Introduction
• In this industrial developing world the need of power is increasing exponentially
thus to transfer high power at long distance is necessary.
• So the transmission at h.v is possible which is up to 720 kv and 1000kv.
• So extensively study is made on high voltage d.c. testing at 400 kv .
• Thus to perform tests and research the lab providing high voltage is needed.
• Transformers
• Lighting arrester
• Isolator and C.B
• Different type of insulators
• Cables
• Capacitors
• Line hardware and accessories
• Other equipment like reactors
Test equipment provided in high voltage lab
Activities and studies in high voltage laboratory
• Main is testing on equipment
• Other than it is research
• So research include
i. Breakdown strength of different material like
solid ,liquid and gas.
ii.Electrical interference of transmission line.
iii.High voltage power system’s insulation.
iv.High current phenomena such as electrics arc and plasma physics.
Small size lab
Medium size lab: an industrial lab
Large size lab
Withstand Voltages, Test Voltages and the Rating
of Equipment in High Voltage Lab
• Generally up to 230 KV design it does not pose any problem but above
400 KV it is to be handle with care.
• For research and development work, the voltage levels needed are usually
about 1.3 times the maximum test voltage needed. Hence, the laboratories
intended for different system voltages should have the test voltages
Size and Dimensions of the Equipment In High Voltage lab
• Mainly two type of lab:
1. indoor type & 2.outdoor type
• indoor type has the advantage of
1. protection of testing equipment against variable weather conditions,
2. simplicity in design and control of the test equipment,
3. provision of observation facilities during testing.
• outdoor laboratories have the advantage of
1. less cost due to the absence of building cost and
2. the planned facility
3. layout cost
• But it has disadvantages
1. absence of lifting and supporting facilities,
2.reproducibility of results not being guaranteed due to uncontrolled
atmospheric conditions, and
3.artificial and wet test studies which are difficult due to wind variation, etc.
• When high voltage laboratories are planned as indoor
laboratories, the following figures fix the dimensions of the
laboratories:
1. Size of the test equipment for a.c., d.c., or impulse generators.
2. Distances or clearances between the test object and ground
during test conditions and also between all the high voltage
terminals and earthed or grounded surroundings such as walls,
roofs of buildings, and other test equipment not energized.
Clearance of HV Lab
a) For power frequency test
b) Lightning impulse clearance
c) D.C. Generator clearance
a) For power frequency test
• The 50% flashover voltage is expressed as,
• V50%=652 × d0.576
where, d –air-gap distance,
• For example,
1)For 1000 kV(rms) – d=3.835 m
2)For 1500 kV - d=7.754 m
3)For 2000 kV d=12.8 m
b) Lightning impulse clearance
• Generally a clearance of 2 meters for each 1000 kV is necessary for lightning
impulse generator. Impulse flashover voltage is given by,
• V50= 500 × d for a rod plane gap.
• The withstand voltage can be assumed to be 80% of V50.
• It means, 2 meters gap will withstand 800kV(peak).
• For d.c. generators, a clearance of 4 meters for every 1000kV is recommended.
c) D.C. Generator clearance
Layout of high voltage lab
• Laboratory arrangements differ very much from a single
equipment to multiple d.c., a.c., & impulse arrangements in
different testing program.
• It is based on type of equipment to be tested, available space,
other accessories needed for the tests……
• EARTHING, SAFETY and CONTROL GEAR is foremost
consideration ……
Labbuilding
Shielding of the high voltage lab
• Safety is one of the most important requirements in a high voltage lab ,
• Proper operation of the high voltage lab include the presence of qualified
personnel,
• The use of systematic procedures, safety ropes, signs, visual and audible
warning & alarms, the use of grounding rods, the periodic review of safety
rules, the availability of fire extinguishers, emergency phone numbers, first aid
kit, and smoke alarm system.
• The walls, two supporting pillars and ceiling of the HV Lab require shielding
with a system of interconnected modular steel sheet elements mounted on
wood framework.
Safety
Design, Planning and Layout of high voltage laboratory

More Related Content

What's hot

Chapter1 breakdown in gases
Chapter1 breakdown in gasesChapter1 breakdown in gases
Chapter1 breakdown in gases
mukund mukund.m
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
Kabilesh K
 
