Introduction
Product design
Process planning
Operation programming
Verification
Scheduling
Execution
Process,
machine
knowledge
Scheduling
knowledge
Introduction
 Process planning - Translation of design
information into the process steps and
instructions to efficient and effective
Manufacturing.
 As new age manufacturing processes
are evolving, Computer Aided Process
Planning (CAPP) helps in simplifying and
efficiently carrying out the conventional
process planning and optimizing use of
resources.
 Detailed set of instructions, engineering
drawings, specifications, parts and
CAPP
 Development of process plan (route
sheet) using following approaches-
Variant Computer Aided Process Planning
Generative Computer Aided Process
Planning
 E.g. Design changes- changes cost
estimates
 Machine breakdown- alternate solution
effective solution
 Interaction among various functions of
an organization and dynamic changes.
General steps involved
 Design input, Material selection,
Process selection, Process
sequencing, Machine and tool
selection, Intermediate surface
determination, Fixture selection,
Machining parameter selection,
Cost/time estimation, Plan
preparation, Mc tape image
generation these are the general steps
involved in the computer aided
process planning.
Variant Computer Aided Process
Planning
 Also known as data retrieval method.
 Process plan for a new part is generated
by recalling, identifying and retrieving an
existing plan for a similar part and
making necessary modifications for new
part known as ‘Master Part’
 Coding and classification schemes of
group technology (GT) used, number of
algorithms, mathematical models are
developed for family part formation and
plan retrieval.
 Using existing system can save a
tremendous amount of time and
manpower.
Block Diagram for Variant
CAPP
Detailed steps involved
 Form the Part Families by Grouping
Parts- classifying parts and formation of
group parts
 Develop Standard Process Plans-
developed for each part families based
on common part features.
 Retrieve and Modify the Standard
Plans for New Parts- when new part
enters the systems, it is designed and
coded based on its feature, using the
coding and classification scheme, and
then assigned to a part family.
Advantages of Variant
Computer Aided Process
Planning
 Processing and evaluation of
complicated activities and managerial
issues done in an efficient manner,
thus reduction of time and labor
requirement.
 Reduced development and hardware
cost and shorter development time.
Disadvantages of Variant Computer
Aided Process Planning
 Difficult to maintain consistency during
editing.
 Proper accommodation of various
combinations of attributes such as
material, geometry, size, precision,
quality, alternate processing sequence
and machine loading among many other
factors are difficult.
 The quality of the final process plan
largely depends on the knowledge and
experience of process planner
Generative Computer Aided
Process Planning
 In generative process planning, process
plans are generated by means of decision
logic, formulas, technology algorithms, etc.
 Main aim is to convert a part form raw
material to finished state.
 Input to the system includes the description
of the part in the form of part code
number.
.
Generative Computer Aided
Process Planning
Generative process plan mainly
consists of two major components :
(i) Geometry based coding scheme.
(ii) Knowledge Based
Block Diagram for Generative
CAPP
Geometry-based Coding Scheme:-
 All the geometric features for all process
such as related surfaces, feature
dimension, locations, on the features are
defined by geometry based coding
scheme.
 The level of detail is much greater in
generative system than a variant system
Knowledge Based:-
Process knowledge in the form of decision
logic and data are used for matching of
part geometry requirement with the
manufacturing capabilities.
Advantages of Generative
Process Plan
 They rely less on group technology
code numbers since the process,
usually uses decision tree to
categorize parts into families.
 Maintenance and updating of stored
process plans are largely
unnecessary.
 New Components can planned as
easy as existing components
Review of CAPP
Advantages
 It can systematically produce accurate
and consistent process plans.
 It leads to the reduction of cost and lead
times of process plan.
 Skill requirement of process planer are
reduced to develop feasible process
plan.
 Interfacing of software for cost,
manufacturing lead time estimation, and
work standards can easily be done.
 Leads to the increased productivity of
process planar.
Disadvantages
 While compared with manual process
planning the CAPP systems have few
disadvantages:
 The inability to show special
manufacturing techniques.
 The initial cost of establishing a CAPP
system is high while compared with
manual process planning.
Thank You

More Related Content

What's hot

Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow Analysis
KEERTHIVASAN RAVI
 
Group Technology
Group TechnologyGroup Technology
Group Technology
Sunith Guraddi
 
Nc part programming
Nc part programmingNc part programming
Nc part programming
Vemulapalli Das
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)
KRUNAL RAVAL
 
Computer Integrated Manufacturing
Computer Integrated Manufacturing  Computer Integrated Manufacturing
Computer Integrated Manufacturing suraj_21
 
