LV Electrical Systems of Fixed Buildings
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 2
Earthing
Lightning
Installations
Reticulation
1. Electricity supply reticulation
2. Electrical installations of fixed buildings
3. Protection against Lightning
4. Earthing
5. Equipment
Equipment
Notes:
Malaysia Does not Develop
National Low Voltage (LV) Electrical
Installations Codes or Standards
3IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
We Adopt Relevant British and/or IEC /
ISO Standards
Notes:
Malaysia “Adopt” Elements or Whole of
Other LV Electrical Codes and
Standards which Enhance Electrical
Safety
4IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Examples:
USA: National Electric Code
IEEE Color Books
5IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
IEEE Color Books
Philippine Electricity Code
6IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Standards, Guides, Codes and Code of Practices
7IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Low Voltage Electrical Installations of
Fixed Buildings
Low Voltage
Reticulation
Electrical
Installation of
Buildings
Protection
Against
Lightning
Electrical
Equipment
Grid Code
TNB Electricity
Application
Handbook
Earthing
MS IEC 62305
BS 7430
MS IEC 60364 /
MS IEC/IEC 60364–7 /
MS 1936 / MS 1979
Others
Equipment (Product)
MS Standard
MS IEC / IEC Standards
/ Approval of Electrical
Equipment
Grouping of Electrical Installations
of Fixed Buildings
8IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Normal
Installations:
MS IEC 60364–
1/6
MS 1936 /
MS 1979
Explosive
Atmospheres
MS IEC 60364 /
MS IEC 60079
Others
Installations:
Various
Special Installations
or Locations:
IEC 60364–7 /
MS IEC 60364–7–710
LV Electrical Installations
of Fixed Buildings
Standards, Guides & Code of Practices
9IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Electrical Installation of Fixed Buildings
MS IEC 60364 / IEC 60364 – 7
Residential / Un–Informed User
MS 1979: Code of Practices
Non – Residential
MS 1936: Guide to IEC 60364
Guidelines for
Electrical Wiring in
Residential Buildings
Code of Practices:
Water Heater
Non – Residential: MS IEC 60364 / MS 1936
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 10
Fixed
Buildings
Outdoor: Carpark
/ Guard HouseCommercial Buildings
Condominiums
Schools Airport: KLIA
Factories
Residential: MS IEC 60364 / MS 1979
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 11
Rural Houses
Fishing Villages
Residential
Buildings
Apartments
Condominiums
Illegal Settlements
Residential
Non – Residential: Special Installations
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 12
Special
Installations
/Locations
Water Features and
Fountains
IEC 60364–7–702
Swimming Pool
IEC 60364–7–702
Agriculture & Horticulture
IEC 60364–7–705
Marina’s: IEC 60364–7–709
Bath room: IEC 60364–7–701
Hospitals: University of
Malaya Medical Faculty
MS IEC 60364–7–710
MS 2366
Residential Buildings: Special Installations
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 13
Residential
Buildings
Guard House:
MS IEC 60364
Fountain: IEC 60364–7–702
Fish Tank: IEC 60364–7–702
Bathroom: IEC 60364–7–701
Electric Vehicle Charging:
IEC 60354–7–722
Water Heater: Code of PracticeResidential Solar PV:
IEC 60364–7–712
Explosive Atmospheres: IEC 60364 / IEC 60079
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 14
Explosive
Atmospheres
Tank Farm
Chemical Complex
Chemical Store
Oleo Refinery
Grain Silos
Oil & Gas Platform
Others Installations
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 15
Others
Installations
Ships: IEC 60092
Aviation & Aerospace
MilitaryPonds, Rivers, Seas & Oceans
Scope of MS 1936 and MS 1979
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 16
EF/OL
T
KwH
MSB
EMSB
G
SSB (E) SSB (N)
UPS
Final Circuits
Final DB
Final Circuits
Final DB
MS 1936
LV Supply to Fire
Protection Systems
(Exclude Equipment)
(Exclude
Equipment)
Final DB ≈
Consumer
Unit
PE
PE
N
R
KwH
Consumer Unit
Residential
Final Circuits
MS 1979
PE
Benefits of Developing MS 1936 & MS 1979
17IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Electrical Installation of Fixed Buildings
MS IEC 60364 – 1 to – 6
Residential / Un–Informed User
MS 1979: Code of Practices
Non – Residential
MS 1936: Guide to IEC 60364
Electrical Installation of Fixed Buildings
IEC 60364 – 1 to – 6
> Rm. 20,000
per set
< Rm. 1,200
per set
Rm. 100
per book
Rm. 20
per book
> 500
pages
> 500
pages
< 100 pages > 30 pages
No Examples
No Examples
with Examples with Examples
18IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Rm.20–00 Rm.100–00
19IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Develop Based on MS 1979 for
Un – informed User:
Free Download: Energy Commission
Case Study: 1
Low Voltage (LV)
Electricity Act and Regulations,
and
Electrical Safety Standards
20IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Electricity Act and Regulations
21IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Electricity
Regulations 1994
Free Download:
Energy Commission
Free Download:
Energy Commission
Electrical Safety Standards: Generic
1. MS IEC 60335: Household and similar electrical appliances;
2. MS IEC 60065: Audio, video and similar electronic
apparatus;
3. MS IEC 61010: Equipment for measurement, control and
laboratory use;
4. MS IEC 60950: Information and communication technology
equipment;
5. MS IEC 60601: Medical electrical equipment;
6. MS IEC 60204: Safety of Machinery
7. MS IEC 61508: Functional safety of electrical / electronic /
programmable electronic safety – related systems
 IEC 62368 replacing IEC 60065; and IEC 60950
o No MS IEC adoption yet
22IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Electrical Safety Standards: Specific
 MS 556: Specification for electrical safety code on private
electric generator;
 MS 949: Code of practice for safety in welding and cutting;
 MS 966: Playground equipment: Part 2: General safety
requirements;
 MS 1597: Part 2–73:2003 Household and similar electrical
appliances–Safety–Part: 2–73: Particular Requirements for
fixed immersion heaters (1st Edition);
 MS 1992: Electronic equipment for use in power
installations;
 Etc.,
23IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Case Study: 2
Adoption of International
Low Voltage Electrical Installations
Standards
24IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Notes:
Malaysia Does not Develop
National Low Voltage (LV) Electrical
Installations Codes or Standards
25IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
We Adopt Relevant British and/or IEC /
ISO Standards
International Standards Harmonization:
LV Electrical Installations of Buildings
26IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
IEC
Year 2003
ISO Standards
27IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Full Members Associate Members Affiliates
ISO
Year 2003
Adoption of International Standards
and Best Practices
 Malaysia adopts IEC & ISO standards as reference standards
 National deviations document in guides and code of practices
o As MS (Malaysian Standard) standards
 Example
o MS IEC 60364: Electrical Installations of Buildings –
Adoption of IEC 60364 with national deviations
 MS 1936: Electrical Installations of Buildings:
Guide to MS IEC 60364: Non–residential
buildings
 MS 1979: Electrical Installations of Buildings:
Code of Practice: Residential buildings
 Code of practice for water heater
28IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Other International & National Standards ??
 We adopt requirements that improve, especially, safety and if
possible economize our electrical installation practices;
 Elements or whole of standards commonly used in Malaysia
today
o BS 7671;
o National Electrical Code (NEC);
o JIS (Japan), GB (China), EN (European Union);
o IEEE colour books
29IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
British Colony & Malaysia Act 1963
 Malaya was a British colony up to 1957
 3 years 8 months under Japanese occupation (No impact on
electrical installations)
 Malaysia Act 1963
o Malaya (Peninsular Malaysia), Sabah, Sarawak, and
Singapore joined as Malaysia in Year 1963
o Singapore left Malaysia 9th August 1965
 Constitution safeguards, includes the supply of electricity
and matters related
o The State of Sabah (20 points agreement)
 Harmonized with Peninsula Malaysia
o The State of Sarawak (18 points agreement)
30IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Fixed Building Electrical Standards Timeline
31IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Time Line (Malaya), Peninsular, FT’s & Sabah The State of Sarawak
Up to year
1991
IEE Wiring Reg. 1st – 15th Ed.(Electrical Installations of Buildings)
BS 6651 (Lightning) / BS 7430 (Earthing)
Year 1991
IEE Wiring Reg. 1st – 16th Ed.(16th Ed., issued in 1991)
BS 6651 / BS 7430
Year 1992
IEE Wiring Reg. 16th Ed.: Harmonized with IEC 60364 and became with
BS 7671:1992 BS 6651 / BS 7430
Year 1991 –
Year 2003
IEE Wiring Reg. / BS 7671
BS 6651 / BS EN 62305 (1999) / BS 7430
BS 7671 BS 6651 /
BS EN 62305 / BS 7430
Year 2004 –
Year 2007
BS 7671 / IEC 60364 / MS 1979 (2007)
BS 6651 or MS IEC 62305:2007/ BS 7430
BS 7671 BS 6651 /
BS EN 62305 / BS 7430
Year 2008 –
Now
IEC 60364 / MS 1979 BS 6651 /
MS IEC 62305 (1 Sep 11) / BS 7430
BS 7671
BS EN 62305 / BS 7430
IEC 60364 (BS 7671:2008:2008) Part 7:
Special Installations or Locations
32IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Malaysian Standard IEC 60364–7– (BS 7671 Part 7–Section)
(700: General)
–701 (701): Locations Containing a Bath or Shower
–702 (702): Swimming Pools and Other Basins
–703 (703): Room and Cabins Containing Sauna Heaters
–704 (704): Construction and Demolition Site Installations
–705 (705): Agricultural and Horticultural Premises
–706 (706): Conducting Locations with Restricted Movement
–708 (708): Caravan Parks, Camping Parks and Similar
Locations
IEC 60364 (BS 7671:2008:2008) Part 7:
Special Installations or Locations
33IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Malaysian Standard IEC 60364–7– (BS 7671 Part 7–Section)
–709 (709): Marinas and Similar Locations
MS IEC 6-364–7–710 –710 (710): Medical Locations
–711 (711): Exhibitions, Shows and Stands
–712 (712): Solar Photovoltaic (PV) Power Supply Systems
–714 (714): External Lighting Installations
–715 (715): Extra Low–Voltage Lighting Installations
–717 (717): Mobile or Transportable Units
–718 (718): Communal Facilities and Workplaces
–721 (721): Electrical Installations in Caravans and Motor
Caravans
IEC 60364 (BS 7671:2008:2008) Part 7:
Special Installations or Locations
34IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Malaysian Standard IEC 60364–7– (BS 7671 Part 7–Section)
–722 (722): Supplies for Electric Vehicles
–729 (729): Operating or Maintenance gangways
