WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 1 of 37
Wind Turbine Generator (WTG) Check List
WTG- Location Number
OEM Name
Model/ Hub Height
State Name
Site Name
WTG- Location SAP Number
Customer Name
Control Reading
Name Of Auditor
Date Of Inspection
WTG- Location Number
WTG Stop Time WTG Start Time
Auditor Signature Site In-Charge Signature
Date: Date:
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 2 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
A WTG TRANSFORMER
1 Check Transformer oil leakages from radiator Fins, HV
Bushings,
Tank, Conservator & Valve,
Transformer Parts Corrosion,
Oil Level,
Bushing Connections ,
1.1 Check WTI & OTI are working,
OTI/WTI Protection with Metal mesh Cover,
WTI & OTI Cables condition,
WTI & OTI Pointer Okay & Mirror Condition,
1.2 Corrosion on transformer parts,
Radiator, Tank, Conservator & Hardwareโ€™s
1.3 Transformer junction Box Cable routing through Metal/PVC
Pipes ( Duct),
Alignment of Metal/PVC Pipes with Transformer Junction
Box,
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 3 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
Cables are rubbing to Metal pipes/PVC Pipes,
1.4 Check Condition Of Breather ( Silica gel, oil Cup),
Position of Arching Horns ,
Transformer plinth condition & Transformer Mounting,
1.5 Check Transformer Earthling I.e. Neutral Earthling, Body
Earthling & Junction Box Earthling,
1.6 Visual Check of CT/PT ( Any Bulging, Oil level & Connections),
CT & PT Earthling
CT & PT Junction Box
CT & PT Mounting
1.7 OTI & WTI Temp.
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 4 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
B Isolator Condition
2 Check for smooth operation,
Ensure that all the phases open and close fully and
simultaneously,
Ensure Proper Spring pressure at female contacts so
that good ,
2.1 Drop out (DO) fuse Availability
2.2 Isolator Operating pipe Condition/Handle condition
2.3 Isolator Earthling
2.4 LOTO Provision
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 5 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
C VCB Panel & Switch Yard Condition
3 VCB Tripping with activation of protection relay &
manual,
Tripping,
Trip circuit,
Power pack & all Protection Fuses,
Protection Relays,
Panel meters & Switches,
Panel door,
3.1 Switch yard all Earthlings,
Vegetation,
Gravel spreading (stone pitching),
Switch yard stay wires condition,
3.2 Check air circuit breaker and vacuum circuit breaker for
correct operation, indicators ON/OFF condition, springs
charged/discharged condition.
3.3 Lighting Arrester (LA) availability
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 6 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
D WTG Outside
4 Check availability of all Earth pits,
Check for corrosions & Rust on Earth pitโ€™s connection,
Earth Flats connection,
Earth Flat connection to Earth Electrode (Pipe),
4.1 Foundation Cracks
4.2 Tower door Ladder
4.3 Tower door Ladder Locking
4.4 Tower door rubber bidding
4.5 Check the Radiator is Cleaned or Not
4.6 Check radiator fan smooth operation
4.7 Check the SCADA link properly installed
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 7 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
E Power Panel
5 Power Panel door condition,
Condition panel door & Hinges,
5.1 Panel Cooling, availability of fans,
Filter mat availability,
5.2 Condition of Sealing for cable Entry,
Fire retardant paint application on cables (1 Meter),
5.3 Bus Bar condition ( for Pitting & Overheating)
5.4 Humming/chattering Noise while operation
5.5 Arcing at bus bar connection
5.6 Decolouring at bus bar
5.7 Arcing/ Decolouring cable terminations
5.8 Cable termination / loose lug โ€“ Crimping quality
5.9 Contactor condition / decolouring
5.10 Water leakage in the panel (find leakages point)
5.11 Cable insulation/Sheath damage from bottom panel air
circuit breaker of Transformer connectors
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 8 of 37
5.12 UPS availability,
UPS Tripping PCB Mounting,
UPS Mounting,
5.13 Power cable lug condition,
(air circuit breaker โ€“I/p & o/p connections)
5.14 Soft starter & Snubber tightness check,
Soft starter mounting,
5.15 Air Circuit breaker (ACB) operation (manual Check)
5.16 ACB Settings :-
Nominal Current (In)
Rated Current (Ir)
Short Circuit current (Isd)
Short circuit time (Tsd)
Ground fault current ( Ig-B)
Ground fault time (Tg)
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 9 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
F Capacitor Panels
6 Capacitor discharge resistor
6.1 Condition of capacitor (Bulged/punctured), capacitor
contactors & fuse units, pre charging coils
6.2 Check of connection tightness and born marks, fuse
base condition
6.3 Capacitor panel door condition,
Condition panel door & Hinges
6.4 Check all capacitor should be in good condition and
voltage must be approx 400-417 VDC
6.5 Panel cooling, availability of fans,
Filter mat availability
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 10 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
G DFIG Panel
7 Capacitor discharge resistor
7.1 Power, Earthling and control cable connection in DFIG
panel torque marks check at DC and AC power
terminals
7.2 Condition of DFIG panel cooling duct and tightness at
termination,
Coolant pressure should be 2.2 bar,
Leakage of coolant,
7.3 Check condition of DC limiter resistor,
Check condition of DC capacitors,
7.4 All acrylic sheets/ insulation cover used on live
terminals/Bus bars
7.5 Bus lines should be earth by clips at the shield ,
Condensation in DFIG Panel,
7.6 Heating and cooling System
7.7 DFIG Panel door lock,
DFIG panel Hinges,
Cooling Fans,
7.8 Arcing at bus bar connection
7.9 Decolouring at bus bar
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 11 of 37
7.10 Arcing/Decolouring cable terminations
7.11 Contactor condition / Decolouring
7.12 Fuse condition / tightness
7.13 DFIG panel cable coming should be routed with rubber
gland to avoid any damages with sharp edge of panel
7.14 Power cables & control cables routing inside DFIG panel
7.15 Cooling System :-
Motor condition
Pump condition
Connection Pipes condition
Structure mounting
Cooling Liquid availability
Protection System
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 12 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
H Control Panel
8 Component- Mounting in Panels,
Cables routing,
Loose connection and tightness checks for 25% of
connection,
8.1 Bottom Earthling PAS Bus Bar earthling connections
8.2 Emergency Switch operation
8.3 SAFETY Chain Circuit operation
8.4 Panel cooling, availability of fans ,
Filter mat availability,
8.5 Check functionality of RCCBs
8.6 Surge arrestors, setting of power supply 24V
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 13 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
I Junction Box
9 All connection tightness,
Sparking / Burnt marks at connections,
Bus Bar condition,
Bus Bar Mounting,
Insulator condition,
9.1 Connection Lugging,
Cable Glands,
9.2 Junction box mounting,
Junction box cover,
9.3 Junction Box connections
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 14 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
