COMPARATIVE ANALYSIS OF FORMWORK IN MULTISTORY BUILDING Sandip.P.Pawar1, P.M.Atterde2 1P.G. Student Deptt of civil Engineering SSGBCOET Bhusawal Maharashtra 2Guide, Deptt of civil Engineering SSGBCOET Bhusawal Maharashtra Abstract One of the most important factors in determing the success of a construction project in terms of speed, quality cost and safety of work is the formwork used in the project as it accounts about 40% of the total project cost of the structure. When considering a construction project both the client and contractor want to finish the job early as the client wants to use the building for the intended purpose as soon as possible. The contractor wants to finish the construction as soon as possible to gain a higher profit. The most efficient way to speed up the work in high-rise building construction is by achieving a very short floor cycle. The floor cycle of a building mainly depend on the formwork type as it is the main time factor of a building project. The aim of this paper is to present about the existing formwork types in Maharashtra and to show each one will affect the project duration, project cost and the quality of the work. For that a research has been carried out and the results will present in this paper. Keywords: Formwork,Duration,cost,quality 
---------------------------------------------------------------------***--------------------------------------------------------------------- 1.INTRODUCTION Formwork is defined as temporary structure whos purpose is to provide support and containment for fresh concrete until it can support itself. It moulds the concrete to the desired shape and size and controls its position and alignment. The development of formworks is parallel with the growth of concrete construction throughout the 20th century. The advancement of technology, increase of population and the space limitation lead the way to construct high-rise buildings. But the task was not very easy at the beginning but now the man made the task easy by inventing new machinery and new techniques. The most important factor in terms of cost, quality and speed in a high-rise building construction project is the type of the formwork used in the project. The first formwork type to be used is the conventional type formwork where the timber planks were supported on timber columns. With the advancement of technology it developed gradually and people used ply wood sheets instead of timber planks and steel pipes with jacks were used to support the ply wood. Then people invented small units of formworks and connect the repeating units in the construction. The larger units were invented like formworks for slab panels, formworks for columns, beams…etc. when the same elements are repeating. Then finally the whole system of formwork is made and initially the material used to it was steel and it was very heavy. Then the aim was to reduce the weight of the system and the materials for formwork have extended to aluminium, plastic, fiber glass…etc. 
contractors are in a belief that the system formwork is suitable only for super tall buildings as the initial cost of the system formwork is a bit high. Though the initial cost of the system formwork is a bit high it reduces the project duration and hence the total project cost. When considering the overall construction of a high-rise building the system formwork is much more economical that to all the other primary formwork types as it reduces the project duration, gives a smooth concrete surface and the repetitive use of the system. This is suitable for even for a two or three storey housing scheme of several houses. 2. TYPES OF FORMWORKS Conventional Formwork: This is the oldest type of formwork used in the construction industry. This type uses timber, bamboo, masonry and carpentry in the construction. This type is very much suitable for small houses with two to three storeys and still they are in use for such constructions. But this is not suitable for the big projects or high-rise buildings. Low initial cost, low experience factor, low weight are some of the advantages of this type and poor finish, high labor requirement, skilled labor. requirement and consume lot of time are some of the disadvantages. 
Modern Conventional Formwork: This type is very much closer to the conventional formwork and in simple words this is one step advanced than the conventional type. The same technique has used in the both types and the only difference is the materials use for the formworks. In modern conventional formwork more advanced materials are used and they can reuse for several times. The differences of both types are that steel props and various types of jacks (U jacks, T jacks) are used as supports in the formwork instead of timber supports and ply wood sheets are used instead of timber planks on slab decks, beams and columns. Low initial cost, low skilled labor requirement, can even use in small places and when there are lot of deviations in the structure are some of the advantages while poor finish of the
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 09 | NCETCE-2014 | June-2014, Available @ http://www.ijret.org 23 
concrete surface, high labor requirement and the higher floor cycle are the disadvantages This type is much more advanced than the modern conventional type. In this type there are pre-fabricated formwork items such as pre-fabricated formworks for slab panels and supports and ply wood should be used additionally for slab deck, beams and columns for the surface. There are other forms of semi system formwork such as table forms, flying forms…etc. DOCA is the most famous brand for this type of formwork and some people know about this type only as “DOCA formwork”. System Formwork: System formwork has prefabricated modular components with casting panels. The system formwork is fabricated as it suits the required shape. The biggest advantage of this type is the speedy and quality construction. But the high initial cost is the main disadvantage and hence it is not economical to use in low – rise buildings. But this is the most economical form of formwork type to be used in high-rise building construction when it is having few typical storeys. 