WTG has many components & the audit checklist helps to maintain the WTG. Checklist covers the following options -
a) Transformer
b) Isolator
c) VCB Panel & Switch Yard
d) Power Panel
e) Capacitor Panel
f) DFIG Panel
g) Control Panel
h) Junction Box
i) Tubular Tower Shell
j) Climb Arrestor
k) Cables
l) Yaw System
m) Main Bearing
n) Gear Box
o) Generator
p) Rotor Brake
q) Hydraulic Unit
r) Hub Lock
s) Nacelle Control Panel
t) Anemometer & Wind Pane
u) Rotor Blade
v) Battery Bank
w) Nose Cone
In-Country Training
On
Operation, Maintenance, Protection & Control of 33/11 kV Substation
Project Name: Design, Supply, Installation, Testing & Commissioning of 33/11 kV sub-stations with source end feeder bays.
ย
Contract No: BREB/UREDS/W-01A-001/02/2016-2017
BREB/UREDS/W-01A-002/03/2016-2017
BREB/UREDS/W-01A-004/04/2016-2017
The document is a checklist to commission various AC Side equipment - Transformers (Power, Auxillary & Inverter) , HT Panels, Relays, Circuit Breakers, LA, CT, PT, C&R Panel.
Here are theย details on 300MW Wind Power Project locatedย in the Western Region of Indiaย presented by Gensol on theย various phases of construction & execution; starting from :
1)Wind resource assessment,
2)Site feasibility studies,ย
3)Statuary & legal approvals required,
4)Civil & electricalย works,
5)Quality & materialย inspection,
6)Post erection & monitoring etc.
(Click here to read more..)
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
ย
Testing and condition monitoring of substation equipments,Transformer specifications,Monitoring of Transformer,On-load Tap changer,Overhauling,Tan delta and capacitance,Thermal imaging,Sweep frequency response analysis,Oil analysis of Switchgear elements containing oil,tests on insulating oil,Breaker monitoring,Condition monitoring of CT,Condition monitoring of CVT,Surge Arresters,Condition monitoring of relays.
In-Country Training
On
Operation, Maintenance, Protection & Control of 33/11 kV Substation
Project Name: Design, Supply, Installation, Testing & Commissioning of 33/11 kV sub-stations with source end feeder bays.
ย
Contract No: BREB/UREDS/W-01A-001/02/2016-2017
BREB/UREDS/W-01A-002/03/2016-2017
BREB/UREDS/W-01A-004/04/2016-2017
The document is a checklist to commission various AC Side equipment - Transformers (Power, Auxillary & Inverter) , HT Panels, Relays, Circuit Breakers, LA, CT, PT, C&R Panel.
Here are theย details on 300MW Wind Power Project locatedย in the Western Region of Indiaย presented by Gensol on theย various phases of construction & execution; starting from :
1)Wind resource assessment,
2)Site feasibility studies,ย
3)Statuary & legal approvals required,
4)Civil & electricalย works,
5)Quality & materialย inspection,
6)Post erection & monitoring etc.
(Click here to read more..)
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
ย
Testing and condition monitoring of substation equipments,Transformer specifications,Monitoring of Transformer,On-load Tap changer,Overhauling,Tan delta and capacitance,Thermal imaging,Sweep frequency response analysis,Oil analysis of Switchgear elements containing oil,tests on insulating oil,Breaker monitoring,Condition monitoring of CT,Condition monitoring of CVT,Surge Arresters,Condition monitoring of relays.
Project Information:
Project Name: Company Name:
Location: Date :
Sl. No Description Yes No N/A Comments
DBs/ SDBs
1. Is earth conducted continued up to DB/ SDB?
2. Whether DBs & extension boards are protected from rain/ water?
3. Is there any overloading of DBs/ SDBs?
4. Are correct rated Circuit breakers provided in all main boards and sub-boards?
5. Is energized wiring in junction boxes, Circuit board panels & similar places covered all times?
CABLES
6. Whether the condition of cable is checked?
7. Are cables received checked for insulation resistance before using them?
8. Are all main cables taken either underground/ overhead?
9. Are main cables protected from sharp/ heavy materials?
10. Is any improper jointing of cable identified?
11. Are all plugs and sockets in good condition?
RCD (ELCB)
12. Is the connections routed through 30mA RCD?
13. EARTHING
14. Are main DB, Generator and other panelโs ear thing done?
15. Earth resistance checked and found within limits?
ELECTRICALLY OPERATED MACHINES/ ACCESSORIES
16. Whether the machine supply cable has industrial type socket and plug?
17. Are all metal parts of electrical equipment and light fittings/ accessories grounded?
18. Is there any shed/ cover for machines?
19. Are flood lights/ task lights fixed properly away from combustibles?
20. Others if any:
Remarks:
Inspected By: Signature:
Reviewed By HSE Manager / In charge : Signature:
Noted by Project Leader : Signature:
Transformer Diagnostics | Sweep Frequency Response AnalysisHamedPasha1
ย
Proper commissioning and periodic testing of high voltage equipment is vital to the longevity of your valuable assets. Research shows that improper commissioning along with โset-and-forgetโ mentality has been the leading causes of premature failures.
Sweep frequency response analysis (SFRA) is one of the most powerful diagnostic tools for assessing mechanical damage to a transformer winding. Analysis of the results, which are in the form of frequency response traces can, however, be daunting to new users.
