1. SCOPE
Covered:
• Unarmoured PVC insulated cables with copper or
aluminium conductors and flexible cords with copper
conductors for electric power and lighting for voltages
up to and including 1100 V.
• Applicable for cables where the combination of
ambient temperature and temperature rise due to load
results in a continuous conductor temperature not
exceeding 70ºC.
1. SCOPE
Not Covered:
• Telephone cables
• PVC data transmission cables
• Instrumentation cables
• PVC insulated screened communication cables
(braid/wires/tapes)
• Flexible power cord other than PVC insulated.
2. CONSTRUCTION
3. TESTS
Type Tests
• Tests required to be made before supply on a general
commercial basis on a type of cable in order to
demonstrate satisfactory performance characteristics
to meet the intended application.
• Type tests need not be repeated unless changes are
made in the cable materials or design which might
change the performance characteristics.
Acceptance Tests
• Tests carried out on samples taken from a lot for the
purpose of acceptance of the lot.
3. TESTS
Routine Tests
• Tests made by manufacturer on all finished cable
lengths to demonstrate the integrity of the cable.
a) Conductor resistance test, and
b) High voltage test.
Optional Tests
• Special tests to be carried out when required by
agreement between the purchaser and the supplier.
3. TESTS
3. TESTS
3. TESTS
The following shall constitute acceptance tests:
• Annealing test (for copper),
• Tensile test (for aluminium),
• Wrapping test (for aluminium),
• Conductor resistance test,
• Test for thickness of insulation and sheath,
• Tensile strength and elongation at break of insulation
and sheath,
• Insulation resistance test,
• High voltage test, and
• Flammability test.
3. TESTS
3. TESTS
3. TESTS
Note:
Unless otherwise stated, the tests shall be carried out in
accordance with appropriate part of IS 10810, taking into
account the additional information given in this standard.
1. High Voltage Test (Water ImmersionTest)
(Type Test)
• ac test
• dc test
2. High Voltage Test (at Room Temperature)
(Acceptance and Routine Test)
3. TESTS
3. Spark Test
3. TESTS
4. Flammability Test:
• The period of burning after removal of flame shall not
exceed 60 seconds and the unaffected (uncharred)
portion from the lower edge of the top clamp shall be
at least 50 mm.
5. Oxygen Index Test:
• The test on samples of insulation/sheath (as
applicable) shall be done at 27 ± 2°C. The oxygen
index shall not be less than 29.
6. Test for Halogen Acid Gas Evolution
• The level of HCl evolved shall not exceed 20 percent
by weight.
3. TESTS
7. Test for Temperature Index
• The measured value of Temperature Index shall be 21
at a temperature of 250°C.
8. Measurement of Smoke Density Rating
9. Flexing Test
10. Additional Ageing Test (For Cables for Outdoor
Use)
3. TESTS
Ageing Test (For Cables for Outdoor Use)
Ageing of Sample
• A sample of at least 6 m long, of the finished cable
shall be suspended in a heating chamber and exposed
to a temperature of 80±2ºC during a period of 168
hours.
• Immediately after this, the sample shall be placed in a
bath of boiling water for a period of 8 hours and in a
water-bath at 25ºC for 16 hours.
• This procedure shall be repeated on 5 successive
days.
• The ends of the sample shall protrude at least 200 mm
above the water level.
3. TESTS
Testing and Evaluation
• A sample, 5 m long, taken from the conditioned
sample shall be tested for high voltage test in
accordance with High Voltage Test (at Room
Temperature).
• The remaining conditioned sample shall be submitted
to cold bend cold impact test as appropriate.
ADDITIONAL POINTS TO BE
NOTED
• For cables for outdoor use, the cables shall meet the
requirements of additional ageing test ( see 15.4 ).
• The cables intended for low-temperature conditions
shall meet the requirements of cold bend or cold
impact test whichever is applicable ( see 15.4 ).
• These cables may be used on dc systems for rated
voltages up to and including 1 500 V.
Lv cable is_694

More Related Content

What's hot

Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
Shanid Pazhamkavil
 
Carburizing
CarburizingCarburizing
Carburizing
Muhammad Zeeshan
 
Heat treatment part 2
Heat treatment part 2Heat treatment part 2
Heat treatment part 2
Naman Dave
 
