- ABHILASH
MSE
11/20/2016 1
Introduction
Implementation of CBM
Discussion
Conclusion
11/20/2016 2
 In order to reduce operation cost, maintenance cost at
once, increasing performance and reliability of production
equipment, many of companies have implemented CBM
 This paper presents the process of implementation and the
elements included in the process
 The main elements in the implementation process are
selection of components to be monitored, techniques and
technologies as well as installation of technologies and
finally how to analyze the results from condition
monitoring
 The results are recorded, this information is leading to
useful and reliable knowledge for maintenance work to be
cost effective and be able to increase the Overall
Equipment Availability (OEA)
11/20/2016 3
Implementation method is mainly divided into four
phases
11/20/2016 4
Feasibility test,
Selection of appropriate techniques to
detect failures
Selection of technologies
Data analysis
Evaluation
Improvement
11/20/2016 5
In order to implement CBM, the company should
consider different aspects in the early phase of the
implementation to estimate the feasibility of
implementing CBM. These aspects are classified in
organizational, economical and technical aspects.
In organizational aspect
 if CBM is feasible and for instant what type of
technologies are appropriate to use
 A SWOT analysis and maintenance audits of the
company’s maintenance activities can also bring
useful information to investigate whether using
CBM is a proper decision
 It should be assessed if CBM can improve the
work environment
11/20/2016 6
Economical aspect
• In early stage the financial issue cannot be
calculated with a high validity
• A list of requirements can be estimated to
evaluate whether implementation of CBM will
be cost effective
• The cost of maintenance and production loss
per breakdown should also be estimated
• This will make a pre-estimation of
implementation cost as well as the paybacks
that implementation of CBM can have
11/20/2016 7
Technical aspect
• A criticality analysis and maintenance audit can
be very helpful to assess the technical feasibility
of implementing CBM
• By using proper tools or techniques we can
detect the failure of the component
• By predicting the failure it is possible to prevent
the major damage of the component
• Plan for maintenance in a time that does not
affect production, in order to reduce
maintenance cost and production loss
11/20/2016 8
 In order to select the techniques several factors
should be considered including; availability of the
technology to monitor the parameters, the
competence and manpower required to use the
technology and the cost effectiveness of applying
the techniques.
 The condition monitoring techniques can be
performed in different levels of technology
 Condition monitoring can be performed either
humans, monitoring by their senses, or by using
measuring systems
11/20/2016 9
 The measuring systems can be applied either online or off-
line. The online measuring systems can provide continuous
monitoring of the assets
 different technologies require different knowledge
within organization
 Higher effectiveness of the technologies with lower
cost would be the best choice in selecting the
technologies
 Bearing Condition Monitoring can be described by
two techniques
o Shock Pulse Method
o Vibration analysis
11/20/2016 10
 The level of performing the data analysis depends on
the type of technologies that is used
 The data can be analyzed in a simple way by looking at
the graphs which are provided by computer software
and analyze the trends
 Data analysis can be performed in more specifically
frequency analysis in a more advanced level which can
provide more accurate and reliable data from bearing
conditions
11/20/2016 11
 An important phase of implementation process is to
evaluate if the implementation has been performed in
an appropriate way and if it can provide the desired
outputs
 Some factors can be considered in this regard, such as
the type of sensors, positioning of the sensors, cost
and the time between detection of a failure and fault
 The implementation should start with an estimation
of cost, after implementation there is a clearer picture
of cost, especially for the cost of condition monitoring
tools
11/20/2016 12
