International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 11 | Nov -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1144
Comparative Studies of Construction Techniques
(Conventional vs Mivan)
Vasav R. Rakholia1, Srinil H. Soni2
1,2 P.G Student Dept. of Civil Engineering MIT Art Design and Technology, Loni, Pune, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Formwork, whichholdsandsupportswetcement
till such time it cures, is an exceptionally key component in
concrete construction. With the globalization of Indian
economy and presentation of multinationals in India for the
development and countries pride program of golden
quadrilateral, it has turned out to be chief to have fast
development and opportune finishing of projects. Now a days
current formwork system for superstructure developmentare
ordinarily received. Formwork system influences on the cost,
time, and nature of project delivery. Yet at thesametimethese
formwork frameworks are very little utilized as a partofIndia
and the majority of the temporary workers don't prefer to
move to the most recent innovation as they have the
uncertainty of confronting misfortunes intheundertaking and
they are especially comfortable with the current formwork
sort, the ordinary sort. Mivan is new development innovation
up and coming for fruitful finish of mass lodging venture in
India. In the meantime they trust that these formwork
frameworks are bit costly. This papermeansto lookatbenefits
and faults by utilizing an ordinary timber formwork system
and current formwork system like Mivan. The examinations
incorporate costs, time, and nature of these frameworks. For
better comprehension of this subject, diverse development
destinations are contemplated where most propel methods in
formwork are utilized and the information gathered from
these locales is exhibited keeping in mind the end goal to give
examination between present day Mivan formwork and
conventional formwork framework.
Key Words: Formwork, Mivan, Conventional,
Comparison, Requirement
1. INTRODUCTION
This Indian development industry has begun utilizing a
portion of the world class advancements. A few formwork
systems are being used at better places on the planet; in the
end the systems which are sensibly efficient and simple for
operation with talented work are more valuable in India.
Formwork system has critical part in the development
procedure, settling on the correct choice by picking the
suitable formwork systemcouldpromptreactiontopractical
development. Distinctive systems have their own particular
points of interest however one needs to pick a formwork
which best backings singular task prerequisite. The
progression of innovation, increment of populace and
constrained spaces lead the best approachtodevelopthe tall
building structures. Developing the skyscraper was not a
simple assignment at first butrather now withtheassistance
of the advanced innovationandmachinesithasturnedoutto
be very simple.
Lack/non-accessibility skilled and semi-skilled
workers brings about issues of cost and time over-runs,sub-
par development, poor completions spillages, consumption
of structures and so forth this can be escaped by receiving
present day formwork frameworks. This additionally
maintains a strategic distance from repairs and restoration
of structures before its normal life expectancy.
2. CONVENTIONAL FORMWORK
This more often than not comprises of standard framed
panels tied together over their backs with even individuals
called waling. The waling is furnished with the essential
capacity of opposing the flat power of wet concrete. One side
of the wall formwork is first amassed guaranteeing that it is
accuratelyadjusted, plumbed and strutted. Thesteelsupport
confine is then setand situatedbeforetheoppositesideofthe
formwork is raised and settled. Plywood sheet in mix with
timber is the most well-known material utilized for wall
formwork. The standard technique is to make upwallshapes
as framed panels with the plywood confronting sheet
screwed on to studs on a timber outline. This takes into
consideration the plywood to be effortlessly evacuated and
turned around and utilized on the two sides in order to build
the quantity of reuses. The wall forms are powerless to edge
and corner harm and should be precisely taken care of.
Uncommon consideration must be given to comers and
connected wharfs since the expanded weights connected by
wet cement could make the projections open up, offering
ascend to unsatisfactory grout escapeand apoorcompleteto
the cast divider. The cycle time for one floor with the use of
conventional formwork is minimum 3-4 weeks. Also the
block or Brick work and plastering is needed in order to get
the finished surface. This takes more timeandskilledlabours