This Presentation is about l.v switch gear design, presented during the graduation project final discussion 15/7/2018.
It presented a good summary of switch gear components and types and practicing on AL.HAMOOL W.T.P M.D.B design using SIEMENS SIVACON S8
The following topics are covered: components of power distribution systems, fuses, padmounted transformers, pole mounted transformers, vault installed transformers, transformer stations protection, transformer connections, thermometers, pressure relief devices, restricted ground faults, differential protection current transformers connections, overexcitation, inrush current, percentage differential relays, gas relays, characteristics of CTs.
In this presentation talk about:
Able to describe Substation.
Importance of substation.
Factors governing the selection of side.
Classification of Sub-Station.
Elements of a substation.
Operation of substation.
Hazards & safety.
Recent substation accident Bangladesh.
Electrical substation (one and half breaker scheme)Sourabh sharma
ย
Double Bus One and Half Breaker Scheme is mostly adopted in high voltage electrical substations (220 KV or 400KV, 700 KV). Due to many advantages of this arrangement like high selectivity, reliability and less cost as compare to other bus arrangements for power stations or switch yards
Rotork YTC YT-2501 Smart Positioner Manual | YTC INDIAYTC INDIA
ย
Rotork YTC YT-2501 Smart positioner supplies remote functions and higher liabilities in high temperature and vibration environment. YT-2501 Smart Valve Positioner accurately controls valve stroke, according to input signal of 4-20mA, which is being input from the controller. In addition, built-in micro-processing operator optimizes the positioner's performance and provides unique functions such as Auto calibration, PID control, Alarm, and Hart protocol.
Rotork YTC Smart Positioner, Electro Pneumatic Positioner, Volume Booster, Lock Up Valve, Solenoid Valve, Position Transmitter, I/P Converter Distributors, Suppliers, Traders, Wholesalers India
For any Enquiry Call Us: +91-11-2201-4325, Email at : info@ytcindia.com, Our Website :- www.ytcindia.com
#YTCINDIA #Smartpositioner #YT2501 #Smartvalvepositioner #Industrialequipment
Project Information:
Project Name: Company Name:
Location: Date :
Sl. No Description Yes No N/A Comments
DBs/ SDBs
1. Is earth conducted continued up to DB/ SDB?
2. Whether DBs & extension boards are protected from rain/ water?
3. Is there any overloading of DBs/ SDBs?
4. Are correct rated Circuit breakers provided in all main boards and sub-boards?
5. Is energized wiring in junction boxes, Circuit board panels & similar places covered all times?
CABLES
6. Whether the condition of cable is checked?
7. Are cables received checked for insulation resistance before using them?
8. Are all main cables taken either underground/ overhead?
9. Are main cables protected from sharp/ heavy materials?
10. Is any improper jointing of cable identified?
11. Are all plugs and sockets in good condition?
RCD (ELCB)
12. Is the connections routed through 30mA RCD?
13. EARTHING
14. Are main DB, Generator and other panelโs ear thing done?
15. Earth resistance checked and found within limits?
ELECTRICALLY OPERATED MACHINES/ ACCESSORIES
16. Whether the machine supply cable has industrial type socket and plug?
17. Are all metal parts of electrical equipment and light fittings/ accessories grounded?
18. Is there any shed/ cover for machines?
19. Are flood lights/ task lights fixed properly away from combustibles?
20. Others if any:
Remarks:
Inspected By: Signature:
Reviewed By HSE Manager / In charge : Signature:
Noted by Project Leader : Signature:
Transformer Diagnostics | Sweep Frequency Response AnalysisHamedPasha1
ย
Proper commissioning and periodic testing of high voltage equipment is vital to the longevity of your valuable assets. Research shows that improper commissioning along with โset-and-forgetโ mentality has been the leading causes of premature failures.
Sweep frequency response analysis (SFRA) is one of the most powerful diagnostic tools for assessing mechanical damage to a transformer winding. Analysis of the results, which are in the form of frequency response traces can, however, be daunting to new users.
This Presentation is about l.v switch gear design, presented during the graduation project final discussion 15/7/2018.
It presented a good summary of switch gear components and types and practicing on AL.HAMOOL W.T.P M.D.B design using SIEMENS SIVACON S8
The following topics are covered: components of power distribution systems, fuses, padmounted transformers, pole mounted transformers, vault installed transformers, transformer stations protection, transformer connections, thermometers, pressure relief devices, restricted ground faults, differential protection current transformers connections, overexcitation, inrush current, percentage differential relays, gas relays, characteristics of CTs.
In this presentation talk about:
Able to describe Substation.
Importance of substation.
Factors governing the selection of side.
Classification of Sub-Station.
Elements of a substation.
Operation of substation.
Hazards & safety.
Recent substation accident Bangladesh.
Electrical substation (one and half breaker scheme)Sourabh sharma
ย
Double Bus One and Half Breaker Scheme is mostly adopted in high voltage electrical substations (220 KV or 400KV, 700 KV). Due to many advantages of this arrangement like high selectivity, reliability and less cost as compare to other bus arrangements for power stations or switch yards
Rotork YTC YT-2501 Smart Positioner Manual | YTC INDIAYTC INDIA
ย
Rotork YTC YT-2501 Smart positioner supplies remote functions and higher liabilities in high temperature and vibration environment. YT-2501 Smart Valve Positioner accurately controls valve stroke, according to input signal of 4-20mA, which is being input from the controller. In addition, built-in micro-processing operator optimizes the positioner's performance and provides unique functions such as Auto calibration, PID control, Alarm, and Hart protocol.
