BIM and project management can help address challenges in the AEC industry like complex projects, tight budgets and deadlines, and information overload. BIM involves creating an intelligent 3D model of a building virtually before physical construction. This model contains embedded information about the building and can be used across the design, construction and operations phases to improve collaboration, reduce waste and rework, and improve productivity. Lean construction applies lean principles from manufacturing to construction projects to eliminate waste, streamline workflows, improve value delivery and bring projects in on time and budget. Key lean techniques include creating flow, maximizing value and implementing plan-do-check-act cycles.
Building Information Modeling (BIM) is a powerful tool for visualizing and virtually constructing in 3D. It is also a database where the information and process for adding data is equally powerful, giving owners and operators the ability to integrate BIM into Facility Management (FM) software and use the model to manage the facility over the building's lifecycle. Learn about Building Information Models and how BIM reinforces collaboration and helps project teams deliver better products and services.
✓ What is ISO 19650
✓ ISO 19650 Templates
✓ ISO 19650 Appointment Workflow
✓ ISO 19650 Project Planning Workflow
✓ ISO 19650 Project Management Workflow
WATCH THE WEBINAR HERE: https://www.plannerly.com/what-is-iso-19650
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
A BIM Execution Plan (BEP) is a valuable and necessary part of any project in the AEC sector. It is essential when the team needs to work in a collaborative process to ensure that everyone on the project is aligned with the project objectives. A correctly implemented BEP will ensure the project goals are clear and agreed by the wide project team. Communication is a key component of all construction projects. To be successful, it requires many different people working together to achieve the client requirements. A well-built BEP requires the project team to work together and communicate from the very beginning to the completion of the project. This class will explain the importance of the BEP and demonstrate how to create an efficient BEP for post-contract-award which will include the Model Production & Delivery Table (MPDT). The post-contract-award BEP sets out how the information required in the Employer's Information Requirements will be provided.
Change Management For Building Information Modelling (BIM)Ir. Abdul Aziz Abas
Change Management for Building Information Modelling (BIM) addressing the challenges, advantages, implementation process strictly used for educational purposes.
Building Information Modeling (BIM) is a powerful tool for visualizing and virtually constructing in 3D. It is also a database where the information and process for adding data is equally powerful, giving owners and operators the ability to integrate BIM into Facility Management (FM) software and use the model to manage the facility over the building's lifecycle. Learn about Building Information Models and how BIM reinforces collaboration and helps project teams deliver better products and services.
✓ What is ISO 19650
✓ ISO 19650 Templates
✓ ISO 19650 Appointment Workflow
✓ ISO 19650 Project Planning Workflow
✓ ISO 19650 Project Management Workflow
WATCH THE WEBINAR HERE: https://www.plannerly.com/what-is-iso-19650
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
A BIM Execution Plan (BEP) is a valuable and necessary part of any project in the AEC sector. It is essential when the team needs to work in a collaborative process to ensure that everyone on the project is aligned with the project objectives. A correctly implemented BEP will ensure the project goals are clear and agreed by the wide project team. Communication is a key component of all construction projects. To be successful, it requires many different people working together to achieve the client requirements. A well-built BEP requires the project team to work together and communicate from the very beginning to the completion of the project. This class will explain the importance of the BEP and demonstrate how to create an efficient BEP for post-contract-award which will include the Model Production & Delivery Table (MPDT). The post-contract-award BEP sets out how the information required in the Employer's Information Requirements will be provided.
Change Management For Building Information Modelling (BIM)Ir. Abdul Aziz Abas
Change Management for Building Information Modelling (BIM) addressing the challenges, advantages, implementation process strictly used for educational purposes.
The new revolutionary concept of Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility
Building Information Modeling (BIM)
BIM is a process of generating and managing building data during its complete
lifecycle, from conceptual design through operation of the building
Building information modeling(BIM) is an integrated
workflow that enables architects, engineers, and
builders to explore a project digitally before it is built.
BIM is Evolution not Revolution
The creation and use of coordinated,
internally consistent, computable
information about a building project in
BIM is a modern technology and associated set of
processes to produce, communicate, and analyze
‘building models’…..