EE8701-High Voltage Engineering (1).pptx
EE8701-High Voltage Engineering (1).pptxEE8701-High Voltage Engineering (1).pptx
EE8701-High Voltage Engineering (1).pptx
sai karthick
 
Introduction to power system protection
Introduction to power system protectionIntroduction to power system protection
Introduction to power system protection
SaifUrrehman183
 
concept of resilience and self healing in smart grid
concept of resilience and self healing in smart gridconcept of resilience and self healing in smart grid
concept of resilience and self healing in smart grid
Kundan Kumar
 
**Lightning Arrester Presentation**
**Lightning Arrester Presentation****Lightning Arrester Presentation**
**Lightning Arrester Presentation**SKPAMB
 
Townsend ’s theory
Townsend ’s theoryTownsend ’s theory
Townsend ’s theory
vishalgohel12195
 
Tripping and control of impulse generators
Tripping and control of impulse generatorsTripping and control of impulse generators
Tripping and control of impulse generatorsFariza Zahari
 
Types Of Substations
Types Of SubstationsTypes Of Substations
Types Of Substations
sapna186
 
Chapter 02- Breakdown in liquid dielectrics
Chapter 02- Breakdown in liquid dielectricsChapter 02- Breakdown in liquid dielectrics
Chapter 02- Breakdown in liquid dielectrics
MUET SZAB Campus Khairpur Mir's Sindh Pakistan
 
transformer protection
transformer protection transformer protection
transformer protection
jason adidela
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
raiamitesh8
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
vishalgohel12195
 
Insulation coordination
Insulation coordinationInsulation coordination
Insulation coordination
sarunkutti
 
HV testing of insulator
HV testing of insulatorHV testing of insulator
HV testing of insulator
Jawad Ali
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
siddharam kantoli
 
Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
Shanid Pazhamkavil
 

What's hot (20)

Chapter1 breakdown in gases
Chapter1 breakdown in gasesChapter1 breakdown in gases
Chapter1 breakdown in gases
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
 
EE8701-High Voltage Engineering (1).pptx
EE8701-High Voltage Engineering (1).pptxEE8701-High Voltage Engineering (1).pptx
EE8701-High Voltage Engineering (1).pptx
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
Introduction to power system protection
Introduction to power system protectionIntroduction to power system protection
Introduction to power system protection
 
concept of resilience and self healing in smart grid
concept of resilience and self healing in smart gridconcept of resilience and self healing in smart grid
concept of resilience and self healing in smart grid
 
Power quality ppt
Power quality pptPower quality ppt
Power quality ppt
 
**Lightning Arrester Presentation**
**Lightning Arrester Presentation****Lightning Arrester Presentation**
**Lightning Arrester Presentation**
 
Townsend ’s theory
Townsend ’s theoryTownsend ’s theory
Townsend ’s theory
 
Tripping and control of impulse generators
Tripping and control of impulse generatorsTripping and control of impulse generators
Tripping and control of impulse generators
 
Types Of Substations
Types Of SubstationsTypes Of Substations
Types Of Substations
 
Chapter 02- Breakdown in liquid dielectrics
Chapter 02- Breakdown in liquid dielectricsChapter 02- Breakdown in liquid dielectrics
Chapter 02- Breakdown in liquid dielectrics
 
transformer protection
transformer protection transformer protection
transformer protection
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
Insulation coordination
Insulation coordinationInsulation coordination
Insulation coordination
 
HV testing of insulator
HV testing of insulatorHV testing of insulator
HV testing of insulator
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Power quality
Power qualityPower quality
Power quality
 
Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
 

Viewers also liked

Design, planning and layout of high voltage lab
Design, planning and layout of high voltage labDesign, planning and layout of high voltage lab
Design, planning and layout of high voltage labNidhi Maru
 
High voltage presentation
High voltage presentationHigh voltage presentation
High voltage presentationdanielcowie
 
Laboratory Relayout Project
Laboratory Relayout ProjectLaboratory Relayout Project
Laboratory Relayout Project
Rama Renspandy
 
Production & Inventory Management (PIM) Environment
Production & Inventory Management (PIM) EnvironmentProduction & Inventory Management (PIM) Environment
Production & Inventory Management (PIM) Environment
Rama Renspandy
 
