Personal Information
Organization / Workplace
Pakistan Pakistan
Occupation
Electrical Engineer
Industry
Electronics / Computer Hardware
About
•Initiate & execute plans for the reactive and routine preventive maintenance activities to ensure the Uninterrupted Plant and Machinery operations.
•Perform system calculations and studies for electrical power systems – load flow, voltage drop, motor starting, short circuit studies, and relay coordination studies.
•Handle the tasks of modifying, repair/replace Electrical and Electronic systems and updating drawings Including;
o Electrical Single Line Diagram
o Earth Pits Measurements
o Switch-gears, HT/LT Panel, Transformer over-hauling and Oil dehydration
o Power factor & GENSET Units
o Contactors, Relay Logic, Motors, Phase Reverse Protection, EOCR, Surge suppressors and
o S...
Presentations
(7)Likes
(4)Microgrid.iet
SankaraVinayagam
•
10 years ago
Micro grid
Abhishek Kumar
•
8 years ago
Micro-Grid in India
sanjeevirny
•
10 years ago
Pak china relation s.....
fatma345
•
8 years ago
Personal Information
Organization / Workplace
Pakistan Pakistan
Occupation
Electrical Engineer
Industry
Electronics / Computer Hardware
About
•Initiate & execute plans for the reactive and routine preventive maintenance activities to ensure the Uninterrupted Plant and Machinery operations.
•Perform system calculations and studies for electrical power systems – load flow, voltage drop, motor starting, short circuit studies, and relay coordination studies.
•Handle the tasks of modifying, repair/replace Electrical and Electronic systems and updating drawings Including;
o Electrical Single Line Diagram
o Earth Pits Measurements
o Switch-gears, HT/LT Panel, Transformer over-hauling and Oil dehydration
o Power factor & GENSET Units
o Contactors, Relay Logic, Motors, Phase Reverse Protection, EOCR, Surge suppressors and
o S...