too. This ultimately increases the time required for the
completion of the project.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 11 | Nov -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1145
3. REQUIREMENT FOR MODERN FORMWORK
SYSTEMS
The most punctual formwork systems made utilization of
wooden scantlings and timber sprinters as it empowered
simple shaping and making at site. Be that as it may, these
wooden scantlings and timber sprinters have a tendency to
lose their auxiliary and dimensional properties overaperiod
time and after rehashed utilization consequently posturing
security issues. A large number of the mischances happen in
Reinforced Cement Concrete (RCC) development in light of
sub-par formwork and scaffolding. Now center must be
moved to other key factor "Formwork", to confront the
difficulties for the consummation of quick track ventures. By
going in forsystemformwork,considerablereservefundsare
conceivable by quicker profit for speculations.
4. MIVAN TECHNOLOGY
MIVAN TECHNOLOGY is analuminum formwork innovation.
MIVAN framework is formwork development, cast – in – situ
solid divider and floor chunks cast solid gives the auxiliary
framework in one nonstop pour. Expansive room estimated
shapes for dividers and floors sections are raised at site.
These structures are made solid and durable, manufactured
with exactness and simple to deal with. They bear the cost of
expansive number of redundancies(around250).Thesolidis
created in RMC clumping plants under strict quality control
and pass on it to site with travel blenders. Formwork
frameworks forstructuresaredelegatedeitherflatorvertical
formwork. Level formwork frameworks are those used to
shape the flat solid work (pieces or rooftops), while vertical
formwork frameworks are those used to frame the vertical
supporting components of the structure, e.g., segments,
center dividers, and shear dividers. Because of the fine
resistances accomplished in the machined metal formwork
parts, predictable solid shapes and complete are gotten floor
after floor, a great many buildings, affirming to the most
demanding gauges of value and precision. This enables
plumbing and electrical fittings to be pre-assembledwiththe
specific information that there will be a correct fit when
gathered. The dimensional exactness at the cemented work
likewise brings about reliable fittings of entryways and
windows. The arrangement of Aluminum frames has been
utilized broadly in the developmentofprivateunitsandmass
lodging ventures. It is quick, basic, versatile and cost –
compelling. It produces add up to quality work which
requires least upkeep and when sturdiness is the prime
thought. This framework is most reasonable for Indian
condition as a tailor– made aluminumformworkforcast–in–
situ completely solid structure.
4.1 Comparison of Mivan formwork system with
Conventional Construction
Table -1
Factors Conventional System Mivan Formwork
System
Speed of
developm
ent
The speed of development
is much slower because of
well-ordered fruition of
various phases of the
exercises, for example,
erection of formwork,
cementing and de-
covering and from there
on putting and other
completing exercises.
In this framework the
divider and the floors are
threw all the while in one
nonstop operation and
furthermore the
completing work can be
begun instantly, so the
speed of thedevelopment
is considerably speedier.
Quality Because of traditional
strategy for development
ordinary quality is
obtained.
Superior quality is
acquired due to in-situ
throwing of entire
structure and transverse
dividers done in constant
operation.
Aesthetics On account of ordinary
development the partition
walls are comprised of
blocks because of which
the column and the beam
indicate unattractive
projections in room
interiors.
If there should arise an
occurrence of Mivan
framework the wall and
the roof components are
casted together because
of which the insides have
flawless and clean lines
without unattractive
projections in different
corners. The wall and the
roofs likewise have a
smooth even surface.
External
finishes
All the outer walls are
comprised of blocks, so it
requires manual bond
putting which should be
repainted as often as
possible.
All the outside walls are
comprised of concrete
and don't require manual
cement putting and
furthermorehavesmooth
completing, so this will
require no regular
repainting.
Maintena
nce
The maintenance cost is
too high as it requires visit
repairs of mortars of wall
and roofs, painting of
external andinternalwalls
because of leakages.
The maintenance cost is
negligible as the walls
and roof is comprised of
excellent concrete which
don't require visit
repairs.
Proficienc
y and cost
saving
 Skilled workers are
