Introduction
 A well-designed airport drainage system is a
prime requisite for operational safety and
efficiency as well as pavement durability
 Inadequate drainage facilities may result in
 costly damage due to flooding
 Constitute a source of serious hazards to air
traffic
 Erosion of slopes
 Saturated and weakened pavement foundations
Airport Drainage - Introduction
 Airport drainage system is similar to street and
highway drainage design.
 Airports are characterized by large areas of
relatively flat gradient.
 Airports require prompt removal of surface and
subsurface water.
 Hence, they need an integrated drainage
system.
 Removal of water should be done from
runways, taxiways, aprons, parking lots etc.
Airport drainage
 Runoff is removed from airports by means of
surface ditches, inlets and an underground
storm drainage system
 Airport drainage can be described into
following sections
1. Estimation of runoff
2. Design of basic system for collection and
disposal of runoff
3. Provision for adequate subsurface drainage
1. Estimation of Runoff
 No of formulas and analytical procedures exist
for finding runoff
 All methods are not precise and accurate
 Of the available methods Rational Method is
widely used one
 Co-efficient of runoff, rain fall intensity, duration
and frequency are the factors on which this
method depends on.
 Only a portion of the rainfall flows as runoff
 Some water evaporates
 Some intercepted by vegetation
 Some infiltrates into ground
 Airport drainage channels and structures must be
designed for the precipitation – losses
 Losses depends on slope, soil condition,
vegetation and land use.
 Some of these factors change with time
 Important to assess the effects of planned
development works on the runoff as they may
disturb the existing pattern of runoff.
 Runoff coefficient indicates the hydrologic
nature of the drainage area
 It is defined as the ratio of quantity of runoff to
the total precipitation that falls on the drainage
area
 The below table gives the recommended
values of runoff coefficient.
Values of runoff coefficient
 Rainfall intensity is the rate at which rain falls,
typically expressed in inches per hour.
 Because of the probabilistic nature of weather, it
is discussed in terms of its frequency and
duration
 Procedures for the construction of rainfall
intensity–duration curves have been published
by the FAA.
 Making use of such charts we can determine
the intensity of a 5 year rainfall of desired
duration
For example., calculation of rainfall
intensities from charts can be done
as follows
 To obtain values for short-duration rainfalls, the
following relationships between a
 30-min rainfall and 5-, 10-, 15-min amounts
may be used:
 Duration (min) Ratio
5 0.37
10 0.57
15 0.72
 In the previous example we took, the 30 mm rainfall
intensity that is 1.37 inch will be multiplied by the
ratios given to yield the rainfalls of smaller
durations as follows.
 0.51 in. in 5 min
 0.78 in. in 10 min
 0.99 in. in 15 min
 After that values will be converted into inches per
hour to get the intensity
 Now the above obtained values can be used for
drawing a 5 year storm intensity duration curve.
 Similarly for other periods like 2, 10, 20 we can
develop curves.
 A designer must choose correct curve for the
design
 This involves the weighing and judging various
factors related to physical and social damages
that might result from the flood of a given
frequency.
 Normally a return period of 5 years is used for
the design of drainage systems at airports
 Choosing a higher return period will return a
costly design which is not economical
Time of concentration
 In the design of airport drainage facilities, a rainfall
duration equal to the time of concentration is
chosen.
 It is the time taken by the water droplet from the
remotest area of the catchment to reach the inlet of
drainage.
 It consists of 2 components
 Time of surface flow or inlet time
 Time of flow within the structural drainage system
 Inlet time can be obtained using the formula
 D = KT2
 D – distance in mts
 T – inlet time in minutes
 Following is the formula recommended by FAA for
finding the time T
 where
 T = surface flow time (min)
 C = runoff coefficient
 S = slope (%)
 D = distance to most remote point (ft)
 Or else following figure can be used for finding the
approximate inlet time
 The time of flow within the structural system
can be determined by dividing the structure
length (in feet) by the velocity of flow (in feet
per minute).
 The rational method is recommended for the
calculation of runoff from airport surfaces, especially
for drainage areas of less than 200 acres
 The method is expressed by the equation
Q = CIA
 Q = runoff (cfs)
 C = runoff coefficient (typical values are given in Table
12.1)
 I = intensity of rainfall (in./hr for estimated time of
concentration)
 A = drainage area (acres); area may be determined
from field surveys, topographical maps, or aerial
photographs
COLLECTION AND DISPOSAL
OF RUNOFF
 The hydraulic design of a system for the
collection and disposal of surface runoff is
discussed in the framework of four subtopics:
 Layout of drainage system
 Design of underground pipe system
 Design of open channels
 Design of inlets, manholes, and other
apparatus
1. Layout of Drainage System
 A generalized topographical map showing existing
2-ft ground contours should be obtained or