Boundary condition
Boundary conditionBoundary condition
Boundary condition
Awaab Fakih
 
Chap6 laplaces and-poissons-equations
Chap6 laplaces and-poissons-equationsChap6 laplaces and-poissons-equations
Chap6 laplaces and-poissons-equationsUmesh Kumar
 
Poisson’s and Laplace’s Equation
Poisson’s and Laplace’s EquationPoisson’s and Laplace’s Equation
Poisson’s and Laplace’s Equation
Abhishek Choksi
 
Healthcare facility design stat consultants
Healthcare facility design stat consultantsHealthcare facility design stat consultants
Healthcare facility design stat consultants
Arun Sebastian
 
Streamer theory of breakdown
Streamer theory of breakdownStreamer theory of breakdown
Streamer theory of breakdown
vishalgohel12195
 
Resistance potential divider
Resistance potential dividerResistance potential divider
Resistance potential divider
120101eer001
 
EE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of CablesEE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of CablesRajesh Ramesh
 
Healthcare Design: Lessons Learned from the United States' First Hospital
Healthcare Design:  Lessons Learned from the United States' First HospitalHealthcare Design:  Lessons Learned from the United States' First Hospital
Healthcare Design: Lessons Learned from the United States' First Hospital
Sara Marberry
 
Elect principles 2 voltage divider
Elect principles 2   voltage dividerElect principles 2   voltage divider
Elect principles 2 voltage dividersdacey
 
Unit 2 Laboratory Design P2 M2 D2
Unit 2 Laboratory Design P2 M2 D2Unit 2 Laboratory Design P2 M2 D2
Unit 2 Laboratory Design P2 M2 D2Steve Bishop
 
High voltage engineering
High voltage engineeringHigh voltage engineering
High voltage engineering
Hari Kumar
 
Electricity transmission, generation and distribution
Electricity transmission, generation and distributionElectricity transmission, generation and distribution
Electricity transmission, generation and distribution
KuNal MeHta
 
Clinical laboratory basic
Clinical laboratory basicClinical laboratory basic
Clinical laboratory basicdoc30845
 

Viewers also liked (20)

Design, planning and layout of high voltage lab
Design, planning and layout of high voltage labDesign, planning and layout of high voltage lab
Design, planning and layout of high voltage lab
 
8 ee7 hve lab manual
8 ee7 hve lab manual8 ee7 hve lab manual
8 ee7 hve lab manual
 
High voltage presentation
High voltage presentationHigh voltage presentation
High voltage presentation
 
Laboratory Relayout Project
Laboratory Relayout ProjectLaboratory Relayout Project
Laboratory Relayout Project
 
Production & Inventory Management (PIM) Environment
Production & Inventory Management (PIM) EnvironmentProduction & Inventory Management (PIM) Environment
Production & Inventory Management (PIM) Environment
 
Boundary condition
Boundary conditionBoundary condition
Boundary condition
 
Chap6 laplaces and-poissons-equations
Chap6 laplaces and-poissons-equationsChap6 laplaces and-poissons-equations
Chap6 laplaces and-poissons-equations
 
Ppt
PptPpt
Ppt
 
Poisson’s and Laplace’s Equation
Poisson’s and Laplace’s EquationPoisson’s and Laplace’s Equation
Poisson’s and Laplace’s Equation
 
Healthcare facility design stat consultants
Healthcare facility design stat consultantsHealthcare facility design stat consultants
Healthcare facility design stat consultants
 
Streamer theory of breakdown
Streamer theory of breakdownStreamer theory of breakdown
Streamer theory of breakdown
 
Resistance potential divider
Resistance potential dividerResistance potential divider
Resistance potential divider
 
EE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of CablesEE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of Cables
 
Healthcare Design: Lessons Learned from the United States' First Hospital
Healthcare Design:  Lessons Learned from the United States' First HospitalHealthcare Design:  Lessons Learned from the United States' First Hospital
Healthcare Design: Lessons Learned from the United States' First Hospital
 
High Voltage
High VoltageHigh Voltage
High Voltage
 
Elect principles 2 voltage divider
Elect principles 2   voltage dividerElect principles 2   voltage divider
Elect principles 2 voltage divider
 