Rotork YTC Smart Positioner, Electro Pneumatic Positioner, Volume Booster, Lock Up Valve, Solenoid Valve, Position Transmitter, I/P Converter Distributors, Suppliers, Traders, Wholesalers India
For any Enquiry Call Us: +91-11-2201-4325, Email at : info@ytcindia.com, Our Website :- www.ytcindia.com
#YTCINDIA #Smartpositioner #YT2501 #Smartvalvepositioner #Industrialequipment
Harga distributor jual Pasang pemasangan baru service maintenance repair panggilan water heater ariston pemanas air listrik kapasitas 15-30-50-80-100 Tipe AN R - RS - Pro R - ECO - TI PRO Jakarta Indonesia Oleh Cv Fikri Mandiri Jaya
Perusahaan kami telah berpengalaman Sebagai service penjualan ariston water heater ย yang memberikan jasaย pasangย Resmi ariston pemanas air merek lain harga murah bergaransi
Distributor Pemasangan Harga Spare Part, Elemen Elektrik, Thermostat, Cek Valve, Anoda, Aquades
Perusahaan kami terlibat juga dalam beberapa kontrak baik untuk Maintenace dan Service Pemanas Air Solahart di Perumahan ternama, rumah sakit maupun di hotel.ย
Jual,Harga,Distributor Water Heater Pemanas Air Ariston Toko Jakarta,Bekasi,Tangerang Electrik Harga Murah Ekonomis Bergaransi Cv Fikri Mandiri Jaya 082113812149 @Copyrigh - Budi JR - 2016
Jual,Harga,Distributor Water Heater Pemanas Air Ariston Toko Jakarta,Bekasi,Tangerang Electrik Harga Murah Ekonomis Bergaransi Cv Fikri Mandiri Jaya 082113812149 @Copyrigh - Budi JR - 2016
Jual,Harga,Distributor Water Heater Pemanas Air Ariston Toko bogor akarta,Bekasi,Tangerang Electrik Harga Murah Ekonomis Bergaransi Cv Fikri Mandiri Jaya 082113812149 @Copyrigh - Budi JR - 2016
Vรกlvula utilizada para la regulaciรณn del caudal en una tuberรญa que contiene un elemento tipo disco mรณvil y un anillo estacionario en un cuerpo generalmente esfรฉrico.
Las vรกlvulas de globo se llaman asรญ por su cuerpo esfรฉrico y sus dos mitades separadas por una o varias pantallas internas. รste tiene una apertura que forma un asiento donde un tapรณn movible puede ser roscado para cerrar la vรกlvula.
Valve used for regulating the flow in piping that contains a mobile disk type element and a stationary ring in a generally spherical body.
Globe valves are so called due to their spherical body and their two halves separated by one or several internal screens.
Gensol has estimated Bifacial Gain varying between ~4.0-10.5% when Bifacial PV Modules are configured with Single Axis Tracker (SAT) system depending on system configuration & ground albedo. Various iterations of energy generation were simulated using PVsyst to understand the impact of design considerations and climatic factors on the Bifacial Gain of 1P x 30 Bifacial PV array with SAT system equipped over-torqueย tube for India & Middle East regions.
Gensol collected Actual Global Tilted Irradiation (AGTI) of 57 sites from operational projects spread across in India. It was then correlated with Expected Global Tilted Irradiation (EGTI) from the following meteo-databases namely:
1) Meteonorm-7.2
2) SolarGIS,
3) NASA (National Aeronautics and Space Administration),
4) NREL (National Renewable Energy Laboratory)
In our report, we find most representative meteo-data set for each site.
Gensol is a leading Solar Advisory and Operation & Maintenance Service Provider with a footprint across 13 countries and 20 GW of projects. This presentation showcase company's business verticals, leadership team, growth trajectory, global presence, major projects executed (National, Government & International).
ย Blu-Smartย has carried outย a comparative ofย India Vs countries like China, Belgium, Germany, Italy and many moreย with respect to electric vehicleย policies, tax benefitsย & incentives applicable.
Gensol has presented quicks highlights ofย 1200MW Renewable Energy Tender with assuredย Peak Power Supply in termsย of eligibilityย criteria,ย bidders obligations, project capacity (MW), generation criteria, various guarantees, project tariffย rate (Rs/kWh) and many more. It's interesting to highlight that SECI has issued tender with no cap in tariff at the same assured peak power supply.
The document mentions the following with tentative quantities:
1. List of 17 nos. of main equipment
2. List of 15 nos. of miscellaneous equipment
3. List of 16 nos. of civil works required
4. List of 8 nos. of lattice type equipment
5. List of 11 nos. of foundations required
Gensol has summarized the list of upcoming tenders in India by State & Central Government authorities to achieve National Solar Mission (NSM) targets. This document covers list of EPC & IPP tenders for ground mounted, rooftop solar, floating solar and hybrid projects for various locations in India .
The document summarizes the list of successful bidders, awarded capacity (MW) and ceiling tariff rate (Rs/kWh) for the latest released solar PV tenders.