 it can be observed whether implementation has
been performed in a cost effective way
 An important success factor for the
implementation is to find out the most precise
interval time between detecting a failure and fault
 the best instance for the manufacturing company
is to have sufficient time after detecting a failure to
plan for a maintenance activity in a correct time
11/20/2016 13
 The results from evaluation phase are used for
improvement of the implementation
 Some technical examples of the improvement can be
to change the type of sensors, positioning of the
sensors and number of sensors
 the organization should follow up the activities,
increase the competence to analyze the data and use
CBM effectively, but management support will still be
required
 company should establish a routine monitoring
11/20/2016 14
 It should be clear to what to measure and when to
measure. More accurate warning limits will be set by
measurement after measurement
 The techniques should also be used to detect the most
failure modes and the most critical assets should be
covered by these techniques
11/20/2016 15
 Gas circulation fans electric motor
• A gas circulation fan is mounted on top of 920oC pre-
heating furnace
• It is running 24*7 to keep the gas atmosphere of cracked
Methanol and Nitrogen smooth and steady
• The fan has a heavy impeller which is assembled to a 4 KW
standard electric motor with a long shaft which is rotating
at 945 rpm
• The bearing in the electric motor is exposed to a high load
due to the extra -long motor shaft and a relatively big
impeller
• the unbalances can cause a failure in the electric motor’s
bearing
• Due to the working conditions of 920°C in the furnace the
motor shaft and the impeller are exposed to a high wear
due to material fatigue/metal dusting (erosion of material)
which causes unbalance, and in the long run vibration
11/20/2016 16
• An unbalance in a fan and electric
motor, or a fault in a bearing
produces extra vibrations and
noises
• These parameters can be the
failure indicators for the fans
electric motors which are
measurable by vibration analysis
and SPM techniques
• In this study, online condition
monitoring has been selected to
continuously monitor the
vibrations and shock pulses from
the fans and trigger a warning
alarm whenever something wrong
is detected
11/20/2016 17
 Two shock pulse transducers
and one vibration transducer
have been installed on the
electric motors
 The transducers are
connecting to a system unit
by cables. Depending on the
type of the unit, it can have
several channels for vibration
and shock pulse
11/20/2016 18
11/20/2016 19
 By installing computer software provided by a
condition monitoring supplier, the data are being
analyzed autonomously
 The computer software is also able to trigger warning.
Hence, the early measurement from the objects can be
used as the baseline data and setting warning limits
according to the standards
11/20/2016 20
 According to the observed breakdowns on the fans,
one of the main inquiries to be discussed is the reason
of the late warnings before breakdowns
 by having the late warnings, the company is not able to
schedule the maintenance work outside of production
time to reduce production losses
 Therefore, some factors have been reconsidered such
as the type of sensors, positioning and placing the
sensors
 The result of failure analysis has shown that the
lubricant in the bearing has been quite dried
11/20/2016 21
 Thus, a possible reason for the failure is the heat from
the furnace which dries the lubricant in the bearing
 it has been suggested to use an appropriate lubricant
than can sustain in high temperatures. Using the
sprays on the bearing that protect the lubricant in
front of the heat can also be worthwhile
11/20/2016 22
 The process of an implementation of CBM is proposed
in order to consider different aspects in the decision
making phase and implementation phase of CBM
 The implementation process can also be a good guide
when implementing CBM in manufacturing
companies without existing experience in CBM
 As long as applying CBM is costly, having an
appropriate approach for implementation can help to
succeed and gain paybacks from CBM
 analyze the data and follow up the activities is
important to have a continuous improvement
11/20/2016 23
11/20/2016 24

