 What is MIVAN Formwork..?
 History & Background
 When it is Suitable ..?
 Formwork Assembly
 Components of MIVAN Formwork
 Work cycle (Speed of Construction)
 Comparison between Aluminium formwork & Conventional
formwork system
 Quality Advantage of MIVAN
 Other Advantage of MIVAN
 Limitations of MIVAN Formwork
 Conclusion
OUTLINE OF PRESENTATION
 Mivan is the Brand name from far East,Malaysia.
 It is Alluminium Alloy Formwork.
 The system of Aluminium forms (MIVAN) has been used widely in
the construction of residential units and mass housing projects.
 It is fast, simple, adaptable and cost – effective. It produces total
quality work which requires minimum maintenance and when
durability is the prime consideration.
 This system is most suitable for Indian condition as a tailor–made
aluminum formwork for cast–in–situ fully concrete structure.
 Aluminum Formwork system is a comparatively a new technology in
India.
WHAT IS MIVAN FORMWORK?
 Mivan is basically an aluminum formwork system developed by one of
the construction company from Europe. In 1990, the Mivan Company Ltd
from Malaysia started the manufacturing of such formwork systems.
 Now a days more than 30,000 sq. m of formwork used in the world are
under their operation. In Mumbai, India there are number of buildings
constructed with the help of the above system which has been proved to
be very economical and satisfactory for Indian Construction Environment.
 The technology has been used extensively in other countries such as
Europe, Gulf Countries, Asia and all other parts of the world.
HISTORY & BACKGROUND
WHEN IT IS SUITABLE ..?
 Mass Housing
 No. of Repetitions Are More
 Typical Floors
 Fast Construction Required
 High Quality
 Column Less Structure
 Highly Suitable To Load Bearing Structure (Shear wall)
 MIVAN aims in using modern construction techniques and
equipment in all its projects. On leaving the MIVAN factory all
panels are clearly labeled to ensure that they are easily
identifiable on site and can be smoothly fitted together using the
formwork modulation drawings. All formwork begins at a corner
and proceeds from there.
Fig.1 – Wall Assembly Details
FORMWORK ASSEMBLY
Fig.2 – Beam Assembly Details
 SIMPLICITY – PIN AND WEDGE SYSTEM
The panels are held in position by a simple pin and wedge system that
passes through holes in the outside rib of each panel. The panels fit
precisely, simply and securely and require no bracing.
FORMWORK ASSEMBLY
COMPONENTS OF MIVAN FORMWORK
 The basic element of the formwork is the panel, which is an extruded
aluminum rail section, welded to an aluminum sheet. This produces a
lightweight panel with an excellent stiffness to weight ratio, yielding
minimum deflection under concrete loading. Panels are manufactured
in the size and shape to suit the requirements of specific projects.
 The panels are made from high strength aluminum alloy with a 4 mm
thick skin plate and 6mm thick ribbing behind to stiffen the panels. The
panels are manufactured in MIVAN’S dedicated factories in Europe and
South East Asia. Once they are assembled they are subjected to a trial
erection in order to eliminate any dimensional or on site problems.
 All the formwork components are received at the site within three
months after they are ordered. Following are the components that are
regularly used in the construction.
BEAM COMPONENTS
Prop Head
Beam Side Panel
Beam Soffit Panel
Beam Soffit Bulkhead
DECK COMPONENTS
Deck
Panel
Deck Prop
Prop
Length
Deck Mid –Beam
Soffit Length
OTHER COMPONENTS
Internal Soffit Corner
External
Corner
External Soffit Corner