• ‘Digital representations’ of the building components that follow
parametric rules, which can be manipulated in an intelligent
fashion
• Carry ‘computable graphic and non‐redundant data attributes’
which are consistent, coordinated which can be viewed
BIM Lecture Note (6/6)
Objectives
* To understand how BIM project is implemented and its challenges
Question
* How to execute a successful BIM project?
www.mtech.com.hk
All text that is green is for illustrative purposes only and should not be construed as formalized responses to this execution plan. The text can and should be modified to suit the needs of the organization filling out the template.
In this presentation I gave one overall overview about BIM workflow for Construction and D&B companies.
BIM is not a tool, BIM is not a software, BIM is a way of thinking about the project and put together processes to exchange information during the entire lifecycle.
This presentation is mainly focused on Autodesk platform but is applicable to many other solutions.
Drafted a BIMEX plan based on the BIMEX Guide 2.0 (PSU).
Identified all the BIM goals & uses, contractors, communitcation protocol, collaboration procedures, deliverables and the infrastructure needed. Prepared BIM informaiton exchange sheet in CSI Uniformat II and described the LOD for each component.
Project / Delivery : Renovation / D-B-B
Owner : Jump Trading Simulation & Education Center (OSF Medical Center)
Contractor : P.J.Hoerr
Contract Value : $10.5 Million
Note : Certain details have been changed for privacy.
Introduction
ISO 19650 Templates Team
ISO 19650 Templates Results So Far
Using Structured Data
How To Get Involved
OIR, PIR, AIR, EIR, BEP - etc required
Outlines the concepts and principles for information management
Provides recommendations for a framework to manage information
Applied to all types of assets and by all types and sizes of organizations, regardless of the chosen procurement strategy
A unified approach
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015Aconex
In this webinar, we heard Sean VonFeldt of Triunity and Matt Abeles of BuiltWorlds discuss how their organizations use BIM project-wide to accelerate and improve decisions from concept through handover. We also saw a live demo of Aconex Connected BIM showing how sharing models can streamline processes like design coordination, approval cycles, and handover to benefit your entire project team.
The new revolutionary concept of Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility
Building Information Modeling (BIM)
BIM is a process of generating and managing building data during its complete
lifecycle, from conceptual design through operation of the building
Building information modeling(BIM) is an integrated
workflow that enables architects, engineers, and
builders to explore a project digitally before it is built.
BIM is Evolution not Revolution
The creation and use of coordinated,
internally consistent, computable
information about a building project in
BIM is a modern technology and associated set of
processes to produce, communicate, and analyze
‘building models’…..
• ‘Digital representations’ of the building components that follow
parametric rules, which can be manipulated in an intelligent
fashion
• Carry ‘computable graphic and non‐redundant data attributes’
which are consistent, coordinated which can be viewed
BIM Lecture Note (6/6)
Objectives
* To understand how BIM project is implemented and its challenges
Question
* How to execute a successful BIM project?
www.mtech.com.hk
All text that is green is for illustrative purposes only and should not be construed as formalized responses to this execution plan. The text can and should be modified to suit the needs of the organization filling out the template.
In this presentation I gave one overall overview about BIM workflow for Construction and D&B companies.
BIM is not a tool, BIM is not a software, BIM is a way of thinking about the project and put together processes to exchange information during the entire lifecycle.
This presentation is mainly focused on Autodesk platform but is applicable to many other solutions.
Drafted a BIMEX plan based on the BIMEX Guide 2.0 (PSU).
Identified all the BIM goals & uses, contractors, communitcation protocol, collaboration procedures, deliverables and the infrastructure needed. Prepared BIM informaiton exchange sheet in CSI Uniformat II and described the LOD for each component.
Project / Delivery : Renovation / D-B-B
Owner : Jump Trading Simulation & Education Center (OSF Medical Center)
Contractor : P.J.Hoerr
Contract Value : $10.5 Million
Note : Certain details have been changed for privacy.
Introduction
ISO 19650 Templates Team
ISO 19650 Templates Results So Far
Using Structured Data
How To Get Involved
OIR, PIR, AIR, EIR, BEP - etc required
Outlines the concepts and principles for information management
Provides recommendations for a framework to manage information
Applied to all types of assets and by all types and sizes of organizations, regardless of the chosen procurement strategy
A unified approach
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015Aconex
In this webinar, we heard Sean VonFeldt of Triunity and Matt Abeles of BuiltWorlds discuss how their organizations use BIM project-wide to accelerate and improve decisions from concept through handover. We also saw a live demo of Aconex Connected BIM showing how sharing models can streamline processes like design coordination, approval cycles, and handover to benefit your entire project team.