3. RESEARCH STUDY The expectation of this study is to find the most economical formwork type to be used in a high-rise building project. When considering a construction project there are many cost components contributing to the total cost of the project. Preliminary cost is a key cost component when comparing the total cost of a project, and the duration of the project is the governing factor for the preliminary running cost. Total Project Cost = Materials and labour + Preliminary cost + Machinery & equipment t+ Waste material handling + Safety + Finishes + … Preliminary Cost = Salaries + work establishment charge + Security … When a building construction project is considered the material requirement is unique as it depends on the design. But the labor requirement and the duration of the project are directly affected by the technologies and the construction methods used in the project. The speed of the project is directly affected by the formwork type used in the project. This is the most critical in high-rise building construction. When using latest technologies, the labor requirement and the time duration can beminimized in the project, mainly for the super structure. In high-rise building projects time controlling factor is the formwork as it directly affect the floor cycle and hence it will reduce the time taken to construct the main structure and because of that the total duration of the project will go down drastically. In this research cost comparisons of total project cost has done for several projects when all the two types of formwork types are used in the same project. 
4. THE RESULTS 
4.1 The Results Obtained 
Data is collected from M/s Sai Construction Ahmednagar .Name of Construction work on Residetial Building of KARAN RHEA Wing A,Wing B,&Wing C at Wadegaon Sheri, Pune projects and calculations are done for the total project cost of the selected projects when using different types of formworks in the construction. In the calculations all the parameters are kept same and only the formwork type is changed. At the same time all the factors affect due to the formwork type is considered. The results can be shown in a table as follows. Table .1 
Project 
No.of Floor 
Area of each floor (sqm) 
Total cost of Project 
Wing A 
10 
418 
11,24,42,000 
Wing B 
15 
510 
13,71,90,000 
Wing C 
20 
600 
16,14,40,000 
Table .2 
Analysis of the Aluminium formwork for Typical Floor 
Wing A aA1 11 
Wing B 2 
Wing C 3 
Form work cost in Laks 
9.82 
11.98 
14.1 
Waist disposal cost in Laks 
0 
0 
0 
Machinary cost in Laks 
0.9 
1.12 
1.98 
For Aluminium form work Table 3 
. Analysis of the conventional formwork for Typical Floor 
Wing A aA1 11 
Wing B 2 
Wing C 3 
Form work cost in Laks 
6.27 
7.65 
9.0 
Waist disposal cost in Laks 
0.31 
0.38 
0.45 
0 
5 
10 
15 
Tower 1 
Tower 2 
Tower 3 
Form work cost in Laks 
Waist disposal cost in Laks
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 09 | NCETCE-2014 | June-2014, Available @ http://www.ijret.org 24 
Machinary cost in Laks 
0.5 
0.85 
1.25 
For Conventional Form work 
5. CONCLUSIONS From the results obtained we can come to a conclusion that when the system formwork is used in the construction project, the total project cost and the duration of the project is lesser than the other formwork types. The main important thing is that the aluminium panel system formwork is the most expensive formwork type from those three types. At the same time the highest total project cost is obtained when modern conventional type of formwork is used in the building construction project which is the least expensive formwork type. So it is clearly seen that that not the cost of formwork directly affected to the total project cost but the type of formwork. The floor cycle will be 6-10 days when the system formwork is in use and hence the total project duration will be reduced. At the same time a smooth concrete surface can be obtained as the system can be assembled without any discontinuities in the surface and hence less finishing work will be there and hence the cost for finishes will be reduced. There will be less waste disposal and less machinery usage. Not only the direct benefits, there are many indirect benefits of using aluminium panel system formwork in the high-rise building construction projects. For example the system can be sold after using, it can be used in other slabs doing slight variations (there is no need to buy materials again). REFERENCES 
[1] Hurd, M.K. 1989. Formwork for Concrete, 6th ed. American Concrete Institute, Detroit, MI. 
[2] Nolan, É. Innovation in concrete frame construction 1995–2015. IHS BRE Press, Garston. BR 483. 44pp 
[3] Moore, C.E. 1977. Concrete Form Construction. Van Nostrand Reinhold, New York. 
[4] Ratay, R.T. 1984. Handbook of Temporary Structures in Construction. McGraw-Hill, New York 
[5] Peurifoy, P.E. 1976. Formwork for Concrete Structures. McGraw-Hill, New York. Plasticizer” International Scholarly Research Network ISRN Civil Engineering Volume 2012, Article ID 469272, 5 pages doi:10.5402/2012/469272 2005. 
[6] Ketan Shah, " Modular formwork for faster, economical and quality construction", Indian Concrete Journal, July 2005, Volume 79,Pg.6-23. 
[7] “Formwork & Scaffolding”, CE & CR, September 1992, Vol. 05, No. 9, Pg. 46-57. 
[8] Ashok Mandal, "Scaffolding & Formwork- Maintenance & Safety",CE & CR, August 2006, Vol. 19, No. 8, Pg. 46-50. 
[9] "Emerging Trends In Formwork And Scaffolding", CE & CR, Sep 92,Pg.46-49. 
[10] "ConstructionEquipment",CE&CR,Mayl992,Pg.50- 52. 
[11] IS14687(Falsework For Concrete Structures- Guidelines) 
BIOGRAPHIES 
Sandip P.Pawar Completed B.E. in civil Engineering 2009 and M.E appear in Construction Technology & Management in North Maharashtra University Jalgaon (MS). 
P.M.Atterde (Department of civil engineering SSGBCOET Bhusawal) 
0 
2 
4 
6 
8 
10 
Tower 1 
Tower 2 
Tower 3 
Form work cost in Laks 
Waist disposal cost in Laks

