Chapter 1 Introduction to Operations Management
Overview Introduction Historical Milestones in OM Factors Affecting OM Today Different Ways of Studying OM Wrap-Up: What World-Class Producers Do
Introduction Operations management  is the management of an organization’s productive resources or its production system. A  production system  takes inputs and converts them into outputs. The  conversion process  is the predominant activity of a production system. The primary concern of an  operations manager  is the activities of the conversion process.
Organizational Model Marketing MIS Engineering HRM QA Accounting Sales Finance OM
Entry-Level Jobs in OM Purchasing planner/buyer Production (or operations) supervisor Production (or operations) scheduler/controller Production (or operations) analyst Inventory analyst Quality specialist
Historical Milestones in OM The Industrial Revolution Post-Civil War Period Scientific Management Human Relations and Behaviorism Operations Research The Service Revolution
The Industrial Revolution The  industrial revolution  developed in England in the 1700s. The steam engine, invented by James Watt in 1764, largely replaced human and water power for factories. Adam Smith’s  The Wealth of Nations  in 1776 touted the economic benefits of the  specialization of labor . Thus the late-1700s factories had not only machine power but also ways of planning and controlling the tasks of workers.
The Industrial Revolution The industrial revolution spread from England to other European countries and to the United Sates. In 1790 an American, Eli Whitney, developed the concept of  interchangeable parts . The first great industry in the US was the textile industry. In the 1800s the development of the gasoline engine and electricity further advanced the revolution. By the mid-1800s, the old  cottage system  of production had been replaced by the  factory system . . . . more
Post-Civil War Period During the post-Civil War period great expansion of production capacity occurred. By post-Civil War the following developments set the stage for the great production explosion of the 20th century: increased capital and production capacity the expanded urban workforce new Western US markets an effective national transportation system
Scientific Management Frederick Taylor is known as the father of  scientific management .  His  shop system  employed these steps: Each worker’s skill, strength, and learning ability were determined. Stopwatch studies were conducted to precisely set standard output per worker on each task. Material specifications, work methods, and routing sequences were used to organize the shop. Supervisors were carefully selected and trained. Incentive pay systems were initiated.
Scientific Management In the 1920s, Ford Motor Company’s operation embodied the key elements of scientific management: standardized product designs mass production low manufacturing costs mechanized assembly lines specialization of labor interchangeable parts
Human Relations and Behavioralism In the 1927-1932 period, researchers in the Hawthorne Studies realized that human factors were affecting production. Researchers and managers alike were recognizing that psychological and sociological factors affected production. From the work of  behavioralists  came a gradual change in the way managers thought about and treated workers.
Operations Research During World War II, enormous quantities of resources (personnel, supplies, equipment, …) had to be deployed. Military  operations research  (OR) teams were formed to deal with the complexity of the deployment. After the war, operations researchers found their way back to universities, industry, government, and consulting firms. OR helps operations managers make decisions when problems are complex and wrong decisions are costly.
The Service Revolution The creation of services organizations accelerated sharply after World War II. Today, more than two-thirds of the US workforce is employed in services. About two-thirds of the US GDP is from services. There is a huge trade surplus in services. Investment per office worker now exceeds the investment per factory worker. Thus there is a growing need for service operations management.
The Computer Revolution Explosive growth of computer and communication technologies Easy access to information and the availability of more information Advances in software applications such as Enterprise Resource Planning (ERP) software Widespread use of email More and more firms becoming involved in E-Business using the Internet Result:   faster, better decisions over greater distances
Today's Factors Affecting OM Global Competition Quality, Customer Service, and Cost Challenges Rapid Expansion of Advanced Technologies Continued Growth of the Service Sector Scarcity of Operations Resources Social-Responsibility Issues
Studying Operations Management Operations as a System Decision Making in OM
Operations as a System Inputs Outputs Conversion Subsystem Production System Control Subsystem
Inputs of an Operations System External Legal, Economic, Social, Technological Market Competition, Customer Desires, Product Info. Primary Resources Materials, Personnel, Capital, Utilities
Conversion Subsystem Physical  (Manufacturing) Locational Services  (Transportation) Exchange Services  (Retailing) Storage Services  (Warehousing) Other Private Services   (Insurance) Government Services   (Federal)
Outputs of an Operations System Direct Products Services Indirect Waste Pollution Technological Advances
Production as an Organization Function US companies cannot compete with marketing, finance, accounting, and engineering alone. We focus on OM as we think of global competitiveness, because that is where the vast majority of a firm’s workers, capital assets, and expenses reside. To succeed, a firm must have a strong operations function teaming with the other organization functions.