prepared.
 All natural and man made objects influencing the
drainage should be represented
 Existing water courses, canals, irrigation ditches,
roads etc,
 In addition, a more detailed or grading and
drainage plan, which shows the runway–taxiway
system and other proposed airport features,
should be prepared.
 Each drainage subarea should be outlined on the
plan
 pipe sizes, lengths, and slopes should also be shown.
 The grading plan makes it possible to select
appropriate locations for drainage ditches, inlets,
and manholes.
 Storm drain inlets are placed as needed at low
points
 FAA recommends that inlets be located laterally at
least 75 ft from the edge of pavements and also at
air carrier airports and 25 ft from the edge at
general aviation airports.
 Placing drain inlets nearer to pavements
should be avoided as it might lead to ponding
and may cause flooding or saturation of sub-
grade
2. Design of Underground Pipe
System
 After the location of ditches, pipes, inlets, and manholes on the layout next
step is to determine the size and gradient of pipe
 The Manning equation is the most popular formula for determination of the
flow characteristics in pipes.
 Its use is recommended by the FAA in the design of underground airport
pipe systems
 where
 Q = discharge (cfs)
 A = cross-sectional area of flow (ft2)
 R = hydraulic radius (ft: area of section/wetted perimeter)
 S = slope of pipe invert (ft/ft)
 n = coefficient of roughness of pipe
 It is important that sufficient velocities be
maintained to prevent the deposition and
accumulation of suspended matter within the
pipes.
 a mean velocity of 2.5 ft/sec will normally
prevent the depositing of suspended matter in
the pipes
Ponding
 When the rate of runoff inflow at a drainage
inlet exceeds the capacity of the drainage
structure to remove it, temporary storage or
ponding occurs in the vicinity of the inlet.
 Excessive ponding is not desirable
 Operational hazards
 Damage of pavement subgrades
 Kills grass
 Hence probability of ponding and its
magnitude must be understood.
 Study involves the computation of runoff that flows
into ponding system, then the runoff removed by
the drainage facilities
 Vin = QCIAt
 Vout = qct
 qc = capacity of drainage system
 Capacity is independent of time hence varies linearly
 It is also possible determine the amount of ponding at
different times.
 Cumulative runoff graphs can be used to evaluate
ponding
3. Design of Open Channels
 Open channels, ditches play a major role in
airport drainage system
 Size, shape, and slope of these channels must
be carefully determined
 Avoid overflow, flooding, erosion
 Flow in long, open channels is assumed to be
uniform
 Energy losses due to friction are balanced by
slope
 Hence, mannings equation can be applied
here.
 To solve the Manning equation directly, the
depth and cross-sectional area of flow and the
slope, shape, and frictional characteristics of
the channel must be known.
 By solving the manning equation, we can
design the cross-section of channel according
to our requirement
 Nomographs and charts are used for
eliminating the use of mannings equation
 Generally, wide and shallow open channels are
preferred
 Channel slope should not be steeper than
2.5:1 (H:V)
 To prevent erosion flow velocities should be
restricted to standard values
 When flow velocity exceeds 6ft/s special
treatment and lining should be done to edges
and sides
Design of inlets, manholes and
headwalls
 Where high heads are permissible, the
capacity of an inlet grating can be determined
by the orifice formula
 For low heads, the discharge conforms to the
general weir equation
 With the equations given above, the number
and size of grates needed to accommodate a
given runoff and head can be readily
determined.
 The general weir formula should be applied for
aircraft servicing aprons and other areas
where significant ponding depths would be
unacceptable.
 The orifice formula normally applies to grates
in turfed areas
 A safety factor 1.25 for paved areas and 1.5 –
2.0 for turfed areas should be applied.
4.Subsurface Drainage
 Special drainage systems are required to control
and avoid the undesirable effects of sub-surface
moisture
 Subsurface drainage has three functions
 to drain wet soil masses
 to intercept and divert subsurface flows, and
 to lower and control the water table.
 Subsurface drains consist of small pipes (typically
6–8 in. in diameter) which are laid in trenches
approximately 1.5–2.0 wide and backfilled with a
pervious filter material.
 The pipes should be bedded in a minimum
thickness of filter material.
 Subsurface drainage systems are most likely
to be effective in sandy clays, clay silts, and
sandy silts.
 The finer grained materials (predominantly
silts and clays) are more difficult to drain
 whereas the coarser grainer materials (gravels
and sands) tend to be self-draining.
 Subsurface drainage systems must be inspected
and maintained. To allow for this manholes should
be placed at intervals of not more than 1000 ft and
at principal junction points in base and subgrade
drainage systems.
 Inspection and flushing holes (risers) are normally
placed between manholes and at dead ends.
 It is recommended that subsurface drains be laid
on a slope of at least 0.15 ft/100 ft.
 the drain pipes must be backfilled with a carefully
graded filter material.