Gensol has carried out state-wise comparative analysis for forecasting, scheduling and deviation settlement mechanism (DSM) of Solar & Wind projects. There has been huge requirement to facilitate large-scale RE integration with grid while maintaining grid stability and security as envisaged under the Grid Code.Following points are highlighted in this presentation:
1) Responsibility & Requirements
2) Available Capacity & Tolerance Band
3) Deviation Settlement Mechanism (DSM)
4) Metering, Energy & Deviation Accounting etc (Click here)
Module price trend hasย declined with the increased solar PV demand & competition among the industry. The trend has been studied & forecast has been evaluatedย by Gensol for the modules supplied from South East Asia especially China to India from September 2013 to January 2019. The following points are highlighted:
1) Global & India Solar PV Installations & Forecast (GW)
2)ย Solar PV System Cost Trend Global & India 2014-2018
3)ย Module Price Trend (2014- 2018)ย & Forecast (2019 -2026)
4) Quarterly Variation in Module Price Trend YoY in %
5) Solar PV Demand in Indiaย 2017 Vsย 2018
The Sate of Tamil Nadu has recently released new solar policy with highly ambitious target of 9GW by 2023. Gensol has highlighted key areas of focus & inferences with respect to incentives, energy accounting, wheeling of power etc.
A comparative study has been carried by Gensol on Solar-Wind Hybrid Policies issued by Central Government, Gujarat State & Andhra Pradesh (A.P.) in terms of following:
1) Incentives & Pertinent Charges
2) Evacuation & Metering Scheme
3) Energy Accounting & Banking
4) AC-DC Integration & other important clauses.
The presentation focuses on the investment opportunities in commercial and industrial rooftop building in India. Sensitivity analysis has been carried out for 11 states to understand the impact on project economics in terms of PIRR, EIRR, and payback periods.
Gensol has summarised the tender issued byย SECIย for 2.5GW Wind Solar Hybrid ISTS projects.
The document covers major commercial & technical guidelines provided in the tender.
This presentation highlights on the following :
Need of wind-solar hybrid systems
Indian policy support to hybrid systems - MNRE & Gujarat State
Renewable Energy integration with grid,
Cost savings in hybrid for AC-AC & DC-DC coupling systems,
Case studies
The largest tender by Solar Energy Corporation of India for Floating Solar for 150 MW is up for bidding.
The document is a summary of the tender document and covers the commercial & technical guidelines provided in the tender.
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Gensol Engineering Limited
ย
The presentation is a detailed study on the following:
a) Impact of solar module component on reliability
b) Raw Material - Quality Assurance
c) Manufacturing Process - Quality Assurance
d) Lab Inspection
e) On site module inspection
The technical risks in solar PV projects are arising mainly in modules, inverters, other equipment. These risks are unpredictable and can be occurred in any phases of life cycle of PV project like development, installation, commissioning and operation leading to plant outage or reduction in energy output. The presentation covers the various risks and associated mitigation measures.
Gensol has achieved 2 GW of Lender Engineer Credentials at various states of India for both Ground-mounted and Rooftop projects. Gensol has provided Lenders Independent services to major lenders like Power Finance Corporation (PFC), IDBI, IndusInd, SBI, Tata Cleantech etc.
Solar PV O&M looks easy however maintaining a Solar PV Plant at top performance is a task and based on the experience of Solarig-Gensol in maintaining a 2 GW portfolio of solar plants in India, here are some basics on Solar O&M.
Presentation has the following contents:
a) Balancing Soiling Losses with case study
b) Monitoring & Corrective Maintenance
c) Performance Ratio & Uptime Guarantee
d) Impact of O&M on IRR
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxmy Pandit
ย
Explore the world of the Taurus zodiac sign. Learn about their stability, determination, and appreciation for beauty. Discover how Taureans' grounded nature and hardworking mindset define their unique personality.
Putting the SPARK into Virtual Training.pptxCynthia Clay
ย
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...PaulBryant58
ย
This article provides a comprehensive guide on how to
effectively manage the convert Accpac to QuickBooks , with a particular focus on utilizing online accounting services to streamline the process.
Memorandum Of Association Constitution of Company.pptseri bangash
ย
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
"๐ฉ๐ฌ๐ฎ๐ผ๐ต ๐พ๐ฐ๐ป๐ฏ ๐ป๐ฑ ๐ฐ๐บ ๐ฏ๐จ๐ณ๐ญ ๐ซ๐ถ๐ต๐ฌ"
๐๐ ๐๐จ๐ฆ๐ฌ (๐๐ ๐๐จ๐ฆ๐ฆ๐ฎ๐ง๐ข๐๐๐ญ๐ข๐จ๐ง๐ฌ) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
๐๐ ๐๐จ๐ฆ๐ฌ provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
โญ ๐ ๐๐๐ญ๐ฎ๐ซ๐๐ ๐ฉ๐ซ๐จ๐ฃ๐๐๐ญ๐ฌ:
โข 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
โข SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
โขFreenBecky 1st Fan Meeting in Vietnam
โขCHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
โข WOW K-Music Festival 2023
โข Winner [CROSS] Tour in HCM
โข Super Show 9 in HCM with Super Junior
โข HCMC - Gyeongsangbuk-do Culture and Tourism Festival
โข Korean Vietnam Partnership - Fair with LG
โข Korean President visits Samsung Electronics R&D Center
โข Vietnam Food Expo with Lotte Wellfood
"๐๐ฏ๐๐ซ๐ฒ ๐๐ฏ๐๐ง๐ญ ๐ข๐ฌ ๐ ๐ฌ๐ญ๐จ๐ซ๐ฒ, ๐ ๐ฌ๐ฉ๐๐๐ข๐๐ฅ ๐ฃ๐จ๐ฎ๐ซ๐ง๐๐ฒ. ๐๐ ๐๐ฅ๐ฐ๐๐ฒ๐ฌ ๐๐๐ฅ๐ข๐๐ฏ๐ ๐ญ๐ก๐๐ญ ๐ฌ๐ก๐จ๐ซ๐ญ๐ฅ๐ฒ ๐ฒ๐จ๐ฎ ๐ฐ๐ข๐ฅ๐ฅ ๐๐ ๐ ๐ฉ๐๐ซ๐ญ ๐จ๐ ๐จ๐ฎ๐ซ ๐ฌ๐ญ๐จ๐ซ๐ข๐๐ฌ."