Decision Making in OM Strategic Decisions Operating Decisions Control Decisions
Strategic Decisions These decisions are of strategic importance and have long-term significance for the organization. Examples include deciding: the design for a new product’s production process where to locate a new factory whether to launch a new-product development plan
Operating Decisions These decisions are necessary if the ongoing production of goods and services is to satisfy market  demands and provide profits. Examples include deciding: how much finished-goods inventory to carry the amount of overtime to use next week the details for purchasing raw material next month
Control Decisions These decisions concern the day-to-day activities of workers, quality of products and services, production and overhead costs, and machine maintenance. Examples include deciding: labor cost standards for a new product frequency of preventive maintenance new quality control acceptance criteria
What Controls the Operations System? Information about the outputs, the conversions, and the inputs is fed back to management. This information is matched with management’s expectations When there is a difference, management must take corrective action to  maintain control of the system
Wrap-Up: World Class Practice OM important in  any  organization Global competition forces rapid evolution of OM  Decision based framework focus of course Strategic, Operating, and Control
End of Chapter 1

Ch01 2

  • 1.
  • 2.
    Chapter 1 Introductionto Operations Management
  • 3.
    Overview Introduction HistoricalMilestones in OM Factors Affecting OM Today Different Ways of Studying OM Wrap-Up: What World-Class Producers Do
  • 4.
    Introduction Operations management is the management of an organization’s productive resources or its production system. A production system takes inputs and converts them into outputs. The conversion process is the predominant activity of a production system. The primary concern of an operations manager is the activities of the conversion process.
  • 5.
    Organizational Model MarketingMIS Engineering HRM QA Accounting Sales Finance OM
  • 6.
    Entry-Level Jobs inOM Purchasing planner/buyer Production (or operations) supervisor Production (or operations) scheduler/controller Production (or operations) analyst Inventory analyst Quality specialist
  • 7.
    Historical Milestones inOM The Industrial Revolution Post-Civil War Period Scientific Management Human Relations and Behaviorism Operations Research The Service Revolution
  • 8.
    The Industrial RevolutionThe industrial revolution developed in England in the 1700s. The steam engine, invented by James Watt in 1764, largely replaced human and water power for factories. Adam Smith’s The Wealth of Nations in 1776 touted the economic benefits of the specialization of labor . Thus the late-1700s factories had not only machine power but also ways of planning and controlling the tasks of workers.
  • 9.
    The Industrial RevolutionThe industrial revolution spread from England to other European countries and to the United Sates. In 1790 an American, Eli Whitney, developed the concept of interchangeable parts . The first great industry in the US was the textile industry. In the 1800s the development of the gasoline engine and electricity further advanced the revolution. By the mid-1800s, the old cottage system of production had been replaced by the factory system . . . . more
  • 10.
    Post-Civil War PeriodDuring the post-Civil War period great expansion of production capacity occurred. By post-Civil War the following developments set the stage for the great production explosion of the 20th century: increased capital and production capacity the expanded urban workforce new Western US markets an effective national transportation system
  • 11.
    Scientific Management FrederickTaylor is known as the father of scientific management . His shop system employed these steps: Each worker’s skill, strength, and learning ability were determined. Stopwatch studies were conducted to precisely set standard output per worker on each task. Material specifications, work methods, and routing sequences were used to organize the shop. Supervisors were carefully selected and trained. Incentive pay systems were initiated.
  • 12.
    Scientific Management Inthe 1920s, Ford Motor Company’s operation embodied the key elements of scientific management: standardized product designs mass production low manufacturing costs mechanized assembly lines specialization of labor interchangeable parts
  • 13.
    Human Relations andBehavioralism In the 1927-1932 period, researchers in the Hawthorne Studies realized that human factors were affecting production. Researchers and managers alike were recognizing that psychological and sociological factors affected production. From the work of behavioralists came a gradual change in the way managers thought about and treated workers.
  • 14.
    Operations Research DuringWorld War II, enormous quantities of resources (personnel, supplies, equipment, …) had to be deployed. Military operations research (OR) teams were formed to deal with the complexity of the deployment. After the war, operations researchers found their way back to universities, industry, government, and consulting firms. OR helps operations managers make decisions when problems are complex and wrong decisions are costly.
  • 15.