J Tubular Tower Shell : T1 + T2 + T3 + T4 (as
Possible no of sections)
10 Platform chequer plate status & hardwareโ€™s condition
10.1 Tubular Tower bottom earthlings
10.2 Ladder condition in Tower Shell
10.3 Gap between tower to tower shell joints (use filler
gauge),
Sun light is coming inside tower from flanges (check
360 degree),
10.4 Any linear indication (crack) on welds joints/near
surface
10.5 Corrosion on welds joints/near surface
10.6 Any types of linear indication(Crack) on tower shell
plates
10.7 Flange bolts (Looseness/condition),
Flange bolts corrosion,
10.8 Flange Bolts Make
10.9 Tower shell to shell earthling
10.10 Condition of safety rope
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 15 of 37
10.11 Safety rope clamps condition
10.12 Safety rope routing
10.13 Check the discharge flume for blockage
10.14 Check the bolted tower connection between each
section
10.15 Check the bolted tower connection between tower
section 1 and tower section 2.
10.16 Measurement of tower inclination max. 8mm/m tower
height (Misalignment & settlement).
10.17 Grease /Oil spillages on Platforms
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
K Climb Assistor(Wherever applicable)
11 Operation is proper
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 16 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
L Cable Inspection
12 Fire retardant paint at bottom cabinet
12.1 Cable uniformly distributed on cable tray
12.2 Cable rubbing/Insulation damage/crack
12.3 Cable decoloration
12.4 Cable loop holder Orange color PVC sleeve
Welding contact to tower,corrosion at welding portion
12.5 Cable routing through cable guide/Cable holder
12.6 Cable guide ring Holding
12.7 End Cap on the cable clamp stud below cable drum
12.8 Cable twisting
12.9 Cable Hitting with ladder and tower
12.10 At Tower top plateform cut-out,cable damage/rubbing
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 17 of 37
12.11 Cable Hanging Cable Socks mounting
Cable socks Corrosion
Cable Socks Holding
12.12 Cable Socks D-shackle bolt orientation/piercing in cable
12.13 Cable Laying from tower to nacelle(below Gear box) for
cutting rubbing at sharp edges/support channel/cable
tray clamps
12.14 Cable loop length and loop to cable drum routing
12.15 Cable drum Cables routing
12.16 Cable drum Cables Holding
12.17 Tightness of Cables in cable joint
12.18 No of Cable joints in tower Power Cables
12.19 Check the available joint in power Cables crimping
12.20 Control Cable joints
12.21 Power Cables Clamping
12.22 Fire retardant paint at junction box
12.23 Crimping as per specification.
12.24 Lugs used are standards and as mention in specs
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 18 of 37
12.25 No pinching condition seen
12.26 Check all the cables clips(Clip and Plastic lining)
12.27 Check the cables at the grips and their fastening bolts.
12.28 Cable edge protection at sharp edges,cable drum
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 19 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
M Nacelle
13 Nacelle to tower Cables routing
13.1 Operation of winch
Condition of chain
13.2 Nacelle Libero window
Winch bottom window road
13.3 Nacelle bottom FRP Door
13.4 Nacelle GRP Cracks
Nacelle joints & Nacelle cover Shifting
13.5 Cables Laying inside the Nacelle
13.6 Water leakages from Nacelle joints
Water leakages from Nacelle Hoods
13.7 Vibration Sensor condition
PCH Box mounting
PCH Box Connections
13.8 All Nacelle earthings ( Panels + platform + Generator +
Gear Box + Brake Unit + Main Bearing + Slew ring)
13.9 All Nacelle Spark Gaps
13.10 Nacelle PAS Earthing Bus bar Condition
Nacelle PAS to WTG Bottom PAS Earthing Connection
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 20 of 37
13.11 Nacelle Metal Platforms availability
Cable Twist Limit Switch Assembly
North position Sensor availability
Yaw Sensor availability
13.12 Check the bolted Connection of generator cantilever for
attaching the conical mounts (elastomeric bearings) of
the generator.
13.13 Check the elastomer of the generator conical mounts
the regarding cracks or damages.
13.14 Check the conical mounts for cracks or other
damages.(Connection between casing suspension and
GRP)
13.15 Nacelle Cooling Fans availability
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
N YAW System
14 Rim Teeth Greasing
14.1 Backslash between Rim & Pinion Teeth
Grease Lubber Condition
Grease lubber connections
14.2 Yaw drive
14.3 Yaw drive mounting bolt tightness
Yaw motors availability
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 21 of 37
14.4 Leakage from the Yaw Drives
14.5 Abnormal Noise during Yawing
14.6 Yaw Brake availability & setting
14.7 Distance between sensor and metal of Yaw angle
sensor
14.8 Distance between sensor and metal of north position
sensor
14.9 Yaw brake air gap
14.10 Measure the distance between Yaw rim bottom surface
and lateral suspender
14.11 Measure the distance between Yaw rim top surface and
main frame
14.12 Check the disk spring preload in the lateral suspenders.
14.13 Measure the distance between Yaw rim lateral surface
and lateral suspender
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 22 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
O Main Bearing
15 Lubrication pump Operation
Grease lubber condition
Main bearing operation
Grease lubber electrical connections
15.1 Lab Type
15.2 Grease leakages
15.3 Labyrinth ring Rubbing
15.4 Gap at lock nut
15.5 Noise and temperature/shifting
15.6 Main Bearing fasteners condition
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 23 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
P Gear Box
16 Alignment & Mounting
16.1 Tightness of gearbox connections
16.2 Gearbox mounting to mainframe
16.3 Brake calliper air gap
16.4 Bearing temperature DE & NDE
16.5 Oil Level
16.6 Oil pressure Switch settings
16.7 Silica gel breather availability & color
16.8 Shifting of gear box
Gear box noise
16.9 Gear box leakage (slip ring area, LSS, HSS, & radiator)
16.10 Condition of hosepipes
Cable routing below gear box
16.11 Radiator โ€“ mountings
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 24 of 37
16.12 Leakages from radiators
16.13 Radiators fins condition
16.14 Bellow cover condition
16.15 Oil pump motor condition
16.16 Check the elastomer of contamination by oil or grease
16.17 Check the rubber elements of the noise decoding
elements for cracks
16.18 Check the circuit for blocking by touching the
lubrication pipes shortly after turbine
16.19 Check the gear box oil cooling fan 1 and 2 circuitry
16.20 Check working of the mechanical driven pump
16.21 Gap between main frame and gear rim at locations
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 25 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
Q Generator
17 Bearing lubrication (DE & NDE)
17.1 Grease Collector
Check greasing extension pipe at DE side
17.2 Cover mounting
Power cable connections
Availability of cable glands
Fire retardant paint (FRP) application on cables
CU Bus condition
17.3 Check the axial, radial, and angular alignment of the
generator drive shaft to the gear box output shaft
17.4 Check all O-ring seals regarding leakage and damage
(cracks)