Heat treatment 2
Heat treatment 2Heat treatment 2
Heat treatment 2
senthamarai kannan
 
Testing/Manufacture/Rubber & plastic testing equipments
Testing/Manufacture/Rubber & plastic testing equipmentsTesting/Manufacture/Rubber & plastic testing equipments
Testing/Manufacture/Rubber & plastic testing equipments
fec2020
 
Nitriding and carbonitriding copy
Nitriding and carbonitriding   copyNitriding and carbonitriding   copy
Nitriding and carbonitriding copy
BASIT ALI KHAN
 
Mechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile partsMechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile parts
Mihir Patel
 
Case hardening
Case hardeningCase hardening
Case hardening
shashi jaiswal
 
Carbonitriding
CarbonitridingCarbonitriding
Carbonitriding
jaimin kemkar
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
Rami Al-Majzoub
 
EM-Unit-IV- Case hardening
EM-Unit-IV- Case hardeningEM-Unit-IV- Case hardening
EM-Unit-IV- Case hardening
Mohanumar S
 
Bogie hearth furnance
Bogie hearth furnanceBogie hearth furnance
Bogie hearth furnance
Abdul Rahman
 
Flame Spray Company Profile 2016
Flame Spray Company Profile 2016Flame Spray Company Profile 2016
Flame Spray Company Profile 2016
Andrea Chierichetti
 
Heat treatment of steels- II
Heat treatment of steels- IIHeat treatment of steels- II
Heat treatment of steels- II
Nishant Khatod
 

What's hot (14)

Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
 
Carburizing
CarburizingCarburizing
Carburizing
 
Heat treatment part 2
Heat treatment part 2Heat treatment part 2
Heat treatment part 2
 
Heat treatment 2
Heat treatment 2Heat treatment 2
Heat treatment 2
 
Testing/Manufacture/Rubber & plastic testing equipments
Testing/Manufacture/Rubber & plastic testing equipmentsTesting/Manufacture/Rubber & plastic testing equipments
Testing/Manufacture/Rubber & plastic testing equipments
 
Nitriding and carbonitriding copy
Nitriding and carbonitriding   copyNitriding and carbonitriding   copy
Nitriding and carbonitriding copy
 
Mechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile partsMechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile parts
 
Case hardening
Case hardeningCase hardening
Case hardening
 
Carbonitriding
CarbonitridingCarbonitriding
Carbonitriding
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
 
EM-Unit-IV- Case hardening
EM-Unit-IV- Case hardeningEM-Unit-IV- Case hardening
EM-Unit-IV- Case hardening
 
Bogie hearth furnance
Bogie hearth furnanceBogie hearth furnance
Bogie hearth furnance
 
Flame Spray Company Profile 2016
Flame Spray Company Profile 2016Flame Spray Company Profile 2016
Flame Spray Company Profile 2016
 
Heat treatment of steels- II
Heat treatment of steels- IIHeat treatment of steels- II
Heat treatment of steels- II
 

Viewers also liked

DGM_finalPresentation
DGM_finalPresentationDGM_finalPresentation
DGM_finalPresentation
Chansai Tolbert
 
Informatica y convergencia tegnologica
Informatica y convergencia tegnologicaInformatica y convergencia tegnologica
Informatica y convergencia tegnologica
aura123y
 
Slumber Pm Review
Slumber Pm ReviewSlumber Pm Review
Slumber Pm Review
Slumber PM
 
Lv cable is_694
Lv cable is_694Lv cable is_694
Lv cable is_694
vjsudarshan
 
Derechos de autor
Derechos de  autorDerechos de  autor
Derechos de autor
camila leal murillo
 
The Visual Essay
The Visual Essay The Visual Essay
The Visual Essay
Maricela Diaz
 
Slidesharecamila
SlidesharecamilaSlidesharecamila
Slidesharecamila
Camila Tovar
 
MOHAMAD ZAYED
MOHAMAD ZAYEDMOHAMAD ZAYED
MOHAMAD ZAYED
mohamadu Umaru
 
Whatcolombia 160905010357
Whatcolombia 160905010357Whatcolombia 160905010357
Whatcolombia 160905010357
Marjorie Lamus
 
Increasing Global Competence
Increasing Global CompetenceIncreasing Global Competence
Increasing Global Competence
Tracie Kirven
 