More Related Content

What's hot

Motor Current Signature Analysis R K Gupta
Motor Current Signature Analysis R K GuptaMotor Current Signature Analysis R K Gupta
Motor Current Signature Analysis R K Gupta
RajuGupta88
 
Tpm basic
Tpm basicTpm basic
Tpm basic
Paul Robere
 
Planned Maintenance
Planned MaintenancePlanned Maintenance
Planned Maintenance
Arun Senthil Kumar
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoring
APPIA SATHYANARAYANA
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
Dibyendu De
 
Measurement System Analysis (MSA)
Measurement System Analysis (MSA)Measurement System Analysis (MSA)
Measurement System Analysis (MSA)Ram Kumar
 
Maintenance types
Maintenance typesMaintenance types
Maintenance typesMotasem Ash
 
Preventive and predictive maintainence
Preventive and predictive maintainencePreventive and predictive maintainence
Preventive and predictive maintainence
Ankit Narain
 
VIBRATION-ANALYSIS.ppt
VIBRATION-ANALYSIS.pptVIBRATION-ANALYSIS.ppt
VIBRATION-ANALYSIS.ppt
CARLOSPRUDENCIODEGRA
 
Maintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceMaintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of Maintenance
Dhanesh S
 
Condition monitoring of rotating machines ppt
Condition monitoring of rotating machines pptCondition monitoring of rotating machines ppt
Condition monitoring of rotating machines ppt
Rohit Kaushik
 
Motor Current Signature Analysis
Motor Current Signature AnalysisMotor Current Signature Analysis
Motor Current Signature Analysis
Ankit Basera
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenanceJames Shearer
 
Condition based maintenance strategy
Condition based maintenance strategyCondition based maintenance strategy
Condition based maintenance strategy
Priyesh Nair
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
Anil Mohindru
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORING
laxtwinsme
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
hossam hassanein
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
Anand Subramaniam
 
Preventive Maintenance Presentation
Preventive Maintenance PresentationPreventive Maintenance Presentation
Preventive Maintenance Presentation
imhoffm
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
Hal Frohreich
 

What's hot (20)

Motor Current Signature Analysis R K Gupta
Motor Current Signature Analysis R K GuptaMotor Current Signature Analysis R K Gupta
Motor Current Signature Analysis R K Gupta
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Planned Maintenance
Planned MaintenancePlanned Maintenance
Planned Maintenance
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoring
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Measurement System Analysis (MSA)
Measurement System Analysis (MSA)Measurement System Analysis (MSA)
Measurement System Analysis (MSA)
 
Maintenance types
Maintenance typesMaintenance types
Maintenance types
 
Preventive and predictive maintainence
Preventive and predictive maintainencePreventive and predictive maintainence
Preventive and predictive maintainence
 
VIBRATION-ANALYSIS.ppt
VIBRATION-ANALYSIS.pptVIBRATION-ANALYSIS.ppt
VIBRATION-ANALYSIS.ppt
 
Maintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceMaintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of Maintenance
 
Condition monitoring of rotating machines ppt
Condition monitoring of rotating machines pptCondition monitoring of rotating machines ppt
Condition monitoring of rotating machines ppt
 
Motor Current Signature Analysis
Motor Current Signature AnalysisMotor Current Signature Analysis
Motor Current Signature Analysis
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
Condition based maintenance strategy
Condition based maintenance strategyCondition based maintenance strategy
Condition based maintenance strategy
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORING
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Preventive Maintenance Presentation
Preventive Maintenance PresentationPreventive Maintenance Presentation
Preventive Maintenance Presentation
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 

Viewers also liked

Condition based maintenance
Condition based maintenanceCondition based maintenance
Condition based maintenance
Cristian Garcia
 
An Introduction to Condition Based Maintenance (CBM)
An Introduction to  Condition Based Maintenance (CBM)An Introduction to  Condition Based Maintenance (CBM)
An Introduction to Condition Based Maintenance (CBM)
abasathab
 
Condition based maintenance
Condition based maintenanceCondition based maintenance
Condition based maintenance
Paul Menig
 
Introduction to condition based maintenance
Introduction to condition based maintenanceIntroduction to condition based maintenance
Introduction to condition based maintenance
ASQ Reliability Division
 
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia SystemsSensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Evigia
 
Envisioneering - Leveraging Technology for Future Innovation final version
Envisioneering  - Leveraging Technology for Future Innovation final versionEnvisioneering  - Leveraging Technology for Future Innovation final version
Envisioneering - Leveraging Technology for Future Innovation final versionPaul Menig
 
Understanding Machines Predicting machine failure
Understanding Machines  Predicting machine failure Understanding Machines  Predicting machine failure
Understanding Machines Predicting machine failure
Data Curry
 
Comparison of analytical methods of analysing linear induction motors
Comparison of analytical methods of analysing linear induction motors Comparison of analytical methods of analysing linear induction motors
Comparison of analytical methods of analysing linear induction motors
Chandan Kumar
 
The Gearbox Fault Diagnosis Based on Wavelet Transform
The Gearbox Fault Diagnosis Based on Wavelet TransformThe Gearbox Fault Diagnosis Based on Wavelet Transform
The Gearbox Fault Diagnosis Based on Wavelet Transform
iosrjce
 