–740 (740): Temporary Electrical Installations for
Structures, Amusement Devices and Booths at fairgrounds,
Amusement Parts and Circuses
–753 (753): Heating Cables and Embedded Heating Systems
IEC 60364 – 8 – 1 & IEC 60364 – 9 – 1
35IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
IEC 60364 – 8 to – 9 / BS 7671 Part 8 & Part 9
Part 8 – 1 Low Voltage Electrical Installations – Part 8 – 1: Energy Efficiency
Part 9 – 1
Low Voltage Electrical Installations – Part 8 – 1: Installations,
Design and Safety Requirements for Photovoltaic Systems (PV) –
Reject - 2014
Malaysia is P Member of IEC
Case Study 3:
Total Risk Management
36IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Moving Electrical Equipment: Motors
37IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
2/3 Consumed by
Electric Motors
1/2 Horse Power motor
can kill a person
Primary Acts & Regulations: Safety and Health
38IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Free Download:
DOSH Malaysia
Free Download:
DOSH Malaysia
Except:
Electrical
Electricity: Primary Acts & Regulations
39IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Electricity
Regulations 1994
DOSH Guidelines & COP: Safety and Health
40IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Free Download:
DOSH, Malaysia
Free Download:
DOSH Malaysia
41IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Adoption of International Safety Standards
42IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Others
ISO 31000
Department of Occupational
Safety and Health, Malaysia
43IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Rm. 40-00
only
Rm. 20-00
only
Rm.100-00
only
Case Study 4:
Compliance with Requirements of
Act, Regulations, and Standards
44IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Compliance with Regulations and Standards
45IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
R
Plug:
Plug: MS 589
Plug: BS 1363
Fuse: BS 1362
13A Socket
Outlet:
MS 589
BS 1363
Cable Management:
Trunking: MS 1777
Cable Ducting: MS 1777
uPVC Conduit: MS 1034
Conduit System:
MS IEC 61386
Cable: MS 2xxxx
RCD:
MS IEC 61008
MS IEC 61540
MS 62350
MCB:
MS IEC 60898
MS IEC 60947
MS IEC 60335 – 1
MS IEC 60335 – 1
Comply with Acts and Regulations
Comply with Standards
MCB – RCD:
MS IEC 61009
Maintenance
Disconnector
MS IEC 60364 / MS 1936 / MS 1979
???
???
Equipment
46IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
R
Plug:
Plug: MS 589
Plug: BS 1363
Fuse: BS 1362
13A Socket
Outlet:
MS 589
BS 1363
Cable Management:
Trunking: MS 1777
Cable Ducting: MS 1777
uPVC Conduit: MS 1034
Conduit System:
MS IEC 61386
Cable: MS 2xxxx
RCD:
MS IEC 61008
MS IEC 61540
MS 62350
MCB:
MS IEC 60898
MS IEC 60947
MS IEC 60335 – 1
MS IEC 60335 – 1
Competent Person
MCB – RCD:
MS IEC 61009
User /
Manufacturer
Compliance with Regulations and Standards
47IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Compliance with Regulations and Standards
MS IEC 60364: IP Rating Protection
No Cable
Stress Relief
Cable Stress
Relief
BS 1362 Fuse:
3A: < 700 W
5A: 700 W – 1,200 W
13A: > 1,200 W
Moulded Cable
Standard lengths: 2 or 3
meters
Hospital: Pendant/Bedhead Trunking
48IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
IEC 61534: Power Track Systems
MS IEC 61008: RCD’s
MS 589/BS 1363: Socket Outlets
Electric Shock & Fire Protection by RCD
49
63A 4P Type A
100 mA RCD
63A 3P+N C
6kA MCB
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
13A S/S/O
Water Features
40A 2P Type A
10 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–7-702
20A 1P+N C
6kA MCB
MS IEC 60898
40A 2P Type A
10 mA RCD
MS IEC 60008
WaterHeaterIEC 60364–7-701
Electricity Regulations 1994
13A S/S/O
Kitchen
40A 2P Type A
30 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–Part 1 - 6
13A S/S/O
Others
40A 2P Type A
30 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–Part 1 - 6
Lighting / Air
Conditioners /
Others Above 2.5 m
IEC 60364–Part 1 - 6
MS IEC 60364–4
Protection Against Fire
MS IEC 60364–4
Protection Against
Electric Shock
Case Study 5:
Protection for Safety against
Electric Shock and Fire
at Final Distribution Board or
Consumer Unit
50IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Notes:
Electric Shock is the Major Cause
of Fatal Electrical Accident
In Malaysia
51IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Notes:
MS IEC (IEC) 60364
RCD for Electric Shock Protection
Shall have Sensitivity of 30 mA or
less
52IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Notes:
Electricity Regulations 1994
RCD for Equipment such as Water
Heater and Portable Equipment
Shall have Sensitivity of 10 mA or
less
53IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Notes:
Leakage Currents > 260 mA
≈ 300 mA
can cause Fire
54IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Notes:
Electricity Regulations 1994
RCD for Fire Protection
Shall have Sensitivity of 100 mA or
less
55IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Notes:
“Safe” AC Voltage < 50 Vrms at 50/60 Hz
“Safe” DC Voltage < 120 Vdc +10% Ripple
For Normal (Fixed) Installations only
56IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Electric Shock & Fire Protection by RCD
57
63A 4P Type A
100 mA RCD
63A 3P+N C
6kA MCB
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
13A S/S/O
Water Features
40A 2P Type A
10 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–7-702
20A 1P+N C
6kA MCB
MS IEC 60898
40A 2P Type A
10 mA RCD
MS IEC 60008
WaterHeaterIEC 60364–7-701
Electricity Regulations 1994
13A S/S/O
Kitchen
40A 2P Type A
30 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–Part 1 - 6
13A S/S/O
Others
40A 2P Type A
30 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–Part 1 - 6
Lighting / Air
Conditioners /
Others Above 2.5 m
IEC 60364–Part 1 - 6
MS IEC 60364–4
Protection Against Fire
MS IEC 60364–4
Protection Against
Electric Shock
Enhanced Protection for Safety: Power
58IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
63A 4P Type A
100 mA RCD
63A 3P+N C
6kA MCB
13A S/S/O
Water Features
40A 2P Type A
10 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–7-702
20A 1P+N C
6kA MCB
40A 2P Type A
10 mA RCD
WaterHeaterIEC 60364–7-701: RCD = 30 mA
Electricity Regulations 1994: RCD = 10 mA
13A S/S/O
Kitchen
40A 2P Type A
30 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–Part 1 - 6
13A S/S/O
Others
40A 2P Type A
30 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–Part 1 - 6
Air Conditioners /
Others Above 2.5 m
IEC 60364–Part 1 - 6
Enhanced Safety
Enhanced Safety
Electricity Regulations 1994: RCD < 100 mA
IEC 60364–41: RCD < 300 mA
Recommend:
Outdoor S/S/O: RCD = 10 mA
& at least 1,500 mm Above
Finished Floor Level
Enhanced Protection for Safety: Power
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems -
Nov 15 59
R
Consumer Unit (Residential)
Final Circuit Distribution Board
Electricity Provider
4 Pole
I∆n = 100 mA
(Malaysia)
3 Pole MCB
R
4 Pole
I∆n =30mA
Three Phase Loads
R
2 Pole
I∆n = 10 mA
(Malaysia)
Single Phase Wet Loads
R
2 Pole
I∆n = 30mA
Single Phase Other Loads
RYB R or Y or B
R or Y or B
PE
MS IEC 60364: By Calculation or
< 150 Ω whichever is lower
MS 1936 / MS 1979:
Maximum Earth Resistivity < 10 Ω
Protection:
Electric
Shock
Protection:
Fire
Protection for Safety: Lighting & Fans
60IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
63A 4P Type A
100 mA RCD
63A 3P+N C
6kA MCB
Water Features
/ Wet Areas
40A 2P Type A
30 mA RCD
40A 1P+N C
6kA MCB
20A 1P+N C
6kA MCB
40A 2P Type A
30 mA RCD
Parameter/
GardenLighting
IEC 60364–Part 1 - 6
Outdoor Lighting
IEC 60364–7–702
Electricity Regulations 1994: RCD < 100 mA
IEC 60364–41: RCD < 300 mA
Indoor Lighting & Fans
Recommend:
Outdoor Lighting: RCD = 10 mA
Protection for Safety: Lighting & Fans
61IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
63A 4P Type A
300 mA RCD
63A 3P+N C
6kA MCB
Water Features
/ Wet Areas
40A 2P Type A
30 mA RCD
40A 1P+N C
6kA MCB
20A 1P+N C
6kA MCB
40A 2P Type A
30 mA RCD
Parameter/
GardenLighting
Indoor
Lighting & Fans
40A 2P Type A
100 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–Part 1 - 6
Outdoor Lighting
IEC 60364–7–702
Electricity Regulations 1994:
RCD < 100 mA
IEC 60364–41: RCD < 300 mA
MS 1936
40A 2P Type A
100 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–Part 1 - 6
Indoor
Lighting & Fans
Recommend:
Outdoor Lighting: RCD = 10 mA
40A 2P Type A
100 mA RCD
40A 1P+N C
6kA MCB
IEC 60364–Part 1 - 6
Indoor
Lighting & Fans
RCD for Electric Shock and Fire Protection
at Final Distribution Board
1. MS IEC 61008: Residual current circuit breaker without
integral overcurrent protection for household and similar
uses (RCCBs)
2. MS IEC 61009: Residual current operated circuit-breakers
with integral overcurrent protection for household and
similar uses (RCBOs) – Part 1: General rules
3. MS IEC 61540: Electrical accessories – Portable residual
current devices without integral overcurrent protection for
household and similar uses (PRCDs)
4. MS IEC 61543: Residual current–operated protective
devices (RCDs) for household and similar uses –
Electromagnetic compatibility
62IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
RCD for Electric Shock and Fire Protection
at Final Distribution Board
5. MS IEC 62423: Type B residual current operated circuit
breakers without integral overcurrent protection for
household and similar uses (Type B RCCBs and Type B
RCBOs)
6. MS IEC 62350: Guidance for the correct use of RCDS for
household and similar uses
7. MS IEC 60364: Electrical installations of buildings
63IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Open Source FREE References
64IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Case Study 6:
Electrical Power Drive Systems
65IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Electrical Power Drives Systems
66IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Electrical Power Drive Systems
67IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
63A4PTypeA
30mARCD
63A3P+NC
6kAMCB
Domestic:IEC60898–1
Industrial:IEC60947–2
IEC61008
63A3P+N
Isolator
IEC60947–3
Adjustable
SpeedDrive
Induction
Motor
IEC61800
IEC60034
Electricity Act 1990 and Regulations 1994
63A3P+N
Isolator
Electrical
Installations Equipment/Installation
Standards
1. Electric Motors: IEC 60034 (MS IEC 60034: Withdrawn in
Nov 2015)
2. Power drives systems (Adjustable speed drives): IEC 61800
3. Electrical safety standards
o MS IEC 60240
o MS IEC 61508
o MS ISO 31000, etc.,
4. NEMA 1C53.1: Safety standards for construction and guide
for selection, installation and operation of adjustable speed
drive systems
68IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Open Source FREE References
69IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Case Study 7:
Protecting and Sizing of Cables
For Final Circuits
70IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
IEC 60446: LV Circuit Cable Colour Code
71
 IEC 60446: Basic and safety principles for man-machine
interface, marking and identification – Identification of
conductors by colours or alphanumerics
 Malaysia: Considering compliance: No action as on 2015
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Low Voltage Electrical Circuits: Single Phase
72
Extraneous Conductive
Parts
EB / SEB –
Green
L – Red
N – Black
1–Phase
Load
PE – Green
Exposed Conductive Part
Socket Outlet
L
N
G
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Three (3) or Four (4) Conductors
 Three (3) or four (4) conductors
1. Live conductor 1: Phase conductor
2. Live conductor 2: Neutral conductor
3. Live conductor 3: Protective earth (PE) conductor
4. Equipotential bonding (EB) conductor – Optional
for MS 1979
 MS 1979: Equipotential bonding conductor is optional for
domestic, residential or similar installations, except
o Special installation or equipment such as water
heater
73IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Electrical Circuits: Three Phase
74
Extraneous Conductive
Parts
EB / SEB –
Green
L – Yellow
N – Black
3–Phase
Load
PE – Green
Exposed Conductive Part
L – Red
L – Blue
Isolator
R
N
B
Y
G
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Five (5) or Six (6) Conductors
 Five (5) or six (6) conductors
1. Live conductor 1: Phase conductor – Red (L1);
2. Live conductor 2: Phase conductor – Yellow (L2);
3. Live conductor 3: Phase conductor – Blue (L3);
4. Live conductor 4: Neutral conductor
5. Live conductor 5: Protective earth (PE) conductor
6. Equipotential bonding (EB) conductor – Optional
for MS 1979
 MS 1979: Equipotential bonding conductor is optional for
domestic, residential or similar installations, except
o Special installation or equipment such as water
heater
75IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Functions of PE / EB Conductors:
PE – Discharging Earth Fault Current
76
L – Red
N – Black
LoadPE – Green
Equipment:
Exposed Conductive Part
Socket Outlet
L
N
G
EB – Green
RB ≈ 500ΩRF ≈ mΩ
IF ≈ 0 mA
Metallic Table:
Extraneous Conductive Part
Jumper SEB
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Functions of PE / EB Conductors:
EB – Discharging Earth Fault Current
77
L – Red
N – Black
LoadPE – Green
Equipment:
Exposed Conductive Part
Socket Outlet
L
N
G
EB – Green
RB ≈ 500Ω
IF ≈ 0 mA
Metallic Table:
Extraneous Conductive Part
Break
RF < 10 Ω
Jumper SEB
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Earth Fault Current Flowing into Victim
When PE & EB Conductors are Faulty
78
L – Red
N – Black
LoadPE – Green
Equipment:
Exposed Conductive Part
Socket Outlet
L
N
G
EB – Green
RB ≈ 500Ω
IF
Metallic Table:
Extraneous Conductive Part
Not Installed
Break
ILeakageIExtraneous
RF = Very high
IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Protection and Sizing Cables
 Phase conductors: MS 1936 & MS 1979: TT Earthing
o To size with coordination with circuit breakers
 Neutral conductors: TT Earthing
o MS 1936
 Similar to phase conductor
 By calculation: 3 phase only
 MCB or beak alone cable not permitted
o MS 1979
 Similar to phase conductor
 MCB or beak alone cable not permitted
79IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Protection and Sizing Cables
 Protective earthing conductors (No MCB or breaks allowed)
o MS 1936
 Selection;
 By calculation
o MS 1979
 By selection
o By selection (MS 1936 & MS 1979)
 1.5 mm2 < S < 16 mm2 => Phase conductor
 25 mm2 < S 35 mm2 => 16 mm2
 S > 35 mm2 => S/2 mm2
 Equipotential earthing conductors (MS 1936 & MS 1979)
o By selection (No MCB or breaks allowed)
80IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Protection and Sizing of Cables: Type B MCB
81IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
R
Step 1Step 2
Step 3
Step 1
IB
Step 4
In
Z
I
n
I1.35
B
I:MCBBType 
Step 5
Step 6
MS IEC 60364 / MS 1936 / MS 1979
Protection and Sizing of Cables: Type C/D MCB
82IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
R
Step 1Step 2
Step 3
Step 1
IB
Step 4
In
Z
I
n
I1.45
B
I:MCBBType 
Step 5
Step 6
MS IEC 60364 / MS 1936 / MS 1979
Special Cases: Water Heaters
83IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Maintenance
Isolation
(Outside Zone) 2)
Protection &
Isolation R
Protection
Isolation / Switching
with Visual Indicator
(Outside Zone 2)
Outgoing:
Equipotential Bonding
Cable Size:
Minimum 4 mm2
13 / 15A S/S/O
Not Permitted
Step 1: Determine the Characteristics of
the Load & Calculate IB
1. Comply with equipment / appliance safety standards
2. Obtain the following for the load
a. Power or lighting load;
b. Single phase (230 V) or three phase (400 V);
c. Rated power, kVA or kW;
d. Power factor; and
e. Inrush current, A
2. Maximum demand and diversity factor: Refer to Tables A & B
of Electricity Regulations 1994
3. Calculate IB: The current for which the circuit is designed
84IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Step 2: Plug and Flexible Cords
 Cross–sectional area (CSA) of flexible cords
o Available CSA: 0.50, 0.75 & 1.25 mm2
o Permitted (UK only): 0.22 mm2
 (UK only) accepts that some marginal damage to
small flexible cords is tolerable under short–
circuit conditions, for example where a 0.22
mm2 is used with a 13A BS 1362 fuse
 Not permitted in Malaysia
 BS 1362 fuses
o Available sizes: 1, 2, 3, 5, 7, 10 & 13 A
o Standard size: 3, 5 & 13 A
85IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
BS 1363 Plugs and BS 1362 Fuses
 Select the fuse rating in accordance with requirements of BS
1362 and/or IET (UK) code of practices
o 3A: appliance < 700 W;
o 5A: Appliance > 700 W and < 1,200 W;
o 13A: Appliance > 1,200 V and < 2,300 W
86IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
BS 1363 Plugs and BS 1932 Fuses
 UK Plug and Socket Safety Regulations, 1995
o A correctly fused BS 1363 plug, the flexible cable
connected to equipment is always fully protected
against the effects of overload or small over–currents as
follows:
 3A fuse protects 0.50 mm2 flexible cords;
 5A fuse protects 0.75 mm2 flexible cords;
 13A fuse protects 1.25 mm2 flexible cords
87IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Step 3: Plug and Flexible Cords
 Step 3: Selecting power outlets
o 13A socket outlets (Usually de–rated to 10A load);
o CEE sockets, MCB, MCCB termination box; etc.,
88IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Overload Protection & Sizing of Cables
 .Step 4: Selecting CB: Example MCB
o Step 4A: Select the nominal current of the CB
In = Nominal current of the CB, 6/10/16/20/30/40/50/63 A
IB = Current for which the circuit is designed, full load
current
o Step 4B: Select the type of MCB
 Type B: Inrush < 3 x In
 Type C: Inrush < 5 x In
 Type D: Inrush < 8 x In
89IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
n
I
B
I 
Overload Protection & Sizing of Cables
 Step 5: Selecting the cable
o Step 5A: Determine the continuous current of the
cable
In = Nominal current of the CB
IZ = Max. continuous current – carrying capacity of cable
90IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
z
I
n
I1.45/1.35 
Overload Protection & Sizing of Cables
 .Step 5: Selecting the cable (Continue)
o Step 5B: Determine the nominal current of the cable
 Ca = Correction factor for ambient temperature;
 Cg = Correction factor for grouping; etc.,
91IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
x.......
g
Cx
a
C
z
I
nominal-Z
I 
Overload Protection & Sizing of Cables
 Step 6: Voltage drop calculation
92IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Protection Against Short – Circuit Current
 Short – circuit is a limiting conditions of overload where
o The fault current is relatively high at kA;
o The short – circuit protective CB shall clear the short –
circuit fault within a short time
 Overload CB can protect against short – circuit fault
provided it has a breaking capacity > perspective short –
circuit current of the protected circuit
 Coordination of overload and short – circuit protection shall
ensure the let through energy of the short circuit device does
not exceed that which can be safely withstood by the overload
devices
93IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Sizing PE and EB Cables
94IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Sizing PE Cables
95IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Sizing EB (Supplementary) Cables
96IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Case Study 8:
Selection and Erection of Erection
Equipment – Isolation, Switching
and Control
97IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Isolation, Switching and Control
98IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
R
Isolation &
Switching
Protection &
Isolation
Protection
T
Emergency
Switching:
Firemen Switch
Note:
Coupling to Electricity Provider
Shall be 2P/4P for 1P/3P Supply
Protection
(Fuse)
Isolation, Switching and Control
99IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Maintenance
Isolation
(Outside Zone 2)Protection &
Isolation
R
Protection
Emergency Isolation /
Switching
(Outside Zone 2)
Outgoing:
Equipotential Bonding
Note:
Coupling to Electricity Provider
Shall be 2P/4P for 1P/3P Supply
Isolation, Switching and Control
100IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Maintenance
Isolation
Protection &
Isolation
R
Protection
Emergency
Isolation
Equipotential Bonding ?
Note:
Coupling to Electricity Provider
Shall be 2P/4P for 1P/3P Supply
Isolation, Switching and Control
101IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
R
Protection &
Isolation
Protection
R
Isolation:
Maintenance
Isolation:
Maintenance
Emergency /
Under–voltage
Stop
Note:
Coupling to Electricity Provider
Shall be 2P/4P for 1P/3P Supply
Case Study 9:
Verification:
Initial and Period Verification
102IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Checklist
103IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Checklist
104IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Case Study 10:
Public Awareness and
Training, Workshops and Seminars
105IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Public Awareness: Electrical Safety Seminar
by Energy Commission
106IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Public Comments: MS 1936 & MS 1979
107IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Road Show: Testing RCD
108IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
Workshop: Wiring Design Workshop
109IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
IIEE 2015, Philippines - Annual National Convention of
IIEE - Best Practices in LV Systems - Nov 15 110
Annual National Convention
of
The Institution of Integrated Electrical
Engineers of the Philippines (IIEE)
End of
Presentation
Q & A
Any Questions ?