    The Service RevolutionThe creation of services organizations accelerated sharply after World War II. Today, more than two-thirds of the US workforce is employed in services. About two-thirds of the US GDP is from services. There is a huge trade surplus in services. Investment per office worker now exceeds the investment per factory worker. Thus there is a growing need for service operations management.
  • 16.
    The Computer RevolutionExplosive growth of computer and communication technologies Easy access to information and the availability of more information Advances in software applications such as Enterprise Resource Planning (ERP) software Widespread use of email More and more firms becoming involved in E-Business using the Internet Result: faster, better decisions over greater distances
  • 17.
    Today's Factors AffectingOM Global Competition Quality, Customer Service, and Cost Challenges Rapid Expansion of Advanced Technologies Continued Growth of the Service Sector Scarcity of Operations Resources Social-Responsibility Issues
  • 18.
    Studying Operations ManagementOperations as a System Decision Making in OM
  • 19.
    Operations as aSystem Inputs Outputs Conversion Subsystem Production System Control Subsystem
  • 20.
    Inputs of anOperations System External Legal, Economic, Social, Technological Market Competition, Customer Desires, Product Info. Primary Resources Materials, Personnel, Capital, Utilities
  • 21.
    Conversion Subsystem Physical (Manufacturing) Locational Services (Transportation) Exchange Services (Retailing) Storage Services (Warehousing) Other Private Services (Insurance) Government Services (Federal)
  • 22.
    Outputs of anOperations System Direct Products Services Indirect Waste Pollution Technological Advances
  • 23.
    Production as anOrganization Function US companies cannot compete with marketing, finance, accounting, and engineering alone. We focus on OM as we think of global competitiveness, because that is where the vast majority of a firm’s workers, capital assets, and expenses reside. To succeed, a firm must have a strong operations function teaming with the other organization functions.
  • 24.
    Decision Making inOM Strategic Decisions Operating Decisions Control Decisions
  • 25.
    Strategic Decisions Thesedecisions are of strategic importance and have long-term significance for the organization. Examples include deciding: the design for a new product’s production process where to locate a new factory whether to launch a new-product development plan
  • 26.
    Operating Decisions Thesedecisions are necessary if the ongoing production of goods and services is to satisfy market demands and provide profits. Examples include deciding: how much finished-goods inventory to carry the amount of overtime to use next week the details for purchasing raw material next month
  • 27.
    Control Decisions Thesedecisions concern the day-to-day activities of workers, quality of products and services, production and overhead costs, and machine maintenance. Examples include deciding: labor cost standards for a new product frequency of preventive maintenance new quality control acceptance criteria
  • 28.
    What Controls theOperations System? Information about the outputs, the conversions, and the inputs is fed back to management. This information is matched with management’s expectations When there is a difference, management must take corrective action to maintain control of the system
  • 29.
    Wrap-Up: World ClassPractice OM important in any organization Global competition forces rapid evolution of OM Decision based framework focus of course Strategic, Operating, and Control
  • 30.

Editor's Notes

  • #8 1700’s Cottage Industry.... Machine power for human power.... factory system which resulted in greater productivity. 1790 Eli Whitney invented concept of interchangeable parts. Forced consistent production of parts. Variation evil. 1865 -1900 Joint stock companies formed changing capital structure of companies. Expansion into West created demand for products, development of rail lines provided quick, cheap transportation of goods. Also influx of labor from farm to urban centers. Early 1900’s Frederick Taylor developed the concept of Shop System. Henry Ford put concepts into practice with assembly lines that utilized modern scientific management concepts..... Standardized product design, mass production for low mfg. costs, mechanized the lines, specialization of labor, & interchangeable parts. 1927 -32 Hawtorne studies at Western Electric plant demonstrated human factors also impacted production. World War II required enormous qty’s of supplies, people, etc. Operations Research teams formed to develop models to manage the complex logistics. Linear programming, PERT/CPM, forecasting developed/refined. Accelerated after WWII, 2/3’s workforce in service and 2/3’s GNP generated by service industry.
  • #19 Table 1.5 discusses the concepts, Figure 1.2 shows the model of inputs, conversion, and outputs, and Table 1.6 shows the diversity of production systems. Table 1.7 shows various jobs available in OM. Highly paid, active market right now. More companies recognize strategic importance of OM. E.G.. Assets management..... inventory. Millions of $ tied up that could be applied to NPI, process improvement, R&D. Strategic ... what kind of product, process, and facility... location.. LONG-TERM Operating .... Planning production to meet demand Control .... Day-to-day activity of workers, product, process