Computer aided quality control
Computer aided quality controlComputer aided quality control
Computer aided quality control
Ahmad Bajwa
 
Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell design
Nauman khan
 
Group Technology
Group TechnologyGroup Technology
Group Technology
Himanshi Gupta
 
Apt programming
Apt programmingApt programming
Apt programming
Vemulapalli Das
 
Group technology
Group technologyGroup technology
Group technology
jntuhcej
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing SystemVishal Jadhav
 
06 group technology
06 group technology06 group technology
06 group technology
Arif Rahman
 
Adaptive Control System
Adaptive Control SystemAdaptive Control System
Adaptive Control System
ShreyashPatel24
 
Introduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptxIntroduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptx
Chirag Patel
 
Numerical control machines tool
Numerical control machines toolNumerical control machines tool
Numerical control machines tool
jntuhcej
 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).
Nitin Patil
 
\Transfer Lines
\Transfer Lines\Transfer Lines
\Transfer Lines
PRAVEENKUMAR SHAHAPURMATH
 
Apt programming
Apt programmingApt programming
Apt programming
Vemulapalli Das
 
CIM Unit 1
CIM Unit 1CIM Unit 1
1. cad fundamental
1. cad fundamental1. cad fundamental
1. cad fundamental
Ratnadeepsinh Jadeja
 

What's hot (20)

Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow Analysis
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Nc part programming
Nc part programmingNc part programming
Nc part programming
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)
 
Computer Integrated Manufacturing
Computer Integrated Manufacturing  Computer Integrated Manufacturing
Computer Integrated Manufacturing
 
Computer aided quality control
Computer aided quality controlComputer aided quality control
Computer aided quality control
 
Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell design
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Apt programming
Apt programmingApt programming
Apt programming
 
Group technology
Group technologyGroup technology
Group technology
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing System
 
06 group technology
06 group technology06 group technology
06 group technology
 
Adaptive Control System
Adaptive Control SystemAdaptive Control System
Adaptive Control System
 
Introduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptxIntroduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptx
 
Numerical control machines tool
Numerical control machines toolNumerical control machines tool
Numerical control machines tool
 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).
 
\Transfer Lines
\Transfer Lines\Transfer Lines
\Transfer Lines
 
Apt programming
Apt programmingApt programming
Apt programming
 
CIM Unit 1
CIM Unit 1CIM Unit 1
CIM Unit 1
 
1. cad fundamental
1. cad fundamental1. cad fundamental
1. cad fundamental
 

Viewers also liked

world-class-manufacturing
world-class-manufacturingworld-class-manufacturing
world-class-manufacturingPrasad Bidwai
 
Intro to CAD/CAM/CIM
Intro to CAD/CAM/CIMIntro to CAD/CAM/CIM
Intro to CAD/CAM/CIMAbhay Gore
 
Unit 2.1 cim
Unit 2.1 cimUnit 2.1 cim
Unit 2.1 cim
Vetri Vezhan
 
Introduction to Group technology
Introduction to Group technologyIntroduction to Group technology
Introduction to Group technology
Hashim Hasnain Hadi
 
Ch9 computer integrated manufacturing
Ch9 computer integrated manufacturingCh9 computer integrated manufacturing
Ch9 computer integrated manufacturing
viswa375
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
Nityanand Yadav
 
FLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEMFLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEMAnand Khare
 
Laser Assisted Micro Machining (lamm)
Laser Assisted Micro Machining (lamm)Laser Assisted Micro Machining (lamm)
Laser Assisted Micro Machining (lamm)
Pratik Gandhi
 
Reverse engineering
Reverse engineeringReverse engineering
Reverse engineering
ananya0122
 

Viewers also liked (9)

world-class-manufacturing
world-class-manufacturingworld-class-manufacturing
world-class-manufacturing
 
Intro to CAD/CAM/CIM
Intro to CAD/CAM/CIMIntro to CAD/CAM/CIM
Intro to CAD/CAM/CIM
 
Unit 2.1 cim
Unit 2.1 cimUnit 2.1 cim
Unit 2.1 cim
 
Introduction to Group technology
Introduction to Group technologyIntroduction to Group technology
Introduction to Group technology
 
Ch9 computer integrated manufacturing
Ch9 computer integrated manufacturingCh9 computer integrated manufacturing
Ch9 computer integrated manufacturing
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
 
FLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEMFLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEM
 
Laser Assisted Micro Machining (lamm)
Laser Assisted Micro Machining (lamm)Laser Assisted Micro Machining (lamm)
Laser Assisted Micro Machining (lamm)
 