More Related Content

What's hot

Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...
Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...
Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...Antea Group
 
Roxtec MCT - Cable Entry Solutions for Process Industries
Roxtec MCT - Cable Entry Solutions for Process IndustriesRoxtec MCT - Cable Entry Solutions for Process Industries
Roxtec MCT - Cable Entry Solutions for Process IndustriesAllen Gibson
 
Lv genset protection
Lv genset protectionLv genset protection
Lv genset protectionrkdheepan
 
WEIDMULLER SAUDI ARABIA | AKBAR TRADING EST -SAUDI ARABIA| mail@akbartrading.com
WEIDMULLER SAUDI ARABIA | AKBAR TRADING EST -SAUDI ARABIA| mail@akbartrading.comWEIDMULLER SAUDI ARABIA | AKBAR TRADING EST -SAUDI ARABIA| mail@akbartrading.com
WEIDMULLER SAUDI ARABIA | AKBAR TRADING EST -SAUDI ARABIA| mail@akbartrading.comAKBAR TRADING
 
Breeching Inlet
Breeching InletBreeching Inlet
Breeching Inletbansalash
 
Fire Fighting "A Complete Handbook"
Fire Fighting "A Complete Handbook"Fire Fighting "A Complete Handbook"
Fire Fighting "A Complete Handbook"EzazulHaqueSiddique
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Gensol Engineering Limited
 
Switchgear Installation Precomissioning Inspection.PPT
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPTAbdullah Al Dushaishi
 
Generator set design parameters
Generator set design parametersGenerator set design parameters
Generator set design parametersBruno De Wachter
 
IEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage componentsIEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage componentsCotmac Electronics Pvt. Ltd.
 
Selective Coordination
Selective CoordinationSelective Coordination
Selective Coordinationmichaeljmack
 
Fully calculated firefighting systems with EN 12845 standard
Fully calculated firefighting systems with EN 12845 standardFully calculated firefighting systems with EN 12845 standard
Fully calculated firefighting systems with EN 12845 standardIsidoros Siderakis
 
Fat procedure for lv switchboards
Fat procedure for lv switchboardsFat procedure for lv switchboards
Fat procedure for lv switchboardskhongai
 

What's hot (20)

Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...
Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...
Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...
 
Roxtec MCT - Cable Entry Solutions for Process Industries
Roxtec MCT - Cable Entry Solutions for Process IndustriesRoxtec MCT - Cable Entry Solutions for Process Industries
Roxtec MCT - Cable Entry Solutions for Process Industries
 
Lv genset protection
Lv genset protectionLv genset protection
Lv genset protection
 
WEIDMULLER SAUDI ARABIA | AKBAR TRADING EST -SAUDI ARABIA| mail@akbartrading.com
WEIDMULLER SAUDI ARABIA | AKBAR TRADING EST -SAUDI ARABIA| mail@akbartrading.comWEIDMULLER SAUDI ARABIA | AKBAR TRADING EST -SAUDI ARABIA| mail@akbartrading.com
WEIDMULLER SAUDI ARABIA | AKBAR TRADING EST -SAUDI ARABIA| mail@akbartrading.com
 
Breeching Inlet
Breeching InletBreeching Inlet
Breeching Inlet
 
electrical system
electrical system electrical system
electrical system
 
Fire Fighting "A Complete Handbook"
Fire Fighting "A Complete Handbook"Fire Fighting "A Complete Handbook"
Fire Fighting "A Complete Handbook"
 
Electrical Systems: Designing electrical rooms
Electrical Systems: Designing electrical roomsElectrical Systems: Designing electrical rooms
Electrical Systems: Designing electrical rooms
 
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad IbrahimElectrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
 
MEP & Construction Package
MEP & Construction PackageMEP & Construction Package
MEP & Construction Package
 
Switchgear Installation Precomissioning Inspection.PPT
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPT
 
Generator set design parameters
Generator set design parametersGenerator set design parameters
Generator set design parameters
 
Iec 60364 4-442
Iec 60364 4-442Iec 60364 4-442
Iec 60364 4-442
 
IEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage componentsIEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage components
 
Selective Coordination
Selective CoordinationSelective Coordination
Selective Coordination
 
Chapter 04
Chapter 04Chapter 04
Chapter 04
 
Fully calculated firefighting systems with EN 12845 standard
Fully calculated firefighting systems with EN 12845 standardFully calculated firefighting systems with EN 12845 standard
Fully calculated firefighting systems with EN 12845 standard
 
L.v tech presentation 2
L.v tech presentation 2L.v tech presentation 2
L.v tech presentation 2
 
Fat procedure for lv switchboards
Fat procedure for lv switchboardsFat procedure for lv switchboards
Fat procedure for lv switchboards
 

Similar to Fr4 best practices-in-low-voltage-systems

Seminar engineering.jobs
Seminar engineering.jobsSeminar engineering.jobs
Seminar engineering.jobsZaw Aung
 
NOEL'S (SOLAR 2017) UPDATED RESUME WORD 97
NOEL'S (SOLAR 2017) UPDATED RESUME WORD 97NOEL'S (SOLAR 2017) UPDATED RESUME WORD 97
NOEL'S (SOLAR 2017) UPDATED RESUME WORD 97Noelito Dagal
 
PEC-Philippine-Elec.-Code-by-JVM-Part-1.pdf
PEC-Philippine-Elec.-Code-by-JVM-Part-1.pdfPEC-Philippine-Elec.-Code-by-JVM-Part-1.pdf
PEC-Philippine-Elec.-Code-by-JVM-Part-1.pdfNazieBangayan
 
Required Test Reports & Cerificates for LED Luminaires
Required Test Reports & Cerificates for LED LuminairesRequired Test Reports & Cerificates for LED Luminaires
Required Test Reports & Cerificates for LED LuminairesMichael Santiago
 
Electrical installation guide 2013
Electrical installation guide 2013 Electrical installation guide 2013
Electrical installation guide 2013 Amila Srimaal Gamage
 