Unit 2 Laboratory Design P2 M2 D2
Unit 2 Laboratory Design P2 M2 D2Unit 2 Laboratory Design P2 M2 D2
Unit 2 Laboratory Design P2 M2 D2
 
High voltage engineering
High voltage engineeringHigh voltage engineering
High voltage engineering
 
Electricity transmission, generation and distribution
Electricity transmission, generation and distributionElectricity transmission, generation and distribution
Electricity transmission, generation and distribution
 
Clinical laboratory basic
Clinical laboratory basicClinical laboratory basic
Clinical laboratory basic
 

Similar to Design, Planning and Layout of high voltage laboratory

Design, planning and layout of
Design, planning and layout ofDesign, planning and layout of
Design, planning and layout of
Swaminathan P
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
Novia Putri
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
Asha Anu Kurian
 
High voltage technology & insulation testing
High voltage technology & insulation testingHigh voltage technology & insulation testing
High voltage technology & insulation testing
Zeeshan Akhtar
 
Cables22-1-19.pptx
Cables22-1-19.pptxCables22-1-19.pptx
Cables22-1-19.pptx
IAIvachan
 
Electrical Measurement Safety and Best Practices Webinar Presented by Fluke
Electrical Measurement Safety and Best Practices Webinar Presented by FlukeElectrical Measurement Safety and Best Practices Webinar Presented by Fluke
Electrical Measurement Safety and Best Practices Webinar Presented by Fluke
Transcat
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................
hiiarindam
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
Thien Phan Bản
 
Bil and insulation coordination ppt
Bil and insulation coordination pptBil and insulation coordination ppt
Bil and insulation coordination ppt
BILAL ALAM
 
Tools and Techniques for Commissioning and Maintaining PV Systems
Tools and Techniques for Commissioning and Maintaining PV SystemsTools and Techniques for Commissioning and Maintaining PV Systems
Tools and Techniques for Commissioning and Maintaining PV Systems
Transcat
 
Keeping turbines and workers safe with lightning diverters and electric meters
Keeping turbines and workers safe with lightning diverters and electric metersKeeping turbines and workers safe with lightning diverters and electric meters
Keeping turbines and workers safe with lightning diverters and electric meters
Windpower Engineering & Development
 
Mod5part1
Mod5part1Mod5part1
Mod5part1
Asha Anu Kurian
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
Living Online
 
electrical_measurement.ppt
electrical_measurement.pptelectrical_measurement.ppt
electrical_measurement.ppt
ssuser73fa22
 
CAT IV to I_Electrical Measurement Safety.ppt
CAT IV to I_Electrical Measurement Safety.pptCAT IV to I_Electrical Measurement Safety.ppt
CAT IV to I_Electrical Measurement Safety.ppt
ssuserc3b807
 
High Voltage Design and Installations Master Class
High Voltage Design and Installations Master ClassHigh Voltage Design and Installations Master Class
High Voltage Design and Installations Master Class
Living Online
 
Lv cable is_694
Lv cable is_694Lv cable is_694
Lv cable is_694
vjsudarshan
 
Lv cable is_694
Lv cable is_694Lv cable is_694
Lv cable is_694
vjsudarshan
 
1502957304lectrure_1 [Autosaved].pptx
1502957304lectrure_1 [Autosaved].pptx1502957304lectrure_1 [Autosaved].pptx
1502957304lectrure_1 [Autosaved].pptx
Tajmun1
 

Similar to Design, Planning and Layout of high voltage laboratory (20)

Design, planning and layout of
Design, planning and layout ofDesign, planning and layout of
Design, planning and layout of
 
BR-High-Power-Test-Lab-Brochure
BR-High-Power-Test-Lab-BrochureBR-High-Power-Test-Lab-Brochure
BR-High-Power-Test-Lab-Brochure
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
 
High voltage technology & insulation testing
High voltage technology & insulation testingHigh voltage technology & insulation testing
High voltage technology & insulation testing
 
Cables22-1-19.pptx
Cables22-1-19.pptxCables22-1-19.pptx
Cables22-1-19.pptx
 
Electrical Measurement Safety and Best Practices Webinar Presented by Fluke
Electrical Measurement Safety and Best Practices Webinar Presented by FlukeElectrical Measurement Safety and Best Practices Webinar Presented by Fluke
Electrical Measurement Safety and Best Practices Webinar Presented by Fluke
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
 