More Related Content

What's hot

Airfield Imaginary Surfaces
Airfield Imaginary SurfacesAirfield Imaginary Surfaces
Airfield Imaginary SurfacesAhsan Zahid
 
Ch4 surface runoff
Ch4 surface runoffCh4 surface runoff
Ch4 surface runoff
Deenesh Sharma
 
Seal coat,prime coat and tack coat
Seal coat,prime coat and tack coatSeal coat,prime coat and tack coat
Seal coat,prime coat and tack coat
MuhammadArif856
 
airport drainage
airport drainageairport drainage
airport drainage
Nagarjuna Koppoju
 
Airfield design methods
Airfield design methodsAirfield design methods
Airfield design methods
Bhavya Jaiswal
 
Selection of Airport Site.pptx
Selection of Airport Site.pptxSelection of Airport Site.pptx
Selection of Airport Site.pptx
Priyanshu Pathak
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
Sunny Agarwal
 
Airport elements.
Airport elements.Airport elements.
Airport elements.
Tulsi Makwana
 
July 30-130-Ken Kagy2
July 30-130-Ken Kagy2July 30-130-Ken Kagy2
Airport engineering PART-1
Airport engineering PART-1 Airport engineering PART-1
Airport engineering PART-1
RAMPRASAD KUMAWAT
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
RAMPRASAD KUMAWAT
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristicsAbhishek Kumar
 
Airport marking
Airport markingAirport marking
Airport marking
srinivas2036
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
Ghanashyam Prajapati
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
Shanmugaraj M
 
Air port presentation 6th unit
Air port presentation 6th unitAir port presentation 6th unit
Air port presentation 6th unit
T.Naga Anusha
 
Sight distance
Sight distanceSight distance
Sight distance
Manish Kumar
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
Aglaia Connect
 
Wind Rose.pdf
Wind Rose.pdfWind Rose.pdf
Wind Rose.pdf
WhUllahWa
 

What's hot (20)

Airfield Imaginary Surfaces
Airfield Imaginary SurfacesAirfield Imaginary Surfaces
Airfield Imaginary Surfaces
 
Ch4 surface runoff
Ch4 surface runoffCh4 surface runoff
Ch4 surface runoff
 
Seal coat,prime coat and tack coat
Seal coat,prime coat and tack coatSeal coat,prime coat and tack coat
Seal coat,prime coat and tack coat
 
airport drainage
airport drainageairport drainage
airport drainage
 
Airfield design methods
Airfield design methodsAirfield design methods
Airfield design methods
 
Selection of Airport Site.pptx
Selection of Airport Site.pptxSelection of Airport Site.pptx
Selection of Airport Site.pptx
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Airport elements.
Airport elements.Airport elements.
Airport elements.
 
July 30-130-Ken Kagy2
July 30-130-Ken Kagy2July 30-130-Ken Kagy2
July 30-130-Ken Kagy2
 
Airport engineering PART-1
Airport engineering PART-1 Airport engineering PART-1
Airport engineering PART-1
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristics
 
Airport marking
Airport markingAirport marking
Airport marking
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Road drainage
Road drainageRoad drainage
Road drainage
 
Air port presentation 6th unit
Air port presentation 6th unitAir port presentation 6th unit
Air port presentation 6th unit
 
Sight distance
Sight distanceSight distance
Sight distance
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Wind Rose.pdf
Wind Rose.pdfWind Rose.pdf
Wind Rose.pdf
 

