Implementation of SMED (Single Minute Exchange
of Dies) in Heavy Machine Shop
Register Number Students Name
511316114053 NAVEEN K
511316114058 PAVITHRA M M
511316114066 RUDHRA RAJ V
511316114073 SIDDHARTH M
Under the Guidance of
Mr. S. Mahendiran, M.E.,
Head of the department,
Department of Mechanical Engineering,
Kingston Engineering College.
 Abstract
 Introduction
 Problem Identification
 Literature Review
 Objective
 Methodology
 Working
 Design overview
 Prototype
 Benefits
 Conclusion
 References
Single Minute Exchange of Dies is a process of minimizing
the changeover time (or setup time) from hours to minutes (i.e.
less than 10 minutes). SMED is one of the lean production
methods, having several steps for implementation, is also used to
focus for reducing waste in a manufacturing process and to
increase the overall equipment effectiveness (OEE) in the shop
floor.
In this project, the availability is found and analyzed, the
time study plan of changeover time was taken, pallet design was
created, and applied all the steps of SMED. As a result, the
production rate can be achieved more and non-value added
activities can be eliminated as much as possible.
• Setup time: The time taken to
prepare the manufacturing processes
and system for production.
• Changeover time: The time taken
to modify the production line for
different products or new batches of
the same product.
• SMED helps reduce time in both
setup and changeover.
• Both setup and changeover are Non-
Value Added (NVA) operations and
so should be minimized as much as
possible.
• CNC boring machines does not have in-built pallets.
• Batch production & its size is min 1 to max 3.
• Machine schedules are dynamic in nature due to
varying customer demands.
• Parts varieties are more. Each parts having 23
variants.
• Parts are heavy weight in nature with weight 2 tons to
25 tons with more time for positioning (10-30min).
Title Author /
Publication
Key findings
Reduction in Setup Time
by SMED
Methodology
Prof. Nagaraj A Raikar
Assistant Professor Dept
of Mechanical
Engineering AITD,
Assagao GOA
International Journal of
Latest Trends in
Engineering and
Technology (IJLTET)
This Study is carried
out in one of the
automotive industry. This
document demonstrates
the need to overcome
most of bottleneck of
equipment’s
unavailability for
resources utilization.
Single Minute Exchange
of Die. A Case Study
Implementation
António Carrizo Moreira 1
, Gil Campos Silva Pais 2.
Journal of Technology
Management &
Innovation
Main finding is that by
implementing SMED
techniques the firm
managed to
eliminate wastefulness
and non-added value
activities
Title Author /
Publication / Year
Key findings
An Industrial Application
Of The Smed
Methodology
And Other Lean
Production Tools
Eric Costa1, Rui Sousa,
Sara Bragança, Anabela
Alves
Centre for Industrial and
Technology Management,
Department of
Production and Systems
(DPS), University of
Minho, Guimarães,
Portugal
This paper describes the
improvement of the
setup process of a
mechanical press
machine in
the metal-mechanic area
of a company.
The Implementation of
Single Minute Exchange
of Die with 5’S in
Machining Processes for
reduction of Setup Time
Vipan Kumar, Amit Bajaj
International Journal on
Recent Technologies in
Mechanical and Electrical
Engineering (IJRMEE)
In this paper we describe
that how the SMED
technique is used and
how it helps to reduce
the time and increasing
the productivity
The main objective of a project:
• To Improve OEE to Global benchmark 85%.
• Overall Equipment Effectiveness = Availability X
Performance X Quality
AVAILABILITY PERFORMANCE QUALITY
74% 92% 99%
OEE
68%
Lowest of OEE Parameter is Availability
What is Availability?
Availability = Machine cutting time / Machine available time
How to improve Availability?
Availability can be improved by reducing the non cutting time
Non cutting time
This 3 Non cutting
times are 70 %
Affect to OEE.
Cutting Time
Unloading fixture
Time = 16 min 38 sec
Machine table cleaning
Time = 19 min 42 sec
Fixture loading & clamping
Time = 15 min 53 sec
Job loading & aligning
Time = 12 min 43 sec
Job aligning
Time = 16 min 33 sec
Job clamping
Time = 9 min 7 sec
Origin loading
Time = 17 min 46 sec
Set up (Change over) time:
Elapsed time from completion of Part 1 to Start machining of Part 2
= 108 min 22 sec +
crane waiting time
approx. 60 min.
Totally 2 hrs 48
min in old
method.
Time study of Change over time
Average Change over time matrix
Four side machining parts Single side machining parts
Press Sizes Base Top – Links Side plate Side Link
65” TCP 180 min 22 sec 180 min 34 sec 120 min 28 sec 90 min 36 sec
91” TCP 220 min 46 sec 180 min 24 sec 180 min 42 sec 120 min 21 sec
104” TCP 240 min 15 sec 180 min 41 sec 180 min 33 sec 150 min 49 sec
To Reduce The Setup Losses , Change Over Time Needs To Be Reduced
Traditional effort taken to reduce Setup time:
• Additional manpower introduced for Set up in
machine.
• Modular fixtures and hydraulic clamping
systems.
Solution:
SMED (Single Minute Exchange of Dies) approach
for reducing setup time.
SMED (Changeover Reduction) is a tool supporting
Lean Manufacturing. It is used to control and decrease
downtime due to changeovers.
Took time
study plan of
change over
time
Analyze each
step of the
change over
process
Separate
internal &
external
activities
Convert
external to
internal
activities
Streamline
internal &
external
activities
Continuous
improvement
Steps in implementing SMED
TIME PROCESS TIME
TAKEN
(IN MINS)
2:15 pm Previous job completed
(1st shift over)
2:30 pm Labour called for
unclamping and
cleaning
15:22
2:31 pm Unclamping started 3:52
2:33 pm Crane arrived 2:15
2:34 pm Burr cleaning started 1:24
2:35 pm Belt fitted (to lift the
job)
1:14
2:37 pm Crane movement
started
3:18
2:40 pm Burr cleaning finished 9:75
2:50 pm Idle time 17:30
3:08 pm Crane departure 2:57
3:11 pm Side angle plate fixing 3:02
3.15 pm De clamping 1:40
3:16 pm Crane arrival 3:59
3:20 pm Stud removal 6:30
3:26 pm Full cleaning of job
including floor
8:47
3:35 pm Jig setting 6:46
3:42 pm Clamping new job 9:07
3:51 pm Jig origin (adjustment) 3:36
3:54 pm Tool setting 2:53
3:56 pm Machine idle 1:05
3:57 pm Tool origin 7:40
4:05 pm Workpiece origin 6.30
TIME PROCESS TIME
TAKEN
(IN MINS)
Existing Job &
Fixture
unloading
Machine
Cleaning
Top Link
Fixture
Loading
Fixture
Clamping
Job Tilting
And Loading
Crane
Waiting
Job Aligning
Job
Clamping
Origin
loading
Part 1
completed
Part 2
started
Internal External
TIME PROCESS TIME
TAKEN
(IN MINS)
2:15 pm Previous job completed
(1st shift over)
2:30 pm Labour called for
unclamping and
cleaning
15:22
2:31 pm Unclamping started 3:52
2:33 pm Crane arrived 2:15
2:34 pm Burr cleaning started 1:24
2:35 pm Belt fitted (to lift the
job)
1:14
2:37 pm Crane movement
started
3:18
2.40 pm Burr cleaning finished 9:75
2:50 pm Idle time 17:30
3:08 pm Crane departure 2:57
3:11 pm Side angle plate
removing
3:02
3.15 pm De clamping 1:40
3:16 pm Crane arrival 3:59
3:20 pm Stud removal 6:30
3:26 pm Full cleaning of job
including floor
8:47
3:35 pm Jig setting 6:46
3:42 pm Clamping new job 9:07
3:51 pm Jig origin (adjustment) 3:36
3:54 pm Tool setting 2:53
3:56 pm Machine idle 1:05
3:57 pm Tool origin 7:40
4:05 pm Workpiece origin 6:30
TIME PROCESS TIME
TAKEN
(IN MINS)
TIME PROCESS TIME
TAKEN
(IN MINS)
2:15 pm Previous job completed
(1st shift over)
2:30 pm Labour called for
unclamping and
cleaning
15:22
2:31 pm Unclamping started 3:52
2:33 pm Crane arrived 2:15
2:34 pm Burr cleaning started 1:24
2:35 pm Belt fitted (to lift the
job)
1:14
2:37 pm Crane movement
started
3:18
2.40 pm Burr cleaning finished 9:75
2:50 pm Idle time 17:30
3:08 pm Crane departure 2:57
3:11 pm Side angle plate
removing
3:02
3.15 pm De clamping 1:40
3:16 pm Crane arrival 3:59
3:20 pm Stud removal 6:30
3:26 pm Full cleaning of job
including floor
8:47
3:35 pm Jig setting 6:46
3:42 pm Clamping new job 9:07
3:51 pm Jig origin (adjustment) 3:36
3:54 pm Tool setting 2:53
3:56 pm Machine idle 1:05
3:57 pm Tool origin 7:40
4:05 pm Workpiece origin 6:30
TIME PROCESS TIME
TAKEN
(IN MINS)
• We designed a Pallet to reduce the setup time
of the machinery and improve the productivity.
• With the help of this Pallet, we can externally
clamp the fixtures and workpiece in it.
• Because of this Pallet, the internal works are
partially converted into external works.
• Now we can easily load the entire arrangement
in the worktable with the help of crane.
Before SMED
SMED design with pallet
Before SMED – without
pallet
After SMED – with
pallet
• Productivity increases or reduced production
time.
• Improved Machine Utilization.
• Economically beneficial to the organization.
• Improved Responsiveness to the Customer
Demand.
• Reduction in WIP and lot size reduction.
The development of this project enabled a
thorough setup diagnosis, which underpinned the
identification of critical points and their solutions.
In this project the importance of setup time
reduction was presented using SMED methodologies.
After implementing the SMED methodology, it is possible
to defend that simple process based innovations, the
separation of internal from external operations and the
conversion of internal to external operations, are the key
drivers to productivity improvement.
•BLAU, J.R. (1994). European carmakers turn lean to mean.
Machine Design, 66(10), 26–32.
•DAFT, R.L. (1992). Organizational Theory and Design. West, St.
Paul, MN.
•DAMANPOUR, F. (1991). Organizational innovation: A meta-
analysis of effects of determinants and moderators. Academy of
Management Journal, 34 (3), 555-590.
•DYER, J.H. (1996). Specialized supplier networks as a source of
competitive advantage: evidence from the auto industry. Strategic
Management Journal, 15, 271-291.
Single Minute Exchange of Dies (SMED)