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
ย
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
ย
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. Youโll also learn
โข Four (4) workplace discipline methods you should consider
โข The best and most practical approach to implementing workplace discipline.
โข Three (3) key tips to maintain a disciplined workplace.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
ย
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Improving profitability for small businessBen Wann
ย
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
ย
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Search Disrupted Googleโs Leaked Documents Rock the SEO World.pdf
ย
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
1. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 1 of 37
Wind Turbine Generator (WTG) Check List
WTG- Location Number
OEM Name
Model/ Hub Height
State Name
Site Name
WTG- Location SAP Number
Customer Name
Control Reading
Name Of Auditor
Date Of Inspection
WTG- Location Number
WTG Stop Time WTG Start Time
Auditor Signature Site In-Charge Signature
Date: Date:
2. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 2 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
A WTG TRANSFORMER
1 Check Transformer oil leakages from radiator Fins, HV
Bushings,
Tank, Conservator & Valve,
Transformer Parts Corrosion,
Oil Level,
Bushing Connections ,
1.1 Check WTI & OTI are working,
OTI/WTI Protection with Metal mesh Cover,
WTI & OTI Cables condition,
WTI & OTI Pointer Okay & Mirror Condition,
1.2 Corrosion on transformer parts,
Radiator, Tank, Conservator & Hardwareโs
1.3 Transformer junction Box Cable routing through Metal/PVC
Pipes ( Duct),
Alignment of Metal/PVC Pipes with Transformer Junction
Box,
3. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 3 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
Cables are rubbing to Metal pipes/PVC Pipes,
1.4 Check Condition Of Breather ( Silica gel, oil Cup),
Position of Arching Horns ,
Transformer plinth condition & Transformer Mounting,
1.5 Check Transformer Earthling I.e. Neutral Earthling, Body
Earthling & Junction Box Earthling,
1.6 Visual Check of CT/PT ( Any Bulging, Oil level & Connections),
CT & PT Earthling
CT & PT Junction Box
CT & PT Mounting
1.7 OTI & WTI Temp.
4. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 4 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
B Isolator Condition
2 Check for smooth operation,
Ensure that all the phases open and close fully and
simultaneously,
Ensure Proper Spring pressure at female contacts so
that good ,
2.1 Drop out (DO) fuse Availability
2.2 Isolator Operating pipe Condition/Handle condition
2.3 Isolator Earthling
2.4 LOTO Provision
5. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 5 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
C VCB Panel & Switch Yard Condition
3 VCB Tripping with activation of protection relay &
manual,
Tripping,
Trip circuit,
Power pack & all Protection Fuses,
Protection Relays,
Panel meters & Switches,
Panel door,
3.1 Switch yard all Earthlings,
Vegetation,
Gravel spreading (stone pitching),
Switch yard stay wires condition,
3.2 Check air circuit breaker and vacuum circuit breaker for
correct operation, indicators ON/OFF condition, springs
charged/discharged condition.