required on the site
as the structure isn't
solid and it ought to
be in appropriate
measurement.
 Theformworkboards
are not light in
weight.
 Less talented works
are required on the
site as all the
completing things
are pre-assembled.
 The formwork
boards are light in
weight and can be
lifted physically, so
there is no need of
burning through
cash for substantial
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 11 | Nov -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1146
cranes for lifting.
 There is no
prerequisite of
works for building
block dividers and
putting as real piece
of the structure is
thrown in concrete
by little gathering of
specialists.
4.2 The following arethelimitationsofusingMivan
formwork System
1. Modifications are costly as all members are cast in
RCC.
2. Concealed services become difficult due to small
thickness of the components.
3. The aluminium formworks are far more expensive
than the conventional formwork.
4. It requires uniform planning as well as uniform
elevations to be cost effective.
5. The formwork can be cost effective only if it is used
in symmetrical type of structure.
4.3 Comparison
Table -2
Sr.
No.
Characteristics MIVAN System Conventional
Formwork
System
1 Speed of
development
7 days cycle per
floor.
Min. process
duration is of 21
days.
2 Quality of surface
finish
Excellent.Putting
is not required
Bad.
Putting is
required
3 Pre-planning of
formwork system
Required Not required
4 Type of
construction
Cast-in-situ
Cellular
construction
Simple RCC
encircled
development
5 Wastage of
formwork
material
Very less In incredible
sum.
6 Accuracy in
construction
Accurate
construction
Accuracy is Less
than Modern
Systems
7 Coordination
between various
offices
Essential Not essentially
required
8 Resistance to
earthquake
Good resistance Less than
ModernSystems
9 Removing of floor
piece frames
without expelling
props
Possible Not possible
10 Need of any
timber orplywood
Not required These are the
main
components
11 Re-use estimation
of formwork
150 – 200 Maximum 50
12 Stacking of
materials
Hard Easy
13 Initial investment
in the system
High Less
14 Economy in
development
Economical for
mass housing
Economical on
small scale
3. CONCLUSIONS
It can be concluded that the modern methodsofconstruction
such as 'Mivan formwork system' are the key to meeting the
demand for efficient, sustainable housing. Also the quality
and speed must be given due consideration with regards to
economy. Mivan formwork system not only helps in
improving the quality and efficiency of the work butalso has
helped in maintaining the site safety. Traditional formwork
for concrete construction normally consisted of bespoke
solutions requiring skilled craftsmen. Thistypeofformwork
often had poor safety features and gave slow rates of
construction on-site and huge levels of waste – inefficient
and unsustainable. Modern formwork systems, which are
mostly modular, designed for speed and efficiency. They are
engineered to provide increased accuracy and minimize
waste in construction and most have enhanced health and
safety features built-in. By using MIVAN system we can
achieve cost reduction in less time. By reducing cycle time
than conventional method overall financial cost saving can
be achieved.
ACKNOWLEDGEMENT
We would like to acknowledge and thank the companies,
Marathon Realty Pvt Ltd and Nyati Builders Pvt Ltd for
sharing and providing us with all the necessary dataandsite
visits required for completing the case study without which
it would have been difficult for us to complete the Study.
REFERENCES
[1] Ketan Shah, (2005) “Modular formwork for faster,
economical and quality Construction”, Indian Concrete
Journal, Vol-79, pg. 6-23.
[2] C.S.Poon, Robin C.P. YIP, (2005) “Comparison of
conventional and low waste formwork in Hong Kong”
World Sustainable Building Conference, Tokyo, 27-29
September 2005, pg. 42-48.
[3] Nuzul Azam Haron, Ir. Salihuddin Hassim, Mohd. Razali
Abd. Kadir and Mohd Saleh Jaafar, (2005) “BuildingCost
Comparison Between Conventional and Formwork
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 11 | Nov -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1147
System: A Case Study of Fourstorey School Buildings in
Malaysia”, AmericanJournal ofAppliedSciences,pg819-
823.
[4] Ashok Mandal, (2006) “Scaffolding & Formwork-
Maintenance & Safety”, CE &CR, August2006,Vol.11,Pg.
46-5.
[5] D.M.Wijesekara “Cost EffectiveandSpeedyConstruction
for High-Rise Buildings in Sri Lanka by using Aluminum
Panel System Formworks”, ACEPS – 2012.
[6] Nagi Reddy Sattigari, Ashwin Mahalingam, George
Thomas, 24th International Symposium On Automation
And Robotics In Construction (ISARC 2007),
Construction Automation Group, IIT Madras.
[7] Information on http://www.mivan.com