17.5 Generator mount bolt tightness & generator alignment
bolt tightness
17.6 Check the function of the slip ring space heater
17.7 Check the function from the internal cooling circuit fan
1 and fan 2
17.8 Check the Earth terminals and located on each NDE
foot and Earthing cable is attached to it
17.9 Check the connector and coupling on incremental
rotary transducer
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 26 of 37
17.10 Check the gas โ€“ recharge pressure in expansion vessel
17.11 Check the system pressure for the cooling circuit on the
gauge (2.6 to 3.0)
17.12 Generator earthling and its terminal
17.13 Check the function from the internal cooling circuit fan
1 and fan 2
17.14 Bellow cover condition
17.15 Check control slip ring mounting bolt with GB
Torque arm support
17.16 Check Control slip ring holder mounting tightness
Check control slip ring cover
17.17 Control slip ring brushes
Contact ring condition
Separators insulation rings condition
Brush connections
Brush holders conditions
17.18 Power slip ring Brushes
Contact ring condition
Separators insulation rings condition
Brush connections
Brush holders conditions
Limit switches condition
Bellow
17.19 Additional Earthing brush provision (Grounding
Insulators) :-
Contact ring condition
Separators insulation ring condition
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 27 of 37
Brush connections
Brush holders conditions
17.20 Power Cable connections in stator terminal box
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 28 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
R Rotor Brake
18 Disc Brake Pads wears / break sensor
18.1 Brake Gap
18.2 Rotor Brake structure mounting
18.3 Rotor Brake sensor condition
18.4 Check hydraulic brake system for oil leaks
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 29 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
S Hydraulic Unit
19 Electrical operation of hub lock
19.1 Brake operating electrical box
19.2 Check the brake hydraulic line for any damage and
leakage and check the expiration date of the flexible
tubes
19.3 Check the gas pressure in the rotor brake /pressure
supply line accumulator
19.4 Check the rotor lock hydraulic line for any damage and
leakage and check the expiration date of the flexible
tubes
19.5 Check the hydraulic unit for leakages
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 30 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
T Hub Lock
20 Functionality
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
U Nacelle Control Panel
21 Panel Mounting
Nacelle Fan
21.1 Check Panel door lock
Condition of hinges
21.2 Modules (MPCB, MCB, Contactors, Surge Arresters,
Battery Charger Module) Mountings
21.3 EMERGENCY Switch Operation
21.4 SAFETY Chain Circuit operation
21.5 MPCB Settings
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 31 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
V Anemometer & Wind Vane
22 Anemometer condition & mounting lock nut
22.1 Anemometer & Wind Vane availability
22.3 Anemometer stand lighting arrester availability
22.4 Lighting arrester cable joint to WTG bottom CU PAS Bus
bar/ Separate earth pit connection
22.5 Anemometer & Wind Vane Setting
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 32 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
W Rotor Blade
23 Blade mounting bolts
23.1 Blade rota cap condition
23.2 Check 0 Degree setting in all blades both physically and
at controller
23.3 Lightning Protection Strips availability
Flash Finger
Blade platform condition
23.4 Blade surface cracks
Blade tip availability
Vortex generator (VA) availability
23.5 Check the spar connection
23.6 Check that the drain hole in the area of the blade tip is
not clogged
23.7 Check the connections and contact points of the
lightening cables of the rotor blades and the brushes
23.8 Check the trailing edge bonding
23.9 Angle encoder Condition
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 33 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
X HUB Inside
24 HUB Entry doors condition
24.1 Panel mounting channels & bolts with hub body
24.2 Slip ring cable adapter support at panel side
24.3 Hub cable dressing and damages due to sharp edges
24.4 Hub cooling fans availability & mounting condition
24.5 Hub all cables connections routings
HUB cable cutting at glands
24.6 Grease collecting bottle fixing/leak/damage
24.7 Electrical connections
Cables laying & availability of all panels cable glands
24.8 Decolourisation of connector at power supply
24.9 Flash point, burning marks, MPCB & contactor in panels
24.10 Emergency-stop functioning
24.11 Panel door & Channel mounting
24.12 DC-DC supply connector tightness and burnt mark
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 34 of 37
24.13 Safety Speed check ( Pitch batteries healthiness check)
PITCH Battery voltage are Ok
24.14 Pitch motor cover condition
24.15 Resolver Mounting condition
24.16 Frequency Drive condition
24.17 Leakage from the PITCH drive
Pitch drive mounting
24.18 Rim teeth โ€“ Lubrication
Grease Lubber condition
24.19 Rim teeth thickness of worn out teeth
24.20 EMERGENCY Switch operation
24.21 Hub all Earthings
24.22 Blade and hub Spark gap
24.23 Hub metal Structure
24.24 Hub Platforms
Grease Leakages
24.25 Tightness of bolt connection
Battery box to frame
Frame to Hub
24.26 Check the setting of feathering position proximity
sensor and its operation for all three blades
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 35 of 37
24.27 Check the position and tightness of -5 degree limit
switch sensor in all three blades
24.28 Setting of thermostats (Heating)
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
Y Battery Banks
25 Mounting Channels condition
All mounting channels condition with all hardwareโ€™s
25.1 Battery Box mounting channel tightness/ bush
condition V2 hub
25.2 Battery Voltages
25.3 Battery operational life
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 36 of 37
Sl. No. Inspection Points Limits
Remarks/Comments
(if any)
Photograph
Z Nose Cone
26 Nose cone mounting bracket tightness
Nose cone mounting bracket hardwareโ€™s & Rubber
bush condition
26.1 Nose cone holding railings
26.2 Crack in Nose cone mounting
26.3 Spark gap (finger) gap setting
26.4 Nose cone lightening arrestor connection with the
platform
Nose cone LA Copper flat available
WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 37 of 37
* Annexure Verification & Availability
1 List Software Version
2 List of Latest PLCs version
3 List of Latest applicable motor protection switches settings
4 List of Latest fuses applicable in different part of turbines
5 List of Latest applicable hygrostat settings
6 Standard Earthing value defined in specs.
7 Latest Parameter setting, which needs manual entry in
turbine for its validations
8 Applicable offsets of turbine (i.e. blade angle, yawing, north
direction setting etc.)
9 List of Latest applicable modification/TCIs for its Validation
10 The applicable setting for at different junctions in complete
path of lightening protection system ( Blade tip-root-hub-
nacelle-tower-earth)
11 Audit Check list
12 Health Card Of WTG
Auditor Signature Site In-Charge Signature