3.3 Lighting Arrester (LA) availability
6. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 6 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
D WTG Outside
4 Check availability of all Earth pits,
Check for corrosions & Rust on Earth pitโs connection,
Earth Flats connection,
Earth Flat connection to Earth Electrode (Pipe),
4.1 Foundation Cracks
4.2 Tower door Ladder
4.3 Tower door Ladder Locking
4.4 Tower door rubber bidding
4.5 Check the Radiator is Cleaned or Not
4.6 Check radiator fan smooth operation
4.7 Check the SCADA link properly installed
7. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 7 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
E Power Panel
5 Power Panel door condition,
Condition panel door & Hinges,
5.1 Panel Cooling, availability of fans,
Filter mat availability,
5.2 Condition of Sealing for cable Entry,
Fire retardant paint application on cables (1 Meter),
5.3 Bus Bar condition ( for Pitting & Overheating)
5.4 Humming/chattering Noise while operation
5.5 Arcing at bus bar connection
5.6 Decolouring at bus bar
5.7 Arcing/ Decolouring cable terminations
5.8 Cable termination / loose lug โ Crimping quality
5.9 Contactor condition / decolouring
5.10 Water leakage in the panel (find leakages point)
5.11 Cable insulation/Sheath damage from bottom panel air
circuit breaker of Transformer connectors
8. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 8 of 37
5.12 UPS availability,
UPS Tripping PCB Mounting,
UPS Mounting,
5.13 Power cable lug condition,
(air circuit breaker โI/p & o/p connections)
5.14 Soft starter & Snubber tightness check,
Soft starter mounting,
5.15 Air Circuit breaker (ACB) operation (manual Check)
5.16 ACB Settings :-
Nominal Current (In)
Rated Current (Ir)
Short Circuit current (Isd)
Short circuit time (Tsd)
Ground fault current ( Ig-B)
Ground fault time (Tg)
9. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 9 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
F Capacitor Panels
6 Capacitor discharge resistor
6.1 Condition of capacitor (Bulged/punctured), capacitor
contactors & fuse units, pre charging coils
6.2 Check of connection tightness and born marks, fuse
base condition
6.3 Capacitor panel door condition,
Condition panel door & Hinges
6.4 Check all capacitor should be in good condition and
voltage must be approx 400-417 VDC
6.5 Panel cooling, availability of fans,
Filter mat availability
10. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 10 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
G DFIG Panel
7 Capacitor discharge resistor
7.1 Power, Earthling and control cable connection in DFIG
panel torque marks check at DC and AC power
terminals
7.2 Condition of DFIG panel cooling duct and tightness at
termination,
Coolant pressure should be 2.2 bar,
Leakage of coolant,
7.3 Check condition of DC limiter resistor,
Check condition of DC capacitors,
7.4 All acrylic sheets/ insulation cover used on live
terminals/Bus bars
7.5 Bus lines should be earth by clips at the shield ,
Condensation in DFIG Panel,
7.6 Heating and cooling System
7.7 DFIG Panel door lock,
DFIG panel Hinges,
Cooling Fans,
7.8 Arcing at bus bar connection
7.9 Decolouring at bus bar
11. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 11 of 37
7.10 Arcing/Decolouring cable terminations
7.11 Contactor condition / Decolouring
7.12 Fuse condition / tightness
7.13 DFIG panel cable coming should be routed with rubber
gland to avoid any damages with sharp edge of panel
7.14 Power cables & control cables routing inside DFIG panel
7.15 Cooling System :-
Motor condition
Pump condition
Connection Pipes condition
Structure mounting
Cooling Liquid availability
Protection System
12. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 12 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
H Control Panel
8 Component- Mounting in Panels,
Cables routing,
Loose connection and tightness checks for 25% of
connection,
8.1 Bottom Earthling PAS Bus Bar earthling connections
8.2 Emergency Switch operation
8.3 SAFETY Chain Circuit operation
8.4 Panel cooling, availability of fans ,
Filter mat availability,
8.5 Check functionality of RCCBs
8.6 Surge arrestors, setting of power supply 24V
13. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 13 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
I Junction Box
9 All connection tightness,
Sparking / Burnt marks at connections,
Bus Bar condition,
Bus Bar Mounting,
Insulator condition,
9.1 Connection Lugging,
Cable Glands,
9.2 Junction box mounting,
Junction box cover,
9.3 Junction Box connections
14. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 14 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
J Tubular Tower Shell : T1 + T2 + T3 + T4 (as
Possible no of sections)
10 Platform chequer plate status & hardwareโs condition
10.1 Tubular Tower bottom earthlings
10.2 Ladder condition in Tower Shell
10.3 Gap between tower to tower shell joints (use filler
gauge),
Sun light is coming inside tower from flanges (check
360 degree),
10.4 Any linear indication (crack) on welds joints/near
surface
10.5 Corrosion on welds joints/near surface
10.6 Any types of linear indication(Crack) on tower shell
plates
10.7 Flange bolts (Looseness/condition),
Flange bolts corrosion,
10.8 Flange Bolts Make
10.9 Tower shell to shell earthling
10.10 Condition of safety rope
15. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 15 of 37
10.11 Safety rope clamps condition
10.12 Safety rope routing
10.13 Check the discharge flume for blockage
10.14 Check the bolted tower connection between each
section
10.15 Check the bolted tower connection between tower
section 1 and tower section 2.
10.16 Measurement of tower inclination max. 8mm/m tower
height (Misalignment & settlement).
10.17 Grease /Oil spillages on Platforms
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
K Climb Assistor(Wherever applicable)
11 Operation is proper
16. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 16 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
