineries •Shovels: 5cuM bucket capacity rope shovel- 06 Nos. 5 cuM bucket capacity hydraulic shovel-01 No. 2.8cuM bucket capacity hyraulic shovel- 03 Nos. •Drills:160mm drill diameter- 05 Nos. •Drill: 250 mm. Drill diameter-01 no. •Dumpers on roll(35 Tonnes capacity) - 53 Nos.
  • 5. Achieved high operational efficiency with stripping ratio of 1:3. Achieved Coal Production of 1.12 MT against the target of 1.20 MT in 2007-08 . Receptive to new technologies. Sensitive to environmental issues like ground vibration,fly rocks and noise. Low blasting costs. Successfully doing excavation over old underground workings. Higher percentage percentage of utilization of HEMM 85% as compared to other mines of BCCL. AKWMC, Katras Area BCCL
  • 6. PIP Structure Productivity Improvement Programme was structured as follows: Formation of Steering Team: Steering team formed with some nominated members of Katras area and Indian Explosives Limited.The steering team meeting was scheduled once in a week for planning the operation in next week and to review the work done in last week. Selection of benches: Since time period the study was very less some of the overburden benches in the mine were selected for PIP which are very hard and geologically disturbed where mine management was facing problems in operation. Benchmarking of on-going practices in mine: Productivity of some of the key operations e.g. Drilling,Blasting and Mucking was benchmarked in terms of Rs./cuM and cuM/hr by time and motion study of each operation. Demonstration of benefits: Productivity of the same operations e.g. Drilling,Blasting and Mucking was determined after some blasts were done on the same benches by M/s. Indian Explosives Limited by using modern blasting technology. Calculations: Demonstration of benefits in terms of productivity was done by comparing demonstration and benchmarking data of each operation. Presentation: A presentation on work done was made to the CGM (Katras area) and steering committee.
  • 7. Project Planning by Steering Committee Steering committee met weekly to assess the progress of work done in previous week and to plan the work for next week. Appointed Mr. C.B.Prasad as an officer in-charge dedicated for PIP work. AKWMC management suggested To select only hard and fractured due to presence of depillared and caved goaf benches for PIP exercise, which were over VIII seam top, VIII seam bottom and VII seam. To do time and motion study only for some selected machines deployed on those benches. The machines selected were: Shovels: S-38, S-483, S-394 and S-342. Drills: IDM 30 III, IDM 30 I and RECP 311. To take transportation cost as a constant for both phases. To take average of four months costs for determination of existing operating cost. To conduct at least one blast in each bench for demonstration of the benefits.
  • 8. It was finalized by the Steering Committee that Orica  Will conduct 4 stand up blasts by using advanced blasting technologies.  Will mark drill holes, supervise drilling operations and provide relevant training to drill operators.  Will present the results obtained in both the phases of the study. Project Planning by Steering Committee
  • 9. Benchmarking of On-going Practices Drilling operation Time and motion study of drill machines IDM 30 III, IDM 30 I and RECP 311 and productivity was determined in terms of Rs./m and Rs./cuM. Drilling operation Drilling cost Blasting operation Blast design parameters are studied and tabulated.Bench wise powder factor was determined and cost in Rs./cuM was determined. Blasting operation Blasting cost
  • 10. Mucking operation Time and motion study for shovels S-38,S-342,S-394 and S-493 was done and productivity of mucking operation was determined in terms of Rs./cuM and material handled in cuM/hr. Mucking operation Mucking cost Transportation cost Transportation cost was constant for both phases and material handled per trip was taken as 11cuM/trip as fixed by previous survey data. Total mining cost Total mining cost was determined by adding up drilling cost,blasting cost and mucking cost. COST COMPONENTS DATA SOURCES Study of On-going Practices- Phase I
  • 11. Phase II-Demonstration of Benefits Methodology adopted in demonstration exercise : DRILLING OPERATION •Marking of drill holes in staggered pattern on the patch. •Monitoring of the drilling operation for ensuring proper depth and pattern •Training imparted to the drill operators and helpers.