More Related Content

What's hot (20)

Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Tpm ppt
Tpm pptTpm ppt
Tpm ppt
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
SMED Final
SMED FinalSMED Final
SMED Final
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Single Minute Exchange of Dies
Single Minute Exchange of DiesSingle Minute Exchange of Dies
Single Minute Exchange of Dies
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
 
Curso SMED.
Curso SMED.Curso SMED.
Curso SMED.
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
SMED Kaizen Event
SMED Kaizen EventSMED Kaizen Event
SMED Kaizen Event
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 
Tpm
TpmTpm
Tpm
 

Similar to Single Minute Exchange of Dies (SMED)

SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineParth Patel
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineDhruvShah202
 
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON  ENGINE COOLING ASSEMBLYPRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON  ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLYDIPRANJAN GUPTA
 
Study on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingStudy on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingAlwin Thomas
 
Lean NMR Laboratory Layout
  Lean NMR Laboratory Layout    Lean NMR Laboratory Layout
Lean NMR Laboratory Layout Javier Siles
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
4AD15ME042.pptx
4AD15ME042.pptx4AD15ME042.pptx
4AD15ME042.pptxMrHAD
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingeSAT Publishing House
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
Scooter india,sip presentation
Scooter india,sip presentationScooter india,sip presentation
Scooter india,sip presentationDeepak Gautam
 