Internal Corner
WALL COMPONENTS
Wall Panel
Rocker
Kicker
PIN AND WEDGE SYSTEM
 Pin
 Stub
Image Courtesy: Google
SPEED OF CONSTRUCTION -WORK CYCLE
SPEED OF CONSTRUCTION – WORK CYCLE
The system usually follows a four day cycle: -
 Day 1: -The first activity consists of erection of vertical
reinforcement bars and one side of the vertical formwork for the
entire floor or a part of one floor.
 Day 2: -The second activity involves erection of the second
side of the vertical formwork and formwork for the floor
 Day 3: - Fixing reinforcement bars for floor slabs and casting of
walls and slabs.
 Day 4: -Removal of vertical form work panels after 24hours,
leaving the props in place for 7 days and floor slab formwork in
place for 2.5 days.
SPEED OF CONSTRUCTION – WORK CYCLE
System for scheduling & controlling the work of other connected
construction trades
Deshuttering of the panels – 12 to 15 hrs
Positioning brackets & platforms on the level- 10 to 15 hrs
Deshuttered panels lifted & fixed on floor-7 to 10 hrs
Kicker & external shutters fixed in -7 hrs
Shutters are erected in 6-8 hrs
Reinforcement – 10 to 12 hrs
Electrical fittings -10 hrs
Pouring concrete
COMPARISON BETWEEN ALUMINIUM FORMWORK
& CONVENTIONAL FORMWORK SYSTEM
Sr No Characteristic
1 Speed of construction
2 Quality of surface finish
Aluminium
formwork system
Four days cycle per
floor
Excellent plastering
is not required
Conventional
Formwork system
Ten days cycle per
floor
Bad
3 Pre-planning of form work system Required Not Required
4 Type of construction Cast in situ cellular
construction
Simple RCC framed
construction
5
6
Wastage of form work material
Accuracy in construction
In great amount
Less thanAluform
7
Very less
Accurate
construction
Essential
8
9
Coordination between different
agencies
Resistance to earthquake
Reusage value
Good resistance
250-300
Not necessrily
required
Less thanAluform
50
QUALITY ADVANTAGE OFMIVAN
The Advantages of this system are :-
The MIVAN formwork is specifically designed to allow rapid construction
of all types of architectural layouts.
 1) Total system forms the complete concrete structure.
 2) Custom designed to suit project requirements.
 3) Unsurpassed construction speed.
 4) High quality finish.
 5) Cost effective.
 6) Panels can be reused up to 250 times.
 7) Erected using unskilled labor.
OTHER ADVANTAGE OFMIVAN
 Easy to handle.
 Aluminum does not rust like steel; therefore, the Aluminiumformwork
can be reused hundreds of times.
 Formwork is made with an aluminium alloy, which has high tensile
strength and is also very hard.
 Saving on overhead expenses due to speedy construction.
 Doesn’t require timber or plywood for construction activities so, it
saves the environment.
 Casting of walls and slabs possible simultaneously.
 Less debris generation.
 Higher scrap value.
 Carpet area will increase.
 Collect the best premium from the customer, because of 100% RCC
buildings.
LIMITATIONS OF MIVAN FORMWORK
o Even though there are so many advantages of MIVAN formwork the
limitations cannot be ignored.
o It requires uniform planning as well as uniform elevations to be cost
effective. and skilled labor required.
o Large volume of work is necessary to be cost effective i.e. at least
200 repetitions of the forms should be possible at work.
o Architectural changes not possible on the structure (but some walls
can be of brick work or openings can be entertained).
o Number of holes will be more in the vertical wall, outer wall which is in
direct contact with the rain, hole should be grouted by Non Shrink
compound.
CONCLUSION