  • 12. Training of drill operators and Helpers
  • 13. BLASTING OPERATION •To ensure proper charging of blast holes according to the plan. •To model each blast with Orica’s patented softwares. •To design each blast with the help of Shotplus-i software. •To use hole liners in the crack holes. Blasting cost MUCKING OPERATION •Time and motion study of the shovels is done by dividing the blasted muck into three sections e.g. Initial, middle and last section as in study of on-going practice. •Material handled in cuM/hr. was determined with the study data. Mucking cost TRANSPORTATION COST Transportation cost is taken constant as in study of on-going practice. Demonstration of Benefits
  • 14. Blast Design & Model – Blast 2 Blast 2 in shotplus-i
  • 15. Photographs of the blasted muck pile during demonstration
  • 16. Results Head Cost during benchmarking operation in Rs./cuM Cost during demonstratio n operation in Rs./cuM Savings in cost in Rs./cuM Percentage savings Drilling cost in Rs./cuM 13.23 10.27 2.96 22.39% Blasting cost in Rs./cuM 19.59 13.80 5.79 29.54% Drilling and blasting cost in Rs/cuM 32.82 24.07 8.75 26.65% Mucking cost in Rs./cuM 23.46 14.8 8.66 36.91% Total mining cost in Rs./cuM 56.28 38.87 17.41 30.93% Overall savings in mining cost* in Rs./cuM 17.41 (30.93%)
  • 17. Benefits Improvement in Fragmentation. Drilling cost (per cuM) was saved by optimization of blast design parameters Savings in production hours due to bigger blasts. Exposure of mine management to advanced blasting technology. Sharing of knowledge between BCCL and IEL.
  • 18. Scope of improvement in Future To Merge two small benches (5 to 6 m height) for faster development of the mine. The mine is having capacity to drill 15m. Drill holes. Application of Stratablast (a product of Orica’s Blast Based Services) for mining of thin seams along with partings in a single blast for faster development of the mine.Presently the mine is excavating no. of thin seams in different benches. To conduct bigger blasts for faster exposure of coal and better efficiency. Help the mine meet environmental compliance norms.
  • 22. Method of study DRILLING Time study of: • Drilling time. • Rod changing time. • Spotting time. • Idle time. • Meterage drilling.  Rate of drilling (m/hr.) = Meterage drilling/ Total time taken in drilling (excluding idle time).  Drilling cost (Rs./m.) = Total cost incurred during the period of study/ Total meterage of drilling done by the machine. Back to main slide
  • 23. MUCKING Back to main Time study of the shovels by: • Study of the cycle time of loading of one dumper. • Study of the spotting time of one dumper. • Idle time of the shovel due to non availability of dumpers at the face.  Material handled by the shovel (cuM / Hr) = Volume of the material carried by the dumper per trip* / Total time taken in filling one dumper by shovel (excluding idle time of the shovel)  Mucking cost (Rs. / cuM) = Total cost incurred for the shovel during the study period/ Total volume handled by the shovel during the period. * Standard volume carried by each dumper is considered as 11cuM.
  • 24. COST COMPONENTS Back to main Following cost components are taken into consideration in determination of mining cost of OB in Rs./cuM.  Cost of Diesel, lubes and other consumables  Cost of spares.  Cost of maintenance manpower.  Cost of operation manpower.  Cost of depreciation. Following cost components are considered as a constant in determination of per cubic mining cost of OB due to non-availability of sufficient data:  Electric power consumption cost.  Hauling cost.  Dozing cost.  Administration cost.
  • 25. DATA SOURCES Back to main DATA SOURCE Cost of HSD and consumables. New Keshalpur and West Mudidih Workshop. Cost of Spares and maintenance. New Keshalpur and West Mudidih Workshop. Cost of maintenance manpower. Finance deptt. of the project and Workshops. Machine performance as per BCCL data. Excavations deptt. of the Katras area. Monthly cost sheet. Computer deptt. Katras area. Cost of explosives and blasting accessories. AKWMC magazine. Meterage drilling and cuM handled by machines per month. Office of the project officer AKWMC and pit office.
  • 26. Study of blasting operation in case study Back to main Study of following operations in blasting operation: • Blast design parameters like burden, spacing and depth of the drill holes. • Charging operation. • Drilling cost per cuM. • Blasting cost per cuM. • Bench wise powder factor.