BIM Building Information Modeling is much more than model creation, it is human and software collaboration through large volumes of construction data that is communicated at every point in the development life-cycle for a project(s).
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015Aconex
In this webinar, we heard from Chris Pynn of Arup and Steve Fox of BIM Consulting on how organisations use BIM across project phases and their entire team to accelerate reviews and improve decision making. It also covered key trends in BIM adoption and some of the remarkable achievements from using BIM in the construction industry.
International BIM Implementation for The Saudi Big 5Saad Al Jabri
This lecture highlights international high-level principles around how to implement and use BIM in the design, construction and operation of the built environment, including Aspects of procurement management and asset management. It is intended that these principles be used as a comprehensive framework for individuals and organisations.
Therefore, I advise any professional or firm considering using BIM to attend the lecture.
Offshore Outsourcing India takes pride in leading the AEC Industry with excellence. We provide exceptional Structural BIM Services that go above and beyond the expectations of our USA-based clients. Our services seamlessly integrate strategic planning, rigorous analysis, and precise structural simulation to deliver outstanding results.
Digital construction for integrated project deliveryStephen Au
The industrial challenges and the value proposition, how and what are the Digital Construction with some case studies are discussed in the presentation.
Sustainability In Government - Bim Webinar4 All of Us
CROSS-WHITEHALL SUSTAINABILITY PRACTITIONERS FORUM
ADDRESSING THE BENEFITS OF BIM - SPONSORED BY FORGE TRACK LTD
We kick-started the series with a webinar for the Cross-Whitehall Sustainability Practitioners Forum. These webinars will provide the practitioners with the latest information, knowledge and policy announcements on a range of sustainability issues and was decided to launch this series by addressing BIM. BIM is a new requirement for government which Sustainability Practitioners will need to be aware of and one that will help Departments in the achievement of the mainstreaming commitments outlined below.
The Green Government Commitments require transparency and, in addition to the above requirements, must address the following areas: climate change adaptation; biodiversity and natural environment; procurement of food and catering services; sustainable construction; and staff wellbeing and quality of life. The Government Construction Strategy published May 2011, set out the framework for a range of workstreams, all of which have the ultimate aim of reducing the cost of government construction projects by 15-20 per cent by the end of the current Parliament.
The BIM task group are supporting and helping deliver the objectives of this strategy and the requirement to strengthen the public sector's capability in BIM implementation with the aim that all central government departments will be adopting, as a minimum, collaborative level 2 BIM 2016.
This webinar examined how BIM can support central government departments in their achievement of collaborative level 2 Bim by 2016 and highlight the great work already taking place within this field.
The world of architecture, engineering and construction is changing. New ways of working and new tools are transforming the face of industry, allowing architects, designers, engineers and contractors to work more quickly, accurately and more cost affective. New Processes and Technologies are making it easier to collaborate and coordinate projects.
BIM Dominating The Future of Architectural Design.pptxTop BIM Company
Building Information Modeling technology supports architects throughout the design process. Architects use Building Information Modeling (BIM) throughout the design process to help improve quality and accelerate design processes with integrated workflows for concept design, modeling, multidiscipline coordination, and construction documentation.
To know more about Architectural BIM Design, visit our website: https://www.topbimcompany.com/architectural-bim-services/
BIM: The Promise of an Integrated Approach to Project DeliveryAWC|WEST
A presentation about (1) The technological and business practice influences that are impacting today’s architectural practice;
(2) The difference between Little-BIM and Big-BIM; (3) The relationship of Integrated Project Delivery in Big-BIM; (4) A practical discussion of resources to implement BIM; and (5) The practical uses for the BIM model
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
Your VW's camshaft position sensor is crucial for engine performance. Signs of failure include engine misfires, difficulty starting, stalling at low speeds, reduced fuel efficiency, and the check engine light. Prompt inspection and replacement can prevent further damage and keep your VW running smoothly.
How To Fix The Key Not Detected Issue In Mercedes CarsIntegrity Motorcar
Experiencing a "Key Not Detected" problem in your Mercedes? Don’t take it for granted. Go through this presentation to find out the exact nature of the issue you are dealing with. Have your vehicle checked by a certified professional if necessary.