The intension of this paper is not provide a detailed comparison
or explain the technical features of Mivan formwork system in
depth. Instead of it aims to show the overview, condition &
constraints governing the use of Mivan formwork system under
the typical local circumstances.
 It can be concluded that the modern methods of construction
such as 'Mivan formwork system' are the key to meeting the
demand for efficient, sustainable housing. Also the quality and
speed must be given due consideration with regards to
economy.
THANK YOU

More Related Content

What's hot

Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formwork
chaitanyakrsk
 
Mivan aluminium formwork
Mivan  aluminium formworkMivan  aluminium formwork
Mivan aluminium formwork
Anup Kude
 
Mivan Construction Techinique
Mivan Construction TechiniqueMivan Construction Techinique
Mivan Construction Techinique
ASHISH singh
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
SOURAV4798
 
Automation in construction
Automation in constructionAutomation in construction
Automation in construction
AJAY RAO
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
Simarpreet Singh
 
types of cracks in building
types of cracks in buildingtypes of cracks in building
types of cracks in building
Muhammad Sultan
 
Industrial building
Industrial buildingIndustrial building
Industrial building
tausif_k
 
Presentation on Underground metro.
Presentation on Underground metro.Presentation on Underground metro.
Presentation on Underground metro.
YusufRampurawala1
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
IEI GSC
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
RANJIT KUMAR PANDA
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
Axay Sharma
 
Presentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industryPresentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industry
IEI GSC
 
modular coordination
modular coordinationmodular coordination
modular coordination
Shailja km
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentation
Sze Ting Kuek
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Drainage
DrainageDrainage
Drainage
Rajiva Gupta
 
plastic waste recycling for road construction
plastic waste recycling for road constructionplastic waste recycling for road construction
plastic waste recycling for road construction
Mahaswari Jogia
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
Anshuman Tyagi
 

What's hot (20)

Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formwork
 
Mivan aluminium formwork
Mivan  aluminium formworkMivan  aluminium formwork
Mivan aluminium formwork
 
Mivan Construction Techinique
Mivan Construction TechiniqueMivan Construction Techinique
Mivan Construction Techinique
 
Jump Formwork
Jump FormworkJump Formwork
Jump Formwork
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Automation in construction
Automation in constructionAutomation in construction
Automation in construction
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
types of cracks in building
types of cracks in buildingtypes of cracks in building
types of cracks in building
 
Industrial building
Industrial buildingIndustrial building
Industrial building
 
Presentation on Underground metro.
Presentation on Underground metro.Presentation on Underground metro.
Presentation on Underground metro.
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
 
Presentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industryPresentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industry
 
modular coordination
modular coordinationmodular coordination
modular coordination
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentation
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Drainage
DrainageDrainage
Drainage
 
plastic waste recycling for road construction
plastic waste recycling for road constructionplastic waste recycling for road construction
plastic waste recycling for road construction
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 

Similar to Mivan aluminium formwork

MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction technique
kvijay31
 
Mivan
MivanMivan
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY  for constMIVAN CONSTRUCTION TECHNOLOGY  for const
MIVAN CONSTRUCTION TECHNOLOGY for const
PradeepPandya1
 
Mivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentationMivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentation
CivilTY09AdityaGaval
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
aduiti
 
404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................
KeshavaPrajwal
 
ADVANCED_STRUCTURAL_SYSTEMS.pdf
ADVANCED_STRUCTURAL_SYSTEMS.pdfADVANCED_STRUCTURAL_SYSTEMS.pdf
ADVANCED_STRUCTURAL_SYSTEMS.pdf
mohdarfathkhan
 
CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ CT3 1c aluminium formwork+
CT3 1c aluminium formwork+
Est
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction system
chirag aggarwal
 
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET Journal
 
MIVAN FRAMEWORK
MIVAN FRAMEWORKMIVAN FRAMEWORK
MIVAN FRAMEWORK
Qadir Raza
 
UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
Venkateswaran S
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
Yee Len Wan
 
simplex infrastructure
simplex infrastructure simplex infrastructure
simplex infrastructure
Shubham Pradhan
 
Construction Technology
Construction TechnologyConstruction Technology
Construction Technology
SwapnilGorade1
 
IBS Factory Report Assignment
IBS Factory Report AssignmentIBS Factory Report Assignment
IBS Factory Report Assignment
Haziq1511
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
chongyih2
 
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
ra1508
 
Comparative Studies of Construction Techniques (Conventional VS MIVAN)
Comparative Studies of Construction Techniques (Conventional VS MIVAN)Comparative Studies of Construction Techniques (Conventional VS MIVAN)
Comparative Studies of Construction Techniques (Conventional VS MIVAN)
IRJET Journal
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdf
GourhariBiswas1
 

Similar to Mivan aluminium formwork (20)

MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction technique
 
Mivan
MivanMivan
Mivan
 
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY  for constMIVAN CONSTRUCTION TECHNOLOGY  for const
MIVAN CONSTRUCTION TECHNOLOGY for const
 
Mivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentationMivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentation
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
 
404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................
 