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd  Electrical Equipment & Human SafetyMake India Safer with JMV LPS Ltd  Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd Electrical Equipment & Human SafetyMahesh Chandra Manav
 
Kesedaran keselamatan penggunaan kelengkapan elektrik
Kesedaran keselamatan penggunaan kelengkapan elektrikKesedaran keselamatan penggunaan kelengkapan elektrik
Kesedaran keselamatan penggunaan kelengkapan elektrikdarina1984
 
Kesedaran keselamatan penggunaan kelengkapan elektrik
Kesedaran keselamatan penggunaan kelengkapan elektrikKesedaran keselamatan penggunaan kelengkapan elektrik
Kesedaran keselamatan penggunaan kelengkapan elektrikdarina1984
 
Electrical safety sample
Electrical safety  sampleElectrical safety  sample
Electrical safety sampleniravparekh070
 
Bs 3871 mcb and mccb in ac circuits
Bs 3871 mcb and mccb in ac circuitsBs 3871 mcb and mccb in ac circuits
Bs 3871 mcb and mccb in ac circuitsVasudev Mogili
 
Jeep AS 2067 Presentation By Peter Willis
Jeep AS 2067 Presentation By Peter WillisJeep AS 2067 Presentation By Peter Willis
Jeep AS 2067 Presentation By Peter WillisEngineers Australia
 
Orientation EPAS.pptx
Orientation EPAS.pptxOrientation EPAS.pptx
Orientation EPAS.pptxxtianiversity
 
1. ul singapore battery standards workshop 2021 final
1. ul  singapore battery standards workshop 2021 final1. ul  singapore battery standards workshop 2021 final
1. ul singapore battery standards workshop 2021 finalInstansi
 
Electrical Risk Management
Electrical Risk ManagementElectrical Risk Management
Electrical Risk Managementguest81e1c7
 

Similar to Fr4 best practices-in-low-voltage-systems (20)

Seminar engineering.jobs
Seminar engineering.jobsSeminar engineering.jobs
Seminar engineering.jobs
 
NOEL'S (SOLAR 2017) UPDATED RESUME WORD 97
NOEL'S (SOLAR 2017) UPDATED RESUME WORD 97NOEL'S (SOLAR 2017) UPDATED RESUME WORD 97
NOEL'S (SOLAR 2017) UPDATED RESUME WORD 97
 
PEC-Philippine-Elec.-Code-by-JVM-Part-1.pdf
PEC-Philippine-Elec.-Code-by-JVM-Part-1.pdfPEC-Philippine-Elec.-Code-by-JVM-Part-1.pdf
PEC-Philippine-Elec.-Code-by-JVM-Part-1.pdf
 
Required Test Reports & Cerificates for LED Luminaires
Required Test Reports & Cerificates for LED LuminairesRequired Test Reports & Cerificates for LED Luminaires
Required Test Reports & Cerificates for LED Luminaires
 
Forms 17th
Forms 17thForms 17th
Forms 17th
 
Electrical installation guide 2013
Electrical installation guide 2013 Electrical installation guide 2013
Electrical installation guide 2013
 
Manual instalaciones electricas
Manual instalaciones electricasManual instalaciones electricas
Manual instalaciones electricas
 
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd  Electrical Equipment & Human SafetyMake India Safer with JMV LPS Ltd  Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
 
Kesedaran keselamatan penggunaan kelengkapan elektrik
Kesedaran keselamatan penggunaan kelengkapan elektrikKesedaran keselamatan penggunaan kelengkapan elektrik
Kesedaran keselamatan penggunaan kelengkapan elektrik
 
Kesedaran keselamatan penggunaan kelengkapan elektrik
Kesedaran keselamatan penggunaan kelengkapan elektrikKesedaran keselamatan penggunaan kelengkapan elektrik
Kesedaran keselamatan penggunaan kelengkapan elektrik
 
F04844043
F04844043F04844043
F04844043
 
Electrical safety sample
Electrical safety  sampleElectrical safety  sample
Electrical safety sample
 
Bs 3871 mcb and mccb in ac circuits
Bs 3871 mcb and mccb in ac circuitsBs 3871 mcb and mccb in ac circuits
Bs 3871 mcb and mccb in ac circuits
 
Jeep AS 2067 Presentation By Peter Willis
Jeep AS 2067 Presentation By Peter WillisJeep AS 2067 Presentation By Peter Willis
Jeep AS 2067 Presentation By Peter Willis
 
Standards
StandardsStandards
Standards
 
Standards
StandardsStandards
Standards
 
Orientation EPAS.pptx
Orientation EPAS.pptxOrientation EPAS.pptx
Orientation EPAS.pptx
 
1. ul singapore battery standards workshop 2021 final
1. ul  singapore battery standards workshop 2021 final1. ul  singapore battery standards workshop 2021 final
1. ul singapore battery standards workshop 2021 final
 
Electrical Risk Management
Electrical Risk ManagementElectrical Risk Management
Electrical Risk Management
 
waynes resume
waynes resumewaynes resume
waynes resume
 

Recently uploaded

ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxVishalDeshpande27
 
Introduction to Casting Processes in Manufacturing
Introduction to Casting Processes in ManufacturingIntroduction to Casting Processes in Manufacturing
Introduction to Casting Processes in Manufacturingssuser0811ec
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...Amil baba
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234AafreenAbuthahir2
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdfKamal Acharya
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptssuser9bd3ba
 

Recently uploaded (20)

ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
Introduction to Casting Processes in Manufacturing
Introduction to Casting Processes in ManufacturingIntroduction to Casting Processes in Manufacturing
Introduction to Casting Processes in Manufacturing
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 