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
What Is Recruitment Processing Outsourcing (RPO) Services?Impeccable HR
Impeccable HR provides a wide range of RPO services for your bulk hiring needs within a stipulated period. They meticulously build RPO solutions to improve your recruitment process. RPO services are great for budget-conscious recruiters who want high-quality personnel.
2. Hello!
I am Omar Selim
Founder of BIMarabia
I am here because I love to give presentations.
You can find me at @BIMarabia
2
3.
4.
5. Today’s Challenges of AEC Industry
- Complex Projects
- Tighter Budgets & Deadlines
- Internal & External Collaboration
- Information overload
- Project Risks
5
6. Innovation of Building Processes by Using BIM
Intelligent design information in 3D – ‘model-based
process’; building will be built virtually before
physical building is constructed
New technology and new way of working,
beginning to make an impact to construction
industry (has been used for a while in
manufacturing & engineering industries)
At a strategic level, BIM addresses
many of the industries failures:
waste reduction, value creation
while improving productivity.
Provides a common single and coordinated
source of structured information to support all
parties involved in the delivery process -design,
construct, operation – reducing loss of
information
BIM can be used to demonstrate
the entire building lifecycle from
construction through to facility
operation.
Contains representations of the actual parts
and pieces - includes building shape, design
and construction time, costs, physical
performance, logistics and more
WHAT IS
BIM?
What is BIM ?
6
7. What is BIM?
“a digital representation of physical and functional characteristics of
a facility. As such it serves as a shared knowledge resource for
information about a facility forming a reliable basis for decisions
during its lifecycle from inception onward.”
Building Information Modeling
Building Information Management
Better Information For Management.
7
8. What is BIM? …Embedded
information (the i in BIM)
8
19. - Management
The Human role ,
making sure everybody
collaborates
for the benefits of the project
without any
conflicts of interest.
Right information,
in the right form,
from the right person,
at the right time
BIM
33. ▶ BIM elements are fully parametric
Lego blocks
▶ Lego blocks are [PLACEHOLDERS] for
real-world product data
▶ All Lego blocks must be accounted
for - otherwise model is incomplete
Think of BIM as intelligent Lego
33
34. ▶ Model is complete (No blocks missing)
All Lego blocks accounted for?
34
35. Select the BIM element to access its associated:
• that can store ‘unlimited’ building lifecycle data
● BIM = Document Management System for Buildings
● BIM elements can be used as Smart Folders for “unlimited” data storage
Imagine Lego blocks
✓Real-world products
✓Construction methods
Estimated Costs
✓Actual Costs
✓Manufacturer Info
✓Warranties
✓Maintenance records
✓Specifications
✓Documents
✓Photos
✓Radio Frequency IDs
35
38. BIM Collaboration
ARCH STRUCT MECH ELEC FM
CIVIL
“Federated”
data model
•distributed files
•dynamic references
•discipline security
•manageable file size
38
39. Design
team
Rest of your project
team
Document
Control
RFIs &
change
orders
Bidding &
Tenders
Workflows &
approvals
Commissioning Submittals Field
Inspections
Handover
Authoring tools Coordination tools
“Traditional BIM” leaves project teams,
information & processes disconnected
How do
I…
• View models without special software?
• Link RFIs with objects for resolution of clashes
and issues
How do
I…
• Link information into my model for a
complete BIM handover?
• Get an audit trail of decisions made?
How do
I…
• Distribute huge BIM files?
• Reduce cycle times on clash
resolution?
• Version control to avoid errors on
out-of-date models?
How do
I…
• Access models on my mobile
device?
39
40. Rest of your project
team
Coordination tools
Document
Control
RFIs &
change
orders
Bidding &
Tenders
Workflows &
approvals
Commissioning
Packages &
Deliverables
Field
Inspections
Handover
Document
Control
RFIs &
change
orders
Bidding &
Tenders
Workflows &
approvals
Commissioning Submittals Field
Inspections
Handover
Native model data
Open BIM, IFC, COBie
The Solution: Aconex “Connected BIM”…
Driving everyone project-wide to participate in BIM
Open
BIM
Handover
Design
team
BIM Collaboration
40
42. Finds issue
on site, checks
BIM model
Resolves issue
on site
Responds with instruction
Receives RFI,
clicks through
to BIM model
Reviews linked
information for
full context
Raises RFI
Informed and connected review cycle
▶ Project-wide access to the model
Contractor Designer /
Engineer
BIM Collaboration
42
47. BIM : RETURN ON INVESTMENT
▶ Dodge Data & Analytics
Five Top-Rated Positive
Impacts of BIM
Respondent
Type
% Rating High
or Very High
Improved Constructability
of Final Design
Contractors 74%
Increased Owner’s
Understanding of
Proposed Design Solutions
Owners 73%
Improved Quality /
Function of Final Design
Engineers 71%
Generated Better
Construction Documents
Owners 70%
Improved Ability to Plan
Construction Phasing and
Logistics
Owners 70%
48. 48
BIM BAM BOOM savings
Time
Benefit
Design Build Manage
1$ 20$ 60$
BIM
Building
Information
Model
BAM
Building
Assembly Model
BOOM!