Ch 20 2 Electric Current And Ohm’S Law
Ch 20 2 Electric Current And Ohm’S LawCh 20 2 Electric Current And Ohm’S Law
Ch 20 2 Electric Current And Ohm’S Law
robtownsend
 
Creating an Interactive Content Strategy that Works with Technology
Creating an Interactive Content Strategy that Works with TechnologyCreating an Interactive Content Strategy that Works with Technology
Creating an Interactive Content Strategy that Works with Technology
ion interactive
 
American Comm Centers Brochure 2
American Comm Centers Brochure 2American Comm Centers Brochure 2
American Comm Centers Brochure 2
Steve Moeller
 

Viewers also liked (13)

DGM_finalPresentation
DGM_finalPresentationDGM_finalPresentation
DGM_finalPresentation
 
Informatica y convergencia tegnologica
Informatica y convergencia tegnologicaInformatica y convergencia tegnologica
Informatica y convergencia tegnologica
 
Slumber Pm Review
Slumber Pm ReviewSlumber Pm Review
Slumber Pm Review
 
Lv cable is_694
Lv cable is_694Lv cable is_694
Lv cable is_694
 
Derechos de autor
Derechos de  autorDerechos de  autor
Derechos de autor
 
The Visual Essay
The Visual Essay The Visual Essay
The Visual Essay
 
Slidesharecamila
SlidesharecamilaSlidesharecamila
Slidesharecamila
 
MOHAMAD ZAYED
MOHAMAD ZAYEDMOHAMAD ZAYED
MOHAMAD ZAYED
 
Whatcolombia 160905010357
Whatcolombia 160905010357Whatcolombia 160905010357
Whatcolombia 160905010357
 
Increasing Global Competence
Increasing Global CompetenceIncreasing Global Competence
Increasing Global Competence
 
Ch 20 2 Electric Current And Ohm’S Law
Ch 20 2 Electric Current And Ohm’S LawCh 20 2 Electric Current And Ohm’S Law
Ch 20 2 Electric Current And Ohm’S Law
 
Creating an Interactive Content Strategy that Works with Technology
Creating an Interactive Content Strategy that Works with TechnologyCreating an Interactive Content Strategy that Works with Technology
Creating an Interactive Content Strategy that Works with Technology
 
American Comm Centers Brochure 2
American Comm Centers Brochure 2American Comm Centers Brochure 2
American Comm Centers Brochure 2
 

Similar to Lv cable is_694

Cables22-1-19.pptx
Cables22-1-19.pptxCables22-1-19.pptx
Cables22-1-19.pptx
IAIvachan
 
2013 design for compliance
2013   design for compliance2013   design for compliance
2013 design for compliance
Energy Assurance LLC
 
Development and testing of ipc
Development and testing of ipcDevelopment and testing of ipc
Development and testing of ipc
Harish Agarwal
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
Novia Putri
 
Marine and Offshore Cables - Noskab Catalogue
Marine and Offshore Cables - Noskab CatalogueMarine and Offshore Cables - Noskab Catalogue
Marine and Offshore Cables - Noskab Catalogue
Thorne & Derrick International
 
PPT on Mdpe inspection.pptx
PPT on Mdpe inspection.pptxPPT on Mdpe inspection.pptx
PPT on Mdpe inspection.pptx
Himanshu Shukla
 
A presentation on reinforcement detailing in the manufacturing process
A presentation on reinforcement detailing in the manufacturing processA presentation on reinforcement detailing in the manufacturing process
A presentation on reinforcement detailing in the manufacturing process
RohanDas52
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
Asha Anu Kurian
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
Shubham Kulshreshtha
 
pdfslide.net_iec-61439pptx.pptx
pdfslide.net_iec-61439pptx.pptxpdfslide.net_iec-61439pptx.pptx
pdfslide.net_iec-61439pptx.pptx
jiguparmar
 
Traction distribution
Traction distribution Traction distribution
Traction distribution
Amit Kumar
 
Quality control (training course)
Quality control (training course)Quality control (training course)
Quality control (training course)
fikireyesus
 
Quality control (training course)
Quality control (training course)Quality control (training course)
Quality control (training course)
fikireyesus
 