Similar to Airport drainage

RP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptxRP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptx
ABHISHEKPANDYA60
 
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxNEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
ASHISHGOUTAM6
 
WATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptxWATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptx
CtKamariahMdSaat
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiiihydrologyproject001
 
Deck drainage design
Deck drainage designDeck drainage design
Deck drainage design
Sarita Joshi
 
C-039.pdf
C-039.pdfC-039.pdf
C-039.pdf
hassanakhar
 
J030101053059
J030101053059J030101053059
J030101053059
theijes
 
WATERSHED CATCHMENT.pdf
WATERSHED CATCHMENT.pdfWATERSHED CATCHMENT.pdf
WATERSHED CATCHMENT.pdf
CtKamariahMdSaat
 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Sciencetheijes
 
Irrigation Engg.(CE5G) Irrigation method.ppt
Irrigation Engg.(CE5G) Irrigation    method.pptIrrigation Engg.(CE5G) Irrigation    method.ppt
Irrigation Engg.(CE5G) Irrigation method.ppt
MounikaRangaraj
 
Air flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake portAir flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake port
TunAnh309
 
DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...
DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...
DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...
IAEME Publication
 
Waste water estimation
Waste water estimationWaste water estimation
Waste water estimation
Mian Umair Afzal
 
Experimental Investigations and Computational Analysis on Subsonic Wind Tunnel
Experimental Investigations and Computational Analysis on Subsonic Wind TunnelExperimental Investigations and Computational Analysis on Subsonic Wind Tunnel
Experimental Investigations and Computational Analysis on Subsonic Wind Tunnel
ijtsrd
 
2 SPRINKLER IRRIGATION SYSTEMS.pdf
2 SPRINKLER IRRIGATION SYSTEMS.pdf2 SPRINKLER IRRIGATION SYSTEMS.pdf
2 SPRINKLER IRRIGATION SYSTEMS.pdf
MoisesJose12
 
Numerical analysis for two phase flow distribution headers in heat exchangers
Numerical analysis for two phase flow distribution headers in heat exchangersNumerical analysis for two phase flow distribution headers in heat exchangers
Numerical analysis for two phase flow distribution headers in heat exchangers
eSAT Journals
 
Pump station design manual
Pump station design manualPump station design manual
Pump station design manual
Francis Mitchell
 
5-Runoff computation (2).ppt
5-Runoff computation (2).ppt5-Runoff computation (2).ppt
5-Runoff computation (2).ppt
JohnAyele
 

Similar to Airport drainage (20)

Drainage design
Drainage designDrainage design
Drainage design
 
RP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptxRP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptx
 
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxNEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
 
WATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptxWATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptx
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii
 
Deck drainage design
Deck drainage designDeck drainage design
Deck drainage design
 
C-039.pdf
C-039.pdfC-039.pdf
C-039.pdf
 
Poster
PosterPoster
Poster
 
J030101053059
J030101053059J030101053059
J030101053059
 
WATERSHED CATCHMENT.pdf
WATERSHED CATCHMENT.pdfWATERSHED CATCHMENT.pdf
WATERSHED CATCHMENT.pdf
 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Science
 
Irrigation Engg.(CE5G) Irrigation method.ppt
Irrigation Engg.(CE5G) Irrigation    method.pptIrrigation Engg.(CE5G) Irrigation    method.ppt
Irrigation Engg.(CE5G) Irrigation method.ppt
 
Air flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake portAir flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake port
 
DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...
DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...
DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...
 
Waste water estimation
Waste water estimationWaste water estimation
Waste water estimation
 
Experimental Investigations and Computational Analysis on Subsonic Wind Tunnel
Experimental Investigations and Computational Analysis on Subsonic Wind TunnelExperimental Investigations and Computational Analysis on Subsonic Wind Tunnel
Experimental Investigations and Computational Analysis on Subsonic Wind Tunnel
 
2 SPRINKLER IRRIGATION SYSTEMS.pdf
2 SPRINKLER IRRIGATION SYSTEMS.pdf2 SPRINKLER IRRIGATION SYSTEMS.pdf
2 SPRINKLER IRRIGATION SYSTEMS.pdf
 
Numerical analysis for two phase flow distribution headers in heat exchangers
Numerical analysis for two phase flow distribution headers in heat exchangersNumerical analysis for two phase flow distribution headers in heat exchangers
Numerical analysis for two phase flow distribution headers in heat exchangers
 