Fr4 best practices-in-low-voltage-systems

  • 1. IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 1 40th Annual National Convention (2015) of The Institution of Integrated Electrical Engineers of the Philippines (IIEE) Best Practices in Low Voltage Systems (Malaysia) Ir. K.T. Lim (Lim Kim Ten) The Institution of Engineers, Malaysia 3:30pm – 4:20pm 27th November 2015
  • 2. LV Electrical Systems of Fixed Buildings IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 2 Earthing Lightning Installations Reticulation 1. Electricity supply reticulation 2. Electrical installations of fixed buildings 3. Protection against Lightning 4. Earthing 5. Equipment Equipment
  • 3. Notes: Malaysia Does not Develop National Low Voltage (LV) Electrical Installations Codes or Standards 3IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 We Adopt Relevant British and/or IEC / ISO Standards
  • 4. Notes: Malaysia “Adopt” Elements or Whole of Other LV Electrical Codes and Standards which Enhance Electrical Safety 4IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Examples: USA: National Electric Code IEEE Color Books
  • 5. 5IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 IEEE Color Books
  • 6. Philippine Electricity Code 6IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 7. Standards, Guides, Codes and Code of Practices 7IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Low Voltage Electrical Installations of Fixed Buildings Low Voltage Reticulation Electrical Installation of Buildings Protection Against Lightning Electrical Equipment Grid Code TNB Electricity Application Handbook Earthing MS IEC 62305 BS 7430 MS IEC 60364 / MS IEC/IEC 60364–7 / MS 1936 / MS 1979 Others Equipment (Product) MS Standard MS IEC / IEC Standards / Approval of Electrical Equipment
  • 8. Grouping of Electrical Installations of Fixed Buildings 8IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Normal Installations: MS IEC 60364– 1/6 MS 1936 / MS 1979 Explosive Atmospheres MS IEC 60364 / MS IEC 60079 Others Installations: Various Special Installations or Locations: IEC 60364–7 / MS IEC 60364–7–710 LV Electrical Installations of Fixed Buildings
  • 9. Standards, Guides & Code of Practices 9IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Electrical Installation of Fixed Buildings MS IEC 60364 / IEC 60364 – 7 Residential / Un–Informed User MS 1979: Code of Practices Non – Residential MS 1936: Guide to IEC 60364 Guidelines for Electrical Wiring in Residential Buildings Code of Practices: Water Heater
  • 10. Non – Residential: MS IEC 60364 / MS 1936 IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 10 Fixed Buildings Outdoor: Carpark / Guard HouseCommercial Buildings Condominiums Schools Airport: KLIA Factories
  • 11. Residential: MS IEC 60364 / MS 1979 IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 11 Rural Houses Fishing Villages Residential Buildings Apartments Condominiums Illegal Settlements Residential
  • 12. Non – Residential: Special Installations IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 12 Special Installations /Locations Water Features and Fountains IEC 60364–7–702 Swimming Pool IEC 60364–7–702 Agriculture & Horticulture IEC 60364–7–705 Marina’s: IEC 60364–7–709 Bath room: IEC 60364–7–701 Hospitals: University of Malaya Medical Faculty MS IEC 60364–7–710 MS 2366
  • 13. Residential Buildings: Special Installations IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 13 Residential Buildings Guard House: MS IEC 60364 Fountain: IEC 60364–7–702 Fish Tank: IEC 60364–7–702 Bathroom: IEC 60364–7–701 Electric Vehicle Charging: IEC 60354–7–722 Water Heater: Code of PracticeResidential Solar PV: IEC 60364–7–712
  • 14. Explosive Atmospheres: IEC 60364 / IEC 60079 IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 14 Explosive Atmospheres Tank Farm Chemical Complex Chemical Store Oleo Refinery Grain Silos Oil & Gas Platform
  • 15. Others Installations IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 15 Others Installations Ships: IEC 60092 Aviation & Aerospace MilitaryPonds, Rivers, Seas & Oceans
  • 16. Scope of MS 1936 and MS 1979 IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 16 EF/OL T KwH MSB EMSB G SSB (E) SSB (N) UPS Final Circuits Final DB Final Circuits Final DB MS 1936 LV Supply to Fire Protection Systems (Exclude Equipment) (Exclude Equipment) Final DB ≈ Consumer Unit PE PE N R KwH Consumer Unit Residential Final Circuits MS 1979 PE
  • 17. Benefits of Developing MS 1936 & MS 1979 17IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Electrical Installation of Fixed Buildings MS IEC 60364 – 1 to – 6 Residential / Un–Informed User MS 1979: Code of Practices Non – Residential MS 1936: Guide to IEC 60364 Electrical Installation of Fixed Buildings IEC 60364 – 1 to – 6 > Rm. 20,000 per set < Rm. 1,200 per set Rm. 100 per book Rm. 20 per book > 500 pages > 500 pages < 100 pages > 30 pages No Examples No Examples with Examples with Examples
  • 18. 18IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Rm.20–00 Rm.100–00
  • 19. 19IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Develop Based on MS 1979 for Un – informed User: Free Download: Energy Commission
  • 20. Case Study: 1 Low Voltage (LV) Electricity Act and Regulations, and Electrical Safety Standards 20IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 21. Electricity Act and Regulations 21IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Electricity Regulations 1994 Free Download: Energy Commission Free Download: Energy Commission
  • 22. Electrical Safety Standards: Generic 1. MS IEC 60335: Household and similar electrical appliances; 2. MS IEC 60065: Audio, video and similar electronic apparatus; 3. MS IEC 61010: Equipment for measurement, control and laboratory use; 4. MS IEC 60950: Information and communication technology equipment; 5. MS IEC 60601: Medical electrical equipment; 6. MS IEC 60204: Safety of Machinery 7. MS IEC 61508: Functional safety of electrical / electronic / programmable electronic safety – related systems  IEC 62368 replacing IEC 60065; and IEC 60950 o No MS IEC adoption yet 22IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 23. Electrical Safety Standards: Specific  MS 556: Specification for electrical safety code on private electric generator;  MS 949: Code of practice for safety in welding and cutting;  MS 966: Playground equipment: Part 2: General safety requirements;  MS 1597: Part 2–73:2003 Household and similar electrical appliances–Safety–Part: 2–73: Particular Requirements for fixed immersion heaters (1st Edition);  MS 1992: Electronic equipment for use in power installations;  Etc., 23IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 24. Case Study: 2 Adoption of International Low Voltage Electrical Installations Standards 24IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 25. Notes: Malaysia Does not Develop National Low Voltage (LV) Electrical Installations Codes or Standards 25IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 We Adopt Relevant British and/or IEC / ISO Standards
  • 26. International Standards Harmonization: LV Electrical Installations of Buildings 26IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 IEC Year 2003
  • 27. ISO Standards 27IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Full Members Associate Members Affiliates ISO Year 2003
  • 28. Adoption of International Standards and Best Practices  Malaysia adopts IEC & ISO standards as reference standards  National deviations document in guides and code of practices o As MS (Malaysian Standard) standards  Example o MS IEC 60364: Electrical Installations of Buildings – Adoption of IEC 60364 with national deviations  MS 1936: Electrical Installations of Buildings: Guide to MS IEC 60364: Non–residential buildings  MS 1979: Electrical Installations of Buildings: Code of Practice: Residential buildings  Code of practice for water heater 28IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 29. Other International & National Standards ??  We adopt requirements that improve, especially, safety and if possible economize our electrical installation practices;  Elements or whole of standards commonly used in Malaysia today o BS 7671; o National Electrical Code (NEC); o JIS (Japan), GB (China), EN (European Union); o IEEE colour books 29IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 30. British Colony & Malaysia Act 1963  Malaya was a British colony up to 1957  3 years 8 months under Japanese occupation (No impact on electrical installations)  Malaysia Act 1963 o Malaya (Peninsular Malaysia), Sabah, Sarawak, and Singapore joined as Malaysia in Year 1963 o Singapore left Malaysia 9th August 1965  Constitution safeguards, includes the supply of electricity and matters related o The State of Sabah (20 points agreement)  Harmonized with Peninsula Malaysia o The State of Sarawak (18 points agreement) 30IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 31. Fixed Building Electrical Standards Timeline 31IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Time Line (Malaya), Peninsular, FT’s & Sabah The State of Sarawak Up to year 1991 IEE Wiring Reg. 1st – 15th Ed.(Electrical Installations of Buildings) BS 6651 (Lightning) / BS 7430 (Earthing) Year 1991 IEE Wiring Reg. 1st – 16th Ed.(16th Ed., issued in 1991) BS 6651 / BS 7430 Year 1992 IEE Wiring Reg. 16th Ed.: Harmonized with IEC 60364 and became with BS 7671:1992 BS 6651 / BS 7430 Year 1991 – Year 2003 IEE Wiring Reg. / BS 7671 BS 6651 / BS EN 62305 (1999) / BS 7430 BS 7671 BS 6651 / BS EN 62305 / BS 7430 Year 2004 – Year 2007 BS 7671 / IEC 60364 / MS 1979 (2007) BS 6651 or MS IEC 62305:2007/ BS 7430 BS 7671 BS 6651 / BS EN 62305 / BS 7430 Year 2008 – Now IEC 60364 / MS 1979 BS 6651 / MS IEC 62305 (1 Sep 11) / BS 7430 BS 7671 BS EN 62305 / BS 7430
  • 32. IEC 60364 (BS 7671:2008:2008) Part 7: Special Installations or Locations 32IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Malaysian Standard IEC 60364–7– (BS 7671 Part 7–Section) (700: General) –701 (701): Locations Containing a Bath or Shower –702 (702): Swimming Pools and Other Basins –703 (703): Room and Cabins Containing Sauna Heaters –704 (704): Construction and Demolition Site Installations –705 (705): Agricultural and Horticultural Premises –706 (706): Conducting Locations with Restricted Movement –708 (708): Caravan Parks, Camping Parks and Similar Locations
  • 33. IEC 60364 (BS 7671:2008:2008) Part 7: Special Installations or Locations 33IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Malaysian Standard IEC 60364–7– (BS 7671 Part 7–Section) –709 (709): Marinas and Similar Locations MS IEC 6-364–7–710 –710 (710): Medical Locations –711 (711): Exhibitions, Shows and Stands –712 (712): Solar Photovoltaic (PV) Power Supply Systems –714 (714): External Lighting Installations –715 (715): Extra Low–Voltage Lighting Installations –717 (717): Mobile or Transportable Units –718 (718): Communal Facilities and Workplaces –721 (721): Electrical Installations in Caravans and Motor Caravans