Design, planning and layout of high voltage lab
Design, planning and layout of high voltage labDesign, planning and layout of high voltage lab
Design, planning and layout of high voltage lab
Nidhi Maru
 
Megger regidez dielectrica oil test- OTS seminar
Megger   regidez dielectrica oil test- OTS seminarMegger   regidez dielectrica oil test- OTS seminar
Megger regidez dielectrica oil test- OTS seminar
Cesar Enrique Gutierrez Candia
 
Corrosion Testing Metthods of universsaldfnkasf
Corrosion Testing Metthods of universsaldfnkasfCorrosion Testing Metthods of universsaldfnkasf
Corrosion Testing Metthods of universsaldfnkasf
sivathangaiah1
 
Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory
vishalgohel12195
 
Heatfast HF2260 Heat Tracing Cable - Spec Sheet
Heatfast HF2260 Heat Tracing Cable - Spec SheetHeatfast HF2260 Heat Tracing Cable - Spec Sheet
Heatfast HF2260 Heat Tracing Cable - Spec Sheet
Thorne & Derrick UK
 
BR-High-Power-Test-Lab-Brochure
BR-High-Power-Test-Lab-BrochureBR-High-Power-Test-Lab-Brochure
BR-High-Power-Test-Lab-Brochure
John Rodrigues (Work)
 
Fire Rated and Special Application Enclosures for Hazardous Areas
Fire Rated and Special Application Enclosures for Hazardous AreasFire Rated and Special Application Enclosures for Hazardous Areas
Fire Rated and Special Application Enclosures for Hazardous Areas
Abtech Ltd
 

Similar to Lv cable is_694 (20)

Cables22-1-19.pptx
Cables22-1-19.pptxCables22-1-19.pptx
Cables22-1-19.pptx
 
2013 design for compliance
2013   design for compliance2013   design for compliance
2013 design for compliance
 
Development and testing of ipc
Development and testing of ipcDevelopment and testing of ipc
Development and testing of ipc
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
Marine and Offshore Cables - Noskab Catalogue
Marine and Offshore Cables - Noskab CatalogueMarine and Offshore Cables - Noskab Catalogue
Marine and Offshore Cables - Noskab Catalogue
 
PPT on Mdpe inspection.pptx
PPT on Mdpe inspection.pptxPPT on Mdpe inspection.pptx
PPT on Mdpe inspection.pptx
 
A presentation on reinforcement detailing in the manufacturing process
A presentation on reinforcement detailing in the manufacturing processA presentation on reinforcement detailing in the manufacturing process
A presentation on reinforcement detailing in the manufacturing process
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
 
pdfslide.net_iec-61439pptx.pptx
pdfslide.net_iec-61439pptx.pptxpdfslide.net_iec-61439pptx.pptx
pdfslide.net_iec-61439pptx.pptx
 
Traction distribution
Traction distribution Traction distribution
Traction distribution
 
Quality control (training course)
Quality control (training course)Quality control (training course)
Quality control (training course)
 
Quality control (training course)
Quality control (training course)Quality control (training course)
Quality control (training course)
 
Design, planning and layout of high voltage lab
Design, planning and layout of high voltage labDesign, planning and layout of high voltage lab
Design, planning and layout of high voltage lab
 
Megger regidez dielectrica oil test- OTS seminar
Megger   regidez dielectrica oil test- OTS seminarMegger   regidez dielectrica oil test- OTS seminar
Megger regidez dielectrica oil test- OTS seminar
 
Corrosion Testing Metthods of universsaldfnkasf
Corrosion Testing Metthods of universsaldfnkasfCorrosion Testing Metthods of universsaldfnkasf
Corrosion Testing Metthods of universsaldfnkasf
 
Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory
 
Heatfast HF2260 Heat Tracing Cable - Spec Sheet
Heatfast HF2260 Heat Tracing Cable - Spec SheetHeatfast HF2260 Heat Tracing Cable - Spec Sheet
Heatfast HF2260 Heat Tracing Cable - Spec Sheet
 
BR-High-Power-Test-Lab-Brochure
BR-High-Power-Test-Lab-BrochureBR-High-Power-Test-Lab-Brochure
BR-High-Power-Test-Lab-Brochure
 