More Related Content

What's hot

testing formats
testing formatstesting formats
testing formats
Abhishek Shukla
ย 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
Himansu Pradhan
ย 
Motor Control Centre
Motor Control CentreMotor Control Centre
Motor Control Centre
salehkhan
ย 
ELECTRICAL INSTALLATIONS INSPECTION CHECKLIST Form # HSEQ - EIIC Rev 7.docx
ELECTRICAL INSTALLATIONS INSPECTION CHECKLIST Form # HSEQ - EIIC Rev 7.docxELECTRICAL INSTALLATIONS INSPECTION CHECKLIST Form # HSEQ - EIIC Rev 7.docx
ELECTRICAL INSTALLATIONS INSPECTION CHECKLIST Form # HSEQ - EIIC Rev 7.docx
Dwarika Bhushan Sharma
ย 
Transformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response AnalysisTransformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response Analysis
HamedPasha1
ย 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
Ahmed Saada, (PRMG)
ย 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
H. Kheir
ย 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
Kapil Singh
ย 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
Jobin Abraham
ย 
Intelligent mcc Siemens
Intelligent mcc Siemens Intelligent mcc Siemens
Intelligent mcc Siemens
Praveen Patil
ย 
52573830 electrical inspectionchecklist
52573830 electrical inspectionchecklist52573830 electrical inspectionchecklist
52573830 electrical inspectionchecklistimaduddin91
ย 
Electrical SUBSTATION ppt
Electrical SUBSTATION pptElectrical SUBSTATION ppt
Electrical SUBSTATION ppt
TanvirkabirShishir
ย 
Transformer testing
Transformer testingTransformer testing
Transformer testingajayknows
ย 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
Rakesh Joshi
ย 
Load list calculation
Load list calculationLoad list calculation
Load list calculation
Wiwit Purwanto
ย 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
D Mรฅlรฎk
ย 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTCRohit Dave
ย 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
Modal Holong Education
ย 
Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)
Sourabh sharma
ย 

What's hot (20)

testing formats
testing formatstesting formats
testing formats
ย 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
ย 
Motor Control Centre
Motor Control CentreMotor Control Centre
Motor Control Centre
ย 
ELECTRICAL INSTALLATIONS INSPECTION CHECKLIST Form # HSEQ - EIIC Rev 7.docx
ELECTRICAL INSTALLATIONS INSPECTION CHECKLIST Form # HSEQ - EIIC Rev 7.docxELECTRICAL INSTALLATIONS INSPECTION CHECKLIST Form # HSEQ - EIIC Rev 7.docx
ELECTRICAL INSTALLATIONS INSPECTION CHECKLIST Form # HSEQ - EIIC Rev 7.docx
ย 
Transformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response AnalysisTransformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response Analysis
ย 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
ย 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
ย 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
ย 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
ย 
Intelligent mcc Siemens
Intelligent mcc Siemens Intelligent mcc Siemens
Intelligent mcc Siemens
ย 
52573830 electrical inspectionchecklist
52573830 electrical inspectionchecklist52573830 electrical inspectionchecklist
52573830 electrical inspectionchecklist
ย 
Electrical SUBSTATION ppt
Electrical SUBSTATION pptElectrical SUBSTATION ppt
Electrical SUBSTATION ppt
ย 
Panel check-list
Panel check-listPanel check-list
Panel check-list
ย 
Transformer testing
Transformer testingTransformer testing
Transformer testing
ย 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
ย 
Load list calculation
Load list calculationLoad list calculation
Load list calculation
ย 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
ย 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTC
ย 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
ย 
Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)
ย 

Similar to Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18

Rotork YTC YT-2501 Smart Positioner Manual | YTC INDIA
Rotork YTC YT-2501 Smart Positioner Manual | YTC INDIARotork YTC YT-2501 Smart Positioner Manual | YTC INDIA
Rotork YTC YT-2501 Smart Positioner Manual | YTC INDIA
YTC INDIA
ย 
krausnaimer.pdf
krausnaimer.pdfkrausnaimer.pdf
krausnaimer.pdf
YanahMalasari1
ย 
38999 i ii-catalog 051.812.955.17 folder to Tax Return
38999 i ii-catalog 051.812.955.17 folder to Tax Return38999 i ii-catalog 051.812.955.17 folder to Tax Return
38999 i ii-catalog 051.812.955.17 folder to Tax Return
Sandro Suzart
ย 
01 Introduction 8 series toyota presentation.pdf
01 Introduction 8 series toyota presentation.pdf01 Introduction 8 series toyota presentation.pdf
01 Introduction 8 series toyota presentation.pdf
jcardy1985
ย 
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
dsz422528
ย 
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
f8usuejdkdm3e
ย 
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
f8usejdkdmmd
ย 
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
kdmdmsmmdm
ย 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
Mary Calkins
ย 
Harga pasang ariston 087777888338
Harga pasang ariston 087777888338Harga pasang ariston 087777888338
Harga pasang ariston 087777888338
Stallion Water Heater
ย 
Distributor ariston tangerang 082113812149
Distributor ariston tangerang 082113812149Distributor ariston tangerang 082113812149
Distributor ariston tangerang 082113812149
Harga Water Heater Ariston 082113812149
ย 
Distributor ariston bekasi 082113812149
Distributor ariston bekasi 082113812149Distributor ariston bekasi 082113812149
Distributor ariston bekasi 082113812149
Harga Water Heater Ariston 082113812149
ย 
Distributor ariston bogor 082113812149
Distributor ariston bogor 082113812149Distributor ariston bogor 082113812149
Distributor ariston bogor 082113812149
Harga Water Heater Ariston 082113812149
ย 
samsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdfsamsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdf
freznell
ย 
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.com
 Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.com
Beeteco
ย 
LOTOTO PDF.pdf
LOTOTO PDF.pdfLOTOTO PDF.pdf
LOTOTO PDF.pdf
AnthonyTan82
ย 
Valvulas globo - Globe valves
Valvulas globo - Globe valvesValvulas globo - Globe valves
Valvulas globo - Globe valves
JLX Valve
ย 
JVC AX-V8000
JVC AX-V8000JVC AX-V8000
JVC AX-V8000
egocentrico22
ย 
ProcContSite
ProcContSiteProcContSite
ProcContSiteClyde Porter
ย 
Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256
Thuan Kieu
ย 