More Related Content

What's hot

Off site fabrication
Off site fabricationOff site fabrication
Off site fabrication
Sunny Mahajan
 
IRJET- Planning, Analyzing and Design of High Rise Building using Etabs
IRJET- Planning, Analyzing and Design of High Rise Building using EtabsIRJET- Planning, Analyzing and Design of High Rise Building using Etabs
IRJET- Planning, Analyzing and Design of High Rise Building using Etabs
IRJET Journal
 
ace cover pg 2829
ace cover pg  2829ace cover pg  2829
ace cover pg 2829
Jayanta Chakraborty
 
Modular building institute improving construction efficiency & productivity...
Modular building institute   improving construction efficiency & productivity...Modular building institute   improving construction efficiency & productivity...
Modular building institute improving construction efficiency & productivity...
Clayton Homes ( A Berkshire - Hathaway Company)
 
Modular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingModular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of Housing
Loay Ghazaleh MBA, BSc Civil Eng.
 
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
IRJET Journal
 
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The MasterclassModular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The Masterclass
GPTraining
 
Earth quake response of different shapes of mivan wall tall buildings
Earth quake response of different shapes of mivan wall tall buildingsEarth quake response of different shapes of mivan wall tall buildings
Earth quake response of different shapes of mivan wall tall buildings
eSAT Journals
 
The Time Is Now For Modular Construction
The Time Is Now For Modular ConstructionThe Time Is Now For Modular Construction
The Time Is Now For Modular Construction
Rob Coyle CDCP
 
076 Modular Construction
076 Modular Construction076 Modular Construction
076 Modular Construction
Dr Fereidoun Dejahang
 
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
IJRESJOURNAL
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
Darshiini Vig
 
3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...
SJVijay
 
Prefabricated structure
Prefabricated structurePrefabricated structure
Prefabricated structure
Vishvendu pandey
 
01ADNAN Mtech
01ADNAN Mtech01ADNAN Mtech
01ADNAN Mtech
adnan ahmed
 
Modular housing/building
Modular housing/buildingModular housing/building
Modular housing/building
yogiraj bhandari
 
Overview of Modular Construction
Overview of Modular ConstructionOverview of Modular Construction
Overview of Modular Construction
Rusty Williams
 

What's hot (17)

Off site fabrication
Off site fabricationOff site fabrication
Off site fabrication
 