L Cable Inspection
12 Fire retardant paint at bottom cabinet
12.1 Cable uniformly distributed on cable tray
12.2 Cable rubbing/Insulation damage/crack
12.3 Cable decoloration
12.4 Cable loop holder Orange color PVC sleeve
Welding contact to tower,corrosion at welding portion
12.5 Cable routing through cable guide/Cable holder
12.6 Cable guide ring Holding
12.7 End Cap on the cable clamp stud below cable drum
12.8 Cable twisting
12.9 Cable Hitting with ladder and tower
12.10 At Tower top plateform cut-out,cable damage/rubbing
17. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 17 of 37
12.11 Cable Hanging Cable Socks mounting
Cable socks Corrosion
Cable Socks Holding
12.12 Cable Socks D-shackle bolt orientation/piercing in cable
12.13 Cable Laying from tower to nacelle(below Gear box) for
cutting rubbing at sharp edges/support channel/cable
tray clamps
12.14 Cable loop length and loop to cable drum routing
12.15 Cable drum Cables routing
12.16 Cable drum Cables Holding
12.17 Tightness of Cables in cable joint
12.18 No of Cable joints in tower Power Cables
12.19 Check the available joint in power Cables crimping
12.20 Control Cable joints
12.21 Power Cables Clamping
12.22 Fire retardant paint at junction box
12.23 Crimping as per specification.
12.24 Lugs used are standards and as mention in specs
18. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 18 of 37
12.25 No pinching condition seen
12.26 Check all the cables clips(Clip and Plastic lining)
12.27 Check the cables at the grips and their fastening bolts.
12.28 Cable edge protection at sharp edges,cable drum
19. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 19 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
M Nacelle
13 Nacelle to tower Cables routing
13.1 Operation of winch
Condition of chain
13.2 Nacelle Libero window
Winch bottom window road
13.3 Nacelle bottom FRP Door
13.4 Nacelle GRP Cracks
Nacelle joints & Nacelle cover Shifting
13.5 Cables Laying inside the Nacelle
13.6 Water leakages from Nacelle joints
Water leakages from Nacelle Hoods
13.7 Vibration Sensor condition
PCH Box mounting
PCH Box Connections
13.8 All Nacelle earthings ( Panels + platform + Generator +
Gear Box + Brake Unit + Main Bearing + Slew ring)
13.9 All Nacelle Spark Gaps
13.10 Nacelle PAS Earthing Bus bar Condition
Nacelle PAS to WTG Bottom PAS Earthing Connection
20. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 20 of 37
13.11 Nacelle Metal Platforms availability
Cable Twist Limit Switch Assembly
North position Sensor availability
Yaw Sensor availability
13.12 Check the bolted Connection of generator cantilever for
attaching the conical mounts (elastomeric bearings) of
the generator.
13.13 Check the elastomer of the generator conical mounts
the regarding cracks or damages.
13.14 Check the conical mounts for cracks or other
damages.(Connection between casing suspension and
GRP)
13.15 Nacelle Cooling Fans availability
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
N YAW System
14 Rim Teeth Greasing
14.1 Backslash between Rim & Pinion Teeth
Grease Lubber Condition
Grease lubber connections
14.2 Yaw drive
14.3 Yaw drive mounting bolt tightness
Yaw motors availability
21. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 21 of 37
14.4 Leakage from the Yaw Drives
14.5 Abnormal Noise during Yawing
14.6 Yaw Brake availability & setting
14.7 Distance between sensor and metal of Yaw angle
sensor
14.8 Distance between sensor and metal of north position
sensor
14.9 Yaw brake air gap
14.10 Measure the distance between Yaw rim bottom surface
and lateral suspender
14.11 Measure the distance between Yaw rim top surface and
main frame
14.12 Check the disk spring preload in the lateral suspenders.
14.13 Measure the distance between Yaw rim lateral surface
and lateral suspender
22. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 22 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
O Main Bearing
15 Lubrication pump Operation
Grease lubber condition
Main bearing operation
Grease lubber electrical connections
15.1 Lab Type
15.2 Grease leakages
15.3 Labyrinth ring Rubbing
15.4 Gap at lock nut
15.5 Noise and temperature/shifting
15.6 Main Bearing fasteners condition
23. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 23 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
P Gear Box
16 Alignment & Mounting
16.1 Tightness of gearbox connections
16.2 Gearbox mounting to mainframe
16.3 Brake calliper air gap
16.4 Bearing temperature DE & NDE
16.5 Oil Level
16.6 Oil pressure Switch settings
16.7 Silica gel breather availability & color
16.8 Shifting of gear box
Gear box noise
16.9 Gear box leakage (slip ring area, LSS, HSS, & radiator)
16.10 Condition of hosepipes
Cable routing below gear box
16.11 Radiator โ mountings
24. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 24 of 37
16.12 Leakages from radiators
16.13 Radiators fins condition
16.14 Bellow cover condition
16.15 Oil pump motor condition
16.16 Check the elastomer of contamination by oil or grease
16.17 Check the rubber elements of the noise decoding
elements for cracks
16.18 Check the circuit for blocking by touching the
lubrication pipes shortly after turbine
16.19 Check the gear box oil cooling fan 1 and 2 circuitry
16.20 Check working of the mechanical driven pump
16.21 Gap between main frame and gear rim at locations
25. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 25 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
Q Generator
17 Bearing lubrication (DE & NDE)
17.1 Grease Collector
Check greasing extension pipe at DE side
17.2 Cover mounting
Power cable connections
Availability of cable glands
Fire retardant paint (FRP) application on cables
CU Bus condition
17.3 Check the axial, radial, and angular alignment of the
generator drive shaft to the gear box output shaft
17.4 Check all O-ring seals regarding leakage and damage
(cracks)
17.5 Generator mount bolt tightness & generator alignment
bolt tightness
17.6 Check the function of the slip ring space heater
17.7 Check the function from the internal cooling circuit fan
1 and fan 2
17.8 Check the Earth terminals and located on each NDE
foot and Earthing cable is attached to it
17.9 Check the connector and coupling on incremental
rotary transducer
26. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 26 of 37
17.10 Check the gas โ recharge pressure in expansion vessel
17.11 Check the system pressure for the cooling circuit on the
gauge (2.6 to 3.0)