More Related Content

What's hot

CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ CT3 1c aluminium formwork+
CT3 1c aluminium formwork+
Est
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
ErankajKumar
 
Mivan aluminium formwork
Mivan  aluminium formworkMivan  aluminium formwork
Mivan aluminium formwork
Anup Kude
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction Technique
Sandeep Jain
 
MIVAN TECHNOLOGY
MIVAN TECHNOLOGY MIVAN TECHNOLOGY
MIVAN TECHNOLOGY
ijiert bestjournal
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
Bhishma Bhatti
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
ashleyyeap
 
Ertf
ErtfErtf
Note on tunnel form construction
Note on tunnel form constructionNote on tunnel form construction
Note on tunnel form construction
RohanBuildersIndia
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimney
Axay Sharma
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formwork
chaitanyakrsk
 
MIVAN FRAMEWORK
MIVAN FRAMEWORKMIVAN FRAMEWORK
MIVAN FRAMEWORK
Qadir Raza
 
Ct iii presentation
Ct iii presentationCt iii presentation
Ct iii presentation
Pui Chun Shian
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryAbhishek Shah
 
Pre engineered and other buildings
Pre engineered and other buildingsPre engineered and other buildings
Pre engineered and other buildings
Dr K M SONI
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
ashleyyeap
 
Major projects aluminium of formwork civil engineering
Major  projects aluminium of formwork civil engineeringMajor  projects aluminium of formwork civil engineering
Major projects aluminium of formwork civil engineering
Gopal jakhar
 
New materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiNew materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in Mumbai
Dr K M SONI
 
Formwork
FormworkFormwork
Formwork
natesh0142
 
First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.
Teow Beng Hur
 

What's hot (20)

CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ CT3 1c aluminium formwork+
CT3 1c aluminium formwork+
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
Mivan aluminium formwork
Mivan  aluminium formworkMivan  aluminium formwork
Mivan aluminium formwork
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction Technique
 
MIVAN TECHNOLOGY
MIVAN TECHNOLOGY MIVAN TECHNOLOGY
MIVAN TECHNOLOGY
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
Ertf
ErtfErtf
Ertf
 
Note on tunnel form construction
Note on tunnel form constructionNote on tunnel form construction
Note on tunnel form construction
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimney
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formwork
 
MIVAN FRAMEWORK
MIVAN FRAMEWORKMIVAN FRAMEWORK
MIVAN FRAMEWORK
 
Ct iii presentation
Ct iii presentationCt iii presentation
Ct iii presentation
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
 
Pre engineered and other buildings
Pre engineered and other buildingsPre engineered and other buildings
Pre engineered and other buildings
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
Major projects aluminium of formwork civil engineering
Major  projects aluminium of formwork civil engineeringMajor  projects aluminium of formwork civil engineering
Major projects aluminium of formwork civil engineering
 
New materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiNew materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in Mumbai
 
Formwork
FormworkFormwork
Formwork
 
First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.
 

Similar to Comparative Studies of Construction Techniques (Conventional VS MIVAN)

Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
IRJET Journal
 
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET Journal
 
MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction technique
kvijay31
 
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingPlanning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
IRJET Journal
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
IEI GSC
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in Construction
IRJET Journal
 
Table formwork
Table formwork Table formwork
Table formwork
Davis Ciprikis
 
July2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKJuly2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKSameer Malvankar
 
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
IRJET Journal
 
Time, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsTime, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast Buildings
IRJET Journal
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
IRJET Journal
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...
IRJET Journal
 
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
IRJET Journal
 
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET Journal
 
Comparative analysis of formwork in multistory buildin gv
Comparative analysis of formwork in multistory buildin gvComparative analysis of formwork in multistory buildin gv
Comparative analysis of formwork in multistory buildin gv
eSAT Publishing House
 
Major projects aluminium of formwork civil engineering
Major  projects aluminium of formwork civil engineeringMajor  projects aluminium of formwork civil engineering
Major projects aluminium of formwork civil engineering
Gopal jakhar
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
Construction Tech. and Mgmt., VNIT Nagpur
 
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
IRJET Journal
 

Similar to Comparative Studies of Construction Techniques (Conventional VS MIVAN) (20)

Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
 
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
 
MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction technique
 
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingPlanning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in Construction
 
Table formwork
Table formwork Table formwork
Table formwork
 
July2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKJuly2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORK
 
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
 
Time, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsTime, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast Buildings
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...
 