Bil and insulation coordination ppt
Bil and insulation coordination pptBil and insulation coordination ppt
Bil and insulation coordination ppt
 
Tools and Techniques for Commissioning and Maintaining PV Systems
Tools and Techniques for Commissioning and Maintaining PV SystemsTools and Techniques for Commissioning and Maintaining PV Systems
Tools and Techniques for Commissioning and Maintaining PV Systems
 
Keeping turbines and workers safe with lightning diverters and electric meters
Keeping turbines and workers safe with lightning diverters and electric metersKeeping turbines and workers safe with lightning diverters and electric meters
Keeping turbines and workers safe with lightning diverters and electric meters
 
Mod5part1
Mod5part1Mod5part1
Mod5part1
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
electrical_measurement.ppt
electrical_measurement.pptelectrical_measurement.ppt
electrical_measurement.ppt
 
CAT IV to I_Electrical Measurement Safety.ppt
CAT IV to I_Electrical Measurement Safety.pptCAT IV to I_Electrical Measurement Safety.ppt
CAT IV to I_Electrical Measurement Safety.ppt
 
High Voltage Design and Installations Master Class
High Voltage Design and Installations Master ClassHigh Voltage Design and Installations Master Class
High Voltage Design and Installations Master Class
 
Lv cable is_694
Lv cable is_694Lv cable is_694
Lv cable is_694
 
Lv cable is_694
Lv cable is_694Lv cable is_694
Lv cable is_694
 
1502957304lectrure_1 [Autosaved].pptx
1502957304lectrure_1 [Autosaved].pptx1502957304lectrure_1 [Autosaved].pptx
1502957304lectrure_1 [Autosaved].pptx
 

More from vishalgohel12195

Variable frequency drive and variable frequency control
Variable frequency drive and variable frequency controlVariable frequency drive and variable frequency control
Variable frequency drive and variable frequency control
vishalgohel12195
 
Self control of synchronous motor drives
Self control of synchronous motor drivesSelf control of synchronous motor drives
Self control of synchronous motor drives
vishalgohel12195
 
Owen’s bridge and measurement of increment inductance
Owen’s bridge and measurement of increment inductanceOwen’s bridge and measurement of increment inductance
Owen’s bridge and measurement of increment inductance
vishalgohel12195
 
Initial and final condition for circuit
Initial and final condition for circuitInitial and final condition for circuit
Initial and final condition for circuit
vishalgohel12195
 
FSK , FM DEMODULATOR & VOLTAGE REGULATOR ICS
FSK , FM DEMODULATOR & VOLTAGE REGULATOR ICS  FSK , FM DEMODULATOR & VOLTAGE REGULATOR ICS
FSK , FM DEMODULATOR & VOLTAGE REGULATOR ICS
vishalgohel12195
 
Differential equations of first order
Differential equations of first orderDifferential equations of first order
Differential equations of first order
vishalgohel12195
 
Cost for production including breaking analysis
Cost for production including breaking  analysisCost for production including breaking  analysis
Cost for production including breaking analysis
vishalgohel12195
 
Concept of general terms pertaining to rotating machines
Concept of general terms pertaining to rotating machinesConcept of general terms pertaining to rotating machines
Concept of general terms pertaining to rotating machines
vishalgohel12195
 
Transfer function and mathematical modeling
Transfer  function  and  mathematical  modelingTransfer  function  and  mathematical  modeling
Transfer function and mathematical modeling
vishalgohel12195
 
armature Winding
armature Windingarmature Winding
armature Winding
vishalgohel12195
 
Switching regulators
Switching regulatorsSwitching regulators
Switching regulators
vishalgohel12195
 
Sag in overhead transmission line, sag calculation & string chart
Sag in overhead transmission line, sag   calculation & string chartSag in overhead transmission line, sag   calculation & string chart
Sag in overhead transmission line, sag calculation & string chart
vishalgohel12195
 
Rectifier
RectifierRectifier
Rectifier
vishalgohel12195
 
Protection against overvoltage
Protection against overvoltageProtection against overvoltage
Protection against overvoltage
vishalgohel12195
 