Pump station design manual
Pump station design manualPump station design manual
Pump station design manual
 
5-Runoff computation (2).ppt
5-Runoff computation (2).ppt5-Runoff computation (2).ppt
5-Runoff computation (2).ppt
 

More from jagadish108

Unit 1 notes-final
Unit 1 notes-finalUnit 1 notes-final
Unit 1 notes-final
jagadish108
 
Fem unit 1(1)
Fem unit 1(1)Fem unit 1(1)
Fem unit 1(1)
jagadish108
 
Test 1 fem
Test 1 femTest 1 fem
Test 1 fem
jagadish108
 
Presentation1
Presentation1Presentation1
Presentation1
jagadish108
 
Types of prestressing
Types of prestressingTypes of prestressing
Types of prestressing
jagadish108
 
Types of prestressing
Types of prestressingTypes of prestressing
Types of prestressing
jagadish108
 
Environmentalengg
EnvironmentalenggEnvironmentalengg
Environmentalengg
jagadish108
 
Unit ii flood
Unit ii floodUnit ii flood
Unit ii flood
jagadish108
 
Unit ii drought
Unit ii droughtUnit ii drought
Unit ii drought
jagadish108
 
Unit ii landslide
Unit ii  landslideUnit ii  landslide
Unit ii landslide
jagadish108
 
Unit ii global-hazard-trends
Unit ii   global-hazard-trendsUnit ii   global-hazard-trends
Unit ii global-hazard-trends
jagadish108
 
Unit ii disaster types and earthquake
Unit ii   disaster types and earthquakeUnit ii   disaster types and earthquake
Unit ii disaster types and earthquake
jagadish108
 

More from jagadish108 (20)

Unit 1 notes-final
Unit 1 notes-finalUnit 1 notes-final
Unit 1 notes-final
 
Fem unit 1(1)
Fem unit 1(1)Fem unit 1(1)
Fem unit 1(1)
 
Test 1 fem
Test 1 femTest 1 fem
Test 1 fem
 
Presentation1
Presentation1Presentation1
Presentation1
 
Ppt
PptPpt
Ppt
 
Types of prestressing
Types of prestressingTypes of prestressing
Types of prestressing
 
Types of prestressing
Types of prestressingTypes of prestressing
Types of prestressing
 
Environmentalengg
EnvironmentalenggEnvironmentalengg
Environmentalengg
 
Ee 2
Ee 2Ee 2
Ee 2
 
Unit ii flood
Unit ii floodUnit ii flood
Unit ii flood
 
Unit ii drought
Unit ii droughtUnit ii drought
Unit ii drought
 
Unit ii landslide
Unit ii  landslideUnit ii  landslide
Unit ii landslide
 
Unit ii global-hazard-trends
Unit ii   global-hazard-trendsUnit ii   global-hazard-trends
Unit ii global-hazard-trends
 
Unit ii disaster types and earthquake
Unit ii   disaster types and earthquakeUnit ii   disaster types and earthquake
Unit ii disaster types and earthquake
 
Unit i
Unit iUnit i
Unit i
 
Exp 7
Exp 7Exp 7
Exp 7
 
Exp 5
Exp 5Exp 5
Exp 5
 
Exp 4
Exp  4Exp  4
Exp 4
 
Exp 2 (B)
Exp 2 (B)Exp 2 (B)
Exp 2 (B)
 
Exp 2 (A)
Exp 2 (A)Exp 2 (A)
Exp 2 (A)
 

Recently uploaded

Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 

Recently uploaded (20)

Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 

Airport drainage

  • 2. Introduction  A well-designed airport drainage system is a prime requisite for operational safety and efficiency as well as pavement durability  Inadequate drainage facilities may result in  costly damage due to flooding  Constitute a source of serious hazards to air traffic  Erosion of slopes  Saturated and weakened pavement foundations
  • 3. Airport Drainage - Introduction  Airport drainage system is similar to street and highway drainage design.  Airports are characterized by large areas of relatively flat gradient.  Airports require prompt removal of surface and subsurface water.  Hence, they need an integrated drainage system.  Removal of water should be done from runways, taxiways, aprons, parking lots etc.
  • 4. Airport drainage  Runoff is removed from airports by means of surface ditches, inlets and an underground storm drainage system  Airport drainage can be described into following sections 1. Estimation of runoff 2. Design of basic system for collection and disposal of runoff 3. Provision for adequate subsurface drainage
  • 5. 1. Estimation of Runoff  No of formulas and analytical procedures exist for finding runoff  All methods are not precise and accurate  Of the available methods Rational Method is widely used one  Co-efficient of runoff, rain fall intensity, duration and frequency are the factors on which this method depends on.
  • 6.  Only a portion of the rainfall flows as runoff  Some water evaporates  Some intercepted by vegetation  Some infiltrates into ground  Airport drainage channels and structures must be designed for the precipitation – losses  Losses depends on slope, soil condition, vegetation and land use.  Some of these factors change with time  Important to assess the effects of planned development works on the runoff as they may disturb the existing pattern of runoff.
  • 7.  Runoff coefficient indicates the hydrologic nature of the drainage area  It is defined as the ratio of quantity of runoff to the total precipitation that falls on the drainage area  The below table gives the recommended values of runoff coefficient.
  • 8. Values of runoff coefficient
  • 9.  Rainfall intensity is the rate at which rain falls, typically expressed in inches per hour.  Because of the probabilistic nature of weather, it is discussed in terms of its frequency and duration  Procedures for the construction of rainfall intensity–duration curves have been published by the FAA.  Making use of such charts we can determine the intensity of a 5 year rainfall of desired duration
  • 10. For example., calculation of rainfall intensities from charts can be done as follows
  • 11.  To obtain values for short-duration rainfalls, the following relationships between a  30-min rainfall and 5-, 10-, 15-min amounts may be used:  Duration (min) Ratio 5 0.37 10 0.57 15 0.72
  • 12.  In the previous example we took, the 30 mm rainfall intensity that is 1.37 inch will be multiplied by the ratios given to yield the rainfalls of smaller durations as follows.  0.51 in. in 5 min  0.78 in. in 10 min  0.99 in. in 15 min  After that values will be converted into inches per hour to get the intensity  Now the above obtained values can be used for drawing a 5 year storm intensity duration curve.  Similarly for other periods like 2, 10, 20 we can develop curves.
  • 13.
  • 14.  A designer must choose correct curve for the design  This involves the weighing and judging various factors related to physical and social damages that might result from the flood of a given frequency.  Normally a return period of 5 years is used for the design of drainage systems at airports  Choosing a higher return period will return a costly design which is not economical
  • 15. Time of concentration  In the design of airport drainage facilities, a rainfall duration equal to the time of concentration is chosen.  It is the time taken by the water droplet from the remotest area of the catchment to reach the inlet of drainage.  It consists of 2 components  Time of surface flow or inlet time  Time of flow within the structural drainage system  Inlet time can be obtained using the formula  D = KT2  D – distance in mts  T – inlet time in minutes
  • 16.  Following is the formula recommended by FAA for finding the time T  where  T = surface flow time (min)  C = runoff coefficient  S = slope (%)  D = distance to most remote point (ft)  Or else following figure can be used for finding the approximate inlet time
  • 17.  The time of flow within the structural system can be determined by dividing the structure length (in feet) by the velocity of flow (in feet per minute).
  • 18.
  • 19.  The rational method is recommended for the calculation of runoff from airport surfaces, especially for drainage areas of less than 200 acres  The method is expressed by the equation Q = CIA  Q = runoff (cfs)  C = runoff coefficient (typical values are given in Table 12.1)  I = intensity of rainfall (in./hr for estimated time of concentration)  A = drainage area (acres); area may be determined from field surveys, topographical maps, or aerial photographs
  • 20. COLLECTION AND DISPOSAL OF RUNOFF  The hydraulic design of a system for the collection and disposal of surface runoff is discussed in the framework of four subtopics:  Layout of drainage system  Design of underground pipe system  Design of open channels  Design of inlets, manholes, and other apparatus