IRJET- Planning, Analyzing and Design of High Rise Building using Etabs
IRJET- Planning, Analyzing and Design of High Rise Building using EtabsIRJET- Planning, Analyzing and Design of High Rise Building using Etabs
IRJET- Planning, Analyzing and Design of High Rise Building using Etabs
 
ace cover pg 2829
ace cover pg  2829ace cover pg  2829
ace cover pg 2829
 
Modular building institute improving construction efficiency & productivity...
Modular building institute   improving construction efficiency & productivity...Modular building institute   improving construction efficiency & productivity...
Modular building institute improving construction efficiency & productivity...
 
Modular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingModular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of Housing
 
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
 
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The MasterclassModular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The Masterclass
 
Earth quake response of different shapes of mivan wall tall buildings
Earth quake response of different shapes of mivan wall tall buildingsEarth quake response of different shapes of mivan wall tall buildings
Earth quake response of different shapes of mivan wall tall buildings
 
The Time Is Now For Modular Construction
The Time Is Now For Modular ConstructionThe Time Is Now For Modular Construction
The Time Is Now For Modular Construction
 
076 Modular Construction
076 Modular Construction076 Modular Construction
076 Modular Construction
 
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
 
3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...
 
Prefabricated structure
Prefabricated structurePrefabricated structure
Prefabricated structure
 
01ADNAN Mtech
01ADNAN Mtech01ADNAN Mtech
01ADNAN Mtech
 
Modular housing/building
Modular housing/buildingModular housing/building
Modular housing/building
 
Overview of Modular Construction
Overview of Modular ConstructionOverview of Modular Construction
Overview of Modular Construction
 

Viewers also liked

Innovative timber buildings – including cross laminated timber and laminated ...
Innovative timber buildings – including cross laminated timber and laminated ...Innovative timber buildings – including cross laminated timber and laminated ...
Innovative timber buildings – including cross laminated timber and laminated ...
FWPA
 
Timber frame construction presentation`gr
Timber frame construction presentation`grTimber frame construction presentation`gr
Timber frame construction presentation`gr
CKMCforstudents
 
Run time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration usingRun time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration using
eSAT Publishing House
 
Online review mining for forecasting sales
Online review mining for forecasting salesOnline review mining for forecasting sales
Online review mining for forecasting sales
eSAT Publishing House
 
An understanding of graphical perception
An understanding of graphical perceptionAn understanding of graphical perception
An understanding of graphical perception
eSAT Publishing House
 
Comparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling textComparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling text
eSAT Publishing House
 
Performance evaluation of path loss parameters for broadcasting applications
Performance evaluation of path loss parameters for broadcasting applicationsPerformance evaluation of path loss parameters for broadcasting applications
Performance evaluation of path loss parameters for broadcasting applications
eSAT Publishing House
 
Study on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sandStudy on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sand
eSAT Publishing House
 
Compressive strength variability of brown coal fly ash geopolymer concrete
Compressive strength variability of brown coal fly ash geopolymer concreteCompressive strength variability of brown coal fly ash geopolymer concrete
Compressive strength variability of brown coal fly ash geopolymer concrete
eSAT Publishing House
 
A survey on ontology based web personalization
A survey on ontology based web personalizationA survey on ontology based web personalization
A survey on ontology based web personalization
eSAT Publishing House
 
Searching and tracking of neighboring base stations
Searching and tracking of neighboring base stationsSearching and tracking of neighboring base stations
Searching and tracking of neighboring base stations
eSAT Publishing House
 
Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...
eSAT Publishing House
 
Comparison of physical and rheological properties of
Comparison of physical and rheological properties ofComparison of physical and rheological properties of
Comparison of physical and rheological properties of
eSAT Publishing House
 
.Net compiler using cloud computing
.Net compiler using cloud computing.Net compiler using cloud computing
.Net compiler using cloud computing
eSAT Publishing House
 
Swarm robotics for intelligent warehousing an
Swarm robotics for intelligent warehousing anSwarm robotics for intelligent warehousing an
Swarm robotics for intelligent warehousing an
eSAT Publishing House
 