  • 27. Study of drilling operation Back to main slide Drilling cost( Rs./m.) in case study (Excluding administration cost) HEAD IDM 30 III RECP 311 IDM 30 I COST in Rs.(from Jan to Apr.08) HSD,LUBES & CONS. 867627.00 1087946.00 830952.00 SPARE PARTS 172092.00 300237.00 185208.00 MAINTE.MANPOWER COST 388601.24 388601.24 582901.86 OPERATION MANPOWER COST* 584093.60 683766.03 564717.08 DEPRECIATION COST 359852.00 291333.00 327407.00 TOTAL COST 2372265.84 2751883.27 2491185.94 DRILL METERAGE 14402.00 13318.00 12861.00 WORKING HOURS 779.70 1101.50 842.90 DRILLING COST /M 164.72 206.63 193.70 COST/HR 3042.54 2498.31 2955.49 Avg. drilling cost/m *includes one drill operator, one helper and half supervisor. 188.35
  • 28. Mucking operation in case study.(Back to main) Operation Cost of Shovel as per field study data (in Rs./cuM) (excluding electric power and administration cost) * includes one shovel operator, one cableman and half supervisor. HEAD S-38 S-394 S-342 S-483 Material handled in cuM/hr.( Mar. to Apr.08) Initial Section 74.94 99.27 88.5 100.54 Middle Section 75.51 115.96 105.42 112.45 Last section 72.3 77.83 77.34 103.97 Average 74.25 97.69 90.42 105.65 Total working Hrs. (Jan. to Apr.08) 506.5 827.7 848.5 1968.2 COST in Rs. (From Jan. to Apr. 08) (Avg.muckig cost in Rs./cuM – 23.46 ) Cost of Maintenance Manpower 680052.13 1165803.70 874352.81 971503.10 Cost of operation manpower* 274395.85 547849.15 441606.15 791548.65 Cost of Spares & Consumable # due to comp. rep’g of undercarriage 87759.00 44410.00 311664.00# 132600.00 Cost of Depreciation 0.00 568028.00 0.00 1464724.00 Total Cost 1042206.98 2326090.85 1627622.95 3360375.75 Composite Material handled (cuM) 37607.63 80855.25 76721.37 207946.89 Cost/Hr 2057.66 2810.31 1918.24 1707.33 Cost per cuM in Rs. 27.71 28.77 21.21 16.16
  • 29. Study of blasting operation Back to main Bench Avg. depth in M Av. Burden in M Av. spacing in M P.F. in cuM/K g. Avg. drilling and blasting cost in Rs/cuM Avg. blasting Cost* in Rs./cuM S-38 (VIII seam bottom) 11.38 3.53 4.25 1.27 32.51 20.10 S-394 (VIII seam bottom) 11.20 3.27 3.87 1.19 34.29 20.76 S-483 (VIII seam top) 6.41 3.04 3.90 1.31 38.47 22.52 S-483 ( VIII seam top) 11.19 3.80 4.70 1.51 27.68 14.99 *includes explosives cost and salary cost of blasting crew. Avg. 1.32 32.82 19.59
  • 30. Drilling and Blasting BENCH WISE P.F. AND BLASTING COST (Rs./cuM) Bench Date of blast Avg. depth in M Av. Burde n in M Av. spacing in M P.F.in cuM/K g. Blastin g cost in Rs./cu M Drilling cost in Rs./cu M Avg. drilling and blasting cost in Rs/cuM S-394 19.05.08 6.52 3.7 4.2 1.37 15.89 16.17 30.93 S-394 27.05.08 6.09 3.7 4.2 1.84 11.77 12.32 22.73 S-342 30.05.08 11.73 4 4.5 1.93 10.96 10.38 20.75 S-38 15.06.08 14.34 4 4.5 1.84 11.58 12.06 21.87 Back to main Avg. 1.75 12.55 12.73 24.07
  • 31. Mucking operation Ongoing practice Operation Cost of Shovel as per field study data (in Rs./cuM) (Excluding Electric Power and administration cost) HEAD S-38 S-394 S-342 S-483 Material handled in cuM/hr. (From May - June 08) Initial Section 138.03 147.86 171.81 N.A. Middle Section 157.57 191.05 204.18 N.A. Last section 114.17 124.46 140.89 N.A. Average material handled (cuM/Hr) 136.59 154.46 172.29 N.A. Cost/Hr 2057.66 2810.31 1918.24 N.A Cost per cuM in Rs. 15.06 18.19 11.13 N.A. Mucking cost in Rs./cuM (Avg.) 14.80
  • 32. Mucking operation Ongoing practice Back to main Operation Cost of Shovel as per field study data (in Rs./cuM) (Excluding Electric Power and administration cost) HEAD S-38 S-394 S-342 S-483 Material handled in cuM/hr. (From May - June 08) Initial Section 138.03 147.86 171.81 N.A. Middle Section 157.57 191.05 204.18 N.A. Last section 114.17 124.46 140.89 N.A. Average material handled (cuM/Hr) 136.59 154.46 172.29 N.A. Cost/Hr 2057.66 2810.31 1918.24 N.A Cost per cuM in Rs. 15.06 18.19 11.13 N.A. Mucking cost in Rs./cuM (Avg.) 14.80
  • 33. Cost comparison in study and demonstration exercise Cost Analysis Head Cost during benchmarkin g operation in Rs./cuM Cost during demonstrati on operation in Rs./cuM Savings in cost in Rs./cuM Percentage savings Drilling cost in Rs./cuM 13.23 10.27 2.96 22.39 Blasting cost in Rs./cuM 19.59 13.80 5.79 29.54 Drilling and blasting cost in Rs/cuM 32.82 24.07 8.75 26.65 Mucking cost in Rs./cuM 23.46 14.8 8.66 36.91 Total mining cost in Rs./cuM 56.28 38.87 17.41 30.93 Overall savings in mining cost* in Rs./cuM *Mining cost includes drilling,Blasting & mucking cost. 17.41 (30.93%)