  • 21. 1. Layout of Drainage System  A generalized topographical map showing existing 2-ft ground contours should be obtained or prepared.  All natural and man made objects influencing the drainage should be represented  Existing water courses, canals, irrigation ditches, roads etc,  In addition, a more detailed or grading and drainage plan, which shows the runway–taxiway system and other proposed airport features, should be prepared.
  • 22.  Each drainage subarea should be outlined on the plan  pipe sizes, lengths, and slopes should also be shown.  The grading plan makes it possible to select appropriate locations for drainage ditches, inlets, and manholes.  Storm drain inlets are placed as needed at low points  FAA recommends that inlets be located laterally at least 75 ft from the edge of pavements and also at air carrier airports and 25 ft from the edge at general aviation airports.
  • 23.  Placing drain inlets nearer to pavements should be avoided as it might lead to ponding and may cause flooding or saturation of sub- grade
  • 24.
  • 25. 2. Design of Underground Pipe System  After the location of ditches, pipes, inlets, and manholes on the layout next step is to determine the size and gradient of pipe  The Manning equation is the most popular formula for determination of the flow characteristics in pipes.  Its use is recommended by the FAA in the design of underground airport pipe systems  where  Q = discharge (cfs)  A = cross-sectional area of flow (ft2)  R = hydraulic radius (ft: area of section/wetted perimeter)  S = slope of pipe invert (ft/ft)  n = coefficient of roughness of pipe
  • 26.  It is important that sufficient velocities be maintained to prevent the deposition and accumulation of suspended matter within the pipes.  a mean velocity of 2.5 ft/sec will normally prevent the depositing of suspended matter in the pipes
  • 27. Ponding  When the rate of runoff inflow at a drainage inlet exceeds the capacity of the drainage structure to remove it, temporary storage or ponding occurs in the vicinity of the inlet.  Excessive ponding is not desirable  Operational hazards  Damage of pavement subgrades  Kills grass  Hence probability of ponding and its magnitude must be understood.
  • 28.  Study involves the computation of runoff that flows into ponding system, then the runoff removed by the drainage facilities  Vin = QCIAt  Vout = qct  qc = capacity of drainage system  Capacity is independent of time hence varies linearly  It is also possible determine the amount of ponding at different times.  Cumulative runoff graphs can be used to evaluate ponding
  • 29.
  • 30. 3. Design of Open Channels  Open channels, ditches play a major role in airport drainage system  Size, shape, and slope of these channels must be carefully determined  Avoid overflow, flooding, erosion  Flow in long, open channels is assumed to be uniform  Energy losses due to friction are balanced by slope  Hence, mannings equation can be applied here.
  • 31.  To solve the Manning equation directly, the depth and cross-sectional area of flow and the slope, shape, and frictional characteristics of the channel must be known.  By solving the manning equation, we can design the cross-section of channel according to our requirement  Nomographs and charts are used for eliminating the use of mannings equation  Generally, wide and shallow open channels are preferred
  • 32.  Channel slope should not be steeper than 2.5:1 (H:V)  To prevent erosion flow velocities should be restricted to standard values  When flow velocity exceeds 6ft/s special treatment and lining should be done to edges and sides
  • 33.
  • 34. Design of inlets, manholes and headwalls  Where high heads are permissible, the capacity of an inlet grating can be determined by the orifice formula  For low heads, the discharge conforms to the general weir equation
  • 35.  With the equations given above, the number and size of grates needed to accommodate a given runoff and head can be readily determined.  The general weir formula should be applied for aircraft servicing aprons and other areas where significant ponding depths would be unacceptable.  The orifice formula normally applies to grates in turfed areas  A safety factor 1.25 for paved areas and 1.5 – 2.0 for turfed areas should be applied.
  • 36. 4.Subsurface Drainage  Special drainage systems are required to control and avoid the undesirable effects of sub-surface moisture  Subsurface drainage has three functions  to drain wet soil masses  to intercept and divert subsurface flows, and  to lower and control the water table.  Subsurface drains consist of small pipes (typically 6–8 in. in diameter) which are laid in trenches approximately 1.5–2.0 wide and backfilled with a pervious filter material.
  • 37.  The pipes should be bedded in a minimum thickness of filter material.  Subsurface drainage systems are most likely to be effective in sandy clays, clay silts, and sandy silts.  The finer grained materials (predominantly silts and clays) are more difficult to drain  whereas the coarser grainer materials (gravels and sands) tend to be self-draining.
  • 38.  Subsurface drainage systems must be inspected and maintained. To allow for this manholes should be placed at intervals of not more than 1000 ft and at principal junction points in base and subgrade drainage systems.  Inspection and flushing holes (risers) are normally placed between manholes and at dead ends.  It is recommended that subsurface drains be laid on a slope of at least 0.15 ft/100 ft.  the drain pipes must be backfilled with a carefully graded filter material.