Effect of concentration on structural and optical
Effect of concentration on structural and opticalEffect of concentration on structural and optical
Effect of concentration on structural and optical
eSAT Publishing House
 
The use of polynomial shape function in the buckling
The use of polynomial shape function in the bucklingThe use of polynomial shape function in the buckling
The use of polynomial shape function in the buckling
eSAT Publishing House
 
Seismic evaluation of rc framed buildings with
Seismic evaluation of rc framed buildings withSeismic evaluation of rc framed buildings with
Seismic evaluation of rc framed buildings with
eSAT Publishing House
 
Scheduling for interference mitigation using enhanced intercell interference ...
Scheduling for interference mitigation using enhanced intercell interference ...Scheduling for interference mitigation using enhanced intercell interference ...
Scheduling for interference mitigation using enhanced intercell interference ...
eSAT Publishing House
 
Open channel flow velocity profiles for different
Open channel flow velocity profiles for differentOpen channel flow velocity profiles for different
Open channel flow velocity profiles for different
eSAT Publishing House
 

Viewers also liked (20)

Innovative timber buildings – including cross laminated timber and laminated ...
Innovative timber buildings – including cross laminated timber and laminated ...Innovative timber buildings – including cross laminated timber and laminated ...
Innovative timber buildings – including cross laminated timber and laminated ...
 
Timber frame construction presentation`gr
Timber frame construction presentation`grTimber frame construction presentation`gr
Timber frame construction presentation`gr
 
Run time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration usingRun time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration using
 
Online review mining for forecasting sales
Online review mining for forecasting salesOnline review mining for forecasting sales
Online review mining for forecasting sales
 
An understanding of graphical perception
An understanding of graphical perceptionAn understanding of graphical perception
An understanding of graphical perception
 
Comparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling textComparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling text
 
Performance evaluation of path loss parameters for broadcasting applications
Performance evaluation of path loss parameters for broadcasting applicationsPerformance evaluation of path loss parameters for broadcasting applications
Performance evaluation of path loss parameters for broadcasting applications
 
Study on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sandStudy on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sand
 
Compressive strength variability of brown coal fly ash geopolymer concrete
Compressive strength variability of brown coal fly ash geopolymer concreteCompressive strength variability of brown coal fly ash geopolymer concrete
Compressive strength variability of brown coal fly ash geopolymer concrete
 
A survey on ontology based web personalization
A survey on ontology based web personalizationA survey on ontology based web personalization
A survey on ontology based web personalization
 
Searching and tracking of neighboring base stations
Searching and tracking of neighboring base stationsSearching and tracking of neighboring base stations
Searching and tracking of neighboring base stations
 
Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...
 
Comparison of physical and rheological properties of
Comparison of physical and rheological properties ofComparison of physical and rheological properties of
Comparison of physical and rheological properties of
 
.Net compiler using cloud computing
.Net compiler using cloud computing.Net compiler using cloud computing
.Net compiler using cloud computing
 
Swarm robotics for intelligent warehousing an
Swarm robotics for intelligent warehousing anSwarm robotics for intelligent warehousing an
Swarm robotics for intelligent warehousing an
 
Effect of concentration on structural and optical
Effect of concentration on structural and opticalEffect of concentration on structural and optical
Effect of concentration on structural and optical
 
The use of polynomial shape function in the buckling
The use of polynomial shape function in the bucklingThe use of polynomial shape function in the buckling
The use of polynomial shape function in the buckling
 
Seismic evaluation of rc framed buildings with
Seismic evaluation of rc framed buildings withSeismic evaluation of rc framed buildings with
Seismic evaluation of rc framed buildings with
 
Scheduling for interference mitigation using enhanced intercell interference ...
Scheduling for interference mitigation using enhanced intercell interference ...Scheduling for interference mitigation using enhanced intercell interference ...
Scheduling for interference mitigation using enhanced intercell interference ...
 