Building
Operation & Optimisation
Model
Up to 30% saving Cost benefits over 50 years
48
50. ▶ is a mix of science and art that is
used particularly in the process
and infrastructure sectors as a
standalone discipline to control
what are often large and complex
projects with the aim of bringing
the project to a successful
conclusion from the aspect of time,
cost, and quality.
Project Controls
52. Decision making with incomplete information
• in BIM Right information, in the right form, from the right person, at the right time
52
Multiple Criteria Decision Making (MCDM)
55. 55
Integrating Decision Support System
(DSS) and Building Information Modeling
(BIM) to Optimize the Selection of
Sustainable Building Components
Farzad Jalaei, Ahmad Jrade, Mahtab Nassiri
75. lean services a systematic approach of elimination waste ,
so every step adds value for the customer
75
76. 76
“If you always THINK what
you’ve always THOUGHT,
then you’ll always DO what
you’ve always DONE, and
you’ll always GET what
you’ve always GOT. Greg
Howell, Co-founder LEAN
Construction Institute
77. 77
Cause of Construction Overruns
• Poor or incomplete design and documentation
• Client scope change during construction
• Mistakes during construction
• Delays in decision making or instructions
• Poor communication and information dissemination
• Poor planning and scheduling
• Weather
• Labour skills, availability or disputes
• Incorrect material types or quantity
Sources: Baloyi and Bekker - Causes of construction cost and time overruns 2010 Memon,
Rahman and Azis - Preliminary Study on Causative Factors Leading to Construction Cost
Overrun 2011 Alwi, Hampson and Sherif - Non Value-Adding Activities in Australian
Construction Projects 2002
86. What is Lean Construction?
Lean Construction is an innovative approach to management
that translates the successful principles of the Toyota
Production System (TPS) to construction.
•Creating value for clients
•Removing waste
•Smooth flow of operations
See www.leanconstruction.org
Lean Thinking
To produce the right product at the right time
in the right quantity for the customer and to
produce exactly what you need and nothing
more…
88. 88
Common Misconceptions about Lean What is not a Lean…
⬗ It’s a factory thing.
⬗ It won’t work here.
⬗ We tried that.
⬗ It’s all about one-piece flow
⬗ . 5-S is cleaning up your desk.
⬗ We’re different. Zero inventory.
⬗ Lean is only Kaizen or Kanban
⬗ Doesn’t work for new products
⬗ Customers and Suppliers are not “LEAN”. Why us?
⬗ Another initiative...
91. 91
Lean Construction is an adaption of Lean They lead us to identify it as a mass construction system4. principles and practices to the
design and Empire State Building execution of construction projects.
Lean Construction supplements traditional construction management approaches by focusing on:
1. Creating material and information flows
2. Maximising value generation
3. Using plan, execute and control paradigms
92. Lean Construction.
Shared Principles
• Optimisation of entire system through collaboration and systematic learning
• Continual improvement and pursuit of perfection involving everyone in the system
• Focus on delivering the value desired by the owner/client/end-user
• Creating flow though systematically eliminating obstacles to value creation and elimination
of processes that create no value (waste)
• Creating pull production
Key Differences
• Construction projects are unique (one-of-a-kind) prototypes
• Multiple suppliers act under different commercial arrangements
• Construction environments are typically outdoors and/or difficult to control
92
96. 96
14 Principles of The Toyota Way
Principle #1 – “Base your management decisions on a long-term philosophy, even at the
expense of short-term financial goals.”
Principle #2 – “Create a continuous process flow to bring problems to the surface.”
Principle #3 – “Use ‘pull’ systems to avoid overproduction.”