Machining time and costs
Machining time and costsMachining time and costs
Machining time and costsendika55
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryijmech
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET Journal
 
Productivity Improvement Study
Productivity Improvement StudyProductivity Improvement Study
Productivity Improvement Studysaranshshah
 
Optimization of PVC Pipes Production Process
Optimization of PVC Pipes Production ProcessOptimization of PVC Pipes Production Process
Optimization of PVC Pipes Production ProcessIRJET Journal
 
PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)Asim Aslam
 

Similar to Single Minute Exchange of Dies (SMED) (20)

SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping line
 
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON  ENGINE COOLING ASSEMBLYPRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON  ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
 
Study on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingStudy on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream Mapping
 
Sip
SipSip
Sip
 
Lean NMR Laboratory Layout
  Lean NMR Laboratory Layout    Lean NMR Laboratory Layout
Lean NMR Laboratory Layout
 
Term Project
Term ProjectTerm Project
Term Project
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
4AD15ME042.pptx
4AD15ME042.pptx4AD15ME042.pptx
4AD15ME042.pptx
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Ijmet 10 02_042
Ijmet 10 02_042Ijmet 10 02_042
Ijmet 10 02_042
 
Scooter india,sip presentation
Scooter india,sip presentationScooter india,sip presentation
Scooter india,sip presentation
 
Machining time and costs
Machining time and costsMachining time and costs
Machining time and costs
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
 
Productivity Improvement Study
Productivity Improvement StudyProductivity Improvement Study
Productivity Improvement Study
 
Optimization of PVC Pipes Production Process
Optimization of PVC Pipes Production ProcessOptimization of PVC Pipes Production Process
Optimization of PVC Pipes Production Process
 
PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)
 
PG thesis
PG thesisPG thesis
PG thesis
 

Recently uploaded

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

Single Minute Exchange of Dies (SMED)