Similar to Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18 (20)

Rotork YTC YT-2501 Smart Positioner Manual | YTC INDIA
Rotork YTC YT-2501 Smart Positioner Manual | YTC INDIARotork YTC YT-2501 Smart Positioner Manual | YTC INDIA
Rotork YTC YT-2501 Smart Positioner Manual | YTC INDIA
ย 
krausnaimer.pdf
krausnaimer.pdfkrausnaimer.pdf
krausnaimer.pdf
ย 
38999 i ii-catalog 051.812.955.17 folder to Tax Return
38999 i ii-catalog 051.812.955.17 folder to Tax Return38999 i ii-catalog 051.812.955.17 folder to Tax Return
38999 i ii-catalog 051.812.955.17 folder to Tax Return
ย 
01 Introduction 8 series toyota presentation.pdf
01 Introduction 8 series toyota presentation.pdf01 Introduction 8 series toyota presentation.pdf
01 Introduction 8 series toyota presentation.pdf
ย 
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
ย 
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
ย 
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
ย 
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number  01600011...
JCB JS145LC TRACKED EXCAVATOR Parts Catalogue Manual (Serial Number 01600011...
ย 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
ย 
Harga pasang ariston 087777888338
Harga pasang ariston 087777888338Harga pasang ariston 087777888338
Harga pasang ariston 087777888338
ย 
Distributor ariston tangerang 082113812149
Distributor ariston tangerang 082113812149Distributor ariston tangerang 082113812149
Distributor ariston tangerang 082113812149
ย 
Distributor ariston bekasi 082113812149
Distributor ariston bekasi 082113812149Distributor ariston bekasi 082113812149
Distributor ariston bekasi 082113812149
ย 
Distributor ariston bogor 082113812149
Distributor ariston bogor 082113812149Distributor ariston bogor 082113812149
Distributor ariston bogor 082113812149
ย 
samsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdfsamsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdf
ย 
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.com
 Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.com
ย 
LOTOTO PDF.pdf
LOTOTO PDF.pdfLOTOTO PDF.pdf
LOTOTO PDF.pdf
ย 
Valvulas globo - Globe valves
Valvulas globo - Globe valvesValvulas globo - Globe valves
Valvulas globo - Globe valves
ย 
JVC AX-V8000
JVC AX-V8000JVC AX-V8000
JVC AX-V8000
ย 
ProcContSite
ProcContSiteProcContSite
ProcContSite
ย 
Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256
ย 

More from Gensol Engineering Limited

Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Gensol Engineering Limited
ย 
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Gensol Engineering Limited
ย 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited
ย 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Gensol Engineering Limited
ย 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Gensol Engineering Limited
ย 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Gensol Engineering Limited
ย 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
Gensol Engineering Limited
ย 
List of successful bidders 11.03.2019
List of successful bidders 11.03.2019List of successful bidders 11.03.2019
List of successful bidders 11.03.2019
Gensol Engineering Limited
ย 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Gensol Engineering Limited
ย 
Module Price Trend Analysis
Module Price Trend AnalysisModule Price Trend Analysis
Module Price Trend Analysis
Gensol Engineering Limited
ย 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Gensol Engineering Limited
ย 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Gensol Engineering Limited
ย 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Gensol Engineering Limited
ย 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Gensol Engineering Limited
ย 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
Gensol Engineering Limited
ย 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Gensol Engineering Limited
ย 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Gensol Engineering Limited
ย 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
Gensol Engineering Limited
ย 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18
Gensol Engineering Limited
ย 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
Gensol Engineering Limited
ย 

More from Gensol Engineering Limited (20)

Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
ย 
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
ย 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019
ย 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
ย 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
ย 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
ย 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
ย 
List of successful bidders 11.03.2019
List of successful bidders 11.03.2019List of successful bidders 11.03.2019
List of successful bidders 11.03.2019
ย 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
ย 
Module Price Trend Analysis
Module Price Trend AnalysisModule Price Trend Analysis
Module Price Trend Analysis
ย 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
ย 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
ย 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
ย 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
ย 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
ย 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
ย 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
ย 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
ย 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18
ย 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
ย 

Recently uploaded

BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
ย 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
ย 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
ย 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
ย 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
ย 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
ย 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
ย 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
ย 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
Henry Tapper
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
ย 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
ย 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
ย 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
ย 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
ย 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
ย 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
ย 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
ย 
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdfSearch Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
ย 

Recently uploaded (20)

BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
ย 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
ย 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
ย 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
ย 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
ย 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
ย 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
ย 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
ย 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
ย 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
ย 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
ย 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
ย 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
ย 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
ย 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
ย 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
ย 
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdfSearch Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
ย 

Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18

  • 1. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 1 of 37 Wind Turbine Generator (WTG) Check List WTG- Location Number OEM Name Model/ Hub Height State Name Site Name WTG- Location SAP Number Customer Name Control Reading Name Of Auditor Date Of Inspection WTG- Location Number WTG Stop Time WTG Start Time Auditor Signature Site In-Charge Signature Date: Date:
  • 2. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 2 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph A WTG TRANSFORMER 1 Check Transformer oil leakages from radiator Fins, HV Bushings, Tank, Conservator & Valve, Transformer Parts Corrosion, Oil Level, Bushing Connections , 1.1 Check WTI & OTI are working, OTI/WTI Protection with Metal mesh Cover, WTI & OTI Cables condition, WTI & OTI Pointer Okay & Mirror Condition, 1.2 Corrosion on transformer parts, Radiator, Tank, Conservator & Hardwareโ€™s 1.3 Transformer junction Box Cable routing through Metal/PVC Pipes ( Duct), Alignment of Metal/PVC Pipes with Transformer Junction Box,
  • 3. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 3 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph Cables are rubbing to Metal pipes/PVC Pipes, 1.4 Check Condition Of Breather ( Silica gel, oil Cup), Position of Arching Horns , Transformer plinth condition & Transformer Mounting, 1.5 Check Transformer Earthling I.e. Neutral Earthling, Body Earthling & Junction Box Earthling, 1.6 Visual Check of CT/PT ( Any Bulging, Oil level & Connections), CT & PT Earthling CT & PT Junction Box CT & PT Mounting 1.7 OTI & WTI Temp.
  • 4. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 4 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph B Isolator Condition 2 Check for smooth operation, Ensure that all the phases open and close fully and simultaneously, Ensure Proper Spring pressure at female contacts so that good , 2.1 Drop out (DO) fuse Availability 2.2 Isolator Operating pipe Condition/Handle condition 2.3 Isolator Earthling 2.4 LOTO Provision
  • 5. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 5 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph C VCB Panel & Switch Yard Condition 3 VCB Tripping with activation of protection relay & manual, Tripping, Trip circuit, Power pack & all Protection Fuses, Protection Relays, Panel meters & Switches, Panel door, 3.1 Switch yard all Earthlings, Vegetation, Gravel spreading (stone pitching), Switch yard stay wires condition, 3.2 Check air circuit breaker and vacuum circuit breaker for correct operation, indicators ON/OFF condition, springs charged/discharged condition. 3.3 Lighting Arrester (LA) availability
  • 6. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 6 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph D WTG Outside 4 Check availability of all Earth pits, Check for corrosions & Rust on Earth pitโ€™s connection, Earth Flats connection, Earth Flat connection to Earth Electrode (Pipe), 4.1 Foundation Cracks 4.2 Tower door Ladder 4.3 Tower door Ladder Locking 4.4 Tower door rubber bidding 4.5 Check the Radiator is Cleaned or Not 4.6 Check radiator fan smooth operation 4.7 Check the SCADA link properly installed
  • 7. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 7 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph E Power Panel 5 Power Panel door condition, Condition panel door & Hinges, 5.1 Panel Cooling, availability of fans, Filter mat availability, 5.2 Condition of Sealing for cable Entry, Fire retardant paint application on cables (1 Meter), 5.3 Bus Bar condition ( for Pitting & Overheating) 5.4 Humming/chattering Noise while operation 5.5 Arcing at bus bar connection 5.6 Decolouring at bus bar 5.7 Arcing/ Decolouring cable terminations 5.8 Cable termination / loose lug โ€“ Crimping quality 5.9 Contactor condition / decolouring 5.10 Water leakage in the panel (find leakages point) 5.11 Cable insulation/Sheath damage from bottom panel air circuit breaker of Transformer connectors
  • 8. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 8 of 37 5.12 UPS availability, UPS Tripping PCB Mounting, UPS Mounting, 5.13 Power cable lug condition, (air circuit breaker โ€“I/p & o/p connections) 5.14 Soft starter & Snubber tightness check, Soft starter mounting, 5.15 Air Circuit breaker (ACB) operation (manual Check) 5.16 ACB Settings :- Nominal Current (In) Rated Current (Ir) Short Circuit current (Isd) Short circuit time (Tsd) Ground fault current ( Ig-B) Ground fault time (Tg)
  • 9. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 9 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph F Capacitor Panels 6 Capacitor discharge resistor 6.1 Condition of capacitor (Bulged/punctured), capacitor contactors & fuse units, pre charging coils 6.2 Check of connection tightness and born marks, fuse base condition 6.3 Capacitor panel door condition, Condition panel door & Hinges 6.4 Check all capacitor should be in good condition and voltage must be approx 400-417 VDC 6.5 Panel cooling, availability of fans, Filter mat availability
  • 10. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 10 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph G DFIG Panel 7 Capacitor discharge resistor 7.1 Power, Earthling and control cable connection in DFIG panel torque marks check at DC and AC power terminals 7.2 Condition of DFIG panel cooling duct and tightness at termination, Coolant pressure should be 2.2 bar, Leakage of coolant, 7.3 Check condition of DC limiter resistor, Check condition of DC capacitors, 7.4 All acrylic sheets/ insulation cover used on live terminals/Bus bars 7.5 Bus lines should be earth by clips at the shield , Condensation in DFIG Panel, 7.6 Heating and cooling System 7.7 DFIG Panel door lock, DFIG panel Hinges, Cooling Fans, 7.8 Arcing at bus bar connection 7.9 Decolouring at bus bar
  • 11. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 11 of 37 7.10 Arcing/Decolouring cable terminations 7.11 Contactor condition / Decolouring 7.12 Fuse condition / tightness 7.13 DFIG panel cable coming should be routed with rubber gland to avoid any damages with sharp edge of panel 7.14 Power cables & control cables routing inside DFIG panel 7.15 Cooling System :- Motor condition Pump condition Connection Pipes condition Structure mounting Cooling Liquid availability Protection System
  • 12. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 12 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph H Control Panel 8 Component- Mounting in Panels, Cables routing, Loose connection and tightness checks for 25% of connection, 8.1 Bottom Earthling PAS Bus Bar earthling connections 8.2 Emergency Switch operation 8.3 SAFETY Chain Circuit operation 8.4 Panel cooling, availability of fans , Filter mat availability, 8.5 Check functionality of RCCBs 8.6 Surge arrestors, setting of power supply 24V
  • 13. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 13 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph I Junction Box 9 All connection tightness, Sparking / Burnt marks at connections, Bus Bar condition, Bus Bar Mounting, Insulator condition, 9.1 Connection Lugging, Cable Glands, 9.2 Junction box mounting, Junction box cover, 9.3 Junction Box connections