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
 
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
 
Comparative analysis of formwork in multistory buildin gv
Comparative analysis of formwork in multistory buildin gvComparative analysis of formwork in multistory buildin gv
Comparative analysis of formwork in multistory buildin gv
 
Major projects aluminium of formwork civil engineering
Major  projects aluminium of formwork civil engineeringMajor  projects aluminium of formwork civil engineering
Major projects aluminium of formwork civil engineering
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
 
Ch24556560
Ch24556560Ch24556560
Ch24556560
 
Jump Formwork
Jump FormworkJump Formwork
Jump Formwork
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 

Comparative Studies of Construction Techniques (Conventional VS MIVAN)

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 11 | Nov -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1144 Comparative Studies of Construction Techniques (Conventional vs Mivan) Vasav R. Rakholia1, Srinil H. Soni2 1,2 P.G Student Dept. of Civil Engineering MIT Art Design and Technology, Loni, Pune, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Formwork, whichholdsandsupportswetcement till such time it cures, is an exceptionally key component in concrete construction. With the globalization of Indian economy and presentation of multinationals in India for the development and countries pride program of golden quadrilateral, it has turned out to be chief to have fast development and opportune finishing of projects. Now a days current formwork system for superstructure developmentare ordinarily received. Formwork system influences on the cost, time, and nature of project delivery. Yet at thesametimethese formwork frameworks are very little utilized as a partofIndia and the majority of the temporary workers don't prefer to move to the most recent innovation as they have the uncertainty of confronting misfortunes intheundertaking and they are especially comfortable with the current formwork sort, the ordinary sort. Mivan is new development innovation up and coming for fruitful finish of mass lodging venture in India. In the meantime they trust that these formwork frameworks are bit costly. This papermeansto lookatbenefits and faults by utilizing an ordinary timber formwork system and current formwork system like Mivan. The examinations incorporate costs, time, and nature of these frameworks. For better comprehension of this subject, diverse development destinations are contemplated where most propel methods in formwork are utilized and the information gathered from these locales is exhibited keeping in mind the end goal to give examination between present day Mivan formwork and conventional formwork framework. Key Words: Formwork, Mivan, Conventional, Comparison, Requirement 1. INTRODUCTION This Indian development industry has begun utilizing a portion of the world class advancements. A few formwork systems are being used at better places on the planet; in the end the systems which are sensibly efficient and simple for operation with talented work are more valuable in India. Formwork system has critical part in the development procedure, settling on the correct choice by picking the suitable formwork systemcouldpromptreactiontopractical development. Distinctive systems have their own particular points of interest however one needs to pick a formwork which best backings singular task prerequisite. The progression of innovation, increment of populace and constrained spaces lead the best approachtodevelopthe tall building structures. Developing the skyscraper was not a simple assignment at first butrather now withtheassistance of the advanced innovationandmachinesithasturnedoutto be very simple. Lack/non-accessibility skilled and semi-skilled workers brings about issues of cost and time over-runs,sub- par development, poor completions spillages, consumption of structures and so forth this can be escaped by receiving present day formwork frameworks. This additionally maintains a strategic distance from repairs and restoration of structures before its normal life expectancy. 2. CONVENTIONAL FORMWORK This more often than not comprises of standard framed panels tied together over their backs with even individuals called waling. The waling is furnished with the essential capacity of opposing the flat power of wet concrete. One side of the wall formwork is first amassed guaranteeing that it is accuratelyadjusted, plumbed and strutted. Thesteelsupport confine is then setand situatedbeforetheoppositesideofthe formwork is raised and settled. Plywood sheet in mix with timber is the most well-known material utilized for wall formwork. The standard technique is to make upwallshapes as framed panels with the plywood confronting sheet screwed on to studs on a timber outline. This takes into consideration the plywood to be effortlessly evacuated and turned around and utilized on the two sides in order to build the quantity of reuses. The wall forms are powerless to edge and corner harm and should be precisely taken care of. Uncommon consideration must be given to comers and connected wharfs since the expanded weights connected by wet cement could make the projections open up, offering ascend to unsatisfactory grout escapeand apoorcompleteto the cast divider. The cycle time for one floor with the use of conventional formwork is minimum 3-4 weeks. Also the block or Brick work and plastering is needed in order to get the finished surface. This takes more timeandskilledlabours too. This ultimately increases the time required for the completion of the project.