  • 34. IEC 60364 (BS 7671:2008:2008) Part 7: Special Installations or Locations 34IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Malaysian Standard IEC 60364–7– (BS 7671 Part 7–Section) –722 (722): Supplies for Electric Vehicles –729 (729): Operating or Maintenance gangways –740 (740): Temporary Electrical Installations for Structures, Amusement Devices and Booths at fairgrounds, Amusement Parts and Circuses –753 (753): Heating Cables and Embedded Heating Systems
  • 35. IEC 60364 – 8 – 1 & IEC 60364 – 9 – 1 35IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 IEC 60364 – 8 to – 9 / BS 7671 Part 8 & Part 9 Part 8 – 1 Low Voltage Electrical Installations – Part 8 – 1: Energy Efficiency Part 9 – 1 Low Voltage Electrical Installations – Part 8 – 1: Installations, Design and Safety Requirements for Photovoltaic Systems (PV) – Reject - 2014 Malaysia is P Member of IEC
  • 36. Case Study 3: Total Risk Management 36IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 37. Moving Electrical Equipment: Motors 37IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 2/3 Consumed by Electric Motors 1/2 Horse Power motor can kill a person
  • 38. Primary Acts & Regulations: Safety and Health 38IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Free Download: DOSH Malaysia Free Download: DOSH Malaysia Except: Electrical
  • 39. Electricity: Primary Acts & Regulations 39IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Electricity Regulations 1994
  • 40. DOSH Guidelines & COP: Safety and Health 40IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Free Download: DOSH, Malaysia Free Download: DOSH Malaysia
  • 41. 41IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Adoption of International Safety Standards
  • 42. 42IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Others ISO 31000 Department of Occupational Safety and Health, Malaysia
  • 43. 43IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Rm. 40-00 only Rm. 20-00 only Rm.100-00 only
  • 44. Case Study 4: Compliance with Requirements of Act, Regulations, and Standards 44IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 45. Compliance with Regulations and Standards 45IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 R Plug: Plug: MS 589 Plug: BS 1363 Fuse: BS 1362 13A Socket Outlet: MS 589 BS 1363 Cable Management: Trunking: MS 1777 Cable Ducting: MS 1777 uPVC Conduit: MS 1034 Conduit System: MS IEC 61386 Cable: MS 2xxxx RCD: MS IEC 61008 MS IEC 61540 MS 62350 MCB: MS IEC 60898 MS IEC 60947 MS IEC 60335 – 1 MS IEC 60335 – 1 Comply with Acts and Regulations Comply with Standards MCB – RCD: MS IEC 61009 Maintenance Disconnector MS IEC 60364 / MS 1936 / MS 1979 ??? ??? Equipment
  • 46. 46IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 R Plug: Plug: MS 589 Plug: BS 1363 Fuse: BS 1362 13A Socket Outlet: MS 589 BS 1363 Cable Management: Trunking: MS 1777 Cable Ducting: MS 1777 uPVC Conduit: MS 1034 Conduit System: MS IEC 61386 Cable: MS 2xxxx RCD: MS IEC 61008 MS IEC 61540 MS 62350 MCB: MS IEC 60898 MS IEC 60947 MS IEC 60335 – 1 MS IEC 60335 – 1 Competent Person MCB – RCD: MS IEC 61009 User / Manufacturer Compliance with Regulations and Standards
  • 47. 47IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Compliance with Regulations and Standards MS IEC 60364: IP Rating Protection No Cable Stress Relief Cable Stress Relief BS 1362 Fuse: 3A: < 700 W 5A: 700 W – 1,200 W 13A: > 1,200 W Moulded Cable Standard lengths: 2 or 3 meters
  • 48. Hospital: Pendant/Bedhead Trunking 48IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 IEC 61534: Power Track Systems MS IEC 61008: RCD’s MS 589/BS 1363: Socket Outlets
  • 49. Electric Shock & Fire Protection by RCD 49 63A 4P Type A 100 mA RCD 63A 3P+N C 6kA MCB IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 13A S/S/O Water Features 40A 2P Type A 10 mA RCD 40A 1P+N C 6kA MCB IEC 60364–7-702 20A 1P+N C 6kA MCB MS IEC 60898 40A 2P Type A 10 mA RCD MS IEC 60008 WaterHeaterIEC 60364–7-701 Electricity Regulations 1994 13A S/S/O Kitchen 40A 2P Type A 30 mA RCD 40A 1P+N C 6kA MCB IEC 60364–Part 1 - 6 13A S/S/O Others 40A 2P Type A 30 mA RCD 40A 1P+N C 6kA MCB IEC 60364–Part 1 - 6 Lighting / Air Conditioners / Others Above 2.5 m IEC 60364–Part 1 - 6 MS IEC 60364–4 Protection Against Fire MS IEC 60364–4 Protection Against Electric Shock
  • 50. Case Study 5: Protection for Safety against Electric Shock and Fire at Final Distribution Board or Consumer Unit 50IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 51. Notes: Electric Shock is the Major Cause of Fatal Electrical Accident In Malaysia 51IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 52. Notes: MS IEC (IEC) 60364 RCD for Electric Shock Protection Shall have Sensitivity of 30 mA or less 52IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 53. Notes: Electricity Regulations 1994 RCD for Equipment such as Water Heater and Portable Equipment Shall have Sensitivity of 10 mA or less 53IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 54. Notes: Leakage Currents > 260 mA ≈ 300 mA can cause Fire 54IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 55. Notes: Electricity Regulations 1994 RCD for Fire Protection Shall have Sensitivity of 100 mA or less 55IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 56. Notes: “Safe” AC Voltage < 50 Vrms at 50/60 Hz “Safe” DC Voltage < 120 Vdc +10% Ripple For Normal (Fixed) Installations only 56IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 57. Electric Shock & Fire Protection by RCD 57 63A 4P Type A 100 mA RCD 63A 3P+N C 6kA MCB IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 13A S/S/O Water Features 40A 2P Type A 10 mA RCD 40A 1P+N C 6kA MCB IEC 60364–7-702 20A 1P+N C 6kA MCB MS IEC 60898 40A 2P Type A 10 mA RCD MS IEC 60008 WaterHeaterIEC 60364–7-701 Electricity Regulations 1994 13A S/S/O Kitchen 40A 2P Type A 30 mA RCD 40A 1P+N C 6kA MCB IEC 60364–Part 1 - 6 13A S/S/O Others 40A 2P Type A 30 mA RCD 40A 1P+N C 6kA MCB IEC 60364–Part 1 - 6 Lighting / Air Conditioners / Others Above 2.5 m IEC 60364–Part 1 - 6 MS IEC 60364–4 Protection Against Fire MS IEC 60364–4 Protection Against Electric Shock
  • 58. Enhanced Protection for Safety: Power 58IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 63A 4P Type A 100 mA RCD 63A 3P+N C 6kA MCB 13A S/S/O Water Features 40A 2P Type A 10 mA RCD 40A 1P+N C 6kA MCB IEC 60364–7-702 20A 1P+N C 6kA MCB 40A 2P Type A 10 mA RCD WaterHeaterIEC 60364–7-701: RCD = 30 mA Electricity Regulations 1994: RCD = 10 mA 13A S/S/O Kitchen 40A 2P Type A 30 mA RCD 40A 1P+N C 6kA MCB IEC 60364–Part 1 - 6 13A S/S/O Others 40A 2P Type A 30 mA RCD 40A 1P+N C 6kA MCB IEC 60364–Part 1 - 6 Air Conditioners / Others Above 2.5 m IEC 60364–Part 1 - 6 Enhanced Safety Enhanced Safety Electricity Regulations 1994: RCD < 100 mA IEC 60364–41: RCD < 300 mA Recommend: Outdoor S/S/O: RCD = 10 mA & at least 1,500 mm Above Finished Floor Level
  • 59. Enhanced Protection for Safety: Power IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 59 R Consumer Unit (Residential) Final Circuit Distribution Board Electricity Provider 4 Pole I∆n = 100 mA (Malaysia) 3 Pole MCB R 4 Pole I∆n =30mA Three Phase Loads R 2 Pole I∆n = 10 mA (Malaysia) Single Phase Wet Loads R 2 Pole I∆n = 30mA Single Phase Other Loads RYB R or Y or B R or Y or B PE MS IEC 60364: By Calculation or < 150 Ω whichever is lower MS 1936 / MS 1979: Maximum Earth Resistivity < 10 Ω Protection: Electric Shock Protection: Fire
  • 60. Protection for Safety: Lighting & Fans 60IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 63A 4P Type A 100 mA RCD 63A 3P+N C 6kA MCB Water Features / Wet Areas 40A 2P Type A 30 mA RCD 40A 1P+N C 6kA MCB 20A 1P+N C 6kA MCB 40A 2P Type A 30 mA RCD Parameter/ GardenLighting IEC 60364–Part 1 - 6 Outdoor Lighting IEC 60364–7–702 Electricity Regulations 1994: RCD < 100 mA IEC 60364–41: RCD < 300 mA Indoor Lighting & Fans Recommend: Outdoor Lighting: RCD = 10 mA
  • 61. Protection for Safety: Lighting & Fans 61IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 63A 4P Type A 300 mA RCD 63A 3P+N C 6kA MCB Water Features / Wet Areas 40A 2P Type A 30 mA RCD 40A 1P+N C 6kA MCB 20A 1P+N C 6kA MCB 40A 2P Type A 30 mA RCD Parameter/ GardenLighting Indoor Lighting & Fans 40A 2P Type A 100 mA RCD 40A 1P+N C 6kA MCB IEC 60364–Part 1 - 6 Outdoor Lighting IEC 60364–7–702 Electricity Regulations 1994: RCD < 100 mA IEC 60364–41: RCD < 300 mA MS 1936 40A 2P Type A 100 mA RCD 40A 1P+N C 6kA MCB IEC 60364–Part 1 - 6 Indoor Lighting & Fans Recommend: Outdoor Lighting: RCD = 10 mA 40A 2P Type A 100 mA RCD 40A 1P+N C 6kA MCB IEC 60364–Part 1 - 6 Indoor Lighting & Fans
  • 62. RCD for Electric Shock and Fire Protection at Final Distribution Board 1. MS IEC 61008: Residual current circuit breaker without integral overcurrent protection for household and similar uses (RCCBs) 2. MS IEC 61009: Residual current operated circuit-breakers with integral overcurrent protection for household and similar uses (RCBOs) – Part 1: General rules 3. MS IEC 61540: Electrical accessories – Portable residual current devices without integral overcurrent protection for household and similar uses (PRCDs) 4. MS IEC 61543: Residual current–operated protective devices (RCDs) for household and similar uses – Electromagnetic compatibility 62IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 63. RCD for Electric Shock and Fire Protection at Final Distribution Board 5. MS IEC 62423: Type B residual current operated circuit breakers without integral overcurrent protection for household and similar uses (Type B RCCBs and Type B RCBOs) 6. MS IEC 62350: Guidance for the correct use of RCDS for household and similar uses 7. MS IEC 60364: Electrical installations of buildings 63IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 64. Open Source FREE References 64IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 65. Case Study 6: Electrical Power Drive Systems 65IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 66. Electrical Power Drives Systems 66IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 67. Electrical Power Drive Systems 67IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 63A4PTypeA 30mARCD 63A3P+NC 6kAMCB Domestic:IEC60898–1 Industrial:IEC60947–2 IEC61008 63A3P+N Isolator IEC60947–3 Adjustable SpeedDrive Induction Motor IEC61800 IEC60034 Electricity Act 1990 and Regulations 1994 63A3P+N Isolator Electrical Installations Equipment/Installation