Plant Maintenance & Condition Monitoring
Plant Maintenance & Condition MonitoringPlant Maintenance & Condition Monitoring
Plant Maintenance & Condition Monitoring
Elena Maria Vaccher
 
Wavelet Multi-resolution Analysis of High Frequency FX Rates
Wavelet Multi-resolution Analysis of High Frequency FX RatesWavelet Multi-resolution Analysis of High Frequency FX Rates
Wavelet Multi-resolution Analysis of High Frequency FX Rates
aiQUANT
 
Overview zigbee-2012-03-26
Overview zigbee-2012-03-26Overview zigbee-2012-03-26
Overview zigbee-2012-03-26
Philip Wu
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
Antonius Pompi Bramono
 
Analytical Modeling of Vibration Signals from a Planetary Gear in Normal and ...
Analytical Modeling of Vibration Signals from a Planetary Gear in Normal and ...Analytical Modeling of Vibration Signals from a Planetary Gear in Normal and ...
Analytical Modeling of Vibration Signals from a Planetary Gear in Normal and ...Jungho Park
 
PREDICTING FAILURES_AUGUST2007
PREDICTING FAILURES_AUGUST2007PREDICTING FAILURES_AUGUST2007
PREDICTING FAILURES_AUGUST2007Gan Chun Chet
 
Machine Condition Monitoring by Verhaert
Machine Condition Monitoring by VerhaertMachine Condition Monitoring by Verhaert
Machine Condition Monitoring by Verhaert
Verhaert Masters in Innovation
 
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in  Engineering Management ServicesApplying Condition Based Monitoring Approach in  Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management ServicesIsmail Yusof
 

Viewers also liked (20)

Condition based maintenance
Condition based maintenanceCondition based maintenance
Condition based maintenance
 
An Introduction to Condition Based Maintenance (CBM)
An Introduction to  Condition Based Maintenance (CBM)An Introduction to  Condition Based Maintenance (CBM)
An Introduction to Condition Based Maintenance (CBM)
 
Condition based maintenance
Condition based maintenanceCondition based maintenance
Condition based maintenance
 
Introduction to condition based maintenance
Introduction to condition based maintenanceIntroduction to condition based maintenance
Introduction to condition based maintenance
 
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia SystemsSensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
 
Envisioneering - Leveraging Technology for Future Innovation final version
Envisioneering  - Leveraging Technology for Future Innovation final versionEnvisioneering  - Leveraging Technology for Future Innovation final version
Envisioneering - Leveraging Technology for Future Innovation final version
 
Vibration Analysis
Vibration AnalysisVibration Analysis
Vibration Analysis
 
Machine Vibration Analysis
Machine Vibration AnalysisMachine Vibration Analysis
Machine Vibration Analysis
 
Understanding Machines Predicting machine failure
Understanding Machines  Predicting machine failure Understanding Machines  Predicting machine failure
Understanding Machines Predicting machine failure
 
Comparison of analytical methods of analysing linear induction motors
Comparison of analytical methods of analysing linear induction motors Comparison of analytical methods of analysing linear induction motors
Comparison of analytical methods of analysing linear induction motors
 
The Gearbox Fault Diagnosis Based on Wavelet Transform
The Gearbox Fault Diagnosis Based on Wavelet TransformThe Gearbox Fault Diagnosis Based on Wavelet Transform
The Gearbox Fault Diagnosis Based on Wavelet Transform
 
Plant Maintenance & Condition Monitoring
Plant Maintenance & Condition MonitoringPlant Maintenance & Condition Monitoring
Plant Maintenance & Condition Monitoring
 
Wavelet Multi-resolution Analysis of High Frequency FX Rates
Wavelet Multi-resolution Analysis of High Frequency FX RatesWavelet Multi-resolution Analysis of High Frequency FX Rates
Wavelet Multi-resolution Analysis of High Frequency FX Rates
 
Overview zigbee-2012-03-26
Overview zigbee-2012-03-26Overview zigbee-2012-03-26
Overview zigbee-2012-03-26
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Analytical Modeling of Vibration Signals from a Planetary Gear in Normal and ...
Analytical Modeling of Vibration Signals from a Planetary Gear in Normal and ...Analytical Modeling of Vibration Signals from a Planetary Gear in Normal and ...
Analytical Modeling of Vibration Signals from a Planetary Gear in Normal and ...
 