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 11 | Nov -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1145 3. REQUIREMENT FOR MODERN FORMWORK SYSTEMS The most punctual formwork systems made utilization of wooden scantlings and timber sprinters as it empowered simple shaping and making at site. Be that as it may, these wooden scantlings and timber sprinters have a tendency to lose their auxiliary and dimensional properties overaperiod time and after rehashed utilization consequently posturing security issues. A large number of the mischances happen in Reinforced Cement Concrete (RCC) development in light of sub-par formwork and scaffolding. Now center must be moved to other key factor "Formwork", to confront the difficulties for the consummation of quick track ventures. By going in forsystemformwork,considerablereservefundsare conceivable by quicker profit for speculations. 4. MIVAN TECHNOLOGY MIVAN TECHNOLOGY is analuminum formwork innovation. MIVAN framework is formwork development, cast – in – situ solid divider and floor chunks cast solid gives the auxiliary framework in one nonstop pour. Expansive room estimated shapes for dividers and floors sections are raised at site. These structures are made solid and durable, manufactured with exactness and simple to deal with. They bear the cost of expansive number of redundancies(around250).Thesolidis created in RMC clumping plants under strict quality control and pass on it to site with travel blenders. Formwork frameworks forstructuresaredelegatedeitherflatorvertical formwork. Level formwork frameworks are those used to shape the flat solid work (pieces or rooftops), while vertical formwork frameworks are those used to frame the vertical supporting components of the structure, e.g., segments, center dividers, and shear dividers. Because of the fine resistances accomplished in the machined metal formwork parts, predictable solid shapes and complete are gotten floor after floor, a great many buildings, affirming to the most demanding gauges of value and precision. This enables plumbing and electrical fittings to be pre-assembledwiththe specific information that there will be a correct fit when gathered. The dimensional exactness at the cemented work likewise brings about reliable fittings of entryways and windows. The arrangement of Aluminum frames has been utilized broadly in the developmentofprivateunitsandmass lodging ventures. It is quick, basic, versatile and cost – compelling. It produces add up to quality work which requires least upkeep and when sturdiness is the prime thought. This framework is most reasonable for Indian condition as a tailor– made aluminumformworkforcast–in– situ completely solid structure. 4.1 Comparison of Mivan formwork system with Conventional Construction Table -1 Factors Conventional System Mivan Formwork System Speed of developm ent The speed of development is much slower because of well-ordered fruition of various phases of the exercises, for example, erection of formwork, cementing and de- covering and from there on putting and other completing exercises. In this framework the divider and the floors are threw all the while in one nonstop operation and furthermore the completing work can be begun instantly, so the speed of thedevelopment is considerably speedier. Quality Because of traditional strategy for development ordinary quality is obtained. Superior quality is acquired due to in-situ throwing of entire structure and transverse dividers done in constant operation. Aesthetics On account of ordinary development the partition walls are comprised of blocks because of which the column and the beam indicate unattractive projections in room interiors. If there should arise an occurrence of Mivan framework the wall and the roof components are casted together because of which the insides have flawless and clean lines without unattractive projections in different corners. The wall and the roofs likewise have a smooth even surface. External finishes All the outer walls are comprised of blocks, so it requires manual bond putting which should be repainted as often as possible. All the outside walls are comprised of concrete and don't require manual cement putting and furthermorehavesmooth completing, so this will require no regular repainting. Maintena nce The maintenance cost is too high as it requires visit repairs of mortars of wall and roofs, painting of external andinternalwalls because of leakages. The maintenance cost is negligible as the walls and roof is comprised of excellent concrete which don't require visit repairs. Proficienc y and cost saving  Skilled workers are required on the site as the structure isn't solid and it ought to be in appropriate measurement.  Theformworkboards are not light in weight.  Less talented works are required on the site as all the completing things are pre-assembled.  The formwork boards are light in weight and can be lifted physically, so there is no need of burning through cash for substantial