Reverse engineering
Reverse engineeringReverse engineering
Reverse engineering
 

Similar to Computer Aided Process Planning (CAPP)

INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMSINTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
Jyotiraman De
 
Unit 2 cim
Unit 2 cimUnit 2 cim
Unit 2 cim
rknatarajan
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
chethan kumar
 
4th unit CADM important questions related to capp and fms etc design processs
4th unit CADM important questions related to capp and fms etc design processs4th unit CADM important questions related to capp and fms etc design processs
4th unit CADM important questions related to capp and fms etc design processs
PrudhviRaj667957
 
Unit 1 manufacturing system design
Unit   1 manufacturing system designUnit   1 manufacturing system design
Unit 1 manufacturing system design
Lakshmi Life Sciences Ltd.
 
Process planning unit two
Process planning  unit twoProcess planning  unit two
Process planning unit two
ZELALEMGIRMAW
 
CAPP , JIT, FMS
CAPP , JIT, FMSCAPP , JIT, FMS
CAPP , JIT, FMS
Denny John
 
Chapter 7 automation techniques
Chapter 7  automation techniquesChapter 7  automation techniques
Chapter 7 automation techniquesMohamad Sahiedan
 
Me6703 cim systems
Me6703 cim systemsMe6703 cim systems
Me6703 cim systems
Muthu Natarajan
 
Capp
CappCapp
Unit 1 cim
Unit 1 cimUnit 1 cim
Unit 1 cim
dinesh babu
 
CAPP-ppt.ppt
CAPP-ppt.pptCAPP-ppt.ppt
CAPP-ppt.ppt
SUNILYADAV883679
 
Computer Aided Process Planning Poster
Computer Aided Process Planning PosterComputer Aided Process Planning Poster
Computer Aided Process Planning Poster
Jyotiraman De
 
CIM MODULE 2.pptx
CIM MODULE 2.pptxCIM MODULE 2.pptx
CIM MODULE 2.pptx
RithwikRanjan
 
computer aided process planning
computer aided process planning computer aided process planning
computer aided process planning
Danish saifi
 
Computer aided process planning
Computer aided process planningComputer aided process planning
Computer aided process planning
sushma chinta
 
M-2_CAPP.pptx
M-2_CAPP.pptxM-2_CAPP.pptx
M-2_CAPP.pptx
naveenjadhav6
 
CIM unit-2
CIM unit-2CIM unit-2
CIM unit-2
Dr.PERIASAMY K
 

Similar to Computer Aided Process Planning (CAPP) (20)

INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMSINTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
 
Unit 2 cim
Unit 2 cimUnit 2 cim
Unit 2 cim
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
 
4th unit CADM important questions related to capp and fms etc design processs
4th unit CADM important questions related to capp and fms etc design processs4th unit CADM important questions related to capp and fms etc design processs
4th unit CADM important questions related to capp and fms etc design processs
 
Unit 1 manufacturing system design
Unit   1 manufacturing system designUnit   1 manufacturing system design
Unit 1 manufacturing system design
 
Process planning unit two
Process planning  unit twoProcess planning  unit two
Process planning unit two
 
CAPP , JIT, FMS
CAPP , JIT, FMSCAPP , JIT, FMS
CAPP , JIT, FMS
 
Chapter 7 automation techniques
Chapter 7  automation techniquesChapter 7  automation techniques
Chapter 7 automation techniques
 
TEST 2.pptx
TEST 2.pptxTEST 2.pptx
TEST 2.pptx
 
TEST 2.pdf
TEST 2.pdfTEST 2.pdf
TEST 2.pdf
 
Me6703 cim systems
Me6703 cim systemsMe6703 cim systems
Me6703 cim systems
 
Capp
CappCapp
Capp
 
Unit 1 cim
Unit 1 cimUnit 1 cim
Unit 1 cim
 
CAPP-ppt.ppt
CAPP-ppt.pptCAPP-ppt.ppt
CAPP-ppt.ppt
 
Computer Aided Process Planning Poster
Computer Aided Process Planning PosterComputer Aided Process Planning Poster
Computer Aided Process Planning Poster
 
CIM MODULE 2.pptx
CIM MODULE 2.pptxCIM MODULE 2.pptx
CIM MODULE 2.pptx
 
computer aided process planning
computer aided process planning computer aided process planning
computer aided process planning
 
Computer aided process planning
Computer aided process planningComputer aided process planning
Computer aided process planning
 