Open channel flow velocity profiles for different
Open channel flow velocity profiles for differentOpen channel flow velocity profiles for different
Open channel flow velocity profiles for different
 

Similar to Comparative analysis of formwork in multistory buildin gv

IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET Journal
 
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSISFORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
IRJET Journal
 
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTIONSELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
IRJET Journal
 
Effects of longer span floor system in the constancy of the multistoried stru...
Effects of longer span floor system in the constancy of the multistoried stru...Effects of longer span floor system in the constancy of the multistoried stru...
Effects of longer span floor system in the constancy of the multistoried stru...
eSAT Journals
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formwork
chaitanyakrsk
 
July2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKJuly2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORK
Sameer Malvankar
 
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET Journal
 
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
IRJET Journal
 
Development OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallDevelopment OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound Wall
IRJET Journal
 
A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES
VEMANA INSTITUTE OF TECHNOLOGY, VTU
 
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
IRJET Journal
 
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingPlanning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
IRJET Journal
 
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
Mary Montoya
 
Time, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsTime, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast Buildings
IRJET Journal
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
IRJET Journal
 
The Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction ProjectThe Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction Project
IRJET Journal
 
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
IRJET-  	  Cost Estimation of a Building using Cost Effective Building MaterialsIRJET-  	  Cost Estimation of a Building using Cost Effective Building Materials
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
IRJET Journal
 
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
IRJET Journal
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
IRJET Journal
 
MIVAN FRAMEWORK
MIVAN FRAMEWORKMIVAN FRAMEWORK
MIVAN FRAMEWORK
Qadir Raza
 

Similar to Comparative analysis of formwork in multistory buildin gv (20)

IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
 
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSISFORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
 
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTIONSELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
 
Effects of longer span floor system in the constancy of the multistoried stru...
Effects of longer span floor system in the constancy of the multistoried stru...Effects of longer span floor system in the constancy of the multistoried stru...
Effects of longer span floor system in the constancy of the multistoried stru...
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formwork
 
July2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKJuly2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORK
 
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
 
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
 
Development OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallDevelopment OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound Wall
 
A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES
 
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
 
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingPlanning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
 
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
 
Time, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsTime, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast Buildings
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
 
The Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction ProjectThe Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction Project
 
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
IRJET-  	  Cost Estimation of a Building using Cost Effective Building MaterialsIRJET-  	  Cost Estimation of a Building using Cost Effective Building Materials
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
 
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
 
MIVAN FRAMEWORK
MIVAN FRAMEWORKMIVAN FRAMEWORK
MIVAN FRAMEWORK
 

More from eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
eSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
eSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
eSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
eSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
eSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
eSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
eSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
eSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
eSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
eSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
eSAT Publishing House
 

More from eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Recently uploaded

CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 

Recently uploaded (20)

CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 

Comparative analysis of formwork in multistory buildin gv

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 09 | NCETCE-2014 | June-2014, Available @ http://www.ijret.org 22 COMPARATIVE ANALYSIS OF FORMWORK IN MULTISTORY BUILDING Sandip.P.Pawar1, P.M.Atterde2 1P.G. Student Deptt of civil Engineering SSGBCOET Bhusawal Maharashtra 2Guide, Deptt of civil Engineering SSGBCOET Bhusawal Maharashtra Abstract One of the most important factors in determing the success of a construction project in terms of speed, quality cost and safety of work is the formwork used in the project as it accounts about 40% of the total project cost of the structure. When considering a construction project both the client and contractor want to finish the job early as the client wants to use the building for the intended purpose as soon as possible. The contractor wants to finish the construction as soon as possible to gain a higher profit. The most efficient way to speed up the work in high-rise building construction is by achieving a very short floor cycle. The floor cycle of a building mainly depend on the formwork type as it is the main time factor of a building project. The aim of this paper is to present about the existing formwork types in Maharashtra and to show each one will affect the project duration, project cost and the quality of the work. For that a research has been carried out and the results will present in this paper. Keywords: Formwork,Duration,cost,quality ---------------------------------------------------------------------***--------------------------------------------------------------------- 1.INTRODUCTION Formwork is defined as temporary structure whos purpose is to provide support and containment for fresh concrete until it can support itself. It moulds the concrete to the desired shape and size and controls its position and alignment. The development of formworks is parallel with the growth of concrete construction throughout the 20th century. The advancement of technology, increase of population and the space limitation lead the way to construct high-rise buildings. But the task was not very easy at the beginning but now the man made the task easy by inventing new machinery and new techniques. The most important factor in terms of cost, quality and speed in a high-rise building construction project is the type of the formwork used in the project. The first formwork type to be used is the conventional type formwork where the timber planks were supported on timber columns. With the advancement of technology it developed gradually and people used ply wood sheets instead of timber planks and steel pipes with jacks were used to support the ply wood. Then people invented small units of formworks and connect the repeating units in the construction. The larger units were invented like formworks for slab panels, formworks for columns, beams…etc. when the same elements are repeating. Then finally the whole system of formwork is made and initially the material used to it was steel and it was very heavy. Then the aim was to reduce the weight of the system and the materials for formwork have extended to aluminium, plastic, fiber glass…etc. contractors are in a belief that the system formwork is suitable only for super tall buildings as the initial cost of the system formwork is a bit high. Though the initial cost of the system formwork is a bit high it reduces the project duration and hence the total project cost. When considering the overall construction of a high-rise building the system formwork is much more economical that to all the other primary formwork types as it reduces the project duration, gives a smooth concrete surface and the repetitive use of the system. This is suitable for even for a two or three storey housing scheme of several houses. 2. TYPES OF FORMWORKS Conventional Formwork: This is the oldest type of formwork used in the construction industry. This type uses timber, bamboo, masonry and carpentry in the construction. This type is very much suitable for small houses with two to three storeys and still they are in use for such constructions. But this is not suitable for the big projects or high-rise buildings. Low initial cost, low experience factor, low weight are some of the advantages of this type and poor finish, high labor requirement, skilled labor. requirement and consume lot of time are some of the disadvantages. Modern Conventional Formwork: This type is very much closer to the conventional formwork and in simple words this is one step advanced than the conventional type. The same technique has used in the both types and the only difference is the materials use for the formworks. In modern conventional formwork more advanced materials are used and they can reuse for several times. The differences of both types are that steel props and various types of jacks (U jacks, T jacks) are used as supports in the formwork instead of timber supports and ply wood sheets are used instead of timber planks on slab decks, beams and columns. Low initial cost, low skilled labor requirement, can even use in small places and when there are lot of deviations in the structure are some of the advantages while poor finish of the