ADVANCED_STRUCTURAL_SYSTEMS.pdf
ADVANCED_STRUCTURAL_SYSTEMS.pdfADVANCED_STRUCTURAL_SYSTEMS.pdf
ADVANCED_STRUCTURAL_SYSTEMS.pdf
 
CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ CT3 1c aluminium formwork+
CT3 1c aluminium formwork+
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction system
 
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
 
MIVAN FRAMEWORK
MIVAN FRAMEWORKMIVAN FRAMEWORK
MIVAN FRAMEWORK
 
UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
simplex infrastructure
simplex infrastructure simplex infrastructure
simplex infrastructure
 
Construction Technology
Construction TechnologyConstruction Technology
Construction Technology
 
IBS Factory Report Assignment
IBS Factory Report AssignmentIBS Factory Report Assignment
IBS Factory Report Assignment
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
 
Comparative Studies of Construction Techniques (Conventional VS MIVAN)
Comparative Studies of Construction Techniques (Conventional VS MIVAN)Comparative Studies of Construction Techniques (Conventional VS MIVAN)
Comparative Studies of Construction Techniques (Conventional VS MIVAN)
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdf
 

Recently uploaded

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 

Recently uploaded (20)

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 

Mivan aluminium formwork

  • 1. MIVAN – A Versatile Aluminum Formwork Construction Technique” MUMTAZ ALAM M.TECH in Structural Engineering , NITTTR kolkata
  • 2.  What is MIVAN Formwork..?  History & Background  When it is Suitable ..?  Formwork Assembly  Components of MIVAN Formwork  Work cycle (Speed of Construction)  Comparison between Aluminium formwork & Conventional formwork system  Quality Advantage of MIVAN  Other Advantage of MIVAN  Limitations of MIVAN Formwork  Conclusion OUTLINE OF PRESENTATION
  • 3.  Mivan is the Brand name from far East,Malaysia.  It is Alluminium Alloy Formwork.  The system of Aluminium forms (MIVAN) has been used widely in the construction of residential units and mass housing projects.  It is fast, simple, adaptable and cost – effective. It produces total quality work which requires minimum maintenance and when durability is the prime consideration.  This system is most suitable for Indian condition as a tailor–made aluminum formwork for cast–in–situ fully concrete structure.  Aluminum Formwork system is a comparatively a new technology in India. WHAT IS MIVAN FORMWORK?
  • 4.  Mivan is basically an aluminum formwork system developed by one of the construction company from Europe. In 1990, the Mivan Company Ltd from Malaysia started the manufacturing of such formwork systems.  Now a days more than 30,000 sq. m of formwork used in the world are under their operation. In Mumbai, India there are number of buildings constructed with the help of the above system which has been proved to be very economical and satisfactory for Indian Construction Environment.  The technology has been used extensively in other countries such as Europe, Gulf Countries, Asia and all other parts of the world. HISTORY & BACKGROUND
  • 5. WHEN IT IS SUITABLE ..?  Mass Housing  No. of Repetitions Are More  Typical Floors  Fast Construction Required  High Quality  Column Less Structure  Highly Suitable To Load Bearing Structure (Shear wall)
  • 6.  MIVAN aims in using modern construction techniques and equipment in all its projects. On leaving the MIVAN factory all panels are clearly labeled to ensure that they are easily identifiable on site and can be smoothly fitted together using the formwork modulation drawings. All formwork begins at a corner and proceeds from there. Fig.1 – Wall Assembly Details FORMWORK ASSEMBLY
  • 7. Fig.2 – Beam Assembly Details  SIMPLICITY – PIN AND WEDGE SYSTEM The panels are held in position by a simple pin and wedge system that passes through holes in the outside rib of each panel. The panels fit precisely, simply and securely and require no bracing. FORMWORK ASSEMBLY
  • 8. COMPONENTS OF MIVAN FORMWORK  The basic element of the formwork is the panel, which is an extruded aluminum rail section, welded to an aluminum sheet. This produces a lightweight panel with an excellent stiffness to weight ratio, yielding minimum deflection under concrete loading. Panels are manufactured in the size and shape to suit the requirements of specific projects.  The panels are made from high strength aluminum alloy with a 4 mm thick skin plate and 6mm thick ribbing behind to stiffen the panels. The panels are manufactured in MIVAN’S dedicated factories in Europe and South East Asia. Once they are assembled they are subjected to a trial erection in order to eliminate any dimensional or on site problems.  All the formwork components are received at the site within three months after they are ordered. Following are the components that are regularly used in the construction.