  • 14. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 14 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph J Tubular Tower Shell : T1 + T2 + T3 + T4 (as Possible no of sections) 10 Platform chequer plate status & hardwareโ€™s condition 10.1 Tubular Tower bottom earthlings 10.2 Ladder condition in Tower Shell 10.3 Gap between tower to tower shell joints (use filler gauge), Sun light is coming inside tower from flanges (check 360 degree), 10.4 Any linear indication (crack) on welds joints/near surface 10.5 Corrosion on welds joints/near surface 10.6 Any types of linear indication(Crack) on tower shell plates 10.7 Flange bolts (Looseness/condition), Flange bolts corrosion, 10.8 Flange Bolts Make 10.9 Tower shell to shell earthling 10.10 Condition of safety rope
  • 15. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 15 of 37 10.11 Safety rope clamps condition 10.12 Safety rope routing 10.13 Check the discharge flume for blockage 10.14 Check the bolted tower connection between each section 10.15 Check the bolted tower connection between tower section 1 and tower section 2. 10.16 Measurement of tower inclination max. 8mm/m tower height (Misalignment & settlement). 10.17 Grease /Oil spillages on Platforms Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph K Climb Assistor(Wherever applicable) 11 Operation is proper
  • 16. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 16 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph L Cable Inspection 12 Fire retardant paint at bottom cabinet 12.1 Cable uniformly distributed on cable tray 12.2 Cable rubbing/Insulation damage/crack 12.3 Cable decoloration 12.4 Cable loop holder Orange color PVC sleeve Welding contact to tower,corrosion at welding portion 12.5 Cable routing through cable guide/Cable holder 12.6 Cable guide ring Holding 12.7 End Cap on the cable clamp stud below cable drum 12.8 Cable twisting 12.9 Cable Hitting with ladder and tower 12.10 At Tower top plateform cut-out,cable damage/rubbing
  • 17. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 17 of 37 12.11 Cable Hanging Cable Socks mounting Cable socks Corrosion Cable Socks Holding 12.12 Cable Socks D-shackle bolt orientation/piercing in cable 12.13 Cable Laying from tower to nacelle(below Gear box) for cutting rubbing at sharp edges/support channel/cable tray clamps 12.14 Cable loop length and loop to cable drum routing 12.15 Cable drum Cables routing 12.16 Cable drum Cables Holding 12.17 Tightness of Cables in cable joint 12.18 No of Cable joints in tower Power Cables 12.19 Check the available joint in power Cables crimping 12.20 Control Cable joints 12.21 Power Cables Clamping 12.22 Fire retardant paint at junction box 12.23 Crimping as per specification. 12.24 Lugs used are standards and as mention in specs
  • 18. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 18 of 37 12.25 No pinching condition seen 12.26 Check all the cables clips(Clip and Plastic lining) 12.27 Check the cables at the grips and their fastening bolts. 12.28 Cable edge protection at sharp edges,cable drum
  • 19. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 19 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph M Nacelle 13 Nacelle to tower Cables routing 13.1 Operation of winch Condition of chain 13.2 Nacelle Libero window Winch bottom window road 13.3 Nacelle bottom FRP Door 13.4 Nacelle GRP Cracks Nacelle joints & Nacelle cover Shifting 13.5 Cables Laying inside the Nacelle 13.6 Water leakages from Nacelle joints Water leakages from Nacelle Hoods 13.7 Vibration Sensor condition PCH Box mounting PCH Box Connections 13.8 All Nacelle earthings ( Panels + platform + Generator + Gear Box + Brake Unit + Main Bearing + Slew ring) 13.9 All Nacelle Spark Gaps 13.10 Nacelle PAS Earthing Bus bar Condition Nacelle PAS to WTG Bottom PAS Earthing Connection
  • 20. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 20 of 37 13.11 Nacelle Metal Platforms availability Cable Twist Limit Switch Assembly North position Sensor availability Yaw Sensor availability 13.12 Check the bolted Connection of generator cantilever for attaching the conical mounts (elastomeric bearings) of the generator. 13.13 Check the elastomer of the generator conical mounts the regarding cracks or damages. 13.14 Check the conical mounts for cracks or other damages.(Connection between casing suspension and GRP) 13.15 Nacelle Cooling Fans availability Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph N YAW System 14 Rim Teeth Greasing 14.1 Backslash between Rim & Pinion Teeth Grease Lubber Condition Grease lubber connections 14.2 Yaw drive 14.3 Yaw drive mounting bolt tightness Yaw motors availability
  • 21. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 21 of 37 14.4 Leakage from the Yaw Drives 14.5 Abnormal Noise during Yawing 14.6 Yaw Brake availability & setting 14.7 Distance between sensor and metal of Yaw angle sensor 14.8 Distance between sensor and metal of north position sensor 14.9 Yaw brake air gap 14.10 Measure the distance between Yaw rim bottom surface and lateral suspender 14.11 Measure the distance between Yaw rim top surface and main frame 14.12 Check the disk spring preload in the lateral suspenders. 14.13 Measure the distance between Yaw rim lateral surface and lateral suspender
  • 22. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 22 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph O Main Bearing 15 Lubrication pump Operation Grease lubber condition Main bearing operation Grease lubber electrical connections 15.1 Lab Type 15.2 Grease leakages 15.3 Labyrinth ring Rubbing 15.4 Gap at lock nut 15.5 Noise and temperature/shifting 15.6 Main Bearing fasteners condition
  • 23. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 23 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph P Gear Box 16 Alignment & Mounting 16.1 Tightness of gearbox connections 16.2 Gearbox mounting to mainframe 16.3 Brake calliper air gap 16.4 Bearing temperature DE & NDE 16.5 Oil Level 16.6 Oil pressure Switch settings 16.7 Silica gel breather availability & color 16.8 Shifting of gear box Gear box noise 16.9 Gear box leakage (slip ring area, LSS, HSS, & radiator) 16.10 Condition of hosepipes Cable routing below gear box 16.11 Radiator โ€“ mountings
  • 24. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 24 of 37 16.12 Leakages from radiators 16.13 Radiators fins condition 16.14 Bellow cover condition 16.15 Oil pump motor condition 16.16 Check the elastomer of contamination by oil or grease 16.17 Check the rubber elements of the noise decoding elements for cracks 16.18 Check the circuit for blocking by touching the lubrication pipes shortly after turbine 16.19 Check the gear box oil cooling fan 1 and 2 circuitry 16.20 Check working of the mechanical driven pump 16.21 Gap between main frame and gear rim at locations
  • 25. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 25 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph Q Generator 17 Bearing lubrication (DE & NDE) 17.1 Grease Collector Check greasing extension pipe at DE side 17.2 Cover mounting Power cable connections Availability of cable glands Fire retardant paint (FRP) application on cables CU Bus condition 17.3 Check the axial, radial, and angular alignment of the generator drive shaft to the gear box output shaft 17.4 Check all O-ring seals regarding leakage and damage (cracks) 17.5 Generator mount bolt tightness & generator alignment bolt tightness 17.6 Check the function of the slip ring space heater 17.7 Check the function from the internal cooling circuit fan 1 and fan 2 17.8 Check the Earth terminals and located on each NDE foot and Earthing cable is attached to it 17.9 Check the connector and coupling on incremental rotary transducer