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 09 | NCETCE-2014 | June-2014, Available @ http://www.ijret.org 23 concrete surface, high labor requirement and the higher floor cycle are the disadvantages This type is much more advanced than the modern conventional type. In this type there are pre-fabricated formwork items such as pre-fabricated formworks for slab panels and supports and ply wood should be used additionally for slab deck, beams and columns for the surface. There are other forms of semi system formwork such as table forms, flying forms…etc. DOCA is the most famous brand for this type of formwork and some people know about this type only as “DOCA formwork”. System Formwork: System formwork has prefabricated modular components with casting panels. The system formwork is fabricated as it suits the required shape. The biggest advantage of this type is the speedy and quality construction. But the high initial cost is the main disadvantage and hence it is not economical to use in low – rise buildings. But this is the most economical form of formwork type to be used in high-rise building construction when it is having few typical storeys. 3. RESEARCH STUDY The expectation of this study is to find the most economical formwork type to be used in a high-rise building project. When considering a construction project there are many cost components contributing to the total cost of the project. Preliminary cost is a key cost component when comparing the total cost of a project, and the duration of the project is the governing factor for the preliminary running cost. Total Project Cost = Materials and labour + Preliminary cost + Machinery & equipment t+ Waste material handling + Safety + Finishes + … Preliminary Cost = Salaries + work establishment charge + Security … When a building construction project is considered the material requirement is unique as it depends on the design. But the labor requirement and the duration of the project are directly affected by the technologies and the construction methods used in the project. The speed of the project is directly affected by the formwork type used in the project. This is the most critical in high-rise building construction. When using latest technologies, the labor requirement and the time duration can beminimized in the project, mainly for the super structure. In high-rise building projects time controlling factor is the formwork as it directly affect the floor cycle and hence it will reduce the time taken to construct the main structure and because of that the total duration of the project will go down drastically. In this research cost comparisons of total project cost has done for several projects when all the two types of formwork types are used in the same project. 4. THE RESULTS 4.1 The Results Obtained Data is collected from M/s Sai Construction Ahmednagar .Name of Construction work on Residetial Building of KARAN RHEA Wing A,Wing B,&Wing C at Wadegaon Sheri, Pune projects and calculations are done for the total project cost of the selected projects when using different types of formworks in the construction. In the calculations all the parameters are kept same and only the formwork type is changed. At the same time all the factors affect due to the formwork type is considered. The results can be shown in a table as follows. Table .1 Project No.of Floor Area of each floor (sqm) Total cost of Project Wing A 10 418 11,24,42,000 Wing B 15 510 13,71,90,000 Wing C 20 600 16,14,40,000 Table .2 Analysis of the Aluminium formwork for Typical Floor Wing A aA1 11 Wing B 2 Wing C 3 Form work cost in Laks 9.82 11.98 14.1 Waist disposal cost in Laks 0 0 0 Machinary cost in Laks 0.9 1.12 1.98 For Aluminium form work Table 3 . Analysis of the conventional formwork for Typical Floor Wing A aA1 11 Wing B 2 Wing C 3 Form work cost in Laks 6.27 7.65 9.0 Waist disposal cost in Laks 0.31 0.38 0.45 0 5 10 15 Tower 1 Tower 2 Tower 3 Form work cost in Laks Waist disposal cost in Laks
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 09 | NCETCE-2014 | June-2014, Available @ http://www.ijret.org 24 Machinary cost in Laks 0.5 0.85 1.25 For Conventional Form work 5. CONCLUSIONS From the results obtained we can come to a conclusion that when the system formwork is used in the construction project, the total project cost and the duration of the project is lesser than the other formwork types. The main important thing is that the aluminium panel system formwork is the most expensive formwork type from those three types. At the same time the highest total project cost is obtained when modern conventional type of formwork is used in the building construction project which is the least expensive formwork type. So it is clearly seen that that not the cost of formwork directly affected to the total project cost but the type of formwork. The floor cycle will be 6-10 days when the system formwork is in use and hence the total project duration will be reduced. At the same time a smooth concrete surface can be obtained as the system can be assembled without any discontinuities in the surface and hence less finishing work will be there and hence the cost for finishes will be reduced. There will be less waste disposal and less machinery usage. Not only the direct benefits, there are many indirect benefits of using aluminium panel system formwork in the high-rise building construction projects. For example the system can be sold after using, it can be used in other slabs doing slight variations (there is no need to buy materials again). REFERENCES [1] Hurd, M.K. 1989. Formwork for Concrete, 6th ed. American Concrete Institute, Detroit, MI. [2] Nolan, É. Innovation in concrete frame construction 1995–2015. IHS BRE Press, Garston. BR 483. 44pp [3] Moore, C.E. 1977. Concrete Form Construction. Van Nostrand Reinhold, New York. [4] Ratay, R.T. 1984. Handbook of Temporary Structures in Construction. McGraw-Hill, New York [5] Peurifoy, P.E. 1976. Formwork for Concrete Structures. McGraw-Hill, New York. Plasticizer” International Scholarly Research Network ISRN Civil Engineering Volume 2012, Article ID 469272, 5 pages doi:10.5402/2012/469272 2005. [6] Ketan Shah, " Modular formwork for faster, economical and quality construction", Indian Concrete Journal, July 2005, Volume 79,Pg.6-23. [7] “Formwork & Scaffolding”, CE & CR, September 1992, Vol. 05, No. 9, Pg. 46-57. [8] Ashok Mandal, "Scaffolding & Formwork- Maintenance & Safety",CE & CR, August 2006, Vol. 19, No. 8, Pg. 46-50. [9] "Emerging Trends In Formwork And Scaffolding", CE & CR, Sep 92,Pg.46-49. [10] "ConstructionEquipment",CE&CR,Mayl992,Pg.50- 52. [11] IS14687(Falsework For Concrete Structures- Guidelines) BIOGRAPHIES Sandip P.Pawar Completed B.E. in civil Engineering 2009 and M.E appear in Construction Technology & Management in North Maharashtra University Jalgaon (MS). P.M.Atterde (Department of civil engineering SSGBCOET Bhusawal) 0 2 4 6 8 10 Tower 1 Tower 2 Tower 3 Form work cost in Laks Waist disposal cost in Laks