Analisis de falla de motor
Analisis de falla de motorAnalisis de falla de motor
Analisis de falla de motor
 
PREDICTING FAILURES_AUGUST2007
PREDICTING FAILURES_AUGUST2007PREDICTING FAILURES_AUGUST2007
PREDICTING FAILURES_AUGUST2007
 
Machine Condition Monitoring by Verhaert
Machine Condition Monitoring by VerhaertMachine Condition Monitoring by Verhaert
Machine Condition Monitoring by Verhaert
 
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in  Engineering Management ServicesApplying Condition Based Monitoring Approach in  Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management Services
 

Similar to Implementation of condition based maintenance in manufacturing industry

CBM - BALAJI.pdf
CBM - BALAJI.pdfCBM - BALAJI.pdf
CBM - BALAJI.pdf
veeramaniveltraining
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
Elena Maria Vaccher
 
IATF 16949 Webinar Slides 3.7.17
IATF 16949 Webinar Slides 3.7.17IATF 16949 Webinar Slides 3.7.17
IATF 16949 Webinar Slides 3.7.17
Sara Gulo
 
Some critical facets in air pollution
Some critical facets in air pollutionSome critical facets in air pollution
Some critical facets in air pollution
ECRD2015
 
10 steps to achieve world-class manufacturing maintenance practices
10 steps to achieve world-class manufacturing maintenance practices10 steps to achieve world-class manufacturing maintenance practices
10 steps to achieve world-class manufacturing maintenance practices
UMSConferences
 
Iso final
Iso finalIso final
Commissioning and Operations
Commissioning and OperationsCommissioning and Operations
Commissioning and OperationsAchal Gupta
 
2015 WhitePaper Metering RhNo
2015 WhitePaper Metering RhNo2015 WhitePaper Metering RhNo
2015 WhitePaper Metering RhNoRay Hawksley
 
13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspections13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspections
ssusereb347d
 
IOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxIOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docx
vrickens
 
Turbine maintenance
Turbine maintenanceTurbine maintenance
Turbine maintenance
Brian Douglas
 
Tieu chuan chat luong yeu cau cua continental
Tieu chuan chat luong yeu cau cua continentalTieu chuan chat luong yeu cau cua continental
Tieu chuan chat luong yeu cau cua continental
phuonghalamvy
 
M6 BLACKBELT PROJECT Rev 6.4
M6 BLACKBELT PROJECT Rev 6.4M6 BLACKBELT PROJECT Rev 6.4
M6 BLACKBELT PROJECT Rev 6.4Neelesh Bhagwat
 
_TUBES.pptx
_TUBES.pptx_TUBES.pptx
_TUBES.pptx
DendhyRamadhan
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
jericfreimuth
 
SkidWeigh, lift truck operator performance measurement
SkidWeigh, lift truck operator performance measurementSkidWeigh, lift truck operator performance measurement
SkidWeigh, lift truck operator performance measurement
Ted Jurca
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenance
MANUEL PACINI
 
Pilot plant
Pilot plantPilot plant
Pilot plant
Dr. Jigar Vyas
 

Similar to Implementation of condition based maintenance in manufacturing industry (20)

CBM - BALAJI.pdf
CBM - BALAJI.pdfCBM - BALAJI.pdf
CBM - BALAJI.pdf
 
Condition Based Maintenance
Condition Based MaintenanceCondition Based Maintenance
Condition Based Maintenance
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
IATF 16949 Webinar Slides 3.7.17
IATF 16949 Webinar Slides 3.7.17IATF 16949 Webinar Slides 3.7.17
IATF 16949 Webinar Slides 3.7.17
 
Some critical facets in air pollution
Some critical facets in air pollutionSome critical facets in air pollution
Some critical facets in air pollution
 
10 steps to achieve world-class manufacturing maintenance practices
10 steps to achieve world-class manufacturing maintenance practices10 steps to achieve world-class manufacturing maintenance practices
10 steps to achieve world-class manufacturing maintenance practices
 