  • 68. Standards 1. Electric Motors: IEC 60034 (MS IEC 60034: Withdrawn in Nov 2015) 2. Power drives systems (Adjustable speed drives): IEC 61800 3. Electrical safety standards o MS IEC 60240 o MS IEC 61508 o MS ISO 31000, etc., 4. NEMA 1C53.1: Safety standards for construction and guide for selection, installation and operation of adjustable speed drive systems 68IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 69. Open Source FREE References 69IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 70. Case Study 7: Protecting and Sizing of Cables For Final Circuits 70IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 71. IEC 60446: LV Circuit Cable Colour Code 71  IEC 60446: Basic and safety principles for man-machine interface, marking and identification – Identification of conductors by colours or alphanumerics  Malaysia: Considering compliance: No action as on 2015 IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 72. Low Voltage Electrical Circuits: Single Phase 72 Extraneous Conductive Parts EB / SEB – Green L – Red N – Black 1–Phase Load PE – Green Exposed Conductive Part Socket Outlet L N G IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 73. Three (3) or Four (4) Conductors  Three (3) or four (4) conductors 1. Live conductor 1: Phase conductor 2. Live conductor 2: Neutral conductor 3. Live conductor 3: Protective earth (PE) conductor 4. Equipotential bonding (EB) conductor – Optional for MS 1979  MS 1979: Equipotential bonding conductor is optional for domestic, residential or similar installations, except o Special installation or equipment such as water heater 73IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 74. Electrical Circuits: Three Phase 74 Extraneous Conductive Parts EB / SEB – Green L – Yellow N – Black 3–Phase Load PE – Green Exposed Conductive Part L – Red L – Blue Isolator R N B Y G IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 75. Five (5) or Six (6) Conductors  Five (5) or six (6) conductors 1. Live conductor 1: Phase conductor – Red (L1); 2. Live conductor 2: Phase conductor – Yellow (L2); 3. Live conductor 3: Phase conductor – Blue (L3); 4. Live conductor 4: Neutral conductor 5. Live conductor 5: Protective earth (PE) conductor 6. Equipotential bonding (EB) conductor – Optional for MS 1979  MS 1979: Equipotential bonding conductor is optional for domestic, residential or similar installations, except o Special installation or equipment such as water heater 75IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 76. Functions of PE / EB Conductors: PE – Discharging Earth Fault Current 76 L – Red N – Black LoadPE – Green Equipment: Exposed Conductive Part Socket Outlet L N G EB – Green RB ≈ 500ΩRF ≈ mΩ IF ≈ 0 mA Metallic Table: Extraneous Conductive Part Jumper SEB IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 77. Functions of PE / EB Conductors: EB – Discharging Earth Fault Current 77 L – Red N – Black LoadPE – Green Equipment: Exposed Conductive Part Socket Outlet L N G EB – Green RB ≈ 500Ω IF ≈ 0 mA Metallic Table: Extraneous Conductive Part Break RF < 10 Ω Jumper SEB IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 78. Earth Fault Current Flowing into Victim When PE & EB Conductors are Faulty 78 L – Red N – Black LoadPE – Green Equipment: Exposed Conductive Part Socket Outlet L N G EB – Green RB ≈ 500Ω IF Metallic Table: Extraneous Conductive Part Not Installed Break ILeakageIExtraneous RF = Very high IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 79. Protection and Sizing Cables  Phase conductors: MS 1936 & MS 1979: TT Earthing o To size with coordination with circuit breakers  Neutral conductors: TT Earthing o MS 1936  Similar to phase conductor  By calculation: 3 phase only  MCB or beak alone cable not permitted o MS 1979  Similar to phase conductor  MCB or beak alone cable not permitted 79IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 80. Protection and Sizing Cables  Protective earthing conductors (No MCB or breaks allowed) o MS 1936  Selection;  By calculation o MS 1979  By selection o By selection (MS 1936 & MS 1979)  1.5 mm2 < S < 16 mm2 => Phase conductor  25 mm2 < S 35 mm2 => 16 mm2  S > 35 mm2 => S/2 mm2  Equipotential earthing conductors (MS 1936 & MS 1979) o By selection (No MCB or breaks allowed) 80IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 81. Protection and Sizing of Cables: Type B MCB 81IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 R Step 1Step 2 Step 3 Step 1 IB Step 4 In Z I n I1.35 B I:MCBBType  Step 5 Step 6 MS IEC 60364 / MS 1936 / MS 1979
  • 82. Protection and Sizing of Cables: Type C/D MCB 82IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 R Step 1Step 2 Step 3 Step 1 IB Step 4 In Z I n I1.45 B I:MCBBType  Step 5 Step 6 MS IEC 60364 / MS 1936 / MS 1979
  • 83. Special Cases: Water Heaters 83IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Maintenance Isolation (Outside Zone) 2) Protection & Isolation R Protection Isolation / Switching with Visual Indicator (Outside Zone 2) Outgoing: Equipotential Bonding Cable Size: Minimum 4 mm2 13 / 15A S/S/O Not Permitted
  • 84. Step 1: Determine the Characteristics of the Load & Calculate IB 1. Comply with equipment / appliance safety standards 2. Obtain the following for the load a. Power or lighting load; b. Single phase (230 V) or three phase (400 V); c. Rated power, kVA or kW; d. Power factor; and e. Inrush current, A 2. Maximum demand and diversity factor: Refer to Tables A & B of Electricity Regulations 1994 3. Calculate IB: The current for which the circuit is designed 84IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 85. Step 2: Plug and Flexible Cords  Cross–sectional area (CSA) of flexible cords o Available CSA: 0.50, 0.75 & 1.25 mm2 o Permitted (UK only): 0.22 mm2  (UK only) accepts that some marginal damage to small flexible cords is tolerable under short– circuit conditions, for example where a 0.22 mm2 is used with a 13A BS 1362 fuse  Not permitted in Malaysia  BS 1362 fuses o Available sizes: 1, 2, 3, 5, 7, 10 & 13 A o Standard size: 3, 5 & 13 A 85IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 86. BS 1363 Plugs and BS 1362 Fuses  Select the fuse rating in accordance with requirements of BS 1362 and/or IET (UK) code of practices o 3A: appliance < 700 W; o 5A: Appliance > 700 W and < 1,200 W; o 13A: Appliance > 1,200 V and < 2,300 W 86IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 87. BS 1363 Plugs and BS 1932 Fuses  UK Plug and Socket Safety Regulations, 1995 o A correctly fused BS 1363 plug, the flexible cable connected to equipment is always fully protected against the effects of overload or small over–currents as follows:  3A fuse protects 0.50 mm2 flexible cords;  5A fuse protects 0.75 mm2 flexible cords;  13A fuse protects 1.25 mm2 flexible cords 87IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 88. Step 3: Plug and Flexible Cords  Step 3: Selecting power outlets o 13A socket outlets (Usually de–rated to 10A load); o CEE sockets, MCB, MCCB termination box; etc., 88IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 89. Overload Protection & Sizing of Cables  .Step 4: Selecting CB: Example MCB o Step 4A: Select the nominal current of the CB In = Nominal current of the CB, 6/10/16/20/30/40/50/63 A IB = Current for which the circuit is designed, full load current o Step 4B: Select the type of MCB  Type B: Inrush < 3 x In  Type C: Inrush < 5 x In  Type D: Inrush < 8 x In 89IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 n I B I 
  • 90. Overload Protection & Sizing of Cables  Step 5: Selecting the cable o Step 5A: Determine the continuous current of the cable In = Nominal current of the CB IZ = Max. continuous current – carrying capacity of cable 90IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 z I n I1.45/1.35 
  • 91. Overload Protection & Sizing of Cables  .Step 5: Selecting the cable (Continue) o Step 5B: Determine the nominal current of the cable  Ca = Correction factor for ambient temperature;  Cg = Correction factor for grouping; etc., 91IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 x....... g Cx a C z I nominal-Z I 
  • 92. Overload Protection & Sizing of Cables  Step 6: Voltage drop calculation 92IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 93. Protection Against Short – Circuit Current  Short – circuit is a limiting conditions of overload where o The fault current is relatively high at kA; o The short – circuit protective CB shall clear the short – circuit fault within a short time  Overload CB can protect against short – circuit fault provided it has a breaking capacity > perspective short – circuit current of the protected circuit  Coordination of overload and short – circuit protection shall ensure the let through energy of the short circuit device does not exceed that which can be safely withstood by the overload devices 93IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 94. Sizing PE and EB Cables 94IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 95. Sizing PE Cables 95IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 96. Sizing EB (Supplementary) Cables 96IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 97. Case Study 8: Selection and Erection of Erection Equipment – Isolation, Switching and Control 97IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 98. Isolation, Switching and Control 98IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 R Isolation & Switching Protection & Isolation Protection T Emergency Switching: Firemen Switch Note: Coupling to Electricity Provider Shall be 2P/4P for 1P/3P Supply Protection (Fuse)
  • 99. Isolation, Switching and Control 99IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Maintenance Isolation (Outside Zone 2)Protection & Isolation R Protection Emergency Isolation / Switching (Outside Zone 2) Outgoing: Equipotential Bonding Note: Coupling to Electricity Provider Shall be 2P/4P for 1P/3P Supply
  • 100. Isolation, Switching and Control 100IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 Maintenance Isolation Protection & Isolation R Protection Emergency Isolation Equipotential Bonding ? Note: Coupling to Electricity Provider Shall be 2P/4P for 1P/3P Supply
  • 101. Isolation, Switching and Control 101IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 R Protection & Isolation Protection R Isolation: Maintenance Isolation: Maintenance Emergency / Under–voltage Stop Note: Coupling to Electricity Provider Shall be 2P/4P for 1P/3P Supply
  • 102. Case Study 9: Verification: Initial and Period Verification 102IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 103. Checklist 103IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 104. Checklist 104IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 105. Case Study 10: Public Awareness and Training, Workshops and Seminars 105IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 106. Public Awareness: Electrical Safety Seminar by Energy Commission 106IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 107. Public Comments: MS 1936 & MS 1979 107IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 108. Road Show: Testing RCD 108IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 109. Workshop: Wiring Design Workshop 109IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15
  • 110. IIEE 2015, Philippines - Annual National Convention of IIEE - Best Practices in LV Systems - Nov 15 110 Annual National Convention of The Institution of Integrated Electrical Engineers of the Philippines (IIEE) End of Presentation Q & A Any Questions ?