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 11 | Nov -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1146 cranes for lifting.  There is no prerequisite of works for building block dividers and putting as real piece of the structure is thrown in concrete by little gathering of specialists. 4.2 The following arethelimitationsofusingMivan formwork System 1. Modifications are costly as all members are cast in RCC. 2. Concealed services become difficult due to small thickness of the components. 3. The aluminium formworks are far more expensive than the conventional formwork. 4. It requires uniform planning as well as uniform elevations to be cost effective. 5. The formwork can be cost effective only if it is used in symmetrical type of structure. 4.3 Comparison Table -2 Sr. No. Characteristics MIVAN System Conventional Formwork System 1 Speed of development 7 days cycle per floor. Min. process duration is of 21 days. 2 Quality of surface finish Excellent.Putting is not required Bad. Putting is required 3 Pre-planning of formwork system Required Not required 4 Type of construction Cast-in-situ Cellular construction Simple RCC encircled development 5 Wastage of formwork material Very less In incredible sum. 6 Accuracy in construction Accurate construction Accuracy is Less than Modern Systems 7 Coordination between various offices Essential Not essentially required 8 Resistance to earthquake Good resistance Less than ModernSystems 9 Removing of floor piece frames without expelling props Possible Not possible 10 Need of any timber orplywood Not required These are the main components 11 Re-use estimation of formwork 150 – 200 Maximum 50 12 Stacking of materials Hard Easy 13 Initial investment in the system High Less 14 Economy in development Economical for mass housing Economical on small scale 3. CONCLUSIONS It can be concluded that the modern methodsofconstruction such as 'Mivan formwork system' are the key to meeting the demand for efficient, sustainable housing. Also the quality and speed must be given due consideration with regards to economy. Mivan formwork system not only helps in improving the quality and efficiency of the work butalso has helped in maintaining the site safety. Traditional formwork for concrete construction normally consisted of bespoke solutions requiring skilled craftsmen. Thistypeofformwork often had poor safety features and gave slow rates of construction on-site and huge levels of waste – inefficient and unsustainable. Modern formwork systems, which are mostly modular, designed for speed and efficiency. They are engineered to provide increased accuracy and minimize waste in construction and most have enhanced health and safety features built-in. By using MIVAN system we can achieve cost reduction in less time. By reducing cycle time than conventional method overall financial cost saving can be achieved. ACKNOWLEDGEMENT We would like to acknowledge and thank the companies, Marathon Realty Pvt Ltd and Nyati Builders Pvt Ltd for sharing and providing us with all the necessary dataandsite visits required for completing the case study without which it would have been difficult for us to complete the Study. REFERENCES [1] Ketan Shah, (2005) “Modular formwork for faster, economical and quality Construction”, Indian Concrete Journal, Vol-79, pg. 6-23. [2] C.S.Poon, Robin C.P. YIP, (2005) “Comparison of conventional and low waste formwork in Hong Kong” World Sustainable Building Conference, Tokyo, 27-29 September 2005, pg. 42-48. [3] Nuzul Azam Haron, Ir. Salihuddin Hassim, Mohd. Razali Abd. Kadir and Mohd Saleh Jaafar, (2005) “BuildingCost Comparison Between Conventional and Formwork
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 11 | Nov -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1147 System: A Case Study of Fourstorey School Buildings in Malaysia”, AmericanJournal ofAppliedSciences,pg819- 823. [4] Ashok Mandal, (2006) “Scaffolding & Formwork- Maintenance & Safety”, CE &CR, August2006,Vol.11,Pg. 46-5. [5] D.M.Wijesekara “Cost EffectiveandSpeedyConstruction for High-Rise Buildings in Sri Lanka by using Aluminum Panel System Formworks”, ACEPS – 2012. [6] Nagi Reddy Sattigari, Ashwin Mahalingam, George Thomas, 24th International Symposium On Automation And Robotics In Construction (ISARC 2007), Construction Automation Group, IIT Madras. [7] Information on http://www.mivan.com