Iso final
Iso finalIso final
Iso final
 
Commissioning and Operations
Commissioning and OperationsCommissioning and Operations
Commissioning and Operations
 
2015 WhitePaper Metering RhNo
2015 WhitePaper Metering RhNo2015 WhitePaper Metering RhNo
2015 WhitePaper Metering RhNo
 
13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspections13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspections
 
IOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxIOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docx
 
Maintenance 2sp
Maintenance 2spMaintenance 2sp
Maintenance 2sp
 
Turbine maintenance
Turbine maintenanceTurbine maintenance
Turbine maintenance
 
Tieu chuan chat luong yeu cau cua continental
Tieu chuan chat luong yeu cau cua continentalTieu chuan chat luong yeu cau cua continental
Tieu chuan chat luong yeu cau cua continental
 
M6 BLACKBELT PROJECT Rev 6.4
M6 BLACKBELT PROJECT Rev 6.4M6 BLACKBELT PROJECT Rev 6.4
M6 BLACKBELT PROJECT Rev 6.4
 
_TUBES.pptx
_TUBES.pptx_TUBES.pptx
_TUBES.pptx
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
SkidWeigh, lift truck operator performance measurement
SkidWeigh, lift truck operator performance measurementSkidWeigh, lift truck operator performance measurement
SkidWeigh, lift truck operator performance measurement
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenance
 
Pilot plant
Pilot plantPilot plant
Pilot plant
 

Recently uploaded

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 

Recently uploaded (20)