  • 1. Implementation of SMED (Single Minute Exchange of Dies) in Heavy Machine Shop Register Number Students Name 511316114053 NAVEEN K 511316114058 PAVITHRA M M 511316114066 RUDHRA RAJ V 511316114073 SIDDHARTH M Under the Guidance of Mr. S. Mahendiran, M.E., Head of the department, Department of Mechanical Engineering, Kingston Engineering College.
  • 2.  Abstract  Introduction  Problem Identification  Literature Review  Objective  Methodology  Working  Design overview  Prototype  Benefits  Conclusion  References
  • 3. Single Minute Exchange of Dies is a process of minimizing the changeover time (or setup time) from hours to minutes (i.e. less than 10 minutes). SMED is one of the lean production methods, having several steps for implementation, is also used to focus for reducing waste in a manufacturing process and to increase the overall equipment effectiveness (OEE) in the shop floor. In this project, the availability is found and analyzed, the time study plan of changeover time was taken, pallet design was created, and applied all the steps of SMED. As a result, the production rate can be achieved more and non-value added activities can be eliminated as much as possible.
  • 4. • Setup time: The time taken to prepare the manufacturing processes and system for production. • Changeover time: The time taken to modify the production line for different products or new batches of the same product. • SMED helps reduce time in both setup and changeover. • Both setup and changeover are Non- Value Added (NVA) operations and so should be minimized as much as possible.
  • 5. • CNC boring machines does not have in-built pallets. • Batch production & its size is min 1 to max 3.
  • 6. • Machine schedules are dynamic in nature due to varying customer demands. • Parts varieties are more. Each parts having 23 variants.
  • 7. • Parts are heavy weight in nature with weight 2 tons to 25 tons with more time for positioning (10-30min).
  • 8. Title Author / Publication Key findings Reduction in Setup Time by SMED Methodology Prof. Nagaraj A Raikar Assistant Professor Dept of Mechanical Engineering AITD, Assagao GOA International Journal of Latest Trends in Engineering and Technology (IJLTET) This Study is carried out in one of the automotive industry. This document demonstrates the need to overcome most of bottleneck of equipment’s unavailability for resources utilization. Single Minute Exchange of Die. A Case Study Implementation António Carrizo Moreira 1 , Gil Campos Silva Pais 2. Journal of Technology Management & Innovation Main finding is that by implementing SMED techniques the firm managed to eliminate wastefulness and non-added value activities
  • 9. Title Author / Publication / Year Key findings An Industrial Application Of The Smed Methodology And Other Lean Production Tools Eric Costa1, Rui Sousa, Sara Bragança, Anabela Alves Centre for Industrial and Technology Management, Department of Production and Systems (DPS), University of Minho, Guimarães, Portugal This paper describes the improvement of the setup process of a mechanical press machine in the metal-mechanic area of a company. The Implementation of Single Minute Exchange of Die with 5’S in Machining Processes for reduction of Setup Time Vipan Kumar, Amit Bajaj International Journal on Recent Technologies in Mechanical and Electrical Engineering (IJRMEE) In this paper we describe that how the SMED technique is used and how it helps to reduce the time and increasing the productivity
  • 10. The main objective of a project: • To Improve OEE to Global benchmark 85%. • Overall Equipment Effectiveness = Availability X Performance X Quality
  • 11. AVAILABILITY PERFORMANCE QUALITY 74% 92% 99% OEE 68% Lowest of OEE Parameter is Availability What is Availability? Availability = Machine cutting time / Machine available time How to improve Availability? Availability can be improved by reducing the non cutting time
  • 12. Non cutting time This 3 Non cutting times are 70 % Affect to OEE. Cutting Time
  • 13. Unloading fixture Time = 16 min 38 sec Machine table cleaning Time = 19 min 42 sec Fixture loading & clamping Time = 15 min 53 sec Job loading & aligning Time = 12 min 43 sec Job aligning Time = 16 min 33 sec Job clamping Time = 9 min 7 sec Origin loading Time = 17 min 46 sec Set up (Change over) time: Elapsed time from completion of Part 1 to Start machining of Part 2 = 108 min 22 sec + crane waiting time approx. 60 min. Totally 2 hrs 48 min in old method.
  • 14. Time study of Change over time Average Change over time matrix Four side machining parts Single side machining parts Press Sizes Base Top – Links Side plate Side Link 65” TCP 180 min 22 sec 180 min 34 sec 120 min 28 sec 90 min 36 sec 91” TCP 220 min 46 sec 180 min 24 sec 180 min 42 sec 120 min 21 sec 104” TCP 240 min 15 sec 180 min 41 sec 180 min 33 sec 150 min 49 sec To Reduce The Setup Losses , Change Over Time Needs To Be Reduced