  • 9. BEAM COMPONENTS Prop Head Beam Side Panel Beam Soffit Panel Beam Soffit Bulkhead
  • 11. OTHER COMPONENTS Internal Soffit Corner External Corner External Soffit Corner Internal Corner
  • 13. PIN AND WEDGE SYSTEM  Pin  Stub Image Courtesy: Google
  • 14. SPEED OF CONSTRUCTION -WORK CYCLE
  • 15. SPEED OF CONSTRUCTION – WORK CYCLE The system usually follows a four day cycle: -  Day 1: -The first activity consists of erection of vertical reinforcement bars and one side of the vertical formwork for the entire floor or a part of one floor.  Day 2: -The second activity involves erection of the second side of the vertical formwork and formwork for the floor  Day 3: - Fixing reinforcement bars for floor slabs and casting of walls and slabs.  Day 4: -Removal of vertical form work panels after 24hours, leaving the props in place for 7 days and floor slab formwork in place for 2.5 days.
  • 16. SPEED OF CONSTRUCTION – WORK CYCLE System for scheduling & controlling the work of other connected construction trades Deshuttering of the panels – 12 to 15 hrs Positioning brackets & platforms on the level- 10 to 15 hrs Deshuttered panels lifted & fixed on floor-7 to 10 hrs Kicker & external shutters fixed in -7 hrs Shutters are erected in 6-8 hrs Reinforcement – 10 to 12 hrs Electrical fittings -10 hrs Pouring concrete
  • 17. COMPARISON BETWEEN ALUMINIUM FORMWORK & CONVENTIONAL FORMWORK SYSTEM Sr No Characteristic 1 Speed of construction 2 Quality of surface finish Aluminium formwork system Four days cycle per floor Excellent plastering is not required Conventional Formwork system Ten days cycle per floor Bad 3 Pre-planning of form work system Required Not Required 4 Type of construction Cast in situ cellular construction Simple RCC framed construction 5 6 Wastage of form work material Accuracy in construction In great amount Less thanAluform 7 Very less Accurate construction Essential 8 9 Coordination between different agencies Resistance to earthquake Reusage value Good resistance 250-300 Not necessrily required Less thanAluform 50
  • 18. QUALITY ADVANTAGE OFMIVAN The Advantages of this system are :- The MIVAN formwork is specifically designed to allow rapid construction of all types of architectural layouts.  1) Total system forms the complete concrete structure.  2) Custom designed to suit project requirements.  3) Unsurpassed construction speed.  4) High quality finish.  5) Cost effective.  6) Panels can be reused up to 250 times.  7) Erected using unskilled labor.
  • 19. OTHER ADVANTAGE OFMIVAN  Easy to handle.  Aluminum does not rust like steel; therefore, the Aluminiumformwork can be reused hundreds of times.  Formwork is made with an aluminium alloy, which has high tensile strength and is also very hard.  Saving on overhead expenses due to speedy construction.  Doesn’t require timber or plywood for construction activities so, it saves the environment.  Casting of walls and slabs possible simultaneously.  Less debris generation.  Higher scrap value.  Carpet area will increase.  Collect the best premium from the customer, because of 100% RCC buildings.
  • 20. LIMITATIONS OF MIVAN FORMWORK o Even though there are so many advantages of MIVAN formwork the limitations cannot be ignored. o It requires uniform planning as well as uniform elevations to be cost effective. and skilled labor required. o Large volume of work is necessary to be cost effective i.e. at least 200 repetitions of the forms should be possible at work. o Architectural changes not possible on the structure (but some walls can be of brick work or openings can be entertained). o Number of holes will be more in the vertical wall, outer wall which is in direct contact with the rain, hole should be grouted by Non Shrink compound.
  • 21. CONCLUSION  The intension of this paper is not provide a detailed comparison or explain the technical features of Mivan formwork system in depth. Instead of it aims to show the overview, condition & constraints governing the use of Mivan formwork system under the typical local circumstances.  It can be concluded that the modern methods of construction such as 'Mivan formwork system' are the key to meeting the demand for efficient, sustainable housing. Also the quality and speed must be given due consideration with regards to economy.