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 

Implementation of condition based maintenance in manufacturing industry

  • 3.  In order to reduce operation cost, maintenance cost at once, increasing performance and reliability of production equipment, many of companies have implemented CBM  This paper presents the process of implementation and the elements included in the process  The main elements in the implementation process are selection of components to be monitored, techniques and technologies as well as installation of technologies and finally how to analyze the results from condition monitoring  The results are recorded, this information is leading to useful and reliable knowledge for maintenance work to be cost effective and be able to increase the Overall Equipment Availability (OEA) 11/20/2016 3
  • 4. Implementation method is mainly divided into four phases 11/20/2016 4
  • 5. Feasibility test, Selection of appropriate techniques to detect failures Selection of technologies Data analysis Evaluation Improvement 11/20/2016 5
  • 6. In order to implement CBM, the company should consider different aspects in the early phase of the implementation to estimate the feasibility of implementing CBM. These aspects are classified in organizational, economical and technical aspects. In organizational aspect  if CBM is feasible and for instant what type of technologies are appropriate to use  A SWOT analysis and maintenance audits of the company’s maintenance activities can also bring useful information to investigate whether using CBM is a proper decision  It should be assessed if CBM can improve the work environment 11/20/2016 6
  • 7. Economical aspect • In early stage the financial issue cannot be calculated with a high validity • A list of requirements can be estimated to evaluate whether implementation of CBM will be cost effective • The cost of maintenance and production loss per breakdown should also be estimated • This will make a pre-estimation of implementation cost as well as the paybacks that implementation of CBM can have 11/20/2016 7
  • 8. Technical aspect • A criticality analysis and maintenance audit can be very helpful to assess the technical feasibility of implementing CBM • By using proper tools or techniques we can detect the failure of the component • By predicting the failure it is possible to prevent the major damage of the component • Plan for maintenance in a time that does not affect production, in order to reduce maintenance cost and production loss 11/20/2016 8
  • 9.  In order to select the techniques several factors should be considered including; availability of the technology to monitor the parameters, the competence and manpower required to use the technology and the cost effectiveness of applying the techniques.  The condition monitoring techniques can be performed in different levels of technology  Condition monitoring can be performed either humans, monitoring by their senses, or by using measuring systems 11/20/2016 9
  • 10.  The measuring systems can be applied either online or off- line. The online measuring systems can provide continuous monitoring of the assets  different technologies require different knowledge within organization  Higher effectiveness of the technologies with lower cost would be the best choice in selecting the technologies  Bearing Condition Monitoring can be described by two techniques o Shock Pulse Method o Vibration analysis 11/20/2016 10
  • 11.  The level of performing the data analysis depends on the type of technologies that is used  The data can be analyzed in a simple way by looking at the graphs which are provided by computer software and analyze the trends  Data analysis can be performed in more specifically frequency analysis in a more advanced level which can provide more accurate and reliable data from bearing conditions 11/20/2016 11
  • 12.  An important phase of implementation process is to evaluate if the implementation has been performed in an appropriate way and if it can provide the desired outputs  Some factors can be considered in this regard, such as the type of sensors, positioning of the sensors, cost and the time between detection of a failure and fault  The implementation should start with an estimation of cost, after implementation there is a clearer picture of cost, especially for the cost of condition monitoring tools 11/20/2016 12
  • 13.  it can be observed whether implementation has been performed in a cost effective way  An important success factor for the implementation is to find out the most precise interval time between detecting a failure and fault  the best instance for the manufacturing company is to have sufficient time after detecting a failure to plan for a maintenance activity in a correct time 11/20/2016 13
  • 14.  The results from evaluation phase are used for improvement of the implementation  Some technical examples of the improvement can be to change the type of sensors, positioning of the sensors and number of sensors  the organization should follow up the activities, increase the competence to analyze the data and use CBM effectively, but management support will still be required  company should establish a routine monitoring 11/20/2016 14
  • 15.  It should be clear to what to measure and when to measure. More accurate warning limits will be set by measurement after measurement  The techniques should also be used to detect the most failure modes and the most critical assets should be covered by these techniques 11/20/2016 15
  • 16.  Gas circulation fans electric motor • A gas circulation fan is mounted on top of 920oC pre- heating furnace • It is running 24*7 to keep the gas atmosphere of cracked Methanol and Nitrogen smooth and steady • The fan has a heavy impeller which is assembled to a 4 KW standard electric motor with a long shaft which is rotating at 945 rpm • The bearing in the electric motor is exposed to a high load due to the extra -long motor shaft and a relatively big impeller • the unbalances can cause a failure in the electric motor’s bearing • Due to the working conditions of 920°C in the furnace the motor shaft and the impeller are exposed to a high wear due to material fatigue/metal dusting (erosion of material) which causes unbalance, and in the long run vibration 11/20/2016 16
  • 17. • An unbalance in a fan and electric motor, or a fault in a bearing produces extra vibrations and noises • These parameters can be the failure indicators for the fans electric motors which are measurable by vibration analysis and SPM techniques • In this study, online condition monitoring has been selected to continuously monitor the vibrations and shock pulses from the fans and trigger a warning alarm whenever something wrong is detected 11/20/2016 17
  • 18.  Two shock pulse transducers and one vibration transducer have been installed on the electric motors  The transducers are connecting to a system unit by cables. Depending on the type of the unit, it can have several channels for vibration and shock pulse 11/20/2016 18
  • 19. 11/20/2016 19  By installing computer software provided by a condition monitoring supplier, the data are being analyzed autonomously  The computer software is also able to trigger warning. Hence, the early measurement from the objects can be used as the baseline data and setting warning limits according to the standards
  • 21.  According to the observed breakdowns on the fans, one of the main inquiries to be discussed is the reason of the late warnings before breakdowns  by having the late warnings, the company is not able to schedule the maintenance work outside of production time to reduce production losses  Therefore, some factors have been reconsidered such as the type of sensors, positioning and placing the sensors  The result of failure analysis has shown that the lubricant in the bearing has been quite dried 11/20/2016 21
  • 22.  Thus, a possible reason for the failure is the heat from the furnace which dries the lubricant in the bearing  it has been suggested to use an appropriate lubricant than can sustain in high temperatures. Using the sprays on the bearing that protect the lubricant in front of the heat can also be worthwhile 11/20/2016 22
  • 23.  The process of an implementation of CBM is proposed in order to consider different aspects in the decision making phase and implementation phase of CBM  The implementation process can also be a good guide when implementing CBM in manufacturing companies without existing experience in CBM  As long as applying CBM is costly, having an appropriate approach for implementation can help to succeed and gain paybacks from CBM  analyze the data and follow up the activities is important to have a continuous improvement 11/20/2016 23