  • 15. Traditional effort taken to reduce Setup time: • Additional manpower introduced for Set up in machine. • Modular fixtures and hydraulic clamping systems. Solution: SMED (Single Minute Exchange of Dies) approach for reducing setup time.
  • 16. SMED (Changeover Reduction) is a tool supporting Lean Manufacturing. It is used to control and decrease downtime due to changeovers.
  • 17. Took time study plan of change over time Analyze each step of the change over process Separate internal & external activities Convert external to internal activities Streamline internal & external activities Continuous improvement Steps in implementing SMED
  • 18. TIME PROCESS TIME TAKEN (IN MINS) 2:15 pm Previous job completed (1st shift over) 2:30 pm Labour called for unclamping and cleaning 15:22 2:31 pm Unclamping started 3:52 2:33 pm Crane arrived 2:15 2:34 pm Burr cleaning started 1:24 2:35 pm Belt fitted (to lift the job) 1:14 2:37 pm Crane movement started 3:18 2:40 pm Burr cleaning finished 9:75 2:50 pm Idle time 17:30 3:08 pm Crane departure 2:57 3:11 pm Side angle plate fixing 3:02 3.15 pm De clamping 1:40 3:16 pm Crane arrival 3:59 3:20 pm Stud removal 6:30 3:26 pm Full cleaning of job including floor 8:47 3:35 pm Jig setting 6:46 3:42 pm Clamping new job 9:07 3:51 pm Jig origin (adjustment) 3:36 3:54 pm Tool setting 2:53 3:56 pm Machine idle 1:05 3:57 pm Tool origin 7:40 4:05 pm Workpiece origin 6.30 TIME PROCESS TIME TAKEN (IN MINS)
  • 19. Existing Job & Fixture unloading Machine Cleaning Top Link Fixture Loading Fixture Clamping Job Tilting And Loading Crane Waiting Job Aligning Job Clamping Origin loading Part 1 completed Part 2 started Internal External
  • 20. TIME PROCESS TIME TAKEN (IN MINS) 2:15 pm Previous job completed (1st shift over) 2:30 pm Labour called for unclamping and cleaning 15:22 2:31 pm Unclamping started 3:52 2:33 pm Crane arrived 2:15 2:34 pm Burr cleaning started 1:24 2:35 pm Belt fitted (to lift the job) 1:14 2:37 pm Crane movement started 3:18 2.40 pm Burr cleaning finished 9:75 2:50 pm Idle time 17:30 3:08 pm Crane departure 2:57 3:11 pm Side angle plate removing 3:02 3.15 pm De clamping 1:40 3:16 pm Crane arrival 3:59 3:20 pm Stud removal 6:30 3:26 pm Full cleaning of job including floor 8:47 3:35 pm Jig setting 6:46 3:42 pm Clamping new job 9:07 3:51 pm Jig origin (adjustment) 3:36 3:54 pm Tool setting 2:53 3:56 pm Machine idle 1:05 3:57 pm Tool origin 7:40 4:05 pm Workpiece origin 6:30 TIME PROCESS TIME TAKEN (IN MINS)
  • 21.
  • 22. TIME PROCESS TIME TAKEN (IN MINS) 2:15 pm Previous job completed (1st shift over) 2:30 pm Labour called for unclamping and cleaning 15:22 2:31 pm Unclamping started 3:52 2:33 pm Crane arrived 2:15 2:34 pm Burr cleaning started 1:24 2:35 pm Belt fitted (to lift the job) 1:14 2:37 pm Crane movement started 3:18 2.40 pm Burr cleaning finished 9:75 2:50 pm Idle time 17:30 3:08 pm Crane departure 2:57 3:11 pm Side angle plate removing 3:02 3.15 pm De clamping 1:40 3:16 pm Crane arrival 3:59 3:20 pm Stud removal 6:30 3:26 pm Full cleaning of job including floor 8:47 3:35 pm Jig setting 6:46 3:42 pm Clamping new job 9:07 3:51 pm Jig origin (adjustment) 3:36 3:54 pm Tool setting 2:53 3:56 pm Machine idle 1:05 3:57 pm Tool origin 7:40 4:05 pm Workpiece origin 6:30 TIME PROCESS TIME TAKEN (IN MINS)
  • 23. • We designed a Pallet to reduce the setup time of the machinery and improve the productivity. • With the help of this Pallet, we can externally clamp the fixtures and workpiece in it. • Because of this Pallet, the internal works are partially converted into external works. • Now we can easily load the entire arrangement in the worktable with the help of crane.
  • 26. Before SMED – without pallet After SMED – with pallet
  • 27. • Productivity increases or reduced production time. • Improved Machine Utilization. • Economically beneficial to the organization. • Improved Responsiveness to the Customer Demand. • Reduction in WIP and lot size reduction.
  • 28. The development of this project enabled a thorough setup diagnosis, which underpinned the identification of critical points and their solutions. In this project the importance of setup time reduction was presented using SMED methodologies. After implementing the SMED methodology, it is possible to defend that simple process based innovations, the separation of internal from external operations and the conversion of internal to external operations, are the key drivers to productivity improvement.
  • 29. •BLAU, J.R. (1994). European carmakers turn lean to mean. Machine Design, 66(10), 26–32. •DAFT, R.L. (1992). Organizational Theory and Design. West, St. Paul, MN. •DAMANPOUR, F. (1991). Organizational innovation: A meta- analysis of effects of determinants and moderators. Academy of Management Journal, 34 (3), 555-590. •DYER, J.H. (1996). Specialized supplier networks as a source of competitive advantage: evidence from the auto industry. Strategic Management Journal, 15, 271-291.