Pantograph,catenary wire,smothing reactor
Pantograph,catenary wire,smothing reactorPantograph,catenary wire,smothing reactor
Pantograph,catenary wire,smothing reactor
vishalgohel12195
 
On load tap changer in a.c. locomotive transformer & air blast circuit b...
On load tap changer in a.c. locomotive transformer  & air blast circuit b...On load tap changer in a.c. locomotive transformer  & air blast circuit b...
On load tap changer in a.c. locomotive transformer & air blast circuit b...
vishalgohel12195
 
Logical instruction of 8085
Logical instruction of 8085Logical instruction of 8085
Logical instruction of 8085
vishalgohel12195
 
Effect of non sinusoidal waveform of a.c. machine performance
Effect of non sinusoidal waveform of a.c. machine performanceEffect of non sinusoidal waveform of a.c. machine performance
Effect of non sinusoidal waveform of a.c. machine performance
vishalgohel12195
 
Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...
vishalgohel12195
 
Design considerations of electrical installations
Design considerations of electrical installationsDesign considerations of electrical installations
Design considerations of electrical installations
vishalgohel12195
 

More from vishalgohel12195 (20)

Variable frequency drive and variable frequency control
Variable frequency drive and variable frequency controlVariable frequency drive and variable frequency control
Variable frequency drive and variable frequency control
 
Self control of synchronous motor drives
Self control of synchronous motor drivesSelf control of synchronous motor drives
Self control of synchronous motor drives
 
Owen’s bridge and measurement of increment inductance
Owen’s bridge and measurement of increment inductanceOwen’s bridge and measurement of increment inductance
Owen’s bridge and measurement of increment inductance
 
Initial and final condition for circuit
Initial and final condition for circuitInitial and final condition for circuit
Initial and final condition for circuit
 
FSK , FM DEMODULATOR & VOLTAGE REGULATOR ICS
FSK , FM DEMODULATOR & VOLTAGE REGULATOR ICS  FSK , FM DEMODULATOR & VOLTAGE REGULATOR ICS
FSK , FM DEMODULATOR & VOLTAGE REGULATOR ICS
 
Differential equations of first order
Differential equations of first orderDifferential equations of first order
Differential equations of first order
 
Cost for production including breaking analysis
Cost for production including breaking  analysisCost for production including breaking  analysis
Cost for production including breaking analysis
 
Concept of general terms pertaining to rotating machines
Concept of general terms pertaining to rotating machinesConcept of general terms pertaining to rotating machines
Concept of general terms pertaining to rotating machines
 
Transfer function and mathematical modeling
Transfer  function  and  mathematical  modelingTransfer  function  and  mathematical  modeling
Transfer function and mathematical modeling
 
armature Winding
armature Windingarmature Winding
armature Winding
 
Switching regulators
Switching regulatorsSwitching regulators
Switching regulators
 
Sag in overhead transmission line, sag calculation & string chart
Sag in overhead transmission line, sag   calculation & string chartSag in overhead transmission line, sag   calculation & string chart
Sag in overhead transmission line, sag calculation & string chart
 
Rectifier
RectifierRectifier
Rectifier
 
Protection against overvoltage
Protection against overvoltageProtection against overvoltage
Protection against overvoltage
 
Pantograph,catenary wire,smothing reactor
Pantograph,catenary wire,smothing reactorPantograph,catenary wire,smothing reactor
Pantograph,catenary wire,smothing reactor
 
On load tap changer in a.c. locomotive transformer & air blast circuit b...
On load tap changer in a.c. locomotive transformer  & air blast circuit b...On load tap changer in a.c. locomotive transformer  & air blast circuit b...
On load tap changer in a.c. locomotive transformer & air blast circuit b...
 
Logical instruction of 8085
Logical instruction of 8085Logical instruction of 8085
Logical instruction of 8085
 
Effect of non sinusoidal waveform of a.c. machine performance
Effect of non sinusoidal waveform of a.c. machine performanceEffect of non sinusoidal waveform of a.c. machine performance
Effect of non sinusoidal waveform of a.c. machine performance
 
Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...
 