Fire Rated and Special Application Enclosures for Hazardous Areas
Fire Rated and Special Application Enclosures for Hazardous AreasFire Rated and Special Application Enclosures for Hazardous Areas
Fire Rated and Special Application Enclosures for Hazardous Areas
 

Recently uploaded

一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
CVCSOfficial
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
Kamal Acharya
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 

Recently uploaded (20)

一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 

Lv cable is_694

  • 1. PVC INSULATED CABLES FOR WORKING VOLTAGES UP TO AND INCLUDING 1 100 VOLTS — AS PER IS 694
  • 2. 1. SCOPE Covered: • Unarmoured PVC insulated cables with copper or aluminium conductors and flexible cords with copper conductors for electric power and lighting for voltages up to and including 1100 V. • Applicable for cables where the combination of ambient temperature and temperature rise due to load results in a continuous conductor temperature not exceeding 70ºC.
  • 3. 1. SCOPE Not Covered: • Telephone cables • PVC data transmission cables • Instrumentation cables • PVC insulated screened communication cables (braid/wires/tapes) • Flexible power cord other than PVC insulated.
  • 5. 3. TESTS Type Tests • Tests required to be made before supply on a general commercial basis on a type of cable in order to demonstrate satisfactory performance characteristics to meet the intended application. • Type tests need not be repeated unless changes are made in the cable materials or design which might change the performance characteristics. Acceptance Tests • Tests carried out on samples taken from a lot for the purpose of acceptance of the lot.
  • 6. 3. TESTS Routine Tests • Tests made by manufacturer on all finished cable lengths to demonstrate the integrity of the cable. a) Conductor resistance test, and b) High voltage test. Optional Tests • Special tests to be carried out when required by agreement between the purchaser and the supplier.
  • 9. 3. TESTS The following shall constitute acceptance tests: • Annealing test (for copper), • Tensile test (for aluminium), • Wrapping test (for aluminium), • Conductor resistance test, • Test for thickness of insulation and sheath, • Tensile strength and elongation at break of insulation and sheath, • Insulation resistance test, • High voltage test, and • Flammability test.
  • 12. 3. TESTS Note: Unless otherwise stated, the tests shall be carried out in accordance with appropriate part of IS 10810, taking into account the additional information given in this standard. 1. High Voltage Test (Water ImmersionTest) (Type Test) • ac test • dc test 2. High Voltage Test (at Room Temperature) (Acceptance and Routine Test)
  • 14. 3. TESTS 4. Flammability Test: • The period of burning after removal of flame shall not exceed 60 seconds and the unaffected (uncharred) portion from the lower edge of the top clamp shall be at least 50 mm. 5. Oxygen Index Test: • The test on samples of insulation/sheath (as applicable) shall be done at 27 ± 2°C. The oxygen index shall not be less than 29. 6. Test for Halogen Acid Gas Evolution • The level of HCl evolved shall not exceed 20 percent by weight.
  • 15. 3. TESTS 7. Test for Temperature Index • The measured value of Temperature Index shall be 21 at a temperature of 250°C. 8. Measurement of Smoke Density Rating 9. Flexing Test 10. Additional Ageing Test (For Cables for Outdoor Use)
  • 16. 3. TESTS Ageing Test (For Cables for Outdoor Use) Ageing of Sample • A sample of at least 6 m long, of the finished cable shall be suspended in a heating chamber and exposed to a temperature of 80±2ºC during a period of 168 hours. • Immediately after this, the sample shall be placed in a bath of boiling water for a period of 8 hours and in a water-bath at 25ºC for 16 hours. • This procedure shall be repeated on 5 successive days. • The ends of the sample shall protrude at least 200 mm above the water level.
  • 17. 3. TESTS Testing and Evaluation • A sample, 5 m long, taken from the conditioned sample shall be tested for high voltage test in accordance with High Voltage Test (at Room Temperature). • The remaining conditioned sample shall be submitted to cold bend cold impact test as appropriate.
  • 18. ADDITIONAL POINTS TO BE NOTED • For cables for outdoor use, the cables shall meet the requirements of additional ageing test ( see 15.4 ). • The cables intended for low-temperature conditions shall meet the requirements of cold bend or cold impact test whichever is applicable ( see 15.4 ). • These cables may be used on dc systems for rated voltages up to and including 1 500 V.