Principle #4 – workload “Level out the workload (work like the tortoise, not the hare).”
Principle #5 – “Build a culture of stopping to fix problems, to get quality right the first
time.”
Principle #6 – “Standardized tasks and processes are the foundation for continuous
improvement and employee empowerment.”
Principle #7 – “Use visual controls so no problems are hidden.”
97. 97
14 Principles of The Toyota Way
Principle #8 – “Use only reliable, thoroughly tested technology that serves your people and process.”
Principle #9 – “Grow leaders who thoroughly understand the work, live the philosophy, and teach it to
others.”
Principle #10 – “Develop exceptional people and teams who follow your company’s philosophy.”
Principle #11 – “Respect your extended network of partners and suppliers by challenging them and
helping them improve.”
Principle #12 – “Go and see for yourself to thoroughly understand the situation.”
Principle #13 – “Make decisions slowly by consensus, thoroughly considering all options; implement
decisions rapidly.”
Principle #14 – “Become a learning organization through relentless reflection and continuous
improvement.”
98. 98
Model integration workflow from office to site
Principle #2 – Create a continuous
process flow to bring problems to the
surface.”
99. : Information Flow Process Model of the
Design Phase on Traditional 2D CAD
Projects
99
109. 109
Lean Tools for Construction
● 5S
● Andon
● Bottleneck Analysis
● Continuous Flow
● Gemba (The Real Place)
● Heijunka (Level Scheduling)
● Hoshin Kanri (Policy Deployment)
● Jidoka (Autonomation)
● Just-In-Time (JIT)
● Kaizen (Continuous Improvement)
● Kanban (Pull System)
● KPIs (Key Performance Indicators)
● Muda (Waste)
● Overall Equipment Effectiveness (OEE)
● PDCA (Plan, Do, Check, Act)
● Poka-Yoke (Error Proofing)
● Root Cause Analysis
● Single-Minute Exchange of Dies (SMED)
● Six Big Losses
● SMART Goals
● Standardized Work
● Takt Time
● Total Productive Maintenance (TPM)
● Value Stream Mapping
● FIVE WHYS
110. 110
Project Goal:
Right information
with
Right detail level
At the
Right time
with
Right quantity
at
Right location
BIM solution:
BIM SESSIONS
Relevant info only
Mail, notes, design, tender doc, shop
drawings
What level at what time?
Right people involved, right amount of info
added to the BIM model
Right man at right place, models/docs
archived right place, Model parameters well
structured and added at right place
5R
130. 130
Rules for construction site:
1. Previous activity/task shall be completed before initiation of new activity/task
2. Control zone must be ready and accessible
3. Drawings and other information must be accessible
4. There must be people available to do the work
5. Materials must be on site
6. All equipment to complete activity must be on site
7. Formalities related to activity must be solved/cleared
8. We dont create defects, leave defects to others, or receive defects from others
BIM solution:
Model control by use of control zones
• Regular coordination meetings
• Quality checks of models
• Open and shared, live design work, providing
transparency to other collaborators
• Validated information in model
• Verification of buildability
• Remove unimportant information from models,
right info at right time
131. 4D MODELING OVERALL BENEFITS
Traditional Planning and
scheduling
4D Planning and scheduling
Which do
you prefer
???
131
132. 4D MODELING OVERALL BENEFITS
Traditional Baseline Vs Actual 4D Baseline Vs Actual
Which do
you prefer
???
132
133. 4D MODELING OVERALL BENEFITS
Traditional Lookahead 4D Lookahead
Which do
you prefer
???
133
134. 4D MODELING OVERALL BENEFITS
Traditional Progress meeting
discussion
4D Progress meeting discussion
Which do
you prefer
???
134
135. 4D MODELING OVERALL BENEFITS
Traditional Claim analysis 4D Claim analysis
Which do
you prefer
???
135
136. 4D MODELING OVERALL BENEFITS
Traditional Documentation 4D Documentation
Which do
you prefer
???
136
138. 138
References
⬗ The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer
⬗ Learning to See: Value Stream Mapping to Add Value and Eliminate MUDA
⬗ Lean Thinking: Banish Waste and Create Wealth in Your Corporation
⬗ http://www.buildingsguide.com/blog/introduction-lean-construction
⬗ https://www.academia.edu/8852339/Advantages_and_disadvantages_of_ traditional_and_lean_method
⬗ www.leanconstruction.or