M-2_CAPP.pptx
M-2_CAPP.pptxM-2_CAPP.pptx
M-2_CAPP.pptx
 
CIM unit-2
CIM unit-2CIM unit-2
CIM unit-2
 

Recently uploaded

weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 

Recently uploaded (20)

weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

Computer Aided Process Planning (CAPP)

  • 1. Computer Aided Process Planning Presented By- Pratik Patel 111213049 Mayank Chidri 111213015 Atul Gosavi 111213023 Pratik Gandhi 111213021
  • 2. Contents  Introduction  About Computer Aided Process Planning  General steps involved  Variant Computer Aided Process Planning  Generative Computer Aided Process Planning  Review  Advantages & Disadvantages
  • 3. Introduction Product design Process planning Operation programming Verification Scheduling Execution Process, machine knowledge Scheduling knowledge
  • 4. Introduction  Process planning - Translation of design information into the process steps and instructions to efficient and effective Manufacturing.  As new age manufacturing processes are evolving, Computer Aided Process Planning (CAPP) helps in simplifying and efficiently carrying out the conventional process planning and optimizing use of resources.  Detailed set of instructions, engineering drawings, specifications, parts and
  • 5. CAPP  Development of process plan (route sheet) using following approaches- Variant Computer Aided Process Planning Generative Computer Aided Process Planning  E.g. Design changes- changes cost estimates  Machine breakdown- alternate solution effective solution  Interaction among various functions of an organization and dynamic changes.
  • 6. General steps involved  Design input, Material selection, Process selection, Process sequencing, Machine and tool selection, Intermediate surface determination, Fixture selection, Machining parameter selection, Cost/time estimation, Plan preparation, Mc tape image generation these are the general steps involved in the computer aided process planning.
  • 7. Variant Computer Aided Process Planning  Also known as data retrieval method.  Process plan for a new part is generated by recalling, identifying and retrieving an existing plan for a similar part and making necessary modifications for new part known as ‘Master Part’  Coding and classification schemes of group technology (GT) used, number of algorithms, mathematical models are developed for family part formation and plan retrieval.  Using existing system can save a tremendous amount of time and manpower.
  • 8. Block Diagram for Variant CAPP
  • 9. Detailed steps involved  Form the Part Families by Grouping Parts- classifying parts and formation of group parts  Develop Standard Process Plans- developed for each part families based on common part features.  Retrieve and Modify the Standard Plans for New Parts- when new part enters the systems, it is designed and coded based on its feature, using the coding and classification scheme, and then assigned to a part family.
  • 10. Advantages of Variant Computer Aided Process Planning  Processing and evaluation of complicated activities and managerial issues done in an efficient manner, thus reduction of time and labor requirement.  Reduced development and hardware cost and shorter development time.
  • 11. Disadvantages of Variant Computer Aided Process Planning  Difficult to maintain consistency during editing.  Proper accommodation of various combinations of attributes such as material, geometry, size, precision, quality, alternate processing sequence and machine loading among many other factors are difficult.  The quality of the final process plan largely depends on the knowledge and experience of process planner
  • 12. Generative Computer Aided Process Planning  In generative process planning, process plans are generated by means of decision logic, formulas, technology algorithms, etc.  Main aim is to convert a part form raw material to finished state.  Input to the system includes the description of the part in the form of part code number. .
  • 13. Generative Computer Aided Process Planning Generative process plan mainly consists of two major components : (i) Geometry based coding scheme. (ii) Knowledge Based
  • 14. Block Diagram for Generative CAPP
  • 15. Geometry-based Coding Scheme:-  All the geometric features for all process such as related surfaces, feature dimension, locations, on the features are defined by geometry based coding scheme.  The level of detail is much greater in generative system than a variant system Knowledge Based:- Process knowledge in the form of decision logic and data are used for matching of part geometry requirement with the manufacturing capabilities.
  • 16. Advantages of Generative Process Plan  They rely less on group technology code numbers since the process, usually uses decision tree to categorize parts into families.  Maintenance and updating of stored process plans are largely unnecessary.  New Components can planned as easy as existing components
  • 18. Advantages  It can systematically produce accurate and consistent process plans.  It leads to the reduction of cost and lead times of process plan.  Skill requirement of process planer are reduced to develop feasible process plan.  Interfacing of software for cost, manufacturing lead time estimation, and work standards can easily be done.  Leads to the increased productivity of process planar.
  • 19. Disadvantages  While compared with manual process planning the CAPP systems have few disadvantages:  The inability to show special manufacturing techniques.  The initial cost of establishing a CAPP system is high while compared with manual process planning.