  • 26. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 26 of 37 17.10 Check the gas โ€“ recharge pressure in expansion vessel 17.11 Check the system pressure for the cooling circuit on the gauge (2.6 to 3.0) 17.12 Generator earthling and its terminal 17.13 Check the function from the internal cooling circuit fan 1 and fan 2 17.14 Bellow cover condition 17.15 Check control slip ring mounting bolt with GB Torque arm support 17.16 Check Control slip ring holder mounting tightness Check control slip ring cover 17.17 Control slip ring brushes Contact ring condition Separators insulation rings condition Brush connections Brush holders conditions 17.18 Power slip ring Brushes Contact ring condition Separators insulation rings condition Brush connections Brush holders conditions Limit switches condition Bellow 17.19 Additional Earthing brush provision (Grounding Insulators) :- Contact ring condition Separators insulation ring condition
  • 27. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 27 of 37 Brush connections Brush holders conditions 17.20 Power Cable connections in stator terminal box
  • 28. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 28 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph R Rotor Brake 18 Disc Brake Pads wears / break sensor 18.1 Brake Gap 18.2 Rotor Brake structure mounting 18.3 Rotor Brake sensor condition 18.4 Check hydraulic brake system for oil leaks
  • 29. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 29 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph S Hydraulic Unit 19 Electrical operation of hub lock 19.1 Brake operating electrical box 19.2 Check the brake hydraulic line for any damage and leakage and check the expiration date of the flexible tubes 19.3 Check the gas pressure in the rotor brake /pressure supply line accumulator 19.4 Check the rotor lock hydraulic line for any damage and leakage and check the expiration date of the flexible tubes 19.5 Check the hydraulic unit for leakages
  • 30. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 30 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph T Hub Lock 20 Functionality Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph U Nacelle Control Panel 21 Panel Mounting Nacelle Fan 21.1 Check Panel door lock Condition of hinges 21.2 Modules (MPCB, MCB, Contactors, Surge Arresters, Battery Charger Module) Mountings 21.3 EMERGENCY Switch Operation 21.4 SAFETY Chain Circuit operation 21.5 MPCB Settings
  • 31. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 31 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph V Anemometer & Wind Vane 22 Anemometer condition & mounting lock nut 22.1 Anemometer & Wind Vane availability 22.3 Anemometer stand lighting arrester availability 22.4 Lighting arrester cable joint to WTG bottom CU PAS Bus bar/ Separate earth pit connection 22.5 Anemometer & Wind Vane Setting
  • 32. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 32 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph W Rotor Blade 23 Blade mounting bolts 23.1 Blade rota cap condition 23.2 Check 0 Degree setting in all blades both physically and at controller 23.3 Lightning Protection Strips availability Flash Finger Blade platform condition 23.4 Blade surface cracks Blade tip availability Vortex generator (VA) availability 23.5 Check the spar connection 23.6 Check that the drain hole in the area of the blade tip is not clogged 23.7 Check the connections and contact points of the lightening cables of the rotor blades and the brushes 23.8 Check the trailing edge bonding 23.9 Angle encoder Condition
  • 33. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 33 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph X HUB Inside 24 HUB Entry doors condition 24.1 Panel mounting channels & bolts with hub body 24.2 Slip ring cable adapter support at panel side 24.3 Hub cable dressing and damages due to sharp edges 24.4 Hub cooling fans availability & mounting condition 24.5 Hub all cables connections routings HUB cable cutting at glands 24.6 Grease collecting bottle fixing/leak/damage 24.7 Electrical connections Cables laying & availability of all panels cable glands 24.8 Decolourisation of connector at power supply 24.9 Flash point, burning marks, MPCB & contactor in panels 24.10 Emergency-stop functioning 24.11 Panel door & Channel mounting 24.12 DC-DC supply connector tightness and burnt mark
  • 34. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 34 of 37 24.13 Safety Speed check ( Pitch batteries healthiness check) PITCH Battery voltage are Ok 24.14 Pitch motor cover condition 24.15 Resolver Mounting condition 24.16 Frequency Drive condition 24.17 Leakage from the PITCH drive Pitch drive mounting 24.18 Rim teeth โ€“ Lubrication Grease Lubber condition 24.19 Rim teeth thickness of worn out teeth 24.20 EMERGENCY Switch operation 24.21 Hub all Earthings 24.22 Blade and hub Spark gap 24.23 Hub metal Structure 24.24 Hub Platforms Grease Leakages 24.25 Tightness of bolt connection Battery box to frame Frame to Hub 24.26 Check the setting of feathering position proximity sensor and its operation for all three blades
  • 35. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 35 of 37 24.27 Check the position and tightness of -5 degree limit switch sensor in all three blades 24.28 Setting of thermostats (Heating) Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph Y Battery Banks 25 Mounting Channels condition All mounting channels condition with all hardwareโ€™s 25.1 Battery Box mounting channel tightness/ bush condition V2 hub 25.2 Battery Voltages 25.3 Battery operational life
  • 36. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 36 of 37 Sl. No. Inspection Points Limits Remarks/Comments (if any) Photograph Z Nose Cone 26 Nose cone mounting bracket tightness Nose cone mounting bracket hardwareโ€™s & Rubber bush condition 26.1 Nose cone holding railings 26.2 Crack in Nose cone mounting 26.3 Spark gap (finger) gap setting 26.4 Nose cone lightening arrestor connection with the platform Nose cone LA Copper flat available
  • 37. WTG Audit Checklist V1.2 Revision 1 Edition 2018 Gensol Engineering Private Limited (Wind Division) Page 37 of 37 * Annexure Verification & Availability 1 List Software Version 2 List of Latest PLCs version 3 List of Latest applicable motor protection switches settings 4 List of Latest fuses applicable in different part of turbines 5 List of Latest applicable hygrostat settings 6 Standard Earthing value defined in specs. 7 Latest Parameter setting, which needs manual entry in turbine for its validations 8 Applicable offsets of turbine (i.e. blade angle, yawing, north direction setting etc.) 9 List of Latest applicable modification/TCIs for its Validation 10 The applicable setting for at different junctions in complete path of lightening protection system ( Blade tip-root-hub- nacelle-tower-earth) 11 Audit Check list 12 Health Card Of WTG Auditor Signature Site In-Charge Signature