Design considerations of electrical installations
Design considerations of electrical installationsDesign considerations of electrical installations
Design considerations of electrical installations
 

Recently uploaded

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 

Recently uploaded (20)

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 

Design, Planning and Layout of high voltage laboratory

  • 1. Presentation on Design, Planning and Layout of high voltage laboratory
  • 2. • Introduction • Test equipment provided in high voltage lab • Activity and study in high voltage lab • Classification of high voltage lab • Clearance of high voltage Lab • Layout of high voltage lab • Safety • Shielding of the high voltage lab CONTENT
  • 3. Introduction • In this industrial developing world the need of power is increasing exponentially thus to transfer high power at long distance is necessary. • So the transmission at h.v is possible which is up to 720 kv and 1000kv. • So extensively study is made on high voltage d.c. testing at 400 kv . • Thus to perform tests and research the lab providing high voltage is needed.
  • 4. • Transformers • Lighting arrester • Isolator and C.B • Different type of insulators • Cables • Capacitors • Line hardware and accessories • Other equipment like reactors Test equipment provided in high voltage lab
  • 5. Activities and studies in high voltage laboratory • Main is testing on equipment • Other than it is research • So research include i. Breakdown strength of different material like solid ,liquid and gas. ii.Electrical interference of transmission line. iii.High voltage power system’s insulation. iv.High current phenomena such as electrics arc and plasma physics.
  • 7. Medium size lab: an industrial lab
  • 9. Withstand Voltages, Test Voltages and the Rating of Equipment in High Voltage Lab • Generally up to 230 KV design it does not pose any problem but above 400 KV it is to be handle with care. • For research and development work, the voltage levels needed are usually about 1.3 times the maximum test voltage needed. Hence, the laboratories intended for different system voltages should have the test voltages
  • 10.
  • 11. Size and Dimensions of the Equipment In High Voltage lab • Mainly two type of lab: 1. indoor type & 2.outdoor type • indoor type has the advantage of 1. protection of testing equipment against variable weather conditions, 2. simplicity in design and control of the test equipment, 3. provision of observation facilities during testing. • outdoor laboratories have the advantage of 1. less cost due to the absence of building cost and 2. the planned facility 3. layout cost • But it has disadvantages 1. absence of lifting and supporting facilities, 2.reproducibility of results not being guaranteed due to uncontrolled atmospheric conditions, and 3.artificial and wet test studies which are difficult due to wind variation, etc.
  • 12. • When high voltage laboratories are planned as indoor laboratories, the following figures fix the dimensions of the laboratories: 1. Size of the test equipment for a.c., d.c., or impulse generators. 2. Distances or clearances between the test object and ground during test conditions and also between all the high voltage terminals and earthed or grounded surroundings such as walls, roofs of buildings, and other test equipment not energized.
  • 13. Clearance of HV Lab a) For power frequency test b) Lightning impulse clearance c) D.C. Generator clearance
  • 14. a) For power frequency test • The 50% flashover voltage is expressed as, • V50%=652 × d0.576 where, d –air-gap distance, • For example, 1)For 1000 kV(rms) – d=3.835 m 2)For 1500 kV - d=7.754 m 3)For 2000 kV d=12.8 m
  • 15. b) Lightning impulse clearance • Generally a clearance of 2 meters for each 1000 kV is necessary for lightning impulse generator. Impulse flashover voltage is given by, • V50= 500 × d for a rod plane gap. • The withstand voltage can be assumed to be 80% of V50. • It means, 2 meters gap will withstand 800kV(peak). • For d.c. generators, a clearance of 4 meters for every 1000kV is recommended. c) D.C. Generator clearance
  • 16. Layout of high voltage lab • Laboratory arrangements differ very much from a single equipment to multiple d.c., a.c., & impulse arrangements in different testing program. • It is based on type of equipment to be tested, available space, other accessories needed for the tests…… • EARTHING, SAFETY and CONTROL GEAR is foremost consideration ……
  • 18. Shielding of the high voltage lab • Safety is one of the most important requirements in a high voltage lab , • Proper operation of the high voltage lab include the presence of qualified personnel, • The use of systematic procedures, safety ropes, signs, visual and audible warning & alarms, the use of grounding rods, the periodic review of safety rules, the availability of fire extinguishers, emergency phone numbers, first aid kit, and smoke alarm system. • The walls, two supporting pillars and ceiling of the HV Lab require shielding with a system of interconnected modular steel sheet elements mounted on wood framework. Safety