17.12 Generator earthling and its terminal
17.13 Check the function from the internal cooling circuit fan
1 and fan 2
17.14 Bellow cover condition
17.15 Check control slip ring mounting bolt with GB
Torque arm support
17.16 Check Control slip ring holder mounting tightness
Check control slip ring cover
17.17 Control slip ring brushes
Contact ring condition
Separators insulation rings condition
Brush connections
Brush holders conditions
17.18 Power slip ring Brushes
Contact ring condition
Separators insulation rings condition
Brush connections
Brush holders conditions
Limit switches condition
Bellow
17.19 Additional Earthing brush provision (Grounding
Insulators) :-
Contact ring condition
Separators insulation ring condition
28. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 28 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
R Rotor Brake
18 Disc Brake Pads wears / break sensor
18.1 Brake Gap
18.2 Rotor Brake structure mounting
18.3 Rotor Brake sensor condition
18.4 Check hydraulic brake system for oil leaks
29. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 29 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
S Hydraulic Unit
19 Electrical operation of hub lock
19.1 Brake operating electrical box
19.2 Check the brake hydraulic line for any damage and
leakage and check the expiration date of the flexible
tubes
19.3 Check the gas pressure in the rotor brake /pressure
supply line accumulator
19.4 Check the rotor lock hydraulic line for any damage and
leakage and check the expiration date of the flexible
tubes
19.5 Check the hydraulic unit for leakages
30. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 30 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
T Hub Lock
20 Functionality
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
U Nacelle Control Panel
21 Panel Mounting
Nacelle Fan
21.1 Check Panel door lock
Condition of hinges
21.2 Modules (MPCB, MCB, Contactors, Surge Arresters,
Battery Charger Module) Mountings
21.3 EMERGENCY Switch Operation
21.4 SAFETY Chain Circuit operation
21.5 MPCB Settings
31. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 31 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
V Anemometer & Wind Vane
22 Anemometer condition & mounting lock nut
22.1 Anemometer & Wind Vane availability
22.3 Anemometer stand lighting arrester availability
22.4 Lighting arrester cable joint to WTG bottom CU PAS Bus
bar/ Separate earth pit connection
22.5 Anemometer & Wind Vane Setting
32. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 32 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
W Rotor Blade
23 Blade mounting bolts
23.1 Blade rota cap condition
23.2 Check 0 Degree setting in all blades both physically and
at controller
23.3 Lightning Protection Strips availability
Flash Finger
Blade platform condition
23.4 Blade surface cracks
Blade tip availability
Vortex generator (VA) availability
23.5 Check the spar connection
23.6 Check that the drain hole in the area of the blade tip is
not clogged
23.7 Check the connections and contact points of the
lightening cables of the rotor blades and the brushes
23.8 Check the trailing edge bonding
23.9 Angle encoder Condition
33. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 33 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
X HUB Inside
24 HUB Entry doors condition
24.1 Panel mounting channels & bolts with hub body
24.2 Slip ring cable adapter support at panel side
24.3 Hub cable dressing and damages due to sharp edges
24.4 Hub cooling fans availability & mounting condition
24.5 Hub all cables connections routings
HUB cable cutting at glands
24.6 Grease collecting bottle fixing/leak/damage
24.7 Electrical connections
Cables laying & availability of all panels cable glands
24.8 Decolourisation of connector at power supply
24.9 Flash point, burning marks, MPCB & contactor in panels
24.10 Emergency-stop functioning
24.11 Panel door & Channel mounting
24.12 DC-DC supply connector tightness and burnt mark
34. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 34 of 37
24.13 Safety Speed check ( Pitch batteries healthiness check)
PITCH Battery voltage are Ok
24.14 Pitch motor cover condition
24.15 Resolver Mounting condition
24.16 Frequency Drive condition
24.17 Leakage from the PITCH drive
Pitch drive mounting
24.18 Rim teeth โ Lubrication
Grease Lubber condition
24.19 Rim teeth thickness of worn out teeth
24.20 EMERGENCY Switch operation
24.21 Hub all Earthings
24.22 Blade and hub Spark gap
24.23 Hub metal Structure
24.24 Hub Platforms
Grease Leakages
24.25 Tightness of bolt connection
Battery box to frame
Frame to Hub
24.26 Check the setting of feathering position proximity
sensor and its operation for all three blades
35. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 35 of 37
24.27 Check the position and tightness of -5 degree limit
switch sensor in all three blades
24.28 Setting of thermostats (Heating)
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
Y Battery Banks
25 Mounting Channels condition
All mounting channels condition with all hardwareโs
25.1 Battery Box mounting channel tightness/ bush
condition V2 hub
25.2 Battery Voltages
25.3 Battery operational life
36. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 36 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
Z Nose Cone
26 Nose cone mounting bracket tightness
Nose cone mounting bracket hardwareโs & Rubber
bush condition
26.1 Nose cone holding railings
26.2 Crack in Nose cone mounting
26.3 Spark gap (finger) gap setting
26.4 Nose cone lightening arrestor connection with the
platform
Nose cone LA Copper flat available
37. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 37 of 37
* Annexure Verification & Availability
1 List Software Version
2 List of Latest PLCs version
3 List of Latest applicable motor protection switches settings
4 List of Latest fuses applicable in different part of turbines
5 List of Latest applicable hygrostat settings
6 Standard Earthing value defined in specs.
7 Latest Parameter setting, which needs manual entry in
turbine for its validations
8 Applicable offsets of turbine (i.e. blade angle, yawing, north
direction setting etc.)
9 List of Latest applicable modification/TCIs for its Validation
10 The applicable setting for at different junctions in complete
path of lightening protection system ( Blade tip-root-hub-
nacelle-tower-earth)
11 Audit Check list
12 Health Card Of WTG
Auditor Signature Site In-Charge Signature